CN105465481A - 顶管工作井顶进结构的施工方法 - Google Patents

顶管工作井顶进结构的施工方法 Download PDF

Info

Publication number
CN105465481A
CN105465481A CN201610048908.9A CN201610048908A CN105465481A CN 105465481 A CN105465481 A CN 105465481A CN 201610048908 A CN201610048908 A CN 201610048908A CN 105465481 A CN105465481 A CN 105465481A
Authority
CN
China
Prior art keywords
jacking
track
construction
fixed
tube coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610048908.9A
Other languages
English (en)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610048908.9A priority Critical patent/CN105465481A/zh
Publication of CN105465481A publication Critical patent/CN105465481A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种顶管工作井顶进结构的施工方法,主要施工步骤包括:(1)垫层及后座墙施工;(2)轨道安装;(3)千斤顶安装;(4)洞口止水***安装;(5)管节及顶铁吊装;本发明涉及的施工方法具有拆装方便,施工效率高,能减少轨道与管节之间的摩擦,为管节提供辅助的导向定位等特点,具有较好的经济技术效益。

Description

顶管工作井顶进结构的施工方法
技术领域
本发明涉及一种顶管工作井顶进结构,尤其涉及一种顶管工作井顶进结构的施工方法。
技术背景
随着城市建设的发展,地下空间非开挖技术在越来越受到人们的重视,并得到了广泛的应用。如何在对城市环境破坏最小的前提下安装及更换城市的供水排水、煤气和通讯设施,对地下工程施工技术提出了新要求。
顶管技术是在不开挖地表的情况下,利用液压油缸从顶管工作井将顶管机和待铺设的管节在地下逐节顶进、直到顶管接收井的非开挖地下管道敷设施工工艺。目前,在顶管施工中,一方面顶管的轨道一般由2根工字钢组成,管道与轨道之间的摩擦大,而且顶管管节直接放在轨道上,没有辅助的限位装置。另一方面,管节进洞口与井壁接触处虽然做了防水处理,但是一般采用了单层塑胶板或塑胶法兰盘,防水效果差。
鉴于此,目前亟需发明一种安装方面,减少轨道与管节之间的摩擦,为管节提供辅助的导向定位调整装置,可适应不同规格顶管施工的顶管工作井顶进结构。
发明内容
本发明的目的在于提供一种施工方便,减少轨道与管节之间的摩擦,为管节提供辅助的导向定位调整装置,可适应不同规格顶管施工的顶管工作井顶进结构。
为实现上述目的,本发明采用了以下技术方案:
顶管工作井顶进结构的施工方法,其特征在于包括以下步骤:
1)垫层及后座墙施工:在工作井底部铺设一层碎石垫层,在碎石垫层上浇筑一层混凝土垫层,待混凝土强度达到要求后,进行后座墙和底座施工,在后座墙中预埋入预埋螺杆;
2)轨道安装:根据设计要求安装轨道,轨道在管节顶进的方向均匀设置导轮,导轮轴承固定在轨道上,导轮可沿管节顶进方向转动;
3)千斤顶安装:千斤顶后座通过预埋螺杆固定在后座墙上,千斤顶固定在千斤顶后座上,并在底座上设置测量***;
4)洞口止水***安装:窗帘橡胶板、圆环板、扇形板叠放在一起,通过螺栓和预埋套筒连接结构固定在井壁指定位置;
5)管节及顶铁吊装:将管节吊装到轨道上,然后将环箍通过螺杆对拉固定在一起,然后将横顶铁、顺顶铁、环顶铁吊装到轨道上。
洞口止水***由窗帘橡胶板、圆环板、扇形板、螺栓、预埋套筒组成;窗帘橡胶板、圆环板、扇形板叠放在一起,通过螺栓和预埋套筒连接结构固定在井壁指定。
环箍底部通过高强度螺栓固定在轨道上,环箍顶部通过螺杆对拉固定在一起。
本发明具有以下的特点和有益效果:
(1)顶管轨道上均匀设置导轮,减少了轨道与管节的摩擦,更有利于管节的顶进施工。
(2)顶管轨道上设置可分离式环箍,为顶管提供辅助的导向定位调整装置,本管节顶进完成后,拆除环箍顶部螺杆,环箍即可分离不影响下一管节的安装,保证了管节的稳定顶进。
(3)洞口设置了止水***,止水***由橡胶板、圆环板、扇形板组成,并通过螺杆和预埋套筒连接结构固定在井壁指定,施工方便,止水效果好。
附图说明
图1是本发明顶管工作井顶进结构示意图;
图2是洞口止水结构详图;
图3是轨道剖面详图;
图4是本发明施工工艺流程图;
图中:1.井壁;2.后座墙;3.千斤顶后座;4.千斤顶;5.测量***;6.横顶铁;7.顺顶铁;8.环顶铁;9.管节;10.洞口止水***;11.轨道;12.混凝土垫层;13.碎石垫层;14.底座;15.窗帘橡胶板;16.圆环板;17.扇形板;18.螺栓;19.预埋套筒;20.预埋注浆管;21.环箍;22.螺杆;23.导轮;24.高强度螺栓;25.导轮轴承;26.预埋螺杆。
具体实施方式
本实施方式钢结构焊接工艺、螺栓连接施工工艺、井壁模板设置工艺及混凝土浇筑施工工艺等本实施中就不在累述,重点阐述本发明涉及结构的实施方式。
图1是本发明顶管工作井顶进结构示意图。参照图1所示,顶管工作井顶进结构主要包括:千斤顶4、测量***5、横顶铁6、顺顶铁7、环顶铁8、管节9、洞口止水***10、轨道11、导轮23、环箍21。
顶管工作井顶进结构搭设前,首先在工作井底部铺设一层砂石垫层13,在砂石垫层上浇筑一层混凝土垫层,在井壁安放千斤顶位置预先设置后座墙2和底座14。
参照图1所示,千斤顶4水平放置在底座14上,千斤顶后座3固定在后座墙2上;轨道11上设置导轮23和环箍21;管节9放置在轨道11上,千斤顶4与管节9之间安放横顶铁6、顺顶铁7、环顶铁8;底座14上设置测量***5,洞口位置设置洞口止水***10。
参照图2所述,洞口止水***10由窗帘橡胶板15、圆环板16、扇形板17、螺栓18、预埋套筒19组成;窗帘橡胶板15、圆环板16、扇形板17叠放在一起,通过螺栓18和预埋套筒19连接结构固定在井壁指定位置。
参照图3所述,轨道11在管节顶进的方向均匀设置导轮23,导轮轴承25固定在轨道上,导轮23可沿管节顶进方向转动;环箍21底部通过高强度螺栓24固定在轨道11上,环箍21顶部通过螺杆22对拉固定在一起,本管节顶进完成后,拆除环箍21顶部螺杆22,环箍21即可分离。
本发明还提供了上述顶管工作井顶进结构的施工方法,主要包括以下步骤:
1)垫层及后座墙施工:在工作井底部铺设一层碎石垫层13,在碎石垫层13上浇筑一层混凝土垫层12,待混凝土强度达到要求后,进行后座墙2和底座14施工,在后座墙中预埋入预埋螺杆26;
2)轨道安装:根据设计要求安装轨道11,轨道11在管节顶进的方向均匀设置导轮23,导轮轴承25固定在轨道上,导轮23可沿管节顶进方向转动;
3)千斤顶安装:千斤顶后座3通过预埋螺杆26固定在后座墙2上,千斤顶4固定在千斤顶后座3上,并在底座上设置测量***5;
4)洞口止水***安装:窗帘橡胶板15、圆环板16、扇形板17叠放在一起,通过螺栓18和预埋套筒19连接结构固定在井壁指定位置;
5)管节及顶铁吊装:将管节9吊装到轨道11上,然后将环箍21通过螺杆22对拉固定在一起,然后将横顶铁6、顺顶铁7、环顶铁8吊装到轨道上。

Claims (2)

1.顶管工作井顶进结构的施工方法,其特征在于包括以下步骤:
1)垫层及后座墙施工:在工作井底部铺设一层碎石垫层(13),在碎石垫层(13)上浇筑一层混凝土垫层(12),待混凝土强度达到要求后,进行后座墙(2)和底座(14)施工,在后座墙中预埋入预埋螺杆(26);
2)轨道安装:根据设计要求安装轨道(11),轨道(11)在管节顶进的方向均匀设置导轮(23),导轮轴承(25)固定在轨道(11)上,导轮(23)可沿管节顶进方向转动;
3)千斤顶安装:千斤顶后座(3)通过预埋螺杆(26)固定在后座墙(2)上,千斤顶(4)固定在千斤顶后座(3)上,并在底座(14)上设置测量***(5);
4)洞口止水***安装:将窗帘橡胶板(15)、圆环板(16)、扇形板(17)叠放在一起,通过螺栓(18)和预埋套筒(19)连接结构固定在井壁(1)洞口指定位置;
5)管节及顶铁吊装:将管节(9)吊装到轨道(11)上,然后将环箍(21)通过螺杆(22)对拉固定在一起,然后将横顶铁(6)、顺顶铁(7)、环顶铁(8)吊装到轨道上。
2.根据权利要求1所述的顶管工作井顶进结构的施工方法,其特征在于步骤(5)所述的环箍(21)底部通过高强度螺栓(24)固定在轨道(11)上,环箍(21)顶部通过螺杆(22)对拉固定在一起。
CN201610048908.9A 2016-01-25 2016-01-25 顶管工作井顶进结构的施工方法 Pending CN105465481A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610048908.9A CN105465481A (zh) 2016-01-25 2016-01-25 顶管工作井顶进结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610048908.9A CN105465481A (zh) 2016-01-25 2016-01-25 顶管工作井顶进结构的施工方法

Publications (1)

Publication Number Publication Date
CN105465481A true CN105465481A (zh) 2016-04-06

Family

ID=55603491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610048908.9A Pending CN105465481A (zh) 2016-01-25 2016-01-25 顶管工作井顶进结构的施工方法

Country Status (1)

Country Link
CN (1) CN105465481A (zh)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489816A (zh) * 2017-07-25 2017-12-19 上海市政建设有限公司 采用顶管反拔***处理顶管顶进遇阻的施工方法
CN107504262A (zh) * 2017-08-07 2017-12-22 上海公路桥梁(集团)有限公司 一种软土地层中越江顶管管道退管施工方法
CN107606308A (zh) * 2017-10-17 2018-01-19 上海城建市政工程(集团)有限公司 一种适用于微型钢顶管高精度出洞姿态的辅助控制装置
CN108194703A (zh) * 2018-02-11 2018-06-22 北京建工土木工程有限公司 一种施工顶管的修正施工***及其修正方法
CN108266207A (zh) * 2017-12-26 2018-07-10 广州市市政集团有限公司 一种适用于深厚富水砂层地区的顶管进出洞止水方法及装置
CN108561137A (zh) * 2018-03-28 2018-09-21 中铁上海工程局集团有限公司 一种可回退的矩形顶管顶铁结构及使用方法
CN108612910A (zh) * 2018-07-23 2018-10-02 重庆建工市政交通工程有限责任公司 一种安装t型球墨铸铁管的施工方法
CN108916472A (zh) * 2018-08-10 2018-11-30 杭州江润科技有限公司 隔离置换预留槽预埋过路保护管及其施工方法
CN109630173A (zh) * 2018-11-16 2019-04-16 中铁二十局集团轨道交通工程有限公司 一种预应力锚索清理装置及方法
CN110360379A (zh) * 2019-07-16 2019-10-22 中国华西企业股份有限公司 一种能够防止管道偏斜的顶进设备
CN110541966A (zh) * 2019-08-27 2019-12-06 北京住总集团有限责任公司 一种狭小空间下管节顶进辅助设备及其使用方法
CN110656910A (zh) * 2019-10-23 2020-01-07 东方雨虹智能装备有限责任公司 注浆用接驳器
CN110761807A (zh) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 一种预制拼装式顶管的拼装***及拼装方法
CN111059352A (zh) * 2019-11-15 2020-04-24 中国化学工程第六建设有限公司 顶管施工设备及施工方法
CN111287309A (zh) * 2020-03-06 2020-06-16 佛山轨道交通设计研究院有限公司 一种地铁区间分离式废水泵房结构及其施工方法
CN111335919A (zh) * 2020-03-20 2020-06-26 重庆渝高科技产业(集团)股份有限公司 预制管节顶推方法
CN112695803A (zh) * 2020-12-29 2021-04-23 中交第三航务工程局有限公司 一种海滩上的顶管工作井和管沟的支护、止水施工方法
CN114484073A (zh) * 2022-02-17 2022-05-13 中铁五局集团第一工程有限责任公司 一种人工顶管施工方法
CN114526376A (zh) * 2022-01-12 2022-05-24 中建隧道建设有限公司 叠线顶管施工方法
CN115288113A (zh) * 2022-07-20 2022-11-04 中国一冶集团有限公司 一种用于顶管回顶退出加固结构及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6148690A (ja) * 1984-08-16 1986-03-10 三菱樹脂株式会社 既設管のライニング工法
FR2645614B1 (fr) * 1989-04-10 1991-11-08 Matiere Marcel Enceinte allongee sous pression et son procede de realisation
CN101982688A (zh) * 2010-09-30 2011-03-02 中铁四局集团有限公司 一种大口径长距离钢顶管施工***
CN102561405A (zh) * 2010-12-09 2012-07-11 上海市基础工程有限公司 管幕连续开洞洞口处理方法
CN102767643A (zh) * 2012-07-27 2012-11-07 河北二十冶工程技术有限公司 长输管道涵洞内分段铺设安装方法
CN104455725A (zh) * 2014-09-18 2015-03-25 叶长青 一种顶管施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6148690A (ja) * 1984-08-16 1986-03-10 三菱樹脂株式会社 既設管のライニング工法
FR2645614B1 (fr) * 1989-04-10 1991-11-08 Matiere Marcel Enceinte allongee sous pression et son procede de realisation
CN101982688A (zh) * 2010-09-30 2011-03-02 中铁四局集团有限公司 一种大口径长距离钢顶管施工***
CN102561405A (zh) * 2010-12-09 2012-07-11 上海市基础工程有限公司 管幕连续开洞洞口处理方法
CN102767643A (zh) * 2012-07-27 2012-11-07 河北二十冶工程技术有限公司 长输管道涵洞内分段铺设安装方法
CN104455725A (zh) * 2014-09-18 2015-03-25 叶长青 一种顶管施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐刚等: "《上海长江口青草沙水源地原水工程论文集》", 30 June 2011 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489816A (zh) * 2017-07-25 2017-12-19 上海市政建设有限公司 采用顶管反拔***处理顶管顶进遇阻的施工方法
CN107504262A (zh) * 2017-08-07 2017-12-22 上海公路桥梁(集团)有限公司 一种软土地层中越江顶管管道退管施工方法
CN107606308A (zh) * 2017-10-17 2018-01-19 上海城建市政工程(集团)有限公司 一种适用于微型钢顶管高精度出洞姿态的辅助控制装置
CN108266207A (zh) * 2017-12-26 2018-07-10 广州市市政集团有限公司 一种适用于深厚富水砂层地区的顶管进出洞止水方法及装置
CN108266207B (zh) * 2017-12-26 2020-05-08 广州市市政集团有限公司 一种适用于深厚富水砂层地区的顶管进出洞止水方法及装置
CN108194703B (zh) * 2018-02-11 2023-06-20 北京建工土木工程有限公司 一种施工顶管的修正施工***及其修正方法
CN108194703A (zh) * 2018-02-11 2018-06-22 北京建工土木工程有限公司 一种施工顶管的修正施工***及其修正方法
CN108561137A (zh) * 2018-03-28 2018-09-21 中铁上海工程局集团有限公司 一种可回退的矩形顶管顶铁结构及使用方法
CN108612910A (zh) * 2018-07-23 2018-10-02 重庆建工市政交通工程有限责任公司 一种安装t型球墨铸铁管的施工方法
CN108916472A (zh) * 2018-08-10 2018-11-30 杭州江润科技有限公司 隔离置换预留槽预埋过路保护管及其施工方法
CN109630173A (zh) * 2018-11-16 2019-04-16 中铁二十局集团轨道交通工程有限公司 一种预应力锚索清理装置及方法
CN110360379A (zh) * 2019-07-16 2019-10-22 中国华西企业股份有限公司 一种能够防止管道偏斜的顶进设备
CN110541966A (zh) * 2019-08-27 2019-12-06 北京住总集团有限责任公司 一种狭小空间下管节顶进辅助设备及其使用方法
CN110541966B (zh) * 2019-08-27 2024-03-26 北京住总集团有限责任公司 一种狭小空间下管节顶进辅助设备及其使用方法
CN110656910A (zh) * 2019-10-23 2020-01-07 东方雨虹智能装备有限责任公司 注浆用接驳器
CN111059352B (zh) * 2019-11-15 2021-10-15 中国化学工程第六建设有限公司 顶管施工设备及施工方法
CN111059352A (zh) * 2019-11-15 2020-04-24 中国化学工程第六建设有限公司 顶管施工设备及施工方法
CN110761807A (zh) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 一种预制拼装式顶管的拼装***及拼装方法
CN111287309A (zh) * 2020-03-06 2020-06-16 佛山轨道交通设计研究院有限公司 一种地铁区间分离式废水泵房结构及其施工方法
CN111335919A (zh) * 2020-03-20 2020-06-26 重庆渝高科技产业(集团)股份有限公司 预制管节顶推方法
CN112695803A (zh) * 2020-12-29 2021-04-23 中交第三航务工程局有限公司 一种海滩上的顶管工作井和管沟的支护、止水施工方法
CN114526376A (zh) * 2022-01-12 2022-05-24 中建隧道建设有限公司 叠线顶管施工方法
CN114526376B (zh) * 2022-01-12 2024-03-29 中建隧道建设有限公司 叠线顶管施工方法
CN114484073A (zh) * 2022-02-17 2022-05-13 中铁五局集团第一工程有限责任公司 一种人工顶管施工方法
CN114484073B (zh) * 2022-02-17 2022-09-06 中铁五局集团第一工程有限责任公司 一种人工顶管施工方法
CN115288113A (zh) * 2022-07-20 2022-11-04 中国一冶集团有限公司 一种用于顶管回顶退出加固结构及其施工方法

Similar Documents

Publication Publication Date Title
CN105465481A (zh) 顶管工作井顶进结构的施工方法
CN205479706U (zh) 顶管工作井顶进结构
CN103292035B (zh) 一种地下顶管的施工方法
CN103981898B (zh) 一种整体明挖节点逆作的地下工程施工方法
CN104343455B (zh) 长距离曲线顶管及管幕施工工艺
CN107460888B (zh) 一种混凝土预制管廊的安装结构及方法
CN101725357B (zh) 地铁隧道下穿段施工方法
CN104404983B (zh) 一种用于顶管施工的骑马井装置及其施工方法
CN103643971B (zh) 隧道仰拱定型端模快速施工方法
CN108194703B (zh) 一种施工顶管的修正施工***及其修正方法
CN103628509B (zh) 用于桩基承载力测试的内外管采用不同材质的双套管结构及施工方法
CN206036390U (zh) 一种管道升降调平装置
CN102518300B (zh) 预埋锥形承载接头式钢结构支座及其施工方法
CN104563271A (zh) 一种塑料检查井及其施工方法
CN104482343A (zh) 一种柔性连接管道及其用于隔震建筑的施工方法
CN102322292A (zh) 基于盾构隧道间的联络通道兼泵站结构及其施工方法
CN202927262U (zh) 油气管道隧道内管道安装支墩
CN208058113U (zh) 一种施工顶管的修正施工***
CN204533812U (zh) 一种泥水平衡式顶管施工***
KR100751573B1 (ko) 연약지반 기초보강용 상수도 관거 받침장치
CN114321494B (zh) 一种市政管线保护结构及其施工方法
CN212297912U (zh) 一种顶管接收井出洞口加固结构
CN212455952U (zh) 一种地下管道保护装置
CN104074370A (zh) 一种砖混结构建筑物整体过河平移方法及其专用托换装置
CN202228089U (zh) 基于盾构隧道间的联络通道兼泵站结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160406