CH400887A - Device for the production of shaped stones from concrete - Google Patents

Device for the production of shaped stones from concrete

Info

Publication number
CH400887A
CH400887A CH1330962A CH1330962A CH400887A CH 400887 A CH400887 A CH 400887A CH 1330962 A CH1330962 A CH 1330962A CH 1330962 A CH1330962 A CH 1330962A CH 400887 A CH400887 A CH 400887A
Authority
CH
Switzerland
Prior art keywords
sep
mold
concrete
mold bases
marked
Prior art date
Application number
CH1330962A
Other languages
German (de)
Inventor
Roehr Alfred
Original Assignee
Roehr Alfred
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to FR913856A priority Critical patent/FR1338092A/en
Application filed by Roehr Alfred filed Critical Roehr Alfred
Priority to CH1330962A priority patent/CH400887A/en
Publication of CH400887A publication Critical patent/CH400887A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/084Producing shaped prefabricated articles from the material by vibrating or jolting the vibrating moulds or cores being moved horizontally for making strands of moulded articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/02Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping on conveyors of the endless-belt or chain type
    • B28B5/021Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping on conveyors of the endless-belt or chain type the shaped articles being of definite length
    • B28B5/025Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping on conveyors of the endless-belt or chain type the shaped articles being of definite length the moulds or the moulding surfaces being divided by separating walls and being continuously fed

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)

Description

  

      Einrichtung    zur Herstellung von Formsteinen aus Beton    Es sind     Einrichtungen    zur     Herstellung    -von     Form-          stDinen    :aus Beton bekannt, in. welchen Formen mit  Beton gefüllt,     verdichtet,        weitertransportiert    und  nach dem Entleeren. der     Füllvorrichtung        wieder    zu  geführt werden.  



  Die     bekannten        Einrichtungen        weisen,aber    ;erheb  liehe     Nachteile    auf. So hat sich gezeigt, dass     Vibra-          tions:

  e.inrichtungen    -allein nicht ,in der Lage     sind,        ein     im Gefüge     ,dichtes        Formstück    zu     schaffen.    Die     ,bei     diesen Einrichtungen     verwendeten        endlosen        Förder-          bahnen    wenden     idurch    die     Vibrationseiinrichtungen          leicht    in Eigenschwingungen versetzt,     welche    das Gut  eher     auflockern    als verdichten.  



  Die Erfindung bezweckt, ,die Mängel der bekann  ten     Einrichtungen        zu        vermeiden        und-    eine     Einrichtung     zu schaffen, die es gestattet, ,die Formsteine     wirt-          schaftlich        mittels        eines        kontinuierlichen     herzustellen, und welche sich in einfacher Weise für  die     Herstellung    von     Formsteinen    verschiedener Form  und Grösse     einrichten        lässt.     



  Zur Erzielung     dieser        Vorteile    ,ist     ,die        !erfinidungsge-          mässe    Einrichtung     ;gekennzeichnet    ,durch leine     Rehe     von Formböden und     diesen    gegenüber     bzweglichen.          Lämgsseitenwänden,        welche    zusammen oben offene       Formen        bilden,        idurch    Mittel zum Einfüllen     ides    Be  tons, zum Rütteln.

   der F     ormen,    zum Pressen     und,    zum  Glätten ,der Oberfläche ,der     ,geformten    Steine,     fernier          gekennzeichnet,durch    Mittel zum Bewegen der Form  böden     und    der     ,anderen        Einrichtungsteile    in     bezug          ,aufeinander.     



  Im     .folgenden    wird an Hand     ,der        beigefügten     Zeichnung ein     Ausführungsbeispiel    der     @erfimdungsge-          mässen        Einrichtung    erläutert.  



  Auf :der Zeichnung     zeigt:          Fig.    1 -eine     Seitenansicht        ,der        Einrichtung,        teil-          weise        geschnitten,     
EMI0001.0085     
  
    Fig. <SEP> 2 <SEP> eine <SEP> Ansicht <SEP> idenj,enigen <SEP> Seite <SEP> id@er <SEP> Einrich  tung, <SEP> an <SEP> welcher <SEP> ,die <SEP> Formbö,deneingesetzt <SEP> werden,
<tb>  Fig. <SEP> 3 <SEP> .,eine <SEP> :schematische <SEP> Darstellung <SEP> der <SEP> Verdich  tun<B>g</B> <SEP> ödes <SEP> @eiinigefüllten <SEP> Materials <SEP> in <SEP> ,den <SEP> verschiedenen
<tb>  Bearbeitungsstufen,
<tb>  .Eig. <SEP> 4 <SEP> :und <SEP> 5 <SEP> ,die <SEP> Ant:

  rieib.smIttel <SEP> für <SEP> ,die <SEP> Formbö  )den <SEP> von <SEP> edier <SEP> .Seite <SEP> und <SEP> von <SEP> ,hinten,
<tb>  Fig. <SEP> 6 <SEP> bis <SEP> 8 <SEP> Mittel <SEP> zum <SEP> Ausdrückendes <SEP> Antriebes
<tb>  mach <SEP> den <SEP> Fig. <SEP> 4 <SEP> ,und <SEP> 5 <SEP> bei <SEP> Überlast, <SEP> von <SEP> id@er <SEP> Seite,
<tb>  von <SEP> hinten <SEP> und <SEP> im <SEP> GrundTiss,
<tb>  Fig. <SEP> 9 <SEP> ein <SEP> Rührwerk <SEP> für <SEP> Iden <SEP> Inhalt <SEP> seines <SEP> Einfüll  trichters <SEP> in <SEP> schaubildlicher <SEP> Darstellung <SEP> und
<tb>  Fig.

   <SEP> 10 <SEP> das <SEP> Ende <SEP> eines <SEP> Förderhanides <SEP> zum
<tb>  Zurückführen <SEP> edier <SEP> leeren <SEP> Formbaden <SEP> rund <SEP> einen
<tb>  Drehtisch <SEP> zum <SEP> Übertragen <SEP> der <SEP> Formböden <SEP> vom <SEP> För  derband <SEP> zur <SEP> Einsetzstelle <SEP> ,der <SEP> Einrichtung, <SEP> ebenfalls
<tb>  in <SEP> schaubildlicher <SEP> Darstellung.
<tb>  



  Gemäss <SEP> Fig. <SEP> 1 <SEP> und <SEP> 2 <SEP> weist <SEP> idie <SEP> Einrichtung <SEP> eine
<tb>  Reihc <SEP> von. <SEP> Formbüden <SEP> 1 <SEP> ;auf. <SEP> Diese <SEP> Formböden <SEP> sind
<tb>  aus <SEP> einer <SEP> Blechplatte <SEP> gebildet, <SEP> die <SEP> an <SEP> einzr <SEP> Seite <SEP> seine
<tb>  rechtwinklige <SEP> Aufbiegung <SEP> ,aufweist, <SEP> wie <SEP> iam <SEP> besten
<tb>  aus <SEP> (den <SEP> Fi;g. <SEP> 4 <SEP> und <SEP> .5 <SEP> ersichtlich <SEP> eist. <SEP> Die <SEP> Formböden <SEP> 1
<tb>  ruhen <SEP> lauf <SEP> .einem <SEP> Tisch <SEP> 2, <SEP> der <SEP> entlang <SEP> :

  seiner <SEP> Längs  mittellinieeine <SEP> breite <SEP> Ausn@ehmung <SEP> ,aufweist, <SEP> deren
<tb>  Kanten <SEP> Führungsschienen <SEP> für <SEP> idIe <SEP> Formböden <SEP> ibildien.
<tb>  Jeder <SEP> Formboden <SEP> trägt <SEP> lauf <SEP> der <SEP> unteren <SEP> Seite, <SEP> 3m <SEP> glei  chen <SEP> Abstand <SEP> von <SEP> id.er <SEP> LängsmittelEnie <SEP> zwei, <SEP> Schienen
<tb>  3 <SEP> mit <SEP> abgewinkeltem <SEP> Profil, <SEP> welchie <SEP> zwei <SEP> panallellau  .fende <SEP> Flansche <SEP> laufweisen, <SEP> in <SEP> welche <SEP> Querbolzen <SEP> 4
<tb>  (Feg. <SEP> 4) <SEP> eingesetzt <SEP> sind, <SEP> iso <SEP> ,dass <SEP> sie <SEP> eine <SEP> Zahnstange.
<tb>  bilden.

   <SEP> Die <SEP> anderen <SEP> Längsränder <SEP> der <SEP> Schienen <SEP> 3 <SEP> sind
<tb>  zweimal <SEP> ehgewinkelt, <SEP> so <SEP> ,dass <SEP> sie <SEP> parallel <SEP> zum <SEP> Form  boden <SEP> verlaufen. <SEP> Sie <SEP> umgreifen <SEP> die <SEP> durch <SEP> Iden <SEP> Tisch <SEP> 2
<tb>  gebildeten <SEP> Führungsschienen. <SEP> Zu <SEP> heiden <SEP> Seiten <SEP> der
<tb>  Formbodenreihe <SEP> sind <SEP> senkrecht <SEP> zum <SEP> Tisch <SEP> 2 <SEP> ste  hende <SEP> Wände <SEP> 5 <SEP> angeordnet, <SEP> deren <SEP> Abstand <SEP> vonein-              ander        verändert    und so der Breite der verwendeten       Formböden    angepasst werden     kann.     



  Auf der rechten Seite     in        Fig.    1 befindet     sich    das       Einsetzende    der Einrichtung. Da werden: leere Form  böden nacheinander .so     eingesetzt,        Jass        sie        mit    ;den  Führungsschienen :des Tisches 2 in     Eingriff        kommen,          -und    werden     nachgeschobn,    bis der erste     Querbolzen     4 seiner     Zahnstangvom    Antriebszahnrad 6     :erfasst     wird.

   Das Zahnrad 6 bewegt die ,ganze     Formboden-          reihe        kontinulerl.ichdurch        di;        Einrichtung.     



  Im Bereich des     Antriebszahnrades    6 weisen die  beiden Tischhälften zwei Ausschnitte 19 auf, so     (dass     ihre Führungsschienen ,dort     unterbrochen        ,sind.    An  diesen Stellen werden     die        fehlenden        Führungsschie-          nen,durch        Blechstücke    2.1 ersetzt, welche in ;

  die     Aus-          schnitte    19 passen und en Laschen 20, welche an der       gt        sind    rund de     Aus-          Unterseite    des Tisches 2 befestig       schnitte    19 überqueren,     .angepres.st        werden.    Dieses       Anpressen    wird     durch    zwei     Rai.hen    von     Druckfedern:

       23 erzielt,     .die    sich     zinerseits    von     unten    auf die  Laschen 20,     .anderseits    auf die Köpfe von     Bolzen    22  abstützen, welche :die Laschen 20     durchdringen.        rund          in    den Blechstücken 21     festgeschraubt        ;sind    und die  auch zum Führen dieser Blechstücke ;dienen.

   Falls  bei einem zu grossen     Förderwiderstand        ider    Formbö  denreib-e der     Gegendruck        der        Zahnstange    ;auf ;das       Zahn,ad    6 so     stark        .an.steigt,        ;dass    seine     vertikale     Komponente die Spannung der Federn 23 überwin  det,     kann    der betr.

   Formboden nach oben     auswei-          chen,    wie in     Fig.    7 dargestellt ist,     so,dass        eseine    Zahn  stange ausser Eingriff mit dem     Zahnrad    6     kommt.          Diese        Einachtung    wirkt somit als     Bruchsicherung.     



       Die        Seitenwände    5 und     edie    Formböden 1 mit  ihren rechtwinkligen     Aufb.ie;gungen    bilden     zusammen     eine Reihe von     nach    oben offenen Formen.  



  In ;den durch -die Seitenwände 5 gebildeten Kanal  sind     nacheinander    zwei     Einfülltrichter    7 und 8 ange  ordnet.  



  Für die     Herst llung    einfacher     Formsteine    genügt  ein.     Einfülltrichter.        Beim    Durchlauf unter :dem Trich  ter hindurch werden     die    Formen mit Beton 9     gefüllt.     Ein     Abstreichblech    sorgt für die     Einhaltung,der    vor  geschriebenen     Einfüllhäh.e.     



  Sollen     Formsteine    aus zwei Schichten verschiede  ner Betonqualität,     Stein-.    mit zwischen zwei Schichten  eingesetzten     Einlagen.    oder     Armierungen,    oder     jauch          Steine    von grosser Dicke     hergestellt    werden, wird ein       Teil    des Betons durch den Trichter 7, ;

  der     andere    Teil  durch den Trichter 8     eingetragen.        Zwischen    den. bei  den Trichtern wird     dann        zweckmässig    ein von oben  auf     die        erste    Schicht wirkender     Vorstampfer        üngeord-          net.     



  Im Bereich zwischen den     Einfülltrichtern    7 und 8  ist unter der     Formbödenreihe    ein     Rüitler    10 angeord  net, der     eiinen        ;eigenen        Antrneebsmotor        besitzt.    Dieser  Rüttler wirkt ;direkt von :unten auf     idie        Formböden     und erzielt     eine        bedeute.nede        Verfestigung    ;des Betons.

    Infolge ;der ,erwähnten Anordnung des     Rüttlers    10  bleibt ,der Tisch 2, auf welchem die Formböden auf  ruhen, frei von     Schwingungen.       In diesem Punkte unterscheidet     sich    die :beschrie  bene Einrichtung     vorteilhaft    von     Jen        .einäan:gs    er  wähnten.     bekannten,    bei welchen ;die     Schwingungen     :unter Vermittlung des Trägers ,der     Formen    auf     diese     übertragen werden.     Bei    diesen bekannten Einrichtun  gen breiten sich     idie    Schwingungen -auch     :

  ausserhalb     des Bereiches     id-es    Rüttlers auf     -den        Formenträger    und  seine     Stützteile    ;aus und können     in    :den Formen     :erfah-          rungsgemäss    ein     Wie.derauflockern    !des Betons bewir  ken.  



  In     eilen        Ein.fülltrichter    7 ist ein Rührwerk 11     ein-          _gebaut.    Seine     Beschaffenheit    ist     aus        Fig.    9 ersichtlich.

    Auf ,einer .angetriebenen Welle 12 eist ein Rahmen  .angeordnet, dessen     Querleisten    13 mit der Welle     un-          drehbiar        verbunden    sind und dessen Längsleisten 14  ,auf der     Umfan,gsszite        gezahnt        sind.    Durch Verstellen  ;der Lage ;der Querleisten 13 auf der Welle und der  Lage der     Längsleisten        Kauf        ;deen    Querleisten, können  die     Dimensionen    des Rahmens     geändert        werden.     



  Innerhalb des     Rahrnens    sind     eeuf    der Welle eben  falls verstellbare     Schaufeln    15     angeordnet,    welche  senkrecht     zur    Fläche des     Rahmens        ,stehen    und sich       .abwechselnd    nach verschiedenen     Seeiter    erstrecken.

         Während    ;dies Arbeitens     ider        Einrichtung    wird ;dem  Rahmen :eine     kontinuierliche    Drehung     in        edem        durch     einen Pfeil     @ange;deute@ten    Sinne erteilt.

   Durch ;die ab  wechselnd.-     Einwirkung,des    Rahmens und ;der     Schau-          feln    wird     lein        stetiges        Nachfliessen    ;des Betons     'aus          ide@m        Fiilltrichter    in die     Formen    und     ein        gleichmässi-          iges    Füllen der Formen erzielt,     Insbesondere        wenn          Odem    Beton faseriges Material     beigemengt    ist.

   Der       Einfülltrichter    8 kann     natürlich    auch     reit        einem     derartigen Rührwerk versehen sein.  



       Nach        ;d-,m        Einfülltricht;er    8 sind zwischen     den          Seitenwäniden    5     ;,@in        Betonverteiler    16, ein     Haupt-          stampfer    17 und     c.1.11,-        Glättvorrichtung    18 angeord  net. Der Stampfer 17 erhält seinen Antrieb von  einem Motor über     -einen    Exzenter.

   Von     diesem    Ex  zenter     wind        mittels    je     eines        G3stängeantriebes    eine       vertikale        Bewegun-skomponente    auf     ,den        Verteiler     ;und eine     .horizontale    Komponente :auf     die        Glättor-          gane    übertragen.  



       Fi.    3     ,-stellt        tin    -schematischer Weise     die,-    verschie  denen\     Arbeitsstufen    der Einrichtung     dar,        fier    den  Fall, dass die ;

  gesamte Betonmenge .durch den.     Trich-          ter    7     ein-        gefüllt        wird.        Darin        ist        a        die        Einfüllstufe,        in     welcher die Formen nacheinander und     gleichmässig     mit Beton gefüllt werden, und b ist die Rüttelstufe, in  welcher     derBeton        @nlittels    !des Rüttlers 10     vorverdieh-          tet    wird.

   In ;der Stufe c erfolgt     ;die    Endverdichtung  durch :den Stampfer 17,     @in        !der    Stufe d     die        Glättung          ed.er        Oberfläche        und-    schliesslich in der Stufe e die  Weiterleitung ;des fertig geformten Steines zur     A:us-          schalstelle.     



  Hervorgehoben sei noch, ;dass die     Einrichtung     auch mit einem     Förderband    24 zum Zurückführen       ,der    leeren     Formböden    von der     A@usschalstelle    zur       Einsetzstelle    ;am Kopfe der     Einrichtung    versehen ist.

    Zur     Reimigung    der leeren Formböden 1     während        des     Zurückführers sind längs des     Förderbandes    24 rotie-    
EMI0003.0001     
  
    rend-e <SEP> Bürsten <SEP> 25 <SEP> und <SEP> feststehende <SEP> Bürsten <SEP> 26 <SEP> vorge  s;

   <SEP> her, <SEP> ferner <SEP> feste <SEP> Anschläge <SEP> 27, <SEP> welche <SEP> eine <SEP> Dre  hung <SEP> der <SEP> vorheibewe.gt.en <SEP> Formböden <SEP> relativ <SEP> zum
<tb>  Förderband <SEP> bewirken, <SEP> um <SEP> möglichst <SEP> alle <SEP> ihre <SEP> be  schmutzten <SEP> Teile <SEP> der <SEP> Reiinigungswirkung <SEP> ,der <SEP> Bürsten
<tb>  auszusetzen. <SEP> Der <SEP> Drehtisch <SEP> 28 <SEP> am <SEP> Kopfende <SEP> Iden <SEP> Ein
<tb>  richtjung <SEP> übernimmt <SEP> die <SEP> auf <SEP> dem <SEP> Förderband <SEP> ankom  menden <SEP> Formböden <SEP> rund <SEP> trägt <SEP> sie <SEP> zur <SEP> Einsietzstelle,
<tb>  die <SEP> beim <SEP> vorliegenden <SEP> Beispiel <SEP> von <SEP> ieinem <SEP> Arbeiter
<tb>  zu <SEP> beid,i:e:

  nen <SEP> ist. <SEP> Das <SEP> Föriderb.and <SEP> und <SEP> ider <SEP> Drehtisch
<tb>  werden <SEP> vom <SEP> gleichen <SEP> ,Motor <SEP> )aus <SEP> ,angetmieben, <SEP> wie <SEP> Idas
<tb>  Zahnrad <SEP> 6. <SEP> 29 <SEP> :ist <SEP> ein <SEP> Leitblech <SEP> für <SEP> :die <SEP> Formböden
<tb>  und <SEP> mit <SEP> 30 <SEP> sind <SEP> -die <SEP> Steuer- <SEP> und <SEP> Rückmeldeappamate
<tb>  für <SEP> die <SEP> vz.rschie,denen <SEP> Antriebsmotoren <SEP> angeideutet.
<tb>  



  Alle <SEP> beschriebenen. <SEP> Einrich:tungsteüle <SEP> sind <SEP> auf
<tb>  einem <SEP> -em: <SEP> ins:am,en, <SEP> fahrbaren <SEP> Gestell <SEP> 3.1 <SEP> montiert.
<tb>  <B>Die</B> <SEP> Einrichtung <SEP> bietet <SEP> mannigfaltige <SEP> Abände  run,gs:möglichkeiten. <SEP> Es <SEP> können <SEP> z. <SEP> B. <SEP> die <SEP> obierie <SEP> Fläche
<tb>  der <SEP> Formböden <SEP> 1 <SEP> rund <SEP> beide <SEP> Seiten <SEP> ider <SEP> @aufragenden
<tb>  Wand, <SEP> .ferner <SEP> ,die <SEP> Längswände <SEP> 5 <SEP> und <SEP> die <SEP> Pressflächen
<tb>  des <SEP> Hauptstampfers <SEP> 17 <SEP> mit <SEP> Mitteln <SEP> zum <SEP> Profilieren
<tb>  der <SEP> betr. <SEP> Seiten <SEP> der <SEP> Formsteine <SEP> versehen <SEP> sein.

   <SEP> Ferner
<tb>  ist <SEP> es <SEP> in <SEP> Umkehrung <SEP> ider <SEP> idaraele,gteu <SEP> Anordnung <SEP> auch
<tb>  möglich, <SEP> die <SEP> Formböden <SEP> ortsfest, <SEP> z. <SEP> B. <SEP> auf <SEP> idem
<tb>  Boden <SEP> ides <SEP> Werkplatzes <SEP> ianzuordnen <SEP> rund <SEP> die <SEP> übrigen
<tb>  Ein.riehtungsteüle, <SEP> nämlich <SEP> die <SEP> Seitenwände <SEP> 5, <SEP> idie
<tb>  Einfälltrichter, <SEP> Rüttler, <SEP> Stampfer <SEP> ietc., <SEP> der <SEP> Formbö  denrei:he <SEP> -gegenüber <SEP> verführbar <SEP> rauszubilden.



      Device for the production of molded blocks from concrete Devices for the production of molded blocks from concrete are known in which molds are filled with concrete, compacted, transported further and after emptying. the filling device to be performed again.



  The known devices have, however, considerable disadvantages. It has been shown that vibrations:

  e devices -only not, are able to create a structurally tight fitting. The endless conveyor tracks used in these devices turn, caused by the vibration devices, to vibrate slightly, which loosen the material rather than compress it.



  The aim of the invention is to avoid the shortcomings of the known devices and to create a device which allows the molded bricks to be produced economically by means of a continuous, and which can be used in a simple manner for the production of molded bricks of various shapes and sizes lets set up.



  In order to achieve these advantages, the device according to the invention is characterized by a series of shaped bases and movable bases opposite them. Long side walls, which together form open forms at the top, by means of filling in the concrete, for shaking.

   the molds, for pressing and, for smoothing, the surface, the, shaped stones, further characterized by means for moving the mold bases and the, other equipment parts in relation to one another.



  In the following, an exemplary embodiment of the device according to the invention is explained using the attached drawing.



  On: the drawing shows: Fig. 1 - a side view of the device, partially cut,
EMI0001.0085
  
    Fig. <SEP> 2 <SEP> a <SEP> view <SEP> idenj, some <SEP> page <SEP> id @ er <SEP> facility, <SEP> to <SEP> which <SEP>, the < SEP> Forms that are used <SEP>
<tb> Fig. <SEP> 3 <SEP>., a <SEP>: schematic <SEP> representation <SEP> of the <SEP> Verdich do <B> g </B> <SEP> desolate <SEP> @ one-filled <SEP> Materials <SEP> in <SEP>, the <SEP> different
<tb> processing stages,
<tb> .Eig. <SEP> 4 <SEP>: and <SEP> 5 <SEP>, the <SEP> Ant:

  rieib.smIttel <SEP> for <SEP>, the <SEP> formbö) the <SEP> from <SEP> edier <SEP>. side <SEP> and <SEP> from <SEP>, back,
<tb> Fig. <SEP> 6 <SEP> to <SEP> 8 <SEP> means <SEP> for <SEP> expressing the <SEP> drive
<tb> do <SEP> the <SEP> Fig. <SEP> 4 <SEP>, and <SEP> 5 <SEP> at <SEP> overload, <SEP> from <SEP> id @ he <SEP> side,
<tb> from <SEP> behind <SEP> and <SEP> in <SEP> GrundTiss,
<tb> Fig. <SEP> 9 <SEP> a <SEP> agitator <SEP> for <SEP> ID <SEP> contents <SEP> of its <SEP> filling funnel <SEP> in <SEP> graphical <SEP> representation <SEP> and
<tb> Fig.

   <SEP> 10 <SEP> the <SEP> end <SEP> of a <SEP> funding hanide <SEP> for
<tb> Return <SEP> edier <SEP> empty <SEP> Form bath <SEP> round <SEP> one
<tb> Turntable <SEP> for <SEP> transferring <SEP> the <SEP> mold bases <SEP> from the <SEP> conveyor belt <SEP> to the <SEP> insertion point <SEP>, the <SEP> facility, <SEP> also
<tb> in <SEP> graphical <SEP> representation.
<tb>



  According to <SEP> Fig. <SEP> 1 <SEP> and <SEP> 2 <SEP>, <SEP> i indicates the <SEP> facility <SEP> one
<tb> Row <SEP> from. <SEP> Forms <SEP> 1 <SEP>; on. <SEP> These <SEP> molded bottoms are <SEP>
<tb> formed from <SEP> a <SEP> sheet metal plate <SEP>, <SEP> the <SEP> on <SEP> on one <SEP> side <SEP>
<tb> right-angled <SEP> bend <SEP>, has, <SEP> like <SEP> iam <SEP> best
<tb> from <SEP> (the <SEP> Fi; g. <SEP> 4 <SEP> and <SEP> .5 <SEP> can be seen <SEP>. <SEP> The <SEP> molded bases <SEP> 1
<tb> rest <SEP> run <SEP>. a <SEP> table <SEP> 2, <SEP> the <SEP> along <SEP>:

  its <SEP> longitudinal center line has a <SEP> wide <SEP> exception <SEP>, <SEP> their
<tb> Edges <SEP> Guide rails <SEP> for <SEP> idIe <SEP> molded bases <SEP> imaged.
<tb> Each <SEP> mold base <SEP> carries <SEP> run <SEP> on the <SEP> lower <SEP> side, <SEP> 3m <SEP> equal <SEP> distance <SEP> from <SEP> id .er <SEP> longitudinal center line <SEP> two, <SEP> rails
<tb> 3 <SEP> with <SEP> angled <SEP> profile, <SEP> which <SEP> two <SEP> panel running .fende <SEP> flanges <SEP> run, <SEP> in <SEP> which <SEP > Cross bolt <SEP> 4
<tb> (Feg. <SEP> 4) <SEP> are used <SEP>, <SEP> iso <SEP> that <SEP> they <SEP> a <SEP> rack.
<tb> form.

   <SEP> The <SEP> other <SEP> longitudinal edges <SEP> of the <SEP> rails <SEP> 3 <SEP> are
<tb> twice <SEP> angled, <SEP> so <SEP> that <SEP> they run <SEP> parallel <SEP> to the <SEP> mold base <SEP>. <SEP> You <SEP> encompass <SEP> the <SEP> with <SEP> ID <SEP> table <SEP> 2
<tb> formed <SEP> guide rails. <SEP> To <SEP> the <SEP> pages <SEP> of the
<tb> Form floor row <SEP> are <SEP> perpendicular <SEP> to the <SEP> table <SEP> 2 <SEP> standing <SEP> walls <SEP> 5 <SEP>, <SEP> their <SEP> distance <SEP> can be changed from one another and thus adapted to the width of the mold bases used.



  On the right in Fig. 1 is the insertion end of the device. There: empty mold bases are inserted one after the other so that they come into engagement with; the guide rails: of the table 2 and are pushed in until the first transverse pin 4 of its toothed rack is gripped by the drive gearwheel 6 :.

   The gear wheel 6 moves the entire row of mold bases continuously through di; Facility.



  In the area of the drive gear wheel 6, the two table halves have two cutouts 19 so (that their guide rails are interrupted there. At these points, the missing guide rails are replaced by sheet metal pieces 2.1, which in;

  the cutouts 19 fit and the tabs 20, which are attached to the gt round the bottom of the table 2, cross cuts 19, are pressed. This pressing is achieved by two levels of compression springs:

       23 achieved, .which, on the other hand, are supported from below on the tabs 20, on the other hand on the heads of bolts 22, which: the tabs 20 penetrate. are screwed tightly in the sheet metal pieces 21 and which also serve to guide these sheet metal pieces.

   If the counterpressure of the rack; on; the tooth, ad 6 rises so strongly that its vertical component overcomes the tension of the springs 23, the relevant

   Dodge the bottom of the mold upwards, as shown in FIG. 7, so that a toothed rack disengages from the toothed wheel 6. This respect thus acts as a break protection.



       The side walls 5 and the mold bases 1 with their right-angled configurations together form a series of upwardly open molds.



  In; the channel formed by the side walls 5, two hopper 7 and 8 are sequentially arranged.



  One is sufficient for the production of simple shaped bricks. Filling funnel. When passing under: the funnel through the forms are filled with concrete 9. A mouldboard ensures compliance with the prescribed filling height.



  Shall form stones made of two layers of different concrete quality, stone. with inserts inserted between two layers. or reinforcements, or even stones of great thickness are produced, a part of the concrete is through the funnel 7,;

  the other part entered through the funnel 8. Between. In the case of the funnels, a rammer that acts from above on the first layer is then expediently arranged.



  In the area between the feed hoppers 7 and 8, a jig 10 is arranged under the row of mold bottoms, which has its own drive motor. This vibrator acts; directly from: below on the bottom of the mold and achieves significant consolidation of the concrete.

    As a result of the above-mentioned arrangement of the vibrator 10, the table 2, on which the mold bases rest, remains free from vibrations. In this point, the facility described differs advantageously from the one mentioned above. known, in which; the vibrations: with the mediation of the carrier, the forms are transferred to them. In these known devices, the vibrations also spread:

  outside the area of the vibrator on the mold carrier and its supporting parts; from and can in: the molds: according to experience, cause the concrete to be loosened up again.



  An agitator 11 is built into the filling funnel 7. Its nature can be seen from FIG.

    A frame is arranged on a driven shaft 12, the transverse strips 13 of which are connected to the shaft in a non-rotatable manner and the longitudinal strips 14 of which are toothed on the circumference. By adjusting; the position; of the transverse strips 13 on the shaft and the position of the longitudinal strips purchase; deen transverse strips, the dimensions of the frame can be changed.



  Within the frame, adjustable blades 15 are also arranged on the shaft, which are perpendicular to the surface of the frame and extend alternately to different sides.

         While this work is being carried out by the device, the frame is given a continuous rotation in each sense by an arrow.

   Through the alternating action of the frame and the shovels, a steady flow of concrete from the filling funnel into the molds and even filling of the molds is achieved, especially when fibrous material is added to the concrete is.

   The hopper 8 can of course also be provided with such an agitator.



       According to; d-, m filling funnel; he 8 are between the side walls 5;, @ in concrete distributor 16, a main tamper 17 and c.1.11, - smoothing device 18 angeord net. The tamper 17 receives its drive from a motor via an eccentric.

   From this eccentric, a vertical movement component, the distributor, and a horizontal component: transmitted to the smoothing organs, are lifted up by means of a G3 rod drive.



       Fi. 3 - shows in a schematic way the - different work stages of the facility, for the case that the;

  total amount of concrete .through the. Hopper 7 is filled. Here, a is the filling stage in which the molds are filled with concrete one after the other and evenly, and b is the vibrating stage in which the concrete is pre-processed by means of the vibrator 10.

   In; stage c; the final compaction takes place through: the tamper 17, @in! Of stage d the smoothing of the surface and finally in stage e the forwarding; of the finished stone to the formwork point.



  It should also be emphasized that the device is also provided with a conveyor belt 24 for returning the empty mold bases from the disconnection point to the insertion point at the head of the device.

    To close the empty mold bottoms 1 during the return, 24 are rotated along the conveyor belt
EMI0003.0001
  
    rend-e <SEP> brushes <SEP> 25 <SEP> and <SEP> fixed <SEP> brushes <SEP> 26 <SEP> provided;

   <SEP> here, <SEP> furthermore <SEP> fixed <SEP> stops <SEP> 27, <SEP> which <SEP> a <SEP> rotation <SEP> of the <SEP> moves forward <SEP> Form bases <SEP> relative <SEP> to
<tb> Conveyor belt <SEP> cause <SEP> by <SEP> if possible <SEP> all <SEP> your <SEP> contaminated <SEP> parts <SEP> of the <SEP> cleaning effect <SEP>, the <SEP> to brush
suspend <tb>. <SEP> The <SEP> rotary table <SEP> 28 <SEP> at the <SEP> head end <SEP> Iden <SEP> on
<tb> Richtjung <SEP> <SEP> takes over the <SEP> on <SEP> the <SEP> conveyor belt <SEP> arriving <SEP> molded bases <SEP> round <SEP> <SEP> carries them <SEP> to < SEP> insertion point,
<tb> the <SEP> for the <SEP> present <SEP> example <SEP> from <SEP> a <SEP> worker
<tb> to <SEP> both, i: e:

  nen <SEP> is. <SEP> The <SEP> Föriderb.and <SEP> and <SEP> ider <SEP> turntable
<tb> <SEP> are driven by <SEP> same <SEP>, motor <SEP>) from <SEP>, <SEP> like <SEP> Idas
<tb> Gear <SEP> 6. <SEP> 29 <SEP>: if <SEP> is a <SEP> guide plate <SEP> for <SEP>: the <SEP> mold bases
<tb> and <SEP> with <SEP> 30 <SEP> are <SEP> -the <SEP> control- <SEP> and <SEP> feedback devices
<tb> for <SEP> the <SEP> vz.rschie, to which <SEP> drive motors <SEP> are suggested.
<tb>



  All <SEP> described. <SEP> setup: maintenance controls <SEP> are <SEP> on
<tb> a <SEP> -em: <SEP> ins: am, en, <SEP> mobile <SEP> frame <SEP> 3.1 <SEP> mounted.
<tb> <B> The </B> <SEP> facility <SEP> offers <SEP> a variety of <SEP> variations run, gs: possibilities. <SEP> <SEP> can <SEP> e.g. <SEP> B. <SEP> the <SEP> obierie <SEP> area
<tb> of the <SEP> molded bases <SEP> 1 <SEP> round <SEP> both <SEP> sides <SEP> ider <SEP> @upragende
<tb> wall, <SEP>, furthermore <SEP>, the <SEP> long walls <SEP> 5 <SEP> and <SEP> the <SEP> pressing surfaces
<tb> of the <SEP> main tamper <SEP> 17 <SEP> with <SEP> means <SEP> for <SEP> profiling
<tb> of the <SEP> concerning <SEP> sides <SEP> of the <SEP> shaped stones <SEP> must be provided with <SEP>.

   <SEP> Furthermore
<tb> is <SEP> it <SEP> in <SEP> inversion <SEP> ider <SEP> idaraele, gteu <SEP> arrangement <SEP> too
<tb> possible, <SEP> the <SEP> molded bases <SEP> stationary, <SEP> e.g. <SEP> B. <SEP> to <SEP> idem
<tb> Floor <SEP> to be assigned to the <SEP> workstation <SEP> <SEP> around <SEP> the other <SEP>
<tb> Ein.richtungsteüle, <SEP> namely <SEP> the <SEP> side walls <SEP> 5, <SEP> i
<tb> Injection funnel, <SEP> vibrator, <SEP> tamper <SEP> ietc., <SEP> of the <SEP> line of molds: he <SEP> - against <SEP> seductible <SEP> to be formed.

 

Claims (1)

,PATENTANSPRUCH Einrichtung zur Herstellung von Formsteinen :aus Beton, gekennzeichnet durch eine Reihe von Form böden und diesen gegenüber beweglichen Längssei- tenwänden, welche zusiammen oben offene Formen bilden, durch Mittel zum Einfüllen ides Betons, zum Rütteln id: , PATENT CLAIM Device for the production of molded blocks: made of concrete, characterized by a series of molded floors and longitudinal side walls that move opposite these, which together form open shapes, by means for filling in concrete, for vibrating: r Formen, zum Pressen und zum, Glätten der Oberfläche -der geformten Steine, ferner gekenn zeichnet -durch Mittel zum Bewegen der Formböden und der anderen Einrichtungsteile in bezug aufeinan- der. <B>UNTERANSPRÜCHE</B> 1. Einrichtung :gemäss P:atentan.spruch,dadurch . r molding, for pressing and for smoothing the surface -of the shaped stones, further characterized -by means for moving the mold bases and the other equipment parts with respect to one another. <B> SUBClaims </B> 1. Establishment: according to P: atentan.spruch, thereby. gek.enuzeichnet, dass -die Formböden an Schienen geführt sind rund lauf ihrer Untersqite @aufweisen, in @die iam Einsetzende ein Zahnrad ein greift, marked that -the mold bottoms are guided on rails and have their undersides running around, in which a gear engages at the end of the insertion, um die -ganze Formbödenmeiihe in bezug iguf die anderen Einrichtungsteile vorwärtszuschieben. 2. in order to push the entire mold base row forward in relation to the other equipment parts. 2. Einrichtung gemäss Unteranspruch 1, idadurch gekennzerichnet, dass idie Führungsschienen für die Formböden im Bereich -des Zahnrades über mit vor- gespannten Federn versehenen Sicherheitsmitteln mit EMI0003.0064 den <SEP> feststehenden <SEP> Einrichtungsteilen <SEP> verbunden <SEP> sind, Device according to dependent claim 1, characterized in that the guide rails for the mold bases in the area of the gearwheel have safety means provided with pretensioned springs EMI0003.0064 the <SEP> fixed <SEP> facility parts <SEP> are connected <SEP>, <tb> um <SEP> heri <SEP> Du <SEP> grossem <SEP> Föriderwiderstand <SEP> ider <SEP> Farmbö den.reifie <SEP> ider <SEP> Zahnstange <SEP> ides <SEP> im <SEP> Zaihnmadb.ereich <SEP> b.e fin:dlich-en <SEP> .Formbodens <SEP> zu <SEP> :ermöglichen, <SEP> aus <SEP> :dem <SEP> Ein griff <SEP> mit <SEP> dem <SEP> Zahnrad <SEP> auszuweichen. <tb> 3. <SEP> Einrschttmg <SEP> :gemäss <SEP> Patentanspruch, <SEP> idadurch <tb> gekennzeichnet, <SEP> dass <SEP> idie <SEP> Län;gss,aitenwände, <SEP> welche <tb> zusammen <SEP> mitden <SEP> Formböden <SEP> oben <SEP> offene <SEP> Formen <tb> bilden, <SEP> in <SEP> Richtung <SEP> zueinander <SEP> rund <SEP> voneinander <SEP> weg <tb> verstellbiar <SEP> :angeordnet <SEP> .sind. <tb> 4. <SEP> Einrichtung <SEP> ; <tb> um <SEP> heri <SEP> you <SEP> large <SEP> conveying resistance <SEP> on the <SEP> farm floors. mature <SEP> on the <SEP> rack <SEP> ides <SEP> in <SEP> Zaihnmadb.bereich <SEP> be fin: en <SEP> .Formbodens <SEP> to <SEP>: enable, <SEP> from <SEP>: the <SEP> A handle <SEP> with <SEP> the < SEP> to avoid gear <SEP>. <tb> 3. <SEP> Einrschttmg <SEP>: according to <SEP> patent claim, <SEP> i thereby <tb> marked, <SEP> that <SEP> i the <SEP> length; gss, aite walls, <SEP> which <tb> together <SEP> with the <SEP> mold bases <SEP> above <SEP> open <SEP> molds Form <tb>, <SEP> in <SEP> direction <SEP> to each other <SEP> around <SEP> away from each other <SEP> <tb> adjustable <SEP>: arranged <SEP> .are. <tb> 4. <SEP> establishment <SEP>; geimäss <SEP> Unteranspruch <SEP> 1, <SEP> idad@ureh <tb> ,gekennzeichnet, <SEP> dass <SEP> zum <SEP> .Einfüllen <SEP> von <SEP> Beton <SEP> meh rere, <SEP> in. <SEP> Bewegungsrichtung <SEP> der <SEP> Forniböden <SEP> nachein ander <SEP> angeordnete <SEP> Einfülltrichter <SEP> vorgesehen <SEP> sind, <tb> und <SEP> :dass <SEP> im <SEP> Bereich <SEP> zwischen <SEP> Iden <SEP> Einfülltrichtern <tb> unter <SEP> :den <SEP> Formböden <SEP> ein <SEP> Rüttler <SEP> für <SEP> die <SEP> Formböden <tb> vorgesehen <SEP> List, <SEP> ider <SEP> direkt <SEP> ; according to <SEP> subclaim <SEP> 1, <SEP> idad @ ureh <tb>, marked, <SEP> that <SEP> for <SEP>. Filling <SEP> of <SEP> concrete <SEP> several, <SEP> in. <SEP> direction of movement <SEP> of the <SEP> mold bases <SEP> <SEP> arranged <SEP> one after the other <SEP> filling funnel <SEP> are provided <SEP>, <tb> and <SEP>: that <SEP> in the <SEP> area <SEP> between <SEP> IDs <SEP> filling funnels <tb> under <SEP>: the <SEP> mold bases <SEP> a <SEP> vibrator <SEP> for <SEP> the <SEP> mold bases <tb> intended <SEP> List, <SEP> ider <SEP> direct <SEP>; auf <SEP> idie <SEP> Formböden <SEP> ein wirkt. <tb> 5. <SEP> Einrichtung <SEP> gemäss <SEP> Unteranspruch <SEP> 4, <SEP> idadurch <tb> gekennzeichnet, <SEP> idass <SEP> zwischen <SEP> den <SEP> beiden <SEP> Einfüll trichtern <SEP> en <SEP> Vorstampfer <SEP> und <SEP> nach <SEP> idam <SEP> zweiten <tb> Einfülltrichter <SEP> nacheinünder <SEP> .ein <SEP> Betonverteiler, <SEP> ein <tb> Stampfer <SEP> und <SEP> eine <SEP> Glättevo:rrichüung <SEP> :angeordnet <tb> sind. <tb> 6. <SEP> Einrichtung <SEP> gemäss <SEP> Unteranspruch <SEP> 5, <SEP> dadurch <tb> gekennzeichnet, <SEP> dass <SEP> die <SEP> Stampfer <SEP> mit <SEP> einem <SEP> Exzen terantrieb <SEP> versehen <SEP> sind, <SEP> und <SEP> dass. <SEP> vom <SEP> Antrieb <SEP> des <tb> ic: the <SEP> mold base <SEP> acts on <SEP> i. <tb> 5. <SEP> facility <SEP> according to <SEP> subclaim <SEP> 4, <SEP> i thereby <tb> marked, <SEP> idass <SEP> between <SEP> the <SEP> two <SEP> filling funnels <SEP> en <SEP> pre-rammer <SEP> and <SEP> after <SEP> idam <SEP> second <tb> Filling funnel <SEP> one after the other <SEP> .a <SEP> concrete distributor, <SEP> one <tb> tamper <SEP> and <SEP> a <SEP> smoothness vo: rrichüung <SEP>: arranged <tb> are. <tb> 6. <SEP> facility <SEP> according to <SEP> subclaim <SEP> 5, <SEP> thereby <tb>, <SEP> that <SEP> the <SEP> rammers <SEP> are provided with <SEP> an <SEP> eccentric drive <SEP> <SEP>, <SEP> and <SEP> that. <SEP > from <SEP> drive <SEP> des <tb> ic: inen <SEP> Stampfers <SEP> mittels <SEP> Gestängen <SEP> -der <SEP> Antrieb <SEP> -des <tb> Retonvertzilers <SEP> und <SEP> der <SEP> Gl'ätteeinrichtung <SEP> iabgeleitet <tb> .ist. <tb> 7. <SEP> Einrichtung <SEP> @;e.mäs.s <SEP> Unteranspruch <SEP> 4, <SEP> daduroh <tb> gekennzeichnet, <SEP> ,dass <SEP> in <SEP> ,mindestens <SEP> --einem <SEP> inem <SEP> der <tb> Einfälltrichter <SEP> ein <SEP> Rührwerk <SEP> @angeordnet <SEP> ist, <SEP> w5lehes <tb> -aus <SEP> einer <SEP> mit <SEP> Antrieb <SEP> versehenen <SEP> Welle, <SEP> ielnem <SEP> auf <tb> der <SEP> Welle <SEP> befestigten, <SEP> verstellbaren <SEP> Rahmen <SEP> mit <SEP> ge zah:nten <SEP> Längsleisten <SEP> und <SEP> :innerhalb <SEP> ,des <SEP> Rahmens <SEP> !auf <tb> ,der <SEP> Welle <SEP> sitzenden, <SEP> quier <SEP> zur <SEP> Rahmenebene <SEP> : in a <SEP> tamper <SEP> using <SEP> rods <SEP> -the <SEP> drive <SEP> -des <tb> Retonvertzilers <SEP> and <SEP> of the <SEP> smoothing device <SEP> i derived <tb> .is. <tb> 7. <SEP> facility <SEP> @; e.mäs.s <SEP> subclaim <SEP> 4, <SEP> daduroh <tb> marked, <SEP> that <SEP> in <SEP>, at least <SEP> --a <SEP> in a <SEP> the <tb> Falling funnel <SEP> a <SEP> agitator <SEP> @ is arranged <SEP>, <SEP> w5lehes <tb> -from <SEP> a <SEP> with <SEP> drive <SEP> provided <SEP> shaft, <SEP> ielnem <SEP> on <tb> the <SEP> shaft <SEP> attached, <SEP> adjustable <SEP> frame <SEP> with <SEP> serrated: nth <SEP> longitudinal strips <SEP> and <SEP>: within <SEP>, des <SEP> frame <SEP>! <tb>, the <SEP> wave <SEP> seated, <SEP> quier <SEP> to the <SEP> frame level <SEP>: gerichte ten <SEP> Schaufeln <SEP> besteht. <tb> B. <SEP> Einmichtung <SEP> gemäss <SEP> .Patentanspruch,, <SEP> gekenn zeichnet <SEP> durch <SEP> ein <SEP> Förderband <SEP> zum <SEP> Zurückführen <tb> ,der <SEP> leeren <SEP> Formböden, <SEP> längs <SEP> welchem <SEP> feststehende <tb> iu.nd <SEP> rotierende <SEP> Bürsten <SEP> und <SEP> Anschläge, <SEP> -die <SEP> eine <SEP> Dre hung <SEP> -der <SEP> vorbeigehenden <SEP> Formböden <SEP> bewirken., <SEP> zum <tb> Reinigen <SEP> -der <SEP> Formböden <SEP> von <SEP> ,allen <SEP> Seiten <SEP> während <tb> ,des <SEP> Zurückführers <SEP> -angeordnet <SEP> .sind, <SEP> und <SEP> -durch <SEP> ieinen <tb> Drehtisch <SEP> zum <SEP> Übertragen <SEP> -der <SEP> Idas <SEP> Förderbund <SEP> ver lass.en,dien <SEP> Formböden <SEP> zur <SEP> Einsetzstelle <SEP> -der <SEP> Einrich tung. directed <SEP> blades <SEP>. <tb> B. <SEP> Setup <SEP> according to <SEP>. Patent claim ,, <SEP> marked <SEP> with <SEP> a <SEP> conveyor belt <SEP> for <SEP> return <tb>, the <SEP> empty <SEP> molded base, <SEP> along <SEP> which <SEP> is fixed <tb> iu.nd <SEP> rotating <SEP> brushes <SEP> and <SEP> stops, <SEP> - the <SEP> a <SEP> rotation <SEP> - the <SEP> passing <SEP> mold bases <SEP> effect., <SEP> for <tb> Cleaning <SEP> -the <SEP> mold bases <SEP> from <SEP>, all <SEP> sides <SEP> during <tb>, of the <SEP> returner <SEP> -arranged <SEP> .are, <SEP> and <SEP> -by <SEP> ione <tb> Turntable <SEP> for <SEP> transfer <SEP> - leave the <SEP> Idas <SEP> conveyor belt <SEP>, serve <SEP> mold bases <SEP> to <SEP> insertion point <SEP> - the <SEP> facility.
CH1330962A 1962-10-30 1962-11-14 Device for the production of shaped stones from concrete CH400887A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR913856A FR1338092A (en) 1962-10-30 1962-10-30 Process for manufacturing concrete slabs or other molded construction elements and installation for the implementation of this process
CH1330962A CH400887A (en) 1962-11-14 1962-11-14 Device for the production of shaped stones from concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1330962A CH400887A (en) 1962-11-14 1962-11-14 Device for the production of shaped stones from concrete

Publications (1)

Publication Number Publication Date
CH400887A true CH400887A (en) 1965-10-15

Family

ID=4391299

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1330962A CH400887A (en) 1962-10-30 1962-11-14 Device for the production of shaped stones from concrete

Country Status (1)

Country Link
CH (1) CH400887A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3590131C2 (en) * 1984-04-02 1994-07-07 Partek Ab Method and device for producing a prestressed endless concrete product
US9221193B2 (en) 2012-12-17 2015-12-29 Elematic Oyj Apparatus for sawing cured slipform cast concrete products
CN113492453A (en) * 2021-06-29 2021-10-12 徐州振丰新型墙体材料有限公司 Extrusion device is used in wall body brick production of can detach waste material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3590131C2 (en) * 1984-04-02 1994-07-07 Partek Ab Method and device for producing a prestressed endless concrete product
US9221193B2 (en) 2012-12-17 2015-12-29 Elematic Oyj Apparatus for sawing cured slipform cast concrete products
CN113492453A (en) * 2021-06-29 2021-10-12 徐州振丰新型墙体材料有限公司 Extrusion device is used in wall body brick production of can detach waste material

Similar Documents

Publication Publication Date Title
DE1703832A1 (en) Process for the production of wood fiber boards and apparatus for carrying out the process
DE945825C (en) Device for the production of moldings from non-homogeneous masses, in particular from ceramic materials, by shaking and applying pressure without interruption
CH627126A5 (en)
CH400887A (en) Device for the production of shaped stones from concrete
DE69524078T2 (en) METHOD AND DEVICE FOR PRODUCING CEMENT PRODUCTS
DE807259C (en) Method and device for the mass production of concrete goods
DE4225840C1 (en) Process for producing mineral wool slabs and device for carrying out the process
DE934818C (en) Device for the production of cement roof tiles
DE3027046C2 (en) Method and device for the production of prefabricated parts from prestressed concrete with an immediate bond, in particular prestressed concrete sleepers
AT163669B (en) Method and device for producing thin-walled plates or the like from hardening molded material
DE102007022455A1 (en) Filling carriage for paving-stone, has slider arranged in mixture chamber, where slider is moved along thrust direction with which distribution of mixture in mixture area is controlled during filling process
DE964302C (en) Device for the continuous production of plate-shaped bodies from a thin fluid mixture of fibrous materials and hydraulic binding agent
DE810131C (en) Method and device for vibrating moldings made of soft concrete u. like
DE1584678A1 (en) Machine for producing moldings from plastic masses such as concrete or the like.
DE688011C (en) Device movable on rails or movable on runners for distributing and compacting bituminous or tarred road building materials
AT149398B (en) Method and device for compacting concrete roads or the like by means of vibration.
DE60120547T2 (en) Device for the production of soft building blocks
DE2043071A1 (en) Process for the production of cast products and apparatus for carrying out the process
DE2901545A1 (en) METHOD AND DEVICE FOR PRODUCING SHAPED STONES
DE2548101A1 (en) Rig for casting supports with prestressed concrete bottom booms - has vibrating rods and mould scraper conveyor levelling U-shaped moulds
DE1683760A1 (en) Method and device for the continuous production of profiled, in particular shell-shaped prefabricated components from compactable materials, preferably concrete, e.g. for sewers
DE2408490A1 (en) Vibratory densification process, e.g. for concrete - carried out in auxiliary mould prior to shaping in main mould
DE1936455A1 (en) Machine for building and repairing railroad tracks
DE2618599A1 (en) Perforated vibrating container - for preloading particulate moulding materials to automate control of wall thickness and/or density
DE2044625A1 (en) Method for changing support plates in a cycle-wise machine for making plates from concrete or the like