CN101581540B - 加热炉炉墙浇注料工字钢支模法 - Google Patents

加热炉炉墙浇注料工字钢支模法 Download PDF

Info

Publication number
CN101581540B
CN101581540B CN2009100627498A CN200910062749A CN101581540B CN 101581540 B CN101581540 B CN 101581540B CN 2009100627498 A CN2009100627498 A CN 2009100627498A CN 200910062749 A CN200910062749 A CN 200910062749A CN 101581540 B CN101581540 B CN 101581540B
Authority
CN
China
Prior art keywords
steel
heating furnace
furnace wall
pouring material
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100627498A
Other languages
English (en)
Other versions
CN101581540A (zh
Inventor
鲍黎明
王青春
谢三江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2009100627498A priority Critical patent/CN101581540B/zh
Publication of CN101581540A publication Critical patent/CN101581540A/zh
Application granted granted Critical
Publication of CN101581540B publication Critical patent/CN101581540B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tunnel Furnaces (AREA)

Abstract

本发明涉及加热炉炉墙浇注料施工时用的工字钢支模法,在加热炉炉墙浇注料施工过程中,采用的支模设施是以工字钢(1)加钢模板为主,以建筑钢管(2)为辅,其中:工字钢有多根,它们布置在加热炉烧嘴(6)的内侧,并且,它们的下部焊接在加热炉炉底的钢板上,它们的上部通过第一角钢(8)焊接在加热炉上部钢结构圈梁上,它们的外侧部焊接有第二角钢(9)及挂耳(5);多根均匀分布的加热炉支撑梁(7),其下部安装固定在加热炉炉底钢结构圈梁上,其顶部和第二角钢(9)共同支撑建筑钢管(2);在三角架(3)上铺跳板形成施工操作平台,该三角架挂在挂耳(5)上。本发明具有模板支设简单、浇注料不易涨膜、拆模后外观平整美观等优点。

Description

加热炉炉墙浇注料工字钢支模法
技术领域
本发明涉及一种加热炉炉墙浇注料工字钢支模方法。
背景技术
在以往炉墙浇注料施工过程中,一般采用普通脚手架支模,脚手架横向支撑于两侧墙之间或横向支撑于支撑梁上,浇注料施工时人的操作空间较小,施工过程中容易产生胀模现象,拆模后浇注料表面平整度不够理想,经常超出规范要求。模板拆除时炉膛内比较混乱,容易发生安全事故,且炉墙施工时其他工序工作(如支撑梁包扎、炉底砌筑等)无法同时开展。
发明内容
本发明所要解决的技术问题是:提供一种加热炉炉墙浇注料工字钢支模的方法,以避免浇注料施工时胀模,提高拆模后浇注料表面平整度及观感,使其他工序作业可同步穿插进行施工。
本发明解决其技术问题采用以下的技术方案:在加热炉炉墙浇注料施工过程中,采用的支模设施是以工字钢加钢模板为主,以建筑钢管为辅。其中:工字钢有多根,它们布置在加热炉烧嘴的内侧,并且,它们的下部焊接在加热炉炉底的钢板上,它们的上部通过第一角钢焊接在加热炉上部钢结构圈梁上,它们的外侧部焊接有第二角钢及挂耳;多根均匀分布的加热炉支撑梁,其下部安装固定在加热炉炉底钢结构圈梁上,其顶部和第二角钢共同支撑建筑钢管;在三角架上铺跳板形成施工操作平台,该三角架挂在挂耳上。
本发明与现有技术相比具有以下的主要优点:
其一.模板支设简单,可避免浇注料施工时胀模;
其二.提高拆模后浇注料表面平整度及观感;
其三.使其他工序作业可同步穿插进行施工,形成流水作业,提高工效。
附图说明
图1是本发明的示意图,是浇注料施工时的炉墙断面图。
图中:1.工字钢;2.建筑钢管;3.三角架;4.吊装孔;5.挂耳;6.加热炉烧嘴;7.加热炉支撑梁;8.第一角钢;9.第二角钢。
具体实施方式
下面结合实施例及附图对本发明作进一步说明。
本发明在炉墙浇注料施工过程中,采用的支模设施是以工字钢1+钢模板为主,以建筑钢管为辅。具体如图1所示:包括工字钢1、建筑钢管2、三角架3、吊装孔4、挂耳5、第一角钢8和第二角钢9。其中:工字钢1采用16号工字钢,有多根,它们布置在加热炉烧嘴6的内侧,并且,它们的下部焊接在炉底钢板上,它们的上部则通过第一角钢8焊接在上部钢结构圈梁上;各工字钢1以间距为600mm、900mm交替布置。每根工字钢1设有吊装孔4。用铁丝将模板与每个工字钢1之间加以固定。多根均匀分布的加热炉支撑梁7,其下部安装固定在炉底钢结构上,其顶部和第二角钢9共同支撑建筑钢管2。在工字钢1与加热炉支撑梁7之间设有三角架3。模板依然采用50×300×1500mm的钢模板。
在工字钢1的外侧部焊接有第二角钢9及挂耳5,它们都是为搭设操作平台所用。当砌筑(或浇注)高度达到1.2m高时,可将三角架3挂在挂耳5上,在三角架上铺跳板既可形成第一层操作平台;当砌筑(或浇注)高度达到与加热炉支撑梁7的垫块相平的高度时,采用建筑钢管2与焊接在工字钢上的角钢连接,然后将第一层操作平台上的跳板拆除后铺在建筑钢管2上形成第二层操作平台;当砌筑(或浇注)高度达到比加热炉支撑梁7的垫块高度高1.2m时,将第一层三角架3拆除挂到上部挂耳5处,并铺跳板形成第三层操作平台,此操作平台即可满足砌筑(或浇注)到墙顶。
在实际的工程中,挂耳5的高度和数量可根据炉墙和加热炉支撑梁7的高度灵活调整,以满足作业人员施工方便为原则。
本发明提供的加热炉炉墙浇注料工字钢支模法,具体是采用包括以下步骤的方法:
第一步,将工字钢1间距为600mm、900mm交替布置,底部焊接在炉底钢板上,上部通过第一角钢8与上部钢结构圈梁焊接牢固。
第二步,当砌筑(或浇注)高度达到1.2m高时,可将三角架3挂在挂耳5上,在三角架上铺跳板既可形成第一层操作平台。
第三步,当砌筑(或浇注)高度达到与加热炉支撑梁7的垫块相平的高度时,采用建筑钢管2与焊接在工字钢上的角钢连接,然后将第一层操作平台上的跳板拆除后铺在建筑钢管2上形成第二层操作平台。
第四步,当砌筑(或浇注)高度达到比加热炉支撑梁7的垫块高度高1.2m时,将第一层三角架3拆除挂到上部挂耳5处,并铺跳板形成第三层操作平台,此操作平台即可满足砌筑(或浇注)到墙顶。实际施工中一般炉墙高度不会达到比加热炉支撑梁7的垫块高度高1.2米的高度,故第三层操作平台一般不需搭设即可满足施工条件。

Claims (4)

1.一种加热炉炉墙浇注料工字钢支模法,其特征是在加热炉炉墙浇注料施工过程中,采用的支模设施是以工字钢(1)加钢模板为主,以建筑钢管(2)为辅,其中:工字钢(1)有多根,它们布置在加热炉烧嘴(6)的内侧,并且,它们的下部焊接在加热炉炉底的钢板上,它们的上部通过第一角钢(8)焊接在加热炉上部钢结构圈梁上,它们的外侧部焊接有第二角钢(9)及挂耳(5);多根均匀分布的加热炉支撑梁(7),其下部安装固定在加热炉炉底钢结构圈梁上,其顶部和第二角钢(9)共同支撑建筑钢管(2);在三角架(3)上铺跳板形成施工操作平台,该三角架挂在挂耳(5)上。
2.根据权利要求1所述的加热炉炉墙浇注料工字钢支模法,其特征是在加热炉炉墙浇注料施工过程中,采用包括以下步骤的方法:
第一步,将工字钢(1)间距为600mm、900mm交替布置,其底部焊接在加热炉炉底钢板上,其顶部通过第一角钢(8)与加热炉上部钢结构圈梁焊接牢固;钢模板与每根工字钢之间用铁丝加以固定;
第二步,当加热炉炉墙砌筑或浇注高度达到1.2m高时,将三角架(3)挂在工字钢(1)的挂耳(5)上,然后在三角架上铺跳板形成第一层操作平台;
第三步,当加热炉炉墙砌筑或浇注高度达到与加热炉支撑梁(7)的垫块相平的高度时,采用建筑钢管(2)与焊接在工字钢上的第二角钢(9)连接,然后将第一层操作平台上的跳板拆除后铺在建筑钢管(2)上形成第二层操作平台;
第四步,当加热炉炉墙砌筑或浇注高度达到比加热炉支撑梁(7)的垫块所处的高度高1.2m时,将第一层操作平台的三角架(3)拆除挂到工字钢(1)上部的挂耳(5)处,并铺跳板形成第三层操作平台,此操作平台可满足加热炉炉墙砌筑或浇注到墙顶。
3.根据权利要求2所述的加热炉炉墙浇注料工字钢支模法,其特征是:第四步中,当加热炉炉墙砌筑或浇注高度低于所述1.2米的高度时,不需搭设第三层操作平台。
4.根据权利要求1或2所述的加热炉炉墙浇注料工字钢支模法,其特征是:工字钢(1)采用16号工字钢。
CN2009100627498A 2009-06-19 2009-06-19 加热炉炉墙浇注料工字钢支模法 Expired - Fee Related CN101581540B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100627498A CN101581540B (zh) 2009-06-19 2009-06-19 加热炉炉墙浇注料工字钢支模法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100627498A CN101581540B (zh) 2009-06-19 2009-06-19 加热炉炉墙浇注料工字钢支模法

Publications (2)

Publication Number Publication Date
CN101581540A CN101581540A (zh) 2009-11-18
CN101581540B true CN101581540B (zh) 2011-01-12

Family

ID=41363799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100627498A Expired - Fee Related CN101581540B (zh) 2009-06-19 2009-06-19 加热炉炉墙浇注料工字钢支模法

Country Status (1)

Country Link
CN (1) CN101581540B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636029A (zh) * 2012-04-24 2012-08-15 山西太钢不锈钢股份有限公司 一种加热炉可塑料施工方法
CN105021042B (zh) * 2015-07-29 2017-06-09 中国一冶集团有限公司 用于加热炉支撑梁冬季施工的保温模板
CN105758185B (zh) * 2016-04-28 2018-06-15 中国五冶集团有限公司 一种加热炉炉墙耐火浇注料施工的模板支撑***

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1195078C (zh) * 2000-12-29 2005-03-30 河南省耕生实业(集团)有限公司 混铁炉整体浇注工艺
CN1278003C (zh) * 2004-03-15 2006-10-04 中国第二十冶金建设公司 整体浇注结构炉炉墙对拉支模方法
CN201245982Y (zh) * 2008-08-18 2009-05-27 杨小平 现浇墙体的支模装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1195078C (zh) * 2000-12-29 2005-03-30 河南省耕生实业(集团)有限公司 混铁炉整体浇注工艺
CN1278003C (zh) * 2004-03-15 2006-10-04 中国第二十冶金建设公司 整体浇注结构炉炉墙对拉支模方法
CN201245982Y (zh) * 2008-08-18 2009-05-27 杨小平 现浇墙体的支模装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开2004-169938A 2004.06.17
JP特开2007-285573A 2007.11.01
JP特开平11-130485A 1999.05.18

Also Published As

Publication number Publication date
CN101581540A (zh) 2009-11-18

Similar Documents

Publication Publication Date Title
CN103628680B (zh) 大面积钢结构吊挂层施工方法
CN102383628B (zh) 筒仓结构后施工减压锥的施工装置及施工方法
CN104695336B (zh) 双层现浇梁先上后下支架施工方法
CN102505846B (zh) 钢管柱承台梁节点施工方法
CN105133755B (zh) 一种钢筋焊接网架复合剪力墙的施工方法及剪力墙结构
CN104120877B (zh) 一种液压爬模***及爬模方法
CN102134910B (zh) 一种筒状混凝土结构倒模施工方法
CN101845882B (zh) 高层楼房托吊浇灌水泥模架和建材吊运与吊箱的组合装置
CN109594479A (zh) 一种双幅并行高架桥中央防撞护栏同时施工模架及方法
CN101581540B (zh) 加热炉炉墙浇注料工字钢支模法
CN102733608B (zh) 一种造粒塔喷头层施工方法
CN211286601U (zh) 一种应用液压提升翻模技术的烟筒施工装置
KR20070106386A (ko) 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀
CN102605988B (zh) 烟囱内衬外砼同步施工方法
CN103924653B (zh) 一种框架式排水井及其施工方法
CN102286927A (zh) 桥梁墩柱盖梁钢筋笼整体安装施工方法
CN107489214A (zh) 核心筒竖向与水平结构的平层施工方法
CN208650086U (zh) 一种移动式路灯基础
CN103061568A (zh) 倒锥壳保温水塔水柜采用锥形悬架高位现浇施工方法
CN203498850U (zh) 超高层建筑筏板基础钢筋支架
CN115095153A (zh) 混凝土烟囱无内模施工方法
CN106284997A (zh) 钢筋混凝土烟囱的大钢模整体提升施工方法
CN104131635A (zh) 一种预制楼梯间周边剪力墙施工方法及施工平台
CN104848693B (zh) 用于加热炉内衬层的快速施工方法
CN206829603U (zh) 一种快速准确安装烟道拱顶模板的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL GROUP CO., LTD.

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20190619

CF01 Termination of patent right due to non-payment of annual fee