CN100590294C - Waste filling thin coal seam tunnelling method - Google Patents
Waste filling thin coal seam tunnelling method Download PDFInfo
- Publication number
- CN100590294C CN100590294C CN200710020152A CN200710020152A CN100590294C CN 100590294 C CN100590294 C CN 100590294C CN 200710020152 A CN200710020152 A CN 200710020152A CN 200710020152 A CN200710020152 A CN 200710020152A CN 100590294 C CN100590294 C CN 100590294C
- Authority
- CN
- China
- Prior art keywords
- coal
- tunnel
- coal seam
- filling
- spoil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000002699 waste material Substances 0.000 title claims description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000000605 extraction Methods 0.000 claims description 5
- 239000011435 rock Substances 0.000 claims description 5
- 238000007569 slipcasting Methods 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 abstract 2
- 235000019738 Limestone Nutrition 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000006028 limestone Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000029087 digestion Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000003245 working effect Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a tunneling method by filling thin coal layer with coal gangue. Said method is characterized by that after the tunnel meeting production requirements is excavated in the thin coal layer zone, the width of said tunnel section is 1.5-2 m, at two sides of said tunnel a coal layer whose length is less than 12 m is respectively excavated along the thin coal layer, thenthe obtained coal body space can be filled up with coal gangue obtained by tunneling, if necessary, the filled coal gangue can be grouted.
Description
Technical field
The present invention relates to a kind of waste filling thin coal seam tunnelling method, be particularly useful for harder roof and floors such as limestone, sandstone.
Background technology
In thickness was thin seam mining below the 1.3m, crawlway digging gangue recovery ratio was big, and the rate of producing coal is low, and its cost is higher, at present for the digging of crawlway, did not also have the method for specially suitable its excavation cost of reduction.
Summary of the invention
The purpose of this invention is to provide a kind of waste filling thin coal seam tunnelling method, it is big to solve crawlway digging gangue recovery ratio, and the problem that the rate of producing coal is low reduces the tunnelling cost, and is implemented in down-hole digestion process digging gangue.
Waste filling thin coal seam tunnelling method of the present invention, excavate the wide 2~3m of being in the girdle zone, height is after 1.5~2m satisfies the drift section of regular production requirement, respectively excavate the coal seam of length in the both sides, tunnel along girdle again less than 12m, filling is carried out with the spoil that the tunnel excavates in coal body space after the extraction, carry out in case of necessity the spoil of filling is carried out slip casting, make it contact tight with base plate with seam roof, under the good situation of wall rock condition, the roadway support mode can be bare supporting, but during driving, top board is in a single day broken, should in time increase and hold up the canopy supporting.
Waste filling thin coal seam tunnelling method of the present invention, the coal body that makes full use of the extraction of both sides, tunnel are carried out the bastard coal displacement as the filling space.For the harder top board of country rock good adaptive capacity is arranged, be particularly useful for top boards such as limestone, sandstone, can effectively control under the condition of deformation of the surrounding rock in tunnel, realize that driving has more coal and goes out spoil less, reduces the tunnelling cost.This method is used for reference the operating principle of traditional stope drift active workings roadside packing gob side entry driving method, the other release in lane and colliery cancellation hillock-downhole gangue treatment technology, has concentrated from the source and has reduced the spoil output, has realized that spoil does not go out the advantage of well.Be better than the other waste filling gob side entry driving in traditional lane aspect safeguarding again in tunnelling, and improved the driving coal output of crawlway.This method easy construction after spoil and coal displacement, can be saved the tunnelling cost greatly.In addition, greatly reduce ten thousand tons of drivage ratios and go out the cash rate, reduced spoil and stacked the environment pollution that is brought with a ton coal.
Description of drawings
Accompanying drawing is a waste filling thin coal seam tunnelling section structure schematic diagram of the present invention.
Among the figure: 1-girdle top board, 2-waste filling layer, 3-girdle, 4-girdle base plate, 5-tunnel.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are further described:
Shown in the accompanying drawing, after excavating tunnel 5 sections that satisfy the regular production requirement, 5 both sides respectively excavate the coal seam of certain-length along girdle 3 in the tunnel again, the specification in tunnel 5 is generally: width is about 2.5m, girdle base plate 4 can reach about 1.8m apart from the height of girdle top board 1, about two help the coal body length maximum of the girdle 3 of extraction to reach about 10m.Adhere to beating shallow eye, few powder charge, improve roadway quality.The spoil that coal body space after the extraction excavates with the tunnel carries out filling to be reinforced, the time in case of necessity the spoil layer 2 of filling is carried out slip casting, it is tight that its and top, coal seam top board 1 contacts with seat earth 4, guarantees that the tunnel satisfies normally use.Under the good situation of wall rock condition, the roadway support mode can be bare supporting, but when driving, and top board will in time be modified to and hold up the canopy supporting in case broken.
Claims (1)
1. waste filling thin coal seam tunnelling method, excavate the wide 2~3m of being in the girdle zone, height is after 1.5~2m satisfies the drift section of regular production requirement, it is characterized in that: respectively excavate the coal seam of length along girdle less than 12m in the both sides, tunnel, filling is carried out with the spoil that the tunnel excavates in coal body space after the extraction, spoil to filling carries out slip casting in case of necessity, make it contact tight with base plate with seam roof, under the good situation of wall rock condition, the roadway support mode is bare supporting, during nude supporting driving, top board is in case broken, and timely increasing held up the canopy supporting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710020152A CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710020152A CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101021153A CN101021153A (en) | 2007-08-22 |
CN100590294C true CN100590294C (en) | 2010-02-17 |
Family
ID=38709024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200710020152A Expired - Fee Related CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100590294C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967992A (en) * | 2010-09-17 | 2011-02-09 | 山东新矿赵官能源有限责任公司 | Different-strength bearing roadside filler for pillar-free mining of thin coal bed |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424195B (en) * | 2008-01-23 | 2011-08-31 | 王岩 | Method for digging gangue and filling tunnel for coal mine coal-rock drift |
CN101798927B (en) * | 2010-04-01 | 2011-12-07 | 中国矿业大学 | Near infrared spectral recognizing coal gangue and gangue content control method |
CN101975064B (en) * | 2010-10-21 | 2012-11-07 | 中南大学 | Mechanical continuous mining method for gently inclined thin ore body |
CN102011610B (en) * | 2010-10-28 | 2013-01-16 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102337925B (en) * | 2011-08-31 | 2013-12-25 | 山东科技大学 | Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving |
CN102943674B (en) * | 2012-11-14 | 2015-09-16 | 山东科技大学 | Thin coal seam wide roadway digging gangue bag placement method under a kind of tight roof |
CN111022062B (en) * | 2019-12-06 | 2022-09-16 | 首钢滦南马城矿业有限责任公司 | Construction method for clay layer section of ramp |
CN111456805B (en) * | 2020-04-20 | 2021-01-01 | 北京中矿创新联盟能源环境科学研究院 | Waste rock filling and supporting method of ultra-thin coal seam based on N00 construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2277171C1 (en) * | 2004-11-09 | 2006-05-27 | ГНУ "Центр информационно-аналитического обеспечения системы дистанционного образования Министерства образования Российской Федерации" (ЦИАН) | Method of underground solid mineral deposit mining |
CN1782327A (en) * | 2004-12-03 | 2006-06-07 | 北京中矿机电工程技术研究所 | Method for coal mine waste rock pipeline transporting and tunnel filling and injecting slurry |
CN1782326A (en) * | 2004-12-03 | 2006-06-07 | 河北金牛能源股份有限公司 | Method for treating waste rock in coal mine |
-
2007
- 2007-02-23 CN CN200710020152A patent/CN100590294C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2277171C1 (en) * | 2004-11-09 | 2006-05-27 | ГНУ "Центр информационно-аналитического обеспечения системы дистанционного образования Министерства образования Российской Федерации" (ЦИАН) | Method of underground solid mineral deposit mining |
CN1782327A (en) * | 2004-12-03 | 2006-06-07 | 北京中矿机电工程技术研究所 | Method for coal mine waste rock pipeline transporting and tunnel filling and injecting slurry |
CN1782326A (en) * | 2004-12-03 | 2006-06-07 | 河北金牛能源股份有限公司 | Method for treating waste rock in coal mine |
Non-Patent Citations (4)
Title |
---|
保证生产安全提高回收率、国营煤矿实行新法采煤、半年来,事故减少,效率提高,成本减低,节省了大量国家资金. 燃料工业部通讯处.***. 1950 * |
坚硬顶板薄煤层皮带巷洁净快速施工技术. 刘文.煤炭技术,第25卷第10期. 2006 * |
煤矸石对环境的危害及其综合治理与利用. 汪洪清.煤炭加工与综合利用,第3期. 2003 * |
矸石充填带在薄煤层开采中的应用. 王文博.煤炭工程师,第4期. 1992 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967992A (en) * | 2010-09-17 | 2011-02-09 | 山东新矿赵官能源有限责任公司 | Different-strength bearing roadside filler for pillar-free mining of thin coal bed |
CN101967992B (en) * | 2010-09-17 | 2011-06-01 | 山东新矿赵官能源有限责任公司 | Different-strength bearing roadside filler for pillar-free mining of thin coal bed |
Also Published As
Publication number | Publication date |
---|---|
CN101021153A (en) | 2007-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100590294C (en) | Waste filling thin coal seam tunnelling method | |
CN112360462B (en) | Mining process for filling and grouting short-wall fully-mechanized mining gangue | |
CN103821558B (en) | Coal mine gob filling mining and gob side entry retaining filling process | |
CN103410515B (en) | It is a kind of that three-soft seam is reciprocating combines mining method without coal column | |
CN101864956B (en) | Sectional coal pillar-free exploitation method | |
CN110242301A (en) | A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer | |
CN103742148B (en) | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam | |
CN104763434B (en) | A kind of without coal column double lanes driving method | |
CN102392642A (en) | Method for arranging roadways on coal-pillar-free stope | |
CN110424966B (en) | Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method | |
CN111364998B (en) | Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing | |
CN110359914B (en) | Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body | |
CN113202475B (en) | Filling caving mining method | |
CN102877848B (en) | Method for performing coal mining and gangue cementation stripe filling simultaneously | |
CN104500070A (en) | Continuous coal mining machine paste filling mining method | |
CN103993881A (en) | Long-wall roadway type cemented filling mining method | |
CN112360550A (en) | Method for injecting and filling coal-based solid waste paste in low-position roof separation zone in gob-side entry retaining | |
CN109869150A (en) | A kind of mine resources are segmented the full office of adopting and fill recovery method | |
CN112593939A (en) | Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling | |
CN102011610B (en) | Supporting method of no-pillar mining mode for medium-thick coal seams | |
CN109630112A (en) | A kind of N00 mining codes for cutting top filling | |
CN100485161C (en) | Upward spacing admission passage filling mining method | |
CN109630116B (en) | Mining method for inclined medium-thickness blind ore body | |
CN109505604B (en) | Slope ramp arrangement method applied to stope adopting upward layered filling mining method | |
CN109973094A (en) | Recovery method is filled by a kind of coplanar full office of adopting of mine resources |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20110223 |