CH399982A - Process for producing structures from prefabricated reinforced concrete parts - Google Patents

Process for producing structures from prefabricated reinforced concrete parts

Info

Publication number
CH399982A
CH399982A CH204363A CH204363A CH399982A CH 399982 A CH399982 A CH 399982A CH 204363 A CH204363 A CH 204363A CH 204363 A CH204363 A CH 204363A CH 399982 A CH399982 A CH 399982A
Authority
CH
Switzerland
Prior art keywords
prefabricated parts
prefabricated
joint
parts
formwork
Prior art date
Application number
CH204363A
Other languages
German (de)
Inventor
Otto Dipl Ing Seidl
Original Assignee
Dyckerhoff & Widmann Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff & Widmann Ag filed Critical Dyckerhoff & Widmann Ag
Priority to CH204363A priority Critical patent/CH399982A/en
Publication of CH399982A publication Critical patent/CH399982A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/22Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material with parts being prestressed
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • E04C2/384Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

  

      Verfahren    zum Herstellen von Bauwerken aus     Stahlbeton-Fertigteilen       Im Zuge der auch im Bausektor     einsetzenden     Entwicklung von wirtschaftlichen Arbeitsweisen ist  man dazu übergegangen, die Bauwerke in Einzelteile  aufzuteilen, die     entweder    in besonderen Betonwerken  oder auf der Baustelle hergestellt werden können.  Diese     sogenannten        Stahlbeton-Fertigteile    werden nach  dem Erhärten des Betons an ihre Einbaustelle trans  portiert und in geeigneter Weise miteinander verbun  den.

   Die Herstellung der Fertigteile erfolgt in der  Regel, indem der Beton in Schalungen bekannter Art  gestampft, gerüttelt oder auf andere Art und Weise  so verdichtet wird, dass die Werkstücke in kürzester  Frist     entschalt    und die Schalungen noch vor dem  völligen Erhärten des Betons erneut verwendet werden  können.  



  Um ein sattes Auf- oder     Aneinanderliegen    benach  barter Teile zu gewährleisten, wurden beim Verlegen  der so hergestellten Fertigteile in den Stoss- oder  Lagerfugen eine eventuelle Unebenheiten ausgleichen  de Schicht, z. B. eine Zwischenlage aus Mörtel oder  an Ort und Stelle eingebrachtem Beton angeordnet.  Solche Zwischenschichten wurden auch vorgesehen,  wenn gleichartige     Fertigteile    nebeneinander oder auf  einander verlegt werden sollten, z.

   B. bei dicht an  dicht liegenden Deckelbalken, Brückenträgern, Rah  menriegeln, die auf vorgefertigte Rahmenstiele auf  gesetzt werden, bei aus Teilstücken vorfabrizierten  Balken oder Bogenbindern, bei der Aneinanderreihung  vorgefertigter     Shed-    oder Tonnenschalen zu     einem     Dach, beim Einbau von     Tübbingen    in Tunnel- oder       Stollenauskleidungen    u. dgl.  



  Auch bei Aufwand besonderer Sorgfalt und bei  Verwendung von ausgesprochen festen Schalungen  fallen die Berührungsflächen der Fertigteile niemals    so eben aus, dass, wenn     wirklich    gut geschlossene  Fugen erforderlich sind, eine wenigstens die Uneben  heiten, seien sie auch minimaler Art, ausgleichende       Zwischenschlussschicht    entbehrt werden könnte.

   Das  beruht darauf, dass die in einer Fuge     aneinander-          stossenden    Flächen benachbarter Betonfertigteile stets  von unterschiedlichen Schaltflächen gebildet sind, de  ren Unebenheiten sich in der Sichtfläche     widerspiegeln.     Auch das     vielfach        versuchte    nachträgliche Bearbeiten  der Fugenflächen, z. B. durch Schleifen, führt nicht  zu dem gewünschten Erfolg.  



  Die Anordnung einer Ausgleichsschicht in den  Fugen ist, wie immer sie auch     ausgebildet    sein mag,  zeitraubend und arbeitsaufwendig. Am nachteiligsten  aber ist, dass die Betonqualität dieser meist unter  schwierigen Bedingungen eingebrachten Schicht er  heblich schlechter ist als diejenige der Fertigteile, was  zu Beeinträchtigungen der Festigkeit des gesamten  Bauwerkes führt.  



  Diese     Festigkeitsminderung    wird zum Teil durch  das unterschiedliche Alter von Fertigteil- und Fugen  beton und zum Teil dadurch verursacht, dass die  bereits erhärteten Fertigteile dem frisch in die Fugen  eingebrachten Beton das zum Abbinden notwendige  Wasser entziehen. Der jüngere Fugenbeton schwindet  stärker als der Beton der Fertigteile. Dadurch treten  im Beton der Fuge Zugspannungen auf. Die dadurch  bedingten inneren Spannungszustände machen daher  eine Bewehrung des zwischen die Fertigteile im Be  reich der Fuge eingebrachten Betons notwendig, wel  che für das Tragvermögen der Konstruktion nicht  nutzbar ist.  



  Der Erfindung     liegt    die Aufgabe zugrunde, eine       Möglichkeit    zu schaffen, um auf Fugeneinlagen, die      für die Gesamtkonstruktion nachteilig sind, ganz zu  verzichten.  



  Die Lösung dieser Aufgabe liegt in der Aus  wertung der Erkenntnis, dass zwei Berührungsflächen,  die mit ein und demselben Blech als Schalung herge  stellt werden, bezüglich ihrer Unebenheiten einander  so entsprechen, dass beide Flächen genau auf- und  ineinander passen, wodurch es möglich ist, die Fertig  teile ohne das Einfügen von     Ortbeton    in die Fugen  zu verlegen und derart zusammenzuschliessen, dass  die Fugen ohne Verbindungsmittel Kräfte zu über  tragen vermögen.

   Zu diesem Zweck werden die zur       Verwendung    kommenden Fertigteile in geeigneten  Schalungen in einer Lage zueinander betoniert, die  derjenigen entspricht, die sie beim späteren Versetzen  an dem zu errichtenden Bauwerk einnehmen, wobei  die Flächen der herzustellenden Fertigteile in der  späteren Einbaulage im Bereich einer Fuge einander  zugekehrt sein werden, die beim     Betoniervorgang     durch ein Stahlblech voneinander getrennt werden,  an dessen einer Seite sich die eine     Stossfläche    des  zu bildenden Fertigteiles abformt,

   während sich die  Stossfläche des zu bildenden benachbarten Fertig  teiles an der gegenüberliegenden Seite des     Zwischen-          bleches    abformt und dass die so gebildeten     Stoss-          flächen    benachbarter Fertigteile mit Flächenberührung  aneinandergefügt und ohne Zwischenlagen mit Hilfe  von an sich bekannten, die Teile durchsetzenden  Spanngliedern zusammengespannt werden.  



  Dadurch gelingt es, die jeweils     aneinanderliegen-          den    Fugenflächen benachbarter Fertigteile genau auf  einanderpassend auszubilden. Selbst wenn das Trenn  blech an einzelnen Stellen Beulen aufweisen sollte,  so ist seine Stärke doch immer gleich, so dass also  ein  Berg  des einen Fertigteiles auf ein  Tal  des  benachbarten passt und umgekehrt.  



  Die beigefügten Zeichnungen veranschaulichen  beispielsweise Durchführungen des     erfindungsgemäs-          sen    Verfahrens.  



       Fig.    1 ist eine teilweise Draufsicht auf dicht neben  einander liegend hergestellte     Balken    für eine Brücke,       Fig.    2 ist ein Querschnitt nach der Linie     II-II     der     Fig.    1,       Fig.    3 zeigt nach     Art    von Schalentonnen geformte  Fertigteile,       Fig.    4 zeigt Fertigteile für Rahmenstiele mit dem  Rahmenriegel als Schemaskizze,       Fig.    5 ist eine Draufsicht auf die Fertigteile     ge-          mäss        Fig.    4 bei deren Herstellung,

         Fig.    6 ist ein Schnitt nach der Linie     VI-VI    der       Fig.    5,       Fig.    7     schliesslich    zeigt in Draufsicht eine     Scha-          lungsform    für     Tübbings    aus     Stahlbeton-Fertigteilen     und       Fig.    8 gibt einen Schnitt nach der Linie     VIII-VIII     der     Fig.    7 wieder.  



  Als erstes Beispiel     (Fig.    1 und 2) sei die Ausfüh  rung einer Brücke erläutert, deren Längsträger aus  dicht nebeneinander angeordneten Fertigteilen besteht,  die in der Querrichtung zusammengespannt werden    sollen. Bisher wurden die dazu notwendigen Fertig  teile einzeln oder gleichzeitig in wenigen     Stahlformen     hergestellt. Es wird bei der Herstellung wie folgt vor  gegangen:  Auf einer Matrize 1, die dem Negativ der Unter  sicht der Brücke entspricht, und auf welche eine Iso  lierung 2, z. B. aus einem geeigneten Anstrich, einer  Papierlage     od.    dgl. aufgebracht wurde, um zu verhin  dern, dass der später aufzubringende Beton an der  Matrize anhaftet, wird eine der ganzen Brückenbreite  und der Länge der Längsträger entsprechende Rand  schalung 3, 3' aufgestellt.

   Die Randschalung ist durch  schematisch dargestellte Streben 4 versteift. An der  Randschalung werden an den Stirnseiten 3' Bleche 5  befestigt, die die inneren Seitenschalungen der ein  zelnen Balken 6 darstellen. Diese Bleche werden  in auf der     Oberfläche    der Matrize angeordneten Rillen  7 geführt. Der Beton wird     zweckmässigerweise    in allen  Balken 6 gleichzeitig von einem Ende her fortlaufend  eingebracht, so dass z. B. 3 bis 5 mm starke     Schalungs-          bleche    genügen. Diese bedürfen auch bei hohen Balken  keiner Verstärkung, da sie von beiden Seiten her  gleich stark belastet werden.  



  Die vom Walzwerk kommenden Bleche haben,  auch wenn sie nicht völlig eben sind, stets parallele  Flächen. Diese Eigenschaft der Bleche wird bei der  Balkenherstellung ausgenutzt und bewirkt, dass, nach  dem die     Balken        entschalt    sind, d. h. nachdem die  Trennbleche entfernt wurden, die Balken derart zu  sammengeschoben werden können, dass die Uneben  heiten der einen Seitenfläche in die korrespondieren  den Unebenheiten der Seitenfläche des benachbarten  Balkens zu liegen kommen. Da es sich bei diesen  Unebenheiten um Erhebungen bzw. Vertiefungen han  delt, deren     Höhendifferenzen    in der Grössenordnung  von Bruchteilen eines Millimeters liegen, so ist es  möglich, sogar wasserdichte Fugen zu erzielen.

   Man  muss dabei nur Sorge tragen, dass die Fertigteile  genau in der Lage zusammengebaut werden, in der  sie betoniert wurden.  



  Beim Herstellen der einzelnen     Balken    werden ent  sprechende Aussparungen vorgesehen, in die     zweck-          mässig    gleich an der Einbaustelle Spannglieder einge  zogen werden, mit     Hilfe    derer die Fertigteile zusam  mengespannt und die Berührungsfugen unter Druck  spannung gesetzt werden können. Diese Aussparungen  werden     zweckmässigerweise    durch Stäbe 9 erzeugt,  die durch Aussparungen in den Schalblechen 3 bzw. 5  gesteckt werden und an den Enden durch Muttern 8  in ihrer Lage gehalten werden.

   Die Stäbe 9 sind in  bekannter Weise präpariert, um ein Anhaften des  Betons zu vermeiden, und werden noch vor dessen  Erhärten wieder entfernt.     In    die so gebildeten     Aus-          sparungen    können dann nach dem endgültigen Ver  legen der Fertigteile Spannglieder zum Zusammen  spannen der Fertigteile eingezogen werden. Eine et  waige     Längsvorspannung    der Balken kann unter Ein  satz der üblichen Spannverfahren ausgeführt werden.  



  Die einzelnen     Ballken    müssen selbstverständlich so      gekennzeichnet werden, dass es möglich ist, sie an  der Einbaustelle in gleicher Reihenfolge zu verlegen.  



  Das Ausführungsbeispiel gemäss     Fig.    3 stellt aus  Fertigteilen gebildete Tonnenschalen dar, die dicht  zusammengeschlossen werden sollen. Der Vorgang ist  im Prinzip der gleiche wie beim ersten Beispiel. Die  Herstellung     erfolgt    wiederum auf einer in     Fig.    3 nicht  dargestellten Matrize, wobei als Stirnschalung der  Tonnenfertigteile 10 Bleche eingelegt     sind,    nach deren  Entfernung die entsprechenden Fertigteile dicht an  einandergelegt und zusammengespannt werden kön  nen. Dazu bedient man sich der -     ähnlich    wie oben  beschrieben - in Aussparungen 11 eingezogenen  Spannglieder. Das so erhaltene Tonnendach kann in  bekannter Weise auf Stützen aufgelegt werden.  



  Das erfindungsgemässe     Verfahren    ist besonders  vorteilhaft, wenn eine grössere Anzahl von gleich  ausgebildeten Fertigteilen herzustellen ist. In diesen  Fall wird zweckmässig der zuletzt hergestellte Ab  schnitt der Tonnenschale als Ausgangspunkt einer  neuen Serie von Fertigteilen verwendet und zwar  derart, dass man das letzte begrenzende     Schalungs-          blech    nicht entfernt und das zuletzt hergestellte Fertig  teil mitsamt dem     Schalungsblech    an den Ort des  ersten verlagert, worauf der gleiche Arbeitsvorgang  erneut ablaufen kann.  



  Als drittes Beispiel     (Fig.    4, 5 und 6) soll die Her  stellung eines Rahmenriegels, der an einem Rahmen  stiel biegesteif angeschlossen werden soll, erläutert  werden.  



  Die Stiele 12 und der oder die Riegel 13 werden  wiederum auf einer Matrize 1 mit Seitenschalungen 3  liegend hergestellt. Als Kopfschalung eines Stieles wird  dabei ein Blech 14 eingelegt, welches zum Hindurch  führen, z. B. von Spanngliedern 15, entsprechend  durchlöchert ist und das auf der anderen Seite einen  Teil der Schalung des Riegels 13 bildet. Die Spann  glieder 15 werden in bekannter Weise mit     Hüllrohren     versehen und in dem Riegel 13 entsprechende Aus  sparungen erzeugt, so dass die Teile     einzeln    versetzt  werden und nach dem Zusammensetzen vorgespannt  werden können. So werden, auch bei mehreren Stielen,  diese und der Riegel liegend und in der ganzen     Länge     der auszuführenden Halle hergestellt.

   In diesem Falle  ist es jedoch erforderlich, an den Stielen eine starre  Hilfskonstruktion 16, z. B. aus     Profilstahl,    anzubrin  gen, um sicherzustellen, dass die Säulen in gleicher  Höhe und in den richtigen Abständen voneinander  aufgestellt werden.  



  Da, wie oben bereits dargelegt, die Fugen zwischen  den     einzelnen    Fertigteilen wasserdicht hergestellt wer  den können, eignet sich das erfindungsgemässe Ver  fahren auch besonders gut zur Herstellung von     Tüb-          bings    für Tunnel- und     Stollenauskleidungen    aus Stahl  betonfertigteilen. Eine solche Arbeitsweise veran  schaulichen die     Fig.    7 und B.  



  Wegen der in der Regel grossen Länge der Tunnels  oder Stollen wird beim Betonieren der Fertigteile  zweckmässig in ähnlicher Weise verfahren wie bei der  Herstellung von Schalentonnen. Auf einer Unterlage    17 wird innerhalb der     Schalungselemente    18 ein erster,  in einzelne     Tübbings    unterteilter Rohrring 19 liegend  mit lotrecht stehender Tunnelachse betoniert. Die  Unterteilung der     einzelnen    Rohrringe 19, 19', 19" usw.  in     Tübbings    erfolgt in einfacher Weise durch lotrechte,  radiale Bleche 20.

   Die einzelnen Ringe 19 werden  übereinander in einer Art     Blätterteigverfahren        unter     Zwischenschaltung horizontaler Bleche 21 zur Aus  bildung der Ringfugen hergestellt, wobei die Anord  nung der horizontalen Bleche 21 dem     erfindungs-          gemässen    Verfahren den Vorteil verleiht, dass fort  laufend und ohne die Fugenflächen mit einem Anstrich  zu versehen, weiter betoniert werden kann.  



  Bei Verwendung     keilförmiger    Bleche 21 zur Her  stellung der Ringfugen, die gebohrt und möglichst  auch geschliffen werden sollen, ist es möglich, auch       Tübbings    für Tunnelkrümmungen bei lotrechter Achse  während der Fertigung auszuführen. Bei einem Tun  neldurchmesser von z. B. 5 m, einem Radius von  z. B. 100 m und einer     Tübbinglänge    von 0,7 m wäre  die Ausführung auf diese Weise     möglich,    wenn die       Blechdickendifferenz    zwischen     Krümmungsaussen-          und        -innenseite    35 mm beträgt.  



  Beim Herstellen dieser horizontalen Ringe wird       zweckmässig    ähnlich wie bei der oben beschriebenen  Herstellung von Schalentonnen vorgegangen. Der auf  einem hergestellten Stapel jeweils oben liegende Ring,  an den weiter angeschlossen werden muss, wird nach  Entfernung der unteren Ringe an die Stelle des unter  sten gelegt, worauf darauf aufbauend wieder weitere  Ringe hergestellt werden können.



      Process for the production of structures from reinforced concrete prefabricated parts In the course of the development of economic working methods, which also began in the construction sector, there has been a move towards dividing the structures into individual parts that can be produced either in special concrete works or on the construction site. These so-called reinforced concrete prefabricated parts are transported to their installation location after the concrete has hardened and are connected to one another in a suitable manner.

   The prefabricated parts are usually produced by tamping, shaking or otherwise compacting the concrete in formwork of a known type in such a way that the workpieces can be removed from the mold in the shortest possible time and the formwork can be used again before the concrete has completely hardened .



  In order to ensure a snug fit on or against each other adjacent parts, a possible unevenness was compensated de layer when laying the finished parts so produced in the butt or horizontal joints, z. B. an intermediate layer of mortar or placed on the spot concrete is arranged. Such intermediate layers were also provided when similar prefabricated parts should be laid next to one another or on top of one another, e.g.

   B. menriegeln with tightly packed cover beams, bridge girders, frames that are placed on prefabricated frame posts, with prefabricated beams or arched trusses from sections, when lining up prefabricated shed or barrel shells to form a roof, when installing segments in tunnels or Tunnel linings u. like



  Even with special care and the use of extremely solid formwork, the contact surfaces of the prefabricated parts are never so flat that, if really well-closed joints are required, at least one of the unevenness, even if it is minimal, compensating intermediate layer could be dispensed with.

   This is based on the fact that the surfaces of adjacent precast concrete elements that adjoin each other in a joint are always formed by different buttons, the unevenness of which is reflected in the visible surface. Even the often attempted subsequent editing of the joint surfaces, e.g. B. by grinding, does not lead to the desired success.



  The arrangement of a leveling layer in the joints is, however it may be designed, time-consuming and labor-intensive. The most disadvantageous thing, however, is that the concrete quality of this layer, which is usually applied under difficult conditions, is considerably worse than that of the prefabricated parts, which leads to impairment of the strength of the entire structure.



  This reduction in strength is caused in part by the different ages of precast and joint concrete and in part by the fact that the precast elements that have already hardened remove the water necessary for setting from the concrete that has just been placed in the joints. The younger joint concrete shrinks more than the concrete of the precast elements. This creates tensile stresses in the concrete of the joint. The resulting internal stresses therefore make reinforcement of the concrete introduced between the prefabricated parts in the area of the joint necessary, which cannot be used for the load-bearing capacity of the structure.



  The invention is based on the object of creating a way of completely doing without joint inserts, which are disadvantageous for the overall construction.



  The solution to this problem lies in the evaluation of the knowledge that two contact surfaces, which are produced with one and the same sheet metal as formwork, correspond to one another in terms of their unevenness in such a way that both surfaces fit exactly on and into one another, which makes it possible to lay the prefabricated parts without adding in-situ concrete in the joints and to close them together in such a way that the joints are able to transfer forces without connecting means.

   For this purpose, the prefabricated parts to be used are concreted in suitable formwork to one another in a position that corresponds to that which they will occupy when moving the building to be built later, with the surfaces of the prefabricated parts to be produced facing each other in the later installation position in the area of a joint which will be separated from each other during the concreting process by a steel sheet, on one side of which one of the abutting surfaces of the precast element to be formed is formed,

   while the joint surface of the adjacent prefabricated part to be formed is formed on the opposite side of the intermediate sheet and the joint surfaces formed in this way of adjacent prefabricated parts are joined together with surface contact and are clamped together without intermediate layers with the aid of known tendons penetrating the parts.



  This makes it possible to design the joint surfaces of adjacent prefabricated parts that lie against one another so that they exactly match one another. Even if the partition plate should have dents in individual places, its thickness is always the same, so that a mountain of one prefabricated part fits onto a valley of the neighboring one and vice versa.



  The accompanying drawings illustrate, for example, implementation of the method according to the invention.



       Fig. 1 is a partial plan view of beams for a bridge that are produced close together, Fig. 2 is a cross-section along the line II-II of Fig. 1, Fig. 3 shows finished parts shaped in the manner of shell barrels, Fig. 4 shows Finished parts for frame posts with the frame bar as a schematic sketch, FIG. 5 is a plan view of the finished parts according to FIG. 4 during their production,

         FIG. 6 is a section along line VI-VI of FIG. 5, FIG. 7 finally shows, in plan view, a form of form for tubbings made of prefabricated reinforced concrete parts, and FIG. 8 shows a section along line VIII-VIII of FIG. 7 again.



  As a first example (Fig. 1 and 2) the Ausfüh tion of a bridge is explained, the longitudinal beam consists of closely spaced prefabricated parts that are to be clamped together in the transverse direction. So far, the necessary prefabricated parts have been produced individually or simultaneously in a few steel molds. It is proceeded as follows in the production: On a die 1, which corresponds to the negative of the lower view of the bridge, and on which an insulation 2, z. B. from a suitable paint, a layer of paper. The like. Was applied to verhin countries that the concrete to be applied later adheres to the matrix, one of the entire bridge width and the length of the side members corresponding edge formwork 3, 3 'is set up.

   The edge formwork is stiffened by struts 4 shown schematically. At the edge formwork 3 'sheets 5 are attached to the end faces, which represent the inner side formwork of an individual bar 6. These sheets are guided in grooves 7 arranged on the surface of the die. The concrete is expediently continuously introduced simultaneously from one end into all beams 6 so that, for. B. 3 to 5 mm thick shuttering sheets are sufficient. Even with high beams, these do not require any reinforcement, as they are equally stressed from both sides.



  The sheets coming from the rolling mill always have parallel surfaces, even if they are not completely flat. This property of the sheets is used in the production of beams and has the effect that, after the beams have been demoulded, i. H. After the separating plates have been removed, the beams can be pushed together in such a way that the unevenness of one side surface comes to lie in the corresponding unevenness of the side surface of the adjacent beam. Since these bumps are elevations or depressions whose height differences are on the order of fractions of a millimeter, it is even possible to achieve watertight joints.

   You only have to ensure that the precast elements are assembled in the exact position in which they were concreted.



  When making the individual beams, appropriate recesses are provided, into which tendons are expediently drawn in at the installation point, with the help of which the precast elements can be clamped together and the contact joints can be put under compressive stress. These recesses are expediently produced by rods 9 which are inserted through recesses in the shuttering plates 3 and 5 and are held in their position at the ends by nuts 8.

   The rods 9 are prepared in a known manner in order to prevent the concrete from sticking and are removed again before it hardens. Tendons for clamping the prefabricated parts together can then be drawn into the recesses formed in this way after the final laying of the prefabricated parts. Any longitudinal prestressing of the beams can be carried out using the usual prestressing methods.



  The individual balls must of course be marked in such a way that it is possible to lay them in the same order at the installation site.



  The embodiment according to FIG. 3 represents barrel shells formed from prefabricated parts which are to be tightly closed. The process is basically the same as in the first example. The production takes place again on a die, not shown in Fig. 3, 10 sheets are inserted as the front formwork of the barrel prefabricated parts, after their removal the corresponding prefabricated parts can be placed close together and clamped together. For this purpose, the tendons drawn into recesses 11 are used - similar to those described above. The barrel roof thus obtained can be placed on supports in a known manner.



  The method according to the invention is particularly advantageous when a larger number of identically designed prefabricated parts is to be produced. In this case, the most recently produced section of the barrel shell is expediently used as the starting point for a new series of prefabricated parts in such a way that the last delimiting formwork sheet is not removed and the last produced prefabricated part together with the formwork sheet is moved to the location of the first, whereupon the same work process can run again.



  As a third example (Fig. 4, 5 and 6), the Her position of a frame bolt that is to be connected rigidly to a frame handle will be explained.



  The posts 12 and the bolt or bars 13 are in turn produced lying on a die 1 with side formwork 3. As a head formwork of a stem, a sheet metal 14 is inserted, which lead through, z. B. of tendons 15 is perforated accordingly and which forms part of the shuttering of the bolt 13 on the other side. The clamping members 15 are provided in a known manner with ducts and corresponding recesses generated in the bolt 13, so that the parts are individually offset and can be prestressed after assembly. So, even with several standards, these and the transom are produced horizontally and along the entire length of the hall to be executed.

   In this case, however, it is necessary to attach a rigid auxiliary structure 16, e.g. B. made of section steel, to ensure that the columns are set up at the same height and at the correct distances from each other.



  Since, as already explained above, the joints between the individual prefabricated parts can be made watertight, the method according to the invention is also particularly suitable for the production of segments for tunnel and gallery linings from precast reinforced concrete parts. Such a mode of operation is illustrated in FIGS. 7 and B.



  Because of the generally great length of the tunnels or tunnels, when concreting the prefabricated parts, it is advisable to proceed in a manner similar to that for the manufacture of shell barrels. On a base 17 within the formwork elements 18, a first tubular ring 19 divided into individual segments is concreted lying with a perpendicular tunnel axis. The subdivision of the individual pipe rings 19, 19 ′, 19 ″, etc. into tubbings takes place in a simple manner by means of vertical, radial metal sheets 20.

   The individual rings 19 are produced on top of each other in a kind of puff pastry process with the interposition of horizontal sheets 21 to form the ring joints, the arrangement of the horizontal sheets 21 giving the method according to the invention the advantage that continuously and without painting the joint surfaces provided, can be further concreted.



  When using wedge-shaped sheets 21 for the manufacture of the annular joints that are to be drilled and, if possible, also ground, it is possible to also carry out segments for tunnel curvatures with a vertical axis during manufacture. With a tunnel diameter of z. B. 5 m, a radius of z. B. 100 m and a segment length of 0.7 m, the execution would be possible in this way if the sheet thickness difference between the outside and inside of the curvature is 35 mm.



  When producing these horizontal rings, the procedure is expediently similar to the above-described production of bowls. The ring on top of each stack that has to be connected to it is placed in the place of the bottom after removing the bottom rings, whereupon further rings can be made again.

 

Claims (1)

PATENTANSPRUCH Verfahren zum Herstellen von Bauwerken aus Fertigteilen aus Stahlbeton, dadurch gekennzeichnet, dass die zur Verwendung kommenden Fertigteile in Schalungen in einer Lage zueinander betoniert wer den, die derjenigen entspricht, die sie beim späteren Versetzen an dem zu errichtenden Bauwerk ein nehmen, wobei die Flächen der herzustellenden Fertig teile in der späteren Einbaulage im Bereich einer Fuge einander zugekehrt sein werden, die beim Betonier- vorgang durch ein Stahlblech voneinander getrennt werden, an dessen einer Seite sich die eine Stossfläche des zu bildenden Fertigteiles abformt, PATENT CLAIM A method for producing structures from prefabricated parts made of reinforced concrete, characterized in that the prefabricated parts coming to use are concreted in formwork in a position to each other that corresponds to that which they take when later relocating on the structure to be erected, the areas the prefabricated parts to be produced will face each other in the later installation position in the area of a joint, which will be separated from each other during the concreting process by a steel sheet, on one side of which the one joint surface of the prefabricated part to be formed is formed, während sich die Stossfläche des zu bildenden benachbarten Fertig teiles an der gegenüberliegenden Seite des Zwischen- bleches abformt und dass die so gebildeten Stoss- flächen benachbarter Fertigteile mit Flächenberührung aneinandergefügt und ohne Zwischenlagen mit Hilfe von die Teile durchsetzenden Spanngliedern zusam mengespannt werden. UNTERANSPRÜCHE 1. while the joint of the adjacent prefabricated part to be formed is formed on the opposite side of the intermediate plate and the joint surfaces of adjacent prefabricated parts formed in this way are joined together with surface contact and clamped together without intermediate layers with the help of tendons penetrating the parts. SUBCLAIMS 1. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, dass beim Herstellen von Fertigteilen für Brücken, Schalendächer od. dgl. die nebeneinander anzuordnenden und sich mit Längsfugen berührenden Fertigteile jeweils von einer Stirnseite her fortlaufend betoniert werden, wobei die die Trennfugen bildenden Stahlbleche durch kammartige, dem Betoniervorgang vorauseilende Halterungen in ihrer Lage gehalten werden. 2. Method according to claim, characterized in that when manufacturing prefabricated parts for bridges, shell roofs or the like, the prefabricated parts to be arranged next to each other and touching with longitudinal joints are continuously concreted from one end face, the steel sheets forming the separating joints by comb-like, the concreting process Leading brackets are held in place. 2. Verfahren nach Unteranspruch 1, dadurch ge kennzeichnet, dass bei der Herstellung langer Bau werke diese in gleiche, aus jeweils einer Serie von Fertigteilen gebildete Teilabschnitte unterteilt werden, derart, dass man, ohne das die letzte Fugenfläche begrenzende Stahlblech zu entfernen, das zuletzt her gestellte Fertigteil an den Ort des ersten verlagert, worauf der gleiche Arbeitsvorgang am selben Ort erneut ablaufen kann. 3. Method according to dependent claim 1, characterized in that in the production of long structures, these are divided into equal subsections, each formed from a series of prefabricated parts, in such a way that the last made without removing the steel sheet delimiting the last joint surface The finished part is relocated to the location of the first, whereupon the same work process can run again at the same location. 3. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, dass beim Herstellen von Tübbings für die Auskleidung von Stollen, Tunnels od. dgl. die Fertigteile vorzugsweise aufeinander in horizontalen Ringen in einer Art Blätterteigverfahren unter Zwi schenlage von Stahlblechen betoniert werden, wobei auch in den Längsfugen des Stollens Stahlbleche als Fugenschalung angeordnet werden. Method according to claim, characterized in that when producing tubbings for the lining of galleries, tunnels or the like, the prefabricated parts are preferably concreted on top of one another in horizontal rings in a kind of puff pastry process with the interposition of steel sheets, also in the longitudinal joints of the tunnel Sheet steel can be arranged as joint formwork.
CH204363A 1963-02-19 1963-02-19 Process for producing structures from prefabricated reinforced concrete parts CH399982A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH204363A CH399982A (en) 1963-02-19 1963-02-19 Process for producing structures from prefabricated reinforced concrete parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH204363A CH399982A (en) 1963-02-19 1963-02-19 Process for producing structures from prefabricated reinforced concrete parts

Publications (1)

Publication Number Publication Date
CH399982A true CH399982A (en) 1965-09-30

Family

ID=4224598

Family Applications (1)

Application Number Title Priority Date Filing Date
CH204363A CH399982A (en) 1963-02-19 1963-02-19 Process for producing structures from prefabricated reinforced concrete parts

Country Status (1)

Country Link
CH (1) CH399982A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452620C2 (en) * 2010-07-30 2012-06-10 Александр Николаевич Кобец Method to manufacture panels
DE102019116519A1 (en) * 2019-06-18 2020-12-24 Max Bögl Wind AG Formwork device and method for the simultaneous production of several concentrically fitting precast concrete parts of different sizes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452620C2 (en) * 2010-07-30 2012-06-10 Александр Николаевич Кобец Method to manufacture panels
DE102019116519A1 (en) * 2019-06-18 2020-12-24 Max Bögl Wind AG Formwork device and method for the simultaneous production of several concentrically fitting precast concrete parts of different sizes

Similar Documents

Publication Publication Date Title
DE2247609C2 (en) Method for the production of a bridge structure from prestressed concrete in the section-wise free pre-construction
DE2743273B1 (en) Method for producing elongated supporting structures, in particular multi-span bridge superstructures made of reinforced or prestressed concrete
DE598730C (en) Construction process using components produced in the workshop
EP0032959B1 (en) Method and falsework for constructing bridges of prestressed concrete
CH399982A (en) Process for producing structures from prefabricated reinforced concrete parts
EP1210485B1 (en) Reinforced concrete part for producing foundations of buildings
DE1183929B (en) Method for producing high valley bridges from reinforced concrete, especially prestressed concrete
DE1237603B (en) Process for the production of long structures, in particular bridges, from steel or prestressed concrete
DE3322951A1 (en) Truss bridge and method for producing it
DE1043372B (en) Method for the construction of reinforced concrete bridges in sections using cantilever
DE4141331A1 (en) Trussed bridge with top and bottom flanges and diagonal braces - consists of prefabricated members transported to site for assembly on which reinforced or prestressed concrete road is laid
DE1409930C (en) Process for the production of prefabricated components from reinforced concrete for structures, in particular bridge structures
DE1683943C3 (en)
DE2203126A1 (en) COMPONENT, IN PARTICULAR BRIDGE SUPERSTRUCTURE MADE OF PREPARATORY CONCRETE
DE2051002C3 (en) Frame construction, consisting of prefabricated reinforced concrete parts
DE2936836C2 (en)
DE930477C (en) Saw roof made of precast reinforced concrete
DE2112977C3 (en) Method and device for the production of large prefabricated concrete components that adjoin one another in a fitting manner
DE2044722A1 (en) Procedure for erecting a building shell
AT257119B (en) Roof construction
DE829659C (en) Beam-shaped reinforced concrete element for skeleton structures and form for its production
DE1784924C (en) Method for erecting arches and girders made of precast reinforced concrete. Eliminated from: 1484203
DE1409930A1 (en) Process for the manufacture of structures, in particular bridge structures, from prefabricated components made of reinforced concrete
AT249105B (en) Process for the production of high viaducts from reinforced concrete, in particular from prestressed concrete