CN109610344A - Bridge rotation body support construction method of installation - Google Patents

Bridge rotation body support construction method of installation Download PDF

Info

Publication number
CN109610344A
CN109610344A CN201811651236.6A CN201811651236A CN109610344A CN 109610344 A CN109610344 A CN 109610344A CN 201811651236 A CN201811651236 A CN 201811651236A CN 109610344 A CN109610344 A CN 109610344A
Authority
CN
China
Prior art keywords
support
rotation body
body support
pinner
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811651236.6A
Other languages
Chinese (zh)
Inventor
徐琨
焦鹏
张树坤
蔡坚
贾晋亭
秦辉
畅虎兵
张栋
孙国星
李宁
李鹏吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201811651236.6A priority Critical patent/CN109610344A/en
Publication of CN109610344A publication Critical patent/CN109610344A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/08Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to the installations of bridge rotation body support, specially bridge rotation body support construction method of installation.This method orients eight points of support profile " eight equal parts " using with total station, support position is controlled roughly by eight points, the center of support is found out again and is marked, total station complete monitoring, then finely tune to support center and center of rotation in error range.Then it is fixed temporarily support with angle steel, epoxy resin mortar anchors lower bolt, guarantees support located completion before being in the milk.After lower bolt solidification, then support filling epoxy resin mortar is sling, after guaranteeing that support is installed, bottom epoxy resin mortar is closely knit.

Description

Bridge rotation body support construction method of installation
Technical field
The present invention relates to the installations of bridge rotation body support, specially bridge rotation body support construction method of installation.
Background technique
Swivel applying method refers to bridge structure after design axis is pre-formed with external position progress, by power device It is turned to design position, then carries out a kind of method for bridge construction of two sides closure segment construction, there is safe and reliable, expense The advantages that low, short time limit, is suitable for the biggish single hole of across footpath or porous bridge construction, is particularly suitable for across existing railway, public affairs The constructions such as iron grade separation, river, mountain valley and famous scenic spot, nature reserve area are restricted the bridge construction in location.
Rotation body support is the swing system core of rotator construction, is the key structure of rotator construction, production and installation accuracy It is required that very high, it is necessary to elaborate, install meticulously.Bridge rotation body support be placed in swivel lower wall pinner on, mainly by upper bolt, Upper spherical pendulum, upper bolt, pin shaft, pin hole, lower bolt, lower spherical pendulum, lower bolt are constituted, and main performance index is that can be realized stabilization Horizontally rotate and propose bridge rotation body support peace for bridge rotation body support installation with controllable vertical rotating limit, the present invention Fill construction method.
Summary of the invention
The present invention provides bridge rotation body support construction methods of installation, to the critical process and essence of bridge rotation body support installation Accuracy control is expounded.
The present invention adopts the following technical scheme that realization: bridge rotation body support construction method of installation, including following step It is rapid:
The processing of pinner top surface dabbing: by the processing of pinner top surface dabbing, clearing up support lower bolt anchor hole, and cleaned out with water, Guarantee working face cleaning;
Surveying and locating: (1) solution formulation: rotation body support installation is positioned using fixed control point, and control point is set to anti- In the crown beam on fender pile top, it is ensured that mark stability, securely, installation overall process is controlled using the same control point, and when construction makes Plane and high process control are carried out with total station and precision level;(2) support marks: being carried out using steel ruler and engineering line to support Mark divides, and perimeter eight equal parts is carried out using rotation body support known radius, then cross hairs is drawn to determine seat structure center, with label Pen clearly marks eight equal parts point and support central point;(3) coarse localization: using total station using " coordinate method " to rotation body support into Row positioning, and using eight points of known coordinate setting-out " eight equal parts " on pinner, support outer profile is oriented after carrying out mark Edge controls rotation body support position by eight points, will be in rotation body support integral hoisting to pinner with crane;(4) precise positioning: Using total station setting-out center position, measurement and the support centre distance identified before, and carry out support plan-position Accurate adjustment is secured in position after recycling precision level to carry out absolute altitude fine tuning until the center of rotation of setting-out is overlapped with support center, Guarantee misalignment of axe and height variation within allowed band.
Leveling: any point height in rotation body support top surface is measured using precision level, and carries out flatness of support fine tuning, directly Be not more than 1mm to any two points relative relief, then substitute and carry out elevation repetition measurement, until reach design requirement, then with angle steel or Sheet metal is fixed temporarily rotation body support;
Fixed lower anchor bolt: lower bolt is anchored with grouting material, after lower bolt sufficiently anchors, angle steel is removed, unscrews bolt, again will Rotation body support is sling, rotation body support and lower bolt separation;
Rotation body support installation: (1) calculating epoxy resin mortar dosage, guarantees that epoxy resin mortar is sufficient, can fill up swivel branch Space is clogged in seat bottom in advance, to avoid secondary feed supplement;(2) epoxy resin mortar is smeared into ellipsoid in pinner end face center position Shape, in pinner top surface along rotation body support outer profile surrounding formwork erection, template surrounds cylindrical shape, and diameter is 150- bigger than rotation body support outer diameter 250mm can directly observe rotation body support bottom pulp situation;Each template bottom sets one layer of rubber Leakproof strip, passes through expansion Bolt is fixed on pinner top surface, spillage when preventing from being in the milk;(3) rotation body support is hung on pinner with crane, is self-possessed using support It is compacted ellipsoid epoxy resin mortar, it is ensured that rest base installation is closely knit;(4) bolt, anchorage bearing are tightened;(5) repetition measurement turns Support center and elevation, meet design requirement.
This method orients eight points of support profile " eight equal parts " using with total station, is controlled roughly by eight points Support position, then find out the center of support and mark, total station complete monitoring, then finely tune to support center and rotation Center is in error range.Then it is fixed temporarily support with angle steel, epoxy resin mortar anchors lower bolt, guarantees support before being in the milk Located completion.After lower bolt solidification, then sling support filling epoxy resin mortar, after guaranteeing that support is installed, bottom Portion's epoxy resin mortar is closely knit.
Construction method of the present invention has the advantage that
It installs easy to operate: for the bridge pad, support lifting being carried out using 100t truck crane, by consolidating to lower bolt It is fixed, the disposable fixation completed to support.Special installation is not necessarily in construction, investment is small, and construction technology difficulty is low, operability By force, it easily promotes.
Work efficiency is high: in rotation body support installation process, being carried out using 8 points of support circumferential outer edge and support center Dual control positioning, substantially reduces the time of support positioning.
Installation accuracy requires high: rotation body support installation uses the same control using fixed control point, installation overall process Point is controlled.Service performance and the excellent measuring instrument of precision carry out plane and high process control when construction.
Detailed description of the invention
Fig. 1 is process flow chart of the invention.
Specific embodiment
Bridge rotation body support construction method of installation, comprising the following steps:
The processing of pinner top surface dabbing: by the processing of pinner top surface dabbing, clearing up support lower bolt anchor hole, and cleaned out with water, Guarantee working face cleaning.
Surveying and locating: (1) solution formulation: rotation body support installation uses same using fixed control point, installation overall process A control point is controlled.Service performance and the excellent measuring instrument of precision carry out plane and high process control when construction.Plane control is adopted With 1 Lycra T09Plus total station, 1 Suo Jia SET230PK total station, the positioning accuracy of two total station central points reaches ± Within 0.3mm;High process control uses DSZ2 precision automatic compensated level, precision 0.01mm.(2) support marks: using steel Ruler and engineering line are identified division to support, carry out perimeter eight equal parts using rotation body support known radius, then draw cross hairs true Determine seat structure center, understands label eight equal parts point and support central point with marker pen;(3) it coarse localization: is adopted using total station Rotation body support is positioned with " coordinate method ", and using eight points of known coordinate setting-out " eight equal parts " on pinner, is carried out Support outer profile edge is oriented after mark, controls rotation body support position by eight points, it is with 100t crane that rotation body support is whole Body is lifted to pinner;(4) total station setting-out center position, measurement and the support identified before precise positioning: are utilized Centre distance, and the accurate adjustment of support plan-position is carried out, until the center of rotation of setting-out is overlapped with support center, recycle accurate water Quasi- instrument is secured in position after carrying out absolute altitude fine tuning, guarantees misalignment of axe and height variation within allowed band.
Leveling: make rotation body support top surface any two points relative relief no more than 1mm, then repetition measurement elevation using level, such as This until reaching design requirement, is then fixed temporarily rotation body support with angle steel repeatedly.
Fixed lower anchor bolt: rotation body support has been completed in place at this time, in order to be permanently fixed rotation body support, is needed with grouting Expect that (epoxy resin mortar) anchors lower bolt, after lower bolt sufficiently anchors, remove angle steel, unscrew bolt, again by swivel branch Seat is sling.
Rotation body support installation: (1) calculating epoxy resin mortar dosage, guarantees that epoxy resin mortar is sufficient;(2) on pinner top Epoxy resin mortar is smeared into ellipsoid by face center, and in pinner top surface along rotation body support outer profile surrounding formwork erection, template is enclosed 200mm bigger than rotation body support outer diameter at cylinder diameter, each template bottom sets one layer of 4mm thickness rubber Leakproof strip, passes through expansion bolt It is fixed on pinner top surface, spillage when preventing from being in the milk;(3) rotation body support is hung on pinner with crane, it is ellipse with support self weight compacting Spherical epoxy resin mortar, it is ensured that rest base installation is closely knit.Inspection method is to tap support top surface with iron hammer, is stung as issued Sound then shows to be in the milk closely knit;(4) bolt, anchorage bearing are tightened rapidly;(5) repetition measurement rotation body support center and elevation meet design It is required that.
Above method construction point:
1. reserving support lower bolt anchor hole on pinner.
2. " ten " wordline is portrayed in heart top surface in the holder, according to support radius on pinner, 8 " ten " wordline are portrayed (i.e. 8 points) orient support outer profile edge.
3. anchoring lower bolt with grouting material.Support is fixed mainly by lower bolt, it is necessary to ensure that lower bolt anchoring is stablized, wait fill After slurry reaches intensity requirement, angle steel can be removed, bolt is unscrewed, again slings support.
4. being filled between support and pinner with epoxy resin mortar, it is self-possessed using support and is compacted, it is ensured that rest base asphalt mixtures modified by epoxy resin Rouge mortar is closely knit.

Claims (1)

1. bridge rotation body support construction method of installation, it is characterised in that the following steps are included:
The processing of pinner top surface dabbing: by the processing of pinner top surface dabbing, clearing up support lower bolt anchor hole, and cleaned out with water, Guarantee working face cleaning;
Surveying and locating: (1) solution formulation: rotation body support installation uses the same control using fixed control point, installation overall process System point is controlled, and carries out plane and high process control using total station and precision level when construction;(2) support marks: using Steel ruler and engineering line are identified division to support, carry out perimeter eight equal parts using rotation body support known radius, then draw cross hairs It determines seat structure center, understands label eight equal parts point and support central point with marker pen;(3) coarse localization: total station is utilized Rotation body support is positioned using " coordinate method ", and using eight points of known coordinate setting-out " eight equal parts " on pinner, is done Support outer profile edge is oriented after good mark, controls rotation body support position by eight points, it is with crane that rotation body support is whole On lifting to pinner;(4) precise positioning: utilizing total station setting-out center position, measurement in the support that is identified before Heart distance, and the accurate adjustment of support plan-position is carried out, until the center of rotation of setting-out is overlapped with support center, recycle Levelling Instrument is secured in position after carrying out absolute altitude fine tuning, guarantees misalignment of axe and height variation within allowed band;
Leveling: make rotation body support top surface any two points relative relief no more than 1mm, then repetition measurement elevation using precision level, directly To design requirement is reached, rotation body support then is fixed temporarily with angle steel;
Fixed lower anchor bolt: lower bolt is anchored with grouting material, after lower bolt sufficiently anchors, angle steel is removed, unscrews bolt, again will Rotation body support is sling, rotation body support and lower bolt separation;
Rotation body support installation: (1) calculating epoxy resin mortar dosage, guarantees that epoxy resin mortar is sufficient;(2) in pinner top surface Epoxy resin mortar is smeared into ellipsoid by heart position, and in pinner top surface along rotation body support outer profile surrounding formwork erection, template surrounds cylinder Diameter is 150-250mm bigger than rotation body support outer diameter, and each template bottom sets one layer of rubber Leakproof strip, is fixed on by expansion bolt Pinner top surface, spillage when preventing from being in the milk;(3) rotation body support is hung on pinner with crane, is self-possessed with support and is compacted ellipsoid ring Oxygen resin mortar, it is ensured that rest base installation is closely knit;(4) bolt, anchorage bearing are tightened;(5) repetition measurement rotation body support center and height Journey meets design requirement.
CN201811651236.6A 2018-12-31 2018-12-31 Bridge rotation body support construction method of installation Pending CN109610344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811651236.6A CN109610344A (en) 2018-12-31 2018-12-31 Bridge rotation body support construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811651236.6A CN109610344A (en) 2018-12-31 2018-12-31 Bridge rotation body support construction method of installation

Publications (1)

Publication Number Publication Date
CN109610344A true CN109610344A (en) 2019-04-12

Family

ID=66017268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811651236.6A Pending CN109610344A (en) 2018-12-31 2018-12-31 Bridge rotation body support construction method of installation

Country Status (1)

Country Link
CN (1) CN109610344A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211106A (en) * 2020-10-29 2021-01-12 中铁四局集团第一工程有限公司 Method for installing prefabricated bent cap of viaduct

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286926A (en) * 2011-08-25 2011-12-21 重庆新科建设工程有限公司 Mounting process of cast-in-place bridge pot rubber bearing
CN103205936A (en) * 2013-04-12 2013-07-17 中铁三局集团有限公司 Device and method for accurately positioning spherical hinge
KR200473622Y1 (en) * 2013-08-28 2014-07-21 삼영엠텍(주) Friction pendulum bearing with pressure plates
CN105155429A (en) * 2015-07-02 2015-12-16 北京交达铁工科技有限公司 Spherical hinge for swivel construction, machining method for spherical hinge and installation method for spherical hinge
CN106012820A (en) * 2016-07-22 2016-10-12 成都鹏程路桥机械有限公司 Mounting method of bridge support
CN108755395A (en) * 2018-02-12 2018-11-06 浙江大学城市学院 A kind of spherical bearing installation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286926A (en) * 2011-08-25 2011-12-21 重庆新科建设工程有限公司 Mounting process of cast-in-place bridge pot rubber bearing
CN103205936A (en) * 2013-04-12 2013-07-17 中铁三局集团有限公司 Device and method for accurately positioning spherical hinge
KR200473622Y1 (en) * 2013-08-28 2014-07-21 삼영엠텍(주) Friction pendulum bearing with pressure plates
CN105155429A (en) * 2015-07-02 2015-12-16 北京交达铁工科技有限公司 Spherical hinge for swivel construction, machining method for spherical hinge and installation method for spherical hinge
CN106012820A (en) * 2016-07-22 2016-10-12 成都鹏程路桥机械有限公司 Mounting method of bridge support
CN108755395A (en) * 2018-02-12 2018-11-06 浙江大学城市学院 A kind of spherical bearing installation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
三年五年158: "转体下球铰安装精度控制概要", 《百度文库》 *
聂树东: "转体桥球铰安装精度控制", 《中国新技术新产品》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211106A (en) * 2020-10-29 2021-01-12 中铁四局集团第一工程有限公司 Method for installing prefabricated bent cap of viaduct

Similar Documents

Publication Publication Date Title
CN102286926A (en) Mounting process of cast-in-place bridge pot rubber bearing
CN108643221A (en) A kind of offshore wind farm assembled cushion cap foundation and its construction method
CN110409317B (en) Swivel spherical hinge and mounting method thereof
CN108532608B (en) Precise positioning and nidation method for deepwater drilling rock-socketed foundation double-wall steel cofferdam
CN107034931A (en) Steel-pipe pile testing apparatus for verticality and deep water steel pipe pile construction method
CN105926672A (en) Mined metro station steel pipe column construction method
CN109610441A (en) It is a kind of to use hydraulic vertical adjustment frame inverse method one-column one-pile construction method
CN203878601U (en) Tower crane foundation structure
CN109610344A (en) Bridge rotation body support construction method of installation
CN108589555A (en) A kind of Rotary ball hinge and Rotary ball hinge installation method
CN207392771U (en) A kind of guide type steel column locator
CN208072181U (en) A kind of spherical bearing positioning device
CN101985824A (en) Embedded part mounting device for bridge bearing
CN202187285U (en) Basin type rubber support of cast-in-situ bridge
CN107059592A (en) Pier construction method after a kind of first beam in cable-stayed bridge auxiliary pier pier top section
CN103603503A (en) Anchor bolt installing method
CN113863166A (en) Reverse construction method for mounting support after rotating
CN108560369A (en) Lofting construction method for high-speed loop curved surface paving
CN208187393U (en) A kind of magnetic foot pin and measuring device for urban surface settlement deformation survey
CN203177845U (en) Underwater frame cage protective type settlement observation device
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN111502120A (en) Construction method for hoisting platform steel stand column
CN201738248U (en) Embedded part installation device for bridge bearing
CN108755395B (en) A kind of spherical bearing installation method
CN108166337B (en) A kind of adjustable track infrastructure of height difference

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412