CN100528731C - Wharf crane and construction method - Google Patents

Wharf crane and construction method Download PDF

Info

Publication number
CN100528731C
CN100528731C CNB200810105493XA CN200810105493A CN100528731C CN 100528731 C CN100528731 C CN 100528731C CN B200810105493X A CNB200810105493X A CN B200810105493XA CN 200810105493 A CN200810105493 A CN 200810105493A CN 100528731 C CN100528731 C CN 100528731C
Authority
CN
China
Prior art keywords
wharf crane
cantilever
upright post
crane
main couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB200810105493XA
Other languages
Chinese (zh)
Other versions
CN101269782A (en
Inventor
刘辉
陈永宏
张启桥
刘建廷
杜官民
邓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Group Ltd CREC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Group Ltd CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Group Ltd CREC filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNB200810105493XA priority Critical patent/CN100528731C/en
Publication of CN101269782A publication Critical patent/CN101269782A/en
Application granted granted Critical
Publication of CN100528731C publication Critical patent/CN100528731C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention aims at providing a novel structural wharf crane and a construction method thereof, and satisfies the needs of sectional transportation of the especially big bridge body of a modern long-span highway and a railway. The wharf crane of the invention comprises a plurality of groups of upright posts, a fixing suspension point and a crown block run system, and the fixing suspension point is composed of corresponding upright post bases, a main truss, a lifting truss, a windlass lifting system and pulley blocks. The wharf crane also comprises a cantilever, and the cantilever is composed of the front end of the main truss, the upright posts and a steel tube triangular support; the lower end is hinged with upright post bases; other upright posts are fixedly connected with the upright post bases. At least one upright post base near the cantilever forms a flexible connection with the main truss. The inner side of the steel tube triangular support is provided with a balance weight, and one balance weight is arranged on a position of the upright post. The main truss is provided with a longitudinal slope, and the slope can be set at 0.5 percent. The wharf crane has the construction method that the wharf crane steps over the highway, a riverbank and the cantilever are extended to a riverway; the wharf crane is spanned on a position of a pier used for constructing a new railway bridge, an included angle exists between a center line of the main truss of the wharf crane and the center line of the riverway, and the lifting truss is parallel to the center line of the highway.

Description

A kind of wharf crane and construction method thereof
Technical field:
The present invention relates to modern large span highway, the especially big bridge body section transhipment of railway technical field, specifically is under the condition that does not influence water route and land transport, realizes that the beam body is from water channel disembarkation and traversing a kind of wharf crane and construction method thereof in place.
Background technology:
General precast beam is transported by water, and the conventional trestle method that adopts of the harbour of setting must take the river course, the influence navigation; And the trestle height is limited, can't satisfy for the needs of transporting the precast beam highway crossing.Have no idea to satisfy large span highway, the especially big bridge body segment of railway requirement transhipment requirement more.
Summary of the invention:
The wharf crane and the construction method thereof that the purpose of this invention is to provide a kind of new structure satisfy modern large span highway, the especially big bridge body section transhipment of railway needs.
For realizing that the technical scheme that the object of the invention adopts is: a kind of wharf crane, comprise fixedly suspension centre, overhead traveling crane walking system that many group columns and corresponding upright post basic, main couple, a hanging truss, winch tackling system, assembly pulley are formed, also include cantilever, this cantilever is that main couple front end and column, a steel pipe gusseted constitute, its lower end and upright post basic are hinged, and other columns are captiveed joint with upright post basic.
Near the column of cantilever at least one with the main couple flexible connection.
Be provided with counterweight in steel pipe gusseted inboard.
Column place in adjacent cantilever is provided with counterweight.
Main couple is provided with longitudinal gradient, and this gradient can be set to 0.5%.
The construction method of above-mentioned a kind of wharf crane is: this wharf crane crossing highway, river levee, cantilever extend on the river course, this wharf crane is erected at the bridge pier place that is used to make up new railway bridge, and there are an angle in this wharf crane main couple line of centers and river course line of centers, play line parallel in hanging truss and the highway.
Good effect of the present invention is: the present invention is directed to modern large span highway, the especially big bridge body section of railway by water transport disembarkation and traversing in place, a kind of New-Type Wharf loop wheel machine of developing.This wharf crane has not only solved the beam body and has debarked traversing in placely, accounts for the river course again less, and keeps water route, land route unobstructed; This loop wheel machine plays hanging truss when specifically using and main couple can form certain angle, and main couple and bridge longitudinal centerline also can form an angle; Guarantee that transhipment lifting steel case beam is not subjected to the influence of physical features.Simultaneously, also adopt the unidirectional hinged and counterweight means of gusseted in design, improved the structure stress characteristic.Total longitudinally is provided with 0.5% longitudinal gradient, reduces the amount of deflection of cantilever end when lifting; Cantilever is that main couple front end and column, a steel pipe gusseted constitute, and its lower end and upright post basic are hinged, and other columns are captiveed joint with upright post basic, and counterweight, also is the unbalanced moment when lifting by crane steel case beam for balance; For be not limited in steel case beam when lifting truss on scratch, be set to bascule at truss and second near between the column of cantilever, promptly column is a compressed structure, does not participate in stressed when scratching on truss.Multiple spot is provided with counterweight, and the one, in order to reduce the difficulty that single-point is provided with counterweight; The 2nd, the caused chord member internal force of hogging moment that has produced when counterweight has reduced owing to lifting is set in three corner bracing inboards, improved the strained condition of structure.Harbour cross over river levee, highway directly with the handling of beam body to highway pavement, be transported to the bridge location place by chassis, the spelling platform has been saved the time greatly, has improved work efficiency.Not only solve the beam body and debarked traversing in placely, accounted for the river course again less, and kept water route, land route unobstructed.
Description of drawings:
Fig. 1 wharf crane structural representation of the present invention.
Fig. 2 wharf crane cantilever of the present invention lower end and the hinged scheme drawing of upright post basic.
Fig. 3 wharf crane column of the present invention and main couple movable connection structure scheme drawing.
Fig. 4 wharf crane of the present invention makes up scheme drawing.
Fig. 5-Fig. 8 wharf crane quadravalence of the present invention operating mode scheme drawing.
The specific embodiment:
Describing embodiments of the present invention in conjunction with the accompanying drawings, only be convenient to understand summary of the invention specific embodiment, is not the restriction to protection domain.
A kind of wharf crane, comprise fixedly suspension centre, overhead traveling crane walking system that many group columns 1 and corresponding upright post basic 2, main couple 3, a hanging truss 4, winch tackling system, assembly pulley are formed, also include cantilever 5, this cantilever 5 is that main couple front end and column, a steel pipe gusseted 52 constitute, its lower end and upright post basic are hinged, and other columns are captiveed joint with upright post basic.Second column and the main couple near cantilever flexibly connects.Be provided with counterweight 6 in steel pipe gusseted inboard.Also be provided with counterweight at second the column place simultaneously near cantilever.Main truss sets up longitudinal gradient, and this gradient can be set to 0.5%.The construction method of above-mentioned a kind of wharf crane is: this wharf crane crossing highway, river levee, cantilever extend on the river course, this wharf crane is erected at the bridge pier place that is used to make up new railway bridge, and there are an angle α in this wharf crane main couple line of centers and river course line of centers, play line parallel in hanging truss and the highway.
In conjunction with Fig. 5-quadravalence operating mode shown in Figure 8, the following specifically describes load and calculate and the computational analysis of harbour operating mode internal force.
1, calculate load:
The primary load of harbour main couple comprises steel case beam weight, plays hanging truss and tackling system weight, plays hanging truss running mechanism weight and main couple deadweight.
Full-bridge steel case beam is divided into 62 sections, standard beam segment length 12m wherein, totally 46 sections, 8 sections of standard beam section top, base plate thickenings, 4 sections of special facture beam sections, 4 sections of steel reinforced concrete adapter sections.Lifting weight segmentation statistics is as shown in the table:
Steel case beam lifting quantity statistics table
Classification Category-A beam section Category-B beam section C class beam section D class beam section E class beam section The steel reinforced concrete adapter section
Numbering
1# 2#、28# 3#、27# 4#~26# 29# ——
Quantity 2 4 4 46 2 4
Lifting weight 75.4t 204.7t 182.5t 174.9t 145.5t 142.3t
Harbour calculates load and gets the maximum lift heavy of steel case beam (considering 1.2 coefficient of impact):
G 1=205t
Crane truss and accessory structure: G 2=86.4t
Running mechanism is heavy: G 3=39.4t
∑G=1.2G 1+G 2+G 3=1.2×205+86.4+39.4=371.8t
The deadweight of harbour main couple is counted automatically by system.
2, harbour calculates
Harbour calculates and adopts the algor93 finite element analysis software, sets up space-truss model.
Following tabular has gone out several major control operating modes.Capsizing moment during for the balanced cantilever maximum, column place inboard at three corner bracings and the 3rd close cantilever has increased the 60t counterweight.
Operating mode one: the most unfavorable processing condition of lifting steel case beam, load center cantilever length 14m.This moment three corner bracings (pressurized) and first near the stressed maximum of the column of cantilever inboard pricncipal rafter (tension).This moment capsizing moment Mq = ΣG 2 L = 371.8 2 × 14 = 2602.6 t · m .
Main operating mode internal force table
Numbering R1 R2 R3 R4 R5 R6 R7 R8 R9 Diagonal brace The sign rod member
Operating mode one 382t 8.9t 11.2t 220.6t 117.7t
Operating mode two 124t 157t 68t 45.2t 22.1t 42t
Operating mode three 96t 122.2t 61t 37t 58t
Operating mode four 76t 105t 56.6t 14t 58.3t
Balancing torque by the counterweight generation: M P1=P (L 1+ L 2)=60 * (13+33)=2760tm
Balancing torque by the truss generation: M P2=G hL 3=25 * 27=675tm
Safety factor: K=(M P1+ M P2)/M q=(2760+675)/2602.6=1.32
Near operating mode two: play hanging truss and run to second near the column of cantilever, second the column pressurized near cantilever.This moment is because the part vertical rod that concerns main couple and the brace of counterweight are stressed bigger.
Operating mode three: a hanging truss runs to the column and the 4th of the 3rd close cantilever near between the column of cantilever, and last lower boom is stressed not to be controlled, and it is stressed bigger to be mainly near the brace of column.
Operating mode four: a hanging truss runs to the column and the 5th of the 4th close cantilever near between the column of cantilever, and near the brace last lower boom and the column is stressed all bigger.

Claims (5)

1, a kind of wharf crane, comprise fixedly suspension centre, overhead traveling crane walking system that many group columns and corresponding upright post basic, main couple, a hanging truss, winch tackling system, assembly pulley are formed, it is characterized in that: also include cantilever, this cantilever is that main couple front end and column, a steel pipe gusseted constitute, the column of adjacent cantilever and main couple flexibly connect, and multiple spot is provided with counterweight, and its lower end and upright post basic are hinged, and other columns are captiveed joint with upright post basic; Play hanging truss and main couple and can form certain angle, main couple and bridge longitudinal centerline also can form an angle.
2, a kind of wharf crane of stating as claim 1 is characterized in that: be provided with counterweight in steel pipe gusseted inboard.
3, a kind of wharf crane of stating as claim 1 is characterized in that: the column place in adjacent cantilever is provided with counterweight.
4, a kind of wharf crane of stating as claim 1 or 2 or 3, it is characterized in that: main couple is provided with longitudinal gradient, and this gradient can be set to 0.5%.
5, the construction method as the described a kind of wharf crane of each claim of claim 1-4 is: this wharf crane crossing highway, river levee, cantilever extend on the river course, this wharf crane is erected at the bridge pier place that is used to make up new railway bridge, and there are an angle in this wharf crane main couple line of centers and river course line of centers, play line parallel in hanging truss and the highway.
CNB200810105493XA 2008-04-29 2008-04-29 Wharf crane and construction method Active CN100528731C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200810105493XA CN100528731C (en) 2008-04-29 2008-04-29 Wharf crane and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200810105493XA CN100528731C (en) 2008-04-29 2008-04-29 Wharf crane and construction method

Publications (2)

Publication Number Publication Date
CN101269782A CN101269782A (en) 2008-09-24
CN100528731C true CN100528731C (en) 2009-08-19

Family

ID=40004049

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200810105493XA Active CN100528731C (en) 2008-04-29 2008-04-29 Wharf crane and construction method

Country Status (1)

Country Link
CN (1) CN100528731C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508324B (en) * 2013-03-12 2015-07-01 中国有色金属工业第六冶金建设有限公司 Method for hoisting main large components of KP125MN hot die forging press
CN103787203B (en) * 2013-12-16 2016-06-08 重庆岩安科技有限公司 For installing the bracing frame of precast beam jack
CN108423565B (en) * 2018-04-18 2019-06-14 中铁十九局集团轨道交通工程有限公司 The erection and Demolition Construction method of U-shaped twin beams gantry crane with hook
CN109763426A (en) * 2018-12-18 2019-05-17 中铁广州工程局集团有限公司 A kind of long-span Steel Arch segment shipment method
CN114108811B (en) * 2021-11-30 2023-07-11 中建钢构工程有限公司 Unsupported installation method of super high-rise conversion truss

Also Published As

Publication number Publication date
CN101269782A (en) 2008-09-24

Similar Documents

Publication Publication Date Title
CN107905116B (en) Construction method of large-span through type rigid tied steel arch bridge
CN100528731C (en) Wharf crane and construction method
CN107354873A (en) A kind of cable hoisting and rotator construction system
CN101858059A (en) Construction method of erecting prestressed concrete beam on river
CN105544409B (en) Double guide beam bridge erecting machine sets up combination beam and now spells a section girder steel construction technology
CN111501584A (en) Bridge dismantling construction method for prestressed concrete continuous beam
CN210288140U (en) Simple and easy prefabricated decking hoist and mount platform truck
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN108221711A (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN102206934B (en) Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould
CN103147401B (en) Construction method of self-climbing portal frame
Drewry A memoir on suspension bridges
CN214531895U (en) Underground multi-layer pipe gallery wall body sliding frame structure
CN205000328U (en) Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam
CN212895958U (en) Lower hanging movable bridge floor crane
CN204919348U (en) Supplementary head tower of using of self anchored suspension bridge installation
CN110438906B (en) Arch rib construction method for deck box type arch bridge
CN109734003B (en) Suspended assembly crane and method for installing front-end cantilever of river crane based on suspended assembly crane
CN110863435A (en) Movable type section-assembled box girder transverse steel bundle tensioning working platform
CN211522920U (en) Bridge template separator
CN205740078U (en) The gantry of size adjustable
CN210066505U (en) Straddle door type crane support device
CN214566057U (en) Support structure for single point mooring system buoy construction and transportation
CN210134343U (en) Trolley for mounting drain pipe on outer side edge of bridge
CN211420902U (en) Single-segment box girder bridge girder erection machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150324

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150324

Address after: Chinese Railway Building No. 26 Beijing 100021 Fengtai District Lianhuachi South Lane

Patentee after: China Railway Group Co., Ltd.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: Chinese Railway Building No. 26 Beijing 100021 Fengtai District Lianhuachi South Lane

Patentee before: China Railway Group Co., Ltd.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.