CN101847451A - 一种安全注入*** - Google Patents

一种安全注入*** Download PDF

Info

Publication number
CN101847451A
CN101847451A CN200910108230A CN200910108230A CN101847451A CN 101847451 A CN101847451 A CN 101847451A CN 200910108230 A CN200910108230 A CN 200910108230A CN 200910108230 A CN200910108230 A CN 200910108230A CN 101847451 A CN101847451 A CN 101847451A
Authority
CN
China
Prior art keywords
safety injection
pipeline
water tank
pressure
peace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910108230A
Other languages
English (en)
Other versions
CN101847451B (zh
Inventor
张恒明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN2009101082309A priority Critical patent/CN101847451B/zh
Publication of CN101847451A publication Critical patent/CN101847451A/zh
Application granted granted Critical
Publication of CN101847451B publication Critical patent/CN101847451B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

本发明涉及一种安全注入***,用于缓解事故、保护核电厂堆芯的安全,包括高压安注泵、低压安注泵和安注箱,还包括用于容纳安注水的换料水箱。其中,所述换料水箱位于核电厂的安全壳内;所述安注箱通过设置有控制阀门的管道连接在直接压力容器注射管线上;所述高压安注泵通过设置有控制阀门的管道连接在所述换料水箱和直接压力容器注射管线之间;所述低压安注泵通过设置有控制阀门的管道连接在所述换料水箱和直接压力容器注射管线之间。本发明的有益效果在于,减少了***交叉管道,实现连续运行,***运行操作简化,同时增强***严重事故缓解能力,提高了核电厂的安全性。

Description

一种安全注入***
技术领域
本发明涉及核电厂安全注入***结构的改进。
背景技术
安全注入***又叫做应急堆芯冷却***,其主要功能是:当核电设备一回路***破裂引起失水事故时,安全注入***向堆芯注水,保证淹没和冷却堆芯,防止堆芯熔化,保持堆芯的完整性;当发生主蒸汽管道破裂时,反应堆冷却剂由于受到过度冷却而收缩,稳压器水位下降,安全注入***向一回路注入高浓度含硼水,重新建立稳压器水位,迅速停堆并防止反应堆由于过冷而重返临界。
为实现上述功能,安全注入***必须能够根据事故时一回路***压力下降的情况,在不同的压力水平下注入。现有技术中安全注入***由三个子***组成:
高压安注子***:利用高压安注泵106(RCV001PO、RCV002PO、RCV003PO)将硼酸溶液注入到反应堆冷却剂***。电厂正常运行期间,上述三台泵中一台作为化容***上充泵正常运行,一台备用,一台处于维修状态。上充泵从容控箱吸水,提供正常上充流量以及主泵轴封水。事故工况下,切换到高压安注模式,两台泵运行,一台备用。高压安注泵从换料水箱101吸水,提供高压安注。
低压安注子***:事故后的直接注入阶段和长期冷却阶段,两台低压安注泵107(RIS001PO、RIS002PO)可将含硼水注入至反应堆冷却剂***以冷却堆芯。低压安注泵也作为高压安注泵的前置泵。
安注箱注射(中压安注)子***:是一个非能动***,包含三个独立的安注箱:(RIS001BA)108、(RIS002BA)109、(RIS003BA)110。事故期间,当反应堆冷却剂***的压力下降到低于安注箱压力(4.8MPa)时,安注箱内的含硼水自动注射到一回路中,如图2所示。
现有的安全注入***还包括硼酸再循环回路,主要由浓硼酸注入箱104(RIS004BA)、硼酸波动箱103(RIS021BA)、以及硼酸再循环泵105(RIS021PO、RIS022PO)组成。主要功能是提供高浓度含硼水(7000~9000ppm),并且在电厂正常运行期间循环浓硼酸溶液,防止硼结晶。
现有安全注入***组成较为复杂,如图1所示,其主要设备除了安注箱布置在反应堆厂房内(安全壳内),其他设备(包括高、低压安注泵,硼酸在循环泵,浓硼酸注入箱、硼酸波动箱以及换料水箱等)都位于燃料厂房(安全壳外)。图1中,阀门状态对应RIS***的备用状态,
Figure B2009101082309D00021
表示阀门在开启状态,
Figure B2009101082309D00022
表示阀门在关闭状态。现有安全注入***除了需要应急电源、复杂的冷却水和HVAC等支持***外,还采用了较多的交叉管道。浓硼酸注入箱及其循环管道的设置更是大大增加了***的复杂性。***的运行也颇为复杂,不仅仅要进行大量的阀门操作,还涉及了高压安注泵/上充泵运行模式的切换。如事故后,上充泵由上充模式切换至高压安注模式,泵的吸水口由化容***容控箱102切换至换料水箱;以及事故后不同阶段安注水源的切换,如高低压安注泵的吸入口由换料水箱切换至地坑。
由于现有安全注入***组成复杂,运行繁琐,导致***运行过程中发生人因错误的可能性大大增加。而大量的实践统计表明,核电站50%以上的安全重大事件和故障都是由人因错误引发的。
此外,现有安全注入***严重事故处理能力不足,将会成为制约其市场竞争力的重要因素。
为此,需要借鉴世界先进核电技术对其进行改进。
发明内容
本发明要解决的技术问题在于,针对现有技术的上述缺陷,提供一种结构简化、操作步骤少、能有效减少人因故障并能显著提高严重事故处理能力的核电厂安全注入***。
本发明解决其技术问题所采用的技术方案是:
构造了一种安全注入***,用于缓解事故、保护核电厂堆芯的安全,包括高压安注泵、低压安注泵和安注箱,还包括用于容纳安注水的换料水箱,其中,所述换料水箱位于核电厂的安全壳内;
所述安注箱通过设置有控制阀门的管道连接在直接压力容器注射管线上;
所述高压安注泵通过设置有控制阀门的管道连接在所述换料水箱和直接压力容器注射管线之间;
所述低压安注泵通过设置有控制阀门的管道连接在所述换料水箱和直接压力容器注射管线之间。
本发明所述的安全注入***,其中,所述高压安注泵包括相互独立的第一高压安注泵和第二高压安注泵,其中,
所述第一高压安注泵通过设置有控制阀门的管道连接在所述换料水箱和第一直接压力容器注射管线之间;
所述第二高压安注泵通过设置有控制阀门的管道连接在所述换料水箱和第二直接压力容器注射管线之间。
本发明所述的安全注入***,其中,所述安注箱包括第一安注箱和第二安注箱;所述第一安注箱通过设有控制阀门的管道连接到第一直接压力容器注射管线上;所述第二安注箱通过设有控制阀门的管道连接到第二直接压力容器注射管线上。
本发明所述的安全注入***还包括自动卸压子***。所述自动卸压子***包括两个系列,每个系列包括三级并联的卸压阀门;所述自动卸压子***连接所述换料水箱和稳压器,以将稳压器中的蒸汽释放到所述换料水箱,实现反应堆冷却剂***的快速可控卸压。。
本发明的有益效果在于,采用直接压力容器注射方式,减少***交叉管道,使***组成大为简化。换料水箱位于安全壳内,可以实现事故后安注***连续运行不切换,***运行操作简化,可靠性提高。另外,为现有安全注入***增设自动卸压***,可以合理降低高压安注泵的扬程,并且能够增强其严重事故缓解能力,提高了核电厂的安全性。
附图说明
下面将结合附图及实施例对本发明作进一步说明,附图中:
图1是现有技术中的高压和低压安全注入***结构示意图;
图2是现有技术中的中压安全注入***结构示意图
图3是本发明实施例的安全注入***结构示意图。
具体实施方式
下面结合图示,对本发明的优选实施例作详细介绍。
本发明实施例的核电厂的安全注入***结构示意图如图3所示,改进后的安全注入***与原***相比,仍旧是采用了高、中、低三个压力水平下的安全注射方式,但是***的组成却大为简化。改进后的安全注入***主要包括高压安注泵,低压安注泵206,安注箱,还包括用于容纳安注水的换料水箱207。其中,高压安注泵可通过设置有控制阀门的管道连接换料水箱207和直接压力容器注射管线,如图3所示。低压安注泵通过设置有控制阀门的管道连接换料水箱207和直接压力容器注射管线。安注箱通过设置有控制阀门的管道连接在直接压力容器注射管线上。其中,直接压力容器注射管线连接在核电厂压力容器上。改进后的安注***采用了压力容器直接注射方式取代原有的冷管段注射模式,将安注水打入堆芯。
本实施例中,具体可设置两个单独的高压安注泵,包括:第一高压安注泵204和第二高压安注泵205。第一高压安注泵204通过设置有控制阀门的管道连接在换料水箱207和第一直接压力容器注射管线202之间;第二高压安注泵205通过设置有控制阀门的管道连接在换料水箱207和第二直接压力容器注射管线203之间。其中,第一直接压力容器注射管线202和第二直接压力容器注射管线203均连接在压力容器上。上述设置方式可实现安全注入***与化容***的完全独立,事故后无需进行泵运行模式的切换,简化了***在事故后的操作。通过设置两个单独的高压安注泵,能够使得***具备两个完全独立的系列,满足单一故障准则的要求,降低高压安注失效的潜在风险。
本实施例中,采用压力容器直接注射方式取代原有的冷管段注射模式,事故工况下,可利用高、低压安注泵将换料水箱207中的含硼水通过直接压力容器注射管线打入堆芯。采用该方式可以减少母管段的采用,并可将原有***的三个安注箱变为两个,即包括第一安注箱209和第二安注箱210,如图3所示。其中,第一安注箱209通过设有控制阀门的管道连接到第一直接压力容器注射管线202。第二安注箱210通过设有控制阀门的管道连接到第二直接压力容器注射管线203。每个安注箱的堆芯淹没能力由原先的50%增大到100%。这样,安全注入***就可以在提高***可靠性的基础上简化了***的组成,同时降低了主管道的制造难度。
本实施例中,改变换料水箱207的布置方式,将其置于核电厂的安全壳内,并使高、低压安注泵的吸入水源始终为安全壳内的换料水箱207,使其作为事故后高、低压安注泵的唯一安注水源。因此,事故后无需进行安注水源的切换,可实现安全注入***的连续运行并减少事故后的操作步骤,避免了可能发生的人因错误,降低了***运行模式切换导致安全注入***失效的潜在风险,从而提供了***的可靠性,增强了核电厂的安全性。
本实施例中,取消浓硼酸注入箱及其再循环回路,并适当提高换料水箱207中的硼浓度,保证***在未能紧急停堆的预期瞬态(ATWS)事件中,提供足够的硼化能力,在保证电厂安全性的前提下,大大简化电厂正常运行期间安全注入***的操作。
为提高***严重事故处理能力,本实施例的安全注入***在稳压器208和安全壳内换料水箱207之间增设自动卸子***201,如图3所示。自动卸压子***201由两个系列组成,每个系列包括三级并联的卸压阀门,每个系列均连接在所述换料水箱207和稳压器208之间,用于提供安全级的排放通道,将稳压器208、压力容器上封头或者反应堆冷却剂***高点的不凝结气体或蒸汽。事故工况下通过该***将稳压器208内的蒸汽排放至安全壳内换料水箱207,可实现反应堆冷却剂***的快速、可控卸压。该***与高压安注泵共同作用,可以在丧失全部给水的超设计基准事故或严重事故中,快速实现一回路泄补,避免严重事故中一回路高压情况下安注失效,保证安注流量及时有效的注入堆芯,从而缓解事故进程,防止安全壳的早期失效。同时,采用上述技术还降低了对高压安注子***注射压力的要求,可合理降低高压安注泵的性能要求。
本实施例可以在核电厂一回路发生破口事故时,根据一回路***压力下降的情况,实现不同的压力水平下向堆芯注水。如一回路大破口事故工况下,一经接收到安注信号,***将执行以下操作:
1)高压安注子***:启动高压安注泵,打开高压安注泵吸入管道上的隔离阀以及高压安注泵与直接压力容器注射管线之间的主隔离阀,使换料水箱中的含硼水经过高压安注泵增压后通过直接压力容器注射管线进入压力容器;
2)中压安注子***:当一回路压力下降到低于安注箱压力时,安注箱内的含硼水就会在加压氮气的作用下自动注射到一回路中;
3)低压安注子***:启动低压安注泵,打开低压安注泵吸入管道上的隔离阀以及低压安注泵与直接压力容器注射管线之间的主隔离阀,使换料水箱中的含硼水经过低压安注泵增压后通过直接压力容器注射管线进入压力容器,实现低压注射;
4)事故后12小时,运行人员可以建立热管段和直接压力容器注射管线同时注射,防止硼酸在堆芯内结晶。
采用上述技术方案后,安全注入***取消与化容***的设备兼用,设置独立的高压安注泵,并采用直接压力容器注射方式,减少交叉管道,***组成大为简化。改进后的安全注入***实现了连续运行,而不用切换安注水源,***运行操作简化,可靠性提高。另外,由于增设自动卸压子***,能够增强安全注入***的严重事故缓解能力,并且可以合理降低高压安注泵的扬程。改进后的安全注入***满足URD要求。
应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。

Claims (4)

1.一种安全注入***,用于缓解事故、保护核电厂堆芯的安全,包括高压安注泵、低压安注泵(206)和安注箱,还包括用于容纳安注水的换料水箱(207),其特征在于,所述换料水箱(207)位于核电厂的安全壳内;
所述安注箱通过设置有控制阀门的管道连接在直接压力容器注射管线上;
所述高压安注泵通过设置有控制阀门的管道连接在所述换料水箱(207)和直接压力容器注射管线之间;
所述低压安注泵(206)通过设置有控制阀门的管道连接在所述换料水箱(207)和直接压力容器注射管线之间。
2.根据权利要求1所述的安全注入***,其特征在于,所述高压安注泵包括相互独立的第一高压安注泵(204)和第二高压安注泵(205),其中,
所述第一高压安注泵(204)通过设置有控制阀门的管道连接在所述换料水箱(207)和第一直接压力容器注射管线(202)之间;
所述第二高压安注泵(205)通过设置有控制阀门的管道连接在所述换料水箱(207)和第二直接压力容器注射管线(203)之间。
3.根据权利要求2所述的安全注入***,其特征在于,所述安注箱包括第一安注箱(209)和第二安注箱(210);所述第一安注箱(209)通过设有控制阀门的管道连接到第一直接压力容器注射管线(202)上;所述第二安注箱(210)通过设有控制阀门的管道连接到第二直接压力容器注射管线(203)上。
4.根据权利要求3所述的安全注入***,其特征在于,所述安全注入***还包括自动卸压子***(201);所述自动卸压子***(201)包括两个系列,每个系列包括三级并联的卸压阀门;所述自动卸压子***连接在所述换料水箱(207)和稳压器(208)之间,用于将稳压器(208)中的蒸汽释放到所述换料水箱(207)。
CN2009101082309A 2009-06-19 2009-06-19 一种安全注入*** Active CN101847451B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101082309A CN101847451B (zh) 2009-06-19 2009-06-19 一种安全注入***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101082309A CN101847451B (zh) 2009-06-19 2009-06-19 一种安全注入***

Publications (2)

Publication Number Publication Date
CN101847451A true CN101847451A (zh) 2010-09-29
CN101847451B CN101847451B (zh) 2012-10-31

Family

ID=42772033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101082309A Active CN101847451B (zh) 2009-06-19 2009-06-19 一种安全注入***

Country Status (1)

Country Link
CN (1) CN101847451B (zh)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102737739A (zh) * 2011-04-15 2012-10-17 韩国原子力研究院 应对全厂断电和冷却剂流失事故(loca)的非能动高压安全注入箱***
CN103187110A (zh) * 2012-01-03 2013-07-03 陈光焕 核能蒸汽自压加水棒
CN103426485A (zh) * 2012-05-25 2013-12-04 国家核电技术有限公司 一种防止反应堆堆内熔融物熔损压力容器的方法以及用于实施这种方法的***
CN103545001A (zh) * 2012-07-12 2014-01-29 韩国原子力硏究院 使用安全注入箱的非能动安全注入***
WO2014048292A1 (zh) * 2012-09-27 2014-04-03 中国核电工程有限公司 一种能动与非能动相结合的堆芯注水热量导出装置
CN103778975A (zh) * 2012-10-22 2014-05-07 中国核动力研究设计院 一种压力容器非能动堆芯补水***及方法
CN103811083A (zh) * 2012-11-14 2014-05-21 中国广东核电集团有限公司 核电站安全注入***及清理其注入管线的清理方法
CN103871505A (zh) * 2012-12-11 2014-06-18 中国核动力研究设计院 一种核电厂蒸汽排放***自动快速冷却方法
CN103971764A (zh) * 2013-02-01 2014-08-06 韩国原子力研究院 多段式安全注入装置和具有该多段式安全注入装置的无源安全注入***
CN104064230A (zh) * 2013-03-21 2014-09-24 中广核(北京)仿真技术有限公司 核反应堆双端安注***
CN104347132A (zh) * 2013-07-26 2015-02-11 中广核工程有限公司 核电厂停堆工况下保护主泵的方法
CN104536400A (zh) * 2014-12-13 2015-04-22 国核自仪***工程有限公司 核电站dcs仿真建模方法
CN105122375A (zh) * 2013-03-12 2015-12-02 BWXTm动力股份有限公司 换料水箱被动应急堆芯流动
CN105139902A (zh) * 2015-07-01 2015-12-09 中国核电工程有限公司 一种核电厂改进型中压安注***
CN105845187A (zh) * 2016-05-18 2016-08-10 中广核研究院有限公司 核电站严重事故缓解***
CN107945893A (zh) * 2017-10-09 2018-04-20 中广核研究院有限公司 一种核电厂应急堆芯冷却***
CN108091407A (zh) * 2017-11-10 2018-05-29 中广核研究院有限公司 高压安注***及其安全注入方法
CN109473185A (zh) * 2018-11-13 2019-03-15 中国核动力研究设计院 一种自动化学停堆***的测试装置及其测试方法
CN109727688A (zh) * 2018-12-29 2019-05-07 福建福清核电有限公司 核电厂重要厂用水泵和循泵应急轴封水供应***及方法
CN110428915A (zh) * 2019-08-05 2019-11-08 辽宁红沿河核电有限公司 一种核电机组安注***最小流量试验专用工具
CN111081399A (zh) * 2019-11-28 2020-04-28 中广核工程有限公司 核电厂应急堆芯冷却***
GB2523949B (en) * 2012-12-11 2020-07-01 Nuclear Power Inst China High-pressure safe injection system for nuclear power stations
US10720248B2 (en) 2013-03-15 2020-07-21 Bwxt Mpower, Inc. Passive techniques for long-term reactor cooling
CN112820424A (zh) * 2020-12-23 2021-05-18 中国核电工程有限公司 优化母管设计的安全注入***
CN114999693A (zh) * 2022-06-01 2022-09-02 中国核动力研究设计院 压缩气体稳压反应堆防不凝气体进入堆芯的卸压保护***

Cited By (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102737739A (zh) * 2011-04-15 2012-10-17 韩国原子力研究院 应对全厂断电和冷却剂流失事故(loca)的非能动高压安全注入箱***
CN102737739B (zh) * 2011-04-15 2015-12-09 韩国原子力研究院 应对全厂断电和冷却剂流失事故(loca)的非能动高压安全注入箱***
US9129713B2 (en) 2011-04-15 2015-09-08 Korea Atomic Energy Research Institute Passive high pressure safety injection tank system (HPSIT) for responding to station blackout (SBO) and loss-of-coolant accidents (LOCA)
CN103187110A (zh) * 2012-01-03 2013-07-03 陈光焕 核能蒸汽自压加水棒
CN103187110B (zh) * 2012-01-03 2015-11-25 陈光焕 核能蒸汽自压加水棒
CN103426485A (zh) * 2012-05-25 2013-12-04 国家核电技术有限公司 一种防止反应堆堆内熔融物熔损压力容器的方法以及用于实施这种方法的***
CN103426485B (zh) * 2012-05-25 2017-08-04 国家核电技术有限公司 一种防止反应堆堆内熔融物熔损压力容器的方法以及用于实施这种方法的***
CN103545001A (zh) * 2012-07-12 2014-01-29 韩国原子力硏究院 使用安全注入箱的非能动安全注入***
CN103545001B (zh) * 2012-07-12 2016-08-17 韩国原子力硏究院 使用安全注入箱的非能动安全注入***
WO2014048292A1 (zh) * 2012-09-27 2014-04-03 中国核电工程有限公司 一种能动与非能动相结合的堆芯注水热量导出装置
CN103778975A (zh) * 2012-10-22 2014-05-07 中国核动力研究设计院 一种压力容器非能动堆芯补水***及方法
CN103811083A (zh) * 2012-11-14 2014-05-21 中国广东核电集团有限公司 核电站安全注入***及清理其注入管线的清理方法
GB2523949B (en) * 2012-12-11 2020-07-01 Nuclear Power Inst China High-pressure safe injection system for nuclear power stations
CN103871505A (zh) * 2012-12-11 2014-06-18 中国核动力研究设计院 一种核电厂蒸汽排放***自动快速冷却方法
US9859027B2 (en) 2013-02-01 2018-01-02 Korea Atomic Energy Research Institute Multi stage safety injection device and passive safety injection system having the same
CN103971764A (zh) * 2013-02-01 2014-08-06 韩国原子力研究院 多段式安全注入装置和具有该多段式安全注入装置的无源安全注入***
CN105122375A (zh) * 2013-03-12 2015-12-02 BWXTm动力股份有限公司 换料水箱被动应急堆芯流动
US11373768B2 (en) 2013-03-12 2022-06-28 Bwxt Mpower, Inc. Refueling water storage tank (RWST) with tailored passive emergency core cooling (ECC) flow
US11355253B2 (en) 2013-03-15 2022-06-07 Bwxt Mpower, Inc. Passive techniques for long-term reactor cooling
US10720248B2 (en) 2013-03-15 2020-07-21 Bwxt Mpower, Inc. Passive techniques for long-term reactor cooling
CN104064230A (zh) * 2013-03-21 2014-09-24 中广核(北京)仿真技术有限公司 核反应堆双端安注***
CN104347132A (zh) * 2013-07-26 2015-02-11 中广核工程有限公司 核电厂停堆工况下保护主泵的方法
CN104536400A (zh) * 2014-12-13 2015-04-22 国核自仪***工程有限公司 核电站dcs仿真建模方法
CN105139902B (zh) * 2015-07-01 2018-10-12 中国核电工程有限公司 一种核电厂改进型中压安注***
CN105139902A (zh) * 2015-07-01 2015-12-09 中国核电工程有限公司 一种核电厂改进型中压安注***
CN105845187A (zh) * 2016-05-18 2016-08-10 中广核研究院有限公司 核电站严重事故缓解***
CN107945893B (zh) * 2017-10-09 2019-09-27 中广核研究院有限公司 一种核电厂应急堆芯冷却***
CN107945893A (zh) * 2017-10-09 2018-04-20 中广核研究院有限公司 一种核电厂应急堆芯冷却***
CN108091407B (zh) * 2017-11-10 2019-11-15 中广核研究院有限公司 高压安注***及其安全注入方法
CN108091407A (zh) * 2017-11-10 2018-05-29 中广核研究院有限公司 高压安注***及其安全注入方法
CN109473185A (zh) * 2018-11-13 2019-03-15 中国核动力研究设计院 一种自动化学停堆***的测试装置及其测试方法
CN109473185B (zh) * 2018-11-13 2022-07-29 中国核动力研究设计院 一种自动化学停堆***的测试装置及其测试方法
CN109727688A (zh) * 2018-12-29 2019-05-07 福建福清核电有限公司 核电厂重要厂用水泵和循泵应急轴封水供应***及方法
CN109727688B (zh) * 2018-12-29 2022-11-22 福建福清核电有限公司 核电厂重要厂用水泵和循泵应急轴封水供应***及方法
CN110428915A (zh) * 2019-08-05 2019-11-08 辽宁红沿河核电有限公司 一种核电机组安注***最小流量试验专用工具
CN111081399B (zh) * 2019-11-28 2022-03-15 中广核工程有限公司 核电厂应急堆芯冷却***
CN111081399A (zh) * 2019-11-28 2020-04-28 中广核工程有限公司 核电厂应急堆芯冷却***
WO2022135455A1 (zh) * 2020-12-23 2022-06-30 中国核电工程有限公司 优化母管设计的安全注入***
CN112820424A (zh) * 2020-12-23 2021-05-18 中国核电工程有限公司 优化母管设计的安全注入***
CN112820424B (zh) * 2020-12-23 2023-02-17 中国核电工程有限公司 优化母管设计的安全注入***
CN114999693A (zh) * 2022-06-01 2022-09-02 中国核动力研究设计院 压缩气体稳压反应堆防不凝气体进入堆芯的卸压保护***
CN114999693B (zh) * 2022-06-01 2024-05-28 中国核动力研究设计院 压缩气体稳压反应堆防不凝气体进入堆芯的卸压保护***

Also Published As

Publication number Publication date
CN101847451B (zh) 2012-10-31

Similar Documents

Publication Publication Date Title
CN101847451B (zh) 一种安全注入***
US9031183B2 (en) Emergency core cooling system
CN103578581B (zh) 通过分离的氮气箱加压的安全注入箱***
CN102903403B (zh) 一种能动与非能动相结合的堆芯注水热量导出装置
KR101242746B1 (ko) 원자력 발전소의 격납건물 외부 통합피동안전계통 시스템
CN202549319U (zh) 用于核反应堆的多样化专设安全***
CN111081399B (zh) 核电厂应急堆芯冷却***
CN102881340B (zh) 一种能动与非能动相结合的应急停堆***及方法
CN101720488B (zh) 在应急***的闭合回路中使用纳米颗粒的核电设备及相关方法
US11894151B2 (en) Integrated reactor system having passive removal of residual heat
CN109903863B (zh) 一种安全注入***及核电***
CN201788707U (zh) 一种用于保证核电站安全的安全***
CN102867548A (zh) 一种能动与非能动相结合的二次侧堆芯热量导出装置
CN102903402A (zh) 一种先进的二次侧堆芯热量导出装置
EP3907743B1 (en) Passive pulse cooling method and system for nuclear power plant
WO2014048290A1 (zh) 一种能动与非能动相结合的堆腔注水冷却***
CN202887744U (zh) 一种能动与非能动相结合的应急停堆***
CN110097982A (zh) 一种核电厂安全注入及余热排出***
CN103928062B (zh) 一种自充压堆芯补水***
CN103578582A (zh) 通过加压器的安全阀加压的混合型安全注入箱***
GB2539988A (en) Safety injection system
CN202887749U (zh) 一种能动与非能动相结合的二次侧堆芯热量导出装置
CN202887750U (zh) 一种先进的二次侧堆芯热量导出装置
CN210956182U (zh) 安全注入***及核电***
CN214476433U (zh) 一种承担正常余热排出功能的安全注入***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Patentee after: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

Address before: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee before: CHINA GUANGDONG NUCLEAR POWER GROUP Co.,Ltd.

Patentee before: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder