CN102145438A - 一种风电塔架门框组装方法 - Google Patents
一种风电塔架门框组装方法 Download PDFInfo
- Publication number
- CN102145438A CN102145438A CN2011100693266A CN201110069326A CN102145438A CN 102145438 A CN102145438 A CN 102145438A CN 2011100693266 A CN2011100693266 A CN 2011100693266A CN 201110069326 A CN201110069326 A CN 201110069326A CN 102145438 A CN102145438 A CN 102145438A
- Authority
- CN
- China
- Prior art keywords
- cylindrical shell
- pylon
- doorframe
- welding
- gripper shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000003466 welding Methods 0.000 claims abstract description 41
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000004080 punching Methods 0.000 abstract 2
- 239000010410 layer Substances 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 229910052799 carbon Inorganic materials 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000003889 chemical engineering Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Wind Motors (AREA)
Abstract
本发明提供了一种风电塔架门框组装方法,其步骤为:将底部筒体接至总长,随后筒体门框开口位置内部加支撑,再在门框位置开孔,将门框与筒体焊接,随后将支撑工装拆除,将筒体与下法兰焊接,最后焊后法兰尺寸复验。本发明提供的方法打破了常规技术的思维定式,反其道而行之,先开孔后焊接,焊后下塔筒法兰的平面度不会超过2mm。
Description
技术领域
本发明涉及一种风电塔架的门框组装方法。
背景技术
近年来随着绿色环保能源的发展及低碳经济的兴起,风力发电作为一种绿色环保能源将成为达到低碳标准的一大推动力。
风电塔架作为风力发电中的一个部套,是衡量一个制造企业生产制造能力的集中体现,其包含多段筒体、法兰、基础环、门框、内附件等部件。在塔架制造过程中,有一段筒体和其相邻筒体的组装焊接、每段筒体和法兰的组装焊接、基础环和法兰的组装焊接、门框和塔架底部筒体的组装焊接、内附件和筒体的组装焊接等等。
在塔架制造中,下塔筒法兰平面度的控制难度较大,由于位于塔架底部筒体上的门框距离下塔筒法兰较近,使得下塔筒法兰的平面度控制更加困难。根据化工工业出版社的《机械设计手册》中有关钢材料的焊接结构一般注意事项的规定,目前塔架底部筒体的制作工艺步骤为:先将塔架底部筒体与下塔筒法兰组焊后再组焊塔架底部筒体的门框。若采用此制作工艺,由于下塔筒法兰与门框的组焊间距只有600mm,筒体板厚为54mm,门框厚度为200mm,门框焊接量大,预热和层间温度较高,焊接后将引起门框处塔架底部筒体的局部变形,造成下塔筒法兰的平面度超差,其平面度在5mm以上,甚至会达到20mm,即使采用火焰校正的方法也很难掌握及控制效果。
发明内容
本发明的目的是提供一种将下塔筒法兰的平面度控制在2mm以内的风电塔架门框的组装方法。
为了达到上述目的,本发明的技术方案是提供了一种风电塔架门框组装方法,其步骤为:
步骤1、将多段筒体依次首尾相接装配成一基础塔架;
步骤2、将塔架底部筒体接至基础塔架的底部,其特征在于:
步骤3、在塔架底部筒***于待开孔位置的上方及下方分别至少放置一块支撑板,支撑板的外缘与塔架底部筒体的内壁相互贴合,从而使得支撑板对塔架底部筒体的四周形成支撑;
步骤4、在塔架底部筒体上开孔,将门框嵌入孔内,并将门框四周与塔架底部筒体焊接;
步骤5、拆除位于塔架底部筒体内的支撑板,将塔架底部筒体与下塔筒法兰焊接,焊后进行下塔筒法兰的尺寸复验。
本发明提供的方法打破了常规技术的思维定式,反其道而行之,先开孔后焊接,焊后下塔筒法兰的平面度不会超过2mm。
附图说明
图1为本发明中塔架底部筒体安装支撑板示意图;
图2为门框采用对称交叉退弧法焊接的分段及焊接顺序示意图;
图3为图2中每一段焊缝中每一层的焊接顺序示意图。
具体实施方式
以下结合附图来举出本发明的一个较佳实施方法。
结合图1,本发明提供了一种风电塔架门框组装方法,其步骤为:
步骤1、将多段筒体依次首尾相接装配成一基础塔架。
步骤2、将塔架底部筒体1接至基础塔架的底部。
步骤3、在塔架底部筒体1位于待开孔位置的上方及下方分别至少放置一块支撑板2,支撑板2的外缘与塔架底部筒体1的内壁相互贴合,从而使得支撑板2对塔架底部筒体1的四周形成支撑。支撑板2由于面积较大,因此在支撑板2中部往往会向下凹陷,为了使得支撑板2表面平整,在支撑板2的表面需要增加多根筋板6。
步骤4、在塔架底部筒体1上开孔,在开孔后塔架底部筒体1可能会出现变形,通过实际操作前的计算以及试验,在支撑板2的外缘会增加多根楔铁。当在进行步骤3时,由楔铁将塔架底部筒体1容易变形处抵住,这样在进行步骤4的开孔时,塔架底部筒体1便不易产生变形。将门框3嵌入孔内,并将门框3四周与塔架底部筒体1焊接。
在本步骤中,焊接采用对称交叉退弧法,以下结合图2及图3来详细介绍本工法。
如图2所示,塔架底部筒体1与门框3之间的焊缝被分为12段,每段长度在500mm左右,相对位置处的焊缝组成一对,即有6对焊缝,如有三名焊工时,则三条相对位置处的焊缝组成一对,即有4对,具体分组按照实际的焊工数量而定。
焊接时,按照如图2所示的顺序,由两名焊工交叉对称对第1组焊缝进行焊接,随后依次同时焊接第2至6组。
为了使得焊接更加牢固,通常需要焊接多层,焊接时需要内外交替焊接。如图3所示,在本实施例中共需要焊接38层,焊接顺序如图3所示,先焊接塔架底部筒体1与门框3之间的外侧三层焊缝,再焊接塔架底部筒体1与门框3之间的里侧三层焊缝,再转而焊接外侧三层,依次类推直至将38层全部焊接完毕,每层厚度控制在3-4mm。
结合图2及图3,焊接时,将每一层的如图2所示的椭圆形焊缝全部焊接完毕后,再进行下一层的焊接。比如对于图3中的第1层焊缝,需要两名焊接工人将如图2所示的12段全部焊接完毕后,再开始焊接图3中的第2层焊缝,其他几层如此类推。
当施工现场由于停电或其它原因而引起长时间焊接中断应采取防止裂纹产生的措施:用保温棉覆盖未完成的焊缝,使焊缝保温,直到恢复焊接。焊接完毕后,立即进行后热处理(采用内外两根热电偶进行控温)。
步骤5、拆除位于塔架底部筒体1内的支撑板2,将塔架底部筒体1与下塔筒法兰4焊接,此处采用自动焊机进行焊接,焊后进行下塔筒法兰4的尺寸复验。
Claims (4)
1.一种风电塔架门框组装方法,其步骤为:
步骤1、将多段筒体依次首尾相接装配成一基础塔架;
步骤2、将塔架底部筒体(1)接至基础塔架的底部,其特征在于:
步骤3、在塔架底部筒体(1)位于待开孔位置的上方及下方分别至少放置一块支撑板(2),支撑板(2)的外缘与塔架底部筒体(1)的内壁相互贴合,从而使得支撑板(2)对塔架底部筒体(1)的四周形成支撑;
步骤4、在塔架底部筒体(1)上开孔,将门框(3)嵌入孔内,并将门框(3)四周与塔架底部筒体(1)焊接;
步骤5、拆除位于塔架底部筒体(1)内的支撑板(2),将塔架底部筒体(1)与下塔筒法兰(4)焊接,焊后进行下塔筒法兰(4)的尺寸复验。
2.如权利要求1所述的一种风电塔架门框组装方法,其特征在于:在所述支撑板(2)的外缘上设有至少一块楔铁,楔铁抵住所述塔架底部筒体(1)的内壁将塔架底部筒体(1)校正为圆柱形。
3.如权利要求1所述的一种风电塔架门框组装方法,其特征在于:在所述支撑板(2)的表面设有至少一根筋板(6),通过筋板(6)校正所述支撑板(2)表面的平整度。
4.如权利要求1所述的一种风电塔架门框组装方法,其特征在于:步骤4中所述焊接采用对称交叉退弧法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110069326 CN102145438B (zh) | 2011-03-22 | 2011-03-22 | 一种风电塔架门框组装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110069326 CN102145438B (zh) | 2011-03-22 | 2011-03-22 | 一种风电塔架门框组装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102145438A true CN102145438A (zh) | 2011-08-10 |
CN102145438B CN102145438B (zh) | 2013-04-03 |
Family
ID=44420024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110069326 Expired - Fee Related CN102145438B (zh) | 2011-03-22 | 2011-03-22 | 一种风电塔架门框组装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102145438B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104405597A (zh) * | 2014-10-15 | 2015-03-11 | 新疆金风科技股份有限公司 | 风机塔架的门框、门框单元、门框的制造方法及风机塔架 |
CN105397246A (zh) * | 2015-12-24 | 2016-03-16 | 哈尔滨锅炉厂有限责任公司 | 薄壁不锈钢板拼方口管焊接端口处防变形方法 |
CN106002008A (zh) * | 2016-06-07 | 2016-10-12 | 中国水电四局(酒泉)新能源装备有限公司 | 一种超低温大功率风电塔筒门框焊接方法 |
CN107350745A (zh) * | 2017-07-26 | 2017-11-17 | 中航虹波风电设备有限公司 | 风力发电风塔门框的装焊方法 |
CN107511601A (zh) * | 2017-10-13 | 2017-12-26 | 江苏中车电机有限公司 | 一种减小塔架侧法兰和窗门焊接变形的焊接工艺 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3504840A1 (de) * | 1985-02-13 | 1986-08-14 | Stahlrohrbau GmbH, 8500 Nürnberg | Versteifungsvorrichtung fuer einen stahlrohrmast |
CN101057074A (zh) * | 2004-11-10 | 2007-10-17 | 维斯塔斯风力***有限公司 | 用于风轮机的塔架部分、孔口覆盖***、用于制造塔架部分的方法及其应用 |
-
2011
- 2011-03-22 CN CN 201110069326 patent/CN102145438B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3504840A1 (de) * | 1985-02-13 | 1986-08-14 | Stahlrohrbau GmbH, 8500 Nürnberg | Versteifungsvorrichtung fuer einen stahlrohrmast |
CN101057074A (zh) * | 2004-11-10 | 2007-10-17 | 维斯塔斯风力***有限公司 | 用于风轮机的塔架部分、孔口覆盖***、用于制造塔架部分的方法及其应用 |
Non-Patent Citations (1)
Title |
---|
车建设: "风力发电塔筒中Q345E钢的焊接", 《甘肃科技》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104405597A (zh) * | 2014-10-15 | 2015-03-11 | 新疆金风科技股份有限公司 | 风机塔架的门框、门框单元、门框的制造方法及风机塔架 |
CN105397246A (zh) * | 2015-12-24 | 2016-03-16 | 哈尔滨锅炉厂有限责任公司 | 薄壁不锈钢板拼方口管焊接端口处防变形方法 |
CN105397246B (zh) * | 2015-12-24 | 2018-06-05 | 哈尔滨锅炉厂有限责任公司 | 薄壁不锈钢板拼方口管焊接端口处防变形方法 |
CN106002008A (zh) * | 2016-06-07 | 2016-10-12 | 中国水电四局(酒泉)新能源装备有限公司 | 一种超低温大功率风电塔筒门框焊接方法 |
CN106002008B (zh) * | 2016-06-07 | 2017-11-07 | 中国水电四局(酒泉)新能源装备有限公司 | 一种超低温大功率风电塔筒门框焊接方法 |
CN107350745A (zh) * | 2017-07-26 | 2017-11-17 | 中航虹波风电设备有限公司 | 风力发电风塔门框的装焊方法 |
CN107511601A (zh) * | 2017-10-13 | 2017-12-26 | 江苏中车电机有限公司 | 一种减小塔架侧法兰和窗门焊接变形的焊接工艺 |
CN107511601B (zh) * | 2017-10-13 | 2020-03-13 | 江苏中车电机有限公司 | 一种减小塔架侧法兰和窗门焊接变形的焊接工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN102145438B (zh) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102145438B (zh) | 一种风电塔架门框组装方法 | |
CN105089150B (zh) | 一种鼓型节点单层网壳结构及组装方法 | |
KR100951646B1 (ko) | 이중강관구조의 콘크리트 충전 강재기둥의 제조방법 | |
CN105545609B (zh) | 风力发电机组的塔筒以及塔筒的构建方法 | |
JP2014516137A (ja) | 風力発電装置用タワー | |
CN105862589A (zh) | 一种带锚箱折线形双节点栓焊弦杆制作方法 | |
CN202829955U (zh) | 一种焦炭塔裙座包裹式搭接结构 | |
CN107503333A (zh) | 一种超大口径压力钢管安装方法 | |
CN102744580B (zh) | 一种多晶铸锭炉的炉体制造方法 | |
CN104088500B (zh) | 一种电厂钢烟囱防腐衬钛的铺设方法 | |
CN103046788B (zh) | 配煤仓钢漏斗及配煤仓钢漏斗安装方法 | |
CN102922096A (zh) | 大型铝塔现场组对焊接方法 | |
CN102336248B (zh) | 大型球鼻艏艏部模块 | |
CN108820735A (zh) | 一种热力隧道内轴向运输装置及其施工方法 | |
CN102560135A (zh) | 一种整体铜坩埚以及整体锻造加旋压生产铜坩埚的方法 | |
CN105508355B (zh) | 一种包容式节点 | |
CN104607815A (zh) | 一种制作并控制起重机主梁拱度的方法 | |
CN205298176U (zh) | 一种包容式节点 | |
CN103696499A (zh) | 钢结构梁柱连接用铸钢节点 | |
CN102501019B (zh) | 核电站钢衬里穹顶第一层制造方法 | |
CN104475928B (zh) | 锅炉钢架叠梁制作工艺 | |
CN102019512B (zh) | T形柱对接焊施工方法 | |
CN103447587B (zh) | 一种对动力电池包螺纹套筒进行定位焊接的工装及方法 | |
CN105715055B (zh) | 一种核电站大型贯穿件可调工装及调节方法 | |
CN103924811B (zh) | 一种大型圆柱形储料罐的制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 |