Waste filling thin coal seam tunnelling method Download PDFInfo
- Publication number
- CN101021153A CN101021153A CN 200710020152 CN200710020152A CN101021153A CN 101021153 A CN101021153 A CN 101021153A CN 200710020152 CN200710020152 CN 200710020152 CN 200710020152 A CN200710020152 A CN 200710020152A CN 101021153 A CN101021153 A CN 101021153A
- Authority
- CN
- China
- Prior art keywords
- coal
- tunnel
- coal seam
- filling
- spoil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003245 coal Substances 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000002699 waste material Substances 0.000 title claims description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000000605 extraction Methods 0.000 claims description 5
- 239000011435 rock Substances 0.000 claims description 5
- 238000007569 slipcasting Methods 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 abstract 2
- 235000019738 Limestone Nutrition 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000006028 limestone Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000029087 digestion Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000003245 working effect Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a tunneling method by filling thin coal layer with coal gangue. Said method is characterized by that after the tunnel meeting production requirements is excavated in the thin coal layer zone, the width of said tunnel section is 1.5-2 m, at two sides of said tunnel a coal layer whose length is less than 12 m is respectively excavated along the thin coal layer, then the obtained coal body space can be filled up with coal gangue obtained by tunneling, if necessary, the filled coal gangue can be grouted.
Description
Technical field
The present invention relates to a kind of waste filling thin coal seam tunnelling method, be particularly useful for harder roof and floors such as limestone, sandstone.
Background technology
In thickness was thin seam mining below the 1.3m, crawlway digging gangue recovery ratio was big, and the rate of producing coal is low, and its cost is higher, at present for the digging of crawlway, did not also have the method for specially suitable its excavation cost of reduction.
Summary of the invention
The purpose of this invention is to provide a kind of waste filling thin coal seam tunnelling method, it is big to solve crawlway digging gangue recovery ratio, and the problem that the rate of producing coal is low reduces the tunnelling cost, and is implemented in down-hole digestion process digging gangue.
Waste filling thin coal seam tunnelling method of the present invention, excavate the wide 2~3m of being in the girdle zone, height is after 1.5~2m satisfies the drift section of regular production requirement, respectively excavate the coal seam of length in the both sides, tunnel along girdle again less than 12m, filling is carried out with the spoil that the tunnel excavates in coal body space after the extraction, carry out in case of necessity the spoil of filling is carried out slip casting, make it contact tight with base plate with seam roof, under the good situation of wall rock condition, the roadway support mode can be bare supporting, but during driving, top board is in a single day broken, should in time increase and hold up the canopy supporting.
Waste filling thin coal seam tunnelling method of the present invention, the coal body that makes full use of the extraction of both sides, tunnel are carried out the bastard coal displacement as the filling space.For the harder top board of country rock good adaptive capacity is arranged, be particularly useful for top boards such as limestone, sandstone, can effectively control under the condition of deformation of the surrounding rock in tunnel, realize that driving has more coal and goes out spoil less, reduces the tunnelling cost.This method is used for reference the operating principle of traditional stope drift active workings roadside packing gob side entry driving method, the other release in lane and colliery cancellation hillock-downhole gangue treatment technology, has concentrated from the source and has reduced the spoil output, has realized that spoil does not go out the advantage of well.Be better than the other waste filling gob side entry driving in traditional lane aspect safeguarding again in tunnelling, and improved the driving coal output of crawlway.This method easy construction after spoil and coal displacement, can be saved the tunnelling cost greatly.In addition, greatly reduce ten thousand tons of drivage ratios and go out the cash rate, reduced spoil and stacked the environment pollution that is brought with a ton coal.
Description of drawings
Accompanying drawing is a waste filling thin coal seam tunnelling section structure schematic diagram of the present invention.
Among the figure: 1-girdle top board, 2-waste filling layer, 3-girdle, 4-girdle base plate, 5-tunnel.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are further described:
Shown in the accompanying drawing, after excavating tunnel 5 sections that satisfy the regular production requirement, 5 both sides respectively excavate the coal seam of certain-length along girdle 3 in the tunnel again, the specification in tunnel 5 is generally: width is about 2.5m, girdle base plate 4 can reach about 1.8m apart from the height of girdle top board 1, about two help the coal body length maximum of the girdle 3 of extraction to reach about 10m.Adhere to beating shallow eye, few powder charge, improve roadway quality.The spoil that coal body space after the extraction excavates with the tunnel carries out filling to be reinforced, the time in case of necessity the spoil layer 2 of filling is carried out slip casting, it is tight that its and top, coal seam top board 1 contacts with seat earth 4, guarantees that the tunnel satisfies normally use.Under the good situation of wall rock condition, the roadway support mode can be bare supporting, but when driving, and top board will in time be modified to and hold up the canopy supporting in case broken.
Claims (1)
1. waste filling thin coal seam tunnelling method, it is characterized in that: excavate the wide 2~3m of being in the girdle zone, height is after 1.5~2m satisfies the drift section of regular production requirement, respectively excavate the coal seam of length in the both sides, tunnel along girdle again less than 12m, filling is carried out with the spoil that the tunnel excavates in coal body space after the extraction, carry out in case of necessity the spoil of filling is carried out slip casting, make it contact tight with base plate with seam roof, under the good situation of wall rock condition, the roadway support mode can be bare supporting, but during driving, top board is in case broken, and the canopy supporting is held up in increase in time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710020152A CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710020152A CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101021153A true CN101021153A (en) | 2007-08-22 |
CN100590294C CN100590294C (en) | 2010-02-17 |
Family
ID=38709024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200710020152A Expired - Fee Related CN100590294C (en) | 2007-02-23 | 2007-02-23 | Waste filling thin coal seam tunnelling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100590294C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101798927A (en) * | 2010-04-01 | 2010-08-11 | 中国矿业大学 | Near infrared spectral recognizing coal gangue and gangue content control method |
CN101975064A (en) * | 2010-10-21 | 2011-02-16 | 中南大学 | Mechanical continuous mining method for gently inclined thin ore body |
CN102011610A (en) * | 2010-10-28 | 2011-04-13 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN101424195B (en) * | 2008-01-23 | 2011-08-31 | 王岩 | Method for digging gangue and filling tunnel for coal mine coal-rock drift |
CN102337925A (en) * | 2011-08-31 | 2012-02-01 | 山东科技大学 | Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving |
CN102943674A (en) * | 2012-11-14 | 2013-02-27 | 山东科技大学 | Gangue bag filling method in thin coal seam wide roadway tunneling under tight roof |
CN111022062A (en) * | 2019-12-06 | 2020-04-17 | 首钢滦南马城矿业有限责任公司 | Construction method for clay layer section of ramp |
CN111456805A (en) * | 2020-04-20 | 2020-07-28 | 北京中矿创新联盟能源环境科学研究院 | Waste rock filling and supporting method of ultra-thin coal seam based on N00 construction method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967992B (en) * | 2010-09-17 | 2011-06-01 | 山东新矿赵官能源有限责任公司 | Different-strength bearing roadside filler for pillar-free mining of thin coal bed |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2277171C1 (en) * | 2004-11-09 | 2006-05-27 | ГНУ "Центр информационно-аналитического обеспечения системы дистанционного образования Министерства образования Российской Федерации" (ЦИАН) | Method of underground solid mineral deposit mining |
CN1782326B (en) * | 2004-12-03 | 2010-09-08 | 河北金牛能源股份有限公司 | Method for treating waste rock in coal mine |
CN1782327A (en) * | 2004-12-03 | 2006-06-07 | 北京中矿机电工程技术研究所 | Method for coal mine waste rock pipeline transporting and tunnel filling and injecting slurry |
-
2007
- 2007-02-23 CN CN200710020152A patent/CN100590294C/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424195B (en) * | 2008-01-23 | 2011-08-31 | 王岩 | Method for digging gangue and filling tunnel for coal mine coal-rock drift |
CN101798927A (en) * | 2010-04-01 | 2010-08-11 | 中国矿业大学 | Near infrared spectral recognizing coal gangue and gangue content control method |
CN101798927B (en) * | 2010-04-01 | 2011-12-07 | 中国矿业大学 | Near infrared spectral recognizing coal gangue and gangue content control method |
CN101975064B (en) * | 2010-10-21 | 2012-11-07 | 中南大学 | Mechanical continuous mining method for gently inclined thin ore body |
CN101975064A (en) * | 2010-10-21 | 2011-02-16 | 中南大学 | Mechanical continuous mining method for gently inclined thin ore body |
CN102011610A (en) * | 2010-10-28 | 2011-04-13 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102011610B (en) * | 2010-10-28 | 2013-01-16 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102337925A (en) * | 2011-08-31 | 2012-02-01 | 山东科技大学 | Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving |
CN102337925B (en) * | 2011-08-31 | 2013-12-25 | 山东科技大学 | Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving |
CN102943674A (en) * | 2012-11-14 | 2013-02-27 | 山东科技大学 | Gangue bag filling method in thin coal seam wide roadway tunneling under tight roof |
CN102943674B (en) * | 2012-11-14 | 2015-09-16 | 山东科技大学 | Thin coal seam wide roadway digging gangue bag placement method under a kind of tight roof |
CN111022062A (en) * | 2019-12-06 | 2020-04-17 | 首钢滦南马城矿业有限责任公司 | Construction method for clay layer section of ramp |
CN111456805A (en) * | 2020-04-20 | 2020-07-28 | 北京中矿创新联盟能源环境科学研究院 | Waste rock filling and supporting method of ultra-thin coal seam based on N00 construction method |
Also Published As
Publication number | Publication date |
---|---|
CN100590294C (en) | 2010-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100590294C (en) | Waste filling thin coal seam tunnelling method | |
CN103821558B (en) | Coal mine gob filling mining and gob side entry retaining filling process | |
CN112360462B (en) | Mining process for filling and grouting short-wall fully-mechanized mining gangue | |
CN101864956B (en) | Sectional coal pillar-free exploitation method | |
CN110242301A (en) | A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer | |
CN103742148B (en) | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam | |
CN103161480B (en) | Initiatively support the method for roadside packing gob side entry retaining | |
CN102392642A (en) | Method for arranging roadways on coal-pillar-free stope | |
CN104763434B (en) | A kind of without coal column double lanes driving method | |
CN111364998B (en) | Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing | |
CN103410515A (en) | Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method | |
CN113202475B (en) | Filling caving mining method | |
CN103615285A (en) | Stope route arrangement mode and method beneficial to roof-contacted filling | |
CN109681206A (en) | A method of filling control ground settlement of mining | |
CN101922292A (en) | Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application | |
CN104500070A (en) | Continuous coal mining machine paste filling mining method | |
CN102877848B (en) | Method for performing coal mining and gangue cementation stripe filling simultaneously | |
CN102979526B (en) | Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining | |
CN103993881A (en) | Long-wall roadway type cemented filling mining method | |
CN112593939A (en) | Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling | |
CN112360550A (en) | Method for injecting and filling coal-based solid waste paste in low-position roof separation zone in gob-side entry retaining | |
CN102011610B (en) | Supporting method of no-pillar mining mode for medium-thick coal seams | |
CN108035714A (en) | Spoil zero-emission short face is without coal pillar mining method | |
CN109630112A (en) | A kind of N00 mining codes for cutting top filling | |
CN100485161C (en) | Upward spacing admission passage filling mining method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20110223 |