WO2021186492A1 - 工事用エレベーター装置及びエレベーターの主索延長方法 - Google Patents

工事用エレベーター装置及びエレベーターの主索延長方法 Download PDF

Info

Publication number
WO2021186492A1
WO2021186492A1 PCT/JP2020/011369 JP2020011369W WO2021186492A1 WO 2021186492 A1 WO2021186492 A1 WO 2021186492A1 JP 2020011369 W JP2020011369 W JP 2020011369W WO 2021186492 A1 WO2021186492 A1 WO 2021186492A1
Authority
WO
WIPO (PCT)
Prior art keywords
machine room
room unit
main rope
machine
lifting
Prior art date
Application number
PCT/JP2020/011369
Other languages
English (en)
French (fr)
Inventor
悠人 樋野
章智 五十嵐
萩原 高行
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to JP2022508611A priority Critical patent/JP7404506B2/ja
Priority to PCT/JP2020/011369 priority patent/WO2021186492A1/ja
Publication of WO2021186492A1 publication Critical patent/WO2021186492A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators

Definitions

  • the present invention relates to an elevator device for construction work and a method of extending the main rope of an elevator.
  • the construction elevator device described in Patent Document 1 includes a machine room unit below the support beam.
  • the machine room unit is configured by arranging a hoisting machine between the lower beam and the upper beam, and is suspended from a support beam by a rope.
  • the upper beam is equipped with a lifting machine, which winds the rope to lift the machine room unit.
  • the machine room unit becomes large and the number of lifting machines increases when the elevator has a long stroke and a large load, and the machine room unit is formed by a wall or a beam on a specific floor. Since it is supported, there is a problem that a load exceeding the allowable load (allowable load) is applied to the walls and beams on this specific floor.
  • the lifting machine that lifts the machine room unit (the size and number of staff increase according to the weight of the machine room unit, and the weight of the lifting machine itself also increases) Since a rope drum or the like for extending the rope of the elevator is provided, the weight of the machine room unit increases, and it is difficult to reduce the weight of the machine room unit.
  • An object of the present invention is to provide a construction elevator device and a method for extending the main rope of an elevator, which can solve the above-mentioned problems of the prior art, reduce the number of lifting personnel, and suppress the load applied to a beam or a wall on a specific floor. There is.
  • the present invention provides a hoisting machine provided in a hoistway to move a car and a counterweight suspended by a main rope in the elevating direction, and a main rope that stores an extension of the main rope.
  • the machine room unit includes a first machine room unit including the hoisting machine and the main machine room unit. It is characterized in that it is divided into a second machine room unit provided with a cable drum, and the divided first machine room unit and the second machine room unit are placed on beams or walls on different building floors.
  • the present invention includes a hoisting machine provided in a hoistway for moving a car and a counterweight suspended by a main rope in the elevating direction, a main rope drum for storing an extension of the main rope, and the above.
  • the machine room unit includes a first machine room unit including the hoisting machine and the main rope drum.
  • the first machine room unit and the second machine room unit are divided into a second machine room unit provided with the above, and the divided machine room unit and the second machine room unit are placed on a beam or a wall on a different building floor, and when the machine room unit is lifted, the said The second machine chamber unit is suspended from a support member provided in the hoistway, and the first machine chamber unit is suspended from the second machine chamber unit to be the first machine chamber unit or the first machine chamber unit.
  • the two machine chamber units are provided with a lifting machine for the first machine chamber unit for lifting the first machine chamber unit, and the support member or the second machine chamber unit lifts the second machine chamber unit.
  • a lifting machine for a second machine room unit to be overlapped is provided, the first machine room unit is provided with a first machine room unit main rope gripping device for gripping the main rope, and the second machine room unit is equipped with a main rope gripping device.
  • a second machine room unit main rope gripping device for gripping the main rope is provided, and when the second machine room unit is pulled up by the lifting machine for the second machine room unit, the second machine room unit main rope gripping device is provided.
  • the main rope is pulled out from the main rope drum, the main rope is gripped by the first machine room unit main rope gripping device, and the first machine room unit is gripped by the lifting machine for the first machine room unit.
  • the first machine room unit main rope gripping device is opened, and the second machine room unit main rope gripping device grips the main rope.
  • an elevator device for construction work and a method of extending the main rope of an elevator, which can reduce the number of lifting machines and suppress the load applied to a beam or a wall on a specific floor.
  • FIG. 1 is a schematic configuration diagram of a construction elevator device according to the first embodiment.
  • the construction elevator device 1 As shown in FIG. 1, the construction elevator device 1 according to the first embodiment is provided in a hoistway 100 formed in a building structure.
  • the construction elevator device 1 includes a support member 2, a machine room unit (first machine room unit 3, second machine room unit 4), and a machine room unit lifting machine (first machine room unit lifting machine 5a, 5b, lifting machines for the second machine room unit 6a, 6b, 6c) are provided.
  • Three or more lifting machines 6a, 6b, 6c for the second machine room unit are provided in the second machine room unit 4, and the second machine room unit 4 is pulled up.
  • the support member 2 is located at the upper part in the hoistway 100 and is mounted on the beam 110a or the wall of the building.
  • the second machine room unit 4 is suspended from the support member 2, is lifted by the lifting machines 6a, 6b, 6c for the second machine room unit installed in the second machine room unit 4, and moves in the elevating direction. do.
  • the first machine room unit 3 is suspended from the second machine room unit 4, and is lifted by the lifting machines 5a and 5b for the first machine room unit installed in the first machine room unit 3 in the ascending / descending direction.
  • the lifting machines 5a and 5b for the first machine room unit are N: 1 (N is 2 or more) roping via a plurality of pulleys 7 provided in the first machine room unit 3 and the second machine room unit 4, respectively. 1 Lift the machine room unit 3.
  • the first machine room unit 3 has a movable support portion 8 that expands and contracts toward the wall surface of the hoistway 100 (in the left-right direction in FIG. 1) and engages with the beam 110d of the building or the wall when extended. Further, the first machine room unit 3 is a car arranged on the hoisting machine 9, the main rope 10 wound around the sheave of the hoisting machine 9, and the main rope 10 located on one side of the hoisting machine 9. It has 11 and a balance weight 12 arranged on the main rope 10 located on the other side of the hoisting machine 9. The hoisting machine 9 is provided in the hoistway 100, and moves the car 11 and the balance weight 12 suspended by the main rope 10 in the elevating direction.
  • the second machine room unit 4 has a movable support portion 13 that expands and contracts toward the wall surface of the hoistway 100 (in the left-right direction in FIG. 1) and engages with the beam 110c of the building or the wall when extended.
  • the main rope 10 is fixed to the first machine room unit 3 by the main rope fixing portion 14 provided in the first machine room unit 3.
  • the other end side of the main rope 10 extends upward from the first machine room unit 3 and is wound around a main rope drum 15 provided in the second machine room unit 4.
  • the main rope drum 15 is provided for extending the main rope 10, and stores the extension of the main rope 10.
  • the main rope 10 is provided by the first machine room unit main rope gripping device 16 provided in the first machine room unit 3 and the second machine room unit main rope gripping device 17 provided in the second machine room unit 4, respectively. Be grasped.
  • the first machine room unit 3 is provided with a hoisting machine 9 and lifting machines 5a and 5b for the first machine room unit
  • the second machine room unit 4 is provided with a main rope drum 15 and a lifting machine for the second machine room unit.
  • 6a, 6b, 6c are provided.
  • the hoisting machine 9, the lifting machines 5a and 5b for the first machine room unit, the main rope drum 15, and the lifting machines 6a, 6b and 6c for the second machine room unit are heavy and cause an increase in the weight of the machine room unit. ing.
  • the number of lifting machines increases, and the beam or wall on the specific floor on which the machine room unit is mounted increases. , There is a problem that a load exceeding the allowable load is applied.
  • the machine room unit including the hoisting machine 9 and the main cable drum 15 and the like is divided into a plurality of machine room units 3 and a second machine room unit 4, and each machine room unit is divided into a plurality of machine room units. It is placed on a beam or wall (beams 110c, 110d in FIG. 1) on different building floors.
  • the machine room unit can be installed without applying a load exceeding the allowable load to the beam or wall on a specific floor.
  • the construction elevator device moves the machine room unit to the upper building floor as the construction on the building floor progresses.
  • the method of moving the machine room unit will be described with reference to FIGS. 2 and 3.
  • FIG. 2 is a schematic configuration diagram of a construction elevator device showing a state in which the second machine room unit is moved
  • FIG. 3 is a schematic configuration diagram of a construction elevator device showing a state in which the first machine room unit is moved. be.
  • the second machine room unit main rope gripping device 17 grips the weight of the main rope between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17. It may be configured. If the distance between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17 is long, the weight of the main rope between them becomes large, and the second machine room unit main rope gripping device 17 is opened. At that time, the main rope 10 may be unintentionally pulled out from the main rope drum 15 depending on the weight of the main rope.
  • the second machine room unit main rope gripping device 17 grips the weight of the main rope between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17.
  • Safety and workability can be improved by pulling out the main rope 10 from the main rope drum 15 by the force of lifting the second machine room unit 4 of the lifting machines 6a, 6b, 6c for the machine room unit.
  • the first machine room unit 3 and the second machine room unit 4 are provided with movable support portions 8 and 13, respectively, but the machine room unit is provided with non-movable support members. You may do so.
  • the rope for suspending the first machine room unit 3 is pulled out from the lifting machines 5a and 5b for the first machine room unit. Further, the main rope 10 is pulled out from the main rope drum 15. In this way, the second machine room unit 4 can be moved to the upper building floor without moving the first machine room unit 3. At this time, since the main rope 10 is gripped by the first machine room unit main rope gripping device 16, the main rope 10 does not extend downward from the first machine room unit 3, and the second machine room unit 4 The car 11 can be used even during the work of moving the car to the upper building floor.
  • the weight of the first machine room unit 3 and the weight of the basket 11 are temporarily added to the beam supporting the second machine room unit while the first machine room unit 3 is being lifted.
  • the weight of the balanced weight 12 is not applied because it is supported by the shock absorber for the balanced weight.
  • the weight additionally loaded is, for example, the car side guide rails 101a, 101b, or the weight side guide rails 102a, 102b by using the emergency stop device provided in the first machine room unit 3 (not shown). It may be configured to be supported by.
  • each of the car-side guide rails 101a and 101b or the weight-side guide rails 102a and 102b may have a structure in which the additional weight is supported on a fish plate (not shown) that connects the guide rails to each other.
  • the movable support portion 8 is extended to engage with the beam 110c or the wall on the upper building floor. After that, the main rope 10 is gripped by the first machine room unit main rope gripping device 16. As described above, in the first embodiment, since the first machine room unit 3 is provided with the movable support portion 8, the lifting workability of the first machine room unit 3 can be improved.
  • the moving distance of the car 11 in the ascending / descending direction is extended by the amount that the main rope 10 is pulled out from the main rope drum 15.
  • the machine room unit is divided into a plurality of the first machine room unit 3 and the second machine room unit 4, and each machine room unit is divided into beams or walls of different building floors (beams in FIG. 1). Since it is mounted on 110c, 110d), the machine room unit can be installed without increasing the number of lifting machines and without applying a load exceeding the allowable load to the beam or wall on a specific floor. can.
  • the main rope 10 is gripped by the first machine room unit main rope gripping device 16, even during the work of moving the second machine room unit 4 to the upper building floor. It becomes possible to use the basket 11.
  • the lifting machines 6a, 6b for the second machine room unit since the first machine room unit 3 is mounted on the beam or wall of the building floor, the lifting machines 6a, 6b for the second machine room unit, It is sufficient for 6c to have enough power to pull up the second machine room unit 4, and it is possible to prevent the lifting machines 6a, 6b, 6c for the second machine room unit from becoming larger.
  • the construction elevator device 1 having such a configuration operates a car 11 (balance weight 12) installed below the first machine room unit 3 in the ascending / descending direction, and for example, a construction worker is placed in the first machine room. It is transported to each building floor below the unit 3. Further, in the second machine room unit 4, a main rope drum 15 for extending the main rope 10 is installed, and the main rope does not stop the ascending / descending operation of the car 11 (balance weight 12) by the first machine room unit 3. Since the extension work of 10 can be performed, the stop time of the elevator service due to the lifting of the machine room can be shortened.
  • FIG. 4 is a plan view showing the arrangement relationship between the lifting machine for the machine room unit and the machine room unit of the construction elevator device according to the second embodiment.
  • the car 11 is arranged below the second machine room unit 4 (see FIGS. 1 to 3). Further, as shown in FIG. 4, the hoistway 100 is provided with a pair of car-side guide rails 101a and 101b for guiding the car 11 in the ascending / descending direction.
  • the pair of car-side guide rails 101a and 101b extend along the wall surfaces facing each other in the hoistway 100.
  • the car 11 is provided with a pair of car-side guide shoes (not shown) that are slidably engaged with the pair of car-side guide rails 101a and 101b.
  • the second machine room unit 4 is provided with a pair of machine room side guide shoes 31a and 31b that are slidably engaged with the pair of car side guide rails 101a and 101b. Therefore, the pair of car-side guide rails 101a and 101b guide the second machine room unit 4 in the elevating direction.
  • the suspension points 21a, 21b, and 21c are arranged at positions that overlap with the virtual circle C centered on the center of gravity G of the second machine room unit 4. As a result, when viewed from the virtual horizontal plane above the second machine room unit 4, the second machine room unit 4 by the lifting machines 6a, 6b, 6c for the second machine room unit from the center of gravity G of the second machine room unit 4. The distances to the suspension points 21a, 21b, 21c are substantially equal.
  • center of gravity G of the second machine room unit 4 is located in the area surrounded by the virtual straight line connecting the suspension points 21a, 21b, and 21c.
  • the load is uniformly applied to the suspension points 21a, 21b, and 21c of the second machine room unit 4, so that the inclination of the second machine room unit 4 can be effectively prevented, and the inclination of the second machine room unit 4 can be effectively prevented. Stability can be maintained. Further, the second machine room unit 4 can be lifted while preventing an overload on one machine room unit lifting machine.
  • the suspension points 21a, 21b, 21c of the second machine room unit 4 sandwich the car-side virtual straight line L1 connecting the pair of car-side guide rails 101a, 101b. It is arranged on the side opposite to the center of gravity G of the second machine room unit 4. As a result, the suspension points 21a and 21b are arranged on the outer side opposite to the center of gravity G with respect to the car-side virtual straight line L1. As a result, even if an eccentric load is generated in the second machine room unit 4, it is possible to prevent an overload from being applied to the car side guide rails 101a and 101b.
  • the center of gravity G of the second machine room unit 4 changes depending on the hoistway dimensions of the target elevator device and the installation position of the machine (winding machine). Further, the mounting positions of the pair of car-side guide rails 101a and 101b also change depending on the target elevator device. Therefore, the suspension points 21a, 21b, 21c in the construction elevator device of this embodiment are determined according to the center of gravity G of the second machine room unit 4 and the positions of the pair of car-side guide rails 101a, 101b.
  • FIG. 5 is a plan view showing the arrangement relationship between the lifting machine for the machine room unit of the construction elevator device according to the second embodiment, the second machine room unit, the car, and the balance weight.
  • the construction elevator device according to the second embodiment has the same configuration as the construction elevator device according to the first embodiment described above, and the difference is that the lifting machines 6a, 6b for the second machine room unit, This is the suspension point position of the second machine room unit 4 according to 6c. Therefore, here, the suspension point position of the second machine room unit 4 according to the second embodiment will be described, and the description of the configuration common to the first embodiment will be omitted.
  • a balance weight 12 is arranged below the second machine room unit 4 (see FIGS. 1 to 3).
  • the hoistway 100 is provided with a pair of weight side guide rails 102a and 102b for guiding the balance weight 12 in the elevating direction.
  • the pair of weight side guide rails 102a and 102b extend along the wall surfaces facing each other in the hoistway 100.
  • the weight-side virtual straight line L2 connecting the pair of weight-side guide rails 102a and 102b is substantially parallel to the car-side virtual straight line L1 connecting the pair of car-side guide rails 101a and 101b. That is, the pair of weight-side guide rails 102a and 102b and the pair of car-side guide rails 101a and 101b are provided on a pair of wall surfaces facing each other in the hoistway 100.
  • the balance weight 12 is provided with a pair of weight side guide shoes (not shown) that are slidably engaged with the pair of weight side guide rails 102a and 102b.
  • the second machine room unit 4 is provided with a pair of machine room side guide shoes 32a and 32b that are slidably engaged with the pair of weight side guide rails 102a and 102b. Therefore, the pair of weight side guide rails 102a and 102b guide the second machine room unit 4 in the elevating direction.
  • the suspension point position of the second machine room unit 4 according to the second embodiment satisfies all the conditions of the suspension point position of the second machine room unit 4 according to the first embodiment. Therefore, the inclination of the second machine room unit 4 can be effectively prevented, and the stability of the second machine room unit 4 can be maintained. Further, it is possible to prevent an overload on one lifting machine for a machine room unit. Further, even if an eccentric load is generated in the second machine room unit 4, it is possible to prevent an overload from being applied to the car side guide rails 101a and 101b.
  • the suspension point 21c is opposite to the center of gravity G of the second machine room unit 4 with the weight side virtual straight line L2 in between. It is located on the side.
  • the suspension point 21c is arranged on the outer side opposite to the center of gravity G with respect to the weight side virtual straight line L2.
  • the center of gravity G of the second machine room unit 4 changes depending on the hoistway dimensions of the target elevator device and the installation position of the machine (winding machine). Further, the mounting positions of the pair of car-side guide rails 101a and 101b and the pair of weight-side guide rails 102a and 102b also change depending on the target elevator device. Therefore, the suspension points 21a, 21b, and 21c in the construction elevator device of this embodiment are determined according to the center of gravity G of the second machine room unit 4 and the positions of various guide rails.
  • FIG. 6 is a schematic configuration diagram of a construction elevator device according to a third embodiment.
  • the construction elevator device has a different configuration of the lifting machine for the first machine room unit and the lifting machine for the second machine room unit from the construction elevator device according to the first and second embodiments.
  • the machine room unit is composed of a first machine room unit and a second machine room unit.
  • the construction elevator device 60 As shown in FIG. 6, the construction elevator device 60 according to the third embodiment is provided in the hoistway 100 formed in the building structure.
  • the construction elevator device 60 includes a support member 2, a machine room unit (first machine room unit 3, second machine room unit 4), and a machine room unit lifting machine (first machine room unit lifting machine 51a, 51b, 51c, lifting machines for the second machine room unit 61a, 61b, 61c) are provided.
  • the second machine room unit 4 is suspended from the support member 2, is lifted by three or more lifting machines 61a, 61b, 61c for the second machine room unit installed on the support member 2, and moves in the elevating direction. ..
  • the first machine room unit 3 is suspended from the second machine room unit 4, and is lifted by three or more lifting machines 51a, 51b, 51c for the first machine room unit installed in the second machine room unit 4. And move in the ascending / descending direction.
  • the lifting machine for the first machine room unit is installed in either the first machine room unit 3 or the second machine room unit 4, and the first machine room unit 3 is installed as in the first embodiment (FIG. 1).
  • the first machine room unit 3 may be lifted by N: 1 (N is 2 or more) roping via a plurality of pulleys 7 installed in each of the second machine room unit 4.
  • the support member 2 is located at the upper part in the hoistway 100 and is mounted on the beam 110a or the wall of the building.
  • the second machine room unit 4 is suspended from the support member 2 by the lifting machines 61a, 61b, 61c for the second machine room unit installed on the support member 2, and is configured to be movable in the elevating direction.
  • the first machine room unit 3 is suspended from the second machine room unit 4 by the lifting machines 51a, 51b, 51c for the first machine room unit installed in the second machine room unit 4, and can be moved in the elevating direction. It is configured in.
  • the first machine room unit 3 has a movable support portion 8 that expands and contracts toward the wall surface of the hoistway 100 (in the left-right direction in FIG. 1) and engages with the beam 110d of the building or the wall when extended. Further, the first machine room unit 3 is a car arranged on the hoisting machine 9, the main rope 10 wound around the sheave of the hoisting machine 9, and the main rope 10 located on one side of the hoisting machine 9. It has 11 and a balance weight 12 arranged on the main rope 10 located on the other side of the hoisting machine 9. The hoisting machine 9 winds up the main rope 10 and raises and lowers the car 11 (balance weight 12).
  • the second machine room unit 4 has a movable support portion 13 that expands and contracts toward the wall surface of the hoistway 100 (in the left-right direction in FIG. 1) and engages with the beam 110c of the building or the wall when extended.
  • the main rope 10 is fixed to the first machine room unit 3 by the main rope fixing portion 14 provided in the first machine room unit 3.
  • the other end side of the main rope 10 extends upward from the first machine room unit 3 and is wound around a main rope drum 15 provided in the second machine room unit 4.
  • the main rope drum 15 is provided to extend the main rope 10.
  • the main rope 10 is provided by the first machine room unit main rope gripping device 16 provided in the first machine room unit 3 and the second machine room unit main rope gripping device 17 provided in the second machine room unit 4, respectively. Be grasped.
  • the first machine room unit 3 is provided with a hoisting machine 9, and the second machine room unit 4 is provided with a main rope drum 15 and lifting machines 51a, 51b, 51c for the first machine room unit.
  • the hoisting machine 9, the lifting machines 51a and 51b for the first machine room unit, and the main rope drum 15 are heavy and make the machine room unit heavier. When these are incorporated into one machine room unit and mounted on a beam or wall of a building on a specific floor, there is a problem that a load exceeding the allowable load is applied to the beam or wall on the specific floor. ..
  • the machine room unit including the hoisting machine 9, the main cable drum 15, and the like is divided into a first machine room unit 3 and a second machine room unit 4, and each machine room unit is divided into a plurality of machine room units. Is placed on a beam or wall (beams 110c, 110d in FIG. 1) on different building floors.
  • the machine room unit can be installed without applying a load exceeding the allowable load to the beam or wall on a specific floor.
  • the construction elevator device moves the machine room unit to the upper building floor as the construction on the building floor progresses.
  • the second machine room unit main rope gripping device 17 When moving the second machine room unit 4 from the current position of the building floor (beam 110c) to the position of the upper building floor (beam 110b), the second machine room unit main rope gripping device 17 is opened and the second machine room unit main rope gripping device 17 is opened. , The main rope 10 is gripped by the first machine room unit main rope gripping device 16. Then, the rope is pulled out from the lifting machines 51a, 51b, 51c for the first machine room unit, the second machine room unit 4 is pulled up by the lifting machines 61a, 61b, 61c for the second machine room unit, and the movable support portion 13 is reduced. ..
  • the movable support portion 13 is extended to engage with the beam 110b or the wall on the upper building floor. As described above, in the third embodiment, since the second machine room unit 4 is provided with the movable support portion 13, the lifting workability of the second machine room unit 4 can be improved.
  • the rope for suspending the first machine room unit 3 is pulled out from the lifting machines 51a, 51b, 51c for the first machine room unit. Further, the main rope 10 is pulled out from the main rope drum 15. In this way, the second machine room unit 4 can be moved to the upper building floor without moving the first machine room unit 3. At this time, since the main rope 10 is gripped by the first machine room unit main rope gripping device 16, the main rope 10 does not extend downward from the first machine room unit 3, and the second machine room unit 4 The car 11 can be used even during the work of moving the car to the upper building floor.
  • the second machine room unit main rope gripping device 17 may be configured to grip the weight of the main rope between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17. .. If the distance between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17 is long, the weight of the main rope between them becomes large, and the second machine room unit main rope gripping device 17 is opened. At that time, the main rope 10 may be unintentionally pulled out from the main rope drum 15 depending on the weight of the main rope. On the other hand, the second machine room unit main rope gripping device 17 grips the weight of the main rope between the first machine room unit main rope gripping device 16 and the second machine room unit main rope gripping device 17. Safety and workability can be improved by pulling out the main rope 10 from the main rope drum 15 by the force of lifting the second machine room unit 4 of the lifting machines 6a, 6b, 6c for the machine room unit.
  • the balance weight 12 is used for the balance weight (not shown). It is supported by a shock absorber to reduce the tension applied to the main cable 10, the first machine room unit 3 and the car 11 are connected by a chain (see the chain 18 in FIG. 3), and the first machine room unit main cable gripping device 16 is connected. At the same time as opening, the main rope 10 is gripped by the second machine room unit main rope gripping device 17. Then, the first machine room unit 3 is pulled up by the lifting machines 51a, 51b, 51c for the first machine room unit, and the movable support portion 8 is reduced.
  • the movable support portion 8 is extended to engage with the beam 110c or the wall on the upper building floor. After that, the main rope 10 is gripped by the first machine room unit main rope gripping device 16. As described above, in the third embodiment, since the first machine room unit 3 is provided with the movable support portion 8, the lifting workability of the first machine room unit 3 can be improved.
  • the moving distance of the car 11 in the ascending / descending direction is extended by the amount that the main rope 10 is pulled out from the main rope drum 15.
  • the machine room unit is divided into a plurality of the first machine room unit 3 and the second machine room unit 4, and each machine room unit is divided into beams on different building floors (beam 110c, in FIG. 1). Since it is mounted on 110d), the machine room unit can be installed without applying a load exceeding the permissible load to the beam or wall on the specific floor.
  • the main rope 10 is gripped by the first machine room unit main rope gripping device 16, even during the work of moving the second machine room unit 4 to the upper building floor. It becomes possible to use the basket 11.
  • the lifting machines 61a, 61b for the second machine room unit since the first machine room unit 3 is mounted on the beam or the wall of the building floor, the lifting machines 61a, 61b for the second machine room unit, It suffices for 61c to have enough power to pull up the second machine room unit 4, and it is possible to prevent the lifting machines 6a, 6b, 6c for the second machine room unit from becoming larger.
  • the second machine room is equal to the weight of the lifting machines 61a, 61b, 61c for the second machine room unit.
  • the weight of the unit 4 can be reduced, and the load applied to the beam or wall on the specific floor on which the second machine room unit 4 is placed can be reduced.
  • the construction elevator device 1 having such a configuration operates a car 11 (balance weight 12) installed below the first machine room unit 3 in the ascending / descending direction, and for example, a construction worker is placed in the first machine room. It is transported to each building floor below the unit 3. Further, in the second machine room unit 4, a main rope drum 15 for extending the main rope 10 is installed, and the main rope does not stop the raising and lowering operation of the car 11 (balance weight 12) by the first machine room unit 3. Since the extension work of 10 can be performed, the stop time of the elevator service due to the lifting of the machine room can be shortened.
  • the construction elevator devices according to the first and second embodiments described above are arranged below the support member (support member 2) provided in the hoistway (hoistway 100) and below the support member.
  • the first machine room unit (first machine room unit 3), the second machine room unit (second machine room unit 4), and the second machine room unit are suspended from the support member so as to be movable in the elevating direction. It is installed in the lifting machine for the machine room unit (lifting machines 6a, 6b, 6c for the second machine room unit) and the first machine room unit, and the first machine room unit can be moved in the ascending / descending direction from the second machine room unit.
  • the machine room unit is divided into a first machine room unit and a second machine room unit, and the first machine room unit and the second machine room unit are placed on beams or walls of different building floors.
  • the loads of the first machine room unit and the second machine room unit can be distributed to the beams of different building floors, so that the load exceeding the allowable load on the beams or walls of the specific floor can be applied.
  • the machine room unit can be installed without such a problem.
  • the machine room unit is divided into a plurality of parts (first machine room unit 3, second machine room unit 4), so that the main rope (main rope 10) is extended. It is possible to shorten the stop time of the elevator service when the machine room is lifted.
  • the main rope is gripped by the main rope gripping device of the first machine room unit, even during the work of moving the second machine room unit to the upper building floor. , It becomes possible to use a basket.
  • the second machine room unit has three or more hanging points.
  • the distance from the center of gravity (center of gravity G) of the machine room unit to each suspension point is approximately equal, and the area surrounded by a virtual straight line connecting the suspension points.
  • the center of gravity is located inside.
  • the load is uniformly applied to the three suspension points of the second machine room unit, so that the inclination of the second machine room unit can be effectively prevented and the stability of the second machine room unit can be maintained. can. Further, the machine room unit can be lifted while preventing an overload on one machine room unit lifting machine.
  • a pair of car side guide rails (a pair of car side guide rails 101a) for guiding the car (car 11) in the elevating direction are provided.
  • 101b) are provided.
  • the suspension points (suspension points 21a and 21b) at least one of the three or more suspension points of the machine room unit are the car-side virtual straight lines (car-side virtual straight lines L1) connecting the pair of car-side guide rails. It is located on the opposite side of the center of gravity.
  • a pair of weight side guide rails (a pair of weight side guide rails) for guiding the balance weight (balance weight 12) in the ascending / descending direction. 102a, 102b) are provided.
  • the weight-side virtual straight line (weight-side virtual straight line L2) connecting the pair of weight-side guide rails is substantially parallel to the car-side virtual straight line (car-side virtual straight line L1).
  • the hanging points (hanging points 21c) other than the hanging points (hanging points 21a and 21b) arranged on the opposite side of the center of gravity with the virtual straight line on the car side sandwiched are. It is located on the opposite side of the center of gravity with the virtual straight line on the weight side in between.
  • the construction elevator device includes a support member (support member 2) provided in the hoistway (hoistway 100) and a first machine room unit (support member 2) arranged below the support member.
  • the first machine room unit 3), the second machine room unit (second machine room unit 4), and the second machine room which is installed on the support member and suspends the second machine room unit from the support member so as to be movable in the elevating direction.
  • the lifting machine for the unit lifting machines 61a, 61b, 61c for the second machine room unit
  • the first machine room unit installed in the second machine room unit were suspended so as to be movable in the elevating direction. It is equipped with a lifting machine for a first machine room unit (lifting machines for a first machine room unit 51a, 51b, 51c).
  • the weight of the machine room unit can be reduced by the weight of the lifting machine for the second machine room unit.
  • the driving force for the lifting machine for the second machine room unit to pull up the first machine room unit can be reduced, and the size of the lifting machine for the second machine room unit can be suppressed.
  • the second machine room unit 4 is mounted on the beam or the wall of the building floor, so that the lifting machine for the second machine room unit is the second. It suffices to have enough power to pull up the machine room unit 4, and it is possible to prevent the lifting machine for the second machine room unit from becoming large.
  • the present invention is not limited to the above-described examples, and includes various modifications.
  • the above-described embodiment describes the present invention in an easy-to-understand and detailed manner, and the present invention is not necessarily limited to the one including all the configurations described.
  • it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment and it is also possible to add the configuration of another embodiment to the configuration of one embodiment.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

本発明は、昇降路100内に備えられ、主索10により吊下げられたかご11及び釣合おもり12を昇降方向に移動させる巻上機9と、主索10の延長分を蓄える主索ドラム15と、巻上機9及び主索ドラム15を備えた機械室ユニットとから構成される。 機械室ユニットは、巻上機9を備える第1機械室ユニット3と、主索ドラム15を備える第2機械室ユニット4とに分割する。分割した第1機械室ユニット3と第2機械室ユニット4とは異なる建屋階の梁若しくは壁に載置するようにした。

Description

工事用エレベーター装置及びエレベーターの主索延長方法
 本発明は、工事用エレベーター装置及びエレベーターの主索延長方法に関する。
 従来から、建築工事現場における資材等の揚重には、工事用エレベーター装置が用いられている。そして、工事用エレベーター装置としては、例えば、特許文献1に記載されている。この特許文献1に記載された工事用エレベーター装置は、支持梁の下方に機械室ユニットを備えている。機械室ユニットは、下方梁と上方梁との間に巻上機を配置して構成され、支持梁からロープによって吊下げられている。上方梁には揚重機が備えられており、この揚重機がロープを巻上げて機械室ユニットを揚重する。
国際公開第2010/100319号
 しかしながら、特許文献1に記載された工事用エレベーター装置は、長行程・大積載エレベーターとなると機械室ユニットが大型化し、揚重機の員数が増え、さらに機械室ユニットをある特定階の壁や梁で支えているので、この特定階の壁や梁に許容される荷重(許容荷重)を超えた荷重がかかるといった課題があった。工事用エレベーター装置では、かごを巻上げる巻上機の他、機械室ユニットを揚重する揚重機(機械室ユニットの重さに応じて大型化・員数増加し、揚重機自身の重量も増える)、エレベーターのロープを延長するためのロープドラム等が備えられているため、機械室ユニットの重量が増加し、機械室ユニットを軽量化することが困難であった。
 本発明の目的は、上記従来技術の課題を解決し、揚重機員数を減らし、特定階の梁若しくは壁にかかる荷重を抑制することができる工事用エレベーター装置及びエレベーターの主索延長方法を提供することにある。
 上記目的を達成するため本発明は、昇降路内に備えられ、主索により吊下げられたかご及び釣合おもりを昇降方向に移動させる巻上機と、前記主索の延長分を蓄える主索ドラムと、前記巻上機及び前記主索ドラムを備えた機械室ユニットとから構成された工事用エレベーター装置において、前記機械室ユニットは、前記巻上機を備える第1機械室ユニットと、前記主索ドラムを備える第2機械室ユニットとに分割し、分割した前記第1機械室ユニットと前記第2機械室ユニットとを異なる建屋階の梁若しくは壁に載置したことを特徴とする。
 また、本発明は、昇降路内に備えられ、主索により吊下げられたかご及び釣合おもりを昇降方向に移動させる巻上機と、前記主索の延長分を蓄える主索ドラムと、前記巻上機及び前記主索ドラムを備えた機械室ユニットとから構成されたエレベーターの主索延長方法において、前記機械室ユニットは、前記巻上機を備える第1機械室ユニットと、前記主索ドラムを備える第2機械室ユニットとに分割し、分割した前記第1機械室ユニットと前記第2機械室ユニットとを異なる建屋階の梁若しくは壁に載置し、機械室ユニット揚重時において、前記第2機械室ユニットは、前記昇降路内に備えられた支持部材から吊下げられ、前記第1機械室ユニットは、前記第2機械室ユニットから吊下げられ、前記第1機械室ユニット若しくは前記第2機械室ユニットには、前記第1機械室ユニットを揚重する第1機械室ユニット用揚重機が備えられ、前記支持部材若しくは前記第2機械室ユニットには、前記第2機械室ユニットを揚重する第2機械室ユニット用揚重機が備えられ、前記第1機械室ユニットには、前記主索を把持する第1機械室ユニット主索把持装置が備えられ、前記第2機械室ユニットには、前記主索を把持する第2機械室ユニット主索把持装置が備えられ、前記第2機械室ユニット用揚重機による前記第2機械室ユニットの引き上げ時には、前記第2機械室ユニット主索把持装置を開放して前記主索ドラムから前記主索を引き出すと共に、前記第1機械室ユニット主索把持装置で前記主索を把持し、前記第1機械室ユニット用揚重機による前記第1機械室ユニットの引き上げ時には、前記第1機械室ユニット主索把持装置を開放すると共に、前記第2機械室ユニット主索把持装置で前記主索を把持することを特徴とする。
 本発明によれば、揚重機員数を減らし、特定階の梁若しくは壁にかかる荷重を抑制することができる工事用エレベーター装置及びエレベーターの主索延長方法を提供することができる。
本発明の第1実施例に係る工事用エレベーター装置の概略構成図である。 第2機械室ユニットを移動させた状態を示す工事用エレベーター装置の概略構成図である。 第1機械室ユニットを移動させた状態を示す工事用エレベーター装置の概略構成図である 第2実施例に係る工事用エレベーター装置の機械室ユニット用揚重機と機械室ユニットとかごとの配置関係を示す平面図である。 第2実施例に係る工事用エレベーター装置の機械室ユニット用揚重機と第2機械室ユニットとかご及び釣合おもりとの配置関係を示す平面図である。 第3実施例に係る工事用エレベーター装置の概略構成図である。
 以下、本発明の工事用エレベーター装置の実施例について、図1~図6を参照して説明する。
[工事用エレベーター装置の構成]
 まず、本発明の第1実施例に係る工事用エレベーター装置の構成について、図1を参照して説明する。図1は、第1実施例に係る工事用エレベーター装置の概略構成図である。
 図1に示すように、第1実施例に係る工事用エレベーター装置1は、建物構造物内に形成された昇降路100内に設けられている。この工事用エレベーター装置1は、支持部材2と、機械室ユニット(第1機械室ユニット3、第2機械室ユニット4)と、機械室ユニット用揚重機(第1機械室ユニット用揚重機5a,5b、第2機械室ユニット用揚重機6a,6b,6c)とを備えている。
 第2機械室ユニット用揚重機6a,6b,6cは、第2機械室ユニット4に三台以上備えられ、第2機械室ユニット4を引き上げる。
 支持部材2は、昇降路100内の上部にあって、建屋の梁110a若しくは壁に載置されている。
 第2機械室ユニット4は、支持部材2から吊り下げられており、第2機械室ユニット4に設置された第2機械室ユニット用揚重機6a,6b,6cによって揚重され、昇降方向に移動する。
 第1機械室ユニット3は、第2機械室ユニット4から吊り下げられており、第1機械室ユニット3に設置された第1機械室ユニット用揚重機5a,5bによって揚重され、昇降方向に移動する。第1機械室ユニット用揚重機5a,5bは、第1機械室ユニット3と第2機械室ユニット4にそれぞれ設けた複数のプーリ7を介してN:1(Nは2以上)ローピングで、第1機械室ユニット3を揚重する。
 第1機械室ユニット3は、昇降路100の壁面に向かって伸縮(図1の左右方向)し、伸長時に建屋の梁110d若しくは壁に係合する可動支持部8を有している。また、第1機械室ユニット3は、巻上機9と、巻上機9のシーブに巻き掛けられた主索10と、巻上機9の一方側に位置する主索10に配置されたかご11と、巻上機9の他方側に位置する主索10に配置された釣合おもり12とを有している。巻上機9は、昇降路100内に備えられ、主索10により吊下げられたかご11及び釣合おもり12を昇降方向に移動させる。
 第2機械室ユニット4は、昇降路100の壁面に向かって伸縮(図1の左右方向)し、伸長時に建屋の梁110c若しくは壁に係合する可動支持部13を有している。
 主索10の一端側は、第1機械室ユニット3に備えられた主索固定部14によって第1機械室ユニット3に固定されている。主索10の他端側は、第1機械室ユニット3から上方に延び、第2機械室ユニット4に備えられた主索ドラム15に巻かれている。主索ドラム15は、主索10を延長させるために備えられており、主索10の延長分を蓄えている。主索10は、第1機械室ユニット3に備えられた第1機械室ユニット主索把持装置16と、第2機械室ユニット4に備えられた第2機械室ユニット主索把持装置17とによってそれぞれ把持される。
 第1機械室ユニット3には、巻上機9及び第1機械室ユニット用揚重機5a,5bが備えられ、第2機械室ユニット4には主索ドラム15及び第2機械室ユニット用揚重機6a,6b,6cが備えられている。巻上機9、第1機械室ユニット用揚重機5a,5b、主索ドラム15、第2機械室ユニット用揚重機6a,6b,6cは重量があり、機械室ユニットの重量増加の原因となっている。これらを一つの機械室ユニットに組み込んで構成し、特定階の建屋の梁若しくは壁に載置した場合、揚重機の員数が増え、機械室ユニットが載置された特定階の梁若しくは壁には、許容荷重を超えた荷重がかかるといった課題があった。
 そこで、本実施例では、巻上機9及び主索ドラム15等を備える機械室ユニットを、第1機械室ユニット3と第2機械室ユニット4とに複数に分割し、それぞれの機械室ユニットを異なる建屋階の梁若しくは壁(図1では梁110c,110d)に載置するようにしている。
 このように構成することにより、特定階の梁若しくは壁には許容荷重を超える荷重がかかることなく、機械室ユニットを設置することができる。
 工事用エレベーター装置は、建屋階の工事の進行に合わせ、機械室ユニットを上方の建屋階に移動させる。機械室ユニットの移動方法について、図2及び図3を用いて説明する。
 図2は、第2機械室ユニットを移動させた状態を示す工事用エレベーター装置の概略構成図、図3は、第1機械室ユニットを移動させた状態を示す工事用エレベーター装置の概略構成図である。
 図2において、第2機械室ユニット4を現在の建屋階の位置(梁110c)から上の建屋階の位置(梁110b)へと移動させる場合には、第2機械室ユニット主索把持装置17を開放すると共に、第1機械室ユニット主索把持装置16で主索10を把持する。そして、第1機械室ユニット用揚重機5a,5bからロープを引き出し、第2機械室ユニット用揚重機6a,6b,6cで第2機械室ユニット4を引き上げ、可動支持部13を縮小させる。第2機械室ユニット4が上の建屋階の梁110bを通過した後、可動支持部13を伸長させて上の建屋階の梁110b若しくは壁と係合させる。このように第1実施例では、第2機械室ユニット4に可動支持部13を備えているので、第2機械室ユニット4の昇降作業性を向上することができる。なお、図3において、第2機械室ユニット主索把持装置17は、第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との間の主索重量分を把持する構成としてもよい。第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との距離が長いと、その間の主索重量が大きくなり、第2機械室ユニット主索把持装置17を開放した際に、主索重量によって主索ドラム15から意図せず主索10が引き出されることがある。これに対し、第2機械室ユニット主索把持装置17は、第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との間の主索重量分を把持し、第2機械室ユニット用揚重機6a,6b,6cの第2機械室ユニット4を揚重する力で主索ドラム15から主索10を引き出すことで安全性と作業性を向上することができる。
 なお、図1に示す構成では、第1機械室ユニット3および第2機械室ユニット4には、それぞれ可動支持部8、13を備える構成としたが、非可動の支持部材を機械室ユニットに備えるようにしてもよい。
 第2機械室ユニット4が上の建屋階へ移動している状態においては、第1機械室ユニット3を吊下げるロープが第1機械室ユニット用揚重機5a,5bから引き出される。さらに主索10が、主索ドラム15から引き出される。このようにして、第2機械室ユニット4は、第1機械室ユニット3を移動させることなく、上の建屋階へ移動することができる。この際、主索10は第1機械室ユニット主索把持装置16によって把持されているので、主索10が第1機械室ユニット3から下方に延びることはなく、また、第2機械室ユニット4を上の建屋階へ移動させる作業中においても、かご11を使用することが可能となる。
 次に、第1機械室ユニット3の移動方法について説明する。
 図3において、第1機械室ユニット3を現在の建屋階の位置(梁110d)から上の建屋階の位置(梁110c)へと移動させる場合には、釣合おもり12を図示を省略した釣合おもり用の緩衝器に支持させ、主索10にかかる張力を低減させ、第1機械室ユニット3とかご11をチェーン18で接続し、第1機械室ユニット主索把持装置16を開放すると共に、第2機械室ユニット主索把持装置17で主索10を把持する。そして、第1機械室ユニット用揚重機5a,5bで第1機械室ユニット3を引き上げ、可動支持部8を縮小させる。このとき、第2機械室ユニットを支持する梁には、第1機械室ユニット3を揚重している最中に、一時的に第1機械室ユニット3の重量とかご11の重さが追加で負荷される(釣合おもり12の重量は釣合おもり用緩衝器が支持するためかからない)。この場合において、追加で負荷される重量分は、例えば図示を省略した第1機械室ユニット3に備えられた非常止め装置を用いてかご側ガイドレール101a、101b、もしくはおもり側ガイドレール102a,102bにて支持する構成としてもよい。または、かご側ガイドレール101a、101b、もしくはおもり側ガイドレール102a,102bそれぞれについて、ガイドレール同士を連結する図示を省略するフィッシュプレートに上記追加重量を支持する構造としてもよい。
 第1機械室ユニット3が上の建屋階の梁110cを通過した後、可動支持部8を伸長させて上の建屋階の梁110c若しくは壁と係合させる。その後、第1機械室ユニット主索把持装置16で主索10を把持する。このように第1実施例では、第1機械室ユニット3に可動支持部8を備えているので、第1機械室ユニット3の昇降作業性を向上することができる。
 第1機械室ユニット3の上の建屋階への移動完了後は、主索ドラム15から主索10が引き出された分、かご11の昇降方向への移動距離が延長される。
 第1機械室ユニット3を建屋階の梁110c若しくは壁に載置後は、第1機械室ユニット3とかご11を接続するチェーン18を取り外す。
 第1実施例によれば、機械室ユニットを第1機械室ユニット3と第2機械室ユニット4とに複数に分割し、それぞれの機械室ユニットを異なる建屋階の梁若しくは壁(図1では梁110c,110d)に載置するようにしているので、揚重機の員数が増えることなく、さらに特定階の梁若しくは壁には許容荷重を超える荷重がかかることなく、機械室ユニットを設置することができる。
 また、第1実施例では、主索10が第1機械室ユニット主索把持装置16によって把持されているので、第2機械室ユニット4を上の建屋階へ移動させている作業中においても、かご11を使用することが可能となる。
 さらに、第2機械室ユニット4を移動させている状態においては、第1機械室ユニット3が建屋階の梁若しくは壁に載置されているので、第2機械室ユニット用揚重機6a,6b,6cは、第2機械室ユニット4を引き上げるだけの動力を備えていれば十分であり、第2機械室ユニット用揚重機6a,6b,6cが大型化するのを抑制することができる。
 このような構成の工事用エレベーター装置1は、第1機械室ユニット3の下方に設置したかご11(釣合おもり12)を昇降方向に運転し、例えば、建築工事の作業者を第1機械室ユニット3の下方における各建屋階に搬送する。また、第2機械室ユニット4には、主索10を延長する主索ドラム15が設置され、第1機械室ユニット3によるかご11(釣合おもり12)の昇降運転を停止することなく主索10の延長作業ができるので、機械室揚重に伴うエレベーターサービスの停止時間を短縮することができる。
[機械室ユニットの吊点位置]
 次に、第2機械室ユニット用揚重機6a,6b,6cによる第2機械室ユニット4の吊点位置について、図4を参照して説明する。図4は、第2実施例に係る工事用エレベーター装置の機械室ユニット用揚重機と機械室ユニットとかごとの配置関係を示す平面図である。
 上述したように、第2機械室ユニット4の下方には、かご11が配置されている(図1~図3参照)。また、図4に示すように、昇降路100には、かご11を昇降方向に案内する一対のかご側ガイドレール101a,101bが設けられている。一対のかご側ガイドレール101a,101bは、昇降路100における互いに対向する壁面に沿って延びている。
 一方、かご11には、一対のかご側ガイドレール101a,101bに摺動可能に係合する一対のかご側ガイドシュー(不図示)が設けられている。また、第2機械室ユニット4には、一対のかご側ガイドレール101a,101bに摺動可能に係合する一対の機械室側ガイドシュー31a,31bが設けられている。したがって、一対のかご側ガイドレール101a,101bは、第2機械室ユニット4を昇降方向に案内する。
 図4に示すように、第2機械室ユニット用揚重機6a,6b,6cによる第2機械室ユニット4の吊点は、3箇所であり、吊点21a,21b,21cとする。
 吊点21a,21b,21cは、第2機械室ユニット4の重心Gを中心とした仮想円Cと重なる位置に配置する。これにより、第2機械室ユニット4の上方の仮想水平面から見たとき、第2機械室ユニット4の重心Gから第2機械室ユニット用揚重機6a,6b,6cによる第2機械室ユニット4の吊点21a,21b,21cまでの距離が略等しい。
 また、第2機械室ユニット4の重心Gは、吊点21a,21b,21c間を結ぶ仮想直線で囲まれた領域内に位置している。
 その結果、第2機械室ユニット4の吊点21a,21b,21cに均一に荷重が掛かるので、第2機械室ユニット4の傾きを効果的に防止することができ、第2機械室ユニット4の安定性を保つことができる。さらに、1つの機械室ユニット用揚重機への過負荷を防止しながら第2機械室ユニット4を揚重することができる。
 また、第1実施例では、第2機械室ユニット4の吊点21a,21b,21cのうち、吊点21a,21bが、一対のかご側ガイドレール101a,101bを結ぶかご側仮想直線L1を挟んで第2機械室ユニット4の重心Gと反対側に配置されている。これにより、吊点21a,21bは、かご側仮想直線L1に対して重心Gと反対側である外側に配置される。その結果、第2機械室ユニット4に偏荷重が生じても、かご側ガイドレール101a,101bに過負荷が加えられないようにすることができる。
 なお、第2機械室ユニット4の重心Gは、対象となるエレベーター装置の昇降路寸法やマシン(巻上機)の据付位置によって変化する。また、一対のかご側ガイドレール101a,101bの取り付け位置も、対象となるエレベーター装置に応じて変化する。そのため、本実施例の工事用エレベーター装置における吊点21a,21b,21cは、第2機械室ユニット4の重心Gや一対のかご側ガイドレール101a,101bの位置に応じて決定する。
[機械室ユニットの吊点位置]
 以下、本発明の第2実施例に係る工事用エレベーター装置について、図5を参照して説明する。図5は、第2実施例に係る工事用エレベーター装置の機械室ユニット用揚重機と第2機械室ユニットとかご及び釣合おもりとの配置関係を示す平面図である。
 第2実施例に係る工事用エレベーター装置は、上述の第1実施例に係る工事用エレベーター装置と同様の構成を有しており、異なる点は、第2機械室ユニット用揚重機6a,6b,6cによる第2機械室ユニット4の吊点位置である。そのため、ここでは、第2実施例に係る第2機械室ユニット4の吊点位置について説明し、第1実施例と共通する構成についての説明を省略する。
 第2機械室ユニット4の下方には、釣合おもり12が配置されている(図1~図3参照)。図5に示すように、昇降路100には、釣合おもり12を昇降方向に案内する一対のおもり側ガイドレール102a,102bが設けられている。一対のおもり側ガイドレール102a,102bは、昇降路100における互いに対向する壁面に沿って延びている。
 一対のおもり側ガイドレール102a,102bを結ぶおもり側仮想直線L2は、一対のかご側ガイドレール101a,101bを結ぶかご側仮想直線L1と略平行である。すなわち、一対のおもり側ガイドレール102a,102bと一対のかご側ガイドレール101a,101bは、昇降路100における互いに対向する一組の壁面に設けられている。
 釣合おもり12には、一対のおもり側ガイドレール102a,102bに摺動可能に係合する一対のおもり側ガイドシュー(不図示)が設けられている。また、第2機械室ユニット4には、一対のおもり側ガイドレール102a,102bに摺動可能に係合する一対の機械室側ガイドシュー32a,32bが設けられている。したがって、一対のおもり側ガイドレール102a,102bは、第2機械室ユニット4を昇降方向に案内する。
 第2実施例に係る第2機械室ユニット4の吊点位置は、第1実施例に係る第2機械室ユニット4の吊点位置の条件を全て満たす。したがって、第2機械室ユニット4の傾きを効果的に防止することができ、第2機械室ユニット4の安定性を保つことができる。また、1つの機械室ユニット用揚重機への過負荷を防止することができる。さらに、第2機械室ユニット4に偏荷重が生じても、かご側ガイドレール101a,101bに過負荷が加えられないようにすることができる。
 さらにまた、第2実施例では、第2機械室ユニット4の吊点21a,21b,21cのうち、吊点21cが、おもり側仮想直線L2を挟んで第2機械室ユニット4の重心Gと反対側に配置されている。これにより、吊点21cは、おもり側仮想直線L2に対して重心Gと反対側である外側に配置される。その結果、第2機械室ユニット4に偏荷重が生じても、一対のおもり側ガイドレール102a,102bに過負荷が加えられないようにすることができる。
 なお、第2機械室ユニット4の重心Gは、対象となるエレベーター装置の昇降路寸法やマシン(巻上機)の据付位置によって変化する。また、一対のかご側ガイドレール101a,101b及び一対のおもり側ガイドレール102a,102bの取り付け位置も、対象となるエレベーター装置に応じて変化する。そのため、本実施例の工事用エレベーター装置における吊点21a,21b,21cは、第2機械室ユニット4の重心Gや各種ガイドレールの位置に応じて決定する。
[工事用エレベーター装置の構成]
 以下、本発明の第3実施例に係る工事用エレベーター装置について、図6を参照して説明する。図6は、第3実施例に係る工事用エレベーター装置の概略構成図である。
 第3実施例に係る工事用エレベーター装置は、第1機械室ユニット用揚重機及び第2機械室ユニット用揚重機の構成が、第1及び第2実施例に係る工事用エレベーター装置と異なる。第3実施例では、機械室ユニットを第1機械室ユニットと第2機械室ユニットから構成する。
 図6に示すように、第3実施例に係る工事用エレベーター装置60は、建物構造物内に形成された昇降路100内に設けられている。この工事用エレベーター装置60は、支持部材2と、機械室ユニット(第1機械室ユニット3、第2機械室ユニット4)と、機械室ユニット用揚重機(第1機械室ユニット用揚重機51a,51b,51c、第2機械室ユニット用揚重機61a,61b,61c)とを備えている。
 第2機械室ユニット4は、支持部材2から吊り下げられており支持部材2に三台以上設置された第2機械室ユニット用揚重機61a,61b,61cによって揚重され、昇降方向に移動する。
 第1機械室ユニット3は、第2機械室ユニット4から吊り下げられており、第2機械室ユニット4に三台以上設置された第1機械室ユニット用揚重機51a,51b,51cによって揚重され、昇降方向に移動する。なお、第1機械室ユニット用揚重機は、第1機械室ユニット3若しくは第2機械室ユニット4の何れかに設置し、第1実施例(図1)のように、第1機械室ユニット3と第2機械室ユニット4のそれぞれに設置した複数のプーリ7を介してN:1(Nは2以上)ローピングで、第1機械室ユニット3を揚重するようにしてもよい。
 支持部材2は、昇降路100内の上部にあって、建屋の梁110a若しくは壁に載置されている。
 第2機械室ユニット4は、支持部材2に設置された第2機械室ユニット用揚重機61a,61b,61cによって支持部材2から吊り下げられており、昇降方向に移動可能に構成されている。
 第1機械室ユニット3は、第2機械室ユニット4に設置された第1機械室ユニット用揚重機51a,51b,51cによって第2機械室ユニット4から吊り下げられており、昇降方向に移動可能に構成されている。
 第1機械室ユニット3は、昇降路100の壁面に向かって伸縮(図1の左右方向)し、伸長時に建屋の梁110d若しくは壁に係合する可動支持部8を有している。また、第1機械室ユニット3は、巻上機9と、巻上機9のシーブに巻き掛けられた主索10と、巻上機9の一方側に位置する主索10に配置されたかご11と、巻上機9の他方側に位置する主索10に配置された釣合おもり12とを有している。巻上機9は主索10を巻上げてかご11(釣合おもり12)を昇降させる。
 第2機械室ユニット4は、昇降路100の壁面に向かって伸縮(図1の左右方向)し、伸長時に建屋の梁110c若しくは壁に係合する可動支持部13を有している。
 主索10の一端側は、第1機械室ユニット3に備えられた主索固定部14によって第1機械室ユニット3に固定されている。主索10の他端側は、第1機械室ユニット3から上方に延び、第2機械室ユニット4に備えられた主索ドラム15に巻かれている。主索ドラム15は、主索10を延長させるために備えられている。主索10は、第1機械室ユニット3に備えられた第1機械室ユニット主索把持装置16と、第2機械室ユニット4に備えられた第2機械室ユニット主索把持装置17とによってそれぞれ把持される。
 第1機械室ユニット3には、巻上機9が備えられ、第2機械室ユニット4には主索ドラム15及び第1機械室ユニット用揚重機51a,51b,51cが備えられている。巻上機9、第1機械室ユニット用揚重機51a,51b、主索ドラム15は重量があり、機械室ユニットを重くしている。これらを一つの機械室ユニットに組み込んで構成し、特定階の建屋の梁若しくは壁に載置した場合、この特定階の梁若しくは壁には、許容荷重を超えた荷重がかかるといった課題があった。
 そこで、第3実施例では、巻上機9及び主索ドラム15等を備える機械室ユニットを、第1機械室ユニット3と第2機械室ユニット4とに複数に分割し、それぞれの機械室ユニットを異なる建屋階の梁若しくは壁(図1では梁110c,110d)に載置するようにしている。
 このように構成することにより、特定階の梁若しくは壁には許容荷重を超える荷重がかかることなく、機械室ユニットを設置することができる。
 工事用エレベーター装置は、建屋階の工事の進行に合わせ、機械室ユニットを上方の建屋階に移動させる。
 第2機械室ユニット4を現在の建屋階の位置(梁110c)から上の建屋階の位置(梁110b)へと移動させる場合には、第2機械室ユニット主索把持装置17を開放すると共に、第1機械室ユニット主索把持装置16で主索10を把持する。そして、第1機械室ユニット用揚重機51a,51b,51cからロープを引き出し、第2機械室ユニット用揚重機61a,61b,61cで第2機械室ユニット4を引き上げ、可動支持部13を縮小させる。第2機械室ユニット4が上の建屋階の梁110bを通過した後、可動支持部13を伸長させて上の建屋階の梁110b若しくは壁と係合させる。このように第3実施例では、第2機械室ユニット4に可動支持部13を備えているので、第2機械室ユニット4の昇降作業性を向上することができる。
 第2機械室ユニット4が上の建屋階へ移動している状態においては、第1機械室ユニット3を吊下げるロープが第1機械室ユニット用揚重機51a,51b,51cから引き出される。さらに主索10が、主索ドラム15から引き出される。このようにして、第2機械室ユニット4は、第1機械室ユニット3を移動させることなく、上の建屋階へ移動することができる。この際、主索10は第1機械室ユニット主索把持装置16によって把持されているので、主索10が第1機械室ユニット3から下方に延びることはなく、また、第2機械室ユニット4を上の建屋階へ移動させる作業中においても、かご11を使用することが可能となる。なお、第2機械室ユニット主索把持装置17は、第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との間の主索重量分を把持する構成としてもよい。第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との距離が長いと、その間の主索重量が大きくなり、第2機械室ユニット主索把持装置17を開放した際に、主索重量によって主索ドラム15から意図せず主索10が引き出されることがある。これに対し、第2機械室ユニット主索把持装置17は、第1機械室ユニット主索把持装置16と第2機械室ユニット主索把持装置17との間の主索重量分を把持し、第2機械室ユニット用揚重機6a,6b,6cの第2機械室ユニット4を揚重する力で主索ドラム15から主索10を引き出すことで安全性と作業性を向上することができる。
 次に、第1機械室ユニット3の移動方法について説明する。
 第1機械室ユニット3を現在の建屋階の位置(梁110d)から上の建屋階の位置(梁110c)へと移動させる場合には、釣合おもり12を図示を省略した釣合おもり用の緩衝器に支持させ、主索10にかかる張力を低減させ、第1機械室ユニット3とかご11をチェーン(図3のチェーン18参照)で接続し、第1機械室ユニット主索把持装置16を開放すると共に、第2機械室ユニット主索把持装置17で主索10を把持する。そして、第1機械室ユニット用揚重機51a,51b,51cで第1機械室ユニット3を引き上げ、可動支持部8を縮小させる。第1機械室ユニット3が上の建屋階の梁110cを通過した後、可動支持部8を伸長させて上の建屋階の梁110c若しくは壁と係合させる。その後、第1機械室ユニット主索把持装置16で主索10を把持する。このように第3実施例では、第1機械室ユニット3に可動支持部8を備えているので、第1機械室ユニット3の昇降作業性を向上することができる。
 第1機械室ユニット3の上の建屋階への移動完了後は、主索ドラム15から主索10が引き出された分、かご11の昇降方向への移動距離が延長される。
 第1機械室ユニット3を建屋階の梁110c若しくは壁に載置後は、第1機械室ユニット3とかご11を接続するチェーンを取り外す。
 第3実施例によれば、機械室ユニットを第1機械室ユニット3と第2機械室ユニット4とに複数に分割し、それぞれの機械室ユニットを異なる建屋階の梁(図1では梁110c,110d)に載置するようにしているので、特定階の梁若しくは壁には許容荷重を超える荷重がかかることなく、機械室ユニットを設置することができる。
 また、第3実施例では、主索10が第1機械室ユニット主索把持装置16によって把持されているので、第2機械室ユニット4を上の建屋階へ移動させている作業中においても、かご11を使用することが可能となる。
 さらに、第2機械室ユニット4を移動させている状態においては、第1機械室ユニット3が建屋階の梁若しくは壁に載置されているので、第2機械室ユニット用揚重機61a,61b,61cは、第2機械室ユニット4を引き上げるだけの動力を備えていれば十分であり、第2機械室ユニット用揚重機6a,6b,6cが大型化するのを抑制することができる。
 さらにまた、第2機械室ユニット用揚重機61a,61b,61cは支持部材2に設置するようにしているので、第2機械室ユニット用揚重機61a,61b,61cの自重分だけ第2機械室ユニット4を軽量化でき、第2機械室ユニット4が載置される特定階の梁若しくは壁にかかる荷重を軽減できる。
 このような構成の工事用エレベーター装置1は、第1機械室ユニット3の下方に設置したかご11(釣合おもり12)を昇降方向に運転し、例えば、建築工事の作業者を第1機械室ユニット3の下方における各建屋階に搬送する。また、第2機械室ユニット4には、主索10を延長する主索ドラム15が設置され、第1機械室ユニット3によるかご11(釣合おもり12)の昇降運転を停止することなく主索10の延長作業ができるので、機械室揚重に伴うエレベーターサービスの停止時間を短縮することができる。
[まとめ]
 以上説明したように、上述した第1及び第2実施例に係る工事用エレベーター装置は、昇降路(昇降路100)に設けられた支持部材(支持部材2)と、支持部材の下方に配置された第1機械室ユニット(第1機械室ユニット3)及び第2機械室ユニット(第2機械室ユニット4)と、支持部材から第2機械室ユニットを昇降方向に移動可能に吊り下げた第2機械室ユニット用揚重機(第2機械室ユニット用揚重機6a,6b,6c)と、第1機械室ユニットに設置され、第2機械室ユニットから第1機械室ユニットを昇降方向に移動可能に吊り下げた第1機械室ユニット用揚重機(第1機械室ユニット用揚重機5a,5b)と、を備えている。機械室ユニットは、第1機械室ユニットと第2機械室ユニットとに分割され、第1機械室ユニットと第2機械室ユニットは、異なる建屋階の梁若しくは壁に載置するようにしている。
 第1及び第2実施例よれば、第1機械室ユニットと第2機械室ユニットの荷重を異なる建屋階の梁に分散することができるので、特定階の梁若しくは壁において許容荷重を超える荷重がかかることなく、機械室ユニットを設置することができる。
 また、第1及び第2実施例よれば、機械室ユニットを複数に分割(第1機械室ユニット3、第2機械室ユニット4)しているので、主索(主索10)の延長作業による機械室揚重時のエレベーターサービスの停止時間を短縮することができる。
 さらに、第1及び第2実施例よれば、主索が第1機械室ユニット主索把持装置によって把持されているので、第2機械室ユニットを上の建屋階へ移動させている作業中においても、かごを使用することが可能となる。
 第2機械室ユニット用揚重機は、三台以上設けられ、第2機械室ユニットの吊点が3箇所以上である。第2機械室ユニットの上方の仮想水平面から見たとき、機械室ユニットの重心(重心G)から各吊点までの距離が略等しく、かつ、各吊点間を結ぶ仮想直線で囲まれた領域内に重心が位置する。
 これにより、第2機械室ユニットの3つの吊点に均一に荷重が掛かるので、第2機械室ユニットの傾きを効果的に防止することができ、第2機械室ユニットの安定性を保つことができる。さらに、1つの機械室ユニット用揚重機への過負荷を防止しながら機械室ユニットを揚重することができる。
 また、上述した第1及び第2実施例に係る工事用エレベーター装置を配置する昇降路には、かご(かご11)を昇降方向に案内する一対のかご側ガイドレール(一対のかご側ガイドレール101a,101b)が設けられている。そして、機械室ユニットの3箇所以上の吊点のうち、少なくとも1箇所の吊点(吊点21a,21b)は、一対のかご側ガイドレール間を結ぶかご側仮想直線(かご側仮想直線L1)を挟んで重心と反対側に配置されている。これにより、機械室ユニットに偏荷重が生じても、かご側ガイドレールに過負荷が加えられないようにすることができる。
 さらに、上述した第2実施例に係る工事用エレベーター装置を配置する昇降路には、釣合おもり(釣合おもり12)を昇降方向に案内する一対のおもり側ガイドレール(一対のおもり側ガイドレール102a,102b)が設けられている。一対のおもり側ガイドレール間を結ぶおもり側仮想直線(おもり側仮想直線L2)は、かご側仮想直線(かご側仮想直線L1)と略平行である。そして、機械室ユニットの3箇所以上の吊点のうち、かご側仮想直線を挟んで重心と反対側に配置された吊点(吊点21a,21b)以外の吊点(吊点21c)は、おもり側仮想直線を挟んで重心と反対側に配置されている。これにより、機械室ユニットに偏荷重が生じても、一対のおもり側ガイドレールに過負荷が加えられないようにすることができる。
 さらに、上述した第3実施例に係る工事用エレベーター装置は、昇降路(昇降路100)に設けられた支持部材(支持部材2)と、支持部材の下方に配置された第1機械室ユニット(第1機械室ユニット3)及び第2機械室ユニット(第2機械室ユニット4)と、支持部材に設置され支持部材から第2機械室ユニットを昇降方向に移動可能に吊り下げた第2機械室ユニット用揚重機(第2機械室ユニット用揚重機61a,61b,61c)と、第2機械室ユニットに設置され第2機械室ユニットから第1機械室ユニットを昇降方向に移動可能に吊り下げた第1機械室ユニット用揚重機(第1機械室ユニット用揚重機51a,51b,51c)と、を備えている。
 第3実施例では第1及び第2実施例に加え、以下の効果を得ることができる。
 第2機械室ユニットを揚重する第2機械室ユニット用揚重機が支持部材に設置されているので、第2機械室ユニット用揚重機の自重の分だけ機械室ユニットの重量を低減できる。その結果、第2機械室ユニット用揚重機が第1機械室ユニットを引き上げるための駆動力を小さくでき、第2機械室ユニット用揚重機の大型化を抑制することができる。
 さらに、第2機械室ユニット4を移動させている状態においては、第2機械室ユニット4が建屋階の梁若しくは壁に載置されているので、第2機械室ユニット用揚重機は、第2機械室ユニット4を引き上げるだけの動力を備えていれば十分であり、第2機械室ユニット用揚重機が大型化するのを抑制することができる。
 以上、本発明の工事用エレベーター装置の実施例について、その作用効果も含めて説明した。しかし、本発明は、上述した実施例に限定するものではなく、様々な変形例が含まれる。例えば、上述した実施例は、本発明を分かり易く詳細に説明したものであり、本発明は、必ずしも説明した全ての構成を備えるものに限定するものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加、削除、置換をすることが可能である。
 1,60…工事用エレベーター装置、3…第1機械室ユニット、4…第2機械室ユニット、5a,5b…第1機械室ユニット用揚重機、6a,6b,6c…第2機械室ユニット用揚重機、7…プーリ、8,13…可動支持部、9…巻上機、10…主索、11…かご、12…釣合おもり、14…主索固定部、15…主索ドラム、16…第1機械室ユニット主索把持装置、17…第2機械室ユニット主索把持装置、18…チェーン、21a,21b,21c…吊点、31a,31b,32a,32b…機械室側ガイドシュー、51a,51b,51c…第1機械室ユニット用揚重機、61a,61b,61c…第2機械室ユニット用揚重機、100…昇降路、101a,101b…かご側ガイドレール、102a,102b…おもり側ガイドレール、110a,110b,110c,110d…梁

Claims (10)

  1.  昇降路内に備えられ、主索により吊下げられたかご及び釣合おもりを昇降方向に移動させる巻上機と、前記主索の延長分を蓄える主索ドラムと、前記巻上機及び前記主索ドラムを備えた機械室ユニットとから構成された工事用エレベーター装置において、
     前記機械室ユニットは、前記巻上機を備える第1機械室ユニットと、前記主索ドラムを備える第2機械室ユニットとに分割し、分割した前記第1機械室ユニットと前記第2機械室ユニットとを異なる建屋階の梁若しくは壁に載置した
     ことを特徴とする工事用エレベーター装置。
  2.  前記第2機械室ユニットは、前記昇降路内に備えられた支持部材から吊下げられ、前記第1機械室ユニットは、前記第2機械室ユニットから吊下げられた
     ことを特徴とする請求項1に記載の工事用エレベーター装置。
  3.  前記第1機械室ユニットを揚重する第1機械室ユニット用揚重機と、前記第2機械室ユニットを揚重する第2機械室ユニット用揚重機を備え、
     前記第1機械室ユニット用揚重機は、前記第1機械室ユニット若しくは前記第2機械室ユニットに備えられ、
     前記第2機械室ユニット用揚重機は、前記支持部材若しくは前記第2機械室ユニットに備えられた
     ことを特徴とする請求項2に記載の工事用エレベーター装置。
  4.  前記第1機械室ユニット用揚重機は、N:1(Nは2以上)ローピングで前記第1機械室ユニットを揚重する ことを特徴とする請求項3に記載の工事用エレベーター装置。
  5.  前記第1機械室ユニットには、前記主索を把持する第1機械室ユニット主索把持装置が備えられ、
     前記第2機械室ユニットには、前記主索を把持する第2機械室ユニット主索把持装置が備えられた
     ことを特徴とする請求項3に記載の工事用エレベーター装置。
  6.  前記第2機械室ユニット用揚重機は、三台以上備えられ、前記第2機械室ユニットの吊点が3箇所以上であり、
     前記第2機械室ユニットの上方の仮想水平面から見たとき、前記第2機械室ユニットの重心から各吊点までの距離が略等しく、かつ、各吊点間を結ぶ仮想直線で囲まれた領域内に前記重心が位置する
     ことを特徴とする請求項3に記載の工事用エレベーター装置。
  7.  前記昇降路には、かご及び前記第2機械室ユニットを昇降方向に案内する一対のかご側ガイドレールが設けられており、
     前記第2機械室ユニットの3箇所以上の吊点のうち、少なくとも1箇所の吊点は、前記一対のかご側ガイドレール間を結ぶかご側仮想直線を挟んで前記重心と反対側に配置されている
     ことを特徴とする請求項6に記載の工事用エレベーター装置。
  8.  前記昇降路には、釣合おもり及び前記第2機械室ユニットを昇降方向に案内する一対のおもり側ガイドレールが設けられており、
     前記一対のおもり側ガイドレール間を結ぶおもり側仮想直線は、前記かご側仮想直線と略平行であり、
     前記第2機械室ユニットの3箇所以上の吊点のうち、前記かご側仮想直線を挟んで前記重心と反対側に配置された吊点以外の吊点は、前記おもり側仮想直線を挟んで前記重心と反対側に配置されている
     ことを特徴とする請求項7に記載の工事用エレベーター装置。
  9.  昇降路内に備えられ、主索により吊下げられたかご及び釣合おもりを昇降方向に移動させる巻上機と、前記主索の延長分を蓄える主索ドラムと、前記巻上機及び前記主索ドラムを備えた機械室ユニットとから構成されたエレベーターの主索延長方法において、
     前記機械室ユニットは、前記巻上機を備える第1機械室ユニットと、前記主索ドラムを備える第2機械室ユニットとに分割し、分割した前記第1機械室ユニットと前記第2機械室ユニットとを異なる建屋階の梁若しくは壁に載置し、
     前記第2機械室ユニットは、前記昇降路内に備えられた支持部材から吊下げられ、前記第1機械室ユニットは、前記第2機械室ユニットから吊下げられ、
     前記第1機械室ユニット若しくは前記第2機械室ユニットには、前記第1機械室ユニットを揚重する第1機械室ユニット用揚重機が備えられ、
     前記支持部材若しくは前記第2機械室ユニットには、前記第2機械室ユニットを揚重する第2機械室ユニット用揚重機が備えられ、
     前記第1機械室ユニットには、前記主索を把持する第1機械室ユニット主索把持装置が備えられ、
     前記第2機械室ユニットには、前記主索を把持する第2機械室ユニット主索把持装置が備えられ、
     前記第2機械室ユニット用揚重機による前記第2機械室ユニットの引き上げ時には、前記第2機械室ユニット主索把持装置を開放して前記主索ドラムから前記主索を引き出すと共に、前記第1機械室ユニット主索把持装置で前記主索を把持し、
     前記第1機械室ユニット用揚重機による前記第1機械室ユニットの引き上げ時には、前記第1機械室ユニット主索把持装置を開放すると共に、前記第2機械室ユニット主索把持装置で前記主索を把持する
     ことを特徴とするエレベーターの主索延長方法。
  10.  前記第1機械室ユニットの引き上げ時には、前記第1機械室ユニットと前記かごをチェーンで接続する
     ことを特徴とする請求項9に記載のエレベーターの主索延長方法。
PCT/JP2020/011369 2020-03-16 2020-03-16 工事用エレベーター装置及びエレベーターの主索延長方法 WO2021186492A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022508611A JP7404506B2 (ja) 2020-03-16 2020-03-16 工事用エレベーター装置及びエレベーターの主索延長方法
PCT/JP2020/011369 WO2021186492A1 (ja) 2020-03-16 2020-03-16 工事用エレベーター装置及びエレベーターの主索延長方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/011369 WO2021186492A1 (ja) 2020-03-16 2020-03-16 工事用エレベーター装置及びエレベーターの主索延長方法

Publications (1)

Publication Number Publication Date
WO2021186492A1 true WO2021186492A1 (ja) 2021-09-23

Family

ID=77770733

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/011369 WO2021186492A1 (ja) 2020-03-16 2020-03-16 工事用エレベーター装置及びエレベーターの主索延長方法

Country Status (2)

Country Link
JP (1) JP7404506B2 (ja)
WO (1) WO2021186492A1 (ja)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5033586A (en) * 1990-07-11 1991-07-23 Otis Elevator Company Construction elevator assembly
JP2000226169A (ja) * 1999-02-08 2000-08-15 Hitachi Building Systems Co Ltd エレベータの据付方法
JP2001322778A (ja) * 2000-05-17 2001-11-20 Hitachi Building Systems Co Ltd 工事用エレベータの解体方法および工事用エレベータの本設エレベータへの盛り替え方法
JP2009196808A (ja) * 2008-02-25 2009-09-03 Mitsubishi Electric Corp エレベータの据付装置
JP2013532104A (ja) * 2010-05-28 2013-08-15 コネ コーポレイション 方法およびエレベータ装置
JP2015000798A (ja) * 2013-06-17 2015-01-05 株式会社日立ビルシステム エレベータ据付用作業床装置
WO2020035930A1 (ja) * 2018-08-16 2020-02-20 三菱電機株式会社 工事用エレベーターの揚程延長方法およびエレベーター用のロープおろし治具

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5033586A (en) * 1990-07-11 1991-07-23 Otis Elevator Company Construction elevator assembly
JP2000226169A (ja) * 1999-02-08 2000-08-15 Hitachi Building Systems Co Ltd エレベータの据付方法
JP2001322778A (ja) * 2000-05-17 2001-11-20 Hitachi Building Systems Co Ltd 工事用エレベータの解体方法および工事用エレベータの本設エレベータへの盛り替え方法
JP2009196808A (ja) * 2008-02-25 2009-09-03 Mitsubishi Electric Corp エレベータの据付装置
JP2013532104A (ja) * 2010-05-28 2013-08-15 コネ コーポレイション 方法およびエレベータ装置
JP2015000798A (ja) * 2013-06-17 2015-01-05 株式会社日立ビルシステム エレベータ据付用作業床装置
WO2020035930A1 (ja) * 2018-08-16 2020-02-20 三菱電機株式会社 工事用エレベーターの揚程延長方法およびエレベーター用のロープおろし治具

Also Published As

Publication number Publication date
JP7404506B2 (ja) 2023-12-25
JPWO2021186492A1 (ja) 2021-09-23

Similar Documents

Publication Publication Date Title
KR100427470B1 (ko) 엘리베이터
KR101245570B1 (ko) 엘리베이터를 설치하는 방법 및 엘리베이터
EP3097043B1 (en) Low-construction trolley for wire rope hoist
WO2021186493A1 (ja) 工事用エレベーター装置
JP6813123B2 (ja) エレベーターの揚程延長技術の適用方法
JP2006256760A (ja) エレベーター装置
EP2373565A2 (en) Method for installing the hoisting roping of an elevator
JP6969686B2 (ja) 工事用エレベーターの揚程延長方法
JP4713494B2 (ja) エレベータと装置
WO2020044444A1 (ja) 揚程延長式工事用エレベーター
WO2021186492A1 (ja) 工事用エレベーター装置及びエレベーターの主索延長方法
JP4091326B2 (ja) エレベーター装置
JP7064620B2 (ja) 工事用エレベーター装置
JP6336225B2 (ja) エレベータ装置
JP6684473B2 (ja) 複数の釣合い錘を備えるエレベータ
JP7213362B2 (ja) 工事用エレベーター装置
JP7144905B1 (ja) 揚程延長式工事用エレベーター
WO2023084721A1 (ja) 工事用エレベーター及び工事用エレベーターのコンペンロープの延長方法
JP2017210829A (ja) エレベータ式駐車装置
JPH08133634A (ja) ジャンプアップエレベーターのジャンプ方法
JPH054784A (ja) エレベータの主索交換方法
JPH11322231A (ja) 工事用エレベータ
JPWO2020178979A1 (ja) 工事用エレベータ装置、及び工事用エレベータ装置のガバナロープ延長方法
KR20160076261A (ko) 승강기용 보상 시브 부재

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20926015

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022508611

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase