WO2023145182A1 - 作業機械 - Google Patents

作業機械 Download PDF

Info

Publication number
WO2023145182A1
WO2023145182A1 PCT/JP2022/040741 JP2022040741W WO2023145182A1 WO 2023145182 A1 WO2023145182 A1 WO 2023145182A1 JP 2022040741 W JP2022040741 W JP 2022040741W WO 2023145182 A1 WO2023145182 A1 WO 2023145182A1
Authority
WO
WIPO (PCT)
Prior art keywords
meter
target
flow rate
valve
pressure
Prior art date
Application number
PCT/JP2022/040741
Other languages
English (en)
French (fr)
Inventor
賢人 熊谷
進也 井村
靖貴 釣賀
孝昭 千葉
慎二郎 山本
裕昭 天野
真司 西川
昭広 楢▲崎▼
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to JP2023576629A priority Critical patent/JPWO2023145182A1/ja
Priority to KR1020247006161A priority patent/KR20240038048A/ko
Priority to EP22924036.1A priority patent/EP4375516A1/en
Priority to CN202280057287.4A priority patent/CN117836521A/zh
Publication of WO2023145182A1 publication Critical patent/WO2023145182A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • F15B11/04Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the speed
    • F15B11/042Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the speed by means in the feed line, i.e. "meter in"
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2217Hydraulic or pneumatic drives with energy recovery arrangements, e.g. using accumulators, flywheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • E02F9/2228Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • F15B11/028Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the actuating force
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • F15B11/04Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the speed
    • F15B11/044Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the speed by means in the return line, i.e. "meter out"

Definitions

  • the present invention relates to working machines such as hydraulic excavators.
  • a work machine such as a hydraulic excavator is provided with various hydraulic actuators.
  • Direction switching control for switching the direction of supply and discharge of hydraulic oil to the pump, meter-in opening control for controlling the supply flow rate from the hydraulic pump to the hydraulic actuator, and meter-out opening control for controlling the discharge flow rate from the hydraulic actuator to the hydraulic oil tank Those configured to do so are widely known.
  • a control circuit that supplies (regenerates) oil discharged from one oil chamber of a hydraulic actuator (return oil) directly to the other oil chamber.
  • the relationship between the opening area on the meter-in side and the opening area on the meter-out side with respect to the movement position of the spool valve is unique. It will be decided. Therefore, the opening area on the meter-in side and the meter-out side can be adjusted according to various work contents, such as a single action that drives one hydraulic actuator alone, a compound action that drives a plurality of hydraulic actuators simultaneously, or light work or heavy work.
  • one opening control may interfere with the opening control of the other, resulting in reduced operability.
  • oil supply/discharge control for hydraulic actuators has been performed using head-side and rod-side supply valves (head-end and rod-end supply valves) that control the flow rate of supply from the hydraulic pump to the head-side oil chamber and the rod-side oil chamber of the hydraulic cylinder, respectively.
  • valve head-side and rod-side drain valves (head-end and rod-end drain valves) that control the flow rate of discharge from the head-side oil chamber and rod-side oil chamber to the oil tank, respectively.
  • a control circuit using a formed bridge circuit is known (for example, Patent Document 1).
  • the four metering valves operate individually based on commands from the controller, so it is possible to easily change the relationship between the meter-in opening and the meter-out opening according to the work content.
  • an auxiliary valve having a variable resistance function is arranged upstream of the direction switching valve that performs the above-described direction switching control, meter-in opening control, and meter-out opening control with a single spool valve.
  • a control circuit that assists pressure oil supply to the directional control valve according to the content of work such as compound operation for example, Patent Document 2.
  • Patent Document 1 since four metering valves control oil supply and discharge for one actuator, it is possible to achieve both actuator speed control by meter-in opening control and actuator thrust control by meter-out opening control. It is possible.
  • the control circuit requires four spools (or poppets) that constitute the four metering valves, and four driving devices (solenoids in Patent Document 1) for driving each spool.
  • the cost increases due to the complexity of the circuit and the increase in the number of parts.
  • Patent Document 1 does not describe meter-in opening control and meter-out opening control of an actuator that regenerates return oil.
  • the present invention has been made in view of the above problems, and its object is to control the speed of each actuator and to and thrust control with a simple configuration.
  • the present invention provides a vehicle body, a working device attached to the vehicle body, a hydraulic fluid tank, a variable displacement hydraulic pump that sucks and discharges hydraulic fluid from the hydraulic fluid tank, a regulator that controls the capacity of the hydraulic pump; a plurality of actuators that drive the work device; a plurality of directional control valves that control the flow of pressure oil supplied from the hydraulic pump to the plurality of actuators; a meter-out flow path for connecting a specific directional control valve among the plurality of directional control valves to the hydraulic fluid tank, and the specific directional control valve for connecting to the hydraulic pump a regeneration flow path that connects to a meter-in flow path, and a specific actuator that is provided in the regeneration flow path and that corresponds to the specific directional control valve among the plurality of actuators.
  • a regeneration valve that merges with the flow path is provided downstream of a branch point of the regeneration flow path in the meter-out flow path, and adjusts the flow rate returned to the hydraulic fluid tank from the specific actuator.
  • a work machine comprising: a regeneration control valve that controls a flow rate through the regeneration valve; and a controller that controls the regulator, the plurality of directional control valves, and the regeneration control valve according to an input amount of the operating device,
  • a first pressure sensor that detects pump pressure, which is the discharge pressure of a hydraulic pump; a second pressure sensor that detects meter-in pressure and meter-out pressure of the plurality of actuators; each of the plurality of directional control valves is formed by the same valve body and the same housing so that the meter-in opening area is smaller than the meter-out opening area with respect to valve displacement, and the controller calculates an actuator target flow rate, which is a target value of the flow rate of pressure oil supplied from the hydraulic pump to the plurality of actuators, based on the input amount of the operation device, and calculate
  • a target meter-in opening area which is a target value of the meter-in opening areas of the plurality of directional control valves, is calculated based on the actuator target flow rate, the pump pressure, and the meter-in pressure. and calculating a target thrust, which is a target value of the thrust of the specific actuator, based on the input amount of the operating device and the output value of the attitude sensor, and calculating the target thrust and the meter-in pressure of the specific actuator.
  • a target meter-out pressure which is a target value of the meter-out pressure of the specific actuator, is calculated, and based on the target meter-out pressure and the meter-out pressure of the specific actuator, opening of the regeneration control valve
  • a regeneration control valve target opening area which is a target value of the area, is calculated, the regulator is controlled according to the pump target flow rate, the plurality of directional control valves are controlled according to the target meter-in opening area, and the regeneration control is performed.
  • the regeneration control valve is controlled according to the valve target opening area.
  • each meter-in opening is adjusted according to the differential pressure across each directional control valve during a combined operation in which a specific actuator for regenerating return oil and other actuators are simultaneously driven.
  • a target flow rate can be supplied to each actuator.
  • by adjusting the meter-out opening of a specific directional control valve to input a target thrust force to a specific actuator it is possible to prevent overshoot due to the inertia of non-driven members.
  • each directional control valve has a simple configuration in which the meter-in opening area and the meter-out opening area are formed by the same valve body and the same housing, costs can be suppressed. This makes it possible to perform speed control of each actuator and thrust control of a specific actuator with a simple configuration during a combined operation in which a specific actuator that regenerates return oil and other actuators are simultaneously driven.
  • speed control of the specific actuator and the other actuators and thrust control of the specific actuator are performed during a combined operation in which the specific actuator for regenerating the return oil and the other actuator are simultaneously driven. This can be done with a simple configuration.
  • FIG. 1 is a side view of a hydraulic excavator according to an embodiment of the present invention
  • FIG. 2 is a circuit diagram (1/2) of a hydraulic drive system mounted on the hydraulic excavator shown in FIG. 1
  • FIG. 2 is a circuit diagram (2/2) of a hydraulic drive system mounted on the hydraulic excavator shown in FIG. 1
  • FIG. 2B is a diagram showing opening characteristics of the directional control valve shown in FIG. 2A
  • FIG. 2B is a diagram showing the opening characteristics of the bleed-off valve shown in FIG. 2A
  • FIG. 3 is a flowchart showing processing related to pump flow rate control of the controller shown in FIG. 2B;
  • FIG. 3 is a flowchart showing processing related to pump flow rate control of the controller shown in FIG. 2B;
  • 3 is a flow chart showing processing related to opening control of a boom direction control valve of the controller shown in FIG. 2B; 3 is a flow chart showing processing related to opening control of an arm direction control valve of the controller shown in FIG. 2B; 3 is a flow chart showing processing related to opening control of an arm regeneration control valve of the controller shown in FIG. 2B; 3 is a flowchart showing processing related to opening control of the bleed-off valve of the controller shown in FIG. 2B;
  • FIG. 1 is a side view of the hydraulic excavator according to this embodiment.
  • a hydraulic excavator 901 includes a traveling body 201, a revolving body 202 that is arranged on the traveling body 201 so as to be able to turn, and a revolving body 202 that constitutes a vehicle body, and a revolving body 202 that is attached to the revolving body 202 so as to be able to turn vertically. , and a working device 203 for excavating earth and sand.
  • the revolving body 202 is driven by a revolving motor 211 .
  • the working device 203 includes a boom 204 attached to a revolving body 202 so as to be vertically rotatable, an arm 205 attached to the tip of the boom 204 so as to be vertically rotatable, and a tip of the arm 205 to be vertically rotatable.
  • a rotatably attached bucket 206, a boom cylinder 204a that is an actuator that drives the boom 204, an arm cylinder 205a that is an actuator that drives the arm 205, and a bucket cylinder 206a that is an actuator that drives the bucket 206. have.
  • Inertial measurement devices 212 , 213 , and 214 for detecting the postures and operating states of boom 204 , arm 205 , and bucket 206 are installed in work device 203 .
  • Inertial measurement devices 215 and 216 for detecting the posture and rotational speed of the revolving body 202 are installed on the revolving body 202 .
  • the inertial measurement devices 212 to 216 in this embodiment form attitude sensors that detect the attitudes and operating states of the revolving body 202 and the working device 203 .
  • An operator's cab 207 is provided on the front side of the revolving body 202, and a counterweight 209 is attached to the rear side to ensure the weight balance of the vehicle body.
  • a machine room 208 is provided between the cab 207 and the counterweight 209 .
  • the machine room 208 accommodates an engine (not shown), a control valve 210, a swing motor 211, hydraulic pumps 1 to 3 (shown in FIG. 2A), and the like.
  • a control valve 210 controls the flow of hydraulic fluid from the hydraulic pump to each actuator.
  • FIG. 1 2A and 2B are circuit diagrams of the hydraulic drive system mounted on the hydraulic excavator 901.
  • FIG. 1 is a circuit diagram of the hydraulic drive system mounted on the hydraulic excavator 901.
  • Hydraulic drive device 902 includes three main hydraulic pumps (for example, first hydraulic pump 1, second hydraulic pump 2, and third hydraulic pump 3, which are variable displacement hydraulic pumps), pilot pump 91, and hydraulic pump 1. 3 and a hydraulic oil tank 5 that supplies oil to the pilot pump 91 . Hydraulic pumps 1-3 and pilot pump 91 are driven by an engine (not shown).
  • the tilting angle of the first hydraulic pump 1 is controlled by a regulator attached to the first hydraulic pump 1.
  • the regulator of the first hydraulic pump 1 has a flow control command pressure port 1a and is driven by command pressure acting on the flow control command pressure port 1a.
  • the tilt angle of the second hydraulic pump 2 is controlled by a regulator attached to the second hydraulic pump 2 .
  • the regulator of the second hydraulic pump 2 has a flow control command pressure port 2a and is driven by command pressure acting on the flow control command pressure port 2a.
  • the tilting angle of the third hydraulic pump 3 is controlled by a regulator attached to the third hydraulic pump 3 .
  • the regulator of the third hydraulic pump 3 has a flow control command pressure port 3a and is driven by command pressure acting on the flow control command pressure port 3a.
  • a pump line 40 of the first hydraulic pump 1 includes meter-in flow paths 41, 42, and meter-in flow paths 41, 42, respectively. They are connected in parallel via meter-in channels 43 and 44 , meter-in channels 45 and 46 , and meter-in channels 47 and 48 .
  • check valves 21 to 48 are provided in order to prevent backflow of pressure oil to the pump line 40. 24 are arranged respectively.
  • the right travel direction control valve 6 controls the flow of pressure oil supplied from the first hydraulic pump 1 to a right travel motor (not shown) of the pair of travel motors that drive the travel body 201 .
  • the bucket direction control valve 7 controls the flow of pressure oil supplied from the first hydraulic pump 1 to the bucket cylinder 206a.
  • the second arm direction control valve 8 controls the flow of pressure oil supplied from the first hydraulic pump 1 to the arm cylinder 205a.
  • the first boom direction control valve 9 controls the flow of pressure oil supplied from the first hydraulic pump 1 to the boom cylinder 204a.
  • Pump line 40 is connected to hydraulic fluid tank 5 through main relief valve 18 to protect the circuit from excessive pressure build-up.
  • a pump line 40 is connected to the hydraulic oil tank 5 via a bleed-off valve 35 in order to discharge excess oil discharged from the hydraulic pump 1 .
  • a pump line 50 of the second hydraulic pump 2 includes a second boom directional control valve 10, a first arm directional control valve 11, a first attachment directional control valve 12, and a left traveling directional control valve 13, respectively.
  • 52 , meter-in channels 53 and 54 , meter-in channels 55 and 56 , and meter-in channels 57 and 58 are connected in parallel.
  • check valves 25 to 58 are provided to prevent backflow of pressure oil to the pump line 50. 28 are arranged respectively.
  • the second boom direction control valve 10 controls the flow of pressure oil supplied from the second hydraulic pump 2 to the boom cylinder 204a.
  • the first arm direction control valve 11 controls the flow of pressure oil supplied from the second hydraulic pump 2 to the arm cylinder 205a.
  • the first attachment directional control valve 12 controls the flow of pressure oil supplied from the second hydraulic pump 2 to a first actuator (not shown) that drives a first special attachment such as a shredder provided in place of the bucket 206, for example. Control.
  • the left travel direction control valve 13 controls the flow of pressure oil supplied from the second hydraulic pump 2 to a left travel motor (not shown) of the pair of travel motors that drive the travel body 201 .
  • Pump line 50 is connected to hydraulic fluid tank 5 through main relief valve 19 to protect the circuit from excessive pressure build-up.
  • a pump line 50 is connected to the hydraulic oil tank 5 via a bleed-off valve 36 in order to discharge excess oil discharged from the hydraulic pump 2 .
  • the pump line 50 is connected to the pump line 40 via the confluence valve 17 in order to merge the discharge oil of the first hydraulic pump 1 .
  • a check valve 32 is provided at a portion of the pump line 50 that connects the meter-in flow path 55 and the meter-in flow path 57 . The check valve 32 prevents the pressurized oil that flows from the first hydraulic pump 1 into the pump line 50 via the confluence valve 17 from flowing into the directional control valves 10 to 12 other than the travel left directional control valve 13 .
  • a meter-out side port of the first arm directional control valve 11 is connected to the hydraulic oil tank 5 via a meter-out flow path 75 .
  • the meter-out channel 75 is connected to the meter-in channel 54 via an arm regeneration channel 76 .
  • the arm regeneration flow path 76 is provided with an arm regeneration valve 33 that allows flow from the meter-out flow path 75 to the meter-in flow path 54 .
  • a regeneration control valve that controls the flow rate through the regeneration valve by adjusting the flow rate returned from the arm cylinder 205a to the hydraulic oil tank 5 is located downstream of the branch point of the meter-out flow path 75 with the arm regeneration valve 33.
  • An arm regeneration control valve 34 is installed.
  • the turning directional control valve 14, the third boom directional control valve 15, and the second attachment directional control valve 16 are provided with meter-in passages 61, 62, meter-in passages 63, 64, respectively. and meter-in channels 65 and 66 in parallel.
  • Check valves 29 to 31 are arranged in the meter-in passages 61, 62, the meter-in passages 63, 64, and the meter-in passages 65, 66, respectively, in order to prevent backflow of pressure oil to the pump line 60. .
  • the swing direction control valve 14 controls the flow of pressure oil supplied from the third hydraulic pump 3 to the swing motor 211 .
  • the third boom direction control valve 15 controls the flow of pressure oil supplied from the third hydraulic pump 3 to the boom cylinder 204a.
  • the second attachment directional control valve 16 operates when a second special attachment having a second actuator is attached in addition to the first special attachment, or when the first special actuator is replaced with the first actuator and the second actuator. It is used to control the flow of pressure oil supplied to the second actuator when a second special attachment with two actuators is attached.
  • Pump line 60 is connected to hydraulic fluid tank 5 through main relief valve 20 to protect the circuit from excessive pressure build-up.
  • the pump line 60 is connected to the hydraulic oil tank 5 via the bleed-off valve 37 in order to discharge excess oil discharged from the hydraulic pump 3 .
  • FIG. 3 shows the opening characteristics of the directional control valves 6-16.
  • the meter-in opening area increases from zero to maximum opening area with spool displacement.
  • the meter-out opening area similarly increases from zero to the maximum opening area with spool displacement, but is set to a value less than the meter-in opening area with respect to spool displacement. This makes it possible to control the drive speed of the actuator with the meter-in opening.
  • FIG. 4 shows opening characteristics of the bleed-off valves 35-37.
  • the bleed-off valve opening area becomes the maximum opening area when the maximum operating lever input amount is from zero to a predetermined value, and sharply decreases to zero when the maximum operating lever input amount exceeds the predetermined value.
  • the maximum operation lever input amount referred to here is the maximum value of each operation lever input amount corresponding to a plurality of actuators connected to the pump line to which the bleed-off valve is connected.
  • the pump line 50 is provided with a pressure sensor 85 that detects the discharge pressure (pump pressure P Pmp2 ) of the second hydraulic pump 2 .
  • Flow paths 73, 74 connecting the boom cylinder 204a and the boom direction control valves 9, 10, 15 are provided with pressure sensors 86, 86 for detecting the meter-in side pressure (boom meter-in pressure P MIBm ) of the boom cylinder 204a. 87 is provided.
  • Flow paths 71 and 72 connecting the arm cylinder 205a and the arm directional control valves 8 and 11 are supplied with the meter-in side pressure (arm meter-in pressure P MIAm ) and the meter-out side pressure (arm meter-out pressure P MIAm ) of the arm cylinder 205a.
  • P MOAm meter-in side pressure
  • P MIAm meter-out side pressure
  • P MIAm meter-out pressure
  • the discharge port of the pilot pump 91 is connected to the hydraulic oil tank 5 via a pilot relief valve 92 for generating the pilot primary pressure, and is built in the solenoid valve unit 93 via the flow path 80. It is connected to one input port of the solenoid valves 93a-93g. The other input ports of the solenoid valves 93a to 93f are connected to the hydraulic oil tank 5 via the flow path 81. As shown in FIG. Each of the solenoid valves 93a to 93g reduces the pilot primary pressure according to the command signal from the controller 94 and outputs it as the command pressure.
  • the output port of the solenoid valve 93a is connected to the flow rate control command pressure port 2a of the regulator of the second hydraulic pump 2.
  • Output ports of the solenoid valves 93b and 93c are connected to pilot ports 10a and 10b of the second boom direction control valve 10, respectively.
  • Output ports of the solenoid valves 93 d and 93 e are connected to pilot ports 11 a and 11 b of the first arm direction control valve 11 .
  • the output port of the solenoid valve 93f is connected to the command pressure port 36a of the bleed-off valve 36.
  • the output port of the solenoid valve 93g is connected to the command pressure port 34a of the regeneration control valve 34.
  • the hydraulic drive device 902 includes a boom operating lever 95a capable of switching between the first boom direction control valve 9, the second boom direction control valve 10 and the third boom direction control valve 15, the first arm direction control valve 11 and the third boom direction control valve 95a.
  • An arm operating lever 95b capable of switching and operating the two-arm direction control valve 8 is provided.
  • the left travel control lever for switching the left travel direction control valve 13, the turning operation lever for switching the turning direction control valve 14, and the second attachment control lever for switching the second attachment direction control valve 16 Illustration is omitted.
  • the hydraulic drive device 902 has a controller 94 .
  • the controller 94 operates solenoid valves 93a to 93g (not shown) of the solenoid valve unit 93 according to the input amounts of the operation levers 95a and 95b, the output values of the inertial measurement devices 212 to 216, and the output values of the pressure sensors 85 to 89. (including solenoid valve).
  • FIG. 5 is a functional block diagram of the controller 94.
  • the controller 94 includes a boom target flow rate calculator 94a, an arm target flow rate calculator 94b, an arm estimated regeneration flow rate calculator 94c, an arm corrected target flow rate calculator 94d, and a bleed-off valve target opening calculator 94e.
  • an estimated bleed-off flow rate calculation unit 94f a pump target flow rate calculation unit 94g, a pump control command output unit 94h, a pressure state determination unit 94i, a boom direction control valve target meter-in opening calculation unit 94j, and a boom direction control valve
  • a target torque calculation unit 94q a target thrust calculation unit 94r, an arm target meter-out pressure calculation unit 94s, an arm regeneration control valve target opening calculation unit 94t, an arm regeneration control valve control command output unit 94u, and a bleed-off valve. and a control command output unit 94v.
  • the boom target flow rate calculator 94a calculates a target value (boom target flow rate QTgtBm) of the flow rate (boom flow rate) supplied to the boom cylinder 204a based on the operation lever input amount. Specifically, the boom target flow rate Q TgtBm corresponding to the operating lever input amount is calculated according to the boom flow rate characteristic corresponding to the operating lever input amount set in advance.
  • the arm target flow rate calculator 94b calculates a target value (arm target flow rate Q TgtAm ) of the flow rate (arm flow rate) supplied to the arm cylinder 205a based on the operation lever input amount. Specifically, the arm target flow rate Q TgtAm corresponding to the operation lever input amount is calculated in accordance with the arm flow rate characteristic with respect to the operation lever input amount set in advance.
  • the arm estimated regeneration flow rate calculator 94c calculates the arm estimated regeneration flow rate Q based on the arm meter-in pressure P MIAm and the arm meter-out pressure P MOAm obtained from the output values of the pressure sensors 88 and 89 and the opening area of the arm regeneration valve 33. Calculate EstRegAm .
  • the arm corrected target flow rate calculation section 94d calculates the arm corrected target flow rate based on the arm target flow rate Q TgtAm calculated by the arm target flow rate calculation section 94b and the arm estimated regeneration flow rate Q EstRegAm calculated by the arm estimated regeneration flow rate calculation section 94c. Calculate Q ModiTgtAm .
  • a bleed-off valve target opening calculation unit 94e calculates target opening areas of the bleed-off valves 35 to 37 based on the operation lever input amount. Specifically, the bleed-off valve target opening area corresponding to the operation lever input amount is calculated according to preset bleed-off valve opening area characteristics for the operation lever input amount.
  • the estimated bleed-off flow rate calculation unit 94f calculates an estimated bleed-off flow rate based on the bleed-off valve target opening area A TgtBO calculated by the bleed-off valve target opening calculation unit 94e and the pump pressure P Pmp2 obtained from the output value of the pressure sensor 85. Calculate the flow rate Q EstBO .
  • the pump target flow rate calculation section 94g calculates the boom target flow rate Q TgtBm calculated by the boom target flow rate calculation section 94a, the arm target flow rate Q TgtAm calculated by the arm target flow rate calculation section 94b, and the estimated bleed-off flow rate calculation section 94f.
  • a pump target flow rate Q TgtPmp is calculated based on the estimated bleed-off flow rate Q EstBO .
  • the pump control command output section 94h outputs a command signal (pump flow rate control command signal) according to the pump target flow rate Q TgtPmp calculated by the pump target flow rate calculation section 94g, according to the solenoid valve command signal characteristic for the pump flow rate set in advance. Output to the electromagnetic valve 93a.
  • the pressure state determination unit 94i determines whether or not the differential pressure across the directional control valve of each actuator is smaller than a predetermined threshold based on the output value of the pressure sensor provided in each actuator line. Output to the control valve target meter-in opening calculator 94j.
  • a boom direction control valve target meter-in opening calculator 94j is obtained from the boom target flow rate calculated by the boom target flow rate calculator 94a, the pump pressure obtained from the output value of the pressure sensor 85, and the output value of the pressure sensor 86 (87).
  • a target meter-in opening area A TgtMIBm of the boom direction control valves 9, 10, 15 is calculated based on the boom meter-in pressure and the determination result output from the pressure state determination section 94i.
  • the boom direction control valve control command output unit 94k outputs a command according to the target meter-in opening area ATgtMIBm calculated by the boom direction control valve target meter-in opening calculation unit 94j according to the electromagnetic valve command signal characteristics for the meter-in opening area set in advance.
  • a signal (boom direction control valve control command signal) is output to the solenoid valve 93b (93c).
  • the arm directional control valve target meter-in opening calculator 94l is obtained from the arm target flow rate calculated by the arm target flow rate calculator 94b, the pump pressure obtained from the output value of the pressure sensor 85, and the output value of the pressure sensor 88 (89).
  • a target meter-in opening area A TgtMIAm of the arm direction control valves 8 and 11 is calculated based on the arm meter-in pressure and the determination result output from the pressure state determination section 94i.
  • the arm directional control valve control command output unit 94m outputs a command according to the target meter-in opening area A TgtMIAm calculated by the arm directional control valve target meter-in opening calculation unit 94l, according to the solenoid valve command signal characteristic for the preset meter-in opening area.
  • a signal (arm direction control valve control command signal) is output to the solenoid valve 93d (93e).
  • the required torque calculation unit 94n calculates the required torque T ReqAm of the arm 205 according to the arm operation lever input amount according to the arm required torque characteristic for the arm operation lever input amount set in advance.
  • the gravitational torque calculator 94o calculates the gravitational component of the arm moment as the gravitational torque T Gravity based on the output values of the inertial measurement devices 212 to 216 and the vehicle body specification values.
  • the inertia torque calculator 94p calculates the inertia component of the arm moment as the inertia torque T Inertia based on the gravitational torque T Gravity calculated by the gravitational torque calculator 94o and the output values of the inertia measurement devices 212-216.
  • the target torque calculation unit 94q is based on the required torque calculated by the required torque calculation unit 94n, the gravitational torque T Gravity calculated by the gravity torque calculation unit 94o, and the inertia torque T Inertia calculated by the inertia torque calculation unit 94p. , the target torque TgtAm of the arm 205 is calculated.
  • the target thrust calculation unit 94r calculates the target thrust F TgtAm of the arm cylinder 205a based on the target torque T TgtAm calculated by the target torque calculation unit 94q, the output values of the inertial measurement devices 212 to 216, and the vehicle body specification values. .
  • the arm target meter-out pressure calculation unit 94s is based on the target thrust F TgtAm of the arm cylinder 205a calculated by the target thrust calculation unit 94r and the arm meter-in pressure P MIAm obtained from the output value of the pressure sensor 88 (89). Calculate arm target meter-out pressure P MOTgtAm .
  • the arm regeneration control valve target opening calculation section 94t calculates the arm target meter-out pressure P MOTgtAm calculated by the arm target meter-out pressure calculation section 94s and the arm meter-out pressure P MOAm obtained from the output value of the pressure sensor 88 (89).
  • a target opening area A TgtMOAm of the arm regeneration control valve 34 is calculated based on .
  • the arm regeneration control valve control command output unit 94u outputs the arm regeneration control valve 34 calculated by the arm regeneration control valve target opening calculation unit 94t according to the command electric signal characteristic of the electromagnetic valve with respect to the preset opening area of the arm regeneration control valve.
  • a command signal (arm regeneration control valve control command signal) corresponding to the target opening area A TgtMOAm is output to the solenoid valve 93g.
  • the bleed-off valve control command output unit 94v follows the preset electromagnetic valve command signal characteristics for the opening areas of the bleed-off valves 35 to 37, and the target opening area A TgtBO calculated by the bleed-off valve target opening calculation unit 94e. command signal (bleed-off valve control command signal) to the solenoid valve 93f.
  • FIG. 6 is a flow chart showing processing related to pump flow rate control by the controller 94 . Below, only the processing related to flow rate control of the second hydraulic pump 2 will be described. Since other processes related to flow rate control of the hydraulic pumps 1 and 3 are the same as those described above, description thereof will be omitted.
  • the controller 94 first determines whether or not there is an operation lever input (step S101).
  • the operation lever input here is an operation lever input corresponding to the actuators 204 a and 205 a connected to the pump line 60 of the second hydraulic pump 2 . If it is determined in step S101 that there is no operation lever input (YES), the flow ends.
  • step S101 If it is determined in step S101 that there is an operation lever input (NO), the boom target flow rate calculation unit 94a calculates the boom target flow rate corresponding to the operation lever input amount according to the boom target flow rate characteristic with respect to the operation lever input amount set in advance.
  • Q TgtBm is calculated (step S102A).
  • the arm target flow rate calculation unit 94b calculates the arm target flow rate Q TgtAm corresponding to the operation lever input amount according to preset arm target flow rate characteristics for the operation lever input amount (step S102B). Although not shown, target flow rates are similarly calculated for other actuators connected to the pump line 50 of the second hydraulic pump 2 .
  • the arm estimated regeneration flow rate calculation unit 94c calculates arm meter-in pressure P MIAm and arm meter-out pressure P MOAm obtained from the output values of the pressure sensors 88 and 89, and the opening area of the arm regeneration valve 33.
  • An arm estimated regeneration flow rate Q EstRegAm is calculated (step S103).
  • the arm corrected target flow rate calculator 94d uses the arm target flow rate Q TgtAm calculated by the arm target flow rate calculator 94b and the arm estimated regeneration flow rate Q EstRegAm calculated by the arm estimated regeneration flow rate calculator 94c. Then, the arm corrected target flow rate Q ModiTgtAm is calculated from Equation 1 (step S104).
  • the estimated bleed-off flow rate calculator 94f calculates the target opening area A TgtBO of the bleed-off valve 36 calculated by the bleed-off valve target opening calculator 94e and the pressure sensor 85. Using the pump pressure P Pmp2 obtained from the output value, the estimated bleed-off flow rate Q EstBO is calculated from Equation 2 (step S105).
  • Cd is the flow coefficient
  • P Tank is the tank pressure
  • is the hydraulic fluid density
  • the pump target flow rate calculation unit 94g calculates the pump target flow rate Q TgtPmp by Equation 3 using the boom target flow rate Q TgtBm , the arm corrected target flow rate Q ModiTgtAm , and the estimated bleed-off flow rate Q EstBO . Calculate (step S106).
  • the pump control command output unit 94h generates a command signal ( pump flow rate control command signal) to the solenoid valve 93a for controlling the pump flow rate of the second hydraulic pump 2 (step S107).
  • step S107 the electromagnetic valve 93a for controlling the pump flow rate of the second hydraulic pump 2 is caused to generate a command pressure (step S108), and the tilting of the second hydraulic pump 2 is changed according to the command pressure (step S109 ) to end the flow.
  • FIG. 7 is a flowchart showing processing related to opening control of the boom direction control valves 9, 10, and 15 of the controller 94.
  • the controller 94 first determines whether or not there is a boom operation lever input (step S201). If it is determined in step S201 that there is no boom operation lever input (YES), the flow ends.
  • step S201 If it is determined in step S201 that there is a boom operation lever input (NO), the boom target flow rate calculation unit 94a calculates a value according to the boom operation lever input amount according to the boom target flow rate characteristic with respect to the boom operation lever input amount set in advance. A boom target flow rate Q TgtBm is calculated (step S202).
  • the pressure state determination unit 94i determines the differential pressure (the first It is determined whether or not the differential pressure across the 2-boom direction control valve 10) is smaller than the threshold ⁇ (step S203).
  • the threshold ⁇ is set to, for example, the minimum value of the differential pressure across the directional control valve that can ensure flow rate control accuracy.
  • step S203 If it is determined in step S203 that the differential pressure (P Pmp2 ⁇ P MIBm ) is equal to or greater than the threshold value ⁇ (NO), the boom directional control valve target meter-in opening calculation section 94j determines that the boom target flow rate calculation section 94a Using the boom target flow rate Q TgtBm , the pump pressure P Pmp2 of the second hydraulic pump 2 obtained from the output value of the pressure sensor 85, and the boom meter-in pressure P MIBm obtained from the output value of the pressure sensor 86 (87), the formula 4, the target meter-in opening area A TgtMIBm of the second boom direction control valve 10 is calculated (step S204).
  • step S203 If it is determined in step S203 that the differential pressure (P Pmp2 ⁇ P MIBm ) is smaller than the threshold value ⁇ (YES), the boom direction control valve target meter-in opening calculation unit 94j calculates the differential pressure (P Pmp2 ⁇ P MIBm ) , the target meter-in opening area A TgtMIBm (step S205) as in step S204.
  • the boom direction control valve control command output unit 94k calculates the target meter-in opening of the boom direction control valve according to the electromagnetic valve command signal characteristic for the preset meter-in opening area of the second boom direction control valve 10.
  • a command signal (boom direction control valve control command signal) corresponding to the target meter-in opening area ATgtMIBm calculated in the section 94j is output to the electromagnetic valve 93b (93c) for the second boom direction control valve 10 (step S206).
  • step S206 the electromagnetic valve 93b (93c) for the second boom direction control valve 10 is caused to generate a command pressure (step S207), and the second boom direction control valve 10 is opened according to the command pressure (step S208). ) to end the flow.
  • FIG. 8 is a flow chart showing processing related to opening control of the arm direction control valves 8 and 11 of the controller 94 . Only processing related to opening control of the first arm direction control valve 11 will be described below. Since the processing related to the opening control of the second arm direction control valve 8 is the same as this, the explanation is omitted.
  • the controller 94 first determines whether or not there is an arm operation lever input (step S301). If it is determined in step S301 that there is no arm operation lever input (YES), the flow ends.
  • the arm target flow rate calculation unit 94b calculates a value corresponding to the arm operation lever input amount according to the arm target flow rate characteristic with respect to the arm operation lever input amount set in advance.
  • An arm target flow rate Q TgtAm is calculated (step S302).
  • step S302 the pressure state determination unit 94i determines the differential pressure ( second It is determined whether or not the differential pressure across the one-arm directional control valve 11) is smaller than the threshold ⁇ (step S303).
  • step S303 If it is determined in step S303 that the differential pressure (P Pmp2 ⁇ P MIAm ) is equal to or greater than the threshold value ⁇ (NO), the arm directional control valve target meter-in opening calculation section 94l calculates the target flow rate calculated by the arm target flow rate calculation section 94b.
  • the arm target flow rate Q TgtAm the pump pressure P Pmp2 of the second hydraulic pump 2 obtained from the output value of the pressure sensor 85, and the arm meter-in pressure P MIAm obtained from the output value of the pressure sensor 88 (89)
  • the equation 5 the target meter-in opening area A TgtMIAm of the first arm directional control valve 11 is calculated (step S304).
  • step S303 If it is determined in step S303 that the differential pressure (P Pmp2 ⁇ P MIAm ) is smaller than the threshold value ⁇ (YES), the arm directional control valve target meter-in opening calculator 94l calculates the differential pressure (P Pmp2 ⁇ P MIAm ) , the target meter-in opening area A TgtMIAm (step S305) in the same manner as in step S304.
  • the arm directional control valve control command output unit 94m calculates arm directional control valve target meter-in opening in accordance with the preset electromagnetic valve command signal characteristics for the meter-in opening area of the first arm directional control valve 11.
  • a command signal (arm directional control valve control command signal) corresponding to the target meter-in opening area ATgtMIAm calculated in the section 94l is output to the electromagnetic valve 93d (93e) for the first arm directional control valve 11 (step S306).
  • step S306 the solenoid valve 93d (93e) for the first arm direction control valve 11 is caused to generate a command pressure (step S307), and the first arm direction control valve 11 is opened according to the command pressure (step S308). ) to end the flow.
  • FIG. 9 is a flow chart showing processing related to opening control of the arm regeneration control valve 34 of the controller 94 .
  • the controller 94 first determines whether or not there is an arm operation lever input (step S401). If it is determined in step S401 that there is no arm operation lever input (YES), the flow ends.
  • step S401 When it is determined that there is an arm operation lever input (NO) in step S401, the required torque calculation unit 94n calculates the amount of arm operation lever input in accordance with the arm required torque characteristic for the preset arm operation amount lever input amount. An arm request torque T ReqAm is calculated (step S402).
  • step S403 the gravitational torque calculator 94o converts the gravitational component of the arm moment to the gravitational torque T Gravity is calculated (step S403).
  • the inertia torque calculation unit 94p sets the inertia component of the arm moment as the inertia torque T Inertia based on the gravitational torque T Gravity calculated by the gravitational torque calculation unit 94o and the output values of the inertial measurement devices 212 to 216. Calculate (step S404).
  • the target torque calculator 94q calculates the arm requested torque T ReqAm calculated by the requested torque calculator 94n, the gravitational torque T Gravity calculated by the gravitational torque calculator 94o, and the inertia torque calculator 94p.
  • Arm target torque T TgtAm is calculated from Equation 6 using the inertia torque T Inertia calculated in step S405.
  • the target thrust calculation unit 94r calculates the target thrust of the arm cylinder 205a based on the arm target torque T TgtAm calculated by the target torque calculation unit 94q, the output values of the inertial measurement devices 212 to 216, and the vehicle body specification values. FTgtAm is calculated (step S406).
  • the arm target meter-out pressure calculation unit 94s uses the target thrust F TgtAm calculated by the target thrust calculation unit 94r and the arm meter-in pressure P MIAm obtained from the output value of the pressure sensor 88 (89). , the arm target meter-out pressure P MOTgtAm is calculated from Equation 7 (step S407).
  • SMIAm is the pressure receiving area on the meter-in side of the arm cylinder 205a
  • SMOAm is the pressure receiving area on the meter-out side of the arm cylinder 205a.
  • the arm regeneration control valve target opening calculation unit 94t calculates the arm target meter-out pressure P TgtMOAm calculated by the arm target meter-out pressure calculation unit 94s and the arm meter obtained from the output value of the pressure sensor 89 (88).
  • a target opening area A TgtMOAm of the arm regeneration control valve 34 is calculated so that the difference from the out pressure P MOAm becomes small (step S408).
  • the arm regeneration control valve control command output unit 94u outputs the target calculated by the arm regeneration control valve target opening calculation unit 94t in accordance with the electromagnetic valve command signal characteristics for the opening area of the arm regeneration control valve 34 set in advance.
  • a command signal (arm regeneration control valve control command signal) corresponding to the opening area ATgtMOAm is output to the electromagnetic valve 93g for the arm regeneration control valve 34 (step S409).
  • step S410 the electromagnetic valve 93g is caused to generate a command pressure for the arm regeneration control valve 34 (step S410), the arm regeneration control valve 34 is opened according to the command pressure (step S411), and the flow ends.
  • FIG. 10 is a flowchart showing processing related to opening control of the bleed-off valves 35 to 37 of the controller 94.
  • FIG. Below, only processing related to opening control of the bleed-off valve 36 connected to the pump line 50 of the second hydraulic pump 2 will be described. Other processes related to the control of the opening of the bleed-off valve are the same as this, so description thereof will be omitted.
  • the controller 94 first determines whether or not there is an operation lever input (step S501).
  • the operation lever input here is an operation lever input corresponding to the actuators 204 a and 205 a connected to the pump line 50 of the second hydraulic pump 2 . If it is determined in step S501 that there is no operation lever input (YES), the flow ends.
  • step S501 If it is determined in step S501 that there is an operation lever input (NO), the bleed-off valve target opening calculation unit 94e calculates the bleed-off valve 36 corresponding to the maximum operation lever input amount according to the bleed-off valve opening characteristic shown in FIG. A target opening area A TgtBO is calculated (step S502).
  • the maximum operation lever input amount referred to here is the maximum value of each operation lever input amount corresponding to the actuators 204 a and 205 a connected to the pump line 50 of the second hydraulic pump 2 .
  • the bleed-off valve control command output unit 94v outputs a command signal ( bleed-off valve control command signal) to the electromagnetic valve 93f for the bleed-off valve 36 (step S503).
  • step S503 the electromagnetic valve 93f is caused to generate a command pressure for the bleed-off valve 36 (step S504), the bleed-off valve 36 is opened according to the command pressure (step S505), and the flow ends.
  • the controller 94 calculates the pump target flow rate Q TgtPmp of the second hydraulic pump 2 based on the input amounts of the boom control lever 95a and the arm control lever 95b, and outputs a command signal (pump flow control command signal) corresponding to the pump target flow rate Q TgtPmp . ) to the electromagnetic valve 93a.
  • the electromagnetic valve 93 a generates a command pressure according to the pump flow rate control command signal and drives the discharge flow rate of the second hydraulic pump 2 .
  • the controller 94 controls the boom target flow rate Q TgtBm calculated based on the input amount of the boom operating lever 95a, the pump pressure P Pmp2 detected by the pressure sensor 85, and the boom meter-in detected by the pressure sensor 86 (87).
  • a target meter-in opening area A TgtMIBm is calculated based on the pressure P MIBm , and a command signal (boom direction control valve control command signal) corresponding to the target meter-in opening area A TgtMIBm is output to the solenoid valve 93b (93c).
  • the solenoid valve 93 b ( 93 c ) generates command pressure according to the boom direction control valve control command signal and controls the meter-in opening area of the second boom direction control valve 10 .
  • the controller 94 controls the arm target flow rate Q TgtAm calculated based on the input amount of the arm operating lever 95b, the pump pressure P Pmp2 detected by the pressure sensor 85, and the arm meter-in detected by the pressure sensor 88 (89).
  • a target meter-in opening area A TgtMIAm is calculated based on the pressure P MIAm , and a command signal (arm direction control valve control command signal) corresponding to the target meter-in opening area A TgtMIAm is output to the solenoid valve 93d (93e).
  • the solenoid valve 93 d ( 93 e ) generates command pressure according to the arm direction control valve control command signal, and controls the meter-in opening area of the first arm direction control valve 11 .
  • the controller 94 controls the target torque TgtAm calculated from the input amount of the arm control lever 95b, the gravitational torque T Gravity and the inertia torque T Inertia of the vehicle body, the arm meter pressure P MIAm detected by the pressure sensors 88 and 89, and the arm A target opening area A TgtMOAm of the arm regeneration control valve 34 is calculated based on the meter-out pressure P MOAm , and a command signal (arm regeneration control valve control command signal) corresponding to the target opening area A TgtMOAm is output to the solenoid valve 93g. .
  • the solenoid valve 93g generates a command pressure according to the arm regeneration control valve control command signal, and controls the opening area of the arm regeneration control valve 34 .
  • the controller 94 calculates the target opening area A TgtBO of the bleed-off valve 36 based on the input amounts of the boom control lever 95a and the arm control lever 95b, and outputs a command signal (bleed-off valve control command signal) corresponding to the target opening area A TgtBO . ) to the solenoid valve 93f.
  • the solenoid valve 93f generates a command pressure according to the bleed-off valve control command signal and controls the opening area of the bleed-off valve 36.
  • a vehicle body 202 In this embodiment, a vehicle body 202, a work device 203 attached to the vehicle body 202, a hydraulic oil tank 5, a variable displacement hydraulic pump 2 that sucks and discharges hydraulic oil from the hydraulic oil tank 5, and the hydraulic pump 2 a plurality of actuators 204a and 205a for driving the working device 203; and a plurality of directional control valves 10 for controlling the flow of pressure oil supplied from the hydraulic pump 2 to the plurality of actuators 204a and 205a. , 11, operating devices 95a and 95b for instructing the operation of the plurality of actuators 204a and 205a, and a meter-out passage connecting a specific directional control valve 11 among the plurality of directional control valves 10 and 11 to the hydraulic oil tank 5.
  • the regeneration valve 33 that joins the return oil of the specific actuator 205a corresponding to the meter-out flow path 75 to the meter-in flow path 54 and the regeneration flow path 76 in the meter-out flow path 75 are provided downstream of the branch point.
  • a regeneration control valve 34 that controls the flow rate through the regeneration valve 33 by adjusting the flow rate returned to the hydraulic oil tank 5 from a specific actuator 205a;
  • a first pressure sensor 85 that detects the pump pressure, which is the discharge pressure of the hydraulic pump 2, and a plurality of actuators 204a.
  • the plurality of directional control valves 10 and 11 are each formed by the same valve body and the same housing so that the meter-in opening area is smaller than the meter-out opening area with respect to valve displacement, and the controller 94
  • Actuator target flow rates Q TgtBm and Q TgtAm which are target values for the flow rates of pressure oil supplied from the hydraulic pump 2 to the plurality of actuators 204 a and 205 a, are calculated based on the input amounts of the operation devices 95 a and 95 b.
  • the estimated regeneration flow rate Q EstRegAm which is an estimated value of the flow rate through the regeneration valve 33, is calculated, and the actuator target flow rate Q TgtBm , Based on Q TgtAm and the estimated regeneration flow rate Q EstRegAm , a pump target flow rate Q TgtPmp , which is a target value for the discharge flow rate of the hydraulic pump 2, is calculated, and actuator target flow rates Q TgtBm and Q TgtAm , pump pressure P Pmp2 and meter-in pressure P are calculated.
  • the target meter-in opening areas A TgtMIBm and A TgtMIAm which are the target values of the meter-in opening areas of the plurality of directional control valves 10 and 11, are calculated, and the input amount of the operation device 95b and the attitude sensor 212- 216, the target thrust F TgtAm , which is the target value of the thrust of the specific actuator 205a, is calculated, and based on the target thrust F TgtAm and the meter-in pressure P MIAm of the specific actuator 205a, the specific actuator A target meter-out pressure P MOTgtAm , which is a target value of the meter-out pressure P MOAm of 205a, is calculated, and the regeneration control valve 34 is opened based on the target meter-out pressure P MOTgtAm and the meter-out pressure P MOAm of a specific actuator 205a.
  • a regeneration control valve target opening area A TgtMOAm which is a target area value, is calculated, the regulator 2a is controlled according to the pump target flow rate Q TgtPmp , and a plurality of directional control valves 10 are controlled according to the target meter-in opening areas A TgtMIBm and A TgtMIAm . , 11 to control the regeneration control valve 34 according to the regeneration control valve target opening area ATgtMOAm .
  • each directional control valve 10 , 11 when the arm cylinder 205a (the specific actuator that regenerates return oil) and the boom cylinder 204a (another actuator) are operated simultaneously, each directional control valve 10 , 11, the target flow rate can be supplied to each actuator 204a, 205a. Further, by adjusting the meter-out opening of the arm direction control valve 11 and inputting a target thrust to the arm cylinder 205a, it is possible to prevent overshoot due to the inertia of the non-driving member (arm 205). Further, the directional control valves 10 and 11 have a simple configuration in which the meter-in opening area and the meter-out opening area are formed by the same valve body and the same housing, so the cost can be suppressed.
  • the working machine 901 in this embodiment includes a bleed-off valve 36 that discharges the hydraulic oil discharged from the hydraulic pump 3 to the hydraulic oil tank 5, and the controller 94 operates based on the input amounts of the operating devices 95a and 95b.
  • the bleed-off valve target opening area A TgtBO which is the target value of the opening area of the bleed-off valve 36, is calculated, and the passing flow rate of the bleed-off valve 36 is calculated based on the bleed-off valve target opening area A TgtBO and the pump pressure P Pmp2 , and the pump target flow rate Q TgtPmp is calculated based on the actuator target flow rates Q TgtBm and Q TgtAm , the estimated regeneration flow rate Q EstRegAm , and the estimated bleed-off flow rate Q EstBO .
  • the actuators 204a and 205a are started to operate, the surplus of the oil discharged from the hydraulic pump 3 is discharged to the hydraulic oil tank 5, so that the actuators 204a and 205
  • Reference Signs List 1 first hydraulic pump 1a flow control command pressure port (regulator) 2 second hydraulic pump 2a flow control command pressure port (regulator) 3 third hydraulic pump 3a flow control command pressure port (Regulator) 5...Hydraulic oil tank 6...Travel right directional control valve 7...Bucket directional control valve 8...Second arm directional control valve 9...First boom directional control valve 10...Second boom directional control Valves 10a, 10b... Pilot port 11... First arm directional control valve 11a, 11b... Pilot port 12... First attachment directional control valve 13... Traveling left directional control valve 14...

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

本発明は、戻り油を再生する特定のアクチュエータとその他のアクチュエータとを同時に駆動する複合操作時に、各アクチュエータの速度制御と特定のアクチュエータの推力制御とを簡素な構成で行うことが可能な作業機械を提供することを目的とする。そのために、コントローラは、操作装置の入力量と姿勢センサの出力値とを基に、特定のアクチュエータの推力の目標値である目標推力を算出し、前記目標推力と前記特定のアクチュエータのメータイン圧とを基に、前記特定のアクチュエータのメータアウト圧の目標値である目標メータアウト圧を算出し、前記目標メータアウト圧と前記特定のアクチュエータのメータアウト圧とを基に、再生制御弁の開口面積の目標値である再生制御弁目標開口面積を算出する。

Description

作業機械
 本発明は、油圧ショベル等の作業機械に関するものである。
 一般に、例えば油圧ショベル等の作業機械には種々の油圧アクチュエータが設けられるが、このような油圧アクチュエータに対する油給排制御を行うための制御回路として、従来から、一本のスプール弁で、油圧アクチュエータに対する作動油の給排方向を切り換える方向切換制御と、油圧ポンプから油圧アクチュエータへの供給流量を制御するメータイン開口制御と、油圧アクチュエータから作動油タンクへの排出流量を制御するメータアウト開口制御とを行うように構成したものが広く知られている。また、油圧アクチュエータの一方の油室から排出される油(戻り油)を直接他方の油室へ供給(再生)する制御回路が知られている。
 油圧アクチュエータのメータイン開口制御とメータアウト開口制御とを一本のスプール弁で行う制御回路の場合、当該スプール弁の移動位置に対するメータイン側の開口面積とメータアウト側の開口面積との関係が一意的に決まってしまう。それゆえ、1つの油圧アクチュエータを単独で駆動させる単独動作や複数の油圧アクチュエータを同時に駆動させる複合動作、あるいは軽作業や重作業等の種々の作業内容に応じてメータイン側の開口面積とメータアウト側の開口面積との関係を変更させることができず、メータイン開口制御によりアクチュエータへの供給流量を制御する際、または、メータアウト開口制御によりアクチュエータからの排出流量を制御する際に、一方の開口制御が他方の開口制御に干渉してしまい、操作性が低下してしまう可能性がある。
 そこで、従来、油圧アクチュエータに対する油給排制御を、油圧ポンプから油圧シリンダのヘッド側油室、ロッド側油室への供給流量をそれぞれ制御するヘッド側、ロッド側供給弁(ヘッドエンド、ロッドエンド供給弁)と、ヘッド側油室、ロッド側油室から油タンクへの排出流量をそれぞれ制御するヘッド側、ロッド側排出弁(ヘッドエンド、ロッドエンドドレン弁)との4つのメータリングバルブを用いて形成したブリッジ回路により行う制御回路が知られている(例えば、特許文献1)。当該制御回路では、4つのメータリングバルブがコントローラからの指令に基づいて個別に作動するため、作業内容等に応じてメータイン開口とメータアウト開口との関係を容易に変更することが可能である。
 また、前述した方向切換制御とメータイン開口制御とメータアウト開口制御とを一本のスプール弁で行う方向切換弁の上流側に可変抵抗機能を有する補助弁を配し、当該補助弁により単独動作や複合動作等の作業内容等に応じて方向切換弁に対する圧油供給を補助的に行う制御回路も知られている(例えば、特許文献2)。
特許第5214450号公報 特許第3511425号公報
 特許文献1の制御回路では、1つのアクチュエータに対する油給排制御を4つのメータリングバルブで行うため、メータイン開口制御によるアクチュエータの速度制御とメータアウト開口制御によるアクチュエータの推力制御とを両立させることができると考えられる。しかしながら、当該制御回路は、4つのメータリングバルブをそれぞれ構成する4つのスプール(またはポペット)に加え、各スプールを駆動するための4つの駆動装置(特許文献1においてはソレノイド)を必要とするため、回路の複雑化および部品点数の増加によりコストが増大するという課題がある。また、特許文献1には、戻り油を再生させるアクチュエータのメータイン開口制御およびメータアウト開口制御に関する記載はない。
 一方、特許文献2の制御回路においては、補助弁によって複合動作時に各アクチュエータへの圧油配分や優先度合いを制御することはできるものの、1つの方向切換弁で油圧アクチュエータに対するメータイン開口制御とメータアウト開口制御を行うことは従来通りであるため、一方の開口制御に他方の開口制御が干渉してしまうという問題は依然として解消されない。そのため、メータイン開口制御によるアクチュエータの速度制御とメータアウト開口制御によるアクチュエータの推力制御とを両立させることができない。
 本発明は、上記の課題に鑑みてなされたものであり、その目的は、戻り油を再生する特定のアクチュエータとその他のアクチュエータとを同時に駆動する複合操作時に、各アクチュエータの速度制御と特定のアクチュエータの推力制御とを簡素な構成で行うことが可能な作業機械を提供することにある。
 上記目的を達成するために、本発明は、車体と、前記車体に取り付けられた作業装置と、作動油タンクと、前記作動油タンクから作動油を吸い込んで吐出する可変容量型の油圧ポンプと、前記油圧ポンプの容量を制御するレギュレータと、前記作業装置を駆動する複数のアクチュエータと、前記油圧ポンプから前記複数のアクチュエータに供給される圧油の流れを制御する複数の方向制御弁と、前記複数のアクチュエータの動作を指示する操作装置と、前記複数の方向制御弁のうち特定の方向制御弁を前記作動油タンクに接続するメータアウト流路と前記特定の方向制御弁を前記油圧ポンプに接続するメータイン流路とを接続する再生流路と、前記再生流路に設けられ、前記複数のアクチュエータのうち前記特定の方向制御弁に対応する特定のアクチュエータの戻り油を前記メータアウト流路から前記メータイン流路へ合流させる再生弁と、前記メータアウト流路のうち前記再生流路との分岐点よりも下流に設けられ、前記特定のアクチュエータから前記作動油タンクに戻される流量を調整することにより前記再生弁の通過流量を制御する再生制御弁と、前記操作装置の入力量に応じて前記レギュレータ、前記複数の方向制御弁、および前記再生制御弁を制御するコントローラとを備えた作業機械において、前記油圧ポンプの吐出圧であるポンプ圧を検出する第1圧力センサと、前記複数のアクチュエータのメータイン圧およびメータアウト圧を検出する第2圧力センサと、前記車体および前記作業装置の姿勢および動作状態を検出する姿勢センサとを備え、前記複数の方向制御弁は、それぞれ、同一弁体および同一ハウジングにより、弁変位に対してメータイン開口面積がメータアウト開口面積よりも小さくなるように形成され、前記コントローラは、前記操作装置の入力量を基に、前記油圧ポンプから前記複数のアクチュエータに供給される圧油の流量の目標値であるアクチュエータ目標流量を算出し、前記再生弁の開口面積と前記特定のアクチュエータのメータイン圧およびメータアウト圧とを基に、前記再生弁の通過流量の推定値である推定再生流量を算出し、前記アクチュエータ目標流量と前記推定再生流量とを基に、前記油圧ポンプの吐出流量の目標値であるポンプ目標流量を算出し、前記アクチュエータ目標流量と前記ポンプ圧と前記メータイン圧とを基に、前記複数の方向制御弁のメータイン開口面積の目標値である目標メータイン開口面積を算出し、前記操作装置の入力量と前記姿勢センサの出力値とを基に、前記特定のアクチュエータの推力の目標値である目標推力を算出し、前記目標推力と前記特定のアクチュエータのメータイン圧とを基に、前記特定のアクチュエータのメータアウト圧の目標値である目標メータアウト圧を算出し、前記目標メータアウト圧と前記特定のアクチュエータのメータアウト圧とを基に、前記再生制御弁の開口面積の目標値である再生制御弁目標開口面積を算出し、前記ポンプ目標流量に応じて前記レギュレータを制御し、前記目標メータイン開口面積に応じて前記複数の方向制御弁を制御し、前記再生制御弁目標開口面積に応じて前記再生制御弁を制御するものとする。
 以上のように構成した本発明によれば、戻り油を再生する特定のアクチュエータとその他のアクチュエータとを同時に駆動する複合操作時に、各方向制御弁の前後差圧に応じて各メータイン開口を調整することにより、目標通りの流量を各アクチュエータに供給することができる。また、特定の方向制御弁のメータアウト開口を調整して目標通りの推力を特定のアクチュエータに入力することにより、非駆動部材の慣性による行き過ぎなどを防止することができる。そして、各方向制御弁は、メータイン開口面積およびメータアウト開口面積が同一弁体および同一ハウジングにより形成される簡素な構成であるため、コストを抑制することができる。これにより、戻り油を再生する特定のアクチュエータとその他のアクチュエータとを同時に駆動する複合操作時に、各アクチュエータアクチュエータの速度制御と特定のアクチュエータの推力制御とを簡素な構成で行うことが可能となる。
 本発明に係る作業機械によれば、戻り油を再生する特定のアクチュエータとその他のアクチュエータとを同時に駆動する複合操作時に、特定のアクチュエータおよびその他のアクチュエータの速度制御と特定のアクチュエータの推力制御とを簡素な構成で行うことが可能となる。
本発明の実施形態に係る油圧ショベルの側面図である。 図1に示す油圧ショベルに搭載される油圧駆動装置の回路図(1/2)である。 図1に示す油圧ショベルに搭載される油圧駆動装置の回路図(2/2)である。 図2Aに示す方向制御弁の開口特性を示す図である。 図2Aに示すブリードオフ弁の開口特性を示す図である。 図2Bに示すコントローラの機能ブロック図 図2Bに示すコントローラのポンプ流量制御に関わる処理を示すフローチャートである。 図2Bに示すコントローラのブーム方向制御弁の開口制御に関わる処理を示すフローチャートである。 図2Bに示すコントローラのアーム方向制御弁の開口制御に関わる処理を示すフローチャートである。 図2Bに示すコントローラのアーム再生制御弁の開口制御に関わる処理を示すフローチャートである。 図2Bに示すコントローラのブリードオフ弁の開口制御に関わる処理を示すフローチャートである。
 以下、本発明の実施形態に係る作業機械として油圧ショベルを例に挙げ、図面を参照して説明する。なお、各図中、同等の部材には同一の符号を付し、重複した説明は適宜省略する。
 図1は、本実施形態に係る油圧ショベルの側面図である。図1に示すように、油圧ショベル901は、走行体201と、走行体201上に旋回可能に配置され、車体を構成する旋回体202と、旋回体202に上下方向に回動可能に取り付けられ、土砂の掘削作業等を行う作業装置203とを備えている。旋回体202は、旋回モータ211によって駆動される。
 作業装置203は、旋回体202に上下方向に回動可能に取り付けられたブーム204と、ブーム204の先端に上下方向に回動可能に取り付けられたアーム205と、アーム205の先端に上下方向に回動可能に取り付けられたバケット206と、ブーム204を駆動するアクチュエータであるブームシリンダ204aと、アーム205を駆動するアクチュエータであるアームシリンダ205aと、バケット206を駆動するアクチュエータであるバケットシリンダ206aとを有する。作業装置203には、ブーム204、アーム205、バケット206の姿勢および動作状態を検出するための慣性計測装置212,213,214が設置されている。旋回体202には、旋回体202の姿勢や回転速度を検出するための慣性計測装置215,216が設置されている。すなわち、本実施形態における慣性計測装置212~216は、旋回体202および作業装置203の姿勢および動作状態を検出する姿勢センサを構成している。
 旋回体202上の前側位置には運転室207が設けられており、後側位置には車体の重量バランスを確保するためのカウンタウエイト209が取り付けられている。運転室207とカウンタウエイト209の間には、機械室208が設けられている。機械室208には、エンジン(図示せず)、コントロールバルブ210、旋回モータ211、油圧ポンプ1~3(図2Aに示す)等が収容されている。コントロールバルブ210は、油圧ポンプから各アクチュエータへの作動油の流れを制御する。
 図2Aおよび図2Bは、油圧ショベル901に搭載される油圧駆動装置の回路図である。
 (構成)
 油圧駆動装置902は、3つの主油圧ポンプ(例えば、可変容量形油圧ポンプからなる第1油圧ポンプ1、第2油圧ポンプ2、および第3油圧ポンプ3)と、パイロットポンプ91と、油圧ポンプ1~3およびパイロットポンプ91に油を供給する作動油タンク5とを備える。油圧ポンプ1~3およびパイロットポンプ91は、エンジン(図示せず)によって駆動される。
 第1油圧ポンプ1の傾転角は、第1油圧ポンプ1に付設したレギュレータによって制御される。第1油圧ポンプ1のレギュレータは、流量制御指令圧ポート1aを有し、流量制御指令圧ポート1aに作用する指令圧により駆動される。第2油圧ポンプ2の傾転角は、第2油圧ポンプ2に付設したレギュレータによって制御される。第2油圧ポンプ2のレギュレータは、流量制御指令圧ポート2aを有し、流量制御指令圧ポート2aに作用する指令圧により駆動される。第3油圧ポンプ3の傾転角は、第3油圧ポンプ3に付設したレギュレータによって制御される。第3油圧ポンプ3のレギュレータは、流量制御指令圧ポート3aを有し、流量制御指令圧ポート3aに作用する指令圧により駆動される。
 第1油圧ポンプ1のポンプライン40には、走行右方向制御弁6、バケット方向制御弁7、第2アーム方向制御弁8、および第1ブーム方向制御弁9がそれぞれメータイン流路41,42、メータイン流路43,44、およびメータイン流路45,46、メータイン流路47,48を介してパラレルに接続される。メータイン流路41,42、メータイン流路43,44、およびメータイン流路45,46、メータイン流路47,48には、ポンプライン40への圧油の逆流を防止するために、チェック弁21~24がそれぞれ配置されている。走行右方向制御弁6は、第1油圧ポンプ1から、走行体201を駆動する一対の走行モータのうちの図示しない走行右モータに供給される圧油の流れを制御する。バケット方向制御弁7は、第1油圧ポンプ1からバケットシリンダ206aに供給される圧油の流れを制御する。第2アーム方向制御弁8は、第1油圧ポンプ1からアームシリンダ205aに供給される圧油の流れを制御する。第1ブーム方向制御弁9は、第1油圧ポンプ1からブームシリンダ204aに供給される圧油の流れを制御する。ポンプライン40は、過剰な圧力上昇から回路を保護するために、メインリリーフ弁18を介して作動油タンク5に接続される。ポンプライン40は、油圧ポンプ1の余剰な吐出油を排出するために、ブリードオフ弁35を介して作動油タンク5に接続される。
 第2油圧ポンプ2のポンプライン50には、第2ブーム方向制御弁10、第1アーム方向制御弁11、第1アタッチメント方向制御弁12、および走行左方向制御弁13がそれぞれメータイン流路51,52、メータイン流路53,54、メータイン流路55,56、およびメータイン流路57,58を介してパラレルに接続される。メータイン流路51,52、メータイン流路53,54、メータイン流路55,56、およびメータイン流路57,58には、ポンプライン50への圧油の逆流を防止するために、チェック弁25~28がそれぞれ配置されている。第2ブーム方向制御弁10は、第2油圧ポンプ2からブームシリンダ204aに供給される圧油の流れを制御する。第1アーム方向制御弁11は、第2油圧ポンプ2からアームシリンダ205aに供給される圧油の流れを制御する。第1アタッチメント方向制御弁12は、第2油圧ポンプ2から、例えばバケット206に代えて設けられる小割機等の第1特殊アタッチメントを駆動する図示しない第1アクチュエータに供給される圧油の流れを制御する。走行左方向制御弁13は、第2油圧ポンプ2から、走行体201を駆動する一対の走行モータのうちの図示しない走行左モータに供給される圧油の流れを制御する。ポンプライン50は、過剰な圧力上昇から回路を保護するために、メインリリーフ弁19を介して作動油タンク5に接続される。ポンプライン50は、油圧ポンプ2の余剰な吐出油を排出するために、ブリードオフ弁36を介して作動油タンク5に接続される。ポンプライン50は、第1油圧ポンプ1の吐出油を合流させるために、合流弁17を介してポンプライン40に接続される。ポンプライン50のうちメータイン流路55とメータイン流路57とを接続する部分には、チェック弁32が設けられている。チェック弁32は、第1油圧ポンプ1から合流弁17を介してポンプライン50に合流する圧油が走行左方向制御弁13以外の方向制御弁10~12に流入することを防止する。第1アーム方向制御弁11のメータアウト側ポートはメータアウト流路75を介して作動油タンク5に接続される。メータアウト流路75は、アーム再生流路76を介してメータイン流路54に接続されている。アーム再生流路76には、メータアウト流路75からメータイン流路54への流れを許容するアーム再生弁33が設けられている。メータアウト流路75のアーム再生弁33との分岐点よりも下流には、アームシリンダ205aから作動油タンク5に戻される流量を調整することにより前記再生弁の通過流量を制御する再生制御弁とアーム再生制御弁34が設置されている。
 第3油圧ポンプ3のポンプライン60には、旋回方向制御弁14、第3ブーム方向制御弁15、および第2アタッチメント方向制御弁16がそれぞれメータイン流路61,62、メータイン流路63,64、およびメータイン流路65,66を介してパラレルに接続される。メータイン流路61,62、メータイン流路63,64、およびメータイン流路65,66には、ポンプライン60への圧油の逆流を防止するために、チェック弁29~31がそれぞれ配置されている。旋回方向制御弁14は、第3油圧ポンプ3から旋回モータ211に供給される圧油の流れを制御する。第3ブーム方向制御弁15は、第3油圧ポンプ3からブームシリンダ204aに供給される圧油の流れを制御する。第2アタッチメント方向制御弁16は、第1特殊アタッチメントに加えて第2アクチュエータを備えた第2特殊アタッチメントが装着された際、または、第1特殊アクチュエータに代えて第1アクチュエータと第2アクチュエータの2つのアクチュエータを備えた第2特殊アタッチメントが装着された際に、第2アクチュエータに供給される圧油の流れを制御するために使用される。ポンプライン60は、過剰な圧力上昇から回路を保護するために、メインリリーフ弁20を介して作動油タンク5に接続される。ポンプライン60は、油圧ポンプ3の余剰な吐出油を排出するために、ブリードオフ弁37を介して作動油タンク5に接続される。
 図3に方向制御弁6~16の開口特性を示す。図3において、メータイン開口面積は、スプール変位に応じてゼロから最大開口面積まで増加する。メータアウト開口面積も同様に、スプール変位に応じてゼロから最大開口面積まで増加するが、スプール変位に対してメータイン開口面積よりも小さい値に設定されている。これにより、アクチュエータの駆動速度をメータイン開口で制御することが可能となる。図4にブリードオフ弁35~37の開口特性を示す。図4において、ブリードオフ弁開口面積は、最大操作レバー入力量がゼロから所定値までは最大開口面積となり、最大操作レバー入力量が所定値を超えると急峻にゼロまで減少する。なお、ここでいう最大操作レバー入力量は、当該ブリードオフ弁が接続されているポンプラインに接続された複数のアクチュエータに対応する各操作レバー入力量の最大値である。
 図2Aに戻り、ポンプライン50には、第2油圧ポンプ2の吐出圧(ポンプ圧PPmp2)を検出する圧力センサ85が設けられている。ブームシリンダ204aとブーム方向制御弁9,10,15とを接続する流路73,74には、ブームシリンダ204aのメータイン側の圧力(ブームメータイン圧PMIBm)を検出するための圧力センサ86,87が設けられている。アームシリンダ205aとアーム方向制御弁8,11とを接続する流路71,72には、アームシリンダ205aのメータイン側の圧力(アームメータイン圧PMIAm)およびメータアウト側の圧力(アームメータアウト圧PMOAm)を検出するための圧力センサ88,89が設けられている。圧力センサ85~89の出力値はコントローラ94に入力される。
 図2Bにおいて、パイロットポンプ91の吐出ポートは、パイロット一次圧生成用のパイロットリリーフ弁92を介して作動油タンク5に接続されると共に、流路80を介して、電磁弁ユニット93に内蔵される電磁弁93a~93gの一方の入力ポートに接続される。電磁弁93a~93fの他方の入力ポートは、流路81を介して作動油タンク5に接続される。電磁弁93a~93gは、それぞれ、コントローラ94からの指令信号に応じてパイロット一次圧を減圧し、指令圧として出力する。
 電磁弁93aの出力ポートは、第2油圧ポンプ2のレギュレータの流量制御指令圧ポート2aに接続される。電磁弁93b,93cの出力ポートは、第2ブーム方向制御弁10のパイロットポート10a,10bに接続される。電磁弁93d,93eの出力ポートは、第1アーム方向制御弁11のパイロットポート11a,11bに接続される。電磁弁93fの出力ポートは、ブリードオフ弁36の指令圧ポート36aに接続される。電磁弁93gの出力ポートは、再生制御弁34の指令圧ポート34aに接続される。
 なお、説明を簡略化するため、第1油圧ポンプ1および第3油圧ポンプ3のレギュレータの流量制御指令圧ポート1a,3a用の電磁弁、走行右方向制御弁6用の電磁弁、バケット方向制御弁7用の電磁弁、第2アーム方向制御弁8用の電磁弁、第1ブーム方向制御弁9用の電磁弁、第1アタッチメント方向制御弁12用の電磁弁、走行左方向制御弁13用の電磁弁、旋回用方向制御弁14用の電磁弁、第3ブーム用方向制御弁15用の電磁弁、第2アタッチメント方向制御弁16用の電磁弁、ブリードオフ弁35,37用の電磁弁については、図示を省略している。
 油圧駆動装置902は、第1ブーム方向制御弁9、第2ブーム方向制御弁10、および第3ブーム方向制御弁15を切り換え操作可能なブーム操作レバー95aと、第1アーム方向制御弁11および第2アーム方向制御弁8を切り換え操作可能なアーム操作レバー95bとを備えている。なお、説明を簡略化するため、走行右方向制御弁6を切り換え操作する走行右操作レバー、バケット方向制御弁7切り換え操作するバケット操作レバー、第1アタッチメント方向制御弁12を切り換え操作する第1アタッチメント操作レバー、走行左方向制御弁13を切り換え操作する走行左操作レバー、旋回方向制御弁14を切り換え操作する旋回操作レバー、第2アタッチメント方向制御弁16を切り換え操作する第2アタッチメント操作レバーについては、図示を省略している。
 油圧駆動装置902はコントローラ94を備える。コントローラ94は、操作レバー95a,95bの入力量、慣性計測装置212~216の出力値、および圧力センサ85~89の出力値に応じて、電磁弁ユニット93が有する電磁弁93a~93g(図示しない電磁弁を含む)へ指令信号を出力する。
 図5は、コントローラ94の機能ブロック図である。図5において、コントローラ94は、ブーム目標流量演算部94aと、アーム目標流量演算部94bと、アーム推定再生流量演算部94cと、アーム修正目標流量演算部94dと、ブリードオフ弁目標開口演算部94eと、推定ブリードオフ流量演算部94fと、ポンプ目標流量演算部94gと、ポンプ制御指令出力部94hと、圧力状態判定部94iと、ブーム方向制御弁目標メータイン開口演算部94jと、ブーム方向制御弁制御指令出力部94kと、アーム方向制御弁目標メータイン開口演算部94lと、アーム方向制御弁制御指令出力部94mと、要求トルク演算部94nと、重力トルク演算部94oと、慣性トルク演算部94pと、目標トルク演算部94qと、目標推力演算部94rと、アーム目標メータアウト圧演算部94sと、アーム再生制御弁目標開口演算部94tと、アーム再生制御弁制御指令出力部94uと、ブリードオフ弁制御指令出力部94vとを有する。
 ブーム目標流量演算部94aは、操作レバー入力量を基に、ブームシリンダ204aに供給する流量(ブーム流量)の目標値(ブーム目標流量QTgtBm)を算出する。具体的には、予め設定された操作レバー入力量に対するブーム流量特性に従い、操作レバー入力量に応じたブーム目標流量QTgtBmを算出する。アーム目標流量演算部94bは、操作レバー入力量を基に、アームシリンダ205aに供給する流量(アーム流量)の目標値(アーム目標流量QTgtAm)を算出する。具体的には、予め設定された操作レバー入力量に対するアーム流量特性に従い、操作レバー入力量に応じたアーム目標流量QTgtAmを算出する。
 アーム推定再生流量演算部94cは、圧力センサ88,89の出力値から得られるアームメータイン圧PMIAmおよびアームメータアウト圧PMOAmとアーム再生弁33の開口面積とを基にアーム推定再生流量QEstRegAmを算出する。アーム修正目標流量演算部94dは、アーム目標流量演算部94bで算出されたアーム目標流量QTgtAmとアーム推定再生流量演算部94cで算出されたアーム推定再生流量QEstRegAmとを基にアーム修正目標流量QModiTgtAmを算出する。
 ブリードオフ弁目標開口演算部94eは、操作レバー入力量を基に、ブリードオフ弁35~37の目標開口面積を算出する。具体的には、予め設定された操作レバー入力量に対するブリードオフ弁開口面積特性に従い、操作レバー入力量に応じたブリードオフ弁目標開口面積を算出する。推定ブリードオフ流量演算部94fは、ブリードオフ弁目標開口演算部94eで算出されたブリードオフ弁目標開口面積ATgtBOと圧力センサ85の出力値から得られるポンプ圧PPmp2とを基に推定ブリードオフ流量QEstBOを算出する。
 ポンプ目標流量演算部94gは、ブーム目標流量演算部94aで算出されたブーム目標流量QTgtBmとアーム目標流量演算部94bで算出されたアーム目標流量QTgtAmと推定ブリードオフ流量演算部94fで算出された推定ブリードオフ流量QEstBOとを基にポンプ目標流量QTgtPmpを算出する。ポンプ制御指令出力部94hは、予め設定されたポンプ流量に対する電磁弁指令信号特性に従い、ポンプ目標流量演算部94gで算出されたポンプ目標流量QTgtPmpに応じた指令信号(ポンプ流量制御指令信号)を電磁弁93aへ出力する。
 圧力状態判定部94iは、各アクチュエータラインに設けられた圧力センサの出力値を基に各アクチュエータの方向制御弁の前後差圧が所定の閾値より小さいか否かを判定し、判定結果をブーム方向制御弁目標メータイン開口演算部94jへ出力する。ブーム方向制御弁目標メータイン開口演算部94jは、ブーム目標流量演算部94aで算出されたブーム目標流量と圧力センサ85の出力値から得られるポンプ圧と圧力センサ86(87)の出力値から得られるブームメータイン圧と圧力状態判定部94iから出力された判定結果とを基にブーム方向制御弁9,10,15の目標メータイン開口面積ATgtMIBmを算出する。ブーム方向制御弁制御指令出力部94kは、予め設定されたメータイン開口面積に対する電磁弁指令信号特性に従い、ブーム方向制御弁目標メータイン開口演算部94jで算出された目標メータイン開口面積ATgtMIBmに応じた指令信号(ブーム方向制御弁制御指令信号)を電磁弁93b(93c)へ出力する。
 アーム方向制御弁目標メータイン開口演算部94lは、アーム目標流量演算部94bで算出されたアーム目標流量と圧力センサ85の出力値から得られるポンプ圧と圧力センサ88(89)の出力値から得られるアームメータイン圧と圧力状態判定部94iから出力された判定結果とを基にアーム方向制御弁8,11の目標メータイン開口面積ATgtMIAmを算出する。アーム方向制御弁制御指令出力部94mは、予め設定されたメータイン開口面積に対する電磁弁指令信号特性に従い、アーム方向制御弁目標メータイン開口演算部94lで算出された目標メータイン開口面積ATgtMIAmに応じた指令信号(アーム方向制御弁制御指令信号)を電磁弁93d(93e)へ出力する。
 要求トルク演算部94nは、予め設定されたアーム操作レバー入力量に対するアーム要求トルク特性に従い、アーム操作レバー入力量に応じたアーム205の要求トルクTReqAmを算出する。重力トルク演算部94oは、慣性計測装置212~216の出力値と車体仕様値とを基に、アームモーメントの重力成分を重力トルクTGravityとして算出する。慣性トルク演算部94pは、重力トルク演算部94oで算出された重力トルクTGravityと慣性計測装置212~216の出力値とを基に、アームモーメントの慣性成分を慣性トルクTInertiaとして算出する。目標トルク演算部94qは、要求トルク演算部94nで算出された要求トルクと重力トルク演算部94oで算出された重力トルクTGravityと慣性トルク演算部94pで算出された慣性トルクTInertiaとを基に、アーム205の目標トルクTTgtAmを算出する。目標推力演算部94rは、目標トルク演算部94qで算出された目標トルクTTgtAmと慣性計測装置212~216の出力値と車体仕様値とを基に、アームシリンダ205aの目標推力FTgtAmを算出する。
 アーム目標メータアウト圧演算部94sは、目標推力演算部94rで算出されたアームシリンダ205aの目標推力FTgtAmと圧力センサ88(89)の出力値から得られるアームメータイン圧PMIAmとを基にアーム目標メータアウト圧PMOTgtAmを算出する。アーム再生制御弁目標開口演算部94tは、アーム目標メータアウト圧演算部94sで算出されたアーム目標メータアウト圧PMOTgtAmと圧力センサ88(89)の出力値から得られるアームメータアウト圧PMOAmとを基にアーム再生制御弁34の目標開口面積ATgtMOAmを算出する。アーム再生制御弁制御指令出力部94uは、予め設定されたアーム再生制御弁の開口面積に対する電磁弁の指令電気信号特性に従い、アーム再生制御弁目標開口演算部94tで算出されたアーム再生制御弁34の目標開口面積ATgtMOAmに応じた指令信号(アーム再生制御弁制御指令信号)を電磁弁93gへ出力する。
 ブリードオフ弁制御指令出力部94vは、予め設定されたブリードオフ弁35~37の開口面積に対する電磁弁指令信号特性に従い、ブリードオフ弁目標開口演算部94eで算出された目標開口面積ATgtBOに応じた指令信号(ブリードオフ弁制御指令信号)を電磁弁93fへ出力する。
 図6は、コントローラ94のポンプ流量制御に関わる処理を示すフローチャートである。以下では、第2油圧ポンプ2の流量制御に関わる処理のみを説明する。なお、その他の油圧ポンプ1,3の流量制御に関わる処理はこれと同様であるため、説明は省略する。
 コントローラ94は、まず、操作レバー入力が無いか否かを判定する(ステップS101)。ここでいう操作レバー入力は、第2油圧ポンプ2のポンプライン60に接続されたアクチュエータ204a,205aに対応する操作レバー入力である。ステップS101で操作レバー入力が無い(YES)と判定した場合は、当該フローを終了する。
 ステップS101で操作レバー入力が有る(NO)と判定した場合は、ブーム目標流量演算部94aは、予め設定された操作レバー入力量に対するブーム目標流量特性に従い、操作レバー入力量に応じたブーム目標流量QTgtBmを算出する(ステップS102A)。
 ステップS102Aと並行して、アーム目標流量演算部94bは、予め設定された操作レバー入力量に対するアーム目標流量特性に従い、操作レバー入力量に応じたアーム目標流量QTgtAmを算出する(ステップS102B)。なお、図示は省略しているが、第2油圧ポンプ2のポンプライン50に接続されているその他のアクチュエータについても同様に目標流量を算出する。
 ステップS102Bに続き、アーム推定再生流量演算部94cは、圧力センサ88,89の出力値から得られるアームメータイン圧PMIAmおよびアームメータアウト圧PMOAmとアーム再生弁33の開口面積とを基にアーム推定再生流量QEstRegAmを算出する(ステップS103)。
 ステップS103に続き、アーム修正目標流量演算部94dは、アーム目標流量演算部94bで算出されたアーム目標流量QTgtAmとアーム推定再生流量演算部94cで算出されたアーム推定再生流量QEstRegAmとを用いて、式1よりアーム修正目標流量QModiTgtAmを算出する(ステップS104)。
Figure JPOXMLDOC01-appb-M000001
 ステップS102AまたはステップS102B,S103,S104と並行して、推定ブリードオフ流量演算部94fは、ブリードオフ弁目標開口演算部94eで算出されたブリードオフ弁36の目標開口面積ATgtBOと圧力センサ85の出力値から得られるポンプ圧PPmp2とを用いて、式2より推定ブリードオフ流量QEstBOを算出する(ステップS105)。
Figure JPOXMLDOC01-appb-M000002
ここで、Cdは流量係数、PTankはタンク圧、ρは作動油密度である。
 ステップS102A,S104,S105に続き、ポンプ目標流量演算部94gは、ブーム目標流量QTgtBmとアーム修正目標流量QModiTgtAmと推定ブリードオフ流量QEstBOとを用いて、式3によりポンプ目標流量QTgtPmpを算出する(ステップS106)。
Figure JPOXMLDOC01-appb-M000003
 ステップS106に続き、ポンプ制御指令出力部94hは、予め設定されたポンプ流量に対する電磁弁指令信号特性に従い、ポンプ目標流量演算部94gで算出されたポンプ目標流量QTgtPmpに応じた指令信号(ポンプ流量制御指令信号)を第2油圧ポンプ2のポンプ流量制御用の電磁弁93aへ出力する(ステップS107)。
 ステップS107に続き、第2油圧ポンプ2のポンプ流量制御用の電磁弁93aに指令圧を生成させ(ステップS108)、当該指令圧に応じて第2油圧ポンプ2の傾転を変化させ(ステップS109)、当該フローを終了する。
 図7は、コントローラ94のブーム方向制御弁9,10,15の開口制御に関わる処理を示すフローチャートである。以下では、第2ブーム方向制御弁10の開口制御に関わる処理のみを説明する。その他のブーム方向制御弁9,15の開口制御に関わる処理はこれと同様であるため、説明は省略する。
 コントローラ94は、まず、ブーム操作レバー入力が無いか否かを判定する(ステップS201)。ステップS201でブーム操作レバー入力が無い(YES)と判定した場合は、当該フローを終了する。
 ステップS201でブーム操作レバー入力が有る(NO)と判定した場合は、ブーム目標流量演算部94aは、予め設定されたブーム操作レバー入力量に対するブーム目標流量特性に従い、ブーム操作レバー入力量に応じたブーム目標流量QTgtBmを算出する(ステップS202)。
 ステップS202に続き、圧力状態判定部94iは、圧力センサ85の出力値から得られるポンプ圧PPmp2と圧力センサ86(87)の出力値から得られるブームメータイン圧PMIBmとの差圧(第2ブーム方向制御弁10の前後差圧)が閾値αより小さいか否かを判断する(ステップS203)。閾値αは、例えば、流量制御精度を確保することができる方向制御弁の前後差圧の最小値に設定される。
 ステップS203で前後差圧(PPmp2-PMIBm)が閾値α以上である(NO)と判定した場合は、ブーム方向制御弁目標メータイン開口演算部94jは、ブーム目標流量演算部94aで算出されたブーム目標流量QTgtBmと圧力センサ85の出力値から得られる第2油圧ポンプ2のポンプ圧PPmp2と圧力センサ86(87)の出力値から得られるブームメータイン圧PMIBmとを用いて、式4より第2ブーム方向制御弁10の目標メータイン開口面積ATgtMIBmを算出する(ステップS204)。
Figure JPOXMLDOC01-appb-M000004
ここで、Cdは流量係数、ρは作動油密度である。
 ステップS203で前後差圧(PPmp2-PMIBm)が閾値αよりも小さい(YES)と判定した場合は、ブーム方向制御弁目標メータイン開口演算部94jは、前後差圧(PPmp2-PMIBm)に代えて閾値αを用いて、ステップS204と同様に目標メータイン開口面積ATgtMIBm(ステップS205)。
 ステップS204またはステップS205に続き、ブーム方向制御弁制御指令出力部94kは、予め設定された第2ブーム方向制御弁10のメータイン開口面積に対する電磁弁指令信号特性に従い、ブーム方向制御弁目標メータイン開口演算部94jで算出された目標メータイン開口面積ATgtMIBmに応じた指令信号(ブーム方向制御弁制御指令信号)を第2ブーム方向制御弁10用の電磁弁93b(93c)へ出力する(ステップS206)。
 ステップS206に続き、第2ブーム方向制御弁10用の電磁弁93b(93c)に指令圧を生成させ(ステップS207)、当該指令圧に応じて第2ブーム方向制御弁10を開口させ(ステップS208)、当該フローを終了する。
 図8は、コントローラ94のアーム方向制御弁8,11の開口制御に関わる処理を示すフローチャートである。以下では、第1アーム方向制御弁11の開口制御に関わる処理のみを説明する。第2アーム方向制御弁8の開口制御に関わる処理はこれと同様であるため、説明は省略する。
 コントローラ94は、まず、アーム操作レバー入力が無いか否かを判定する(ステップS301)。ステップS301でアーム操作レバー入力が無い(YES)と判定した場合は、当該フローを終了する。
 ステップS301でアーム操作レバー入力が有る(NO)と判定した場合は、アーム目標流量演算部94bは、予め設定されたアーム操作レバー入力量に対するアーム目標流量特性に従い、アーム操作レバー入力量に応じたアーム目標流量QTgtAmを算出する(ステップS302)。
 ステップS302に続き、圧力状態判定部94iは、圧力センサ85の出力値から得られるポンプ圧PPmp2と圧力センサ88(89)の出力値から得られるアームメータイン圧PMIAmとの差圧(第1アーム方向制御弁11の前後差圧)が閾値αより小さいか否かを判断する(ステップS303)。
 ステップS303で前後差圧(PPmp2-PMIAm)が閾値α以上である(NO)と判定した場合は、アーム方向制御弁目標メータイン開口演算部94lは、アーム目標流量演算部94bで算出されたアーム目標流量QTgtAmと圧力センサ85の出力値から得られる第2油圧ポンプ2のポンプ圧PPmp2と圧力センサ88(89)の出力値から得られるアームメータイン圧PMIAmとを用いて、式5より第1アーム方向制御弁11の目標メータイン開口面積ATgtMIAmを算出する(ステップS304)。
Figure JPOXMLDOC01-appb-M000005
ここで、Cdは流量係数、ρは作動油密度である。
 ステップS303で前後差圧(PPmp2-PMIAm)が閾値αよりも小さい(YES)と判定した場合は、アーム方向制御弁目標メータイン開口演算部94lは、前後差圧(PPmp2-PMIAm)に代えて閾値αを用いて、ステップS304と同様に目標メータイン開口面積ATgtMIAm(ステップS305)。
 ステップS304またはステップS305に続き、アーム方向制御弁制御指令出力部94mは、予め設定された第1アーム方向制御弁11のメータイン開口面積に対する電磁弁指令信号特性に従い、アーム方向制御弁目標メータイン開口演算部94lで算出された目標メータイン開口面積ATgtMIAmに応じた指令信号(アーム方向制御弁制御指令信号)を第1アーム方向制御弁11用の電磁弁93d(93e)へ出力する(ステップS306)。
 ステップS306に続き、第1アーム方向制御弁11用の電磁弁93d(93e)に指令圧を生成させ(ステップS307)、当該指令圧に応じて第1アーム方向制御弁11を開口させ(ステップS308)、当該フローを終了する。
 図9は、コントローラ94のアーム再生制御弁34の開口制御に関わる処理を示すフローチャートである。
 コントローラ94は、まず、アーム操作レバー入力が無いか否かを判定する(ステップS401)。ステップS401でアーム操作レバー入力が無い(YES)と判定した場合は、当該フローを終了する。
 ステップS401でアーム操作レバー入力が有る(NO)と判定した場合は、要求トルク演算部94nは、予め設定されたアーム操作量レバー入力量に対するアーム要求トルク特性に従い、アーム操作レバー入力量に応じたアーム要求トルクTReqAmを算出する(ステップS402)。
 ステップS402と並行して、重力トルク演算部94oは、慣性計測装置212~216の出力値と車体仕様値(主に構造物の寸法など)とを基に、アームモーメントの重力成分を重力トルクTGravityとして算出する(ステップS403)。
 ステップS403に続き、慣性トルク演算部94pは、重力トルク演算部94oが算出した重力トルクTGravityと慣性計測装置212~216の出力値とを基に、アームモーメントの慣性成分を慣性トルクTInertiaとして算出する(ステップS404)。
 ステップS402,S404に続き、目標トルク演算部94qは、要求トルク演算部94nで算出されたアーム要求トルクTReqAmと、重力トルク演算部94oで算出された重力トルクTGravityと、慣性トルク演算部94pで算出された慣性トルクTInertiaとを用いて、式6よりアーム目標トルクTTgtAmを算出する(ステップS405)。
Figure JPOXMLDOC01-appb-M000006
ここで、アーム要求トルクTReqAmと同一回転方向のトルクを正とする。
 ステップS405に続き、目標推力演算部94rは、目標トルク演算部94qで算出されたアーム目標トルクTTgtAmと慣性計測装置212~216の出力値および車体仕様値とを基にアームシリンダ205aの目標推力FTgtAmを算出する(ステップS406)。
 ステップS406に続き、アーム目標メータアウト圧演算部94sは、目標推力演算部94rで算出された目標推力FTgtAmと圧力センサ88(89)の出力値から得られるアームメータイン圧PMIAmを用いて、式7よりアーム目標メータアウト圧PMOTgtAmを算出する(ステップS407)。
Figure JPOXMLDOC01-appb-M000007
ここで、SMIAmはアームシリンダ205aのメータイン側の受圧面積、SMOAmはアームシリンダ205aのメータアウト側の受圧面積である。
 ステップS407に続き、アーム再生制御弁目標開口演算部94tは、アーム目標メータアウト圧演算部94sで算出されたアーム目標メータアウト圧PTgtMOAmと圧力センサ89(88)の出力値から得られるアームメータアウト圧PMOAmとの差が小さくなるようにアーム再生制御弁34の目標開口面積ATgtMOAmを算出する(ステップS408)。
 ステップS408に続き、アーム再生制御弁制御指令出力部94uは、予め設定されたアーム再生制御弁34の開口面積に対する電磁弁指令信号特性に従い、アーム再生制御弁目標開口演算部94tで算出された目標開口面積ATgtMOAmに応じた指令信号(アーム再生制御弁制御指令信号)をアーム再生制御弁34用の電磁弁93gへ出力する(ステップS409)。
 ステップS409に続き、電磁弁93gにアーム再生制御弁34の指令圧を生成させ(ステップS410)、当該指令圧に応じてアーム再生制御弁34を開口させ(ステップS411)、当該フローを終了する。
 図10は、コントローラ94のブリードオフ弁35~37の開口制御に関わる処理を示すフローチャートである。以下では、第2油圧ポンプ2のポンプライン50に接続されたブリードオフ弁36の開口制御に関わる処理のみを説明する。その他のブリードオフ弁の開口制御に関わる処理はこれと同様であるため、説明は省略する。
 コントローラ94は、まず、操作レバー入力が無いか否かを判定する(ステップS501)。ここでいう操作レバー入力は、第2油圧ポンプ2のポンプライン50に接続されたアクチュエータ204a,205aに対応する操作レバー入力である。ステップS501で操作レバー入力が無い(YES)と判定した場合は、当該フローを終了する。
 ステップS501で操作レバー入力が有る(NO)と判定した場合は、ブリードオフ弁目標開口演算部94eは、図4に示すブリードオフ弁開口特性に従い、最大操作レバー入力量に応じたブリードオフ弁36の目標開口面積ATgtBOを算出する(ステップS502)。なお、ここでいう最大操作レバー入力量は、第2油圧ポンプ2のポンプライン50に接続されたアクチュエータ204a,205aに対応する各操作レバー入力量の最大値である。
 ステップS502に続き、ブリードオフ弁制御指令出力部94vは、予め設定されたブリードオフ弁36の開口面積に対する電磁弁指令信号特性に従い、ブリードオフ弁36の目標開口面積ATgtBOに応じた指令信号(ブリードオフ弁制御指令信号)をブリードオフ弁36用の電磁弁93fへ出力する(ステップS503)。
 ステップS503に続き、電磁弁93fにブリードオフ弁36の指令圧を生成させ(ステップS504)、当該指令圧に応じてブリードオフ弁36を開口させ(ステップS505)、当該フローを終了する。
 (動作)
 油圧駆動装置902の動作の一例として、ブームシリンダ204aとアームシリンダ205aとを同時に駆動する複合操作が行われた場合の第2油圧ポンプ2、第2ブーム方向制御弁10、第1アーム方向制御弁11、アーム再生制御弁34、およびブリードオフ弁36の動作を説明する。
 「第2油圧ポンプ」
 コントローラ94は、ブーム操作レバー95aおよびアーム操作レバー95bの入力量を基に第2油圧ポンプ2のポンプ目標流量QTgtPmpを算出し、ポンプ目標流量QTgtPmpに応じた指令信号(ポンプ流量制御指令信号)を電磁弁93aへ出力する。電磁弁93aは、ポンプ流量制御指令信号に応じた指令圧を生成し、第2油圧ポンプ2の吐出流量を駆動する。
 「第2ブーム方向制御弁」
 コントローラ94は、ブーム操作レバー95aの入力量を基に算出されるブーム目標流量QTgtBmと、圧力センサ85によって検出されるポンプ圧PPmp2と、圧力センサ86(87)によって検出されるブームメータイン圧PMIBmとを基に目標メータイン開口面積ATgtMIBmを算出し、目標メータイン開口面積ATgtMIBmに応じた指令信号(ブーム方向制御弁制御指令信号)を電磁弁93b(93c)へ出力する。電磁弁93b(93c)は、ブーム方向制御弁制御指令信号に応じた指令圧を生成し、第2ブーム方向制御弁10のメータイン開口面積を制御する。
 「第1アーム方向制御弁」
 コントローラ94は、アーム操作レバー95bの入力量を基に算出されるアーム目標流量QTgtAmと、圧力センサ85によって検出されるポンプ圧PPmp2と、圧力センサ88(89)によって検出されるアームメータイン圧PMIAmとを基に目標メータイン開口面積ATgtMIAmを算出し、目標メータイン開口面積ATgtMIAmに応じた指令信号(アーム方向制御弁制御指令信号)を電磁弁93d(93e)へ出力する。電磁弁93d(93e)は、アーム方向制御弁制御指令信号に応じた指令圧を生成し、第1アーム方向制御弁11のメータイン開口面積を制御する。
 「アーム再生制御弁」
 コントローラ94は、アーム操作レバー95bの入力量、車体の重力トルクTGravityおよび慣性トルクTInertiaから算出される目標トルクTTgtAmと、圧力センサ88,89によって検出されるアームメータイン圧PMIAmおよびアームメータアウト圧PMOAmとを基にアーム再生制御弁34の目標開口面積ATgtMOAmを算出し、目標開口面積ATgtMOAmに応じた指令信号(アーム再生制御弁制御指令信号)を電磁弁93gへ出力する。電磁弁93gは、アーム再生制御弁制御指令信号に応じた指令圧を生成し、アーム再生制御弁34の開口面積を制御する。
 「ブリードオフ弁」
 コントローラ94は、ブーム操作レバー95aおよびアーム操作レバー95bの入力量を基にブリードオフ弁36の目標開口面積ATgtBOを算出し、目標開口面積ATgtBOに応じた指令信号(ブリードオフ弁制御指令信号)を電磁弁93fへ出力する。電磁弁93fは、ブリードオフ弁制御指令信号に応じた指令圧を生成し、ブリードオフ弁36の開口面積を制御する。
 (まとめ)
 本実施形態では、車体202と、車体202に取り付けられた作業装置203と、作動油タンク5と、作動油タンク5から作動油を吸い込んで吐出する可変容量型の油圧ポンプ2と、油圧ポンプ2の容量を制御するレギュレータ2aと、作業装置203を駆動する複数のアクチュエータ204a,205aと、油圧ポンプ2から複数のアクチュエータ204a,205aに供給される圧油の流れを制御する複数の方向制御弁10,11と、複数のアクチュエータ204a,205aの動作を指示する操作装置95a,95bと、複数の方向制御弁10,11のうち特定の方向制御弁11を作動油タンク5に接続するメータアウト流路75と特定の方向制御弁11を油圧ポンプに接続するメータイン流路54とを接続する再生流路76と、再生流路76に設けられ、複数のアクチュエータ204a,205aのうち特定の方向制御弁11に対応する特定のアクチュエータ205aの戻り油をメータアウト流路75からメータイン流路54へ合流させる再生弁33と、メータアウト流路75のうち再生流路76との分岐点よりも下流に設けられ、特定のアクチュエータ205aから作動油タンク5に戻される流量を調整することにより再生弁33の通過流量を制御する再生制御弁34と、操作装置95a,95bの入力量に応じてレギュレータ2a、複数の方向制御弁10,11、および再生制御弁34を制御するコントローラ94とを備えた作業機械901において、油圧ポンプ2の吐出圧であるポンプ圧を検出する第1圧力センサ85と、複数のアクチュエータ204a,205aのメータイン圧PMIBm,PMIAmおよびメータアウト圧PMOBm,PMOAmを検出する第2圧力センサ86~89と、車体202および作業装置203の姿勢および動作状態を検出する姿勢センサ212~216とを備え、複数の方向制御弁10,11は、それぞれ、同一弁体および同一ハウジングにより、弁変位に対してメータイン開口面積がメータアウト開口面積よりも小さくなるように形成され、コントローラ94は、操作装置95a,95bの入力量を基に、油圧ポンプ2から複数のアクチュエータ204a,205aに供給される圧油の流量の目標値であるアクチュエータ目標流量QTgtBm,QTgtAmを算出し、再生弁33の開口面積と特定のアクチュエータ205aのメータイン圧PMIAmおよびメータアウト圧PMOAmとを基に、再生弁33の通過流量の推定値である推定再生流量QEstRegAmを算出し、アクチュエータ目標流量QTgtBm,QTgtAmと推定再生流量QEstRegAmとを基に、油圧ポンプ2の吐出流量の目標値であるポンプ目標流量QTgtPmpを算出し、アクチュエータ目標流量QTgtBm,QTgtAmとポンプ圧PPmp2とメータイン圧PMIBm,PMIAmとを基に、複数の方向制御弁10,11のメータイン開口面積の目標値である目標メータイン開口面積ATgtMIBm,ATgtMIAmを算出し、操作装置95bの入力量と姿勢センサ212~216の出力値とを基に、特定のアクチュエータ205aの推力の目標値である目標推力FTgtAmを算出し、目標推力FTgtAmと特定のアクチュエータ205aのメータイン圧PMIAmとを基に、特定のアクチュエータ205aのメータアウト圧PMOAmの目標値である目標メータアウト圧PMOTgtAmを算出し、目標メータアウト圧PMOTgtAmと特定のアクチュエータ205aのメータアウト圧PMOAmとを基に、再生制御弁34の開口面積の目標値である再生制御弁目標開口面積ATgtMOAmを算出し、ポンプ目標流量QTgtPmpに応じてレギュレータ2aを制御し、目標メータイン開口面積ATgtMIBm,ATgtMIAmに応じて複数の方向制御弁10,11を制御し、再生制御弁目標開口面積ATgtMOAmに応じて再生制御弁34を制御する。
 以上のように構成された本実施形態によれば、アームシリンダ205a(戻り油を再生する特定のアクチュエータ)とブームシリンダ204a(その他のアクチュエータ)とを同時に駆動する複合操作時に、各方向制御弁10,11の前後差圧に応じて各メータイン開口を調整することにより、目標通りの流量を各アクチュエータ204a,205aとに供給することができる。また、アーム方向制御弁11のメータアウト開口を調整して目標通りの推力をアームシリンダ205aに入力することにより、非駆動部材(アーム205)の慣性による行き過ぎなどを防止することができる。そして、各方向制御弁10,11は、メータイン開口面積およびメータアウト開口面積が同一弁体および同一ハウジングにより形成される簡素な構成であるため、コストを抑制することができる。これにより、戻り油を再生する特定のアクチュエータ205aとその他のアクチュエータ204aとを同時に駆動する複合操作時に、各アクチュエータ204a,205aの速度制御と特定のアクチュエータ205aの推力制御とを簡素な構成で行うことが可能となる。
 また、本実施形態における作業機械901は、油圧ポンプ3から吐出された作動油を作動油タンク5へ排出するブリードオフ弁36を備え、コントローラ94は、操作装置95a,95bの入力量を基に、ブリードオフ弁36の開口面積の目標値であるブリードオフ弁目標開口面積ATgtBOを算出し、ブリードオフ弁目標開口面積ATgtBOとポンプ圧PPmp2とを基に、ブリードオフ弁36の通過流量の推定値である推定ブリードオフ流量QEstBOを算出し、アクチュエータ目標流量QTgtBm,QTgtAmと推定再生流量QEstRegAmと推定ブリードオフ流量QEstBOとを基にポンプ目標流量QTgtPmpを算出する。これにより、アクチュエータ204a,205aの操作開始時に、油圧ポンプ3の吐出油の余剰分が作動油タンク5へ排出されるため、アクチュエータ204a,205aの飛び出しを防ぐことが可能となる。
 以上、本発明の実施形態について詳述したが、本発明は、上記した実施形態に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施形態は、本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
 1…第1油圧ポンプ、1a…流量制御指令圧ポート(レギュレータ)、2…第2油圧ポンプ、2a…流量制御指令圧ポート(レギュレータ)、3…第3油圧ポンプ、3a…流量制御指令圧ポート(レギュレータ)、5…作動油タンク、6…走行右方向制御弁、7…バケット方向制御弁、8…第2アーム方向制御弁、9…第1ブーム方向制御弁、10…第2ブーム方向制御弁、10a,10b…パイロットポート、11…第1アーム方向制御弁、11a,11b…パイロットポート、12…第1アタッチメント方向制御弁、13…走行左方向制御弁、14…旋回方向制御弁、15…第3ブーム方向制御弁、16…第2アタッチメント方向制御弁、17…合流弁、18~20…メインリリーフ弁、21~32…チェック弁、33…アーム再生弁、34…アーム再生制御弁、34a…指令圧ポート、35~37…ブリードオフ弁、36a…指令圧ポート、40…ポンプライン、41~48…メータイン流路、50…ポンプライン、51~58…メータイン流路、60…ポンプライン、61~66…メータイン流路、71~74…流路、75…メータアウト流路、76…アーム再生流路、80,81…流路、85…第1圧力センサ、86,87…第2圧力センサ、88,89…第2圧力センサ、91…パイロットポンプ、92…パイロットリリーフ弁、93…電磁弁ユニット、93a~93g…電磁弁、94…コントローラ、94a…ブーム目標流量演算部、94b…アーム目標流量演算部、94c…アーム推定再生流量演算部、94d…アーム修正目標流量演算部、94e…ブリードオフ弁目標開口演算部、94f…推定ブリードオフ流量演算部、94g…ポンプ目標流量演算部、94h…ポンプ制御指令出力部、94i…圧力状態判定部、94j…ブーム方向制御弁目標メータイン開口演算部、94k…ブーム方向制御弁制御指令出力部、94l…アーム方向制御弁目標メータイン開口演算部、94m…アーム方向制御弁制御指令出力部、94n…要求トルク演算部、94o…重力トルク演算部、94p…慣性トルク演算部、94q…目標トルク演算部、94r…目標推力演算部、94s…アーム目標メータアウト圧演算部、94t…アーム再生制御弁目標開口演算部、94u…アーム再生制御弁制御指令出力部、94v…ブリードオフ弁制御指令出力部、95a…ブーム操作レバー(操作装置)、95b…アーム操作レバー(操作装置)、201…走行体、202…旋回体(車体)、203…作業装置、204…ブーム、204a…ブームシリンダ(アクチュエータ)、205…アーム、205a…アームシリンダ(アクチュエータ)、206…バケット、206a…バケットシリンダ(アクチュエータ)、207…運転室、208…機械室、209…カウンタウエイト、210…コントロールバルブ、211…旋回モータ、212~216…慣性計測装置(姿勢センサ)、901…油圧ショベル(作業機械)、902…油圧駆動装置。

Claims (2)

  1.  車体と、
     前記車体に取り付けられた作業装置と、
     作動油タンクと、
     前記作動油タンクから作動油を吸い込んで吐出する可変容量型の油圧ポンプと、
     前記油圧ポンプの容量を制御するレギュレータと、
     前記作業装置を駆動する複数のアクチュエータと、
     前記油圧ポンプから前記複数のアクチュエータに供給される圧油の流れを制御する複数の方向制御弁と、
     前記複数のアクチュエータの動作を指示する操作装置と、
     前記複数の方向制御弁のうち特定の方向制御弁を前記作動油タンクに接続するメータアウト流路と前記特定の方向制御弁を前記油圧ポンプに接続するメータイン流路とを接続する再生流路と、
     前記再生流路に設けられ、前記複数のアクチュエータのうち前記特定の方向制御弁に対応する特定のアクチュエータの戻り油を前記メータアウト流路から前記メータイン流路へ合流させる再生弁と、
     前記メータアウト流路のうち前記再生流路との分岐点よりも下流に設けられ、前記特定のアクチュエータから前記作動油タンクに戻される流量を調整することにより前記再生弁の通過流量を制御する再生制御弁と、
     前記操作装置の入力量に応じて前記レギュレータ、前記複数の方向制御弁、および前記再生制御弁を制御するコントローラとを備えた作業機械において、
     前記油圧ポンプの吐出圧であるポンプ圧を検出する第1圧力センサと、
     前記複数のアクチュエータのメータイン圧およびメータアウト圧を検出する第2圧力センサと、
     前記車体および前記作業装置の姿勢および動作状態を検出する姿勢センサとを備え、
     前記複数の方向制御弁は、それぞれ、同一弁体および同一ハウジングにより、弁変位に対してメータイン開口面積がメータアウト開口面積よりも小さくなるように形成され、
     前記コントローラは、
     前記操作装置の入力量を基に、前記油圧ポンプから前記複数のアクチュエータに供給される圧油の流量の目標値であるアクチュエータ目標流量を算出し、
     前記再生弁の開口面積と前記特定のアクチュエータのメータイン圧およびメータアウト圧とを基に、前記再生弁の通過流量の推定値である推定再生流量を算出し、
     前記アクチュエータ目標流量と前記推定再生流量とを基に、前記油圧ポンプの吐出流量の目標値であるポンプ目標流量を算出し、
     前記アクチュエータ目標流量と前記ポンプ圧と前記メータイン圧とを基に、前記複数の方向制御弁のメータイン開口面積の目標値である目標メータイン開口面積を算出し、
     前記操作装置の入力量と前記姿勢センサの出力値とを基に、前記特定のアクチュエータの推力の目標値である目標推力を算出し、
     前記目標推力と前記特定のアクチュエータのメータイン圧とを基に、前記特定のアクチュエータのメータアウト圧の目標値である目標メータアウト圧を算出し、
     前記目標メータアウト圧と前記特定のアクチュエータのメータアウト圧とを基に、前記再生制御弁の開口面積の目標値である再生制御弁目標開口面積を算出し、
     前記ポンプ目標流量に応じて前記レギュレータを制御し、
     前記目標メータイン開口面積に応じて前記複数の方向制御弁を制御し、
     前記再生制御弁目標開口面積に応じて前記再生制御弁を制御する
     ことを特徴とする作業機械。
  2.  請求項1に記載の作業機械において、
     前記油圧ポンプから吐出された作動油を前記作動油タンクへ排出するブリードオフ弁を備え、
     前記コントローラは、
     前記操作装置の入力量を基に、前記ブリードオフ弁の開口面積の目標値であるブリードオフ弁目標開口面積を算出し、
     前記ブリードオフ弁目標開口面積と前記ポンプ圧とを基に、前記ブリードオフ弁の通過流量の推定値である推定ブリードオフ流量を算出し、
     前記アクチュエータ目標流量と前記推定再生流量と前記推定ブリードオフ流量とを基に前記ポンプ目標流量を算出する
     ことを特徴とする作業機械。
PCT/JP2022/040741 2022-01-25 2022-10-31 作業機械 WO2023145182A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2023576629A JPWO2023145182A1 (ja) 2022-01-25 2022-10-31
KR1020247006161A KR20240038048A (ko) 2022-01-25 2022-10-31 작업 기계
EP22924036.1A EP4375516A1 (en) 2022-01-25 2022-10-31 Work machine
CN202280057287.4A CN117836521A (zh) 2022-01-25 2022-10-31 作业机械

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-009752 2022-01-25
JP2022009752 2022-01-25

Publications (1)

Publication Number Publication Date
WO2023145182A1 true WO2023145182A1 (ja) 2023-08-03

Family

ID=87471352

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/040741 WO2023145182A1 (ja) 2022-01-25 2022-10-31 作業機械

Country Status (5)

Country Link
EP (1) EP4375516A1 (ja)
JP (1) JPWO2023145182A1 (ja)
KR (1) KR20240038048A (ja)
CN (1) CN117836521A (ja)
WO (1) WO2023145182A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158604A (ja) * 1993-12-02 1995-06-20 Hitachi Constr Mach Co Ltd 建設機械の油圧制御装置
JP3511425B2 (ja) 1995-09-18 2004-03-29 日立建機株式会社 油圧システム
JP5214450B2 (ja) 2005-09-30 2013-06-19 キャタピラー インコーポレイテッド 圧力補償を増補した液圧システム
US20140283676A1 (en) * 2013-03-21 2014-09-25 Caterpillar Inc. Fluid Regeneration in a Hydraulic System
WO2021200244A1 (ja) * 2020-03-30 2021-10-07 日立建機株式会社 作業機械
JP2022001769A (ja) * 2020-06-19 2022-01-06 川崎重工業株式会社 液圧駆動システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS511425B2 (ja) 1971-08-19 1976-01-17
JPS5214450U (ja) 1975-07-18 1977-02-01

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158604A (ja) * 1993-12-02 1995-06-20 Hitachi Constr Mach Co Ltd 建設機械の油圧制御装置
JP3511425B2 (ja) 1995-09-18 2004-03-29 日立建機株式会社 油圧システム
JP5214450B2 (ja) 2005-09-30 2013-06-19 キャタピラー インコーポレイテッド 圧力補償を増補した液圧システム
US20140283676A1 (en) * 2013-03-21 2014-09-25 Caterpillar Inc. Fluid Regeneration in a Hydraulic System
WO2021200244A1 (ja) * 2020-03-30 2021-10-07 日立建機株式会社 作業機械
JP2022001769A (ja) * 2020-06-19 2022-01-06 川崎重工業株式会社 液圧駆動システム

Also Published As

Publication number Publication date
JPWO2023145182A1 (ja) 2023-08-03
CN117836521A (zh) 2024-04-05
EP4375516A1 (en) 2024-05-29
KR20240038048A (ko) 2024-03-22

Similar Documents

Publication Publication Date Title
JP5161155B2 (ja) 作業機械および作業機械の制御方法
JP6867551B2 (ja) 電動式油圧作業機械の油圧駆動装置
CN112154271B (zh) 工程机械
CN113227586B (zh) 工程机械
KR102661855B1 (ko) 작업 기계
WO2023145182A1 (ja) 作業機械
WO2021059337A1 (ja) 電動式油圧作業機械
WO2023139885A1 (ja) 作業機械
KR102571722B1 (ko) 작업 기계
CN115279976B (zh) 作业机械
WO2023182010A1 (ja) 作業機械
JP7346647B1 (ja) 作業機械
WO2024070588A1 (ja) 作業機械
JP2019173881A (ja) 建設機械
WO2021200024A1 (ja) 作業機械
JP2022170467A (ja) 作業機械
WO2024070244A1 (ja) 作業機械
WO2022190491A1 (ja) 作業機械
JPWO2023139885A5 (ja)
JP2023150467A (ja) 作業機械

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22924036

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023576629

Country of ref document: JP

ENP Entry into the national phase

Ref document number: 20247006161

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 202280057287.4

Country of ref document: CN

Ref document number: 2022924036

Country of ref document: EP

Ref document number: 1020247006161

Country of ref document: KR

ENP Entry into the national phase

Ref document number: 2022924036

Country of ref document: EP

Effective date: 20240222