CN101947801B - 单板层积材的成套生产设备 - Google Patents
单板层积材的成套生产设备 Download PDFInfo
- Publication number
- CN101947801B CN101947801B CN2010102716802A CN201010271680A CN101947801B CN 101947801 B CN101947801 B CN 101947801B CN 2010102716802 A CN2010102716802 A CN 2010102716802A CN 201010271680 A CN201010271680 A CN 201010271680A CN 101947801 B CN101947801 B CN 101947801B
- Authority
- CN
- China
- Prior art keywords
- veneer
- machine
- saw blade
- saw
- preformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture Of Wood Veneers (AREA)
Abstract
本发明公开了一种单板层积材的成套生产设备,包括砂带斜铣机、涂胶机、单板预压机、储料台和多层热压机,其特征在于,在涂胶机和单板预压机之间还顺序设置有可伸缩送料机和数控定位组坯机,而在单板预压机和储料台之间则顺序设置有移动式截断锯和输送锟,其中,砂带斜铣机、涂胶机、可伸缩送料机、数控定位组坯机、单板预压机、移动式截断锯、输送锟、储料台和多层热压机顺行连接,通过操作平台形成一生产线。本发明与传统的单板层积材的成套生产设备相比,节省了设备投入,因为采用了数控定位组坯机,使得单板定位非常精确,生产效率和产品质量显著提高,且组坯板可被无限接长,单板层积材生产范围扩大,同时,本发明的自动化程度也显著很高。
Description
技术领域
本发明涉及一种单板层积材的成套生产设备,属于木材加工设备技术领域。
背景技术
图1为传统的单板层积材的生产流程示意图。
如图1所示:传统的单板层积材的生产流程为:首先通过砂带斜铣机进行单板铣削,经铣削后的单板人工涂胶后,两张单板斜面对接后通过电加热热压机接长,然后再根据需求将接长后的单板剪切成一定的长度,如4米.3.5米.2.8米等;将剪切好的单板通过涂胶机施胶;再组坯,即先将底板放在组坯台上,将施胶后的单板一层一层的叠在一起,应注意相联接长单板的接缝不要重合,最后加上面板,将组坯好的单板层积材板坯送入单层预压机进行预压;将预压成型的单板层积材交由多层热压机加热加压;将整幅的单板层积材的四周齐边后将整幅的单板层积材锯切成所需规格的木方或其它用材,最后步骤是砂光和打包。
图3为传统的单板层积材的成套生产设备结构示意图。
如图3所示:在上述的单层板的生产过程中,传统的单板层积材的成套生产设备包括:砂带斜铣机1、热压机2、剪板机3、涂胶机4、组坯台5、单板预压机6、储料台7和多层热压机(图中未示出)组成,上述砂带斜铣机1、热压机2、剪板机3、涂胶机4、组坯台5、单板预压机6、储料台7和多层热压机顺序连接,通过操作平台8形成一生产线。此种单板层积材的成套生产设备在生产单板层积材时,应用的设备多、工艺繁杂、浪费原材料、生产效率低,且本成套设备生产的单板层积材的质量无法得到保证。
发明内容
为了克服现有技术的不足,本发明的目的在于提供一种生产效率高、能有效节约原材料和保证产品质量的单板层积材的成套生产设备。
本发明是通过以下技术方案来实现的:
一种单板层积材的成套生产设备,包括砂带斜铣机、涂胶机、单板预压机、储料台和多层热压机,其特征在于,在涂胶机和单板预压机之间还顺序设置有可伸缩送料机和数控定位组坯机,而在单板预压机和储料台之间则顺序设置有移动式截断锯和输送锟,其中,砂带斜铣机、涂胶机、可伸缩送料机、数控定位组坯机、单板预压机、移动式截断锯、输送锟、储料台和多层热压机顺行连接,通过操作平台形成一生产线。
上述的可伸缩送料机包括多个套接的伸缩板,且可伸缩送料机的一端与涂胶机的出料口连接,另一端则与数控定位组坯机的组坯平台连接。
上述的数控定位组坯机包括组坯平台、通过输送电机控制的输送带、通过气缸控制其上下往复运动的靠山、通过电机控制的行走小车和控制开关,其中,输送带设置在组坯平台上,靠山设置在组坯平台的上部,其与行走小车连接,行走小车的底端设置有滚轮,滚轮与设置在组坯平台前后两侧的平行导轨配合,上述的输送带、行走小车和靠山都通过控制***与控制开关连接。
而所述的单板预压机为间断式单板预压机,其预压的长度大于大于两块单板的长度。
进一步,上述的移动式截断锯包括机架、设置在机架底部并与地面上的轨道配合的滚轮、锯切机构、锯片行走机构、锯片行走电机、压紧块、限位挡块和定长拉杆,其中,锯切机构设置在机架内部的一侧,其通过锯片行走机构与设置在机架内部另一侧的锯片行走电机连接,压紧块设置在机架的上部,其与固定在机架外部两侧的压紧气缸连接,在机架的工作台面的前侧还连接有用于板材定长的定长拉杆,定长拉杆上还设置有限位挡块。
而上述的锯切机构包括锯片、锯切电机和锯片升降气缸,其中,锯片与锯切电机通过皮带或链条连接,而锯片升降气缸则设置在锯片的下部,并通过活塞与锯片连接。
本发明的有益效果是:本发明与传统的单板层积材的成套生产设备相比,去除了单板斜接与剪切装置,节省了设备投入,且由于其组坯过程采用了数控定位组坯机,使得单板组坯过程中的定位非常精确,且生产效率和产品质量显著提高,此外,由于数控定位组坯机与间断式单板预压机实现了联动,使得组坯板可被无限接长,可截取任意长度规格的单板层积材,因为截断采用的是移动式截断锯,还大大提高了生产的自动化程度,节约了劳力,提高了效率。
附图说明
图1为传统的单板层积材的生产流程示意图;
图2为新的单板层积材的生产流程示意图;
图3为传统的单板层积材的成套生产设备结构示意图;
图4为本发明一实施例的结构示意图;
图5为本发明所述的数控定位组坯机的结构示意图;
图6为本发明所述的移动式截断锯的主视图;
图7为本发明所述的移动式截断锯的侧视图。
其中,图中主要附图标记含义为:
1、砂带斜铣机 2、热压机 3、剪板机
4、涂胶机 5、组坯台 6、单板预压机
7、储料台 8、操作平台 9、可伸缩送料机
10、数控定位组坯机 11、移动式截断锯 12、输送锟
13、组坯平台 14、输送带 15、行走小车
16、靠山 17、滚轮
具体实施方式
下面将结合附图,详细说明本发明的具体实施方式:
图4为本发明一实施例的结构示意图。
如图4所示:单板层积材的成套生产设备,包括砂带斜铣机1、涂胶机4、可伸缩送料机9、数控定位组坯机10、单板预压机6、移动式截断锯11、输送锟12、储料台7和多层热压机(图中未示出),其中,砂带斜铣机1、涂胶机4、可伸缩送料机9、数控定位组坯机10、单板预压机6、移动式截断锯11、输送锟12、储料台7和多层热压机顺行连接,通过操作平台8形成一生产线,而上述的可伸缩送料机9包括多个套接的伸缩板,在本实施方式中,伸缩板为2个,且可伸缩送料机9的一端与涂胶机4的出料口连接,另一端则与数控定位组坯机10的组坯平台连接,此外,单板预压机6为间断式单板预压机,其预压的长度大于大于两块单板的长度。
图5为本发明所述的数控定位组坯机的结构示意图。
如图5所示:数控定位组坯机10包括组坯平台13、通过输送电机控制的输送带14、通过气缸控制其上下往复运动的靠山16、通过电机控制的行走小车15和控制开关,其中,输送带14设置在组坯平台13上,靠山16设置在组坯平台的上部,其与行走小车15连接,行走小车15的底端设置有滚轮17,滚轮17与设置在组坯平台13前后两侧的平行导轨配合,上述的输送带14、行走小车15和靠山16都通过控制***与控制开关连接。
图6为本发明所述的移动式截断锯的侧视图;图7为本发明所述的移动式截断锯的主视图。
如图6和图7所示:移动式截断锯包括机架112、设置在机架112底部并与地面上的轨道111配合的滚轮、锯切机构、锯片行走机构118、锯片行走电机119、压紧块114、限位挡块122和定长拉杆121,其中,锯切机构设置在机架112内部的一侧,其通过锯片行走机构118与设置在机架112内部另一侧的锯片行走电机119连接,锯切机构包括锯片116、锯切电机5和锯片升降气缸117,锯片116与锯切电机115通过皮带或链条连接,而锯片升降气缸117则设置在锯片116的下部,并通过活塞与锯片116连接,压紧块114设置在机架112的上部,其与固定在机架112外部两侧的压紧气缸113连接,压紧块114为木质材料,而机架112的工作台面的前侧还连接有用于板材定长的定长拉杆121,定长拉杆121上还设置有限位挡块122,通过调节限位挡块122在定长拉杆121上的位置,来调节限位挡块122与锯片116之间的距离,进而可满足不同规格长度的组坯板要求。
图2为新的单板层积材的生产流程示意图。
如图2所示:本发明的生产流程为:
首先将定尺寸的单板干燥处理并通过砂带斜铣机1在单板纵向两端铣成斜面,待用。(单板长度要有尺寸控制,一般取负公差)
然后通过涂胶机4对单板的表面涂胶,其中最上层的单板无需涂胶。
接着是组坯过程,行走小车15从右向左移动,始起位置在右侧的0位,此时把涂好胶的单板靠小车的靠山16放置第一张单板(胶面向上),按动控制开关,靠山16在气缸的作用下上升,然后在电机的作用下,行走小车15向前(即向左)移动一个给定的位移L,气缸动作,靠山16下压,此时放置第二张单板,按动控制开关重复以上的动作,完成第二张单板的铺装,以此类推实现单板组坯的无限接长,其中,行走小车15向前(即向左)移动一个给定的位移L可根据客户的需要自行调整。一般来讲,L的大小与单板层积材的总高度及层数有关系,以确保单板层积材所有层之间无论在什么位置的接缝距离相同,直到达到一定厚度所需的单板层数后,靠山16回到起始位置,同时组坯平台13上的单板前进一个单板的位置。
在组坯后的后道工序为冷压,当前面组坯平台13上的单板前进一个单板位置时,单板预压机6处于上始位置;而当处于组坯过程时,单板预压机6下压,由于单板预压机6的长度大于单板长度的两倍,因此在组坯过程中,所有组坯完的单板均能获得两次以上的冷压过程。
最后通过移动式截断锯11根据所需单板层积材的长度规格截锯成一定长度的大幅面积成板材,即首先,根据需要截断的组坯板的长度L,将调整定长拉杆121上的限位挡块122的距离,使得其与锯片116之间的距离为组坯板所需要的长度L,然后,当组坯板的前端移动到限位挡块122的位置时,如果此时的组坯板还是移动的(即一个单板的长度还没结束),则组坯板压紧限位挡块122,其带动移动式截断锯11整体向前运动,即在组坯板的推力作用下,其机架112上的滚轮在地面上的轨道111上向前行走,直至组坯板停止运动,然后,锯片升降气缸117气动,其推动锯片116到切割位置,同时锯切电机115也启动,开始随组坯板进行锯切,而此时,行走电机119也启动,其通过锯片行走机构118带动锯切机构整体向前运动,进而实现锯片116对整个组坯板的横向锯切,锯切完成后,移动式截断锯11后退到原来的位置。
上述经过锯切的组坯板进入输送锟12,通过输送锟12将冷压后的大幅面积成板材转入热压、载去两侧的边料、砂光处理、侧面砂光及打包等。
以上已以较佳实施例公开了本发明,然其并非用以限制本发明,凡采用等同替换或者等效变换方式所获得的技术方案,均落在本发明的保护范围之内。
Claims (6)
1.一种单板层积材的成套生产设备,包括砂带斜铣机、涂胶机、单板预压机、储料台和多层热压机,其特征在于,在涂胶机和单板预压机之间还顺序设置有可伸缩送料机和数控定位组坯机,而在单板预压机和储料台之间则顺序设置有移动式截断锯和输送锟,其中,砂带斜铣机、涂胶机、可伸缩送料机、数控定位组坯机、单板预压机、移动式截断锯、输送锟、储料台和多层热压机顺行连接,通过操作平台形成一生产线。
2.根据权利要求1所述的单板层积材的成套生产设备,其特征在于,所述的可伸缩送料机包括多个套接的伸缩板,且可伸缩送料机的一端与涂胶机的出料口连接,另一端则与数控定位组坯机的组坯平台连接。
3.根据权利要求1所述的单板层积材的成套生产设备,其特征在于,所述的数控定位组坯机包括组坯平台、通过输送电机控制的输送带、通过气缸控制其上下往复运动的靠山、通过电机控制的行走小车和控制开关,其中,输送带设置在组坯平台上,靠山设置在组坯平台的上部,其与行走小车连接,行走小车的底端设置有滚轮,滚轮与设置在组坯平台前后两侧的平行导轨配合,上述的输送带、行走小车和靠山都通过控制***与控制开关连接。
4.根据权利要求1所述的单板层积材的成套生产设备,其特征在于,所述的单板预压机为间断式单板预压机,其预压的长度大于两块单板的长度。
5.根据权利要求1所述的单板层积材的成套生产设备,其特征在于,所述的移动式截断锯包括机架、设置在机架底部并与地面上的轨道配合的滚轮、锯切机构、锯片行走机构、锯片行走电机、压紧块、限位挡块和定长拉杆,其中,锯切机构设置在机架内部的一侧,其通过锯片行走机构与设置在机架内部另一侧的锯片行走电机连接,压紧块设置在机架的上部,其与固定在机架外部两侧的压紧气缸连接,在机架的工作台面的前侧还连接有用于板材定长的定长拉杆,定长拉杆上还设置有限位挡块。
6.根据权利要求5所述的单板层积材的成套生产设备,其特征在于,所述的锯切机构包括锯片、锯切电机和锯片升降气缸,其中,锯片与锯切电机通过皮带或链条连接,而锯片升降气缸则设置在锯片的下部,并通过活塞与锯片连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102716802A CN101947801B (zh) | 2010-09-02 | 2010-09-02 | 单板层积材的成套生产设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102716802A CN101947801B (zh) | 2010-09-02 | 2010-09-02 | 单板层积材的成套生产设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101947801A CN101947801A (zh) | 2011-01-19 |
CN101947801B true CN101947801B (zh) | 2012-06-06 |
Family
ID=43451486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102716802A Expired - Fee Related CN101947801B (zh) | 2010-09-02 | 2010-09-02 | 单板层积材的成套生产设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101947801B (zh) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102490244A (zh) * | 2011-12-20 | 2012-06-13 | 浙江天仁风管有限公司 | 一种制备植物纤维板的传送压制装置 |
CA2919851C (en) * | 2013-08-27 | 2019-08-20 | Valinge Innovation Ab | A method for producing a lamella core |
CN103737679B (zh) * | 2014-01-16 | 2016-05-11 | 迪芬巴赫机械设备服务(北京)有限公司 | 一种胶合板制备***和方法 |
JP2015174280A (ja) * | 2014-03-14 | 2015-10-05 | ミサワホーム株式会社 | 積層材の製造方法および積層材 |
CN104108123B (zh) * | 2014-06-17 | 2016-11-09 | 湖州世友楼梯有限公司 | 一种层板压合装置 |
CN104191475B (zh) * | 2014-08-13 | 2016-05-04 | 史建平 | 一种上料方便的木板热压机用辊台 |
CN104551695B (zh) * | 2014-12-24 | 2017-10-24 | 湖南恒瑞管桩科技有限公司 | 一体化自动切皮卷皮机 |
CN104875271B (zh) * | 2015-05-20 | 2017-03-08 | 福建省永安林业(集团)股份有限公司 | 竹席材人造板组坯自动铺装装置 |
CN105946064B (zh) * | 2016-07-07 | 2019-03-19 | 福建和其昌竹业股份有限公司 | 一种全竹板或竹木复合板的全自动锯、铣、封边生产线 |
CN106827110B (zh) * | 2017-01-22 | 2019-03-01 | 浙江农林大学 | 大片竹束帘连续热压的重组竹原料单元组坯铺装机 |
CN106863488A (zh) * | 2017-02-23 | 2017-06-20 | 成都蒲江珂贤科技有限公司 | 一种固定切割装置 |
CN207139998U (zh) * | 2017-05-10 | 2018-03-27 | 廖述新 | 一种单板搭接机 |
CN107186834A (zh) * | 2017-07-12 | 2017-09-22 | 康利源科技(天津)股份有限公司 | 一种斜接电工层压木生产过程中的热压斜接工艺 |
CN107442351A (zh) * | 2017-09-21 | 2017-12-08 | 武汉昊宇明徽科技有限公司 | 一种单板层积材制造的端头涂胶设备 |
CN109264372B (zh) * | 2018-11-03 | 2021-03-23 | 群升门窗股份有限公司 | 一种防盗门板热压胶合设备 |
CN110281324B (zh) * | 2019-06-14 | 2024-03-26 | 永安市亚林竹类研究所有限公司 | 一种板材接长*** |
CN110355837B (zh) * | 2019-07-31 | 2024-05-24 | 南京林业大学 | 一种胶合板数控化组坯线总体结构 |
CN113085340B (zh) * | 2021-04-22 | 2022-06-03 | 临海市红鹏机械有限公司 | 一种车辆厢板生产线及生产工艺 |
CN113799221A (zh) * | 2021-08-31 | 2021-12-17 | 江苏福瑞康木业有限公司 | 一种连续胶合板生产*** |
CN115026916A (zh) * | 2022-06-30 | 2022-09-09 | 容县润达家具有限公司 | 一种胶合板的加工工艺及生产线 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1070670A (en) * | 1965-01-21 | 1967-06-01 | Potlatch Forests Inc | Improvements in or relating to the manufacture of plywood |
DE4224522C1 (de) * | 1992-07-24 | 1994-02-03 | Wild Maschinen Gmbh | Verfahren und Pressenanlage zur Herstellung plattenförmiger, beidseitig mit Furnier versehener Werkstücke |
DE19952270A1 (de) * | 1998-08-08 | 2001-05-03 | Dieffenbacher Gmbh Maschf | Verfahren und Anlage zur Herstellung von endlosen Furnierschichtplatten |
CN1745992A (zh) * | 2004-09-08 | 2006-03-15 | 株式会社名南制作所 | 胶合叠层木板的制造方法和设备 |
JP4342365B2 (ja) * | 2003-10-27 | 2009-10-14 | 株式会社名南製作所 | 積層材の製造装置及び板状体の接着方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10225908A (ja) * | 1997-02-14 | 1998-08-25 | Hashimoto Denki Co Ltd | 単板積層材の製造装置 |
-
2010
- 2010-09-02 CN CN2010102716802A patent/CN101947801B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1070670A (en) * | 1965-01-21 | 1967-06-01 | Potlatch Forests Inc | Improvements in or relating to the manufacture of plywood |
DE4224522C1 (de) * | 1992-07-24 | 1994-02-03 | Wild Maschinen Gmbh | Verfahren und Pressenanlage zur Herstellung plattenförmiger, beidseitig mit Furnier versehener Werkstücke |
DE19952270A1 (de) * | 1998-08-08 | 2001-05-03 | Dieffenbacher Gmbh Maschf | Verfahren und Anlage zur Herstellung von endlosen Furnierschichtplatten |
JP4342365B2 (ja) * | 2003-10-27 | 2009-10-14 | 株式会社名南製作所 | 積層材の製造装置及び板状体の接着方法 |
CN1745992A (zh) * | 2004-09-08 | 2006-03-15 | 株式会社名南制作所 | 胶合叠层木板的制造方法和设备 |
Also Published As
Publication number | Publication date |
---|---|
CN101947801A (zh) | 2011-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101947801B (zh) | 单板层积材的成套生产设备 | |
CN207709983U (zh) | 一种金属薄板剪板机 | |
CN201833452U (zh) | 一种多功能竹材弧形重组高频拼板机 | |
CN101439531B (zh) | 一种复合竹地板的制造方法 | |
CN106239702B (zh) | 一种连续成型陶瓷压砖机及其生产工艺 | |
CN101947799B (zh) | 单板层积材的生产方法 | |
CN109808013B (zh) | 高周波压密木材组合生产线 | |
CN201841566U (zh) | 移动式截断锯 | |
CN101983850B (zh) | 单板层积材连续铺装*** | |
CN103158322A (zh) | 一种铝复合板的自动化生产设备 | |
CN104070569A (zh) | 木制品拼接冷压机 | |
CN106695346B (zh) | 一种软包动力电池大型极耳生产线 | |
CN102744763B (zh) | 连续式压力机 | |
CN204354546U (zh) | 一种单板层压板 | |
CN203266840U (zh) | 木制品拼接冷压机 | |
CN201800095U (zh) | 生产单板层积材的数控定位组坯机 | |
CN101422915A (zh) | 四层实木复合地板的生产方法 | |
CN105034098A (zh) | 再生指接多层板的生产方法及产品 | |
CN108381692A (zh) | 非醛胶合板连续成型生产工艺 | |
CN202399369U (zh) | 双钢带连续平压机的加温预压装置 | |
CN204658602U (zh) | 一种连续型生物质重组方材四面热压装置 | |
CN201385344Y (zh) | 胶合板铺板铡板机 | |
CN206030115U (zh) | 板材输送烘干裁切机 | |
CN210616807U (zh) | 一种中板拼板机 | |
CN205394751U (zh) | 一种板材输送时可同步实现滚压、加热、干燥、定位、整平定型的一体化装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |