WO2022149692A1 - 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈 - Google Patents

무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈 Download PDF

Info

Publication number
WO2022149692A1
WO2022149692A1 PCT/KR2021/015486 KR2021015486W WO2022149692A1 WO 2022149692 A1 WO2022149692 A1 WO 2022149692A1 KR 2021015486 W KR2021015486 W KR 2021015486W WO 2022149692 A1 WO2022149692 A1 WO 2022149692A1
Authority
WO
WIPO (PCT)
Prior art keywords
wale
support
block
groove
filling
Prior art date
Application number
PCT/KR2021/015486
Other languages
English (en)
French (fr)
Inventor
윤하영
Original Assignee
(주)제이피이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)제이피이엔씨 filed Critical (주)제이피이엔씨
Priority to JP2023548167A priority Critical patent/JP2023546543A/ja
Priority to CN202180006130.4A priority patent/CN115516170B/zh
Priority to US18/032,218 priority patent/US20230399809A1/en
Publication of WO2022149692A1 publication Critical patent/WO2022149692A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Definitions

  • the present invention relates to a wale support module used to mount a wale on a thumb stake during the construction of a retaining wall, and in particular, it enables easy filling of a groove generated between the thumb stake and the wale through a groove filling block, and installation of an earth anchor Corresponding to the angle, the wale support feet or the pile support feet on the backfill block side pivot to respond appropriately to the inclination of the wale, and optimal anchoring force can be exhibited. It relates to a wale support module for filling and reuse of non-welding grooves designed to increase the installation stability of a wale by a hanger.
  • Retaining walls are constructed to prevent soil from collapsing during excavation work at civil construction sites.
  • the strut method or the earth anchor method is selectively used.
  • the earth anchor method is a method of supporting earth pressure by tensile force by forming an anchor body on the back side of the retaining wall.
  • a bandage is installed on the thumb stake on the retaining wall side.
  • irregular gaps are generated between the thumb piles and the wale. .
  • the groove filling steel is difficult to standardize because the groove spacing between the thumb pile and the wale at the corresponding location is different, and it is difficult to actively respond to the inclination angle of the wale according to the installation direction of the earth anchor, and welding installation work is difficult. .
  • the wale is supported by the wale support bracket installed on the thumb pile of the retaining wall. Therefore, the wale resists the bending moment and shear force caused by the earth pressure acting on the retaining wall.
  • the earth anchor When the earth anchor is installed on this wale, it is installed with an angle of inclination, and for this, the wale support bracket may need to adjust the inclination.
  • the wale support bracket is installed through welding on the thumb stake of the retaining wall at the site, and then dismantled and discarded when the wale is removed. As such, since the wale support bracket cannot be reused, there is a problem in that it is not only a waste of materials but also does not help to reduce the construction cost. Therefore, a technical method for the reuse of the wale support bracket is required.
  • Korean Patent Registration Nos. 10-1677811 and 10-1364227 have been proposed as technologies related to wale cladding as the background of the present invention.
  • two wale sheets must be installed facing the back side, a spacer according to the groove spacing must be additionally installed differently in the groove filling holder, and additionally to combine the groove filling holder to the wale through a shaft bolt and a fixing device.
  • the filling of the home is complicated due to installation work, the number of fastening parts increases, and the need for additional concrete filling and curing time according to the installation of the bellows jack.
  • Korean Patent Registration Nos. 10-1420374 and 10-1683968 have been proposed as technologies related to wale brackets that are the background of the present invention.
  • the above background technologies have a solid structure, there is no technical alternative for reuse to reduce the installation cost of the H-beam wale support bracket, and there is a problem that it cannot be installed in several places depending on the excavation depth of the excavation. That is, it has a disadvantage that the wale bracket cannot be installed in the middle of the wale cladding along the depth of the pile.
  • the angle of the wale bracket cannot be adjusted, so the wale cannot be installed at an angle for the construction of the earth anchor.
  • the present invention enables the groove generated between the thumb pile and the wale to be easily filled through the wadding block, and in response to the installation angle of the earth anchor, the wale support foot or the wale support foot on the groove filling block side pivots to adjust the inclination of the wale.
  • Optimal anchoring force can be exhibited by responding appropriately, and it can be removed and reused when the retaining wall is dismantled. Its purpose is to provide
  • the wale support module for non-welding groove filling and reuse is a wale support module used to mount a wale on a thumb stake of a retaining wall, and is located on a thumb stake where the wale is placed.
  • a wale support bracket that is detachably installed to support the wale; It is characterized in that it includes a; groove filling block supported by the wale support bracket to fill the groove formed between the wale and thumb stakes.
  • it is characterized in that it further includes an inverted wale hanger that is disposed on the upper part of the groove filling block and is detachably installed on the thumb stake so that the installation posture of the wale is maintained.
  • the wale support bracket is disposed under the groove filling block and positioned so as to be in contact with the thumb stake, one end of which is fixed to the upper end of the lower vertical band of the wale support, the lower wale support lower support for supporting the lower end of the wale, One end is fixed to the lower part of the lower vertical wale support and the other end is fixed to the lower part of the wale support. It is characterized in that it includes; the upper and lower hinge joints of the wale support.
  • the block for filling the groove is a block having a block bottom surface that is in contact with the support surface of the wale support bracket, a block vertical surface facing the wale line perpendicular to the bottom surface of the block, and a block having a sloped surface of a block that has a certain acute angle with respect to the bottom of the block and is interviewed by a thumb stake.
  • a filling bolt having a screw shaft screwed to the nut for adjusting the gap for filling in the groove at one end and having a cylindrical pivot having a spherical groove and a groove for rotation operation arranged in a circle at the other end; It is characterized in that it comprises a; spherically coupled to the spherical groove of the cylindrical pivot to be interviewed on the wale belt.
  • the block infill block is a block body having a screw groove for adjusting the gap between the block and the vertical surface of the block facing the wale perpendicular to the bottom of the block and the vertical surface of the block which is in contact with the support surface of the wale support bracket, and ; a groove filling bolt having a screw shaft screwed to the screw groove for adjusting the gap for filling in the groove at one end and having a groove for rotation operation at the other end and being interviewed on the wale; a lower pivot bolt screwed to the block body so as to protrude and move; It is characterized in that it includes; a pile supporting foot that is spherically coupled to the lower pivot bolt and is interviewed on the thumb pile.
  • the reverse wale jig hanger is placed on the upper part of the block filling block and positioned so as to be in contact with the thumb stake, one end is fixed to the lower end of the hanger vertical stand and one end is fixed to the upper part of the hanger vertical stand in contact with the upper part of the wale. It is characterized in that it includes a hook reinforcing bar, the other end of which is fixed to the hanger support, and upper and lower hinge joints of the hanger connected to the upper and lower ends of the hanger upright through detachable hinge bolts and joined to the thumb piles by welding respectively.
  • a pair of groove filling block guides installed to face each other in order to guide the installation of the filling block and prevent deviation of the installation position are further installed on the lower support of the belt support bracket.
  • the wale support module for non-welding groove filling and reuse of the present invention even if the groove spacing between the thumb peg and the wale is different, the groove filling adjustment is easily made with the groove filling bolt of the groove filling block.
  • the wale supporting foot or the pile supporting foot actively pivots to stably support the wale.
  • the wale support bracket is separated leaving only the upper and lower hinge joints of the wale support on the thumb pile and can be reused, thereby reducing the waste of materials and reducing the construction cost.
  • the reverse wale hanger when the reverse wale hanger is additionally installed, the wale is installed more stably, so that the earth anchor can exert optimal anchoring force.
  • the reverse wale hanger also has the advantage of being reusable because it can be separated and disassembled leaving only the hinge joint part.
  • Figure 1a is an installation state diagram of the wale support module according to the present invention.
  • Figure 1b is a state diagram in which a reverse wale hanger applied to the present invention is additionally installed.
  • Figure 2 is a perspective view of the wale support module shown in Figure 1a.
  • Figure 3a is an assembly cross-sectional view of the groove filling block shown in Figure 1a.
  • FIG. 3b is an assembled state diagram in which a lock nut is additionally installed to the groove filling bolt of the groove filling block shown in FIG. 3a.
  • Figure 4 is an assembly cross-sectional view showing another form of the groove filling block applied to the present invention.
  • Figure 5 is a front view of the reverse wale hanger applied to the present invention.
  • Figure 6 is a state diagram in which the wale support bracket and the reverse wale hanger of the wale support module applied to the present invention are separated from the thumb stake.
  • Figure 7 is a state diagram of the use of the groove filling block shown in Figure 4.
  • the wale supporting module 100 is installed on the thumb pile 12 of the retaining wall and used to support the wale 20 as shown in FIGS. 1A and 1B .
  • the wale support module 100 can adjust the gap filling due to the groove filling block 120, accommodate the installation angle of the wale 20, the installation safety is improved, and the earth anchor 5 provides the optimal anchoring force. can perform
  • the wale support module 100 can be disassembled and reused when the wale 20 is removed, thereby reducing material wastage and reducing construction costs.
  • the wale support module 100 is detachably installed on the thumb stake 12 where the wale 20 is to be placed, and the wale support bracket 110 for supporting the wale 20 .
  • a groove filling block 120 or 120 ′ supported by the band support bracket 110 to fill the groove formed between the band band 20 and the thumb stake 12 .
  • the wale support module 100 is disposed on the top of the groove filling block 120 as shown in FIG. 1b and is detachably installed on the thumb stake 12 at the same time to maintain the installation posture of the wale 20. 130) may be further included.
  • the wale support bracket 110 is disposed at the lower portion of the groove filling block 120 and positioned to contact the thumb stake 12, the lower vertical wale support 112, and one end of the wale support lower vertical stand 112 at the top of the
  • the lower wale support 114 that is fixed and supports the lower end of the wale 20, one end is fixed to the lower end of the lower vertical wale 112, and the other end is fixed to the lower wale support lower support 114.
  • (116) the upper and lower hinge joints (118a, 118b) of the wale support, which are connected to the upper and lower ends of the wale support lower vertical bar 112 through detachable hinge bolts 117 and are respectively welded to the thumb stake 12.
  • the lower vertical band 112, the lower wale support 114, and the lower reinforcing bar 116 are made of L-shaped steel, but are not limited to this type of steel.
  • the band support bracket 110 is provided with upper and lower hinge joints 118a and 118b for the band support, and the upper and lower hinge joints 118a and 118b for the band support are welded to the thumb stake 12 to provide the band support bracket ( 110) is installed to support the wale 20. Thereafter, when the earth anchor is removed, through the separation of the hinge bolt 117, as shown in FIG. 6, the wale support lower vertical support 112, the wale support lower support 114, and the strap support lower reinforcing bar 116 are recovered. (110) has the advantage that reuse is possible.
  • a pair of groove fillings installed to face each other in order to guide the installation of the infill block 120 and prevent deviation of the installation position on the lower support 114 of the belt support bracket 110 .
  • a block guide 115 may be further installed.
  • the hinge bolt 117 installed in the wale support lower hinge joint 118b is inserted through the long hole 1181 into the wale support lower hinge joint 118b so that the installation angle of the wale support lower support 114 can be adjusted. It is preferable to do
  • the first type of groove filling block 120 is perpendicular to the block bottom surface 1210a, the block bottom surface 1210a, which is in contact with the support surface of the wale support bracket 110, as shown in FIGS. a block body 1210 having a block inclined surface 1210c that faces the block vertical surface 1210b, a block inclined surface 1210c that is interviewed on the thumb stake 12 with a constant acute angle with respect to the block bottom surface 1210a; A plurality of groove filling gap adjustment nuts 1220 installed on the block vertical surface (1210b) side and; A groove provided with a cylindrical pivot 1232 having a screw shaft 1231 screwed to the nut 1220 for adjusting the gap between filling grooves at one end, and having a spherical groove 1232a and a circularly arranged rotation operation groove 1232b at the other end. Filling bolts 1230 and; It is spherically coupled to the spherical groove 1232b of the cylindrical pivot 1232 and includes a wale support foot 1240 that is
  • the height of the first type of filling block 120 protruding from the filling gap adjusting nut 1220 according to the rotation direction of the filling bolt 1230 is adjusted, so that it can easily respond to a change in the filling gap.
  • the wale support foot 1240 pivots in the spherical groove 1232a of the wale filling bolt 1230 and is in close contact with the bottom surface of the wale 20, thereby stabilizing the filling of the groove.
  • FIGS. (20) Another second type of groove filling block 120' is perpendicular to the block bottom surface (1210a') and the block bottom surface (1210a') that are in contact with the support surface of the wale support bracket 110 as shown in FIGS. (20) a block body 1210' having a vertical surface (1210b '), block vertical surface (1210b ') side screw grooves for adjusting the gap adjustment (1210d') facing the block body (1210') and; At one end, it has a screw shaft 1231' screwed to the screw groove 1210d' for filling the gap, and has a groove for rotation operation 1232b' at the other end, and a groove filling bolt 1230' which is interviewed on the wale 20.
  • the groove filling block 120' of the second type can respond to a change in the groove filling interval by adjusting the protrusion amount by the rotation operation of the groove filling bolt 1230'.
  • the pile support foot 1260' pivots on the lower pivot bolt 1250' and comes in close contact with the thumb pile 12, thereby stably realizing the filling of the groove.
  • a lock nut 1233 may be further installed in the groove filling bolts 1230 and 1230 ′ for fixing the adjusted length as shown in FIG. 3B .
  • the reverse wale hanger 130 is disposed on the upper portion of the groove filling block 120 as in FIG. 5 and is positioned so as to be in contact with the thumb stake 12, a hanger vertical stand 132, one end of which is a hanger vertical stand 132.
  • Hanging reinforcement 136, hanging vertical It includes upper and lower hinge joints (138a, 138b) connected to the upper and lower ends of the stand 132 through detachable hinge bolts 137 and joined to the thumb stakes 12 by welding, respectively.
  • the vertical hanger 132, the hanger support 134, and the hanger reinforcing bar 136 are made of L-shaped steel, but are not limited to this type of steel.
  • the reverse wale holder 130 is supported by the wale support bracket 110 and serves to press the wale 20 from the upper part using the hanger support 134, thereby suppressing the upward lifting of the wale belt 20.
  • the installation stability of (20) can be ensured.
  • the reverse wale hanger 130 separates the hinge bolt 137 to dismantle the upper vertical band 132 from the wale upper and lower hinge joints 138a and 138b, thereby enabling reuse.
  • the hinge bolt 137 installed on the hanger upper hinge joint 138a is inserted through the long hole 1381 into the hanger upper hinge joint 138a to adjust the installation angle of the hanger base 134 due to the wale 20. It is preferable to allow
  • the groove filling bolts 1230 and 1230' of the groove filling block 120 or 120' even if the groove spacing between the thumb stake 12 and the wale 20 is different. It has the advantage that the infill adjustment is possible.
  • the wale supporting foot 1240 or the pile supporting foot 1260 ′ actively pivots to stably support the wale 20. have.
  • the wale support bracket 100 is separated leaving only the upper and lower hinge joints 118a and 118b of the wale support on the thumb pile 12 and can be reused. can be alleviated.
  • the reverse wale hanger 130 when the reverse wale hanger 130 is additionally installed, the wale 20 is installed more stably, so that the earth anchor 5 can exert an optimal anchoring force, and the reverse wale hanger 130 also has upper and lower hinges.
  • the joint (138a, 138b) can be reused to reduce the construction cost.
  • the groove filling adjustment is easily made with the groove filling bolt of the groove filling block, and according to the installation direction of the earth anchor Depending on the inclination angle of the wale, the wale support feet or the pile support feet actively pivot to support the wale stably. As this becomes possible, the waste factor of materials can be reduced and construction costs can be reduced.
  • the reverse wale hanger is additionally installed, the wale is installed more stably, so that the earth anchor can exert an optimal anchoring force. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Retaining Walls (AREA)

Abstract

본 발명은 엄지말뚝과 띠장간에 발생된 홈을 홈메우기 블럭을 통해 쉽게 메울 수 있도록 하고, 어스앵커의 설치각도에 대응하여 홈메우기 블럭측 띠장 받침발 또는 말뚝 받침발이 피봇 동작하여 띠장의 기울기에 적절하게 대응하여 최적의 앵커력이 발휘될 수 있고, 흙막이벽의 해체시 철거되어져 재사용이 가능하며, 역띠장걸이에 의한 띠장의 설치 안정성을 높이도록 한 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈에 관한 것이다.

Description

무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈
본 발명은 흙막이벽의 시공시 띠장을 엄지말뚝에 거치하기 사용되는 띠장 받침 모듈에 관한 것으로, 특히 엄지말뚝과 띠장간에 발생된 홈을 홈메우기 블럭을 통해 쉽게 메울 수 있도록 하고, 어스앵커의 설치각도에 대응하여 홈메우기 블럭측 띠장 받침발 또는 말뚝 받침발이 피봇 동작하여 띠장의 기울기에 적절하게 대응하여 최적의 앵커력이 발휘될 수 있고, 흙막이벽의 해체시 철거되어져 재사용이 가능하며, 역띠장걸이에 의한 띠장의 설치 안정성을 높이도록 한 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈에 관한 것이다.
흙막이벽은 토목 건축 현장에서 터파기 공사시 토사 등이 무너지는 것을 방지하기 위해 시공된다. 이때 흙막이벽이 무너지는 것을 방지하기 위해서는 통상 스트러트공법 또는 어스앵커 공법이 선택적으로 사용된다. 여기서 어스앵커 공법은 흙막이벽 배면에 앵커체를 형성하여 인장력에 의해 토압을 지지하는 공법으로 앵커는 인장재를 사용하여 힘을 흙 또는 암반속에 전달토록 한다. 이때 어스앵커의 두부를 정착시키기 위해 흙막이벽측 엄지말뚝에 띠장이 설치된다. 그런데 엄지말뚝은 시공 후 불규칙한 배열을 이루게 되는 경우, 엄지말뚝과 띠장과의 사이에서 불규칙한 유격(홈)발생으로, 이 홈을 메우기 위해 홈메우기 강재(앵글, 강판, H형 강재 등)가 설치된다. 이때 홈메우기 강재는 해당 위치의 엄지말뚝과 띠장간의 홈 간격이 다르므로 규격되기가 어렵고, 어스앵커의 설치방향에 따른 띠장의 기울어진 각도에 능동적 대응이 안되며, 용접 설치 작업이 어려운 문제가 있다.
한편, 띠장은 흙막이벽의 엄지말뚝에 설치된 띠장 받침브라켓에 지지된다. 따라서 띠장은 흙막이 벽에 작용하는 토압에 의한 휨모멘트와 전단력에 저항한다. 이 띠장에 어스앵커가 설치되는 경우 기울기 각도를 가지고 설치되며, 이를 위해 띠장 받침브라켓은 기울기 조절이 필요할 때가 있다. 일반적으로 띠장 받침브라켓은 현장에서 흙막이벽의 엄지말뚝에 용접으로 통해서 설치된 후, 띠장의 철거시 해체되어 폐기된다. 이같이 띠장 받침브라켓은 재사용이 이루어지지 못하는 실정이기 때문에 자재의 낭비가 될 뿐만 아니라 공사비를 줄이는데 도움이 되지 못하는 문제가 있다. 따라서 띠장 받침브라켓의 재사용을 위한 기술적 방안이 요구된다.
본 발명의 배경이 되는 띠장 관련된 기술로는 한국 등록특허 등록번호 제10-1677811호, 제10-1364227호가 제안되어 있다. 그러나 상기 배경기술들은 띠장 2개가 배면을 마주하여 설치되어야 하고, 홈메우기 겸용 거치대에 홈 간격에 따른 스페이서를 추가적으로 달리 설치해야 하고, 축볼트와 고정장치를 통해 홈메우기 겸용 거치대를 띠장에 결합시키는 추가적인 설치작업등으로 홈메우기 작업이 복잡하고, 체결부품이 많아지는 문제와, 자바라 잭 설치에 따른 별도의 콘크리트 충전 및 양생 시간이 필요한 문제가 있다.
본 발명의 배경이 되는 띠장 브래킷과 관련된 기술로는 한국 등록특허 등록번호 제10-1420374호 및 제10-1683968호가 제안되어 있다. 그러나 상기 배경기술들은 견고한 구조를 갖는데 반해, 에이치빔 띠장 지지용 브라켓의 설치비용을 저감하기 위한 재사용에 대한 기술적 대안이 없고, 터파기의 굴착 깊이에 따라 여러 개소에 설치할 수 없는 문제가 있다. 즉, 띠장 브래킷을 말뚝의 깊이를 따라 띠장이 설치될 중간중간에 설치할 수 없는 단점을 갖는다. 또한 띠장 브래킷에 각도 조절이 불가능하여 어스앵커의 시공을 위해 띠장을 기울게 설치할 수 없는 문제가 있다.
본 발명은 엄지말뚝과 띠장간에 발생된 홈을 홈메우기 블럭을 통해 쉽게 메울 수 있도록 하고, 어스앵커의 설치각도에 대응하여 홈메우기 블럭측 띠장 받침발 또는 말뚝 받침발이 피봇 동작하여 띠장의 기울기에 적절하게 대응하여 최적의 앵커력이 발휘될 수 있고, 흙막이벽의 해체시 철거되어져 재사용이 가능하며, 역띠장걸이에 의한 띠장의 설치 안정성을 높이도록 한 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈을 제공함에 그 목적이 있다.
본 발명의 적절한 실시 형태에 따른 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈은, 흙막이벽의 엄지말뚝에 띠장을 거치하는데 사용되는 띠장 받침 모듈에 있어서, 상기 띠장이 배치될 위치가 되는 엄지말뚝에 착탈 가능하게 설치되어 띠장을 지지하는 띠장받침 브라켓과; 상기 띠장받침 브라켓에 지지되어 띠장과 엄지말뚝의 사이에 형성되는 홈을 메워주는 홈 메우기 블럭;을 포함한 것을 특징으로 한다.
또한, 상기 홈 메우기 블럭의 상부에 배치됨과 동시에 상기 엄지말뚝에 착탈 가능하게 설치되어 띠장의 설치 자세가 유지되도록 하는 역띠장걸이가 더 포함된 것을 특징으로 한다.
또한, 상기 띠장받침 브라켓은 홈 메우기 블럭의 하부에 배치되어 엄지말뚝에 접하도록 위치되는 띠장받침 하부수직대, 일단이 띠장받침 하부수직대의 상단에 고정되어 띠장의 하단을 지지하는 띠장받침 하부받침대, 일단이 띠장받침 하부수직대의 하단에 고정되고 타단이 띠장받침 하부받침대에 고정된 띠장받침 하부보강대, 띠장받침 하부수직대의 상단 및 하단에 분리가능한 힌지볼트를 통해 연결되어 엄지말뚝에 각기 용접으로 접합되는 띠장받침 상,하부힌지조인트;를 포함한 것을 특징으로 한다.
또한, 홈 메우기 블럭은 띠장받침 브라켓의 지지면과 면접되는 블럭 밑면, 블럭 밑면에 대해 수직하여 띠장을 마주보고 있는 블럭 수직면, 블럭 밑면에 대해 일정한 예각을 갖고 엄지말뚝에 면접되는 블럭 경사면을 갖는 블럭몸체와; 상기 블럭 수직면측에 설치된 복수의 홈메우기 간격조정용 너트와; 일단에 상기 홈메우기 간격조정용 너트에 나사 결합되는 나사축을 갖고 타단에 구면홈과 원형 배열된 회전조작용 홈을 갖는 원통형 피봇이 구비된 홈메우기 볼트와; 상기 원통형 피봇의 구면홈에 구면 결합되어 상기 띠장에 면접되는 띠장 받침발;을 포함한 것을 특징으로 한다.
또한, 홈 메우기 블럭은 띠장받침 브라켓의 지지면과 면접되는 블럭 밑면, 블럭 밑면에 대해 수직하여 띠장을 마주보고 있는 블럭 수직면, 블럭 수직면측에 나사 가공된 홈메우기 간격조정용 나사홈을 갖는 블럭몸체와; 일단에 상기 홈메우기 간격조정용 나사홈에 나사 결합되는 나사축을 갖고 타단에 회전조작용 홈을 갖고 띠장에 면접되는 홈메우기 볼트와; 상기 블럭몸체에 돌출 이동 가능하도록 나사 결합되어 있는 하부 피봇 볼트와; 하부 피봇 볼트에 구면 결합되어져 상기 엄지말뚝에 면접되는 말뚝 받침발;을 포함한 것을 특징으로 한다.
또한, 역띠장걸이는 홈 메우기 블럭의 상부에 배치되어 엄지말뚝에 접하도록 위치되는 걸이수직대, 일단이 걸이수직대의 하단에 고정되어 띠장의 상단과 접하는 걸이받침대, 일단이 걸이수직대의 상단에 고정되고 타단이 걸이받침대에 고정된 걸이보강대, 걸이수직대의 상단 및 하단에 분리가능한 힌지볼트를 통해 연결되어 엄지말뚝에 각기 용접으로 접합되는 걸이 상,하부 힌지조인트;를 포함한 것을 특징으로 한다.
또한, 상기 띠장받침 브라켓의 띠장받침 하부받침대에는 홈메우기 블럭의 설치 안내 및 설치 위치의 이탈 방지를 위해 서로 마주보도록 설치된 한 쌍의 홈메우기 블럭 가이드가 더 설치되어 있는 것을 특징으로 한다.
본 발명의 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈에 따르면, 엄지말뚝과 띠장간의 홈 간격이 다르더라도 홈 메우기 블럭의 홈 메우기 볼트로 홈 메우기 조정이 쉽게 이루어지는 이점을 갖는다. 또한 어스앵커의 설치방향에 따른 띠장의 기울어진 각도에 따라 띠장 받침발 또는 말뚝 받침발이 능동적 피봇 동작하여 띠장을 안정되게 지지할 수 있다.
또한, 띠장의 철거시 띠장 받침브라켓은 띠장받침 상,하부 힌지조인트만을 엄지말뚝에 남긴채 분리되어 재사용이 가능해짐으로 자재의 낭비 요소가 줄어들어 공사비를 경감시킬 수 있다.
또한, 역띠장걸이가 추가적으로 설치되는 경우, 띠장이 더욱 안정적으로 설치되어 어스앵커는 최적의 앵커력을 발휘할 수 있다. 또한 역띠장걸이도 힌지조인트 부분만을 남겨두고 분리 해체가 가능하여 재사용이 가능한 장점을 갖는다.
본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1a는 본 발명에 따른 띠장 받침 모듈의 설치상태도.
도 1b는 본 발명에 적용되는 역띠장걸이가 추가적으로 설치된 상태도.
도 2는 도 1a에 도시된 띠장 받침 모듈의 사시도.
도 3a는 도 1a에 도시된 홈 메우기 블럭의 조립단면도.
도 3b는 도 3a에 도시된 홈 메우기 블럭의 홈 메우기 볼트에 잠금너트가 추가적으로 설치된 조립상태도.
도 4는 본 발명에 적용되는 홈 메우기 블럭의 다른 형태를 도시한 조립단면도.
도 5는 본 발명에 적용되는 역띠장걸이의 정면도.
도 6은 본 발명에 적용되는 띠장 받침 모듈의 띠장받침브라켓과 역띠장걸이가 엄지말뚝에서 분리된 상태도.
도 7은 도 4에 도시된 홈 메우기 블럭의 사용상태도.
아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.
본 발명에 따른 띠장 받침 모듈(100)은 도 1a 및 도 1b에서와 같이 흙막이벽의 엄지말뚝(12)에 설치되어 띠장(20)을 지지하는데 사용된다. 특히 띠장 받침 모듈(100)은 홈메우기 블럭(120)으로 인해 홈 메우기 간격 조정이 가능하고, 띠장(20)의 설치 각도를 수용하여 설치 안전성이 향상되고 어스앵커(5)가 최적의 앵커력을 발휘할 수 있다. 또한 띠장 받침 모듈(100)은 띠장(20)의 철거시 해체되어 재사용이 가능함으로 자재낭비를 줄일 수 있고 공사비를 절감할 수 있다.
도 1a 내지 도 3 및 도 7과 같이 띠장 받침 모듈(100)은 띠장(20)이 배치될 위치가 되는 엄지말뚝(12)에 착탈 가능하게 설치되어 띠장(20)을 지지하는 띠장받침 브라켓(110)과, 띠장받침 브라켓(110)에 지지되어 띠장(20)과 엄지말뚝(12)의 사이에 형성되는 홈을 메워주는 홈 메우기 블럭(120 또는 120')을 포함한다.
띠장 받침 모듈(100)은 도 1b에서와 같이 홈 메우기 블럭(120)의 상부에 배치됨과 동시에 엄지말뚝(12)에 착탈 가능하게 설치되어 띠장(20)의 설치 자세가 유지되도록 하는 역띠장걸이(130)가 더 포함될 수 있다.
띠장받침 브라켓(110)은 홈 메우기 블럭(120)의 하부에 배치되어 엄지말뚝(12)에 접하도록 위치되는 띠장받침 하부수직대(112), 일단이 띠장받침 하부수직대(112)의 상단에 고정되어 띠장(20)의 하단을 지지하는 띠장받침 하부받침대(114), 일단이 띠장받침 하부수직대(112)의 하단에 고정되고 타단이 띠장받침 하부받침대(114)에 고정된 띠장받침 하부보강대(116), 띠장받침 하부수직대(112)의 상단 및 하단에 분리가능한 힌지볼트(117)를 통해 연결되어 엄지말뚝(12)에 각기 용접으로 접합되는 띠장받침 상,하부힌지조인트(118a,118b)를 포함한다. 띠장받침 하부수직대(112), 띠장받침 하부받침대(114) 및 띠장받침 하부보강대(116)는 L형 강재로 제작되어 있으나 이러한 형태의 강재에 한정되는 것은 아니다.
이같이 띠장받침 브라켓(110)은 띠장받침 상,하부힌지조인트(118a,118b)를 구비하고 있어, 띠장받침 상,하부힌지조인트(118a,118b)를 엄지말뚝(12)에 용접하여 띠장받침 브라켓(110)이 띠장(20)을 지지할 수 있도록 설치된다. 이후 어스앵커의 제거시 힌지볼트(117)의 분리를 통해 도 6과 같이 띠장받침 하부수직대(112), 띠장받침 하부받침대(114) 및 띠장받침 하부보강대(116)의 회수가 이루어져 띠장받침 브라켓(110)으로 재사용이 가능하게 되는 이점을 갖게 된다.
여기서, 도 1a 및 도 2와 같이 띠장받침 브라켓(110)의 띠장받침 하부받침대(114)에는 홈메우기 블럭(120)의 설치 안내 및 설치 위치의 이탈 방지를 위해 서로 마주보도록 설치된 한 쌍의 홈메우기 블럭 가이드(115)가 더 설치될 수 있다.
또한, 띠장받침 하부힌지조인트(118b)에 설치되는 힌지볼트(117)는 띠장받침 하부힌지조인트(118b)에 장공(1181)을 통해 삽입되어져 띠장받침 하부받침대(114)의 설치 각도를 조정할 수 있도록 함이 바람직하다.
제 1형태의 홈 메우기 블럭(120)은 도 1 및 도 3a와 같이 띠장받침 브라켓(110)의 지지면과 면접되는 블럭 밑면(1210a), 블럭 밑면(1210a)에 대해 수직하여 띠장(20)을 마주보고 있는 블럭 수직면(1210b), 블럭 밑면(1210a)에 대해 일정한 예각을 갖고 엄지말뚝(12)에 면접되는 블럭 경사면(1210c)을 갖는 블럭몸체(1210)와; 블럭 수직면(1210b)측에 설치된 복수의 홈메우기 간격조정용 너트(1220)와; 일단에 홈메우기 간격조정용 너트(1220)에 나사 결합되는 나사축(1231)을 갖고 타단에 구면홈(1232a)과 원형 배열된 회전조작용 홈(1232b)을 갖는 원통형 피봇(1232)이 구비된 홈메우기 볼트(1230)와; 원통형 피봇(1232)의 구면홈(1232b)에 구면 결합되어 띠장(20)에 면접되는 띠장 받침발(1240)을 포함한다.
이같이 제 1형태의 홈 메우기 블럭(120)은 홈메우기 볼트(1230)의 회전 방향에 따라 홈메우기 간격조정용 너트(1220)로부터 돌출되는 높이가 조정되어 홈 메우기 간격 변화에 쉽게 대응할 수 있다. 또한 띠장(20)의 설치 각도에 변화가 생길 경우, 띠장 받침발(1240)이 홈메우기 볼트(1230)의 구면홈(1232a)에서 피봇 회전하여 띠장(20)의 밑면에 밀착됨으로써 홈메우기를 안정되게 실현하게 된다.
다른 제 2형태의 홈 메우기 블럭(120')은 도 4 및 도 7과 같이 띠장받침 브라켓(110)의 지지면과 면접되는 블럭 밑면(1210a'), 블럭 밑면(1210a')에 대해 수직하여 띠장(20)을 마주보고 있는 블럭 수직면(1210b'), 블럭 수직면(1210b')측에 나사 가공된 홈메우기 간격조정용 나사홈(1210d')을 갖는 블럭몸체(1210')와; 일단에 상기 홈메우기 간격조정용 나사홈(1210d')에 나사 결합되는 나사축(1231')을 갖고 타단에 회전조작용 홈(1232b')을 갖고 띠장(20)에 면접되는 홈메우기 볼트(1230')와; 블럭몸체(1210')에 돌출 이동 가능하도록 나사 결합되어 있는 하부 피봇 볼트(1250')와; 하부 피봇 볼트(1250')에 구면 결합되어져 엄지말뚝(12)에 면접되는 말뚝 받침발(1260')을 포함한다.
따라서 제 2형태의 홈 메우기 블럭(120')은 홈메우기 볼트(1230')의 회전 조작에 의해 돌출량이 조정됨으로서 홈 메우기 간격 변화에 대응할 수 있다. 또한 띠장(20)의 설치 각도에 변화가 생길 경우, 말뚝 받침발(1260')이 하부 피봇 볼트(1250')에서 피봇 회전하여 엄지말뚝(12)에 밀착됨으로써 홈메우기를 안정되게 실현할 수 있다.
여기서 도 3b와 같이 홈메우기 볼트(1230,1230')에는 조정된 길이의 고정을 위해 잠금너트(1233)가 더 설치될 수 있다.
한편, 역띠장걸이(130)는 도 5에서와 같이 홈 메우기 블럭(120)의 상부에 배치되어 엄지말뚝(12)에 접하도록 위치되는 걸이수직대(132), 일단이 걸이수직대(132)의 하단에 고정되어 띠장(20)의 상단과 접하는 걸이받침대(134), 일단이 걸이수직대(132)의 상단에 고정되고 타단이 걸이받침대(134)에 고정된 걸이보강대(136), 걸이수직대(132)의 상단 및 하단에 분리가능한 힌지볼트(137)를 통해 연결되어 엄지말뚝(12)에 각기 용접으로 접합되는 걸이 상,하부 힌지조인트(138a,138b)를 포함한다. 걸이수직대(132), 걸이받침대(134) 및 걸이보강대(136)는 L형 강재로 제작되어 있으나 이러한 형태의 강재에 한정되는 것은 아니다.
이같이 역띠장걸이(130)는 띠장 받침브라켓(110)에 지지되어 띠장(20)을 걸이받침대(134)를 사용하여 그 상부에서 억누르는 역할을 하기 때문에 띠장(20)의 상향 들림을 억제시켜 띠장(20)의 설치 안정성이 확보될 수 있다. 또한 도 6과 같이 역띠장걸이(130)는 힌지볼트(137)를 분리시켜 띠장 상,하부 힌지조인트(138a,138b)로부터 띠장 상부수직대(132)를 해체해냄으로써 재사용이 가능하게 되는 이점을 갖게 된다.
한편, 걸이 상부 힌지조인트(138a)에 설치되는 힌지볼트(137)는 걸이 상부 힌지조인트(138a)에 장공(1381)을 통해 삽입되어져 띠장(20)으로 인한 걸이 받침대(134)의 설치 각도를 조정할 수 있도록 함이 바람직하다.
이와 같이 본 발명에 따른 띠장 받침 모듈(100)은 엄지말뚝(12)과 띠장(20)간의 홈 간격이 다르더라도 홈 메우기 블럭(120 또는 120')의 홈 메우기 볼트(1230,1230')로 홈 메우기 조정이 가능한 이점을 갖는다. 또한 어스앵커(5)의 설치방향에 따른 띠장(20)의 기울어진 각도에 따라 띠장 받침발(1240) 또는 말뚝 받침발(1260')이 능동적 피봇 동작하여 띠장(20)을 안정되게 지지할 수 있다.
또한, 띠장(12)의 철거시 띠장 받침브라켓(100)은 띠장받침 상,하부 힌지조인트(118a,118b)만을 엄지말뚝(12)에 남긴채 분리되어 재사용이 가능해짐으로 자재의 낭비 요소가 줄어들어 공사비를 경감시킬 수 있다.
또한, 역띠장걸이(130)가 추가적으로 설치되는 경우, 띠장(20)이 더욱 안정적으로 설치되어 어스앵커(5)는 최적의 앵커력을 발휘할 수 있고, 역띠장걸이(130)도 상,하부 힌지조인트(138a,138b)를 남기고 재사용되어 공사비를 경감시킬 수 있다.
본 발명의 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈은, 엄지말뚝과 띠장간의 홈 간격이 다르더라도 홈 메우기 블럭의 홈 메우기 볼트로 홈 메우기 조정이 쉽게 이루어지며, 어스앵커의 설치방향에 따른 띠장의 기울어진 각도에 따라 띠장 받침발 또는 말뚝 받침발이 능동적 피봇 동작하여 띠장을 안정되게 지지할 수 있고, 띠장의 철거시 띠장 받침브라켓은 띠장받침 상,하부 힌지조인트만을 엄지말뚝에 남긴채 분리되어 재사용이 가능해짐으로 자재의 낭비 요소가 줄어들어 공사비를 경감시킬 수 있다. 또한, 역띠장걸이가 추가적으로 설치되는 경우, 띠장이 더욱 안정적으로 설치되어 어스앵커는 최적의 앵커력을 발휘할 수 있고, 역띠장걸이도 힌지조인트 부분만을 남겨두고 분리 해체가 가능하여 재사용이 가능한 발명이다.

Claims (7)

  1. 흙막이벽의 엄지말뚝(12)에 띠장(20)을 거치하는데 사용되는 띠장 받침 모듈(100)에 있어서,
    상기 띠장(20)이 배치될 위치가 되는 엄지말뚝(12)에 착탈 가능하게 설치되어 띠장(20)을 지지하는 띠장받침 브라켓(110)과;
    상기 띠장받침 브라켓(110)에 지지되어 띠장(20)과 엄지말뚝(12)의 사이에 형성되는 홈을 메워주는 홈 메우기 블럭(120 또는 120');을 포함한 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  2. 제 1항에 있어서,
    상기 홈 메우기 블럭(120)의 상부에 배치됨과 동시에 상기 엄지말뚝(12)에 착탈 가능하게 설치되어 띠장(20)의 설치 자세가 유지되도록 하는 역띠장걸이(130)가 더 포함된 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  3. 제 1항에 있어서,
    상기 띠장받침 브라켓(110)은 홈 메우기 블럭(120)의 하부에 배치되어 엄지말뚝(12)에 접하도록 위치되는 띠장받침 하부수직대(112), 일단이 띠장받침 하부수직대(112)의 상단에 고정되어 띠장(20)의 하단을 지지하는 띠장받침 하부받침대(114), 일단이 띠장받침 하부수직대(112)의 하단에 고정되고 타단이 띠장받침 하부받침대(114)에 고정된 띠장받침 하부보강대(116), 띠장받침 하부수직대(112)의 상단 및 하단에 분리가능한 힌지볼트(117)를 통해 연결되어 엄지말뚝(12)에 각기 용접으로 접합되는 띠장받침 상,하부힌지조인트(118a,118b);를 포함한 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  4. 제 1항에 있어서,
    홈 메우기 블럭(120)은
    띠장받침 브라켓(110)의 지지면과 면접되는 블럭 밑면(1210a), 블럭 밑면(1210a)에 대해 수직하여 띠장(20)을 마주보고 있는 블럭 수직면(1210b), 블럭 밑면(1210a)에 대해 일정한 예각을 갖고 엄지말뚝(12)에 면접되는 블럭 경사면(1210c)을 갖는 블럭몸체(1210)와;
    상기 블럭 수직면(1210b)측에 설치된 복수의 홈메우기 간격조정용 너트(1220)와;
    일단에 상기 홈메우기 간격조정용 너트(1220)에 나사 결합되는 나사축(1231)을 갖고 타단에 구면홈(1232a)과 원형 배열된 회전조작용 홈(1232b)을 갖는 원통형 피봇(1232)이 구비된 홈메우기 볼트(1230)와;
    상기 원통형 피봇(1232)의 구면홈(1232b)에 구면 결합되어 상기 띠장(20)에 면접되는 띠장 받침발(1240);을 포함한 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  5. 제 1항에 있어서,
    홈 메우기 블럭(120')은
    띠장받침 브라켓(110)의 지지면과 면접되는 블럭 밑면(1210a'), 블럭 밑면(1210a')에 대해 수직하여 띠장(20)을 마주보고 있는 블럭 수직면(1210b'), 블럭 수직면(1210b')측에 나사 가공된 홈메우기 간격조정용 나사홈(1210d')을 갖는 블럭몸체(1210')와;
    일단에 상기 홈메우기 간격조정용 나사홈(1210d')에 나사 결합되는 나사축(1231')을 갖고 타단에 회전조작용 홈(1232b')을 갖고 띠장(20)에 면접되는 홈메우기 볼트(1230')와;
    상기 블럭몸체(1210')에 돌출 이동 가능하도록 나사 결합되어 있는 하부 피봇 볼트(1250')와;
    하부 피봇 볼트(1250')에 구면 결합되어져 상기 엄지말뚝(12)에 면접되는 말뚝 받침발(1260');을 포함한 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  6. 제 1항에 있어서,
    역띠장걸이(130)는
    홈 메우기 블럭(120)의 상부에 배치되어 엄지말뚝(12)에 접하도록 위치되는 걸이수직대(132), 일단이 걸이수직대(132)의 하단에 고정되어 띠장(20)의 상단과 접하는 걸이받침대(134), 일단이 걸이수직대(132)의 상단에 고정되고 타단이 걸이받침대(134)에 고정된 걸이보강대(136), 걸이수직대(132)의 상단 및 하단에 분리가능한 힌지볼트(137)를 통해 연결되어 엄지말뚝(12)에 각기 용접으로 접합되는 걸이 상,하부 힌지조인트(138a,138b);를 포함한 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
  7. 제 3항에 있어서,
    상기 띠장받침 브라켓(110)의 띠장받침 하부받침대(114)에는 홈메우기 블럭(120)의 설치 안내 및 설치 위치의 이탈 방지를 위해 서로 마주보도록 설치된 한 쌍의 홈메우기 블럭 가이드(115)가 더 설치되어 있는 것을 특징으로 하는 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈.
PCT/KR2021/015486 2021-01-11 2021-10-30 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈 WO2022149692A1 (ko)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2023548167A JP2023546543A (ja) 2021-01-11 2021-10-30 無溶接裏込め及び再利用のための腹起し受けモジュール
CN202180006130.4A CN115516170B (zh) 2021-01-11 2021-10-30 用于无焊接填缝并可重复使用的横梁支撑模块
US18/032,218 US20230399809A1 (en) 2021-01-11 2021-10-30 Wale support module for filling and reuse of non-welding groove

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020210003493A KR102310228B1 (ko) 2021-01-11 2021-01-11 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈
KR10-2021-0003493 2021-01-11

Publications (1)

Publication Number Publication Date
WO2022149692A1 true WO2022149692A1 (ko) 2022-07-14

Family

ID=78115723

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2021/015486 WO2022149692A1 (ko) 2021-01-11 2021-10-30 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈

Country Status (5)

Country Link
US (1) US20230399809A1 (ko)
JP (1) JP2023546543A (ko)
KR (1) KR102310228B1 (ko)
CN (1) CN115516170B (ko)
WO (1) WO2022149692A1 (ko)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102310228B1 (ko) * 2021-01-11 2021-10-08 (주)제이피이엔씨 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈
KR102637531B1 (ko) 2023-02-28 2024-02-16 김재승 홈메우기 모듈 및 이를 이용한 흙막이 시공 방법
KR102653831B1 (ko) * 2023-07-17 2024-04-02 (주)제이피이엔씨 어스앵커홀이 형성된 폐합단면형 띠장과 볼트식 홈메우기 세트를 구비한 어스앵커 전용 단독 띠장 시스템

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164573A (ja) * 1999-12-08 2001-06-19 Kajima Corp 山留め架構およびそれに使用する切ばり端面部材
KR100714041B1 (ko) * 2006-01-18 2007-05-04 주식회사 스마텍엔지니어링 수직방향 설치각도 조절이 용이한 띠장의 설치구조
KR100910987B1 (ko) * 2007-01-24 2009-08-05 (주)써포텍 띠장용 홈메우기 장치
KR101715876B1 (ko) * 2016-06-08 2017-03-13 세광건설주식회사 흙막이 구조물
KR102077421B1 (ko) * 2019-04-25 2020-02-13 (주)제이피이엔씨 홈메우기 볼트를 갖는 띠장 및 이의 시공 방법
KR102310228B1 (ko) * 2021-01-11 2021-10-08 (주)제이피이엔씨 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252068A (ja) * 1997-03-11 1998-09-22 Shimizu Corp 山留め支保工設置方法
KR101036900B1 (ko) * 2009-07-06 2011-05-25 (주)한미글로벌건축사사무소 마그네틱 브라켓의 설치구조
JP6066758B2 (ja) * 2013-02-19 2017-01-25 大成建設株式会社 腹起こし裏込め型枠。
KR101420374B1 (ko) 2013-06-26 2014-07-16 부산교통공사 에이치빔 띠장 지지용 브라켓
KR101364227B1 (ko) 2013-10-11 2014-02-18 주식회사 에이씨이테크 흙막이 벽체와 띠장 간의 홈메우기용 자바라 잭
KR101683968B1 (ko) 2014-06-26 2016-12-09 양동종 띠장 브래킷
KR101677811B1 (ko) 2014-12-18 2016-11-18 주식회사 진림건설 흙막이 지보공의 어스앵커 단독 띠장 강재 구조물 및 그 시공방법
CN204676531U (zh) * 2015-04-17 2015-09-30 中建海峡建设发展有限公司 预应力锚索锚固装置
KR102315382B1 (ko) * 2016-04-07 2021-10-21 김일 버팀대 해체구간 흙막이벽체의 안정성을 위한 선행하중의 감압크기를 결정하는 수치해석 방법
CN108999199B (zh) * 2018-10-12 2022-06-03 深圳市工勘岩土集团有限公司 组合式基坑支护方法
CN210766797U (zh) * 2019-08-22 2020-06-16 武汉地质工程勘察院 一种深基坑开挖支护结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164573A (ja) * 1999-12-08 2001-06-19 Kajima Corp 山留め架構およびそれに使用する切ばり端面部材
KR100714041B1 (ko) * 2006-01-18 2007-05-04 주식회사 스마텍엔지니어링 수직방향 설치각도 조절이 용이한 띠장의 설치구조
KR100910987B1 (ko) * 2007-01-24 2009-08-05 (주)써포텍 띠장용 홈메우기 장치
KR101715876B1 (ko) * 2016-06-08 2017-03-13 세광건설주식회사 흙막이 구조물
KR102077421B1 (ko) * 2019-04-25 2020-02-13 (주)제이피이엔씨 홈메우기 볼트를 갖는 띠장 및 이의 시공 방법
KR102310228B1 (ko) * 2021-01-11 2021-10-08 (주)제이피이엔씨 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈

Also Published As

Publication number Publication date
CN115516170B (zh) 2024-01-05
CN115516170A (zh) 2022-12-23
KR102310228B1 (ko) 2021-10-08
US20230399809A1 (en) 2023-12-14
JP2023546543A (ja) 2023-11-02

Similar Documents

Publication Publication Date Title
WO2022149692A1 (ko) 무용접 홈 메우기 및 재사용을 위한 띠장 받침 모듈
WO2006038620A1 (ja) 脚柱の接合部構造および接合方法
KR102077421B1 (ko) 홈메우기 볼트를 갖는 띠장 및 이의 시공 방법
JP7234438B1 (ja) 法面安定化擁壁の構築方法
JP7194853B1 (ja) 法面安定化擁壁における擁壁パネルの支持構造
KR101787321B1 (ko) 프리스트레스트 무교대 교량법
US5474399A (en) Open cutting by floor slab braced retaining wall
JP7285386B1 (ja) 法面安定化擁壁における擁壁パネルの支持装置
KR102152766B1 (ko) 안전성이 증대된 거치식 교량점검시설
JPH0842164A (ja) 支保工サポートの設置方法及びその滑止め構造
US5161625A (en) Pile driving apparatus
EP0337475B1 (en) Pile driving apparatus
KR102248682B1 (ko) 재사용을 위한 띠장 받침브라켓
JP3101169B2 (ja) 柱・梁接合部材のための仮止め装置
JP3067565B2 (ja) 斜梁の座屈防止構造
CN209837671U (zh) 可重复使用的装配式建筑支撑装置
US5098066A (en) Clamp for hanging jack
KR20230110120A (ko) 시공 안전성을 높인 띠장의 설치 방법 및 그 구조
CN113356231A (zh) 钢桁架式基坑支护结构
KR102637531B1 (ko) 홈메우기 모듈 및 이를 이용한 흙막이 시공 방법
JP3782180B2 (ja) 土留め腹起こし材の矢板利用支持構造
KR102276810B1 (ko) 흙막이 구조물, 토류판 및 이의 시공방법
JP2886376B2 (ja) 杭頭部の定着部構造
JPH0959925A (ja) 既設の基礎構造物補強工法
JPH0649976B2 (ja) 構真柱の建て込み方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21917854

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023548167

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21917854

Country of ref document: EP

Kind code of ref document: A1