WO2022050840A1 - Crane vessel with a crane for hoisting wind turbine components - Google Patents
Crane vessel with a crane for hoisting wind turbine components Download PDFInfo
- Publication number
- WO2022050840A1 WO2022050840A1 PCT/NL2021/050534 NL2021050534W WO2022050840A1 WO 2022050840 A1 WO2022050840 A1 WO 2022050840A1 NL 2021050534 W NL2021050534 W NL 2021050534W WO 2022050840 A1 WO2022050840 A1 WO 2022050840A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- hoisting
- aft
- boom
- crane
- rotation axis
- Prior art date
Links
- 239000000725 suspension Substances 0.000 claims abstract description 68
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 7
- 101100313164 Caenorhabditis elegans sea-1 gene Proteins 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013341 scale-up Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/108—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means for lifting parts of wind turbines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/185—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use erecting wind turbines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/52—Floating cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/64—Jibs
- B66C23/66—Outer or upper end constructions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/04—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
- B66D3/06—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
Definitions
- the invention relates to a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck .
- Crane vessels of this kind are used for building offshore wind turbines , wherein turbine components , such as a tower, a nacelle, and a rotor with a hub and multiple blades are hoisted high above the waterline .
- the known crane vessels have a crane that comprises a slewing crane base and a long boom that is rotatable connected with the crane base at the boom heel .
- the boom is raised and lowered by means of a luf fing hoist tackle above the boom that is hauled in or paid out by a winch .
- fshore wind turbines typically have power of 8 Megawatt and require a lifting height for its components of 140 meters above the waterline .
- Offshore wind turbines are continuously scaled up, wherein a power of 15 Megawatt is envisaged in the near future .
- the required boom clearance for the rotor or a single blade at high lifting heights can be reached by scaling up the crane but this is limited by the capacity of the entire vessel .
- a so called auxiliary hoist is installed onto a boom extension, but again this causes a higher self-weight-load on the crane and basically results in a heavier crane again .
- the invention provides a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a j ib that proj ects from the boom tip under a j ib angle, wherein the j ib comprises multiple aft hoisting sheaves with a common aft hoisting sheave rotation axis , and multiple forward hoisting sheaves with a common forward hoist
- the vessel according to the invention has a crane with a hoisting block that is suspended from the j ib by means of the aft hoisting tackle and the forward hoisting tackle that are spaced apart from each other in the direction away from the vertical slewing axis .
- the first load suspension and the second load suspension are spaced apart from each other in the same direction .
- aft hoisting cable manipulator and the forward hoisting cable manipulator configured or controlled to keep the first hoisting length equal to the second hoisting length or to maintain a constant di fference between the first hoisting length and the second hoisting length, whereby a parallelogram configuration with constant angles can be maintained between the rotation axes of the sheaves .
- the first distance is equal to the second distance .
- the aft load suspension located between the aft block sheave rotation axis and the forward block sheave rotation axis .
- the aft load suspension located closer to the aft block sheave rotation axis than to the forward block sheave rotation axis .
- the aft load suspension located on an aft distance to the aft block sheave rotation axis and on a forward distance to the forward block sheave rotation axis .
- the ratio between the aft distance and the forward distance equal to the ratio between the hoisting capacity of the forward hoisting tackle and the hoisting capacity of the aft hoisting tackle .
- In an embodiment is the ratio between the aft distance and the forward distance 1 : 2 .
- a higher hoisting capacity for the aft hoisting cable is implemented by the amount of aft falls that is larger than or differs from the amount of forward falls .
- the cable strength of the aft hoisting cable is higher than or dif fers from the cable strength of the forward hoisting cable .
- the forward load suspension located between the aft block sheave rotation axis and the forward block sheave rotation axis .
- the forward load suspension located at the forward block sheave rotation axis .
- the first distance a fixed first distance .
- the second distance a fixed second distance .
- In an embodiment comprises the crane a boom luf fing installation for driving the rotation of the boom around the horizontal luffing axis .
- the ib angle is 45-90 degrees .
- the crane vessel at the aft load suspension and at the forward load suspension a hoisting height as from the water line of at least 100 meters , preferably at least 140 meters , more preferably at least 180 meters .
- the crane vessel at the aft load suspension and at the forward load suspension a hoisting capacity of at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
- the invention provides a method for hoisting a load with a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a ib that proj ects from the boom tip under a j ib angle, wherein
- a hoisting height as from the water line of at least 100 meters , preferably at least 140 meters , more preferably at least 180 meters .
- the load that is suspended from the aft load suspension or from the forward load suspension at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
- Figure 1 is a side view of a crane vessel having a crane with a boom, a j ib and a hoisting block according to an embodiment of the invention, in a j acked-up state and with the boom in an operational raised position;
- Figures 2A-2C are side views of the boom, the ib and the hoisting block of the crane of figure 1 in three orientations respectively;
- Figure 3 is an isometric view of the hoisting block of the crane according to figures 1 and 2A-2C ;
- Figures 4 and 5 are two schematic views of hoisting cable configurations for the crane according to figures 1-3 .
- FIG. 1 shows a sel f-elevating j ack-up crane vessel 10 that is raised or j acked up above a sea 1 with a water line 2 .
- the crane vessel 10 is sel f-propelled, but alternatively the crane vessel 10 is towed by tugs .
- the crane vessel 10 comprises in this embodiment a rectangular hull 11 having a bow 12 , a stern 13 and a large deck 18 .
- the crane vessel 10 comprises a steering house 16, and in this example four upright legs 20 that are guided through j acking houses 19 having a not shown internal drive to lower and raise each of the legs 20 in direction A as known per se to raise the hull 11 above the sea 1 .
- j acking houses 19 having a not shown internal drive to lower and raise each of the legs 20 in direction A as known per se to raise the hull 11 above the sea 1 .
- During sailing all legs 20 are raised and extend with their top side high above the deck 18 and the steering house 16 .
- the crane vessel 10 comprises a crane 30 according to an embodiment of the invention, above a crane foundation 22 on the hull 11 .
- the crane foundation 22 coincides with one of the j acking houses 19, above the rear starboard side j acking house 19.
- the crane vessel 10 with the crane 30 is designed to handle and hoist large wind turbine components , such as a tower 5 or parts thereof , a nacelle 6 with an internal generator, and a rotor 9 with a hub 7 and blades 8 to build an of fshore wind turbine 4 at an of fshore installation site .
- the wind turbine components may be shipped on the deck 18 to the installation site, but alternatively a feeder barge is used to ship the wind turbine components to the crane vessel 10 .
- the rotor 9 may be hoisted pre-assembled in one hoisting operation, or the components thereof are hoisted in consecutive hoisting operations .
- the crane 30 comprises a steel slewing crane base 31 that in this example is rotatingly mounted to the crane foundation 22 for rotation of the entire crane 30 around its vertical slewing or rotation axis Z .
- the crane base 31 comprises a slew platform 32 and a rigid base frame 33 on the slew platform 32 .
- the base frame 33 comprises two upward back box girders 35 and two cross box girders 37 that are at their top end connected with the respective upward back box girders 35 to form rigid triangular frame configurations that are at their top end connected with a not shown transverse back box girder .
- the crane 30 comprises an elongate boom 50 with a longitudinal boom axis L .
- the boom 50 comprises at its bottom end a boom heel 53 that is rotatably connected to the slew platform 32 for luffing or rotation of the boom 50 in direction D around a horizontal luf fing axis or rotation axis X to adj ust the boom luffing angle a .
- the hori zontal rotation axis X extends transverse to the vertical rotation axis Z .
- the boom axis L extends in a notional boom luf fing plane or boom rotation plane that is substantially parallel to the vertical rotation axis Z .
- the crane 30 comprises a boom luffing installation 40 for driving the luffing or rotation of the boom 50 around the horizontal rotation axis X .
- the boom luf fing installation 40 comprises boom luffing tackles that extend between the respective meeting ends of the upward back box girders 35 and the boom tip 55 of the boom 50 .
- the wind turbine components are hoisted and installed aside the deck 18 by means of the crane 30 .
- fshore wind turbines typically have a power of 8 Megawatt .
- the power of offshore wind turbines is continuously scaled up, a power of 15 Megawatt is envisaged in the near future .
- These offshore wind turbines require a high hoisting height above the waterline for the turbine components .
- the crane 30 minimally has a hoisting capacity of 100 tons and a hoisting height of 100 meters above the water line 2 , preferably minimally a hoisting capacity of 900 tons and a hoisting height of 180 meters above the water line 2 .
- a typical hoisting capacity of 900 tons is required for the tower 5 and the nacelle 6 .
- a typical hoisting capacity of 250 tons is required due to the added blade lifting gear such as blade yokes .
- a typical hoisting capacity of 400 tons is required, wherein a larger horizontal clearance with respect to the crane boom 50 is required to prevent collision therewith .
- the crane 30 may optionally be configured as a so called crane around the leg, wherein the crane base 31 can rotate around one of the legs 20 of the j ack-up crane vessel 10 .
- the crane boom 50 may have parallel , spaced apart boom sections and/or ib sections so that in a lowered, hori zontal position wherein the boom 50 is supported by a boom rest 21 , the boom 50 can be stored around one of the legs 20 .
- the invention is not limited to a crane 30 on a j ack-up crane vessel 10 as shown in figure 1 .
- a j ack-up rig with the crane 30 is considered a crane vessel according to the invention .
- the crane 30 may alternatively be installed on a semi-submersible crane vessel or on a monohull crane vessel for performing the same kind of offshore hoisting operations as described above .
- the crane 30 comprises an upper block or j ib 70 that extends from the boom 50 at the tip 55 thereof under a fixed ib angle y .
- the j ib 70 comprises an elongate j ib box girder 71 that has an aft j ib end 72 that is fixedly connected to or merges into the boom tip 55, and a forward j ib end 73 opposite to the aft j ib end 72 .
- the j ib box girder 71 extends from the boom tip 55 substantially in the notional boom rotation plane .
- the j ib 70 comprises multiple aft hoisting sheaves 74 that serve as an aft load suspension at the j ib box girder 71 near the aft j ib end 72 , and multiple forward hoisting sheaves 75 that serve as a forward load suspension at the j ib box girder 71 at or near the forward j ib end 73 .
- the crane 30 comprises a hoisting block 78 that is suspended from the j ib 70 .
- the hoisting block 78 comprises in this example an elongate hoisting girder 79 that has an aft girder end 80 , and a forward girder end 81 opposite to the aft girder end 80 .
- the hoisting block 78 comprises multiple aft block sheaves 82 at the aft girder end 80 and multiple forward block sheaves 83 at the forward girder end 81 .
- the crane 30 comprises an aft hoisting tackle 101 that comprises an aft hoisting cable 76 that is reeved through the aft hoisting sheaves 74 and the aft block sheaves 82 .
- the crane 30 comprises a forward hoisting tackle 102 that comprises a forward hoisting cable 77 that is separate from the aft hoisting cable 76 and that is reeved through the forward hoisting sheaves 75 and the forward block sheaves 83 .
- the hoisting block 78 comprises an aft load suspension 84 with an aft hook 85 that is arranged at the hoisting girder 79 between the aft block sheaves 82 and the forward block sheaves 83 , in this example along the hoisting girder 79 at an aft distance LI to the rotation axis of aft block sheaves 82 and at a forward distance L2 to the rotation axis of the forward block sheaves 83 .
- the forward distance L2 is twice the aft distance LI .
- the hoisting block 78 comprises a forward load suspension 86 with a forward hook 87 that is arranged at the hoisting girder 79 at or near the forward girder end 81 and/or the rotation axis of the forward block sheaves 83 .
- aft hook 85 and the forward hook 87 may be embodied as a single saddle hook or C-hook, or as a double saddle hook or ramshorn-hook, oar as a multi-saddle hook or four-prong hook for attaching a load thereto, for example by means of hoisting slings .
- the aft hoisting sheaves 74 , the forward hoisting sheaves 75, the aft block sheaves 82 , the forward block sheaves 83 , the first hook 84 , and the second hook 85 are arranged substantially in a common plane that is parallel to the notional boom rotation plane, and that preferably substantially coincides with the notional boom rotation plane .
- a notional vertical aft force axis R extends along the aft hoisting tackle 101 through the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the aft block sheaves 82 .
- a notional vertical forward force axis S extends along the forward hoisting tackle 102 through the rotation axis of the forward hoisting sheaves 75 and the rotation axis of the forward block sheaves 83 .
- a notional j ib axis P extends along the ib 70 through the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the forward hoisting sheaves 75.
- a notional block axis Q extends along the hoisting block 78 through the rotation axis of the aft block sheaves 82 and the rotation axis of the forward block sheaves 83 .
- the aft hoisting tackle 101 has a variable first hoisting length Hl between the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the aft block sheaves 82 .
- the forward hoisting tackle 102 has a variable second hoisting length H2 between the rotation axis of the aft hoisting sheaves 75 and the rotation axis of the aft block sheaves 83 .
- the aft load suspension 84 and the forward load suspension 86 effectively engage onto the hoisting girder 79 on the block axis Q .
- the first distance between the rotation axis of the aft hoisting sheaves 74 and the forward hoisting sheaves 75 is equal to the second distance between the rotation axis of the aft block sheaves 82 and the forward block sheaves 83 , and during hoisting the first hoisting length Hl is kept equal to the second hoisting length H2 , whereby the hoisting tackles 101 , 102 the j ib 70 and the hoisting block 78 form at the rotation axes a parallelogram arrangement with constant angles .
- the crane 30 optionally comprises a block fixation 57 that is in this example embodied as a hook that can hook into the hoisting block 78 .
- the block fixation 57 can fixate the hoisting block 78 with respect to the boom 50 in preparation to the lowering of the boom 50 into its lowered, hori zontal position on the boom rest 21 in which the crane vessel 10 can sail to another location .
- the hoisting block 78 can be stored on the deck 18 or be tied down to the deck 18 by fixating a sling from the aft hook 85.
- FIG. 4 schematically shows the relevant parts that are related to the configuration of the aft hoisting tackle 101 and the forward hoisting tackle 102 .
- the crane 30 comprises an aft hoisting cable manipulator 92 with a driven aft hoisting cable drum 93 for manipulating, in particular hauling in and paying out, the aft hoisting cable 76 , and a forward hoisting cable manipulator 94 with a driven forward hoisting cable drum 95 for manipulating, in particular hauling in and paying out , the forward hoisting cable 77 .
- the cable manipulators 92 , 94 are for example located on the slew platform 32 .
- the aft hoisting tackle 101 has a reeving in which the aft hoisting cable 76 has multiple aft falls 88 between the j ib 70 and the hoist block 78 , and a corresponding amount of aft hoisting sheaves 74 and aft block sheaves 82 .
- the forward hoisting tackle 102 has a reeving in which the forward hoisting cable 77 has multiple forward falls 89 between the ib 70 and the hoist block 78 , and a practically corresponding amount of forward hoisting sheaves 75 and forward block sheaves 83 .
- the amount of aft falls 88 is twice the amount of forward falls 89, whereby the strength per cable 76, 77 is equal . So in this example the strength along the aft force axis R is double of the strength along the forward force axis S .
- FIG. 5 shows an alternative configuration for the aft hoisting cable 76 of which only the deviating parts are discussed hereafter .
- the aft hoisting cable manipulator 92 comprises two driven aft hoisting cable drums 93 for manipulating both ends of the aft hoisting cable 76.
- the aft hoisting cable 76 comprises two sections that each extend between one of the aft hoisting cable manipulators 92 and an equalizer 99 .
- the simultaneous rotation of the cable drums 93 , 95 is for both configurations performed by manual or electronic control of the rotation of the hoisting cable drums 93 , 95 .
- the individual control of the rotations also enables the crane 30 to temporarily cancel the parallelogram, for example to lower the hoisting girder 79 horizontally above the deck 18 to enable the hoisting slings to be hooked onto the hoisting hooks 85 , 87 .
- the forward load suspension 86 of the crane 30 is arranged at or near the notional vertical forward force axis S whereby the forward hoisting tackle 102 hoists practically the entire load on the forward load suspension 86 while the aft hoisting tackle 101 j ust runs along with it simultaneously to maintain the parallelogram configuration .
- the aft load suspension 84 is arranged between the notional vertical aft force axis R and the notional vertical forward force axis S .
- the forward distance L2 is twice the aft distance LI , whereby the aft hoisting tackle 101 with the double amount of falls 88 hoists twice as much of the load on the aft load suspension 84 than the forward hoisting tackle 102 .
- the tension force in the aft hoisting cable 76 is thereby practically equal to the tension force in the forward hoisting cable 77 .
- the dif ference in hoisting capacity is achieved by deviating cable strengths for the respective hoisting cables 76, 77 , or combined with deviating amounts of falls .
- the ratio between the aft distance LI and the forward distance L2 is equal to the ratio between the amount of forward falls 89 multiplied by the strength of the forward hoisting cable 77 , and the amount of aft falls 89 multiplied by the strength of the aft hoisting cable 76.
- the crane 30 can hoist 300 tons on the forward load suspension 86 that is carried by the forward hoisting tackle 102 , or 900 tons on the aft load suspension 84 of which 1/ 3 or 300 tons is again carried by the forward hoisting tackle 102 while 2/3 or 600 tons is carried by the aft hoisting tackle 101 .
- the crane 30 can hoist in between 900 tons and 300 tons in between the forward load suspension 86 and the aft load suspension 84 , for example 600 tons can be carried at hal f of the forward distance L2 , of which 1/2 or 300 tons is again carried by the forward hoisting tackle 102 while 1/2 or 300 tons is carried by the aft hoisting tackle 101 .
- This can be physically arranged by lifting gear below the forward load suspension 86 and the aft load suspension 84 , or alternatively by positioning another load suspension on the hoisting block 78 in between the present load suspensions 84 , 86 .
- the boom angle a is 2-30 degrees , whereby the boom 50 stands almost upright to obtain the minimal hoisting height of 100 meters above the water line 2 .
- the actively maintained parallelogram configuration ensures that the hoisted load remains straight below the j ib 70 without penduling or searching for an equilibrium.
- the forward load suspension 86 can be used for the less heavy components of the wind turbine 4 that needs to be hoisted with sufficient clearance with respect to the almost upright oriented boom 50 , such as the pre-assembled rotor 9 or its components .
- the aft load suspension 84 can be used for the much heavier components of the wind turbine 4 that can be hoisted closer to the almost upright oriented boom 50 while maintaining a minimal clearance, such as the tower 5 and the nacelle 6 .
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The invention relates to a crane vessel (10) comprising a crane (30) with an elongate boom (50) and a jib (70) that projects from the boom, a hoisting block (78), an aft hoisting tackle (101) with a variable first hoisting length and a forward hoisting tackle (102) with a variable second hoisting length between the jib and the hoisting block, and hoisting cable manipulators for manipulating the hoisting cables of the hoisting tackles, wherein the hoisting block comprises (78), an aft load suspension (84) for a first load, and a forward load suspension (86) for a second load that is further away from the boom, spaced apart from the aft load suspension (84).
Description
Crane vessel with a crane for hoisting wind turbine components
BACKGROUND
The invention relates to a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck .
Crane vessels of this kind are used for building offshore wind turbines , wherein turbine components , such as a tower, a nacelle, and a rotor with a hub and multiple blades are hoisted high above the waterline . The known crane vessels have a crane that comprises a slewing crane base and a long boom that is rotatable connected with the crane base at the boom heel . The boom is raised and lowered by means of a luf fing hoist tackle above the boom that is hauled in or paid out by a winch .
Known large of fshore wind turbines typically have power of 8 Megawatt and require a lifting height for its components of 140 meters above the waterline . Offshore wind turbines are continuously scaled up, wherein a power of 15 Megawatt is envisaged in the near future .
SUMMARY OF THE INVENTION
As a scale up of offshore wind turbines is envisaged, significant higher lifting heights for the turbine components are required . These high lifts are executed close to the top of the luffing boom while the boom is operated in a steep angle, whereby the load
position becomes very close to the boom. This may cause a boom clearance problem, wherein the boom clearance is the space between the load and the boom . The nacelle is heavy and compact, but when looking to a rotor lift or single blade li ft, the boom clearance becomes critical .
In principle, the required boom clearance for the rotor or a single blade at high lifting heights can be reached by scaling up the crane but this is limited by the capacity of the entire vessel . Alternatively a so called auxiliary hoist is installed onto a boom extension, but again this causes a higher self-weight-load on the crane and basically results in a heavier crane again .
It is an obj ect of the present invention to provide a crane vessel of the kind as described, having a crane that can meet the future boom clearance at large lifting heights without causing significant limitations as described before .
According to a first aspect , the invention provides a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a j ib that proj ects from the boom tip under a j ib angle, wherein the j ib comprises multiple aft hoisting sheaves with a common aft hoisting sheave rotation axis , and multiple forward hoisting sheaves with a common forward hoisting sheave rotation axis that is in a proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a first distance,
a hoisting block that comprises multiple aft block sheaves with a common aft block sheave rotation axis , multiple forward block sheaves with a common forward block sheave rotation axis that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a second distance , an aft load suspension for a first load, a forward load suspension for a second load that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft load suspension, an aft hoisting cable that is reeved between the aft hoisting sheaves and the aft block sheaves with multiple aft falls forming an aft hoisting tackle with a variable first hoisting length between the aft hoisting sheave rotation axis and the aft block sheave rotation axis , a forward hoisting cable that is reeved between the forward hoisting sheaves and the forward block sheaves with multiple forward falls forming a forward hoisting tackle with a variable second hoisting length between the forward hoisting sheave rotation axis and the forward block sheave rotation axis , an aft hoisting cable manipulator for manipulating the aft hoisting cable , and a forward hoisting cable manipulator for manipulating the forward hoisting cable .
The vessel according to the invention has a crane with a hoisting block that is suspended from the j ib by means of the aft hoisting tackle and the forward hoisting tackle that are spaced apart from each other in the direction away from the vertical slewing axis . The first load suspension and the second load suspension are spaced apart from each other in the same direction . This enables the crane to be optimi zed for hoisting di fferent loads with dif ferent clearance distances to the boom, wherein can be chosen whether for example a load is effectively hoisted substantially by the forward hoisting tackle while hanging
with good clearance with respect to the boom, or that a heavier but more compact load is divided over both the forward hoisting tackle and the aft hoisting tackle while hanging closer to the boom. In particular for the second case, less capacity is required for the aft hoisting tackle as a part of the load is carried by the forward hoisting tackle .
In an embodiment are the aft hoisting cable manipulator and the forward hoisting cable manipulator configured or controlled to keep the first hoisting length equal to the second hoisting length or to maintain a constant di fference between the first hoisting length and the second hoisting length, whereby a parallelogram configuration with constant angles can be maintained between the rotation axes of the sheaves .
In an embodiment is the first distance is equal to the second distance .
In an embodiment is in the proj ection parallel to the slewing axis , the aft load suspension located between the aft block sheave rotation axis and the forward block sheave rotation axis .
In an embodiment thereof is in the proj ection parallel to the slewing axis , the aft load suspension located closer to the aft block sheave rotation axis than to the forward block sheave rotation axis .
In an embodiment is in the proj ection parallel to the slewing axis , the aft load suspension located on an aft distance to the aft block sheave rotation axis and on a forward distance to the forward block sheave rotation axis .
In an embodiment thereof is the ratio between the aft distance and the forward distance equal to the ratio between the hoisting capacity of the forward hoisting tackle and the hoisting capacity of the aft hoisting tackle .
In an embodiment is the ratio between the aft distance and the forward distance 1 : 2 .
In an embodiment a higher hoisting capacity for
the aft hoisting cable is implemented by the amount of aft falls that is larger than or differs from the amount of forward falls .
Alternatively, or combined therewith, the cable strength of the aft hoisting cable is higher than or dif fers from the cable strength of the forward hoisting cable .
In an embodiment is the forward load suspension located between the aft block sheave rotation axis and the forward block sheave rotation axis .
In a particular embodiment is in the proj ection parallel to the slewing axis , the forward load suspension located at the forward block sheave rotation axis .
In an embodiment are the centers of the sheave rotation axes located in the same vertical plane parallel to the slewing axis .
In an embodiment is the first distance a fixed first distance .
In an embodiment is the second distance a fixed second distance .
In an embodiment comprises the crane a boom luf fing installation for driving the rotation of the boom around the horizontal luffing axis .
In an embodiment the ib angle is 45-90 degrees .
In an embodiment has the crane vessel at the aft load suspension and at the forward load suspension a hoisting height as from the water line of at least 100 meters , preferably at least 140 meters , more preferably at least 180 meters .
In an embodiment has the crane vessel at the aft load suspension and at the forward load suspension a hoisting capacity of at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
In an embodiment is the crane vessel configured for hoisting the load with the longitudinal boom axis under a boom angle with respect to the slewing axis of 2-30 degrees .
According to a second aspect , the invention provides a method for hoisting a load with a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a ib that proj ects from the boom tip under a j ib angle, wherein the j ib comprises multiple aft hoisting sheaves with a common aft hoisting sheave rotation axis , and multiple forward hoisting sheaves with a common forward hoisting sheave rotation axis that is in a proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a first distance, a hoisting block that comprises multiple aft block sheaves with a common aft block sheave rotation axis , multiple forward block sheaves with a common forward block sheave rotation axis that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a second distance , an aft load suspension for a first load, a forward load suspension for a second load that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft load suspension, an aft hoisting cable that is reeved between the aft hoisting sheaves and the aft block sheaves with multiple aft falls forming an aft hoisting tackle with a variable first hoisting length between the aft hoisting sheave rotation axis and the aft block sheave rotation axis ,
a forward hoisting cable that is reeved between the forward hoisting sheaves and the forward block sheaves with multiple forward falls forming a forward hoisting tackle with a variable second hoisting length between the forward hoisting sheave rotation axis and the forward block sheave rotation axis , an aft hoisting cable manipulator for manipulating the aft hoisting cable , and a forward hoisting cable manipulator for manipulating the forward hoisting cable, wherein in the method the load is suspended from the aft load suspension or from the forward load suspension, wherein while hoisting the load, the aft hoisting cable manipulator and the forward hoisting cable manipulator keep the first hoisting length equal to the second hoisting length or maintain a constant di fference between the first hoisting length and the second hoisting length .
In an embodiment thereof reach the aft load suspension and the forward load suspension from which the load is suspended a hoisting height as from the water line of at least 100 meters , preferably at least 140 meters , more preferably at least 180 meters .
In an embodiment is the load that is suspended from the aft load suspension or from the forward load suspension at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
In an embodiment is during the hoisting the longitudinal boom axis under a boom angle with respect to the slewing axis of 2-30 degrees .
The various aspects and features described and shown in the specification can be applied, individually, wherever possible . These individual aspects , in particular the aspects and features described in the attached dependent claims , can be made subj ect of divisional patent applications .
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will be elucidated on the basis of an exemplary embodiment shown in the attached drawings , in which :
Figure 1 is a side view of a crane vessel having a crane with a boom, a j ib and a hoisting block according to an embodiment of the invention, in a j acked-up state and with the boom in an operational raised position;
Figures 2A-2C are side views of the boom, the ib and the hoisting block of the crane of figure 1 in three orientations respectively;
Figure 3 is an isometric view of the hoisting block of the crane according to figures 1 and 2A-2C ; and
Figures 4 and 5 are two schematic views of hoisting cable configurations for the crane according to figures 1-3 .
DETAILED DESCRIPTION OF THE INVENTION
Figure 1 shows a sel f-elevating j ack-up crane vessel 10 that is raised or j acked up above a sea 1 with a water line 2 . In this embodiment the crane vessel 10 is sel f-propelled, but alternatively the crane vessel 10 is towed by tugs . The crane vessel 10 comprises in this embodiment a rectangular hull 11 having a bow 12 , a stern 13 and a large deck 18 . The crane vessel 10 comprises a steering house 16, and in this example four upright legs 20 that are guided through j acking houses 19 having a not shown internal drive to lower and raise each of the legs 20 in direction A as known per se to raise the hull 11 above the sea 1 . During sailing all legs 20 are raised and extend with their top side high above the deck 18 and the steering house 16 .
The crane vessel 10 comprises a crane 30 according to an embodiment of the invention, above a crane foundation 22 on the hull 11 . In this example the crane
foundation 22 coincides with one of the j acking houses 19, above the rear starboard side j acking house 19. The crane vessel 10 with the crane 30 is designed to handle and hoist large wind turbine components , such as a tower 5 or parts thereof , a nacelle 6 with an internal generator, and a rotor 9 with a hub 7 and blades 8 to build an of fshore wind turbine 4 at an of fshore installation site . The wind turbine components may be shipped on the deck 18 to the installation site, but alternatively a feeder barge is used to ship the wind turbine components to the crane vessel 10 . Depending on the specific circumstances the rotor 9 may be hoisted pre-assembled in one hoisting operation, or the components thereof are hoisted in consecutive hoisting operations .
As shown in figure 1 the crane 30 comprises a steel slewing crane base 31 that in this example is rotatingly mounted to the crane foundation 22 for rotation of the entire crane 30 around its vertical slewing or rotation axis Z .
The crane base 31 comprises a slew platform 32 and a rigid base frame 33 on the slew platform 32 . The base frame 33 comprises two upward back box girders 35 and two cross box girders 37 that are at their top end connected with the respective upward back box girders 35 to form rigid triangular frame configurations that are at their top end connected with a not shown transverse back box girder .
The crane 30 comprises an elongate boom 50 with a longitudinal boom axis L . The boom 50 comprises at its bottom end a boom heel 53 that is rotatably connected to the slew platform 32 for luffing or rotation of the boom 50 in direction D around a horizontal luf fing axis or rotation axis X to adj ust the boom luffing angle a . The hori zontal rotation axis X extends transverse to the vertical rotation axis Z . The boom axis L extends in a notional boom luf fing plane or boom rotation plane that is substantially parallel to the vertical rotation axis Z .
The crane 30 comprises a boom luffing
installation 40 for driving the luffing or rotation of the boom 50 around the horizontal rotation axis X . The boom luf fing installation 40 comprises boom luffing tackles that extend between the respective meeting ends of the upward back box girders 35 and the boom tip 55 of the boom 50 .
At the installation site the wind turbine components are hoisted and installed aside the deck 18 by means of the crane 30 . At present, of fshore wind turbines typically have a power of 8 Megawatt . While the power of offshore wind turbines is continuously scaled up, a power of 15 Megawatt is envisaged in the near future . These offshore wind turbines require a high hoisting height above the waterline for the turbine components . In order to handle the large and heavy wind turbine components at these heights , the crane 30 minimally has a hoisting capacity of 100 tons and a hoisting height of 100 meters above the water line 2 , preferably minimally a hoisting capacity of 900 tons and a hoisting height of 180 meters above the water line 2 . For the tower 5 and the nacelle 6 a typical hoisting capacity of 900 tons is required . For the li ft of a single blade 8 under a non-hori zontal angle a typical hoisting capacity of 250 tons is required due to the added blade lifting gear such as blade yokes . For the preassembled rotor 9 a typical hoisting capacity of 400 tons is required, wherein a larger horizontal clearance with respect to the crane boom 50 is required to prevent collision therewith .
The crane 30 may optionally be configured as a so called crane around the leg, wherein the crane base 31 can rotate around one of the legs 20 of the j ack-up crane vessel 10 . The crane boom 50 may have parallel , spaced apart boom sections and/or ib sections so that in a lowered, hori zontal position wherein the boom 50 is supported by a boom rest 21 , the boom 50 can be stored around one of the legs 20 .
The invention is not limited to a crane 30 on a j ack-up crane vessel 10 as shown in figure 1 . A j ack-up rig
with the crane 30 is considered a crane vessel according to the invention . The crane 30 may alternatively be installed on a semi-submersible crane vessel or on a monohull crane vessel for performing the same kind of offshore hoisting operations as described above .
As shown in figures 1 and 2A-2C, the crane 30 comprises an upper block or j ib 70 that extends from the boom 50 at the tip 55 thereof under a fixed ib angle y . In this example the j ib 70 comprises an elongate j ib box girder 71 that has an aft j ib end 72 that is fixedly connected to or merges into the boom tip 55, and a forward j ib end 73 opposite to the aft j ib end 72 . The j ib box girder 71 extends from the boom tip 55 substantially in the notional boom rotation plane . The j ib 70 comprises multiple aft hoisting sheaves 74 that serve as an aft load suspension at the j ib box girder 71 near the aft j ib end 72 , and multiple forward hoisting sheaves 75 that serve as a forward load suspension at the j ib box girder 71 at or near the forward j ib end 73 .
The crane 30 comprises a hoisting block 78 that is suspended from the j ib 70 . As best shown in figures 2A- 2C and 3 , the hoisting block 78 comprises in this example an elongate hoisting girder 79 that has an aft girder end 80 , and a forward girder end 81 opposite to the aft girder end 80 . The hoisting block 78 comprises multiple aft block sheaves 82 at the aft girder end 80 and multiple forward block sheaves 83 at the forward girder end 81 .
As best shown in figures 2A-C, the crane 30 comprises an aft hoisting tackle 101 that comprises an aft hoisting cable 76 that is reeved through the aft hoisting sheaves 74 and the aft block sheaves 82 . The crane 30 comprises a forward hoisting tackle 102 that comprises a forward hoisting cable 77 that is separate from the aft hoisting cable 76 and that is reeved through the forward hoisting sheaves 75 and the forward block sheaves 83 .
The hoisting block 78 comprises an aft load suspension 84 with an aft hook 85 that is arranged at the
hoisting girder 79 between the aft block sheaves 82 and the forward block sheaves 83 , in this example along the hoisting girder 79 at an aft distance LI to the rotation axis of aft block sheaves 82 and at a forward distance L2 to the rotation axis of the forward block sheaves 83 . In this example the forward distance L2 is twice the aft distance LI . The hoisting block 78 comprises a forward load suspension 86 with a forward hook 87 that is arranged at the hoisting girder 79 at or near the forward girder end 81 and/or the rotation axis of the forward block sheaves 83 .
It is to be understood that the aft hook 85 and the forward hook 87 may be embodied as a single saddle hook or C-hook, or as a double saddle hook or ramshorn-hook, oar as a multi-saddle hook or four-prong hook for attaching a load thereto, for example by means of hoisting slings .
The aft hoisting sheaves 74 , the forward hoisting sheaves 75, the aft block sheaves 82 , the forward block sheaves 83 , the first hook 84 , and the second hook 85 are arranged substantially in a common plane that is parallel to the notional boom rotation plane, and that preferably substantially coincides with the notional boom rotation plane . A notional vertical aft force axis R extends along the aft hoisting tackle 101 through the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the aft block sheaves 82 . A notional vertical forward force axis S extends along the forward hoisting tackle 102 through the rotation axis of the forward hoisting sheaves 75 and the rotation axis of the forward block sheaves 83 . A notional j ib axis P extends along the ib 70 through the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the forward hoisting sheaves 75. A notional block axis Q extends along the hoisting block 78 through the rotation axis of the aft block sheaves 82 and the rotation axis of the forward block sheaves 83 . The aft hoisting tackle 101 has a variable first hoisting length Hl between the rotation axis of the aft hoisting sheaves 74 and the rotation axis of the aft block sheaves 82 . The
forward hoisting tackle 102 has a variable second hoisting length H2 between the rotation axis of the aft hoisting sheaves 75 and the rotation axis of the aft block sheaves 83 .
The aft load suspension 84 and the forward load suspension 86 effectively engage onto the hoisting girder 79 on the block axis Q . The first distance between the rotation axis of the aft hoisting sheaves 74 and the forward hoisting sheaves 75 is equal to the second distance between the rotation axis of the aft block sheaves 82 and the forward block sheaves 83 , and during hoisting the first hoisting length Hl is kept equal to the second hoisting length H2 , whereby the hoisting tackles 101 , 102 the j ib 70 and the hoisting block 78 form at the rotation axes a parallelogram arrangement with constant angles .
As schematically shown in figures 1 and 2A-2C, the crane 30 optionally comprises a block fixation 57 that is in this example embodied as a hook that can hook into the hoisting block 78 . The block fixation 57 can fixate the hoisting block 78 with respect to the boom 50 in preparation to the lowering of the boom 50 into its lowered, hori zontal position on the boom rest 21 in which the crane vessel 10 can sail to another location . Alternatively, the hoisting block 78 can be stored on the deck 18 or be tied down to the deck 18 by fixating a sling from the aft hook 85.
Figure 4 schematically shows the relevant parts that are related to the configuration of the aft hoisting tackle 101 and the forward hoisting tackle 102 . The crane 30 comprises an aft hoisting cable manipulator 92 with a driven aft hoisting cable drum 93 for manipulating, in particular hauling in and paying out, the aft hoisting cable 76 , and a forward hoisting cable manipulator 94 with a driven forward hoisting cable drum 95 for manipulating, in particular hauling in and paying out , the forward hoisting cable 77 . The cable manipulators 92 , 94 are for example located on the slew platform 32 . The aft hoisting
tackle 101 has a reeving in which the aft hoisting cable 76 has multiple aft falls 88 between the j ib 70 and the hoist block 78 , and a corresponding amount of aft hoisting sheaves 74 and aft block sheaves 82 . The forward hoisting tackle 102 has a reeving in which the forward hoisting cable 77 has multiple forward falls 89 between the ib 70 and the hoist block 78 , and a practically corresponding amount of forward hoisting sheaves 75 and forward block sheaves 83 . In this example, the amount of aft falls 88 is twice the amount of forward falls 89, whereby the strength per cable 76, 77 is equal . So in this example the strength along the aft force axis R is double of the strength along the forward force axis S .
Figure 5 shows an alternative configuration for the aft hoisting cable 76 of which only the deviating parts are discussed hereafter . In this configuration the aft hoisting cable manipulator 92 comprises two driven aft hoisting cable drums 93 for manipulating both ends of the aft hoisting cable 76. Optionally the aft hoisting cable 76 comprises two sections that each extend between one of the aft hoisting cable manipulators 92 and an equalizer 99 . As the amount of aft falls 88 is in this example twice the amount of the forward falls 89 , this enables all drums 93 , 95 to be rotated simultaneously as very schematically indicated by the common drive shaft 97 to maintain the parallelogram arrangement between the j ib 70 and the hoist block 78 .
In practice the simultaneous rotation of the cable drums 93 , 95 is for both configurations performed by manual or electronic control of the rotation of the hoisting cable drums 93 , 95 . The individual control of the rotations also enables the crane 30 to temporarily cancel the parallelogram, for example to lower the hoisting girder 79 horizontally above the deck 18 to enable the hoisting slings to be hooked onto the hoisting hooks 85 , 87 .
As best shown in figures 2A-2C, the forward load suspension 86 of the crane 30 is arranged at or near the
notional vertical forward force axis S whereby the forward hoisting tackle 102 hoists practically the entire load on the forward load suspension 86 while the aft hoisting tackle 101 j ust runs along with it simultaneously to maintain the parallelogram configuration . In the crane 30 according to the invention the aft load suspension 84 is arranged between the notional vertical aft force axis R and the notional vertical forward force axis S . In this example the forward distance L2 is twice the aft distance LI , whereby the aft hoisting tackle 101 with the double amount of falls 88 hoists twice as much of the load on the aft load suspension 84 than the forward hoisting tackle 102 . The tension force in the aft hoisting cable 76 is thereby practically equal to the tension force in the forward hoisting cable 77 . Alternatively, the dif ference in hoisting capacity is achieved by deviating cable strengths for the respective hoisting cables 76, 77 , or combined with deviating amounts of falls . Thereby the ratio between the aft distance LI and the forward distance L2 is equal to the ratio between the amount of forward falls 89 multiplied by the strength of the forward hoisting cable 77 , and the amount of aft falls 89 multiplied by the strength of the aft hoisting cable 76.
As a practical example, the crane 30 can hoist 300 tons on the forward load suspension 86 that is carried by the forward hoisting tackle 102 , or 900 tons on the aft load suspension 84 of which 1/ 3 or 300 tons is again carried by the forward hoisting tackle 102 while 2/3 or 600 tons is carried by the aft hoisting tackle 101 . As a practical extension on this example , the crane 30 can hoist in between 900 tons and 300 tons in between the forward load suspension 86 and the aft load suspension 84 , for example 600 tons can be carried at hal f of the forward distance L2 , of which 1/2 or 300 tons is again carried by the forward hoisting tackle 102 while 1/2 or 300 tons is carried by the aft hoisting tackle 101 . This can be physically arranged by lifting gear below the forward load
suspension 86 and the aft load suspension 84 , or alternatively by positioning another load suspension on the hoisting block 78 in between the present load suspensions 84 , 86 .
As a practical example, the boom angle a is 2-30 degrees , whereby the boom 50 stands almost upright to obtain the minimal hoisting height of 100 meters above the water line 2 . The actively maintained parallelogram configuration ensures that the hoisted load remains straight below the j ib 70 without penduling or searching for an equilibrium.
Due to the particular positioning of the load suspensions 84 , 86 with respect to the hoisting tackles
101 , 102 along the hoisting block 78 , the forward load suspension 86 can be used for the less heavy components of the wind turbine 4 that needs to be hoisted with sufficient clearance with respect to the almost upright oriented boom 50 , such as the pre-assembled rotor 9 or its components . The aft load suspension 84 can be used for the much heavier components of the wind turbine 4 that can be hoisted closer to the almost upright oriented boom 50 while maintaining a minimal clearance, such as the tower 5 and the nacelle 6 .
It is to be understood that the above description is included to illustrate the operation of the preferred embodiments and is not meant to limit the scope of the invention . From the above discussion, many variations will be apparent to one skilled in the art that would yet be encompassed by the scope of the present invention .
Claims
1 . Jack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a j ib that proj ects from the boom tip under a ib angle, wherein the j ib comprises multiple aft hoisting sheaves with a common aft hoisting sheave rotation axis , and multiple forward hoisting sheaves with a common forward hoisting sheave rotation axis that is in a proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a first distance, a hoisting block that comprises multiple aft block sheaves with a common aft block sheave rotation axis , multiple forward block sheaves with a common forward block sheave rotation axis that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a second distance , an aft load suspension for a first load, a forward load suspension for a second load that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft load suspension, an aft hoisting cable that is reeved between the aft hoisting sheaves and the aft block sheaves with multiple aft falls forming an aft hoisting tackle with a variable first hoisting length between the aft hoisting
sheave rotation axis and the aft block sheave rotation axis , a forward hoisting cable that is reeved between the forward hoisting sheaves and the forward block sheaves with multiple forward falls forming a forward hoisting tackle with a variable second hoisting length between the forward hoisting sheave rotation axis and the forward block sheave rotation axis , an aft hoisting cable manipulator for manipulating the aft hoisting cable , and a forward hoisting cable manipulator for manipulating the forward hoisting cable .
2 . Crane vessel according to claim 1 , wherein the aft hoisting cable manipulator and the forward hoisting cable manipulator are configured or controlled to keep the first hoisting length equal to the second hoisting length or to maintain a constant di fference between the first hoisting length and the second hoisting length .
3 . Crane vessel according to any one of the preceding claims , wherein the first distance is equal to the second distance .
4 . Crane vessel according to any one of the preceding claims , wherein in the proj ection parallel to the slewing axis , the aft load suspension is located between the aft block sheave rotation axis and the forward block sheave rotation axis .
5. Crane vessel according to claim 4 , wherein in the proj ection parallel to the slewing axis , the aft load suspension is located closer to the aft block sheave rotation axis than to the forward block sheave rotation axis .
6. Crane vessel according to any one of the preceding claims , wherein in the proj ection parallel to the slewing axis , the aft load suspension is located on an aft distance to the aft block sheave rotation axis and on a forward distance to the forward block sheave rotation axis .
7 . Crane vessel according to claim 6, wherein
19 the ratio between the aft distance and the forward distance is equal to the ratio between the hoisting capacity of the forward hoisting tackle and the hoisting capacity of the aft hoisting tackle .
8 . Crane vessel according to claim 6 or 7 , wherein the ratio between the aft distance and the forward distance is 1 : 2 .
9. Crane vessel according to any one of the preceding claims , wherein the amount of aft falls is larger than or dif fers from the amount of forward falls .
10 . Crane vessel according to any one of the preceding claims , wherein the cable strength of the aft hoisting cable is higher than or di ffers from the cable strength of the forward hoisting cable .
11 . Crane vessel according to any one of the preceding claims , wherein in the proj ection parallel to the slewing axis , the forward load suspension is located between the aft block sheave rotation axis and the forward block sheave rotation axis .
12 . Crane vessel according to any one of the preceding claims , wherein in the proj ection parallel to the slewing axis , the forward load suspension is located at the forward block sheave rotation axis .
13 . Crane vessel according to any one of the preceding claims , wherein the centers of the sheave rotation axes are located in the same vertical plane parallel to the slewing axis .
14 . Crane vessel according to any one of the preceding claims , wherein the first distance is a fixed first distance .
15. Crane vessel according to any one of the preceding claims , wherein the second distance is a fixed second distance .
16. Crane vessel according to any one of the preceding claims , wherein the crane comprises a boom luf fing installation for driving the rotation of the boom around the horizontal luffing axis .
20
17 . Crane vessel according to any one of the preceding claims , wherein the j ib angle is 45- 90 degrees .
18 . Crane vessel according to any one of the preceding claims , having at the aft load suspension and at the forward load suspension a hoisting height as from the water line of at least 100 meters , preferably at least 140 meters , more preferably at least 180 meters .
19. Crane vessel according to any one of the preceding claims , having at the aft load suspension and at the forward load suspension a hoisting capacity of at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
20 . Crane vessel according to any one of the preceding claims , configured for hoisting the load with the longitudinal boom axis under a boom angle with respect to the slewing axis of 2-30 degrees .
21 . Method for hoisting a load with a j ack-up crane vessel or semi-submersible crane vessel or mono-hull crane vessel comprising a hull with a deck, and a crane on the hull for hoisting a load outside the deck, wherein the crane comprises a slewing crane base that is rotatable around a vertical slewing axis , an elongate boom having a longitudinal boom axis , a distal boom tip and a proximate boom heel , wherein boom is rotatably connected to the crane base for luffing the boom with respect to the crane base around a horizontal luf fing axis , a j ib that proj ects from the boom tip under a j ib angle, wherein the j ib comprises multiple aft hoisting sheaves with a common aft hoisting sheave rotation axis , and multiple forward hoisting sheaves with a common forward hoisting sheave rotation axis that is in a proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a first distance, a hoisting block that comprises multiple aft
21 block sheaves with a common aft block sheave rotation axis , multiple forward block sheaves with a common forward block sheave rotation axis that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft hoisting sheave rotation axis over a second distance , an aft load suspension for a first load, a forward load suspension for a second load that is in the proj ection parallel to the slewing axis further away from the boom, spaced apart from the aft load suspension, an aft hoisting cable that is reeved between the aft hoisting sheaves and the aft block sheaves with multiple aft falls forming an aft hoisting tackle with a variable first hoisting length between the aft hoisting sheave rotation axis and the aft block sheave rotation axis , a forward hoisting cable that is reeved between the forward hoisting sheaves and the forward block sheaves with multiple forward falls forming a forward hoisting tackle with a variable second hoisting length between the forward hoisting sheave rotation axis and the forward block sheave rotation axis , an aft hoisting cable manipulator for manipulating the aft hoisting cable , and a forward hoisting cable manipulator for manipulating the forward hoisting cable, wherein in the method the load is suspended from the aft load suspension or from the forward load suspension, wherein while hoisting the load, the aft hoisting cable manipulator and the forward hoisting cable manipulator keep the first hoisting length equal to the second hoisting length or maintain a constant di fference between the first hoisting length and the second hoisting length .
22 . Method according to claim 21 , wherein the aft load suspension and the forward load suspension from which the load is suspended reach a hoisting height as from the water line of at least 100 meters , preferably at least 140
22 meters , more preferably at least 180 meters .
23 . Method according to claim 21 or 22 , wherein the load that is suspended from the aft load suspension or from the forward load suspension is at least 100 tons , preferably at least 200 tons , more preferably at least 300 tons .
24 . Method according to any one of the claims 21- 23 , wherein during the hoisting the longitudinal boom axis is under a boom angle with respect to the slewing axis of 2-30 degrees .
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2026416 | 2020-09-04 | ||
NL2026416A NL2026416B1 (en) | 2020-09-04 | 2020-09-04 | Crane vessel with a crane for hoisting wind turbine components |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022050840A1 true WO2022050840A1 (en) | 2022-03-10 |
Family
ID=75108711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/NL2021/050534 WO2022050840A1 (en) | 2020-09-04 | 2021-09-03 | Crane vessel with a crane for hoisting wind turbine components |
Country Status (2)
Country | Link |
---|---|
NL (1) | NL2026416B1 (en) |
WO (1) | WO2022050840A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115535865A (en) * | 2022-10-25 | 2022-12-30 | 中铁二十局集团南方工程有限公司 | Transportation method based on gantry crane |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6669038B1 (en) * | 2000-08-14 | 2003-12-30 | David Zingerman | Self-propelled crane |
CN2615042Y (en) * | 2003-04-25 | 2004-05-12 | 中铁大桥局集团有限公司 | Special crane ship for transporting & erecting bridges on sea |
EP1925583A1 (en) * | 2006-11-23 | 2008-05-28 | Siemens Aktiengesellschaft | Method of handling wind turbine blades and device for mounting wind turbine blades, in particular mounting blades on a wind turbine |
WO2009131442A1 (en) * | 2008-04-25 | 2009-10-29 | Itrec B.V. | Hoisting crane |
WO2020020744A1 (en) * | 2018-07-27 | 2020-01-30 | DEME Offshore Holding N.V. | Hoisting block for a crane |
-
2020
- 2020-09-04 NL NL2026416A patent/NL2026416B1/en not_active IP Right Cessation
-
2021
- 2021-09-03 WO PCT/NL2021/050534 patent/WO2022050840A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6669038B1 (en) * | 2000-08-14 | 2003-12-30 | David Zingerman | Self-propelled crane |
CN2615042Y (en) * | 2003-04-25 | 2004-05-12 | 中铁大桥局集团有限公司 | Special crane ship for transporting & erecting bridges on sea |
EP1925583A1 (en) * | 2006-11-23 | 2008-05-28 | Siemens Aktiengesellschaft | Method of handling wind turbine blades and device for mounting wind turbine blades, in particular mounting blades on a wind turbine |
WO2009131442A1 (en) * | 2008-04-25 | 2009-10-29 | Itrec B.V. | Hoisting crane |
WO2020020744A1 (en) * | 2018-07-27 | 2020-01-30 | DEME Offshore Holding N.V. | Hoisting block for a crane |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115535865A (en) * | 2022-10-25 | 2022-12-30 | 中铁二十局集团南方工程有限公司 | Transportation method based on gantry crane |
CN115535865B (en) * | 2022-10-25 | 2023-10-31 | 中铁二十局集团南方工程有限公司 | Transportation method based on gantry crane |
Also Published As
Publication number | Publication date |
---|---|
NL2026416B1 (en) | 2022-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10894701B2 (en) | Crane, vessel comprising such a crane, and a method for up-ending a longitudinal structure | |
CN111918832B (en) | Crane and method for positioning an object | |
US8701579B2 (en) | Offshore wind turbine installation | |
EP2855329B1 (en) | Handling loads in offshore environments | |
US10906785B2 (en) | Crane for wind turbine blade assembly, a vessel, a hoisting method, and an assembly method | |
US20230392584A1 (en) | Installation of a wind turbine on a floating foundation | |
CN203333189U (en) | Hoisting device for ships | |
US20230399206A1 (en) | Offshore wind turbine assembly vessel | |
CN206634171U (en) | Semi-submersible type deep-sea wind-powered electricity generation mounting platform | |
WO2022050840A1 (en) | Crane vessel with a crane for hoisting wind turbine components | |
US20240166477A1 (en) | Offshore crane vessel and method for operating the offshore crane vessel | |
NL2028124B1 (en) | installation vessel | |
TW202311625A (en) | Wind turbine blade installation apparatus and method of installing a wind turbine blade | |
NL2027280B1 (en) | Installation of a wind turbine on a floating foundation | |
CN112512954A (en) | Suspension crane system | |
JP3332692B2 (en) | Elevated shear device for sand piles | |
CN109665445B (en) | Loading, transporting and conveying process for torch tower crane | |
US11525229B2 (en) | Crane vessel | |
NL2033206B1 (en) | Method for decoupling a crane block from an offshore crane | |
EP4274797A1 (en) | Offshore wind turbine assembly vessel | |
CN114803897A (en) | Six-chord arm support for offshore floating crane, floating crane system and application of floating crane system | |
CN115285317A (en) | Offshore wind turbine-foundation integrated installation vessel and installation method | |
CN115557398A (en) | Method for hoisting heavy parts by combining full rotation of floating crane ship with fixed stern crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21794195 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21794195 Country of ref document: EP Kind code of ref document: A1 |