ZA202200899B - Method for installing viaduct prefabricated cover beam - Google Patents

Method for installing viaduct prefabricated cover beam

Info

Publication number
ZA202200899B
ZA202200899B ZA2022/00899A ZA202200899A ZA202200899B ZA 202200899 B ZA202200899 B ZA 202200899B ZA 2022/00899 A ZA2022/00899 A ZA 2022/00899A ZA 202200899 A ZA202200899 A ZA 202200899A ZA 202200899 B ZA202200899 B ZA 202200899B
Authority
ZA
South Africa
Prior art keywords
viaduct
installing
cover beam
prefabricated cover
prefabricated
Prior art date
Application number
ZA2022/00899A
Inventor
Mingxu Zhang
Mimi Liu
Zhihong Meng
Zhiliang Liao
Fubiao Wang
Wanlai Zhang
Original Assignee
The First Eng Co Ltd Of Ctce Group
China Tiesiju Civil Eng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by The First Eng Co Ltd Of Ctce Group, China Tiesiju Civil Eng Group Co Ltd filed Critical The First Eng Co Ltd Of Ctce Group
Publication of ZA202200899B publication Critical patent/ZA202200899B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
ZA2022/00899A 2020-10-29 2022-01-19 Method for installing viaduct prefabricated cover beam ZA202200899B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011180167.2A CN112211106B (en) 2020-10-29 2020-10-29 Method for installing prefabricated capping beam of viaduct
PCT/CN2021/096138 WO2022088664A1 (en) 2020-10-29 2021-05-26 Installation method for prefabricated capping beam of viaduct

Publications (1)

Publication Number Publication Date
ZA202200899B true ZA202200899B (en) 2022-07-27

Family

ID=74057409

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA2022/00899A ZA202200899B (en) 2020-10-29 2022-01-19 Method for installing viaduct prefabricated cover beam

Country Status (4)

Country Link
CN (1) CN112211106B (en)
LU (1) LU502065B1 (en)
WO (1) WO2022088664A1 (en)
ZA (1) ZA202200899B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211106B (en) * 2020-10-29 2023-01-10 中铁四局集团第一工程有限公司 Method for installing prefabricated capping beam of viaduct
CN113005903A (en) * 2021-02-09 2021-06-22 浙江交工集团股份有限公司 Grouting sleeve connection type bent cap assembling construction process
CN113047637B (en) * 2021-03-30 2022-06-03 上海公路桥梁(集团)有限公司 Adjusting method for guiding and positioning prefabricated stand column
CN114440848A (en) * 2022-01-19 2022-05-06 中建安装集团有限公司 Large-volume capping beam hoisting measurement control method and device suitable for assembly type bridge construction
CN115126267B (en) * 2022-07-25 2024-05-31 中建八局第三建设有限公司 Optical positioning control system and method applied to pre-buried dowel bar alignment of concrete member

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100547591B1 (en) * 2002-11-04 2006-01-31 지에스건설 주식회사 Pier coping part pre-assembly method
AU2004201369B2 (en) * 2004-03-31 2007-12-13 Mitek Holdings, Inc. Building framework, method for making the same and components used in the framework
AU2012290310B2 (en) * 2011-07-29 2014-04-24 Viasat, Inc. Incremental gateway deployment in a hub-spoke satellite communication system using static spot beams
CN102418317A (en) * 2011-11-10 2012-04-18 中铁二十三局集团有限公司 Field manufacturing method for lattice pier
CN106400692A (en) * 2016-10-28 2017-02-15 上海市政工程设计研究总院(集团)有限公司 Construction method for stand column and cover beam assembled structure
CN206448151U (en) * 2017-01-06 2017-08-29 江苏省科佳工程设计有限公司 Overhead road of city precast pier
CN107100078B (en) * 2017-05-19 2019-01-08 中国五冶集团有限公司 A kind of packaged type bridges Precast Pier Columns component installation method
CN108103936B (en) * 2017-11-03 2019-06-25 上海公路桥梁(集团)有限公司 The method that prefabricated bent cap is installed on column
CN107953970B (en) * 2017-11-21 2019-07-16 中船黄埔文冲船舶有限公司 A kind of installation method of the ship large size door frame of no pedestal
JP6425848B1 (en) * 2018-05-15 2018-11-21 株式会社横河住金ブリッジ Bridge replacement method
CN109214099B (en) * 2018-09-20 2023-06-09 中建三局基础设施建设投资有限公司 Arch rib steel pipe positioning and construction method
CN109610344A (en) * 2018-12-31 2019-04-12 中铁六局集团太原铁路建设有限公司 Bridge rotation body support construction method of installation
CN109881898B (en) * 2019-02-21 2021-06-25 深圳市建筑设计研究总院有限公司 Splicing and correcting method for high-rise connected structure
CN109944165A (en) * 2019-04-24 2019-06-28 中铁二十四局集团有限公司 A kind of temporary support method of the modularization regulating posture for the installation of prefabricated bent cap
CN110387825B (en) * 2019-07-17 2021-10-19 中铁二十四局集团有限公司 Construction method for quickly adjusting holes and postures of prefabricated stand columns
CN110777669A (en) * 2019-11-15 2020-02-11 中铁北京工程局集团有限公司 High-speed rail continuous beam short line matching prefabricated cantilever assembly line shape control method
CN110744269B (en) * 2019-11-25 2021-07-06 上海振华重工(集团)股份有限公司南通分公司 Manufacturing and mounting method of tire crane support leg flange
CN111622110B (en) * 2020-04-24 2021-10-29 中交第二航务工程局有限公司 Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology
CN112211106B (en) * 2020-10-29 2023-01-10 中铁四局集团第一工程有限公司 Method for installing prefabricated capping beam of viaduct

Also Published As

Publication number Publication date
CN112211106B (en) 2023-01-10
LU502065B1 (en) 2022-11-02
CN112211106A (en) 2021-01-12
WO2022088664A1 (en) 2022-05-05

Similar Documents

Publication Publication Date Title
ZA202200899B (en) Method for installing viaduct prefabricated cover beam
GB2603424B (en) Method for erecting segmental steel girder on pier-top short slideway girder
PL3696328T3 (en) Method for installing vertical grids against burrowing animals
GB202207026D0 (en) Method
GB2615413B (en) Method for determining beam interfefence
GB202210699D0 (en) Method for installing an anchoring system
GB202406227D0 (en) Demulsifying method
GB202318071D0 (en) Installing a slab for a slab track installation
JP1741944S (en) iron cover for manhole
PT4017792T (en) Method for installing a tension leg platform based floating object
GB202312625D0 (en) Drain assembly for an aquaculture method system
ZA202109940B (en) Novel method for predicting settlement of metro tunnel during construction based on lstm network
ZA202101909B (en) Protein secondary structure prediction method
GB202317028D0 (en) Method
GB202312353D0 (en) Method
GB202217313D0 (en) Method
GB202217032D0 (en) Method
GB202216610D0 (en) Method
GB202216162D0 (en) Method
GB202214502D0 (en) Method
GB202214328D0 (en) Method
GB202213924D0 (en) Method
GB202213553D0 (en) Method
GB202212106D0 (en) Method
GB202211144D0 (en) Method