BE843363A - PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS - Google Patents

PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS

Info

Publication number
BE843363A
BE843363A BE168274A BE168274A BE843363A BE 843363 A BE843363 A BE 843363A BE 168274 A BE168274 A BE 168274A BE 168274 A BE168274 A BE 168274A BE 843363 A BE843363 A BE 843363A
Authority
BE
Belgium
Prior art keywords
bars
buildings
tie rods
slab
renovation
Prior art date
Application number
BE168274A
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to BE168274A priority Critical patent/BE843363A/en
Publication of BE843363A publication Critical patent/BE843363A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Reinforcement Elements For Buildings (AREA)

Description

       

  L'invention se rapporte à un procédé de

  
rénovation d'immeubles par la coulée de dalles de

  
béton sur des planchers existants reposant sur

  
des poutres dont les extrémités sont appuyées et/ou encastrées dans les murs de la construction.

  
Dans la rénovation d'immeubles, on se

  
trouve souvent en présence de planchers reposant

  
sur des poutres ou comportant des poutres dont il

  
 <EMI ID=1.1> 

  
pour assurer la stabilité de la construction sous

  
les charges nouvelles que l'on se propose d'appliquer

  
aux planchers, que ce soient les surcharges d'exploitation ou les surcharges permanentes,par exemple pour

  
avoir une bonne isolation phonique. Les immeubles

  
dont il est question sont souvent conçus avec des

  
planchers très distants d'un étage à l'autre (immeubles

  
à "hauts plafonds"), de sorte que l'on dispose d'un

  
espace largement suffisant pour renforcer les planchers

  
en coulant sur eux des dalles de béton généralement

  
armées d'un treillis. Il est commode d'utiliser le

  
plancher existant comme coffrage, mais on comprend

  
qu'il serait recommandable, sinon indispensable, de

  
renforcer les poutres existantes avant de procéder à

  
cette coulée.

  
L'invention repose sur l'idée d'associer

  
à une poutre existante une armature dont l'allure générale s'inspire du tracé des armatures prévues normalement dans les poutres de béton armé, c'est-à-dire d'une armature composée essentiellement de barres inférieures appelées à travailler à la traction et

  
dont les extrémités sont relevées pour passer audessus des appuis. Elles s'arrêteront sur les appuis

  
ou à proximité de ceux-ci lorsqu'il s'agit de

  
poutres appuyées sur deux appuis. Mais, lorsque la poutre est continue et repose sur plusieurs appuis,

  
ou lorsqu'elle est encastrée, les barres supérieures auront pour rôle de résister aux moments sur appuis

  
et aux moments d'encastrement et seront alors éventuellement prolongées pour participer à l'armature

  
de la travée suivante.

  
Selon l'invention, on propose d'utiliser

  
les poutres existantes en les renforçant par des armatures intérieure et/ou extérieure soutiendront les poutres

  
dans leur partie centrale à l'aide de tirants, et

  
de reprendre les efforts de traction développés dans

  
les tirants en transmettant ces efforts à des moyens d'ancrage établis sensiblement au niveau supérieur

  
des poutres, éventuellement jusqu'au droit de leurs appuis.

  
L'invention propose, pour la mise en exécution du procédé ainsi défini, un dispositif comprenant, en dessous de la partie centrale de la poutre à renforcer, une section d'acier reliée par des tirants à

  
des moyens d'ancrage établis dans une dalle de compression située au-dessus de la poutre aux environs de ses appuis. 

  
Les moyens d'ancrage peuvent être des barres appartenant au système d'armatures de traction de

  
la dalle à couler au-dessus de la poutre ou des barres insérées entre celles-ci. Les moyens d'ancrage po urront être aussi des barres prolongeant les tirants.

  
Suivant une autre disposition de l'invention, il est avantageux d'établir près des extrémités de la poutre des armatures verticales qui permettront de résister aux efforts tranchants développés à proximité des appuis et de pallier aussi dans une certaine mesure à un état éventuellement précaire des extrémités encastrées.

  
En pratique, les extrémités des tirants seront filetées et passées dans des talons comportant chacun deux faces inclinées, dont l'une prendra appui sur la plaque à laquelle s'accroche le tirant et dont l'autre servira d'appui à un écrou vissé sur l'extrémité du tirant.

  
Pour éviter d'entailler les poutres existantes, il sera commode d'associer à chaque poutre un double jeu d'armatures cylindriques placées de part et d'autre de la poutre et reliées à une plaqua commune placée en dessous de la partie centrale de la poutre.

  
Les figures associées au présent mémoire représentent schématiquement, en
- figure 1, une vue en élévation latérale, avec coupe partielle des appuis, d'un dispositif conforme à l'invention, où l'on a supposé la dalle déjà coulée; - figure 2, un talon de retenue pour les tirants, qui peut exister aux deux extrémités de chacun d'eux;
- la figure 3 est un croquis schématique d'une variante. A la figure 1, on a désigné par 1 la poutre existante installée entre les murs 2,2' qui sont vus en coupe, tandis que la poutre 1 est vue

  
en élévation.

  
On a désigné par 3 la dalle de béton coulée sur le plancher existant 4 qui est supposé ici être la table d'un hourdis nervure.. Le niveau supérieur de cette dalle primitive 4 coïncide avec le niveau supérieur de la poutre. Son niveau inférieur est représenté en traits mixtes, en 5. Le treillis d'armature de la nouvelle dalle 3 est désignée par 6. Une section d'acier oonstituant plaque support de la poutre 1 est indiquée par 7. Des tirants 8,8'-:la relient à la partie supérieure de la poutre; ils s'insèrent entre les barres d'armature de la délie à couler au-dessus de la poutre et se terminent normalement par des crochets 9,9'. Ces tirants qui travaillent à la traction créent dans la dalle un effort de compression. Les tirants sont en principe au nombre de quatre, deux d'entre eux étant placés de chaque côté de la poutre.

   Ils se terminent par des parties filetées 8a qui recevront des écrous 8b après mise en place des tirants et enfilage de ceux-ci à travers des talons à faces obliques 10. La plaque 7 présente aux endroits convenables des forures 7a pour le passage des tirants, comme montré en détail à la figure 2. 

  
Le système d'ancrage peut être avantageusement

  
 <EMI ID=2.1> 

  
saignées pratiquées dans la maçonnerie. Ces barres peuvent être reliées aux armatures supérieures par des barres verticales dont l'axe seul a été dessiné
(en 12,12') pour ne pas obscurcir le dessin. On disposera ainsi d'une armature pour résister à l'effort

  
 <EMI ID=3.1> 

  
lement être prévues de part et d'autre de la poutre.

  
Les barres 11 peuvent ne pas s'étendre jusqu'en dessous de la poutre, afin de ne pas ébranler son assise. Le

  
mode de construction envisagé ci-dessus supose que la poutre pourrait être capable de supporter le poids

  
mort de la dalle 3, qui s'appliquera totalement avant

  
la prise du béton. Au cas où cela ne serait pas possible, on étayerait la poutre 1 en son milieu avant la coulée.

  
La figure 3 représente schématiquement une disposition dans laquelle on a donné à la poutre 1 une contre-flèche en créant dans les armatures une précontrainte au moyen des tiges filetées.

  
La description ici donnée ne vise qu'à décrire l'invention et il va' de soi que bien des détails pourront être changés sans sortir du cadre de l'invention.

  
- On pourra prévoir des plaques 7 de longueurs différentes et portant plusieurs forures pour faire face à plusieurs cas avec un même matériel. Les tirants pourront exister également en jeux de longueurs différentes.

  
Un avantage du mode de rénovation des immeubles par le procédé suivant l'invention est qu'il permet de consolider à la fois plusieurs planchers existant à des étages différents, tout échafaudage se trouvant supprimé. Le procédé permet également,par la mise en oeuvre d'une masse de béton,  d'obtenir une excellente isolation phonique pour les bruits aériens. 

REVENDICATIONS

  
1. - Procédé de rénovation d'immeubles par

  
la coulée de dalles de béton sur des planchers existants, reposant sur des poutres dont les extrémités

  
sont appuyées et/ou encastrées dans les murs de'la construction, caractérisé en ce qu'on utilise les

  
poutres existantes en les renforçant par des armatures intérieure: et/ou extérieure soutiendront les poutres dans leur partie centrale à l'aide de tirants, et en ce qu'on reprend les efforts de traction développés dans les tirants en les transmettant à des moyens d'ancrage

  
établis dans une dalle de compression située au-dessus

  
des poutres, éventuellement jusqu'au droit de leurs appuis.

  
2.- Dispositif pour la rénovation d'immeubles

  
 <EMI ID=4.1> 

  
dication 1, caractérisé en ce qu'il comprend en dessous de la partie centrale de la poutre à renforcer une section d'acier reliée par des tirants à des moyens d'ancrage insérés dans une dalle de compression située audessus des extrémités de la poutre, aux environs de ses appuis.



  The invention relates to a method of

  
renovation of buildings by pouring slabs of

  
concrete on existing floors resting on

  
beams whose ends are supported and / or embedded in the walls of the construction.

  
In the renovation of buildings, we

  
often found in the presence of restful floors

  
on beams or comprising beams of which it

  
 <EMI ID = 1.1>

  
to ensure the stability of the construction under

  
the new charges that we propose to apply

  
to floors, whether operating overloads or permanent overloads, for example for

  
have good sound insulation. Buildings

  
in question are often designed with

  
floors very far from one floor to another (buildings

  
to "high ceilings"), so that we have a

  
ample space to reinforce the floors

  
by pouring concrete slabs on them generally

  
armed with a lattice. It is convenient to use the

  
existing floor as formwork, but we understand

  
that it would be advisable, if not essential, to

  
reinforce the existing beams before proceeding with

  
this casting.

  
The invention is based on the idea of associating

  
to an existing beam a reinforcement whose general appearance is inspired by the layout of the reinforcements normally provided in reinforced concrete beams, that is to say of a reinforcement composed mainly of lower bars called to work in tension and

  
the ends of which are raised to pass over the supports. They will stop on the supports

  
or near them when it comes to

  
beams supported on two supports. But, when the beam is continuous and rests on several supports,

  
or when it is embedded, the upper bars will have the role of resisting the moments on supports

  
and at the moments of embedding and will then possibly be extended to participate in the reinforcement

  
of the next bay.

  
According to the invention, it is proposed to use

  
the existing beams by reinforcing them with interior and / or exterior reinforcement will support the beams

  
in their central part using tie rods, and

  
to take up the tensile forces developed in

  
the tie rods by transmitting these forces to anchoring means established substantially at the upper level

  
beams, possibly up to the right of their supports.

  
The invention proposes, for the implementation of the method thus defined, a device comprising, below the central part of the beam to be reinforced, a steel section connected by tie rods to

  
anchoring means established in a compression slab located above the beam in the vicinity of its supports.

  
The anchoring means can be bars belonging to the tensile reinforcement system of

  
the slab to be poured over the beam or the bars inserted between them. The anchoring means will also be bars extending the tie rods.

  
According to another arrangement of the invention, it is advantageous to establish near the ends of the beam vertical reinforcements which will make it possible to resist the shearing forces developed near the supports and also to alleviate to a certain extent a possibly precarious state of the supports. recessed ends.

  
In practice, the ends of the tie rods will be threaded and passed through heels each comprising two inclined faces, one of which will bear on the plate to which the tie is attached and the other of which will serve as a support for a nut screwed onto the end of the tie rod.

  
To avoid notching the existing beams, it will be convenient to associate with each beam a double set of cylindrical reinforcements placed on either side of the beam and connected to a common plate placed below the central part of the beam. beam.

  
The figures associated with this memory represent schematically, in
- Figure 1, a side elevational view, with partial section of the supports, of a device according to the invention, where it is assumed that the slab has already been cast; FIG. 2, a retaining heel for the tie rods, which may exist at both ends of each of them;
- Figure 3 is a schematic sketch of a variant. In Figure 1, we denote by 1 the existing beam installed between the walls 2,2 'which are seen in section, while the beam 1 is seen

  
in elevation.

  
The concrete slab poured on the existing floor 4 is designated by 3, which here is assumed to be the table for a rib slab. The upper level of this primitive slab 4 coincides with the upper level of the beam. Its lower level is shown in phantom lines, at 5. The reinforcing mesh of the new slab 3 is designated by 6. A steel section constituting the support plate of the beam 1 is indicated by 7. Tie rods 8.8 ' -: connect it to the upper part of the beam; they fit between the rebars of the cast-off hairline above the beam and normally end with 9.9 'hooks. These tie rods which work in tension create a compressive force in the slab. The tie rods are in principle four in number, two of them being placed on each side of the beam.

   They end in threaded parts 8a which will receive nuts 8b after installation of the tie rods and threading of these through heels with oblique faces 10. The plate 7 has holes 7a in suitable places for the passage of the tie rods, as shown in detail in Figure 2.

  
The anchoring system can advantageously be

  
 <EMI ID = 2.1>

  
bleeding in masonry. These bars can be connected to the upper reinforcements by vertical bars whose only axis has been drawn.
(in 12.12 ') so as not to obscure the design. We will thus have a reinforcement to resist the force

  
 <EMI ID = 3.1>

  
lement be provided on either side of the beam.

  
The bars 11 may not extend to below the beam, so as not to disturb its seat. The

  
method of construction considered above assumes that the beam might be able to support the weight

  
death of slab 3, which will apply completely before

  
setting of concrete. In the event that this is not possible, beam 1 would be supported in its middle before casting.

  
FIG. 3 schematically represents an arrangement in which the beam 1 has been given a counter-jib by creating a prestress in the reinforcements by means of the threaded rods.

  
The description given here is only intended to describe the invention and it goes without saying that many details could be changed without departing from the scope of the invention.

  
- Plates 7 of different lengths and carrying several holes can be provided to deal with several cases with the same material. The tie rods can also exist in sets of different lengths.

  
An advantage of the mode of renovation of buildings by the process according to the invention is that it makes it possible to consolidate at the same time several floors existing on different floors, any scaffolding being removed. The process also makes it possible, by using a mass of concrete, to obtain excellent sound insulation for airborne noise.

CLAIMS

  
1. - Building renovation process by

  
the pouring of concrete slabs on existing floors, resting on beams whose ends

  
are supported and / or embedded in the walls of the construction, characterized in that the

  
existing beams by reinforcing them with internal reinforcements: and / or external will support the beams in their central part using tie rods, and in that the tensile forces developed in the tie rods are taken up by transmitting them to means of 'anchor

  
established in a compression slab located above

  
beams, possibly up to the right of their supports.

  
2.- Device for the renovation of buildings

  
 <EMI ID = 4.1>

  
dication 1, characterized in that it comprises below the central part of the beam to be reinforced a steel section connected by tie rods to anchoring means inserted in a compression slab located above the ends of the beam, around its supports.


    

Claims (1)

3.- Dispositif suivant la revendication 2, caractérisé en ce que les moyens d'ancrage sont des barres insérées entre les barres appartenant au système d'armatures de traction de la dalle à couler au-dessus de la poutre. 4.- Dispositif suivant l'une quelconque des revendications 1 et 2, caractérisé en ce que 3.- Device according to claim 2, characterized in that the anchoring means are bars inserted between the bars belonging to the tensile reinforcement system of the slab to be cast above the beam. 4.- Device according to any one of claims 1 and 2, characterized in that les moyens d'ancrage sont des barres appartenant the anchoring means are bars belonging to au système d'armatures de la dalle à couler audessus de la poutre. the reinforcement system of the slab to be poured above the beam. 5.- 5.- Dispositif suivant l'une quelconque des revendications 1 à 3, caractérisé en ce que 5.- 5.- Device according to any one of claims 1 to 3, characterized in that les moyens d'ancrage sont des barres prolongeant the anchoring means are bars extending les tirants. the tie rods. 6.- Dispositif suivant l'une quelconque des revendications 2 et 3, caractérisé en ce que 6.- Device according to any one of claims 2 and 3, characterized in that des armatures verticales sont établies près des extrémités de la poutre. vertical reinforcement is established near the ends of the beam. 7.- Dispositif suivant l'une quelconque des revendications 2 à 6, caractérisé en ce que les extrémités des tirants sont filetées et passées dans des talons comportant chacun deux faces inclinées dont l'une prend appui sur la plaque à laquelle s'accroche le tirant et dont l'autre sert d'appui à un écrou vissé sur l'extrémité du tirant. 7.- Device according to any one of claims 2 to 6, characterized in that the ends of the tie rods are threaded and passed through heels each comprising two inclined faces, one of which bears on the plate to which the tie rod and the other of which serves as a support for a nut screwed onto the end of the tie rod. 8.- Dispositif suivant l'une quelconque des revendications 2 à 7, caractérisé en ce qu'il comprend pour chaque poutre un double jeu d'armatures symétriques placées de part et d'autre la poutre et travaillant grâce à des éléments placés en dessous de la partie centrale de la poutre. 8.- Device according to any one of claims 2 to 7, characterized in that it comprises for each beam a double set of symmetrical reinforcements placed on either side of the beam and working thanks to elements placed below of the central part of the beam. 9.- Dispositif suivant l'une quelconque des revendications 1 à 8, caractérisé en ce qu'on a donné à la poutre une contre-flèche en créant dans les armatures une précontrainte au moyen des tiges filetées. 9.- Device according to any one of claims 1 to 8, characterized in that the beam has been given a counter-jib by creating in the reinforcements a prestressing by means of threaded rods.
BE168274A 1976-06-24 1976-06-24 PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS BE843363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE168274A BE843363A (en) 1976-06-24 1976-06-24 PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE843363 1976-06-24
BE168274A BE843363A (en) 1976-06-24 1976-06-24 PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS

Publications (1)

Publication Number Publication Date
BE843363A true BE843363A (en) 1976-10-18

Family

ID=25649442

Family Applications (1)

Application Number Title Priority Date Filing Date
BE168274A BE843363A (en) 1976-06-24 1976-06-24 PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS

Country Status (1)

Country Link
BE (1) BE843363A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2698652A1 (en) * 1992-12-01 1994-06-03 Barra Michel Method of reinforcing timber floor on exposed beams without altering ceiling round them - includes steps of pouring reinforced concrete slab with pockets above beams part stressing filling pockets and loading for beam/slab bond with tension bolts
WO1996012588A1 (en) * 1994-10-19 1996-05-02 Dpd, Inc. Shape-memory material repair system and method of use therefor
DE19620029A1 (en) * 1995-05-17 1997-03-27 Menetrey Philippe Dr Es Sc Tec Reinforcing device for buildings especially for steel-concrete ceilings
CN112922382A (en) * 2021-01-28 2021-06-08 西南科技大学 Flexible reinforcing apparatus of house part of encorbelmenting

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2698652A1 (en) * 1992-12-01 1994-06-03 Barra Michel Method of reinforcing timber floor on exposed beams without altering ceiling round them - includes steps of pouring reinforced concrete slab with pockets above beams part stressing filling pockets and loading for beam/slab bond with tension bolts
WO1996012588A1 (en) * 1994-10-19 1996-05-02 Dpd, Inc. Shape-memory material repair system and method of use therefor
DE19620029A1 (en) * 1995-05-17 1997-03-27 Menetrey Philippe Dr Es Sc Tec Reinforcing device for buildings especially for steel-concrete ceilings
CN112922382A (en) * 2021-01-28 2021-06-08 西南科技大学 Flexible reinforcing apparatus of house part of encorbelmenting

Similar Documents

Publication Publication Date Title
WO2016189476A1 (en) Construction of the prefabricated column and beam type
BE843363A (en) PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS
CA2929009A1 (en) Joist hanger/bracket
KR100922121B1 (en) Construction Structure of Footing using Hybrid Pile having Various Cross-section
FR2635550A1 (en) Method for raising buildings
FR3018298B1 (en) REINFORCING BARRET FOR STRUCTURE ELEMENT
JPH0475322B2 (en)
FR2616166A1 (en) Bridge with composite framework and method for its construction
KR102080976B1 (en) Construction method of Iron bar Fixing Device
KR102522170B1 (en) Hollow member with improved load support performance and the construction method thereof
JPH0327072Y2 (en)
KR970005544Y1 (en) Device for tying forms
JPS60212506A (en) Formation of synthetic structural member accompanying stressadjustment
JPH0678634B2 (en) Legal framework
JPH01203513A (en) Composite wall consisting of underground wall and post-constructed wall
FR1464614A (en) New arrangements and assemblies of preformed materials for the economical and accelerated construction of walls, partitions, floors, ceilings, etc.
OA19773A (en) Early release formwork system for solid slabs.
CH132238A (en) Cement concrete floor-ceiling, and method of carrying it out.
RU1813848C (en) Method of placing concrete pipe underneath high embankment
JPH09137638A (en) Piled-up stone and collapse prevention metal fitting thereof
KR101056634B1 (en) Reinforcing structure for steel pipe head
BE832266R (en) COMPOSITE AND PRE-STRESSED STEEL-CONCRETE BEAMS AND THEIR MANUFACTURING PROCESS
BE843882R (en) PROCESS FOR CONSTRUCTION OF A BRIDGE WITH A MIXED STEEL AND CONCRETE STRUCTURE DECK
JP3525340B2 (en) Temporary earth retaining material and joining method of the temporary earth retaining material
CH488879A (en) Construction process