BRPI0919207A2 - método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura. - Google Patents

método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura.

Info

Publication number
BRPI0919207A2
BRPI0919207A2 BRPI0919207A BRPI0919207A BRPI0919207A2 BR PI0919207 A2 BRPI0919207 A2 BR PI0919207A2 BR PI0919207 A BRPI0919207 A BR PI0919207A BR PI0919207 A BRPI0919207 A BR PI0919207A BR PI0919207 A2 BRPI0919207 A2 BR PI0919207A2
Authority
BR
Brazil
Prior art keywords
modeling
implemented method
computer implemented
rupture
geomechanical reservoir
Prior art date
Application number
BRPI0919207A
Other languages
English (en)
Inventor
Joseph Henry Schmidt
Ricky Howard Dean
Original Assignee
Chevron U S A I N C
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron U S A I N C filed Critical Chevron U S A I N C
Publication of BRPI0919207A2 publication Critical patent/BRPI0919207A2/pt
Publication of BRPI0919207B1 publication Critical patent/BRPI0919207B1/pt

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V99/00Subject matter not provided for in other groups of this subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/11Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
    • G06F17/13Differential equations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/64Geostructures, e.g. in 3D data cubes
    • G01V2210/646Fractures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Algebra (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • Fluid Mechanics (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Operations Research (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Manipulator (AREA)
BRPI0919207-7A 2008-09-19 2009-09-17 método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e, método implementado por computador para uso na modelagem de uma fratura BRPI0919207B1 (pt)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US9860408P 2008-09-19 2008-09-19
US61/098604 2008-09-19
US16476609P 2009-03-30 2009-03-30
US61/164766 2009-03-30
PCT/US2009/057331 WO2010033710A2 (en) 2008-09-19 2009-09-17 Computer-implemented systems and methods for use in modeling a geomechanical reservoir system

Publications (2)

Publication Number Publication Date
BRPI0919207A2 true BRPI0919207A2 (pt) 2015-12-08
BRPI0919207B1 BRPI0919207B1 (pt) 2020-08-18

Family

ID=42038538

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0919207-7A BRPI0919207B1 (pt) 2008-09-19 2009-09-17 método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e, método implementado por computador para uso na modelagem de uma fratura

Country Status (8)

Country Link
US (1) US8204727B2 (pt)
EP (1) EP2342668B1 (pt)
CN (1) CN102203638B (pt)
AU (1) AU2009293209B2 (pt)
BR (1) BRPI0919207B1 (pt)
CA (1) CA2738122C (pt)
EA (1) EA201170472A1 (pt)
WO (1) WO2010033710A2 (pt)

Families Citing this family (127)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9208270B2 (en) 2000-08-02 2015-12-08 Comsol Ab System and method for establishing bidirectional links between multiphysics modeling and design systems
US9323503B1 (en) * 2009-12-29 2016-04-26 Comsol Ab System and method for accessing settings in a multiphysics modeling system using a model tree
US20110029293A1 (en) * 2009-08-03 2011-02-03 Susan Petty Method For Modeling Fracture Network, And Fracture Network Growth During Stimulation In Subsurface Formations
WO2011066021A1 (en) 2009-11-30 2011-06-03 Exxonmobil Upstream Research Company Adaptive newton's method for reservoir simulation
US11610037B2 (en) 2009-12-29 2023-03-21 Comsol Ab System and method for accessing settings in a multiphysics modeling system using a model tree
US8626475B1 (en) 2009-12-29 2014-01-07 Comsol Ab System and method for accessing a multiphysics modeling system via a design system user interface
US8688415B2 (en) * 2010-02-03 2014-04-01 Kellogg Brown & Root Llc Systems and methods for performing stress intensity factor calculations using non-singular finite elements
US8731872B2 (en) 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
US8731887B2 (en) 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) * 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
US9134454B2 (en) 2010-04-30 2015-09-15 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
US9390204B2 (en) 2010-06-24 2016-07-12 Schlumberger Technology Corporation Multisegment fractures
US9540911B2 (en) * 2010-06-24 2017-01-10 Schlumberger Technology Corporation Control of multiple tubing string well systems
US8682628B2 (en) * 2010-06-24 2014-03-25 Schlumberger Technology Corporation Multiphase flow in a wellbore and connected hydraulic fracture
CA2801382C (en) 2010-06-29 2018-12-18 Exxonmobil Upstream Research Company Method and system for parallel simulation models
CN102339325A (zh) * 2010-07-16 2012-02-01 中国石油化工股份有限公司 一种分析离散裂缝性油藏流体流动的方法
CN102339326B (zh) * 2010-07-16 2014-01-15 中国石油化工股份有限公司 一种分析模拟缝洞型油藏流体流动的方法
CN102339339B (zh) * 2010-07-23 2014-01-15 中国石油化工股份有限公司 一种分析缝洞型油藏剩余油分布的方法
CA2801387A1 (en) * 2010-07-26 2012-02-02 Exxonmobil Upstream Research Company Method and system for parallel multilevel simulation
EP2599032A4 (en) 2010-07-29 2018-01-17 Exxonmobil Upstream Research Company Method and system for reservoir modeling
WO2012015518A2 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
CN102383783B (zh) * 2010-09-03 2015-06-17 中国石油化工股份有限公司 一种分析缝洞型油藏孔洞间油水流动特征的方法
BR112013002114A2 (pt) 2010-09-20 2016-05-17 Exxonmobil Upstream Res Co formulações flexíveis e adaptáveis para simulações de reservatório complexas
US9626466B2 (en) 2010-11-23 2017-04-18 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
WO2012079009A2 (en) * 2010-12-10 2012-06-14 Baker Hughes Incorporated A method to improve reservoir simulation and recovery from fractured reservoirs
CN103959233B (zh) 2011-09-15 2017-05-17 埃克森美孚上游研究公司 在执行eos计算的指令受限算法中最优化矩阵和向量运算
CN103034743A (zh) * 2011-09-30 2013-04-10 鸿富锦精密工业(深圳)有限公司 曲面距离计算***及方法
AU2012322729B2 (en) * 2011-10-11 2015-12-24 Schlumberger Technology B.V. System and method for performing stimulation operations
US9366121B2 (en) 2012-02-06 2016-06-14 Halliburton Energy Services, Inc. Modeling fracturing fluid leak-off
US9208268B2 (en) * 2012-02-14 2015-12-08 Saudi Arabian Oil Company Giga-cell linear solver method and apparatus for massive parallel reservoir simulation
AU2013230933B2 (en) * 2012-03-06 2015-12-10 Ion Geophysical Corporation Model predicting fracturing of shale
US9753180B2 (en) 2012-03-28 2017-09-05 Exxonmobil Upstream Research Company Method for multiphase flow upscaling
RU2582482C1 (ru) * 2012-03-30 2016-04-27 Лэндмарк Графикс Корпорейшн Система и способ для автоматического локального измельчения сетки в системе моделирования резервуара
CN102621594B (zh) * 2012-03-31 2014-01-08 中国海洋石油总公司 一种层理构造识别方法及***
US8949094B2 (en) * 2012-04-02 2015-02-03 Honda Motor Co., Ltd. Thermal deflection analysis
AU2013274734B2 (en) * 2012-06-15 2016-08-25 Landmark Graphics Corporation Methods and systems for non-physical attribute management in reservoir simulation
GB2503903B (en) 2012-07-11 2015-08-26 Schlumberger Holdings Fracture monitoring and characterisation
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
US9171109B2 (en) 2012-11-09 2015-10-27 International Business Machines Corporation Method to couple fluid-flow and geomechanical models for integrated petroleum systems using known triggering events
NO345808B1 (no) * 2012-12-27 2021-08-16 Geoquest Systems Bv Flersegmentsprekker
US9297250B2 (en) 2013-03-14 2016-03-29 Halliburton Energy Services, Inc. Controlling net treating pressure in a subterranean region
US9217318B2 (en) * 2013-03-14 2015-12-22 Halliburton Energy Services, Inc. Determining a target net treating pressure for a subterranean region
WO2014193577A1 (en) * 2013-05-31 2014-12-04 Conocophillips Company Method of hydraulic fracture identification using temperature
US10808521B2 (en) 2013-05-31 2020-10-20 Conocophillips Company Hydraulic fracture analysis
CA2913249A1 (en) 2013-07-02 2015-01-08 Landmark Graphics Corporation 2.5d stadia meshing
DE112013007206T5 (de) * 2013-07-02 2016-03-31 Landmark Graphics Corporation 2.75D-Gitternetzerstellungsalgorithmus
SG11201510115UA (en) * 2013-07-02 2016-01-28 Landmark Graphics Corp 3d stadia algorithm for discrete network meshing
WO2015006363A1 (en) * 2013-07-08 2015-01-15 Schlumberger Canada Limited Determining geomechanics completion quality
US10001000B2 (en) * 2013-07-22 2018-06-19 Halliburton Energy Services, Inc. Simulating well system fluid flow based on a pressure drop boundary condition
CN103390108B (zh) * 2013-07-25 2016-08-31 中国石油大学(北京) 一种基于压裂地质体可压性的井型设计方法及装置
AU2014306499B2 (en) * 2013-08-16 2016-11-17 Landmark Graphics Corporation Converting reserve estimates in a reservoir model to a standard format for dynamic comparison
CA2919530A1 (en) * 2013-08-27 2015-03-05 Halliburton Energy Services, Inc. Simulating fluid leak-off and flow-back in a fractured subterranean region
US9677393B2 (en) * 2013-08-28 2017-06-13 Schlumberger Technology Corporation Method for performing a stimulation operation with proppant placement at a wellsite
MX2016002396A (es) 2013-08-29 2016-12-14 Landmark Graphics Corp Metodos y sistemas de calibración de modelo terrestre estático mediante el uso de evaluaciones de turtuosidad.
CA2937225C (en) 2013-12-18 2024-02-13 Conocophillips Company Method for determining hydraulic fracture orientation and dimension
CA2934902C (en) * 2014-02-03 2018-08-14 Halliburton Energy Services, Inc. Geomechanical and geophysical computational model for oil and gas stimulation and production
WO2015124633A1 (en) * 2014-02-19 2015-08-27 Repsol, S.A. Method implemented in a computer for the numerical simulation of a porous medium
CN104747180B (zh) * 2014-02-26 2016-09-14 中国石油化工股份有限公司 一种用于注水开发的缝洞型油藏分析方法及其应用
EP3175265A1 (en) 2014-07-30 2017-06-07 ExxonMobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
WO2016069170A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
WO2016069171A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US20160131800A1 (en) * 2014-11-07 2016-05-12 Schlumberger Technology Corporation Modeling fluid-conducting fractures in reservoir simulation grids
CA2963928C (en) * 2014-11-12 2019-06-25 Halliburton Energy Services, Inc. Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra
WO2016080985A1 (en) * 2014-11-19 2016-05-26 Halliburton Energy Services, Inc. Formation fracture flow monitoring
US10190406B2 (en) * 2014-12-23 2019-01-29 Baker Hughes, A Ge Company, Llc Formation fracturing potential using surrounding pore pressures
US10030497B2 (en) 2015-02-10 2018-07-24 Statoil Gulf Services LLC Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad
US9933535B2 (en) * 2015-03-11 2018-04-03 Schlumberger Technology Corporation Determining a fracture type using stress analysis
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
CN104929624B (zh) * 2015-04-22 2018-04-17 中国地质大学(武汉) 一种超压驱动下原油二次运移速率的计算方法
CN105089595B (zh) * 2015-05-27 2019-04-12 中国石油天然气股份有限公司 水平压裂裂缝导流作用下的油藏数值模拟方法及装置
CN105089582B (zh) * 2015-05-28 2017-12-05 中国石油天然气股份有限公司 基于井下流量控制设备的油藏数值模拟方法及装置
US10846445B2 (en) * 2015-06-18 2020-11-24 M-I L.L.C. Method of waste distribution and formation pressure profile determination
US9988900B2 (en) 2015-06-30 2018-06-05 Statoil Gulf Services LLC Method of geometric evaluation of hydraulic fractures by using pressure changes
CN105114065A (zh) * 2015-08-06 2015-12-02 中国石油天然气股份有限公司 水力压裂裂缝延伸过程的模拟方法
WO2017027342A1 (en) 2015-08-07 2017-02-16 Schlumberger Technology Corporation Method of performing complex fracture operations at a wellsite having ledged fractures
WO2017027433A1 (en) 2015-08-07 2017-02-16 Schlumberger Technology Corporation Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
US10920538B2 (en) 2015-08-07 2021-02-16 Schlumberger Technology Corporation Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
US11578568B2 (en) 2015-08-07 2023-02-14 Schlumberger Technology Corporation Well management on cloud computing system
US10685086B2 (en) * 2015-09-15 2020-06-16 Conocophillips Company Avoiding water breakthrough in unconsolidated sands
CN106547938B (zh) * 2015-11-09 2019-10-01 中国地质大学(北京) 裂隙-孔隙结构双重介质煤储层气水两相流数值模拟方法
CA2914348C (en) * 2015-12-10 2018-03-06 Fanhua Zeng Method of modelling hydrocarbon production from fractured unconventional formations
US10049172B2 (en) * 2015-12-10 2018-08-14 Saudi Arabian Oil Company Predicting and modeling changes in capillary pressure and relative permeabilities in a porous medium due to mineral precipitation and dissolution
US10890058B2 (en) 2016-03-09 2021-01-12 Conocophillips Company Low-frequency DAS SNR improvement
FR3048801A1 (pt) * 2016-03-11 2017-09-15 Services Petroliers Schlumberger
US10303827B2 (en) * 2016-04-05 2019-05-28 Rolls-Royce Corporation Predicting cracking in cooled metal or alloy components
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
WO2017222539A1 (en) 2016-06-24 2017-12-28 Schlumberger Technology Corporation Implementing free advection in basin modeling
CN106640027B (zh) * 2016-09-28 2019-05-07 中国石油化工股份有限公司 缝洞型油藏暗河型岩溶储集体空间结构井网的构建方法
US10753181B2 (en) 2016-11-29 2020-08-25 Conocophillips Company Methods for shut-in pressure escalation analysis
EP3559401B1 (en) 2016-12-23 2023-10-18 ExxonMobil Technology and Engineering Company Method and system for stable and efficient reservoir simulation using stability proxies
US11028679B1 (en) 2017-01-24 2021-06-08 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11365617B1 (en) 2017-01-24 2022-06-21 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
EP3619560B1 (en) 2017-05-05 2022-06-29 ConocoPhillips Company Stimulated rock volume analysis
US11255997B2 (en) 2017-06-14 2022-02-22 Conocophillips Company Stimulated rock volume analysis
GB2565034B (en) * 2017-05-24 2021-12-29 Geomec Eng Ltd Improvements in or relating to injection wells
US10607043B2 (en) 2017-09-14 2020-03-31 Saudi Arabian Oil Company Subsurface reservoir model with 3D natural fractures prediction
AU2018352983B2 (en) 2017-10-17 2024-02-22 Conocophillips Company Low frequency distributed acoustic sensing hydraulic fracture geometry
US20200401739A1 (en) * 2018-01-16 2020-12-24 Halliburton Energy Services, Inc. Modeling Fracture Closure Processes In Hydraulic Fracturing Simulators
US11126762B2 (en) 2018-02-28 2021-09-21 Saudi Arabian Oil Company Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
US11193367B2 (en) 2018-03-28 2021-12-07 Conocophillips Company Low frequency DAS well interference evaluation
CN108825217B (zh) * 2018-04-19 2021-08-20 中国石油化工股份有限公司 适用于油藏数值模拟的综合井指数计算方法
EP3788515A4 (en) 2018-05-02 2022-01-26 ConocoPhillips Company DAS/DTS BASED PRODUCTION LOG INVERSION
CA3099730A1 (en) 2018-05-09 2019-11-14 Conocophillips Company Measurement of poroelastic pressure response
US11326407B2 (en) 2018-12-31 2022-05-10 Halliburton Energy Services, Inc. Predicting downhole fluid mixing and channeling in wellbores
WO2020142075A1 (en) * 2018-12-31 2020-07-09 Hallibuiton Energy Services, Inc. Predicting downhole mechanical cleaning efficiency in wellbore walls during wellbore fluids displacements
WO2020149824A1 (en) * 2019-01-14 2020-07-23 Halliburton Energy Services, Inc. Azimuthal borehole rendering of radioelement spectral gamma data
US20200294413A1 (en) 2019-03-12 2020-09-17 Chevron U.S.A. Inc. Coupling a simulator and at least one other simulator
US10983233B2 (en) 2019-03-12 2021-04-20 Saudi Arabian Oil Company Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs
CN110263382B (zh) * 2019-05-27 2020-04-17 中国石油大学(北京) 垂向注气裂缝油气水微观渗流规律的预测方法及***
US11608730B2 (en) 2019-09-17 2023-03-21 ExxonMobil Technology and Engineering Company Grid modification during simulated fracture propagation
CN110714756A (zh) * 2019-11-21 2020-01-21 西南石油大学 一种高温高压x-ct扫描缝洞物理模型
US11098582B1 (en) * 2020-02-17 2021-08-24 Saudi Arabian Oil Company Determination of calibrated minimum horizontal stress magnitude using fracture closure pressure and multiple mechanical earth model realizations
CN111911140B (zh) * 2020-07-16 2023-10-27 中国石油天然气股份有限公司 陆相沉积储层的模拟方法
CN111734380B (zh) * 2020-07-30 2022-03-11 西南石油大学 一种水平井多级压裂裂缝扩展形态的快速预测方法
US11767751B2 (en) * 2020-11-04 2023-09-26 Reveal Energy Services, Inc. Determining a characteristic associated with a reservoir
US11579334B2 (en) 2021-04-07 2023-02-14 Enverus, Inc. Determining a wellbore landing zone
CA3225345A1 (en) 2021-07-16 2023-01-19 Conocophillips Company Passive production logging instrument using heat and distributed acoustic sensing
US11859490B2 (en) 2021-08-19 2024-01-02 Devon Energy Corporation Systems and methods for monitoring fracturing operations using monitor well flow
US11525935B1 (en) 2021-08-31 2022-12-13 Saudi Arabian Oil Company Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties
EP4177644A1 (en) * 2021-11-05 2023-05-10 MATRIX JVCO LTD trading as AIQ Method and system for determining geomechanical parameters of a well
CN114547998B (zh) * 2022-02-28 2024-03-22 西南石油大学 一种通过耦合储层流动确定水平井压裂改造体积的方法
US11921250B2 (en) 2022-03-09 2024-03-05 Saudi Arabian Oil Company Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation
CN114638137B (zh) * 2022-03-31 2023-03-28 王永亮 一种基于热-流-固-损伤耦合的干热岩产热预测方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7584086B2 (en) * 2003-09-30 2009-09-01 Exxonmobil Upstream Research Company Characterizing connectivity in reservoir models using paths of least resistance
US7877246B2 (en) * 2006-09-22 2011-01-25 Schlumberger Technology Corporation System and method for performing oilfield simulation operations

Also Published As

Publication number Publication date
BRPI0919207B1 (pt) 2020-08-18
CN102203638A (zh) 2011-09-28
WO2010033710A3 (en) 2010-07-01
EA201170472A1 (ru) 2011-10-31
CN102203638B (zh) 2013-07-17
CA2738122C (en) 2020-02-11
CA2738122A1 (en) 2010-03-25
AU2009293209A1 (en) 2010-03-25
US20100076738A1 (en) 2010-03-25
EP2342668A2 (en) 2011-07-13
EP2342668A4 (en) 2016-11-02
AU2009293209B2 (en) 2015-07-09
EP2342668B1 (en) 2019-03-13
WO2010033710A2 (en) 2010-03-25
US8204727B2 (en) 2012-06-19

Similar Documents

Publication Publication Date Title
BRPI0919207A2 (pt) método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura.
BR112013019329A2 (pt) método e sistema para implementar um simulador de reservatório, e, meio legível por computador.
BRPI0816349A2 (pt) sistema, sistema para uso em um poço, e método
BRPI0918937A2 (pt) sistema de gerenciamento de iluminação, método para implementar o sistema de gerenciamento de iluminação e módulo executivo para o uso em um sistema de gerenciamento de iluminação
BRPI0912426A2 (pt) método executado por computador, computador, e sistema para uso com poço
BRPI0909002A2 (pt) aparelho para uso em um poço, sistema, e método para uso em um poço
BRPI0910976A2 (pt) método de ampliar para simulação de reservatório, dispositivo de armazenamento de programa legível por uma máquina, programa de computador adaptado para ser executado por um processador, sistema adaptado para ampliar para simulação de reservatório, e método pra ampliar um modelo de reservatório
BRPI0920442A2 (pt) sistema de computador para modelar um campo de petróleo tendo uma formação subterrânea e um reservatório subterrâneo no mesmo, e método para modelar um campo de petróleo tendo uma formação subterrânea e um reservatório subterrâneo no mesmo.
BRPI0821334A2 (pt) método utilizável em um poço, e sistema utilizável com um poço.
BRPI0919556A2 (pt) método, sistema para perfurar um poço, e, meio legível por computador
BRPI0913461A2 (pt) sistema e método para atuar seletivamente de uma localização remota múltiplas ferramentas de poço dentro do poço em um poço
BRPI0919572A2 (pt) método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície
BRPI0811763A2 (pt) Método para completar uma transação, meio legível por computador, servidor, e, telefone
BRPI0815844A2 (pt) dispensador, sistema de válvula, e, método para prender uma válvula em um recipiente.
BRPI0823080A2 (pt) Sistema para a utilização de uma interface de usuário baseada em gestos, método para a utilização de uma interface de usuário baseada em gestos e meio legível por computador
BRPI0917120A2 (pt) método, e, meio legível por computador.
BRPI0921124A2 (pt) sistema para autenticar um consumidor, método implementado por computador, meio legível por computador, e, computador servidor.
BRPI0818772A2 (pt) Dispositivo, método, e, meio legível por computador.
CL2007002965A1 (es) Metodo y sistema para entregar y ejecutar las mejores practicas en proyectos de desarrollo de yacimiento petrolifero.
BRPI0922312A2 (pt) método, e, meio legível por computador
BRPI0822100A2 (pt) Método e sistema para administrar automaticamente processos no desenvolvimento paralelo de um aplicativo por uma interface de usuário gráfica, sistema de desenvolvimento de aplicativo de computador, e, meio legível por computador de instruções
BRPI1012891A2 (pt) método, meio de armazenamento legível por computador, e, computador servidor.
BRPI0818423A2 (pt) Sistema, método, e, mídia legível por computador
BRPI0821199A2 (pt) dispositivo e métodos para recuperar unidade presente na atmosfera, e, método para adicionar meios antibacterianos a um reservatório.
BRPI0921594A2 (pt) sistema de controle de fluxo para uso em um poço.

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06T Formal requirements before examination [chapter 6.20 patent gazette]
B06A Patent application procedure suspended [chapter 6.1 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 18/08/2020, OBSERVADAS AS CONDICOES LEGAIS.