CN101074566A - System for biochemically recovering and regenerated saving water in urban residence - Google Patents

System for biochemically recovering and regenerated saving water in urban residence Download PDF

Info

Publication number
CN101074566A
CN101074566A CNA2007100076458A CN200710007645A CN101074566A CN 101074566 A CN101074566 A CN 101074566A CN A2007100076458 A CNA2007100076458 A CN A2007100076458A CN 200710007645 A CN200710007645 A CN 200710007645A CN 101074566 A CN101074566 A CN 101074566A
Authority
CN
China
Prior art keywords
water
pipe
plastic cement
pond
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100076458A
Other languages
Chinese (zh)
Other versions
CN101074566B (en
Inventor
郭厚德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007100076458A priority Critical patent/CN101074566B/en
Publication of CN101074566A publication Critical patent/CN101074566A/en
Application granted granted Critical
Publication of CN101074566B publication Critical patent/CN101074566B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/30Wastewater or sewage treatment systems using renewable energies
    • Y02W10/33Wastewater or sewage treatment systems using renewable energies using wind energy

Landscapes

  • Vehicle Waterproofing, Decoration, And Sanitation Devices (AREA)

Abstract

The invention is a biochemical recovery and regeneration water saving system of town building and district. Seal the feces by plastic barrel and trailer for conveniently carrying. The air drafting and the water removing of the lower feeding pipe, the smell-proof air feeding pipe, the wind power fan and its canal fan prolong the period of storing feces to make them harmless to be fertilizer with good quality, improve the price and reduce the times of delivering fertilizer. It is the best to use the ground floor of the building, parkland for body-building or the basic of underground garage to resolve the problems of ladle car saving and channels. Otherwise, the scheme that one unit shares one basement and one channel has to be adopted as civil air defence facilities. The new type lavatory rushes the small pellet inside the pallet through soft hose and link rod all the way. It washes the plastic smell-proof device via round export and forms water seal by the pellet at the channel port through the urinal inner wall, which can save 95% water. The bathwater and the rainwater are purified by the sedimentation tank and the ultrafiltration membrane and flow into the pool for washing lavatory, cars and greening to save more water. It is a good technique to change the problem of high cost without economic benefit of urban wastewater treatment factory.

Description

Urban building and sub-district are biochemical reclaims and regeneration water-saving system
Technical field
The present invention relates to biochemical recovery in urban building and sub-district and regeneration water-saving system.Belong to resource reutilization environmental protection category.
Background technology
At present, townsfolk's people give up (excrements), or in septic tank, fish for again and see off, or be poured in the car to concentrate with toilet and transport, or by the discharging again of urban sewage treatment factory and office reasons, but great majority all be through sewer directly down to the river, river, lake, marine, in various pollution sources, ight soil will account for 80%~90% of total amount, and the enforcement period of the ninth five-year plan government investment needs 4,500 hundred million yuan and administers pollution.Than during " eight or five " 375.79 hundred million yuan increase substantially, on the basis of existing more than 300 tame urban sewage treatment factories, build 600 families again, but this also can only solve 40%~50% of the total amount of should disposing of sewage, yet sewage quantity is also with annual 20% amplitude rising.The investment of urban sewage treatment factory capital cost, fixed assets is all very big, and equipment is various, complex procedures, management operating cost height.The major part of fund has also been used pipe network improving and the construction aspect supporting with factory, and the city has much pipe networks how long will spread, and road breaking everywhere forms a lot of repeated construction.Pipe leakage also produces pollution to environment and underground water, and the end product of administering---useless mud does not almost play recycle value.According to interrelated data record in 1986, the useless annual production of China's urban human was 11,060 ten thousand tons.According to statistics, adult's annual mean fecaluria excretion is 790 kilograms, calculates by nutrient analysis to be equivalent to 22 kilograms of ammonium sulfate, 6.8 kilograms of calcium superphosphate, 3.43 kilograms of potassium sulfates.Calculate by the National urban fecal output, be equivalent to annual 3800000 tons of ammonium sulfate, 92.5 ten thousand tons of calcium phosphate, 48.72 ten thousand tons of potassium sulfates of producing, time-out went 20 years, this group numeral is along with the growth of city de facto population, certainly have the no small growth of amplitude, these doteys concerning the nuisanceless ecological agriculture in rural area but still are taken as pollutant and have been disposed but regrettably.Because people are much to seek the correct method that a kind of science handler gives up.The bad solution of some key issue, as: one, give birth to excrement not through certain shelf time (common one month), wherein germ is easily propagated when using it at random, infringement user health.Give birth to the excrement fertilising crops are produced pollution again.Two, when septic tank is fished for or extract, will propagate foul smell for a long time, the resident does not accept.Do not control the water of flushing the toilet because of, make the ight soil excess dilution and the fertility deficiency, the peasant does not welcome.Make the people's waste water part in salvaging and transporting account for significant proportion simultaneously, cost of transportation, fruitless labour all increase, and the useless selling price potential drop of people is low to making.Three, with the many cities of toilet, as Shanghai, make a gift to someone every day useless once (the toilet volume is limited, inconvenient long storage time), not only the infectivity germ is also conflicted mutually with the seasonal season of spreading manure in the rural area, easily causes the completely situation for suffering from of excrement.In addition, easy and convenient when chemical fertilizer uses all impels people not favor so the people in city is useless.Therefore, it is useless that the way that people have to adopt urban sewage treatment factory and pipe network to match is administered the people, and use the negative effect of chemical fertilizer for a long time to farmland soil property and crops quality, be well-known general knowledge, otherwise just do not had the appearance of this noun of pollution-less agriculture.So, also just no longer repeat.
Summary of the invention
Urban building of the present invention and sub-district are biochemical reclaims and regeneration water-saving system, exactly will be with a kind of scientific method that can solve above Several Key Problems, it is useless in polluting main body the people to change people, spend big price, great strength to administer but not produce economic benefit, the passive negativity operational mode that matches and administer to pollute with urban sewage treatment factory and pipe network, the people is given up turns waste into wealth, promote pollution-less agriculture, improve the farmland soil property and make it stable high yield, and produce the ecological, environmental protective industry of a kind of Chaoyang type.It is by plastic cement bucket (55) or (82) and trailer (66) or (69), make the instrument that carrying encapsulation people gives up, make it sealing, odorless, fast, send pipe (24) when the plastic cement bucket send excrement under the ight soil allowing, this is managed and fans (39) every the wind energy of smelly air pipe (25) and mouth of pipe installation, with by the mouth of pipe interior wing (41) of its drive, the exhausting that the forms ability of anhydrating, can significantly reduce the moisture content of people in useless, suppressing stench simultaneously produces, make the finite volume of plastic cement bucket adorn water less and adorn excrement more, increased its operating period the storage excrement time is also prolonged thereupon, it also is favourable that the intensification of ight soil fermentation is anhydrated to exhausting, the people gives up and carry out the transition to innoxious degree naturally in the fermentation sterilization process, and become high-quality fertilizer, and both can improve the muck price, also significantly reduced and sent fertile number of times and reduce and send the excrement cost.Novel flush toilet, the ball (17) of the connecting rod (20) that the panel (3) of utilization and urinal connects together and its below, the flushing water that urinal inwall upper edge flows down can stopped, mouth in duct (15) forms water seal along the place and plays in smelly effect, the water that can also utilize flexible rubber hose (18) from water tank 5, to attract, on round exit at the bottom of its ball of the inner impulsion of ball (17), work the little ball (16) of the effect of sealing, and let out down on the plastics smell stopper (14) of below, duct (15) flushing action.Thereby the stench trap that has removed conventional toilet is every the smelly required water of flushing the toilet in a large number, can economize on water 95%, plastic cement bucket and trailer can utilize the building bottom to do parklands such as garage or body-building, and to solve the scheme of depositing with the access way problem be best in underground garage formed space, otherwise, to make it have people's air defense facility function concurrently with the scheme of a units shared one basement one passage in the building.Send excrement to go to the countryside first and can not regain plastic cement bucket and trailer unbearably, and next time approximately after 20 days send fertilizer the time empty wagons take back, this has not only saved and has sent excrement to wait for the time of letting out excrement at every turn, farming season, the ground fertilising did not provide temporal adjusting leeway by mistake to give the peasant yet, the peasant borrows the plastic cement bucket to be in the same place with trailer, drag it to from the field nearly any excrement point of executing and get on, also can save very big labour.Be not eager to allow excrement leave the plastic cement bucket, sealing storage period prolongation, the innoxious degree of muck can be higher.Water for bathing and rainwater advance sedimentation basin (112), after milipore filter purification apparatus (134) filters, making regenerated water is used further to flush the toilet, carwash and greening, water supply volume can not only enlarged, when not increasing the system water pressure of water works, can also be at 0.5 yuan/ton cost, obtain considerable economic in 3 yuan of the selling prices.
The present invention is achieved through the following technical solutions purpose:
One, novel flush toilet (9) is changed existing flush toilet and is used the bending pipeline formation water seal of " stench trap " to come the barrier foul smell, but increased the passage gradient, need with the get excited method of ight soil of big water gaging, borrow the ight soil deadweight to fall and adopt, use the low amounts of water flushing channel, help its method that slides to carry ight soil, and low amounts of water is divided into two-way, one the tunnel has rubber sealing ring on the delivery port (21) on the water tank (5), the flexible glue water pipe (18) that comes out enters caliber than in its thick connecting rod (20), extend to the inside of ball (17) again, and locate with the guide pile on the ball inwall, work the little ball (16) of the effect of sealing on the home position circular open of bottom, ball (17) the inside so that get excited from the side, and water is flowed out from circular open, drop on the plastics smell stopper (14) of below, duct (15), its row stain is after an action of the bowels cleaned, after this strand current are intact, the cover plate of plastics smell stopper (14) can seal from horizontal reset because of the effect of spring, little ball (16) is because inside is equipped with a little plastic grain the polymerization action of gravity is arranged, and the rolling power of himself ball appearance also can be carried out the position that fall automatically to the circular open of ball (17) bottom and seals.And another road delivery port (9) of water through water tank (5) bottom of flushing the toilet, flow to the upper edge mouth of pipe all around of novel flush toilet (19) urinal, again the urinal inwall is washed, the back is (15) Kou Yanchu in the duct, by ball (17) with and the rubber sealing ring of waist block, thereby form together every smelly water seal.Because, the connecting rod (20) on the ball (17) with and on panel (3) all be ponderable, so, the effect of this road water seal can be good, closing of panel (3) not only also play every smelly effect, also reduced environment temperature relatively to the caused evaporation of water seal water in summer.Connecting rod (20) is connected with panel (3), be to be connected with a little ball on this bar, and with the fastener (22) of panel disjunctor be two round concave shape sheet spares to lining, can utilize spill to encase little ball from both sides.Screw can be worn in porose again position, centre makes it the location, and screw is not locked, has so just formed a kind of active connection.When people utilize the urinal of novel flush toilet (19) and seat board (2) panel (3) by walking both cross bar and and two ends connecting pin and key seat (10) couple together, just form and turn to active mechanism, be able to seat board (2) panel (3) opened and make it upright, close and make in its action of droping to the ground finishes, this active connection just can make ball (17) remain vertical attitude by deadweight, people is uncapped go just and close cap seal mouth water and neglect neither.In order to make upright panel (3) be unlikely to fall down automatically, squat the distance of positions from keeping certain surplus fully taking into account panel and people, and when can not make people back clothes dirty, the present invention has installed between the front of the front of panel (3) and water tank (5) again and has bumped pearl positioner (23), it is faced the wall and meditated in the respective slot by " Π " font on panel front top and water tank and is made up of the both sides spring and the decorative pearl on top of an official cap and device body that they are installed.Ight soil is relied on the valve of power (15) and plastics smell stopper (14) through the duct for support, by the arc pipe that rubber seal (13) are arranged (12), under the transition of conduit coupling (11), enter and send pipe (24) under the ight soil, between the plastics smell stopper of duct (15) and its below, the duct is drawn in to 9cm gradually by aperture 12cm, so that the screens of plastics smell stopper is installed.In order as much as possible to improve the gaseous environment in the pipeline, the gas ability is dialled in the dehumidifier that also strengthens simultaneously pipeline, reduce the water content in the ight soil as far as possible, the present invention also increased diameter a 15~20cm every smelly air pipe (25), since it at every floor all with arm with sending pipe (24) connection under the ight soil, also just blocked the capable approach that foul smell is sent by arm to next level just time of lower floor in urinal.Formed in the pipeline gaseous environment preferably, the present invention has been flushed the toilet and not smelly purpose really is achieved with few water.The foul smell amount reaches and minimizes in order to ensure with the lavatory time, the present invention is provided with its inside of an interlayer (1) and is placed with charcoal or bamboo charcoal eliminating smell agent at the back side of panel (3), inhale the flavor mesh and be arranged in the vertical lower of panel when upright, like this, just can not drench the eliminating smell agent of the inside when people make the sanitary flush panel, what deserves to be explained is, when people use the lavatory, should close panel (3) earlier after an action of the bowels, and then remove to press joystick, otherwise the water of flushing the toilet does not just form water seal.And take off when covering with the lavatory when people next time, the water of the water seal that formed last time between ball (17) and duct (15), will let out along under the duct because of offing normal of ball, this has just carried out the work that moist pipeline makes the walk help of ight soil drag reduction in advance, is very favourable to the smooth descending of ight soil.
Two, a circle rubber is arranged between water tank (5) and the top cover (4), play airtight effect.On two walls relative position, hole is arranged before and after water tank (5) bottom, respectively wear a screw, can link to each other with position, threaded hole on the correspondence position of the washing basin that is filled with water (8) both sides separately, make washing basin (8) can do amplitude of oscillation motion as shaking nest.3 jin of water can be adorned when it is stablized, ball float (6) stage that water valve cuts out automatically by connecting rod can be held up.Put in available rubber in the valve body with one of screw cross-under below automatic valve (26) front end and take over a business interlock that transverse movement seals the mouth of a river partly, one links to each other with connecting rod (29) with screw socket (28).When the outlet pipe that comes water on automatic valve (27) is wandered in the washing basin (8), the water yield reaches and makes ball float (6) when upwards floating, take over a business by doing the pushing tow action behind the forward direction with regard to making rubber in the valve with the up action of the connecting rod (29) of ball float disjunctor, thereby realize coming the sealing of water so that supply water and stop.And when people pressed joystick (35) or (37), lead bar (30) or (31) will utilize rope to tie up to the bolt position of washing basin (8) one sides, and one with little water tank pull-up, made to topple over the water of flushing the toilet and be accomplished.Be the control excrements water yield of flushing the toilet separately, also designed positive stop lug boss (34) or (36) of joystick in water tank (5) front joystick below, water butt (33) is with the location between screw (32) and the water tank (5).Because device mouth width is narrower, can only collect at every turn washing basin (8) sprinkle water yield pact half, and make the moisture of flushing the toilet become two-way to become possibility.Moreover, the spring on the present plastics smell stopper, the time gets rusty once long behind the water breakthrough, influence its elastic force and life-span, the plastics smell stopper that the present invention is used, on this basis,, and make water and spring do isolation for but spring has increased the thin cover of rubber that a thermoplastic or viscose glue seal.
Three, send pipe (24) also to have the wind turning function of bleeding under the ight soil, it should exceed 2 meters on roof, and contour with it every smelly air pipe (25), both are not far from one another, and available connector string is formed the one that supports each other, increases wind loading rating.The pipe fitting that exceeds flooring should adopt the tubing of thickening, also to increase by a circle pipe box circle in the exit, to strengthen physical strength, wind energy fan (39) is made up of three leaves, by top nut (38), the metal mounting (40) that holds with tape spool, to manage internal fan (41) with punching axle and bottom screw (having alignment pin to play the anticreep effect) is connected as a single entity, in pipe internal fan axis hole and the wind energy fan axis hole bearing is housed, porose position and tapping in the middle of on the axle bed shell, one dull and stereotyped position is arranged on the respective shaft position of punching axle, with flat head screw punching axle and axle bed are connected as a single entity and rotate synchronously.Between the axle housing of wind energy fan (39) and the punching axle this device is arranged also, more uniform screws on the circle send pipe (24) mouth of pipe to couple together along last pipe box circle and pipe shaft at the bottom of metal mounting (40) frame under available screw and the ight soil.Two fans there has been fall the place of position.Mouth of pipe internal fan (41) is a passive-type, and it mainly fans (39) under the blowing of wind-force by the wind energy of its top, and rotation is got up and rotated synchronously.But wind has towards property, and it can make wind energy fan clockwise rotate sometimes, and inhour is rotated again sometimes, and in order to make the wind energy fan when changing, the air draft that but can make progress all the time of mouth of pipe internal fan is given vent to anger.Line up internal fan of the present invention has been done following reform, to thicken in the middle of the fan blade and even can pass a thin axostylus axostyle, one of axostylus axostyle is fixed on the axle bed housing, one is fixed on the ring shape support (45) with screw, the ring shape support is in the left and right sides near fan blade, the fin that certain oblique angle is all arranged, also gone out to block the fin of fan blade on the axle bed housing on the corresponding angle, when calm when static, fan blade is in horizontal plumbness, in case when having wind to be got up by wind energy fan driven rotary, the torsion that rotates produces with rotation direction, with three flabellums of mouth of pipe internal fan along rotate towards, and lean on the fin of projection on ring shape support (45) and the axle bed body and the function that the generation exhausting makes progress.Changed direction of rotation as wind energy fan, these three flabellums also can change towards, lean to again on each three fin of the front and back on the corresponding surface and turn round, the wind of extraction remains (the wind energy fan group of this structure can also be used and improve the IAQ (indoor air quality) aspect) up.Increased the water content of excrement in order to prevent rainwater from flowing in the storage excrement plastic cement bucket along pipeline, the present invention returns the canopy (47) that this wind energy fan group has increased has metallic support (46) to support.Concerning every smelly air pipe (25), can adorn also and can not adorn wind energy fan group, whether decide according to local climate, wind direction, humidity and actual exhausting effect, but under canopy, will increase by a spherical guard (48).
Four, present, plastic cement bucket on sale about 700 yuan one on the market, good weatherability in 35 years application life, can be adorned one ton, progressively popularize at private car, under the historical background that people constantly pursue quality of the life, guard one's health, during building construction design, preferably the bottom Stall is designed to garage parking, body-building field or other public welfare activities zone, the people of second floor resident like this, is useless just can to send pipe to collect in the plastic cement bucket (55) under ight soil in the lump.For building at the front, Stall will be done the shop, will preset basement during the building design, and to the underground garage in market, pipeline is wrapped with sheet material, becomes pillar and does not also affect the appearance.This just makes plastic cement bucket and trailer that the position of falling has been arranged, and two plastic cement buckets are wanted to set aside concerns in this chamber, so that substitute exchange.Send pipe (24) to be connected on the joint (49) under the ight soil, following disjunctor is equipped with this pipe mouth of pipe of rubber folded tube (50) a flange circle, can allow plastic cover (51) rotate in the above and can fall.One section screw socket is arranged under this lid, can unload on the plastic cement bucket behind the former lid outwarding winding, spiral cover is on bung, and a bucket top has pair discharge orifice (54) to want cover lid that bucket is sealed when sending excrement.Rubber folded tube (50) can allow body length that the heave amplitude of certain prolongation and shortening is arranged, for people's switch bung provides spatial margin.Emergent lid (53) is to prevent ight soil whereabouts and setting in the time of changing bung.Can play spins temporarily blocks the effect of the mouth of pipe.There is blowdown hole (59) this pipe of rubber folded tube (60) that can spin that lid (63) is arranged in the middle of plastic cement bucket (55) bottom, and has rope to tie up on the vehicle frame (64).Vehicle frame has support bar (65), handgrip (66), and pad fence (56) is arranged, and adorn two directional wheels (57) behind the car, pre-installed two universal wheels of car (62) have reinforcement gusset (58) on the chassis, and its distributed architecture is shown in (61) dotted line.
Five, also have a kind of trailer (69) also can make the delivery vehicle of plastic cement bucket, its plane of load has pad fence (67) to have support bar (68) to play reinforcement effect for four jiaos.Plane of load couples together both by bag axle part and screw by the axletree (71) of " Ц " font support (70) with trailing wheel (73) down.All there is bearing (72) in the place of axletree (71) two ends wheel-mounted, the front-wheel two-wheeled is coaxial but wheelbase between the wheel is narrower, on the axletree (77) of front-wheel (75) bearing (78) is housed also, axletree (77) middle part is connected with longitudinal axis (74), on two horizontal lamellaes of longitudinal axis by the back side of the forked plane of load that radioactively is welded on car of four support bars, again by the pin-and-hole bolt on pin hole and pin and the trailer bar (76).But trailer bar vertical pulling not only also can swing and draw reversingly like this.For the space of saving after getting on the car, also the trailer bar can be erected (seeing dotted line).
Unit 1 two vertical floors, with vertical eight floors, three mouthfuls of people of every family meter, totally 24 people, every day everyone producing 4 jin 5 liang of excrements, other add excrements each once only with one jin the water meter of flushing the toilet, everyone 5 jin 5 liang of every days, every month in 30 days totally 165 jin.165 jin * 24 people=3960 jin, two months totally 7920 jin, about 4 tons.Send pipe under the ight soil, per hour organize exhausting every smelly air pipe and wind energy fan and anhydrate 1.4 jin, every month exhausting is anhydrated if can 1080 jin.The bimester totally 2160 jin, about 1 ton, 4 tons-1 ton=3 tons, 24 people produce excrement with adorning one ton plastic cement bucket and trailer, sent in per two months three times just (because region and season is different, as the water more than not taking out, just need send excrement 4 times bimester of per).Moreover be subjected to excrement side and to send excrement side be not the behavior of short-term cooperation, and as long as found cover registration formalities, all to paint on the plastic cement bucket and brush numbering, trailer is also stamped same steel seal number, and problem chaotic and that lose just can not take place.The ight soil that is sealed in the plastic cement bucket can not have a negative impact to the rural health situation yet.
Six, for story height, the many places of resident family, plastic cement bucket (82) this barrel bottom of available 2 tons of useful loads will be done thickening and handle.Its available set vanning (79) is loaded and transported, and the advantage that riverine city along the river can utilize shipping to hang down freight rate (about 2 minutes of kilometer per ton) is carried out.For the heavy plastic cement bucket of just body bodice and the people that adorn of institute give up (about 4500 jin) can put into container, the present invention has installed one and has arranged cylinder (84) on the bottom of container, cylinder is positioned in the position of circle hole groove one by one of two ends, left and right sides framework by central shaft heads.Plastic cement bucket (82) waist has twice indent circle, can be two limit ropes (83), and many people together tow strap haul out container with the plastic cement bucket along cylinder (84).Plastic cement bucket forward lower part interposition is equipped with a groove (87), ask for an interview dotted line, on a pulp cutlet and flexible rubber hose (86) are arranged, it has the pipe lid and can make piping hang the pilot pin (85) of location, plastic cement bucket crown center has a big lid (80) and each tegillum (81) of both sides, can manage feeding inward (lid tubular structure similar with a ton, what be delivered to tegillum sets up oblique extension possibly) for sending under three ight soil.Supporting with it slope stand (89) in addition, being equipped with on it below the cylinder is bracing frame (90), dual-side is provided with and can lifts handgrip (91) when moving it for people, by the sleeve on sleeve (92) and the trailer (94), sleeve with " " font latch (93) connects, and slope stand (89) and trailer (94) are linked together, and just the plastic cement bucket of having adorned 2 tons of material can be dragged trailer, drag again toward transporting a little, also its push-and-pull from trailer can be advanced the container to go.Go inside first plastic cement bucket will be advanced to container, when people's arm fell short of again, with regard to available push pedal (88), it had long strut (97) and horizontal pushing hands (96), but the several people firmly pushes away the plastic cement bucket together inward.
Seven, regeneration water-saving system it by the water pipe of having a bath (99), rainwater pipe (101) accepts water, the latter also can be through linking to each other with the former intervalve and valve (103) earlier one section addle be put into and go in the sewer pipe (109), article two, water pipe can be gone into the pond by the Chi Kou (110) that goes into of sedimentation basin (112) through comprehensive pipe and valve port (109), midfeather (111) is arranged in the pond, and it provides convenience on the branch pond for cleaning does not quit work at the bottom of the pond, when the time comes, one-level to be filtered barrier, it is made less than the rustless steel pipe of 1mm by two ligaments, changes over the water proof baffle plate.The pond is provided with floor drain and rubber stopper and sewer pipe and valve (114), also has the overfall gap of going up and water pipe (115), and they all are communicated on the sewer pipe (119).Cascade filtration barrier (116).Lined up by nylon bristle and to check wall, be installed in the little tank (117), it also has floor drain and rubber stopper and sewer pipe and valve (118), also is connected on the sewer pipe (119).Little tank has a water pipe (121) to be connected on the cleaning equipment (134) that hyperfiltration membrane assembly is installed by water pump (130) in addition, blowoff valve (132) is arranged on this equipment, recoil water pump (133) is arranged, valve and the automatic control float valve of the regenerated water of making on water pipe (104) enters pond (129), again through water pump or submersible pump (123), by pipeline input user pipe network.Another route water pipe (100) is delivered to the plastic cement bucket that roof is adorned the water of flushing the toilet, and is redistributed to each user.Also there are floor drain and rubber stopper and water pipe and valve (108) in the pond, also be connected on the sewer pipe (119), during with water for bathing preparation, regeneration water, if the effect of making is undesirable, filter flavor pond (106) that also will be on the pond, flow to water inlet (102) by water pipe and valve control, under the partition of pond internal partition wall (128), through refiltering of metallic multilayer fie screen (125), dress active carbon shell is plastics in the mountain, on have filter stick (126) absorption in a lot of infiltrations hole to remove flavor after, by in the pond, going under the water pipe (107).There is the top cover (124) of maintenance personal's lower storage reservoir on the top, pond, the filter flavor also has dividing plate (127) in the pond, also have ladder and ventilating pipe (122) by wall place, pond, the water that is pooled to sewer pipe (119) all flows at last in the sewer (120) and goes, the size dimension in sedimentation basin, pond, filter flavor these three kinds of ponds, pond and hyperfiltration membrane assembly what all will according to the size of cell sizes and to the demand of regenerated water what etc. factor take all factors into consideration, needn't impose unanimity.
Eight, because the novel flush toilet among the present invention has significant water-saving deodorizing function, and the biochemical recovery system among the present invention is because of the change that relates to storied building structure and don't may popularize in an all-round way socially in a short time, so, be indebted to society in order to allow the lavatory of this water saving appear on the market early with utensil, do not having under the supporting prerequisite of air discharging facility, its water supply volume can be adjusted to 1 jin in stool; on half jin the consumption of urinate; the length of regulating pull rope can be accomplished; other; fan pipeline in the assembly with the wind energy among the present invention, also can receive positive effect to borrowing that wind energy improves IAQ (indoor air quality).
Urban building of the present invention and sub-district be biochemical reclaims and the beneficial effect of regeneration water-saving system is: when the useless in line rivers of present people or the operational mode of controlling discharging through the municipal sewage plant are said " no ", proposed a cover and can stop the useless history of urban human as the pollution sources main body, and make a silk purse out of a sow's ear, save the water of flushing the toilet more than 95%, and make it to produce economic benefit, allow resources circulation optimization, the biochemical recovery method of harmonious co-existence between man and nature, with can make water for bathing and rainwater become regenerated water be used to flush the toilet carwash and greening aspect, cost is lower again, the simple regeneration water-saving system of operational management.Plastic cement bucket and trailer are one-period with 35 cars, regenerated saving water equipment 75 years was one-period, but existing was that one-period is estimated with 35 years all, the present invention is as promoting in National urban, biochemical recovery in this urban building and sub-district and regeneration water-saving system are in 35 years, except that recovery cost investment and operating cost, can produce 3,661 hundred million 1,868 ten thousand yuan economic benefit, be equivalent to 10,000,000,000 yuan value every year.
And will may be 2~3 times of above numeral for country saves the expense of administering municipal sewage in 35 years, because urban population may be 4~4.5 hundred million when the time comes, just in 2 times, more than 7,000 hundred million follow more than 3,000 hundred million to add up, total benefit can reach trillion yuan.Main body people in the pollution sources is useless, and the water quality of making a silk purse out of a sow's ear improves; environment optimization; underground water source also is protected; various places water factory water producing cost and dosage also significantly reduce; people fall ill less; the medical total cost and the individual that sees a doctor of people that can reduce society again hold money; the pollution-less agriculture of big leap ahead not only brings benefit to health of people; simultaneously the peasant is increased income; the farmland soil property is optimized the support of agricultural year stable yields etc.; these social benefits are sure; though we can't describe it with concrete economic figure quickly, certainly, above budgetary estimate has certain advanced; because we can not just can make technology of the present invention push open in the whole nation in a short time with settling at one go comprehensively.But only with above rough estimation, but just let us sees this technology will be brought how many huge interests to society, from world wide, all has extremely important promotional value.
Description of drawings
Please referring to Figure of description.
Fig. 1 send pipe and every the figure of smelly air pipe under novel flush toilet side-looking and the ight soil
Fig. 2 send pipe and concerns rough schematic every each floor installation of smelly air pipe under the ight soil
Fig. 3 is that novel toilet flush water supply component concerns elevation
Fig. 4 is the thin cover of the rubber stereogram of plastics smell stopper spring and increase
Fig. 5 is a wind energy fan group stereogram
Fig. 6 is the wind energy fan group stereogram that canopy is arranged
Fig. 7 be do not have wind energy fan group every metal ball shaped net of the smelly pipe racks of supplying gas and canopy figure
Fig. 8 is the mouth of pipe internal fan structure chart of wind energy fan group
Fig. 9 is plastic cement bucket and trailer and rubber folded tube figure (carrying a ton)
Figure 10 is trailer bearing surface structure chart (dotted line) and plastic cement bucket top plane view (solid line)
Figure 11 is the stereogram of another kind of trailer
Figure 12 is the container stereo figure that can carry two 2 tons plastic cement bucket
Figure 13 is the shared pushing hands structure chart that pushes away the plastic cement bucket of several people
Figure 14 is the trailer of band cylinder and the stereogram of slope stand
Figure 15 is filter flavor pond, pond, sedimentation basin and pipeline configuration figure
Figure 16 is ultrafiltration membrance filter decontamination procedure figure (parenthesized numbering among the figure is same target in Figure 15, for repeating numbering)
Figure 17 is a milipore filter set structure stereogram
Figure 18 is two plastic cement buckets and trailer place basements and send the vertical view of fecal passageway when two ordinate collectors are useless in unit of building
Figure 19 be with basement to the turning shape passage of outlet stretching after shown in the gradient schematic diagram of the passage of moping
Concrete enforcement
Concrete enforcement of the present invention relates to feasibility analysis economically, below is that the budgetary estimate of being done one-period launches with 35 years:
The value that biochemical recovery aspect is created:
Per 8 family expenses, three cover plastic cement bucket and trailers, 700 yuan in each bucket, 300 yuan in trailer, three covers totally 3000 yuan of meter high-quality muck prices per ton in 55 yuan (after all-round popularization opens, crops particularly pickles resemble than seeing to fertilize good, features good taste, can fetch a good price, the peasant can more welcome the city muck, estimate that fertilizer per ton also has 10~20 yuan rising space .), remove and per tonly should spread out 25 yuan of freight charges (sending excrement to go to the countryside and the automobile freight charges of empty plastic cement bucket of empty wagons band and trailer Hui Cheng 6 tons of the each fortune of one car, totally 150 yuan).Artificial 5 yuan, 55 yuan-25 yuan-5 yuan=25 yuan, sharp 25 yuan (city along the river utilizes shipping can reduce cost of transportation greatly, about 2 minutes of kilometer per ton, profit is considerable).3000 yuan plastic cement bucket and trailer cost need send excrement to regain 120 times, to send per February 3 times, send meter No. 18 times, just can spread out in 6 years 08 months in 1 year.Can make a profit 12750 yuan (25 * 18=450 unit added 6 times=12750 yuan in 450 yuan * 28 years in addition) in the back in 28 years 04 months.
The value that the saving of flushing supply aspect is produced:
With present saving toilet, stool needs 6 liters; urine needs 3 premium on currency meters; the 6+3=9 liter, approximates 18 jin of water, and novel flush toilet of the present invention; defecate 6 liang; urinate 4 liang, and 6+4=1 jin is for each person every day only in stool once with once urinate 18 jin-1 jin=17 jin; flush the toilet 17 jin in water of everyone saving every day; 17 jin * 24=408 jin, and 1 year in 360 days, 408 * 360=146880 jin; 2000 jin=73.44 tons of 146880 jin of ÷; in 4 yuan per ton, close 293.76 yuan, 293.76 yuan * 35=10281.6 unit.
In National urban resident population 300,000,000, close 12500000 24 people.
100,010,000 yuan of 12750 * 12500000=159 (the biochemical recovery)
10281.6 100,010,000 yuan of * 12500000=1285 (water saving of flushing the toilet)
Two annual value of creating that add up to:
1,593 hundred million 7,500 ten thousand yuan+1,285 hundred million 2,000 ten thousand yuan=2,878 hundred million 9,500 ten thousand yuan
Setting up an input every smelly ajutage and one to two cover wind energy fan group about per 8 families, be worth about 1000 yuan, concerning several thousand yuan one square metre inhabitation face amount, has been sudden huge profits, should be that business men goes out by the room so this pen is opened money.As basement is the garage, or building basecoat ground is body-building field and garage, puts Plastic Drum and trailer and just can not bring obvious investment.Otherwise will a unit totally one passage share a basement and come arranging barrel and car, because of having the civil air defense constructions and installations effect concurrently, its expense should be included public area in, premises stall half, 16 tame users spread out half.If story height to 16 layer or 32 layers are 2~4 times of 8 floors, each tame expense will be spread out still less.
The benefit that regenerated saving water of the present invention produced again.
In 1200 families is that a regenerated saving water engineering is built in a sub-district, and 350 families are arranged every day, and 1050 people have a bath, everyone is with 3 barrels of water, 54 jin of every barrel of 18 jin of need, 1050 * 54=56700 jin, 28.35 tons of 2000 jin of ≈ of 56700 jin of ÷ just can produce the water source of 25 tons of regenerated waters daily.Do not have so many people and have a bath possible some every day in season, but rainwater throughout the year can remedy this insufficient, summer the every household everyone to have a bath, this season just can many preparation, regenerations water.Be that radix is estimated (4 months summers are with 75 tons of water calculating every day) now to produce 25 tons of regenerated waters every day.
Buy 10,000 yuan every group of hyperfiltration membrane assemblies, 5 carefully totally 5 ten thousand yuan, every group per hour can be produced 2.5 tons in water, and can produce 75 tons in water 7 hours 0 10 minutes 5 groups of summers, and 3 groups can be produced 25 tons in more than 3 hour.
Build 5 square metres of hyperfiltration membrane assembly and staff chambers, count 10,000 yuan for 2000 yuan 1 square.
Build sedimentation basin, 10 square metres, 2000 yuan every square, 20,000 yuan
Build filtering ponds, 10 square metres, 2000 yuan every square, 20,000 yuan
Build the pond, 35 tons, water per ton needs 35 square metres for one square metre altogether
2000 yuan every square, ten thousand yuan of 200 yuan * 35=7
24 1 ton of plastic cement buckets, 700 * 24=16800 unit are joined in 24 buildings
Join 30 yuan 1 of 24 Automatic water valve, 24 * 30=720 unit
Supply water upstairs 300 yuan=7200 yuan in the every building of pipeline fee of the water of flushing the toilet is joined in 24 buildings
Go upstairs 600 yuan=14400 yuan in the every building of pipeline fee of 24 building rainwater and water for bathing
5 ones on water pump, every 3200 yuan=16000 yuan
About 70 square metres of whole regenerated saving water project occupation of land, every square of land for building be in 600 yuan, 70 * 600=42000 unit, and the whole pipe network of regenerated saving water is in 30,000 3 thousand yuan in the sub-district
50,000+10,000+20,000+20,000+70,000+10,000+6800 yuan+720 yuan+7200 yuan+14400 yuan+16000 yuan+42000 yuan+30,000 3 thousand=300,000 zero 120 yuan
With on ordinary days except that April in summer, 1 year remaining 8 months, 25 tons of meters of every month every day system water, water per ton charges 3 yuan, and 15 yuan of labour cost, running costs are removed by 25 tons * 3=75 unit, 75-15=60 unit, sharp 60 yuan of non-every day in summer
8 months 240 days * 60 yuan=14400 yuan
Summer is long, and 4 months 120 days, every day was in 75 tons in water of system, 180 yuan of 75 tons of profits
Every day in summer sharp .180 unit, 4 months every months are in 30 days, totally 120 days
120 * 180 yuan=21600 yuan
14400 yuan+21600 yuan=36000 yuan
Annual regenerated saving water is made a profit 30,000 6 thousand yuan.
300,000 zero 120 yuan of regenerated saving water gross investments need to regain (75 years projected lives) with 8 years 04 months.
35 years that now still reclaim with biochemistry is that one-period is estimated, last 26 years 08 months is the profit time (calculating less 30 years)
30,000 6 thousand * 26=936000 unit
60 yuan * 6 months=360 yuan
936000+360=936360 unit (making a profit in 26 years 08 months)
3600 people that National urban population 300,000,000 closes 1200 families have 83333 base units
936360 * 83333=78223687880 unit
Hundred million 1,868 ten thousand 7880 yuan of (the biochemical recovery and the water saving of flushing the toilet) 2,878 hundred million 9,500 ten thousand+78,200,000,000 2,368 ten thousand 7880 yuan of (regenerated saving water)=3661
Urban building of the present invention and sub-district are biochemical reclaims and regeneration water-saving system after 35 years National urban 300,000,000 populations carrying out, and except that regaining complete cost investment and operating cost, also can create 3,661 hundred million 1,868 ten thousand 7880 yuan of benefits, annually can create about 10,000,000,000 yuan of benefit approximately.

Claims (9)

1, a kind of urban building and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: with plastic cement bucket 55, or 82, with trailer 66, or 69 carry the instrument that the people gives up, allow when sending under the ight soil pipe 24 transporters to give up, with link to each other with arm every smelly air pipe 25 every floors, and stretch out 2 meters high mouths of pipe of roof at two pipes, wind energy fan 39 is installed, with the mouth of pipe internal fan 41 that is driven by it, novel flush toilet 9, available joystick 35,37 press lead bar 30 or 31 the action, make the rope pull-up be installed in washing basin 8 in the water tank 5, make it pouring, water is divided into two strand of one tunnel flexible glue water pipe 18 that stretches out in connecting rod 20 through water butt 33 in water outlet of water tank 21, enter 17 li roundlet balls 16 that go to get excited of ball of its lower end again, the circular delivery port of back below it releases, the plastics smell stopper of flushing 15 belows, duct, another road is through the delivery port 9 of below, water tank 5 fronts, flow to the urinal upper edge all around more down to pond inwall drip washing, place, 15 mouthfuls in duct edges, back is stopped by ball 17 and waist rubber sealing ring thereof, formation is every smelly water seal, when opening panel 3 before with regard to the lavatory, ball 17 with panel rise leave 15 mouthfuls in duct along the place and water seal from letting out, plastic cement bucket 80 years 2 tons can be supporting with container 79, load and transport with trailer 99 and slope stand 89 and pushing hands 88, the space that plastic cement bucket and trailer can utilize the garage of building bottom or gymnasium etc. to form, and the underground space such as underground garage solves it in passing and deposits problem with access way, the scheme of units shared one basement of also available building and a passage, the gradient extraction channel that utilizes stair to make progress, and adopt the turning extending channel to reach neither to influence traffic and slowed down the gradient again, also do not hinder the way of people's current effect in corridor and gate, make it when the solution ladle car falls a problem, have the function of people's air defense facility again concurrently, allow water for bathing and rainwater enter sedimentation basin 112 through pipeline, through milipore filter purification apparatus 134 or after advancing 106 filtrations of filter flavor pond again, make regenerated water and be used further to flush the toilet, carwash and greening.
2, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: novel flush toilet 9, and low amounts of water is divided into two-way, one the tunnel has rubber sealing ring on the delivery port on the water tank 5 21, the flexible glue water pipe 18 that comes out enters caliber than in its thick connecting rod 20, extend to the inside of ball 17 again, and locate with the guide pile on the ball inwall, work the roundlet ball 16 of the effect of sealing on the home position circular open of bottom, ball 17 the inside so that get excited from the side, and water is flowed out from circular open, drop on the plastics smell stopper 14 of 15 belows, duct, the delivery port 9 of water and flush the toilet in another road through water tank 5 bottoms, flow to the upper edge mouth of pipe all around of novel flush toilet 19 urinals, again the urinal inwall is washed, place, 15 mouthfuls in duct edges, back, by ball 17 with and the rubber sealing ring of waist block, thereby form together every smelly water seal, connecting rod 20 is connected with panel 3, be to be connected with a little ball on this bar, and with the fastener 22 of panel disjunctor be two round concave shape sheet spares to lining, can utilize spill to encase little ball from both sides, screw can be worn in porose again position, centre makes it the location, screw is not locked, so just formed a kind of active connection, when people utilize the urinal of novel flush toilet 19 and seat board 2 panels 3 by walking both cross bar and and two ends connecting pin and key seat 10 couple together, just form and turn to active mechanism, be able to seat board 2 panels 3 are opened and make it upright, close and make in its action of droping to the ground finishes, this active connection just can make ball 17 remain vertical attitude by deadweight, people are uncapped go just and close cap seal mouth water and neglect neither, in order to make upright panel 3 be unlikely to fall down automatically, squat the distance of positions from keeping certain surplus fully taking into account panel and people, and when can not make people back clothes dirty, between the front of the front of panel 3 and water tank 5, installed again and bumped pearl positioner 23, it is come directly towards by " ∏ " font on the panel front, face the wall and meditate in the respective slot with water tank and to be formed by the both sides spring and the decorative pearl on top of an official cap and device body that they are installed, ight soil is relied on power for support through the duct 15 and the valve of plastics smell stopper 14, by the arc pipe 12 that rubber seal 13 is arranged, under the transition of conduit coupling 11, enter and send pipe 24 under the ight soil, between the plastics smell stopper of duct 15 and its below, the duct is drawn in to 9cm gradually by aperture 12cm, diameter a 15~20cm every smelly air pipe 25, it all manages 24 connections with arm with sending under the ight soil at every floor, the back side of panel 3 is provided with its inside of an interlayer 1 and is placed with charcoal or bamboo charcoal eliminating smell agent, inhales the flavor mesh and is arranged in the vertical lower of panel when upright.
3, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: a circle rubber is arranged between water tank 5 and the top cover 4, on two walls relative position, hole is arranged before and after water tank 5 bottoms, respectively wear a screw, can link to each other with position, threaded hole on the washing basin 8 both sides correspondence positions that are filled with water separately, when stablizing, it can adorn 3 jin of water, ball float 6 can be held up the stage that water valve cuts out automatically by connecting rod, put in the interior available rubber of valve body with one of screw cross-under below automatic valve 26 front ends and take over a business the interlock part that the mouth of a river is sealed in transverse movement, one links to each other with connecting rod 29 with screw socket 28, when the outlet pipe 27 that comes water on automatic valve is wandered in the washing basin 8, the water yield reaches when ball float 6 is upwards floated, take over a business by doing the pushing tow action behind the forward direction with regard to making the rubber in the valve with the up action of the connecting rod 29 of ball float disjunctor, thereby realize coming the sealing of water so that supply water and stop, and when people press joystick 35 or 37, lead bar 30 or 31 will utilize rope to tie up to the bolt position of washing basin 8 one sides, one with little water tank pull-up, make and topple over the water of flushing the toilet and be accomplished, be the control excrements water yield of flushing the toilet separately, also below water tank 5 front joysticks, designed the positive stop lug boss 34 or 36 of joystick, location between water butt 33 usefulness screws 32 and the water tank 5, the plastics smell stopper, but the thin cover of rubber that a thermoplastic or viscose glue seal increased for spring.
4, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: send pipe 24 also to have the wind turning function of bleeding under the ight soil, it should exceed 2 meters on roof, contour every smelly air pipe 25 with it, both are not far from one another, available connector string is formed the one that supports each other, increase wind loading rating, the pipe fitting that exceeds flooring should adopt the tubing of thickening, also to increase by a circle pipe box circle in the exit, to strengthen physical strength, wind energy fan 39 is made up of three leaves, by top nut 38, the metal mounting 40 that holds with tape spool, to manage internal fan 41 with punching axle and bottom screw is connected as a single entity, in pipe internal fan axis hole and the wind energy fan axis hole bearing is housed, porose position and tapping in the middle of on the axle bed shell, one dull and stereotyped position is arranged on the respective shaft position of punching axle, with flat head screw punching axle and axle bed are connected as a single entity rotates synchronously, between the axle housing of wind energy fan 39 and the punching axle this device is arranged also, more uniform screws on the circle at the bottom of 40 of the metal mountings, send pipe 24 mouths of pipe to couple together under available screw and the ight soil along last pipe box circle and pipe shaft, two fans there has been fall the place of position, give vent to anger in order to make the air draft that can make progress all the time of mouth of pipe internal fan, to thicken in the middle of the mouth of pipe internal fan blade and even can pass a thin axostylus axostyle, one of axostylus axostyle is fixed on the axle bed housing, one is fixed on the ring shape support 45 with screw, the ring shape support is in the left and right sides near fan blade, the fin that certain oblique angle is all arranged, also gone out to block the fin of fan blade on the axle bed housing on the corresponding angle, when calm when static, fan blade is in horizontal plumbness, in case when having wind to be got up by wind energy fan driven rotary, the torsion that rotates produces with rotation direction, with three flabellums of mouth of pipe internal fan along rotate towards, and lean on the fin of projection on ring shape support 45 and the axle bed body and produce the function that exhausting makes progress, changed direction of rotation as the wind energy fan, these three flabellums also can change towards, lean to again on each three fin of the front and back on the corresponding surface and turn round, the wind of extracting out remains up, increased the water content of excrement in order to prevent rainwater from flowing in the storage excrement plastic cement bucket along pipeline, return the canopy 47 that this wind energy fan group has increased has metallic support 46 to support, concerning every smelly air pipe 25, can adorn also and can not adorn wind energy fan group, will be according to local climate, wind direction, whether humidity and actual exhausting effect decide, but will increase by a spherical guard 48 under canopy.
5, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: during building construction design, preferably the bottom Stall is designed to the garage parking, body-building field or other public welfare activities zone, like this, the people of second floor resident is useless just can to send pipe to collect in the plastic cement bucket 55 under ight soil in the lump, for building at the front, Stall will be done the shop, will preset basement during the building design, as big tower lower floor is the market, pipeline will reach the underground garage in market, pipeline is wrapped with sheet material, becoming pillar does not affect the appearance yet, this just makes plastic cement bucket and trailer that the position of falling has been arranged, two plastic cement buckets are wanted to set aside concerns in this chamber, so that substitute exchange, send pipe 24 to be connected on the joint 49 under the ight soil, following disjunctor is equipped with rubber folded tube 50 these pipe mouths of pipe a flange circle, can allow plastic cover 51 rotate in the above and can not fall, one section screw socket is arranged under this lid, can unload on the plastic cement bucket behind the former lid outwarding winding, spiral cover is on bung, when having pair discharge orifice 54 to send excrement, the bucket top want cover lid to make the bucket sealing, rubber folded tube 50 can allow body length that the heave amplitude of certain prolongation and shortening is arranged, for people's switch bung provides spatial margin, it is emergent that cover 53 be to prevent in the time of changing bung that ight soil from falling and setting, can play spins temporarily blocks the effect of the mouth of pipe, have in the middle of plastic cement bucket 55 bottoms blowdown hole 59 rubber folded tube 60 these pipes that can spin that lid 63 is arranged, and have rope to tie up on the vehicle frame 64, vehicle frame has support bar 65, handgrip 66, and pad fence 56 is arranged, adorn two directional wheels 57 behind the car, pre-installed two universal wheels 62 of car, the gusset 58 of reinforcement is arranged on the chassis, and its distributed architecture is shown in 61 dotted lines.
6, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: also have a kind of trailer 69 also can make the delivery vehicle of plastic cement bucket, its plane of load has pad fence 67 that support bar 68 is arranged for four jiaos, plane of load couples together both by bag axle part and screw by the axletree 71 of " Ц " font support 70 with trailing wheel 73 down, all there is bearing 72 in the place of axletree 71 two ends wheel-mounteds, the front-wheel two-wheeled is coaxial but wheelbase between the wheel is narrower, on the axletree 77 of front-wheel 75 bearing 78 is housed also, axletree 77 middle parts are connected with longitudinal axis 74, on two horizontal lamellaes of longitudinal axis by the back side of the forked plane of load that radioactively is welded on car of four support bars, again by the pin-and-hole bolt on pin hole and pin and the trailer bar 76.
7, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: for story height, the place that resident family is many, plastic cement bucket 82 this barrel bottoms of available 2 tons of useful loads will be done thickening and handle, its available set vanning 79 is loaded and transported, for just body bodice heavy plastic cement bucket and the institute's people's wasted energy of adorning threading container, one row's cylinder 84 has been installed on the bottom of container, cylinder is positioned in the position of circle hole groove one by one of two ends, left and right sides framework by central shaft heads, plastic cement bucket 82 waists have twice indent circle, can be two limit ropes 83, many people together tow strap haul out container with the plastic cement bucket along cylinder 84, plastic cement bucket forward lower part interposition is equipped with a groove 87, on a pulp cutlet and flexible rubber hose 86 are arranged, it has the pipe lid and can make piping hang the pilot pin 85 of location, plastic cement bucket crown center has a big lid 80 and each tegillum 81 of both sides, can manage feeding inward for sending under three ight soil, lid tubular structure similar with a ton, what be delivered to tegillum sets up oblique extension possibly, supporting with it slope stand 89 in addition, being equipped with on it below the cylinder is bracing frame 90, dual-side is provided with and can lifts handgrip 91 when moving it for people, by the sleeve on sleeve 92 and the trailer 94, sleeve with " " font latch 93 connects, slope stand 89 and trailer 94 are linked together, just the plastic cement bucket of having adorned 2 tons of material can be dragged trailer, drag again toward transporting a little, also its push-and-pull from trailer can be advanced the container to go, when first plastic cement bucket will be advanced to the container the inside, when people's arm falls short of again, with regard to available push pedal 88, it has long strut 97 and horizontal pushing hands 96.
8, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: regeneration water-saving system it by the water pipe 99 of having a bath, rainwater pipe 101 accepts water, the latter also can be through linking to each other with the former intervalve and valve 103 earlier one section addle be put into and go in the sewer pipe 109, article two, water pipe can be gone into the pond by the pond mouth 110 of going into of sedimentation basin 112 through comprehensive pipe and valve port 109, midfeather 111 is arranged in the pond, and it does not quit work at the bottom of for the cleaning pond convenience on the branch pond is provided, when the time comes, one-level to be filtered barrier, it is made less than the rustless steel pipe of 1mm by two ligaments, change over the water proof baffle plate, the pond is provided with floor drain and rubber stopper and sewer pipe and valve 114, also have the overfall gap of going up and water pipe 115, they all are communicated on the sewer pipe 119, cascade filtration barrier 116 is lined up by nylon bristle and is checked wall, be installed in the little tank 117, it also has floor drain and rubber stopper and sewer pipe and valve 118, also be connected on the sewer pipe 119, little tank has a water pipe 121 to be connected on the cleaning equipment 134 that hyperfiltration membrane assembly is installed by water pump 130 in addition, blowoff valve 132 is arranged on this equipment, recoil water pump 133 is arranged, valve and the automatic control float valve of the regenerated water of making on water pipe 104 enters pond 129, again through water pump or submersible pump 123, by pipeline input user pipe network, another route water pipe 100 is delivered to the plastic cement bucket that roof is adorned the water of flushing the toilet, be redistributed to each user, also there are floor drain and rubber stopper and water pipe and valve 108 in the pond, also be connected on the sewer pipe 119, during with water for bathing preparation, regeneration water, if the effect of making is undesirable, filter flavor pond 106 that also will be on the pond, flow to water inlet 102 by water pipe and valve control, under the partition of pond internal partition wall 128, through refiltering of metallic multilayer fie screen 125, by interior dress active carbon shell is plastics, on have filter stick 126 absorption in a lot of infiltrations hole to remove flavor after, in the pond, go for 107 times by water pipe, there is the top cover 124 of maintenance personal's lower storage reservoir on the top, pond, the filter flavor also has dividing plate 127 in the pond, also have ladder and ventilating pipe 122 by wall place, pond, the water that is pooled to sewer pipe 119 all flows in the sewer 120 at last and goes.
9, urban building according to claim 1 and sub-district are biochemical reclaims and regeneration water-saving system, it is characterized in that: because the novel flush toilet among the present invention has significant water-saving deodorizing function, and the biochemical recovery system among the present invention is because of the change that relates to storied building structure and don't may popularize in an all-round way socially in a short time, so, be indebted to society in order to allow the lavatory of this water saving appear on the market early with utensil, do not having under the supporting prerequisite of air discharging facility, its water supply volume can be adjusted to 1 jin in stool; on half jin the consumption of urinate; the length of regulating pull rope can be accomplished; other; fan pipeline in the assembly with the wind energy among the present invention, also can receive positive effect to borrowing that wind energy improves IAQ (indoor air quality).
CN2007100076458A 2007-01-19 2007-01-19 System for biochemically recovering and regenerated saving water in urban residence Expired - Fee Related CN101074566B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100076458A CN101074566B (en) 2007-01-19 2007-01-19 System for biochemically recovering and regenerated saving water in urban residence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100076458A CN101074566B (en) 2007-01-19 2007-01-19 System for biochemically recovering and regenerated saving water in urban residence

Publications (2)

Publication Number Publication Date
CN101074566A true CN101074566A (en) 2007-11-21
CN101074566B CN101074566B (en) 2011-11-02

Family

ID=38975816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100076458A Expired - Fee Related CN101074566B (en) 2007-01-19 2007-01-19 System for biochemically recovering and regenerated saving water in urban residence

Country Status (1)

Country Link
CN (1) CN101074566B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871234A (en) * 2010-06-28 2010-10-27 郭厚德 Biochemical recovery second-generation toilet seat and matching apparatus thereof
CN102353358A (en) * 2011-06-17 2012-02-15 长江航道局 Self-propelled detector for water depth of navigation channel
CN102720260A (en) * 2012-06-21 2012-10-10 许博 Closestool communication pipe device
CN105906040A (en) * 2016-06-07 2016-08-31 北京碧水源膜科技有限公司 MBR unit capable of achieving three-dimensional reciprocating motion and MBR system with same
CN107386379A (en) * 2017-08-02 2017-11-24 盐城市威隆管夹制造有限公司 A kind of residence building Nei Dung just retracting devices
CN108708439A (en) * 2018-08-14 2018-10-26 广东环境保护工程职业学院 Water-saving system between water saving fixtures and environmentally-friendly sanitary between environmentally-friendly sanitary
CN110523744A (en) * 2019-08-19 2019-12-03 宁波欧琳厨具有限公司 A kind of refuse disposal installation and sink
CN111825233A (en) * 2020-08-24 2020-10-27 兰州交通大学 Centrifugal water purification and supply device
CN112591913A (en) * 2020-11-23 2021-04-02 鲁森环保科技集团有限公司 Plant waste water cyclic utilization equipment based on sewage treatment

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871234B (en) * 2010-06-28 2015-07-01 郭厚德 Biochemical recovery second-generation toilet seat and matching apparatus thereof
CN101871234A (en) * 2010-06-28 2010-10-27 郭厚德 Biochemical recovery second-generation toilet seat and matching apparatus thereof
CN102353358A (en) * 2011-06-17 2012-02-15 长江航道局 Self-propelled detector for water depth of navigation channel
CN102353358B (en) * 2011-06-17 2013-06-05 长江航道局 Self-propelled detector for water depth of navigation channel
CN102720260A (en) * 2012-06-21 2012-10-10 许博 Closestool communication pipe device
CN105906040B (en) * 2016-06-07 2018-10-19 北京碧水源膜科技有限公司 The MBR film group devices that three-dimensional moves back and forth and the MBR system containing the film group device
CN105906040A (en) * 2016-06-07 2016-08-31 北京碧水源膜科技有限公司 MBR unit capable of achieving three-dimensional reciprocating motion and MBR system with same
CN107386379A (en) * 2017-08-02 2017-11-24 盐城市威隆管夹制造有限公司 A kind of residence building Nei Dung just retracting devices
CN108708439A (en) * 2018-08-14 2018-10-26 广东环境保护工程职业学院 Water-saving system between water saving fixtures and environmentally-friendly sanitary between environmentally-friendly sanitary
CN108708439B (en) * 2018-08-14 2024-04-05 广东环境保护工程职业学院 Environment-friendly toilet water saving device and environment-friendly toilet water saving system
CN110523744A (en) * 2019-08-19 2019-12-03 宁波欧琳厨具有限公司 A kind of refuse disposal installation and sink
CN110523744B (en) * 2019-08-19 2023-04-28 宁波欧琳科技股份有限公司 Garbage disposal device and water tank
CN111825233A (en) * 2020-08-24 2020-10-27 兰州交通大学 Centrifugal water purification and supply device
CN112591913A (en) * 2020-11-23 2021-04-02 鲁森环保科技集团有限公司 Plant waste water cyclic utilization equipment based on sewage treatment

Also Published As

Publication number Publication date
CN101074566B (en) 2011-11-02

Similar Documents

Publication Publication Date Title
CN101074566B (en) System for biochemically recovering and regenerated saving water in urban residence
Sedlak Water 4.0: The Past, Present, and Future of the World? s Most Vital Resource
CN102067824B (en) Closed circulating seawater prawn pond culture system
CN100537462C (en) Water quality purification method in source-free water area and facilities
CN202594913U (en) Turn back flow type landscape composite artificial wetland sewage treatment system
CN107555713A (en) Cleaning system and method for Drain contamination for river channel risk point
CN101748776A (en) Biochemical recover and regeneration water-saving system for urban building and community
CN209383612U (en) A kind of Biological Pretreatment system suitable for river type water head site water body
CN106495407A (en) A kind of combined artificial wetland process system for denitrogenation dephosphorizing
CN107721079A (en) A kind of urban river ecological is administered and repair system
CN100519449C (en) Quick-decomposing biological sewage treatment method and treating system
CN207608950U (en) The rainwater-collecting and rainwater in sponge city afforest cyclic utilization system
CN101445300A (en) Eutrophic water low-energy consumption mobility bed-constructed wetland combined treatment method
CN106517524B (en) A kind of device and method of micro- aeration rotating wetland filtering pond processing town sewage
CN207047057U (en) A kind of water circulation cleaning system with ecofallows function
CN101445308B (en) Method for treating feces and device therefor
CN102172192B (en) Method for treating desert by using municipal domestic sewage
CN213296910U (en) Sponge city roof rainwater is collected and is recycled device
CN205367891U (en) Rural sewage treatment system of little anaerobism
CN205346958U (en) Drum formula integration domestic sewage biological treatment ware
CN105948426A (en) Domestic sewage treatment device
CN205712410U (en) A kind of drainage system of artificial swamp
CN209242863U (en) A kind of green building life sewage treatment and reuse system
CN102619261A (en) Sewage recovering, processing and reusing system
CN207760167U (en) A kind of sewage cycling treatment device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20140119