CH676135A5 - Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface - Google Patents

Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface Download PDF

Info

Publication number
CH676135A5
CH676135A5 CH509787A CH509787A CH676135A5 CH 676135 A5 CH676135 A5 CH 676135A5 CH 509787 A CH509787 A CH 509787A CH 509787 A CH509787 A CH 509787A CH 676135 A5 CH676135 A5 CH 676135A5
Authority
CH
Switzerland
Prior art keywords
support
wall
holding device
support rail
rail
Prior art date
Application number
CH509787A
Other languages
German (de)
Inventor
Claude Savoy
Original Assignee
Claude Savoy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Claude Savoy filed Critical Claude Savoy
Priority to CH509787A priority Critical patent/CH676135A5/en
Publication of CH676135A5 publication Critical patent/CH676135A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/365Stop-end shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The holder secures a shuttering component (3) to a wall and has a rail (7) fixed to the latter. A support (9) forming a parallel extension of the rail is offset from it, with the rail fixed between the support and wall top surface. The shuttering section rests on the top end of the rail, held between the support and the top part of the wall. There is pref. a coupling half (11) at the top end of the support for an extension securing a guard rail, or further shuttering section. ADVANTAGE - Simple, strong, compact, and low-cost design.

Description

       

  
 



  Die Erfindung betrifft eine Haltevorrichtung für mindestens ein Schalungselement, sowie eine Verwendung der Haltevorrichtung. 



  Haltevorrichtungen dieser Art werden insbesondere für die Halterung von Deckenrandabschalungselementen verwendet. 



  Eine bekannte Haltevorrichtung besteht aus einem aus einem Vierkantrohr gebildeten rechteckigen Holm, an dem L-förmige Haltelaschen für Geländerbretter aufgeschweisst sind. An seinem den Haltelaschen abgewandten unteren Drittel hat der Holm einen Schlitz mit den Querschnittsabmessungen eines Mauerhakens. Entlang des Holms ist eine Buchse mit einer Spannvorrichtung verschiebbar. In der Spannvorrichtung sitzt eine Stange, die senkrecht zur Längsrichtung des Holms bewegt und durch eine Flügelschraube fixiert werden kann. Die Stange trägt an ihrem einen Ende eine L-förmige Lasche zur Aufnahme eines Schalungsbrettes. 



  Die Haltevorrichtung wird zusammen mit einem mit einem Schlitz versehenen Holzklotz unterhalb der Mauerkrone auf einen eingemauerten bzw. einbetonierten Mauerhaken geschoben, wobei der Holzklotz zwischen der Vorderfläche der Mauerkrone und dem Holm der Haltevorrichtung zur Distanzierung des Holms  von der Mauer dient. Das Schalungsbrett wird an der L-förmigen Lasche befestigt und über die Buchse mit Spannvorrichtung in die für die Herstellung einer Stirnabschalung gewünschte Lage gebracht. 



  Die bekannte Haltevorrichtung hat den Nachteil, dass sie aus einer Vielzahl  von Komponenten aufgebaut ist, die sie teuer und im rauhen Betrieb einer Baustelle störanfällig macht. Schrauben und Verschiebeeinrichtungen werden leicht verlegt, ihre Funktion durch auftropfenden Mörtel, Beton oder Schmutz erschwert oder verunmöglicht, und schon geringfügige Korrosion macht sie nur mit Mühe verstellbar. Ferner bereitet das Aufstecken des Holzklotzes zur Distanzierung zusammen mit der Haltevorrichtung beim überhängenden Arbeiten an einer Mauerkrone Schwierigkeiten. Mehrere Teile  müssen vom Bauarbeiter gehalten und ineinander montiert werden. Hierbei ist die Gefahr gross, dass ihm eines der Teile entgleitet und Mitarbeiter gefährdet. 



  Hier will die Erfindung Abhilfe schaffen. Ihr liegt die Aufgabe zugrunde, eine kompakte, preisgünstige, robuste, einfach und sicher zu montierende Haltevorrichtung der eingangs genannten Art zu schaffen. 



  Die erfindungsgemässe Lösung ist hinsichtlich der Haltevorrichtung durch die im Anspruch 1 und hinsichtlich der Verwendung der Haltevorrichtung durch die im Anspruch 7 angegebenen Merkmale gekennzeichnet. 



  Die durch die Erfindung erzielten Vorteile sind im wesentlichen darin zu sehen, dass anstelle einer Vielzahl von Einzelteilen ein einziges Teil als Haltevorrichtung vorhanden ist, das eine einfache Montage der Schalungselemente erlaubt und die Gefahr eines Herabfallens von Komponenten der Vorrichtung vermeidet. Die Haltevorrichtung ist für rauhesten Betrieb ausgelegt und wird in ihrer Funktionstüchtigkeit nicht durch aufgetropften und erhärteten Schmutz, Mörtel und/oder Beton behindert Auch ist eine Lagerhaltung unproblematisch, da gegenüber der Vielzahl von Komponenten herkömmlicher Abschalungssysteme nur je ein einziger Typ von Haltevorrichtung, Keil bzw. Mutter und Bauholz neben den Schalungselementen benötigt wird, welche ohnehin schon auf der Baustelle vorhanden sind.

  Die Haltevorrichtung hat vorzugsweise im Steg ihrer Auflageschiene Löcher zum Durchstecken von aus der Mauer herausragenden Stäben und/oder Laschen, wobei die Stäbe die herausragenden Teile von Armierungseisen  oder Spannstäben, und die Laschen die herausragenden Teile von abgewinkelten oder geraden Mauerhaken oder Metallflachstäben, vorzugsweise aus Stahl, sein können. 



  Im folgenden wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnung näher erläutert. Es zeigen: 
 
   Fig. 1 eine perspektivische Darstellung einer Haltevorrichtung mit einem als Schalungsbrett dienenden Gerüstbrett; 
   Fig. 2 eine perspektivische Darstellung der Haltevorrichtung von Fig. 1 mit einem eingelegten Bauholz und einer Schalungstafel; 
   Fig. 3 einen Längsschnitt durch eine betonierte Mauerkrone mit der Haltevorrichtung und den Schalungselementen nach Fig. 2; 
   Fig. 4 einen Längsschnitt durch eine gemauerte Mauerkrone mit der Haltevorrichtung und dem Schalungselement nach Fig, 1, und 
   Fig, 5 einen Querschnitt durch die Haltevorrichtung entlang der Linie V-V in Fig. 4. 
 



  Die in der Zeichnung dargestellte Haltevorrichtung 1 für Schalungsbretter 3 bzw. Schalungsplatten 5 besteht aus einer Auflageschiene 7, einer Stütze 9 und einem Kupplungsteil 11. Die Stütze 9 und die Auflageschiene 7 haben ein U-förmiges Stahlprofil, wobei der Schenkelabstand der Auflageschiene 7 etwa um einen Viertel grösser als derjenige der Stütze 9 ist und die Schenkeltiefe der Auflageschiene 7 am Bau zur Schalung verwendeter Gerüstbretter 3 entspricht. Der Schenkelabstand der Stütze 9 ist um eine Toleranz grösser als die Breite gängiger am Bau verwendeter Bauhölzer 8 (z.B. Dachlatten). Das eine Ende der Stütze 9 ist mit seinen Schenkeln am Ende 10 der Auflageschiene 7 auf deren Steg des U-förmigen Profils aufgeschweisst. Die Überlappung der beiden Teile beträgt etwa 10% der Länge der Auflageschiene 7.

  Der Kupplungsteil 11 ist in der Mitte der äusseren Oberfläche des Steges am der Auflageschiene 7 abgewandten Ende der Stütze 9 angeschweisst. Die Überlappung beider Teile beträgt etwa die Hälfte des überstehenden Teils des Kupplungsteils 11. 



  Die Stütze 9 hat entlang der Mittellinie ihres Steges mehrere annähernd gleich distanzierte Löcher 12, z.B. vier, mit einem Durchmesser, der gängigen am Bau verwendeten Nägeln 14 entspricht, deren Länge geringfügig kürzer als die Breite des Bauholzes 8 plus Stegtiefe der Stütze 9 plus Dicke der Schalungstafel 5 ist. 



  Die Auflageschiene 7 hat auf zwei Dritteln der dem Ende 10 abgewandten Länge sechs zur Schienenachse senkrechte Schlitze 13, 15, 17, 19, 23, 25 in ihrem Steg und ein Langloch 21 etwa in der Mitte der Auflageschiene 7. 



  Beim Hochmauern werden handelsübliche Mauerhaken 27 mit flachem Profil  und Längsschlitzen 26 in Längsfugen 22 zwischen den Bausteinen 24 (Ziegel, Betonsteine oder andere) derart verlegt, dass sie aus der Vorderfläche 31 der Mauerkrone mindestens um die doppelte Tiefe der Auflageschiene 7 herausschauen. Die Mauerhaken 27 liegen einige Lagen von Bausteinen 24 unterhalb der Mauerkrone 28 und sind an ihrem eingemauerten Ende so abgewinkelt, dass sie an der vertikalen Fläche der Bausteine anliegen; in Fig. 4 zwischen der sechsten und siebten Lage. Diese Lage wird so gewählt, dass das Ende 10 der Auflageschiene 7 ungefähr um einen Drittel bis zur Hälfte der Breite des Gerüstbrettes 3 bzw. zwanzig bis dreissig Prozent der Schalungstafel 5 unterhalb der Mauerkrone 28 liegt.

   Bei einer Betonmauer 34 werden Spannstäbe 29 (Armierungseisen) vor dem Betonieren etwa in einem Abstand von zwei Dritteln der Länge der Auflageschiene 7 unterhalb der Mauerkrone 28 derart eingezogen, dass sie ebenfalls mindestens um die doppelte Tiefe der Auflageschiene 7 aus der später betonierten Vorderfläche 31 der Mauerkrone 28 herausschauen. 



  Zum Aufbau einer Deckenrandabschalung werden die Auflageschienen 7 mit einem ihrer Schlitze 13, 15, 17, 19, 23, oder 25 über je einen der Mauerhaken 27 so verschoben, dass ihre Schenkel auf der Vorderfläche 31 aufliegen. Der gegenseitige Abstand der Haltevorrichtungen 1 und damit auch der Abstand der Mauerhaken 27 bzw. der herausstehenden Spannstäbe 29 hängt von der verwendeten Gerüstbrett- bzw. Schalungstafellänge und der notwendigen Anpresskraft für die Gerüstbretter 3 bzw. Schalungstafeln 5 an die Mauerkrone 28 ab. Das Ende 10 der Auflageschiene 7 liegt ungefähr ein Sechstel der Länge der Auflageschiene 7 unterhalb der Mauerkrone 28. Um diesen Abstand annähernd einhalten zu können, sind auf dem Steg der Auflageschiene 7 die Schlitze 13, 15, 17, 19, 23 und 25 mit unterschiedlichen Abständen angeordnet.

  Die Abstände sind derart gewählt, dass auch bei verschiedenen Bausteintypen der gewünschte Abstand des Endes 10 der Auflageschiene 7 annähernd erreichbar ist. 



  In den Längsschlitz 26 des über die Haltevorrichtung 1 hinausragenden Teils des Mauerhakens 27 wird ein Keil 35, der die Haltevorrichtung 1 an die Vorderfläche 31 drückt, gesteckt. Handelt es sich um eine Betonmauer 34, wird eine Wirbelmutter 36, bzw. Flügelmutter auf das Gewinde des überstehenden Spannstabs 29 bis zum Anschlag an die Haltevorrichtung 1  geschraubt, aber nicht festgezogen. 



  Die Stütze 9 ist jetzt aufgrund der Konstruktion der Haltevorrichtung 1 um die Dicke eines Gerüstbrettes 3 von der Vorderfläche 31 entfernt. In diesen Zwischenraum wird das Gerüstbrett 3 eingeführt, bis es auf dem Ende 10 der Auflageschiene 7 aufsteht. Das Gerüstbrett 3 überragt nach dem Einführen die Mauerkrone 28 dann um zwei Drittel bis die Hälfte seiner Brettbreite. Zum Anpressen der Auflageschiene 7 an die Vorderfläche 31 wird der Keil 35 in den Längsschlitz 26 eingeschlagen. Bei der betonierten Mauer 34 wird die Mutter 36 festgezogen. Die Auflageschiene 7 wird hierdurch an die Vorderfläche 31 und gleichzeitig das Gerüstbrett 3 durch die Stütze 9 an die Vorderfläche 31 gedrückt, so dass ausreichende Dichtigkeit für die spätere Betonierung gewährleistet ist, und das Gerüstbrett 3 sowie die Haltevorrichtung 1 gegen Verdrehen an der Vorderfläche 31 festgeklemmt sind.

  Zur Erhöhung der Querstabilität der Anordnung können die Stützen 9  in Abständen nebeneinander montierter Haltevorrichtungen mit mindestens je einem Nagel 14 durch eines ihrer Löcher 12 mit dem Gerüstbrett 3 verbunden werden. 



  Je nach Höhe der gewünschten Deckenrandabschalung oder Betonierung genügt ein Gerüstbrett 3, oder es werden mehrere benötigt. Weitere Gerüstbretter 3 werden ebenfalls mittels Nägeln 14 an der Stütze 9 befestigt. 



  Anstelle der abgewinkelten Mauerhaken 27 können auch gerade Mauerhaken, wie z.B. Distanzhalter, Distanzmasse oder Abstandshalter, verwendet werden. 



  Wird anstelle eines Gerüstbrettes 3 eine Schalungstafel 5 mit geringerer Dicke als das Gerüstbrett 3, wie in Fig. 2 bzw. 3 gezeigt, verwendet, oder Gerüstbretter 3 geringerer Dicke, so wird zum Dickenausgleich eine Dachlatte als Bauholz 8 in das U-Profil der Stütze 9 geschoben und gewünschtenfalls mit Nägeln 14 an der Stütze 9 befestigt. Im montierten Zustand überragt die Schalungstafel 5 dann die Mauerkrone 38 mit siebzig bis achtzig Prozent ihrer Breite. 



  Auf das obere Ende je eines Kupplungsteils 11 kann ein die Stütze 9 verlängerndes Halteteil, von dem nur ein Anschlussteil 39 dargestellt ist,  für ein Schutzgeländer (nicht dargestellt) gesteckt werden. 



  Nach dem Abbinden des Betons des Deckenrandes werden die Haltevorrichtungen 1, Gerüstbretter 3 bzw. Schalungstafeln 5, die Bauhölzer 8, sofern die Haltevorrichtung 1 nicht als Teil des Schutzgeländers benötigt wird, und die über die Vorderfläche 28 vorstehenden Teile der Mauerhaken 27 bzw. Spannstäbe 29 entfernt. Die Mauerhaken 27 können auch an ihrer Sollbruchstelle (nicht dargestellt) abgeknickt werden. 



  In den Fig. 1 bis 4 sind die Schenkel der Stütze 9 direkt auf den Steg der Auflageschiene 7 geschweisst. Zur Vergrösserung des gegenseitigen Abstandes der Seite mit den offenen Schenkelenden der Auflageschiene 7 und der Stütze 9, d.h. zur Vergrösserung des Zwischenraums zwischen Stütze 9 und Vorderfläche 31 der Mauerkrone 28 kann auch zwischen der Stütze 9 und der Auflageschiene 7 ein Zwischenstück (nicht dargestellt) eingeschweisst sein. 



  Wie oben erwähnt, wird die Auflageschiene 7 bei der Montage auf einen in der Mauer eingemauerten Mauerhaken 27 geschoben. Die Breite des Mauerhakens 27 und die Spielpassung des betreffenden Schlitzes 13, 15, 17, 19, 23, 25 sichern dabei die Haltevorrichtung 1 gegen Verdrehen auf der Vorderfläche 31. Diese Sicherheit ist bei der Verwendung von Spannstäben 29 nicht gegeben. Ist auch hier die Verdrehungssicherheit erwünscht, so kann zusätzlich zum Langloch 21 ein weiteres Langloch vorgesehen sein und ein weiterer passend aus der Vorderfläche 31 herausragender Spannstab in ein in die Mauerkrone gebohrtes Loch eingesetzt und verschraubt werden. 



   Anstelle eines U-Profils der Auflageschiene 7 kann ein Vierkantrohr verwendet werden. Ein Vierkantrohr gibt eine geringfügig höhere Verbiegungssteifigkeit, lässt sich dafür aber schlechter an die Vorderfläche 31 der Mauerkrone 28 aufgrnd seines geringeren Flächendruckes gegenüber der U-förmigen Schiene 7 anpressen, da Unebenheiten wie Mörtelreste, Abscheidekanten an Bausteinen, etc. immer wieder vorhanden sind. 



  
 



  The invention relates to a holding device for at least one formwork element, and to a use of the holding device.



  Holding devices of this type are used in particular for holding ceiling edge formwork elements.



  A known holding device consists of a rectangular spar formed from a square tube, on which L-shaped holding tabs for railing boards are welded. On its lower third facing away from the retaining tabs, the spar has a slot with the cross-sectional dimensions of a wall hook. A bushing with a tensioning device can be moved along the spar. A rod sits in the tensioning device, which can be moved perpendicular to the longitudinal direction of the spar and can be fixed with a wing screw. The rod has an L-shaped tab at one end for receiving a formwork board.



  The holding device is pushed together with a slotted wooden block below the wall crown onto a walled-in or concrete wall hook, the wooden block between the front surface of the wall crown and the spar of the holding device being used to distance the spar from the wall. The formwork board is attached to the L-shaped bracket and brought into the position required for the manufacture of a front formwork via the socket with a tensioning device.



  The known holding device has the disadvantage that it is constructed from a large number of components, which makes it expensive and prone to failure in the rough operation of a construction site. Screws and sliding devices are easily installed, their function is made difficult or impossible due to dripping mortar, concrete or dirt, and even slight corrosion makes it difficult to adjust them. Furthermore, putting on the wooden block for spacing together with the holding device causes difficulties when working overhanging a wall crown. The construction worker must hold and assemble several parts. There is a great risk that one of the parts will slip away and endanger employees.



  The invention seeks to remedy this. It is based on the task of creating a compact, inexpensive, robust, simple and safe to install holding device of the type mentioned.



  The solution according to the invention is characterized with respect to the holding device by the features specified in claim 1 and with regard to the use of the holding device by the features specified in claim 7.



  The advantages achieved by the invention are essentially to be seen in the fact that instead of a large number of individual parts, a single part is provided as a holding device, which permits simple assembly of the formwork elements and avoids the risk of components of the device falling down. The holding device is designed for the harshest of operations and its functionality is not hindered by dripped and hardened dirt, mortar and / or concrete. Storage is also not a problem since, compared to the large number of components of conventional shuttering systems, only one type of holding device, wedge or Nut and timber are needed in addition to the formwork elements, which are already available on the construction site.

  The holding device preferably has holes in the web of its support rail for pushing through rods and / or brackets protruding from the wall, the rods being the protruding parts of reinforcing bars or tie rods, and the brackets being the protruding parts of angled or straight wall hooks or flat metal rods, preferably made of steel , could be.



  An exemplary embodiment of the invention is explained in more detail below with reference to the drawing. Show it:
 
   Figure 1 is a perspective view of a holding device with a scaffolding board serving as formwork board.
   FIG. 2 shows a perspective illustration of the holding device from FIG. 1 with an inserted timber and a formwork panel;
   3 shows a longitudinal section through a concrete wall crown with the holding device and the formwork elements according to FIG. 2;
   Fig. 4 shows a longitudinal section through a brick wall crown with the holding device and the formwork element according to Fig. 1, and
   5 shows a cross section through the holding device along the line V-V in FIG. 4th
 



  The holding device 1 shown in the drawing for formwork boards 3 or formwork panels 5 consists of a support rail 7, a support 9 and a coupling part 11. The support 9 and the support rail 7 have a U-shaped steel profile, the leg spacing of the support rail 7 being approximately is a quarter larger than that of the support 9 and the leg depth of the support rail 7 corresponds to the scaffolding boards 3 used in the formwork. The distance between the legs of the support 9 is larger by a tolerance than the width of timber 8 commonly used in construction (e.g. roof battens). One end of the support 9 is welded with its legs at the end 10 of the support rail 7 on the web of the U-shaped profile. The overlap of the two parts is approximately 10% of the length of the support rail 7.

  The coupling part 11 is welded in the middle of the outer surface of the web at the end of the support 9 facing away from the support rail 7. The overlap of both parts is approximately half of the protruding part of the coupling part 11.



  The support 9 has a number of approximately equally spaced holes 12 along the center line of its web, e.g. four, with a diameter that corresponds to the common nails 14 used in construction, the length of which is slightly shorter than the width of the timber 8 plus the web depth of the support 9 plus the thickness of the formwork panel 5.



  The support rail 7 has six slots 13, 15, 17, 19, 23, 25 in its web and an elongated hole 21 approximately in the middle of the support rail 7 over two thirds of the length facing away from the end 10.



  When masonry, commercially available wall hooks 27 with a flat profile and longitudinal slots 26 are laid in longitudinal joints 22 between the building blocks 24 (bricks, concrete blocks or others) in such a way that they look out of the front surface 31 of the wall crown at least twice the depth of the support rail 7. The wall hooks 27 lie a few layers of building blocks 24 below the wall crown 28 and are angled at their walled-in end so that they rest on the vertical surface of the building blocks; in Fig. 4 between the sixth and seventh layers. This position is chosen such that the end 10 of the support rail 7 lies below the wall crown 28 by approximately one third to half the width of the scaffolding board 3 or twenty to thirty percent of the formwork panel 5.

   In the case of a concrete wall 34, tie rods 29 (reinforcing bars) are drawn in before the concreting approximately at a distance of two thirds of the length of the support rail 7 below the wall crown 28 in such a way that they are likewise at least twice the depth of the support rail 7 from the front surface 31 of the concrete that is later concreted Look out the wall crown 28.



  To build up a ceiling edge formwork, the support rails 7 are moved with one of their slots 13, 15, 17, 19, 23, or 25 via one of the wall hooks 27 so that their legs rest on the front surface 31. The mutual distance between the holding devices 1 and thus also the distance between the wall hooks 27 and the protruding tie rods 29 depends on the length of the scaffolding board or formwork panel and the necessary pressing force for the scaffolding boards 3 or formwork panels 5 on the wall crown 28. The end 10 of the support rail 7 is approximately a sixth of the length of the support rail 7 below the wall crown 28. In order to be able to approximately maintain this distance, the slots 13, 15, 17, 19, 23 and 25 with different are on the web of the support rail 7 Intervals arranged.

  The distances are chosen such that the desired distance of the end 10 of the support rail 7 can be approximately reached even with different types of building blocks.



  A wedge 35, which presses the holding device 1 against the front surface 31, is inserted into the longitudinal slot 26 of the part of the wall hook 27 projecting beyond the holding device 1. If it is a concrete wall 34, a swivel nut 36 or wing nut is screwed onto the thread of the protruding tension rod 29 as far as possible against the holding device 1, but is not tightened.



  The support 9 is now due to the construction of the holding device 1 by the thickness of a scaffolding board 3 from the front surface 31. The scaffolding board 3 is inserted into this intermediate space until it stands on the end 10 of the support rail 7. After insertion, the scaffolding board 3 projects beyond the wall crown 28 by two thirds to half its board width. To press the support rail 7 against the front surface 31, the wedge 35 is driven into the longitudinal slot 26. In the concrete wall 34, the nut 36 is tightened. The support rail 7 is thereby pressed against the front surface 31 and, at the same time, the scaffolding board 3 by the support 9 against the front surface 31, so that sufficient tightness is guaranteed for later concreting, and the scaffolding board 3 and the holding device 1 are clamped against rotation on the front surface 31 are.

  To increase the transverse stability of the arrangement, the supports 9 can be connected to the scaffolding board 3 at intervals of at least one holding device with at least one nail 14 each through one of their holes 12.



  Depending on the height of the desired ceiling edge formwork or concreting, one scaffold board 3 is sufficient, or several are required. Further scaffolding boards 3 are also fastened to the support 9 by means of nails 14.



  Instead of the angled wall hooks 27, straight wall hooks, e.g. Spacers, spacers or spacers can be used.



  If, instead of a scaffolding board 3, a formwork panel 5 with a smaller thickness than the scaffolding board 3, as shown in FIGS. 2 and 3, or scaffolding boards 3 with a smaller thickness, a roof batten is used as timber 8 in the U-profile of the support 9 pushed and, if desired, fastened to the support 9 with nails 14. In the assembled state, the formwork panel 5 then projects over the wall crown 38 by seventy to eighty percent of its width.



  On the upper end of each coupling part 11, a holding part extending the support 9, of which only one connecting part 39 is shown, can be plugged for a guardrail (not shown).



  After the concrete of the edge of the ceiling has set, the holding devices 1, scaffolding boards 3 or formwork panels 5, the timbers 8, provided that the holding device 1 is not required as part of the protective railing, and the parts of the wall hooks 27 or tie rods 29 projecting beyond the front surface 28 away. The wall hooks 27 can also be bent at their predetermined breaking point (not shown).



  1 to 4, the legs of the support 9 are welded directly onto the web of the support rail 7. To increase the mutual distance between the side with the open leg ends of the support rail 7 and the support 9, i.e. To enlarge the space between the support 9 and the front surface 31 of the wall crown 28, an intermediate piece (not shown) can also be welded between the support 9 and the support rail 7.



  As mentioned above, the support rail 7 is pushed onto a wall hook 27 built into the wall during assembly. The width of the wall hook 27 and the clearance fit of the slot 13, 15, 17, 19, 23, 25 in question secure the holding device 1 against twisting on the front surface 31. This security is not provided when tension rods 29 are used. If the security against rotation is also desired here, in addition to the elongated hole 21, a further elongated hole can be provided and a further tie rod protruding from the front surface 31 can be inserted and screwed into a hole drilled in the wall crown.



   Instead of a U-profile of the support rail 7, a square tube can be used. A square tube gives a slightly higher bending stiffness, but it is more difficult to press against the front surface 31 of the wall crown 28 due to its lower surface pressure against the U-shaped rail 7, since unevenness such as mortar residues, separation edges on building blocks, etc. are always present.


    

Claims (10)

1. Haltevorrichtung für mindestens ein Schalungselement, gekennzeichnet durch eine zur Befestigung an einer Mauer ausgebildete Auflageschiene (7) und eine eine parallele Verlängerung bildende Stütze (9), die so gegenüber der Auflageschiene (7) versetzt ist, dass ein Schalungselement (3) bei vertikal unterhalb der Mauerkrone (28) an der Mauer anliegend befestigter Auflageschiene (7) auf deren oberem Ende aufliegend zwischen der Stütze (9) und der Mauerkrone (28) halterbar ist.       1. Holding device for at least one formwork element, characterized by a support rail (7) designed for fastening to a wall and a support (9) forming a parallel extension, which is offset relative to the support rail (7) such that a formwork element (3) vertically below the wall crown (28) attached to the wall attached support rail (7) on its upper end can be held between the support (9) and the wall crown (28). 2. Haltevorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Stütze (9) an ihrem der Auflageschiene (7) abgewandten Ende ein Kupplungsteil (11) zum Anbringen eines die Stütze (9) verlängernden Halteteils für ein Schutzgeländer und/oder weitere Schalungselemente hat. 2. Holding device according to claim 1, characterized in that the support (9) at its end facing away from the support rail (7) has a coupling part (11) for attaching a support part (9) extending holding part for a protective railing and / or further formwork elements. 3. 3rd Haltevorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Stütze (9) einen zur Auflageschiene (7) offenen U-förmigen Querschnitt hat, der vorzugsweise für die Aufnahme eines Bauholzes (8), z.B. einer Dachlatte, vorgesehen ist. Holding device according to claim 1 or 2, characterized in that the support (9) has a U-shaped cross section which is open to the support rail (7) and which is preferably for receiving a timber (8), e.g. a batten is provided. 4. Haltevorrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass der Abstand der der Stütze (9) abgewandten Seite der Auflageschiene (7) von der der Auflageschiene (7) zugewandten Seite der Stütze (9) derart zur Aufnahme eines Schalungselements (3, 5) ausgebildet ist, dass dieses und ggf. das Bauholz (8) auf dem oberen an der Stütze (9) befestigten Ende (10) der Auflageschiene (7) abstützbar ist bzw. sind. 4. Holding device according to one of claims 1 to 3, characterized in that the distance of the support (9) facing away from the support rail (7) from the support rail (7) facing side of the support (9) such for receiving a formwork element ( 3, 5) that this and possibly the lumber (8) can be supported on the upper end (10) of the support rail (7) fastened to the support (9). 5. 5. Haltevorrichtung nach Anspruch 3 oder 4, dadurch gekennzeichnet, dass die Auflageschiene (7) einen U-förmigen Querschnitt hat, und die Stütze (9) an einem Ende mit ihren Schenkeln am oberen Ende (10) der Auflageschiene (7) auf deren Steg geschweisst ist. Holding device according to claim 3 or 4, characterized in that the support rail (7) has a U-shaped cross section, and the support (9) is welded at one end with its legs at the upper end (10) of the support rail (7) on the web thereof is. 6. Haltevorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass die Auflageschiene (7) in ihrem Steg Löcher (13, 15, 17, 19, 21, 23, 25) zum Durchstecken von aus der Mauer (28) herausragenden Stäben (29) und/oder Laschen (27), und die Stütze (9) in ihrem Steg Löcher (12) für Befestigungsmittel (14) hat. 6. Holding device according to claim 5, characterized in that the support rail (7) in its web holes (13, 15, 17, 19, 21, 23, 25) for pushing through from the wall (28) projecting rods (29) and / or tabs (27), and the support (9) has holes (12) for fastening means (14) in its web. 7. 7. Verwendung der Haltevorrichtung nach Anspruch 1 zur Halterung von Schalungselementen (3, 5), dadurch gekennzeichnet, dass die Haltevorrichtung (1) mit ihrer Auflageschiene (7) vertikal an einer Mauer (28) an hervorstehenden Stäben (29) und/oder Laschen (27) angebracht und ein Schalungselement (3, 5) auf das an der Stütze (9) befestigte obere Ende (10) der Auflageschiene (7) gelegt, und zwischen der Mauer (28) und der Stütze (9) eingeklemmt wird. Use of the holding device according to claim 1 for holding formwork elements (3, 5), characterized in that the holding device (1) with its support rail (7) vertically on a wall (28) on protruding bars (29) and / or tabs (27 ) attached and a formwork element (3, 5) placed on the support (9) attached to the upper end (10) of the support rail (7), and is clamped between the wall (28) and the support (9). 8. Verwendung nach Anspruch 7, dadurch gekennzeichnet, dass auf das zwischen der Mauer (28) und der Stütze (9) eingeklemmte Schalungselement 3, 5) mindestens ein weiteres Schalungselement (3, 5) aufgelegt und an der Stütze (9) lösbar befestigt wird. 8. Use according to claim 7, characterized in that on the between the wall (28) and the support (9) clamped formwork element 3, 5) placed at least one further formwork element (3, 5) and releasably attached to the support (9) becomes. 9. 9. Verwendung nach Ansprch 7 oder 8 der Haltevorrichtung nach Anspruch 2, dadurch gekennzeichnet, dass auf das Kupplungsteil (11) ein die Stütze (9) verlängerndes Halteteil (39) für ein Schutzgeländer gesteckt wird.  Use according to claim 7 or 8 of the holding device according to claim 2, characterized in that a holding part (39) extending the support (9) for a protective railing is plugged onto the coupling part (11). 10. Verwendung nach einem der Ansprüche 7 bis 9 der Haltevorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass ein Bauholz (8) in die U-förmige Stütze (9) eingefügt wird, wobei die Dicke des Bauholzes (8) so gewählt wird, dass das Schalungselement bzw. das unterste Schalungselement (5) zwischen dem Bauholz (8) und der Mauer (28) eingeklemmt wird. 10. Use according to one of claims 7 to 9 of the holding device according to claim 3, characterized in that a timber (8) is inserted into the U-shaped support (9), the thickness of the timber (8) being selected such that the formwork element or the bottom formwork element (5) is clamped between the timber (8) and the wall (28).  
CH509787A 1987-12-29 1987-12-29 Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface CH676135A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH509787A CH676135A5 (en) 1987-12-29 1987-12-29 Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH509787A CH676135A5 (en) 1987-12-29 1987-12-29 Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface

Publications (1)

Publication Number Publication Date
CH676135A5 true CH676135A5 (en) 1990-12-14

Family

ID=4287886

Family Applications (1)

Application Number Title Priority Date Filing Date
CH509787A CH676135A5 (en) 1987-12-29 1987-12-29 Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface

Country Status (1)

Country Link
CH (1) CH676135A5 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9214605U1 (en) * 1992-10-28 1992-12-24 Huxohl, Reiner Fixing device that can be attached to a masonry wall using a fixing anchor
EP0735214A1 (en) * 1995-03-30 1996-10-02 Bartolome Lliteras Alzamora A device to facilitate the shuttering of concrete bands and lintels
WO2007045713A1 (en) * 2005-10-21 2007-04-26 Antonio Navalon Argente Apparatus for fixing slab edge forms for wall coping in buildings
BE1020493A3 (en) * 2012-02-07 2013-11-05 Marc Bollen METHOD AND DEVICE FOR ACHIEVING A RING BAR OR A CONCRETE WALL.
CH706710A1 (en) * 2012-07-05 2014-01-15 Kewo Gmbh Scaffolding bracket for securing scaffold to building wall, has holding unit provided at end of bracket for connecting to scaffold, and center part formed to cross-section of butt joints between wall components and comprising break section

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9214605U1 (en) * 1992-10-28 1992-12-24 Huxohl, Reiner Fixing device that can be attached to a masonry wall using a fixing anchor
EP0735214A1 (en) * 1995-03-30 1996-10-02 Bartolome Lliteras Alzamora A device to facilitate the shuttering of concrete bands and lintels
WO2007045713A1 (en) * 2005-10-21 2007-04-26 Antonio Navalon Argente Apparatus for fixing slab edge forms for wall coping in buildings
BE1020493A3 (en) * 2012-02-07 2013-11-05 Marc Bollen METHOD AND DEVICE FOR ACHIEVING A RING BAR OR A CONCRETE WALL.
CH706710A1 (en) * 2012-07-05 2014-01-15 Kewo Gmbh Scaffolding bracket for securing scaffold to building wall, has holding unit provided at end of bracket for connecting to scaffold, and center part formed to cross-section of butt joints between wall components and comprising break section

Similar Documents

Publication Publication Date Title
EP3926125B1 (en) Fall prevention device
EP3358107A1 (en) Formwork clamp
DE2534160A1 (en) FORMWORK FOR CONCRETE
DE102004004883B4 (en) Ceiling formwork panel and system ceiling formwork
CH676135A5 (en) Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface
DE3108020A1 (en) "PROTECTIVE DEVICE FOR METAL FRAME"
DE3036306A1 (en) METHOD FOR ASSEMBLING AND STRETCHING CEILING FORMWORK FOR CONCRETE WORKS AND CEILING FORMING FOR IMPLEMENTING THE METHOD
DE2407103A1 (en) Ladder scaffolding supporting working-platform - with triangle-grouped cantilevered supports with hooked traverses on base bar
DE10120897A1 (en) Side protective post for scaffolding, is in two parts with forked anchor rails bearing on building and wedged home plus fitted straps for railings and stringers.
EP3354818B1 (en) Length alignment assembly for construction scaffolding
DE3303070A1 (en) Boundary like a railing or a fence
DE824694C (en) Steel formwork device for ceilings
DE3247053C2 (en) External curtain wall
DE844058C (en) Formwork device for concrete walls and ceilings or their parts
DE102012007700B4 (en) Reinforced concrete floor with at least one foot purlin attached
AT400467B (en) AUXILIARY DEVICE FOR USE IN THE AREA OF WINDOW OR PASSWAY OPENINGS AND CORNERS FOR THE CREATION OF WALLS MADE FROM A WALL
CH685830A5 (en) Ceiling shuttering structure with edge shuttering holder
CH674870A5 (en) Balustrade mounting on building site
DE29705696U1 (en) Device for simplifying the formwork of ceiling surfaces in building and civil engineering
DE3009136A1 (en) Lintel area wall facing brickwork girder - is L=sectioned rails with shank lengths fitting brick sizes
AT519309B1 (en) FASTENING ANGLE FOR CEILING EDGE SHEETS
CH690589A5 (en) Anchoring device for a wall shuttering.
AT399008B (en) Shuttering with carrying rails and shuttering panels
WO1996035033A1 (en) Boarding device
AT397268B (en) CONTROL LATCH ANCHOR FOR SECURING THE CONTROL LATCHES ON ROOF CONSTRUCTIONS

Legal Events

Date Code Title Description
PL Patent ceased