CN101591882A - 应力吸收带及其施工方法 - Google Patents

应力吸收带及其施工方法 Download PDF

Info

Publication number
CN101591882A
CN101591882A CNA2009100745437A CN200910074543A CN101591882A CN 101591882 A CN101591882 A CN 101591882A CN A2009100745437 A CNA2009100745437 A CN A2009100745437A CN 200910074543 A CN200910074543 A CN 200910074543A CN 101591882 A CN101591882 A CN 101591882A
Authority
CN
China
Prior art keywords
absorption band
stress absorption
new
old
geosynthetics
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100745437A
Other languages
English (en)
Other versions
CN101591882B (zh
Inventor
李来宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai road and Bridge Construction Group Co.,Ltd.
Original Assignee
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO filed Critical XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority to CN2009100745437A priority Critical patent/CN101591882B/zh
Publication of CN101591882A publication Critical patent/CN101591882A/zh
Application granted granted Critical
Publication of CN101591882B publication Critical patent/CN101591882B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

本发明公开了一种应力吸收带及其施工方法,在新、旧公路(2)、(1)的接缝部位即路基顶面至新铺油面以下设有应力吸收带(3),应力吸收带(3)设为倒梯形或倒三角形沟槽,沟槽内填筑有沥青碎石或改性沥青碎石。本发明还公开了这种应力吸收带的施工方法。该应力吸收带设置在新、旧路结合处,能够吸收和消减应力,防止新、旧路衔接部位因应力作用而产生的路面病害。

Description

应力吸收带及其施工方法
技术领域
本发明涉及一种旧路改扩建中新旧路的联结结构及其施工方法,尤其是新、旧路接缝部位的应力吸收带及其施工方法。
背景技术
随着交通建设的不断发展,大量的旧路进行改扩建,新旧路的结合、路面的铺装往往出现很多病害,其中最常见的病害是,新、旧路的接缝处产生纵缝、龟裂,其形成原因包括:(1)旧路已完成或已基本完成沉降,新旧路之间必然产生不同的沉降量,形成裂缝;(2)由于施工中路面污染、施工机械不易操作等因素,接缝处成为质量薄弱位置,易产生开裂;(3)行车作用、振动引起接缝处的开裂。如不及时整治,雨水和其它污染物可能沿缝隙渗入路基,导致路面早期损坏,造成路面承载力降低,引起裂缝加大和路面结构严重破坏,从而极大影响道路的通行能力和缩短路面使用寿命。这就亟待探索一种新、旧路衔接部位的联结结构,以解决旧路改扩建后的路面病害。
发明内容
本发明的目的就是为了解决以上问题,提供一种新、旧路接缝部位的应力吸收带及其施工方法,该应力吸收带设置在新、旧路结合处,能够吸收和消减应力,防止新、旧路衔接部位因应力作用而产生的路面病害。
本发明的应力吸收带的技术方案是,在新、旧公路接缝部位的下基层或基层上设有应力吸收带,应力吸收带设为倒梯形或倒三角形沟槽,沟槽内填筑有沥青碎石或改性沥青碎石。
本发明的应力吸收带进一步的改进在于:
倒梯形或倒三角形沟槽与新、旧路相接的斜面的倾斜角α为15°-45°。
沟槽内填筑的沥青碎石或改性沥青碎石为分层填筑,每层厚度小于10cm。
在应力吸收带的上方铺筑有与新路面面层相同的沥青混凝土。
在应力吸收带的上方从下到上依次设有土工合成材料和新的面层。
土工合成材料及新铺面层均设为两道。
本发明的应力吸收带的施工方法如下:
(1)将旧路面结构层及与旧路接茬部位的新铺路面结构层,沿路面边缘纵向刨切或铺筑成与纵切垂直面成15°-45°夹角α的斜面,深度直至新铺路的下基层或路基顶面标高,使新、旧路面联结处形成一个倒梯形或倒三角形沟槽;
(2)在清理干净的上述新、旧路形成的倒梯形或倒三角形沟槽内填筑沥青碎石或改性沥青碎石,填筑要求分层处理,每层厚度控制在10cm以内,每层均需振动夯实。
本发明的应力吸收带施工方法进一步的改进在于:
在应力吸收带沟槽上铺筑沥青混凝土,用压路机压实,直至达到设计要求的压实度。
当施工要求设计文件为旧路面上铺筑一层新路面时:
a)先将原旧路面接茬部位刨切一层,刨切厚度与新加宽路面的中面层厚度一致,刨切宽度不小于50cm;
b)在振压夯实完成后的应力吸收带与新、旧路面的接茬部位铺设土工合成材料,土工合成材料总宽度不小于50cm+倒梯形或倒三角形吸收带上口宽度+50cm,然后在其上再进行中面层的沥青面层铺筑;
c)按b步要求再铺放一层土工合成材料,然后在其上再进行上面层的沥青面层铺筑。
当施工要求设计文件为旧路面不加铺新路面时:
a)先将原旧路面沿接茬处刨切两层,并形成不小于50cm宽的台阶,刨切厚度与新铺沥青混凝土路面的上、中面层厚度一致;
b)在振压夯实完成后的应力吸收带与新、旧路面的接茬部位铺设土工合成材料,土工合成材料总宽度不小于50cm+倒梯形或倒三角形吸收带上口宽度+50cm,然后在其上再进行沥青面层铺筑,厚度与旧路面接茬处刨切的下层台阶高度相同;
c)按b步要求再铺放一层土工合成材料,然后在其上再进行沥青面层铺筑,厚度与旧路面接茬处刨切的上层台阶高度相同。
本发明的优点是:
本发明旧路加宽中新、旧路衔接部位的处置方案,是在接缝部位即路基顶部至新铺油面以下设置应力吸收带,它作为一个纵向弹性模量过渡带,采用沥青碎石或改性沥青碎石处理新、旧结构层纵向结合部,沥青碎石结构层抗压缩能力较强,吸收消散两种路面结构的自身及受荷变形应力,防止新、旧结构层因受力变形不同而产生破坏应力,从而防止路面纵向开裂。由于沥青碎石具有柔性的特点,可以与弹性模量较小的旧路结构层整体结合协调受力;同时利用倒梯形或倒三角形沟槽的斜面和沥青碎石具有抗压缩能力较强的作用,能够与弹性模量不同的水泥稳定碎(砾)石、二灰碎石、级配碎石、沥青混凝土、水泥稳定垫层等路面结构层结合形成嵌挤斜面,吸收各方应力。另外,在应力吸收带与新的面层之间设有土工合成材料,可使水平方向的应力通过土工合成材料扩展至更大范围,从而缓解接缝处的应力集中,起到吸收部分拉伸能量的作用,有效改善路面结构应力分布,同时,也减小了面层与基层间的结合力,从而使面层的最大拉应变也减小。本发明新旧路衔接部位的联结结构,能解决旧路改扩建后的路面病害,有效提高路面使用性能,延长路面使用寿命,降低后期公路养护成本。
附图说明
图1为本发明应力吸收带的结构示意图。
图2为本发明应力吸收带的另一种结构示意图。
具体实施方式
如图1所示,本发明是在新、旧公路接缝部位即路基顶部至新铺油面以下设置应力吸收带,应力吸收带设为倒梯形或倒三角形沟槽,沟槽内填筑有沥青碎石或改性沥青碎石。
实施例1
(1)将旧路面结构层1沿路面边缘(能够满足规范要求的强度)纵向刨切或铺筑成与纵切垂直面成15°-45°夹角α的斜面11,深度直至新铺路2的下基层或路基顶面标高4;同样,新铺路面结构层与旧路1接茬部位也铺筑或刨切成与垂直面成15°-45°夹角的斜面21,使新、旧路面11、21联结处形成一个倒梯形或倒三角形沟槽3;
(2)将上述新、旧路形成的倒梯形或倒三角形沟槽3(底宽3cm以上)清理干净,喷洒透层油,然后在沟槽3内填筑沥青碎石或改性沥青碎石,要求分层处理,每层厚度控制在10cm以内,最上面一层采用压路机碾压,其余各层均振动夯实,达到设计要求的压实度即形成本发明应力吸收带;
(3)沟槽3上铺筑与新路面面层相同的沥青混凝土5,用压路机压实,直至达到设计要求的压实度即可。
实施例2
步骤(1)、(2)同实施例1;
步骤(3):在步骤(1)、(2)碾压完成后的应力吸收带3与新、旧路面的接茬部位铺设土工合成材料6,土工合成材料6在应力吸收带沟槽3上口外侧延铺不小于50cm,即土工合成材料宽度应是倒梯形或倒三角形吸收带上口宽度再向两侧各延伸不小于50cm,然后铺筑与新路面面层相同的沥青混凝土5,用压路机压实,直至达到设计要求的压实度即可。
实施例3
如图1所示,本实施例为施工要求设计文件为旧路面上铺筑一层新路面时的施工方法:
步骤(1)、(2)同实施例1;
步骤(3):
a)将原旧路面接茬部位刨切一层12,刨切厚度应与新加宽路面中面层51厚度一致,刨切宽度不小于100cm;
b)在步骤(1)、(2)碾压完成后的应力吸收带3与新、旧路面的接茬部位铺设土工合成材料6,土工合成材料6可采用玻纤网,土工合成材料6在应力吸收带沟槽3上口外侧延铺不小于50cm,即土工合成材料宽度应是倒梯形或倒三角形吸收带上口宽度再向两侧各延伸不小于50cm,然后进行中面层51的沥青面层铺筑;
c)按b步要求,在新、旧路面的接茬处再铺设一层土工合成材料6,然后再进行上面层52的沥青混凝土铺筑即可。
实施例4
如图2所示,本实施例为施工要求设计文件为旧路面不加铺新路面时的施工方法:
步骤(1)、(2)同实施例1;
步骤(3):
a)先将原旧路面沿接茬处刨切两层12、13,并形成不小于50cm宽的台阶,刨切厚度分别与新铺沥青混凝土路面的中、上面层51、52厚度一致;
b)在步骤(1)、(2)振压夯实完成后的应力吸收带3与新、旧路面的接茬部位铺设土工合成材料6,土工合成材料6总宽度不小于50cm+倒梯形或倒三角形吸收带上口宽度+50cm,然后在其上再进行沥青中面层51铺筑,厚度与旧路面接茬处刨切的下层台阶高度相同;
c)按b步要求在新、旧路面的接茬处再铺放一层土工合成材料6,然后在其上再进行沥青上面层52铺筑,厚度与旧路面接茬处刨切的上层台阶高度相同。

Claims (10)

1、一种应力吸收带,其特征在于:在新、旧公路(2)、(1)的接缝部位的下基层或基层上设有应力吸收带(3),应力吸收带(3)设为倒梯形或倒三角形沟槽,沟槽内填筑有沥青碎石或改性沥青碎石。
2、根据权利要求1所述的应力吸收带,其特征在于:所述倒梯形或倒三角形沟槽与新、旧路相接的斜面(21)、(11)的倾斜角α为15°-45°。
3、根据权利要求1或2所述的应力吸收带,其特征在于:所述沟槽内填筑的沥青碎石或改性沥青碎石为分层填筑,每层厚度小于10cm。
4、根据权利要求1或2所述的应力吸收带,其特征在于:在应力吸收带(3)的上方铺筑有与新路面面层相同的沥青混凝土(5)。
5、根据权利要求1或2所述的应力吸收带,其特征在于:在应力吸收带(3)的上方从下到上依次设有土工合成材料(6)和新的面层(5)。
6、根据权利要求5所述的应力吸收带,其特征在于:所述土工合成材料及新铺面层均设为两道。
7、一种权利要求1所述的应力吸收带的施工方法,其特征在于:
(1)将旧路面结构层(1)及与旧路接茬部位的新铺路面结构层(2),沿路面边缘纵向刨切或铺筑成与纵切垂直面成15°-45°夹角α的斜面(11)、(21),深度直至新铺路的下基层或路基顶面标高(4),使新、旧路面联结处形成一个倒梯形或倒三角形沟槽(3);
(2)在清理干净的上述新、旧路形成的倒梯形或倒三角形沟槽(3)内填筑沥青碎石或改性沥青碎石,填筑要求分层处理,每层厚度控制在10cm以内,每层均需振动夯实。
8、根据权利要求7所述的应力吸收带的施工方法,其特征在于:在应力吸收带沟槽(3)上铺筑沥青混凝土(5),用压路机压实,直至达到设计要求的压实度。
9、根据权利要求7所述的应力吸收带的施工方法,其特征在于:
a)先将原旧路面接茬部位刨切一层(12),刨切厚度与新加宽路面的中面层(51)厚度一致,刨切宽度不小于50cm;
b)在振压夯实完成后的应力吸收带(3)与新、旧路面的接茬部位铺设土工合成材料(6),土工合成材料(6)总宽度不小于50cm+倒梯形或倒三角形吸收带上口宽度+50cm,然后在其上再进行中面层(51)的沥青面层铺筑;
c)按b步要求再铺放一层土工合成材料(6),然后在其上再进行上面层(52)的沥青面层铺筑。
10、根据权利要求7所述的应力吸收带的施工方法,其特征在于:
a)先将原旧路面沿接茬处刨切两层(12)、(13),并形成不小于50cm宽的台阶,刨切厚度与新铺沥青混凝土路面的上、中面层(52)、(51)厚度一致;
b)在振压夯实完成后的应力吸收带(3)与新、旧路面的接茬部位铺设土工合成材料(6),土工合成材料(6)总宽度不小于50cm+倒梯形或倒三角形吸收带上口宽度+50cm,然后在其上再进行沥青中面层(51)铺筑,厚度与旧路面接茬处刨切的下层台阶高度相同;
c)按b步要求再铺放一层土工合成材料(6),然后在其上再进行沥青上面层(52)铺筑,厚度与旧路面接茬处刨切的上层台阶高度相同。
CN2009100745437A 2009-06-29 2009-06-29 一种应力吸收带的施工方法 Active CN101591882B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100745437A CN101591882B (zh) 2009-06-29 2009-06-29 一种应力吸收带的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100745437A CN101591882B (zh) 2009-06-29 2009-06-29 一种应力吸收带的施工方法

Publications (2)

Publication Number Publication Date
CN101591882A true CN101591882A (zh) 2009-12-02
CN101591882B CN101591882B (zh) 2011-08-24

Family

ID=41406750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100745437A Active CN101591882B (zh) 2009-06-29 2009-06-29 一种应力吸收带的施工方法

Country Status (1)

Country Link
CN (1) CN101591882B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061658A (zh) * 2010-12-03 2011-05-18 上海市城市建设设计研究院 防止由路面结构拼缝产生反射裂缝的路面修复方法
CN102505606A (zh) * 2011-10-31 2012-06-20 湖南云中沥青有限责任公司 水泥路面加铺沥青层时裂缝的处理方法
CN103343504A (zh) * 2013-06-24 2013-10-09 中国十七冶集团有限公司 一种超薄型沥青砂接缝方法
CN103758009A (zh) * 2013-12-31 2014-04-30 山东省交通科学研究所 一种沥青路面裂缝快速修补方法
CN104562889A (zh) * 2014-12-31 2015-04-29 王新华 一种具有新型伸缩缝和预断缝的水泥混凝土路面
CN105888082A (zh) * 2016-04-29 2016-08-24 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN108589453A (zh) * 2018-04-04 2018-09-28 中交第三公路工程局有限公司 一种新旧路基拼接工艺及设备
CN110004808A (zh) * 2019-04-10 2019-07-12 安徽开源路桥有限责任公司 新老路搭接反射裂缝施工机械及路面施工方法
CN110258238A (zh) * 2019-05-09 2019-09-20 昆山市交通航务工程有限公司 一种新旧路基交界处的铺设方法
CN111305088A (zh) * 2020-03-16 2020-06-19 高增辉 公路桥梁伸缩缝加固方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061658A (zh) * 2010-12-03 2011-05-18 上海市城市建设设计研究院 防止由路面结构拼缝产生反射裂缝的路面修复方法
CN102505606A (zh) * 2011-10-31 2012-06-20 湖南云中沥青有限责任公司 水泥路面加铺沥青层时裂缝的处理方法
CN103343504A (zh) * 2013-06-24 2013-10-09 中国十七冶集团有限公司 一种超薄型沥青砂接缝方法
CN103758009A (zh) * 2013-12-31 2014-04-30 山东省交通科学研究所 一种沥青路面裂缝快速修补方法
CN103758009B (zh) * 2013-12-31 2016-08-17 山东省交通科学研究院 一种沥青路面裂缝快速修补方法
CN104562889A (zh) * 2014-12-31 2015-04-29 王新华 一种具有新型伸缩缝和预断缝的水泥混凝土路面
CN105888082A (zh) * 2016-04-29 2016-08-24 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN105888082B (zh) * 2016-04-29 2018-08-14 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN108589453A (zh) * 2018-04-04 2018-09-28 中交第三公路工程局有限公司 一种新旧路基拼接工艺及设备
CN108589453B (zh) * 2018-04-04 2020-07-07 中交第三公路工程局有限公司 一种新旧路基拼接工艺及设备
CN110004808A (zh) * 2019-04-10 2019-07-12 安徽开源路桥有限责任公司 新老路搭接反射裂缝施工机械及路面施工方法
CN110258238A (zh) * 2019-05-09 2019-09-20 昆山市交通航务工程有限公司 一种新旧路基交界处的铺设方法
CN111305088A (zh) * 2020-03-16 2020-06-19 高增辉 公路桥梁伸缩缝加固方法

Also Published As

Publication number Publication date
CN101591882B (zh) 2011-08-24

Similar Documents

Publication Publication Date Title
CN101591882B (zh) 一种应力吸收带的施工方法
CN109763397B (zh) 嵌合结构沥青路面及施工方法
CN107881858B (zh) 一种铁路基床表层结构及其铺设方法
CN202787067U (zh) 一种桥梁无缝式伸缩缝结构
CN110904740B (zh) 一种控制高速铁路路桥过渡段不均匀沉降的路基及方法
CN103614961B (zh) 一种防止桥台跳车的阶梯式钢筋混凝土板及施工方法
CN107805987A (zh) 深厚软基路段的厚垫层泡沫轻质土路基结构及施工方法
CN202787044U (zh) 一种沥青混凝土路面纵向裂缝处治结构
CN201296895Y (zh) 一种纵向裂缝破损路面修复结构
CN102051848B (zh) Hma/cc复合式路面结构及其建造方法
CN113062164A (zh) 一种双层复合式全预制装配式路面及施工方法
CN109680586A (zh) 一种路面沥青铺设方法
CN111455768A (zh) 一种柔性路基沥青混凝土结构及其施工方法
CN105002800A (zh) 一种处理不同车道路面路况差异较大的路面大修方法及结构
CN111005285A (zh) 一种白改黑路面结构及白改黑路面施工方法
CN209669625U (zh) 混凝土路面加铺沥青纵缝处理构造
CN110777598A (zh) 刚柔复合式路面胀缝错台搭接结构及其制备方法
CN201433346Y (zh) 应力吸收带
CN207452609U (zh) 一种深厚软基路段的厚垫层泡沫轻质土路基结构
CN202194048U (zh) 用于新旧道路衔接处的路面结构
CN113481771B (zh) 一种市政道路永临结合施工结构及其施工方法
CN206298822U (zh) 优化crcp与桥面板连接的无缝路面结构
CN113026473B (zh) 一种道路拓宽施工方法
CN204849511U (zh) 一种处理不同车道路面路况差异较大的路面大修结构
CN212103532U (zh) 适用于旧路面改造的连续配筋混凝土复合式路面结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XINGTAI BRIDGE AND ROAD CONSTRUCTION GENERAL CO.

Free format text: FORMER OWNER: XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO.

Effective date: 20140530

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140530

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai Bridge and Road Construction General Co.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: Xingtai Road and Bridge Construction General Co.

ASS Succession or assignment of patent right

Owner name: XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO.

Free format text: FORMER OWNER: XINGTAI BRIDGE AND ROAD CONSTRUCTION GENERAL CO.

Effective date: 20140903

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140903

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai Road and Bridge Construction General Co.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: Xingtai Bridge and Road Construction General Co.

CP01 Change in the name or title of a patent holder

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai road and Bridge Construction Group Co.,Ltd.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: XINGTAI ROAD & BRIDGE CONSTRUCTION GENERAL Co.,Ltd.

CP01 Change in the name or title of a patent holder