CN102206934B CN2010102667026A CN201010266702A CN102206934B CN 102206934 B CN102206934 B CN 102206934B CN 2010102667026 A CN2010102667026 A CN 2010102667026A CN 201010266702 A CN201010266702 A CN 201010266702A CN 102206934 B CN102206934 B CN 102206934B
Authority
CN
China
Prior art keywords
truss
bridge
case beam
piece section
concrete continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102667026A
Other languages
Chinese (zh)
Other versions
CN102206934A (en
Inventor
上官兴
张璟
刘英卫
聂复生
罗贤虎
魏建华
徐青华
付杰
付书林
官华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Communications Design Research Institute Co., Ltd. of Jiangxi Prov.
Original Assignee
COMMUNICATIONS DESIGN INSTITUTE OF JIANGXI PRO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COMMUNICATIONS DESIGN INSTITUTE OF JIANGXI PRO filed Critical COMMUNICATIONS DESIGN INSTITUTE OF JIANGXI PRO
Priority to CN2010102667026A priority Critical patent/CN102206934B/en
Publication of CN102206934A publication Critical patent/CN102206934A/en
Application granted granted Critical
Publication of CN102206934B publication Critical patent/CN102206934B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a method for block-by-block casting of a concrete continuous beam bridge by using a military truss shift mould. The method is characterized by comprising the following steps of: firstly, dividing a full-span concrete continuous beam with span of L into two segmented box girders, casting the segmented box girder A located on a bridge pier and tensioning the prestress on the upper edge of the segmented box girder A; secondly, transferring withdrawn templates to the segmented box girder B located at the middle span and pouring after the segmented box girder A is cast completely, tensioning the linkage prestress of the segmented box girder A and the segmented box girder B and the prestress on the lower edge of the segmented box girder B after the strength is achieved, finally, transferring the withdrawn templates to the segmented box girder A of the next span to cast. The cross section of the concrete continuous beam can be of a single-box single-chamber type, a single-box two-chamber type, a single-box three-chamber type, a single-box four-chamber type, a single-box fifth-chamber type or a single-box six-chamber type; the bridge pier adopts a non-cover beam column structure comprising a single-column bridge pier, a dual-column bridge pier or a three-column bridge pier. Due to the adoption of the method for block-by-block casting of the concrete continuous beam bridge by using the military truss shift mould, only one set of military truss beam construction equipment with light weight, convenience in mounting/dismounting and good universality is used in construction, high construction speed and a short construction period are realized, and the majority of the members can be used repeatedly, so that good quality, cost reduction and investment saving are realized.

Description

A kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge
Technical field
The present invention relates to a kind of concrete continuous girder bridge casting method, particularly a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge.
Background technology
Simply supported girder bridge is medium and small main bridge type of striding the footpath road bridge because its technology is easy, materials are economized always, and main pattern has T type beam, little case beam, I shape or channel beam etc.Because itemize precast monolithic property is not good enough so all will water the steel bar concrete bridge floor of 10cm thickness on it more.Along with the development of China Higher level highway, and new bridge design standard clearly stipulates " the highway bridge and culvert design reference period is the requirement in 100 years ", simply supported girder bridge is many because of seam, leak, jump car, the operation performance is bad and poor durability not at the row of guarantee.And the beams and prestress concrete continuous bridge has good endurance, seam is few and the characteristics such as comfortable of driving a vehicle, and makes the beams and prestress concrete continuous of seamless box section will become following medium and small main body bridge type of striding the footpath road bridge.The continuous girder bridge great advantage is that it has overcome the peculiar disadvantage of simply supported beam itself at all on structure; Though the expense of construction period is high slightly, it is still economical to plan as a whole century-old maintenance expense, calculates from the full-bridge life-span, and substituting simply supported beam with continuous beam is the bridge Development Trend.The job practices of continuous girder bridge has several kinds of full framing (FSM), cantilever-construction (FCM), incremental launching method (ILM) and shifting formwork methods (MSS) etc.The domestic and abroad bridge engineering practice show for medium and small stride for the bridge of footpath the most economical with the MSS method because its construction state with become this unanimity of abutment, reasonable stress, material savings, speed of application are comparatively fast, expense is lower.China is from Xiamen Gao Ji sea wall bridge in 1991 (since 46m * 45 holes=2070m) introduces MSS technology; There are nearly hundred highway bridges to apply over more than 20 year; But most of shifting formworks are built bridge and are navigation bridge two sides beach access bridge, and it is very few to stride in the bridge of footpath utilization high-grade highway construction medium and small.Kind is single, versatility is poor, equipment is heavy for present domestic special-purpose shifting formwork equipment (MSS bridge fabrication machine); Its installation, dismounting, transportation be very inconvenience all; Add that one-time investment can not in time have enough to meet the need use recovery or the like these reasons very greatly, hamper medium and small popularization of striding footpath highway continuous girder bridge shifting formwork technology.Flourish highway bridge presses for a kind of Chinese actual conditions, general assembling shifting formwork technology of meeting.
" shellfish thunder frame " is being commonly called as of the military truss of war preparedness that all stores in a large number of China each province, and it has from heavy and light (monolithic maximum weight 270kg), adopts keying installation, dismantlement work convenient; The fabulous characteristics with rent low (8 yuan of/ton skies) of versatility.If can the main structure of these assembling type steel structures as " shifting formwork " then can be reduced the cost of " shifting formwork " significantly, for the beams and prestress concrete continuous bridge is promoted the fabulous universal condition that provides.But whole hole casting method is all adopted in " shifting formwork " construction both at home and abroad at present; In the wide 16m of bridge, by the equal thickness D=0.5-0.6m in case Liangping, then the continuous beam deadweight G0=600-1200 (t) of footpath 30-50m is striden in a hole; The vertical girder steel of shifting formwork bears the moment of flexure height to M0=2000-7000 (tm); Required Bailey truss sheet number reaches more than the m=30-100 sheet, on transverse width, can't arrange like this, and this is the reason place that shellfish thunder shifting formwork is difficult to promote.
Summary of the invention
The technical problem that the present invention will solve is to propose a kind of employing " shifting formwork block construction " new technology to build the concrete continuous girder bridge; The beam of a piece section case beam heavily alleviates half behind the piecemeal, has created condition for adopting existing military trusses of highway shellfish thunder and railway six or four or eight or seven military trusses.
Technical scheme of the present invention is: the template that a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge comprises the horizontal steel truss that adopts on the steel hoop that is set up in bridge pier, be positioned at nose girder and the vertical steel truss on the horizontal steel truss and supported by vertical steel truss; The method of said shifting formwork block placement concrete continuous girder bridge, being called for short the shifting formwork block construction is to be divided into two piece section case beams striding the footpath for the whole hole concrete continuous beam of L, at first builds the A piece section case beam that is positioned on the bridge pier, and stretch-draw A piece section case beam upper limb prestressing force; The template that A piece section case beam is dismantled after building and accomplishing moves to the B piece section case beam that is positioned at span centre and builds; After waiting to reach the lower edge prestressing force of connection prestressing force and B piece section case beam of intensity post tensioning B piece section case beam and A piece section case beam, said horizontal steel truss, nose girder and vertical steel truss are moved to next bridge opening; Template moves to the A piece section case beam of next bridge opening and builds, and after repeating to accomplish the shifting formwork block construction operation of said previous bridge opening, changes next bridge opening over to again and carry out the shifting formwork block construction.The cross section type of concrete continuous beam comprises single box single chamber or single-box multi-cell, and wide requirement comprises single case two Room, single case three Room or single case four Room again to single-box multi-cell according to bridge.
Said horizontal steel truss and vertical steel truss adopt the different military truss of bearing load, comprise Bailey truss, six or four truss or eight or seven truss; Whole hole concrete continuous beam stride footpath L≤25m the time, the shifting formwork block construction adopts Bailey truss; During L=30~40m, the shifting formwork block construction adopts six or four truss; During L=40~50m, the shifting formwork block construction adopts eight or seven truss.The method of said shifting formwork block placement concrete continuous girder bridge comprises:
1. when whole hole concrete continuous beam stride footpath L<25m the time; Employing is set up in the horizontal steel truss of shellfish thunder on the steel hoop of bridge pier top, nose girder and the Bei Lei that is positioned on the horizontal steel truss of shellfish thunder indulges steel truss and indulge the template that steel truss supports by Bei Lei; Successively build A piece section case beam and B piece section case beam respectively; The length of the vertical steel truss of Bei Lei is 2.5L, crosses over two bridge piers.Build the A piece section case beam that is positioned at a bridge pier top earlier, A piece section case beam is a hogging moment area, and A piece section case beam length P=2 * 0.25L after concrete reaches intensity, gets final product the upper limb prestressing force of stretch-draw A piece section case beam.Subsequently, will move to span centre B piece section case beam and build B piece section case beam, wait to reach the associating prestressing force of intensity post tensioning B piece section case beam and A piece section case beam and the lower edge prestressing force of B piece section case beam from the template of A piece section case beam dismounting; B piece section case beam length Q=0.5L is the positive bending moment district.After the pre-stress construction of stretch-draw A piece section case beam and B piece section case beam finished, vertical steel truss of Bei Lei and nose girder shifted forward a bridge opening from pouring area, repeat aforementioned construction sequence, build next bridge opening.One time shifting formwork is built a bridge opening usually, i.e. the concrete continuous beam of single span length for can the extend length of the vertical steel truss of shellfish thunder of quickening progress reaches 3L, then can carry out the piecemeal shifting formworks construction simultaneously of two bridge openings.
2. when 25m<L<50m,, can the interim pier of steel pipe (9) be set at span centre according to the job site condition and carry out the shifting formwork block construction in order to save the consumption of stringers.Like this, the footpath of striding during construction is the half the of the continuous girder span of whole hole concrete footpath L, and concrete continuous beam deadweight moment of flexure can reduce four times, can carry out the construction of shellfish thunder shifting formwork by the scheme of the said L<25m of leading portion.The interim pier of said steel pipe can adopt the setting steel pipe column that enlarges the basis, on steel pipe temporary pier top a pair of hydraulic jack is set, and when the concrete continuous beam produced bigger amount of deflection in shifting formwork block placement construction, available vertical jack came straightening.After whole hole concrete continuous beam pouring construction is accomplished, the interim pier of steel pipe is dragged to installation again on the reposition well with rope coil.
3. when 25m<L<50m, if the interim pier of span centre is not set, then adopting length is that six or four steel trusss or eight or seven steel trusss of 3L carry out two simultaneously and stride the shifting formwork block construction.Because being " six or four " steel truss or " eight or seven " steel truss of 3L, length crosses over four bridge piers; Build earlier the A piece section case beam that is positioned at adjacent two bridge pier tops simultaneously; To move to span centre B piece section case beam from the template of A piece section case beam dismounting subsequently, build two B piece section case beams more simultaneously; Wait to reach the connection prestressing force of intensity post tensioning B piece section case beam and A piece piece section case beam and the lower edge prestressing force of B piece section case beam.Length is that six or four vertical steel trusss or eight or seven vertical steel trusss and the nose girder of 3L shifts forward two bridge openings from pouring area, repeats aforementioned construction sequence, and the method that shifting formwork block construction can be built the concrete continuous beam of two span length's degree simultaneously is called for short CMSS.
Said horizontal steel truss is formed one group of integrated member by military truss sheet and counterbracing, is installed on the steel hoop of bridge pier both sides by the direction perpendicular to the concrete continuous beam or the steel pipe pile top of middle interim pier.Sand tube, wedge or the jack that can be out of shape in vertical direction, be used to unload frame are housed between horizontal steel truss and the steel hoop, and the end face of horizontal steel truss is provided with the reinforcement chord member, in order to carry vertical steel truss.After vertical steel truss shifted forward, horizontal steel truss that will the completion back dismounting from pouring area repeated to be installed in next bridge opening position to be installed.Said vertical steel truss is formed one group of integrated member by military truss sheet and counterbracing, and the footpath decision is striden in the calculating of several case beam weight of building according to its carrying of the sheet of military truss sheet and vertical steel truss.Vertical steel truss is parallel to the concrete continuous beam, and vertically packet layout is positioned at the both sides and the two wide avris of bridge of bridge pier below the perpendicular rib of said section case beam that its carrying is built, is erected at the end face of horizontal steel truss.Set up template at the vertical steel truss top of each group, template comprises case beam bottom board plate and portable side template; Case beam bottom board plate is made up of gooseneck, steel plate or plank, and the length of case beam bottom board plate equals the footpath of striding of two hole concrete continuous beams, promptly equals 2L, but the double as operation platform.In the width range of bridge pier, case beam bottom board plate can be twitched to both sides, and is before vertical steel truss displacement, earlier that case beam bottom board plate is traversing to both sides; After the displacement of vertical steel truss, again with case beam bottom board plate from both sides traversing return; Space between case beam bottom board plate and the vertical steel truss is adjusted with jackscrew.Portable side template is formed by shape steel bracket and steel sheet weldering knot, because whole hole concrete continuous beam is divided into A, two section casees of B beam pouring construction successively, so the length of portable side template is striden half of L directly for whole hole concrete continuous beam; Portable side template moves to B piece section case beam again after A piece section case beam is built, reuse.
Described bridge pier adopts uncovered post and beam structure, comprises only columnar pier, two-columned pier or three pillar type bridge pier; The outside of steel hoop is provided with diagonal brace and is fastened on the top of bridge pier.
The invention has the beneficial effects as follows:
1. the used truss sheet of shifting formwork block construction all can reclaim repeated use; Especially " Bailey truss " is the military truss of war preparedness that China each province all stores in a large number, and it has from heavy and light, adopts keying installation, easy accessibility, versatility is good and rent is low advantage; It is convenient that military six or four truss of institute's use railway or eight or seven truss have assembling too in striding the footpath continuous beam greatly, and reusable advantage can reduce disposable equipment investment significantly.The present invention constructs, and equipment needed thereby is few, speed is fast, and the duration is short, quality good, and can reduce cost, practice thrift investment.
2. because beams and prestress concrete continuous has the characteristic of positive and negative two moments of flexure, be divided into A, two sections constructions successively of B; Build A piece section case beam earlier, A piece section case beam is a hogging moment area, after concrete reaches intensity, i.e. and the upper limb positive bending moment prestressing force of stretch-draw A piece section case beam; Thereby alleviated the load-bearing of military truss, increased to use and striden the footpath.
3. adopting length is three holes, six or four steel trusss or eight or seven steel trusss of 3L, and two stride and can construct simultaneously, have accelerated speed of application.Longitudinal stability is better in moving simultaneously.
4. compare with the single box single chamber cross section in the single-box multi-cell pattern continuous beam cross section of adopting, every chamber width 3~4m is close with lane width (3.75m), can accomplish not occur in the Room two traction engines; Therefore thickness that can the attenuate top board is saved the concrete amount more than 10%.In addition, top board can reduce one procedure because case top width degree does not need transverse prestress after reducing, and practices thrift good cost of engineering time.
5. the portable interim intermediate pier that the setting steel pipe column that adopt to enlarge the basis is done shifting formwork can make strides the footpath and reduces half thely, and continuous beam deadweight moment of flexure can reduce four times, can reduce shifting formwork total steel using amount of constructing significantly, when particularly striding the footpath greater than 30m, has better economic property.
Description of drawings
Fig. 1-1,1-2 adopt the vertical steel truss shifting formwork piecemeal in two holes to build the sketch map of concrete continuous girder bridge by the hole.
Fig. 2-1,2-2,2-3,2-4 and 2-5 be adopt the vertical steel truss shifting formwork piecemeal in three holes build simultaneously two stride the concrete continuous girder bridge sketch map.
Fig. 3 adopts the interim pier of span centre to carry out concrete continuous girder bridge shifting formwork block placement method sketch map.
Fig. 4 is that double width Four-Lane Road (or six-lane, eight tracks) merges the lateral arrangement scheme sketch map of " shifting formwork block placement concrete continuous girder bridge ".
Fig. 5 is separate type single width " shifting formwork block placement concrete continuous girder bridge " lateral arrangement scheme sketch map.
Fig. 6 is ramp bridge, overpass bridge, only stub, two chamber " shifting formwork block placement concrete continuous girder bridge " lateral arrangement scheme sketch map.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Embodiment 1: adopt the vertical steel truss shifting formwork piecemeal in two holes builds the concrete continuous girder bridge by the hole method like Fig. 1-1 with shown in the 1-2:
A, service condition: when the shifting formwork block construction duration is not controlled; In order to save the consumption of steel truss; Vertical steel truss 1 length overall is 2.5L, carries out the technology that single span divides A, two section casees of B beam to build, and only waters one at every turn and strides; Vertically move the stable requirement of overturning or slip resistance analysis for satisfying vertical steel truss 1, will set up nose girder 6 on the horizontal steel truss 5 of shifting formwork front end.
B, be suitable for when striding footpath: L≤25m, the shifting formwork block construction adopts the vertical steel truss 1 of shellfish thunder, every high 1.5m, and long 3m, wide 0.23m weighs 270kg; Chord member 2 [10, can use artificial keying to install, it is very convenient to construct.Allow moment of flexure [M]=750 (KNm), quality g=0.13 (t/m); Laterally with the slivering of 0.25m (or 0.45m) spaced sets, cut after support forms integral body with angle steel between each bar, but longitudinal pull is to another hole.
When L increased 30~40m, the shifting formwork block construction adopted six or four vertical steel trusss 1; Every high 3.16m, long 4m, wide 0.52m; [16, easy construction is installed in the keying of the upper and lower layer of the work point of can choosing to chord member 2.Allow moment of flexure [M]=3220 (KNm), quality g=0.24 (t/m); Lateral stability is good, but the monolithic frame is upright.Link to each other spacing a=0.80m, several transverse set sliverings between two with bolt sleeve; But between each bar with angle steel cut support form integral body after longitudinal pull to another hole.
When L increased to 40~50m, the shifting formwork block construction adopted eight or seven vertical steel trusss 1; Every high 2.5m of light-duty eight or seven truss, chord member adopts H380x350x16, is bolt gusset plate structure, allows moment of flexure [M]=11280 (KNm), quality g=0.36 (t/m); Purlin sheet lateral stability is good, and 40 i iron is set between two, and establishing vertical i-beam track again carries out vertical shift down for it.
The vertical steel truss 1 of c, equipment: Bei Lei is formed one group of integral blocks spare by shellfish thunder frame sheet and counterbracing, strides the sheet number that the footpath determines shellfish thunder frame sheet according to case beam weight and stringers calculating that its carrying is built; The vertical steel truss 1 vertical packet layout of shellfish thunder that is parallel to continuous beam the case beam that its carrying is built erect rib below, be positioned at the both sides and the wide outside of bridge of bridge pier 3, be erected at the end face of the horizontal steel truss 5 of Bei Leishi; Set up template 2 at vertical steel truss 1 top of each group, template 2 comprises crossbeam soffit formwork 11 and mobile side template 10.
The horizontal steel truss 5 of shellfish thunder is formed one group of integral blocks spare by shellfish thunder frame sheet and counterbracing, and is horizontal about bridge pier perpendicular to continuous girder bridge, is bearing on the steel hoop 4 of bridge pier 3 both sides or the steel pipe pile top of middle interim pier 9; The steel hoop 4 that the outside is provided with diagonal brace is fastened on bridge pier 3 tops; Being equipped with between the horizontal steel truss 5 of Bei Leishi and the steel hoop 4 can vertical deformation, be used to unload sand tube, wedge or the jack of frame; The end face of the horizontal steel truss 5 of shellfish thunder is provided with the reinforcement chord member, in order to carry the vertical steel truss 1 of shellfish thunder; The horizontal steel truss 5 of a complete set of shellfish thunder has eight groups, is arranged on the current bridge pier of continuous beam and three bridge piers in vertical shift the place ahead of building; Use the horizontal steel truss 5 of shellfish thunder to remove after vertical steel truss 1 displacement of Bei Lei, can repeat to be installed in position to be installed, the place ahead.
Template 2 is device three bulk Steel-wood forming boards on horizontal steel truss 5, and every 2m is a sections.With 10 tons of jackscrew supporting traverse soffit formworks 11 and mobile side template 10, can build concrete after holding out against, get final product the demoulding behind the pine.Establish tail trimmer on the jack, when 1 reach of the vertical steel truss of Bei Leishi, it is taken apart be put on the shellfish thunder frame, load onto again again after waiting to move past bridge pier.During adjustment bed die absolute altitude, camber is set.Full-bridge is established the long L/2 template of two covers.
Support mobile system: comprise trundle, loop wheel machine 8, wire rope, assembly pulley and preceding anchor point etc., gross weight 18t.
Bridge pier steel hoop 4: be two semicircles, be clamped on the bridge pier 3 with 600t prestressing force with 12 pairs of Φ 32 fining twisted steels, support horizontal steel truss 5, do not damage concrete, mounting or dismounting are convenient.Full-bridge is installed steel hoop 4 on 7 bridge piers 3, nearly weigh 7t, can have enough to meet the need use.
D, segmentation casting craft main points are following:
1. striding with one is a construction period, at first builds the A piece section case beam length P=2 * 0.25L that is positioned at the bridge pier top, and A piece section case beam weight GA is half the many for whole hole continuous box girder weight ∑ G; A piece section case beam is a hogging moment area; After A piece section case beam is built in advance, get final product stretch-draw and can satisfy the hogging moment prestressing force that the upper limb of the permanent mobile load needs of full-bridge becomes bridge construction; To move to span centre B piece section case beam from the template 2 of A piece section case beam unloading subsequently, build B piece section case beam, wait to reach longitudinal prestressing and B piece case beam lower edge prestressing force that intensity post tensioning B piece and A piece interrelate; B piece section case beam length Q=0.5L, B piece section weight G BLack for whole hole continuous box girder weight is half the; B piece section case beam is the positive bending moment district; A piece section case beam and B piece section box girder tensioning pre-stress construction finish the back and accomplish a construction period, and the vertical steel truss 1 of two hole Bei Leishi and nose girder 6 shift forward a bridge opening from pouring area 7, repeat aforementioned construction sequence, build next bridge opening.
2. zero moment of flexure; When the A piece watered and stretch-draw prestressing force after, its moment M of being produced of deadweight gBy longitudinal prestressing M TBalance is born, and both add up to total moment of flexure to be close to zero, and promptly on the heavy vertical steel truss 1 that does not act on Bei Leishi of A piece beam, thereby has reduced the suffered load of shellfish thunder trusses.
3. stringers reversal of the natural order of things; At 50cm place, A section two ends, with Φ 32 fining twisted steels reversal of the natural order of things I 36 crossbeams, the supporting stringers, the work that B section case beam is built is striden the footpath and is reduced 11m by 20m, can help amount of deflection control.
Embodiment 2 is as shown in Figure 3: the interim pier of a kind of employing span centre carries out concrete continuous girder bridge shifting formwork block placement method; When 25m<L<50m; At span centre the interim pier 9 of steel pipe is set and carries out the shifting formwork block construction; The footpath of striding during construction is the half the of the continuous girder span of whole hole concrete footpath L, and concrete continuous beam deadweight moment of flexure can reduce four times, can be by the scheme construction of the said L<25m of leading portion; Promptly adopt shellfish thunder trusses to do the interim pier 9 of the said steel pipe of longeron and adopt the setting steel pipe column that enlarges the basis; On the interim Dun9Dun of steel pipe top a pair of hydraulic jack is set; When the concrete continuous beam produced bigger amount of deflection in shifting formwork block placement construction, available vertical jack was adjusted; After whole hole reinforced concrete continuous beam pouring construction is accomplished, the interim pier 9 usefulness rope coils of steel pipe are dragged to installation again on the reposition well.
Embodiment 3 is shown in Fig. 2-1,2-2,2-3,2-4 and 2-5: the vertical steel truss shifting formwork piecemeal in a kind of employing three holes build simultaneously two stride the concrete continuous girder bridge method (being called for short CMSS); When 25m<L<50m is not provided with the interim pier of span centre again; Then adopting length is that " six or four " or " eight or seven " vertical steel truss 1 piecemeal shifting formwork, two of 3L is striden the method for construction simultaneously; The vertical steel truss 1 in " six or four " of 3L or " eight or seven " is crossed over four bridge piers 3, builds earlier the A piece section case beam that is positioned on adjacent two bridge piers 3 simultaneously, the template 2 that will remove from A piece section case beam subsequently; Move to span centre B piece section case beam, build two B piece section case beams simultaneously; After construction finished, vertical steel trusss 1 six or four formulas of 3L or eight or seven formulas and nose girder 6 shifted forward two bridge openings from pouring area 7, repeat aforementioned construction sequence, and a shifting formwork can be built two simultaneously and striden the concrete continuous beam.Steel truss 1 length overall ∑ L=3L+4m is indulged in three holes.Can guarantee most effectively that vertical unstability does not appear in the mould bases moving process, come the quickening progress and utilize 3L length can build two span continuous beam simultaneously.
Embodiment 4 is as shown in Figure 4: the lateral arrangement scheme of " shifting formwork block placement concrete continuous girder bridge " that the double width Four-Lane Road merges, single case six Room patterns and three pillar type bridge pier are adopted in the cross section of concrete continuous beam.Comprise among the bridge floor clear span 12m two row automobiles (2 * 3.75=7.5m), emergency stopping lane only band (3.25m), the crashproof railing of wheel back gauge (0.25m) and both sides (four parts such as 2 * 0.50m).
A, case beam: overall with B=12+2+12=26m, the wherein wide 2m of divided lane.Girder adopts single case six Room patterns, and the width of chamber is b=4m.Bridge pier is a three pillar type, is located at vertical rib below, limit, and column diameter is Φ 1.2m~Φ 1.5m.The post upper end is provided with laminated rubber bearing, apart from box plate height 0.5m, can supply the shifting formwork soffit formwork to go up and down.Bridge floor is an asphalt concrete, gross thickness 10cm.
B, mobile formwork structure: overall with 30m comprise:
1. the 10t straddle truck 8.Can be used for the installation of article such as reinforcing bar, template, small instruments and tools indulging vertically operation and horizontal handling crane gear on the steel truss 1.
2. crashproof railing and bridge floor are all built after girder closes up again.
3. cast-in-situ box girder side template, length 0.5L divides two positions to install, and can on vertical steel truss 1, move.
4. cast-in-situ box girder up-down soffit formwork is made up of I 16 goosenecks and angle iron frame bamboo glue pattern plate soffit formwork.
5. the vertical steel truss 1 of shifting formwork has three types of Bailey truss and six or four truss and eight or seven truss etc.Its number is decided by striding directly to vary in size.
6. bridge pier prestress steel anchor ear 4 is born the weight that crossyard transmits, on the rack device that unloads of adjustment height is arranged.
Embodiment 5 is as shown in Figure 5: " shifting formwork block placement concrete continuous girder bridge " lateral arrangement scheme of separate type single width, single case three Room pattern and two-columned piers are adopted in the cross section of concrete continuous beam.Case beam overall with B=12m, girder adopt single case three cell structures, the width b=3m of chamber.Bridge floor is the modified bitumen concrete, gross thickness 10cm.
Embodiment 6 is as shown in Figure 6: ramp bridge, overpass bridge, only stub, two chamber shifting formwork lateral arrangement scheme, the cross section of concrete continuous beam adopt single case two chamber-type formula and only columnar pier.
A, girder overall with 12m are generally three and stride; Be the two case cross sections of single chamber, the wide b=4m in chamber, owing to limited by underpass, middle pier can only adopt single pillar structure, abutment then is a queen post abutment structure, forms the rock-steady structure of three-point support.
Two organized totally six greatly about the vertical steel truss 1 of b, shifting formwork was divided into.Horizontal steel truss 5 removes and is bearing in the center pillar place, and two outsides will add the steel pipe pile supporting in addition.

Claims (8)

1. method that adopts military truss shifting formwork block placement concrete continuous girder bridge; Comprise the horizontal steel truss (5) that adopts on the steel hoop (4) be set up in bridge pier (3), be positioned on the horizontal steel truss (5) nose girder (6) and vertical steel truss (1) and by the template (2) of vertical steel truss (1) support; It is characterized in that: the method for said shifting formwork block placement concrete continuous girder bridge; Being called for short the shifting formwork block construction is to be divided into two piece section case beams striding the footpath for the whole hole concrete continuous beam of L; At first build the A piece section case beam that is positioned on the bridge pier, and stretch-draw A piece section case beam upper limb prestressing force; The template (2) that A piece section case beam is dismantled after building and accomplishing moves to the B piece section case beam that is positioned at span centre and builds; After waiting to reach the lower edge prestressing force of connection prestressing force and B piece section case beam of intensity post tensioning B piece section case beam and A piece section case beam; Said horizontal steel truss (5), nose girder (6) and vertical steel truss (1) are moved to next bridge opening; Template (2) moves to the A piece section case beam of next bridge opening and builds; And after repeating to accomplish the shifting formwork block construction operation of previous bridge opening, change again next bridge opening over to and carry out the shifting formwork block construction; The cross section type of concrete continuous beam comprises single box single chamber or single-box multi-cell, and wide requirement comprises single case two Room, single case three Room or single case four Room again to single-box multi-cell according to bridge.
2. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 1; It is characterized in that: said horizontal steel truss (5) and vertical steel truss (1) adopt the different military truss of bearing load, comprise Bailey truss, six or four truss or eight or seven truss; Whole hole concrete continuous beam stride footpath L≤25m the time, the shifting formwork block construction adopts Bailey truss; During L=30~40m, the shifting formwork block construction adopts six or four truss; During L=40~50m, the shifting formwork block construction adopts eight or seven truss.
3. according to claim 1 or 2 said a kind of methods that adopt military truss shifting formwork block placement concrete continuous girder bridge, it is characterized in that: the method for said shifting formwork block placement concrete continuous girder bridge comprises:
1. when whole hole concrete continuous beam stride footpath L<25m the time; Employing is set up in the horizontal steel truss of shellfish thunder (5) on bridge pier (3) the top steel hoop (4), nose girder (6) and the shellfish thunder that is positioned on the horizontal steel truss of shellfish thunder (5) indulged steel truss (1) and indulged the template (2) that steel truss (1) supports by Bei Lei; Successively build A piece section case beam and B piece section case beam respectively; The length that Bei Lei indulges steel truss (1) is 2.5L, crosses over two bridge piers (3); Build the A piece section case beam that is positioned at a bridge pier top earlier, A piece section case beam is a hogging moment area, A piece section case beam length P=2 * 0.25L, and after concrete reaches intensity, the upper limb prestressing force of stretch-draw A piece section case beam; To move to span centre B piece section case beam and build B piece section case beam from the template (2) of A piece section case beam dismounting subsequently, wait to reach the associating prestressing force of intensity post tensioning B piece section case beam and A piece section case beam and the lower edge prestressing force of B piece section case beam; B piece section case beam length Q=0.5L is the positive bending moment district; After the pre-stress construction of stretch-draw A piece section case beam and B piece section case beam finished, Bei Lei indulged steel truss (1) and nose girder (6) and shifts forward a bridge opening from pouring area (7), repeats aforementioned construction sequence, builds next bridge opening; One time shifting formwork is built a bridge opening usually, i.e. the concrete continuous beam of single span length for can the extend length of the vertical steel truss (1) of shellfish thunder of quickening progress reaches 3L, then can carry out the piecemeal shifting formworks construction simultaneously of two bridge openings;
2. when 25m<L<50m; In order to save the consumption of stringers; At span centre the interim pier of steel pipe (9) is set according to the job site condition and carries out the shifting formwork block construction; The striding footpath in when construction is the half the of the continuous girder span of whole hole concrete footpath L like this, and concrete continuous beam deadweight moment of flexure reduces four times, carries out shellfish thunder shifting formwork by the scheme of the said L<25m of leading portion and constructs; The interim pier of said steel pipe (9) adopts the setting steel pipe column that enlarges the basis, and Dun Ding is provided with a pair of hydraulic jack at the interim pier of steel pipe (9), when the concrete continuous beam produces bigger amount of deflection in shifting formwork block placement construction, comes straightening with vertical jack; After whole hole concrete continuous beam pouring construction is accomplished, the interim pier of steel pipe (9) is dragged to installation again on the reposition well with rope coil;
3. when 25m<L<50m, if the interim pier of span centre is not set, then adopting length is that six or four steel trusss (1) or eight or seven steel trusss (1) of 3L carry out two simultaneously and stride the shifting formwork block construction; Because being " six or four " steel truss (1) or " eight or seven " steel truss (1) of 3L, length crosses over four bridge piers (3); Build earlier the A piece section case beam that is positioned at adjacent two bridge piers (3) top simultaneously; Subsequently will be from the template (2) of A piece section case beam dismounting; Move to span centre B piece section case beam, build two B piece section case beams more simultaneously; Wait to reach the connection prestressing force of intensity post tensioning B piece section case beam and A piece piece section case beam and the lower edge prestressing force of B piece section case beam; Length is that six or four vertical steel trusss (1) or eight or seven vertical steel trusss (1) and the nose girder (6) of 3L shifts forward two bridge openings from pouring area (7); Repeat aforementioned construction sequence, a shifting formwork block construction can be built the method abbreviation CMSS of the concrete continuous beam of two span length's degree simultaneously;
4. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 2; It is characterized in that: said horizontal steel truss (5) is formed one group of integrated member by military truss sheet and counterbracing, and the steel hoop (4) that is installed in bridge pier (3) both sides by the direction perpendicular to the concrete continuous beam is gone up or the middle steel pipe pile top of pier (9) temporarily; Between horizontal steel truss (5) and the steel hoop (4) sand tube, wedge or the jack that can be out of shape in vertical direction, be used to unload frame is housed, the end face of horizontal steel truss (5) is provided with the reinforcement chord member, in order to carry vertical steel truss (1); After vertical steel truss (1) shifts forward, will repeat to be installed in next bridge opening position to be installed from the horizontal steel truss (5) of pouring area (7) completion back dismounting.
5. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 2; It is characterized in that: said vertical steel truss (1) is formed one group of integrated member by military truss sheet and counterbracing, and the footpath decision is striden in the calculating of several case beam weight of building according to its carrying of the sheet of military truss sheet and vertical steel truss; Vertical steel truss (1) is parallel to the concrete continuous beam, and vertically packet layout is positioned at the both sides and the two wide avris of bridge of bridge pier (3) below the perpendicular rib of said section case beam that its carrying is built, is erected at the end face of horizontal steel truss (5); Set up template (2) at vertical steel truss (1) top of each group, said template (2) comprises case beam bottom board plate (11) and portable side template (10).
6. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 5; It is characterized in that: described case beam bottom board plate (11) is made up of gooseneck, steel plate or plank; The length of case beam bottom board plate (11) equals the footpath of striding of two hole concrete continuous beams; Promptly equal 2L, the double as operation platform; In the width range of bridge pier (3), case beam bottom board plate (11) can be twitched to both sides; Before vertical steel truss (1) displacement, earlier that case beam bottom board plate (11) is traversing to both sides; After vertical steel truss (1) displacement, again with case beam bottom board plate (11) from both sides traversing return, the space between case beam bottom board plate (11) and the vertical steel truss (1) is adjusted with jackscrew.
7. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 5; It is characterized in that: described portable side template (10) is formed by shape steel bracket and steel sheet weldering knot; Because whole hole concrete continuous beam is divided into A, two section casees of B beam pouring construction successively; So the length of portable side template (10) is striden the half the of footpath L for whole hole concrete continuous beam, portable side template (10) moves to B piece section case beam again after A piece section case beam is built, reuse.
8. according to the said a kind of method that adopts military truss shifting formwork block placement concrete continuous girder bridge of claim 1, it is characterized in that: described bridge pier (3) adopts uncovered post and beam structure, comprises only columnar pier, two-columned pier or three pillar type bridge pier; The outside of said steel hoop (4) is provided with diagonal brace and is fastened on the top of bridge pier (3).
CN2010102667026A 2010-08-30 2010-08-30 Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould Expired - Fee Related CN102206934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102667026A CN102206934B (en) 2010-08-30 2010-08-30 Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102667026A CN102206934B (en) 2010-08-30 2010-08-30 Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould

Publications (2)

Publication Number Publication Date
CN102206934A CN102206934A (en) 2011-10-05
CN102206934B true CN102206934B (en) 2012-05-30

Family

ID=44695983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102667026A Expired - Fee Related CN102206934B (en) 2010-08-30 2010-08-30 Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould

Country Status (1)

Country Link
CN (1) CN102206934B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437285B (en) * 2013-07-05 2016-04-13 中交二公局第一工程有限公司 Full space support cast-in-place box beam construction technology
CN103850171B (en) * 2014-03-31 2015-11-04 李艳辉 A kind of all steel assembled overpass on an empty stomach
CN104074142A (en) * 2014-07-11 2014-10-01 四川川交路桥有限责任公司 Box beam cast-in-place support whole-horizontal-moving construction method
CN105133497B (en) * 2015-07-21 2016-08-24 杭州江润科技有限公司 A kind of construction method being inclined cross low clearance active service highway multi-azimuth adjustable cast-in-place box beam bracket system
CN113139223B (en) * 2021-04-09 2023-06-20 中国铁路设计集团有限公司 Continuous Liang Huozai counter force calculation method based on concurrent counter force group

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117791A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Abnormal shape steel case and orthotropic plate bottom formwork combined type moving die carrier framework and construction method thereof
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860620A (en) * 1994-08-16 1996-03-05 Mitsui Eng & Shipbuild Co Ltd Installation method of main girder
JP4424744B2 (en) * 2005-01-13 2010-03-03 三井住友建設株式会社 Bridge replacement method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117791A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Abnormal shape steel case and orthotropic plate bottom formwork combined type moving die carrier framework and construction method thereof
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开2006-193978A 2006.07.27
JP特开平8-60620A 1996.03.05
艾占祥,尤继勤.62. 5 m 预应力混凝土箱梁移动模架施工技术.《世界桥梁》.2008,(第S1期),全文. *

Also Published As

Publication number Publication date
CN102206934A (en) 2011-10-05

Similar Documents

Publication Publication Date Title
CN109629441B (en) PLC multipoint synchronous three-dimensional hydraulic bridge pushing system and pushing method
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN111424570A (en) Assembly type trolley for box culvert construction and construction method thereof
CN101586330A (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN102206934B (en) Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN110847062A (en) Construction method for whole-hole assembly double-width erection in 80-meter-span wide steel box girder factory
CN103741577B (en) A kind of T-shaped beam bridge and construction method thereof that bottom lateral bracing is set
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN114214920B (en) Large-span double-layer built-up steel truss arch bridge and construction method thereof
CN211735002U (en) Steel-concrete combined beam bridge capable of being installed quickly
CN211947993U (en) Support for large-span cast-in-situ bridge construction
CN111851307A (en) Large-span prefabricated assembly type corrugated web combined box girder transportation frame construction method
CN110863417A (en) Steel-concrete combined beam bridge capable of being installed quickly and construction method thereof
JP2006316506A (en) Method of constructing bridge girder
CN214328478U (en) Three-tower self-anchored suspension bridge
CN215629484U (en) Transverse reinforcing device for T-shaped beam bridge
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
CN213233106U (en) Arch ring support
CN114922132A (en) High-pile wharf upper structure part materialized construction method based on combined inclined piles
CN212316712U (en) Box culvert construction is with assembled platform truck
CN211228134U (en) Large cantilever prestress bent cap support device
CN114263114A (en) Construction system and construction method of large-section steel box girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JIANGXI COMMUNICATIONS DESIGN INSTITUE CO., LTD.

Free format text: FORMER NAME: JIANGXI JIAOTONG DESIGNING INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 330000 No. 657 Jinggangshan Avenue, Nanchang, Jiangxi, Xihu District

Patentee after: Communications Design Research Institute Co., Ltd. of Jiangxi Prov.

Address before: 330000 No. 657 Jinggangshan Avenue, Nanchang, Jiangxi, Xihu District

Patentee before: Communications Design Institute of Jiangxi Pro.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20200830