WO2021179752A1 - 基于铁水罐过跨车的高炉-转炉生产***及其运行方法 - Google Patents

基于铁水罐过跨车的高炉-转炉生产***及其运行方法 Download PDF

Info

Publication number
WO2021179752A1
WO2021179752A1 PCT/CN2020/140773 CN2020140773W WO2021179752A1 WO 2021179752 A1 WO2021179752 A1 WO 2021179752A1 CN 2020140773 W CN2020140773 W CN 2020140773W WO 2021179752 A1 WO2021179752 A1 WO 2021179752A1
Authority
WO
WIPO (PCT)
Prior art keywords
molten iron
scrap
steel
straddle
iron
Prior art date
Application number
PCT/CN2020/140773
Other languages
English (en)
French (fr)
Inventor
袁晓峰
Original Assignee
中冶南方工程技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中冶南方工程技术有限公司 filed Critical 中冶南方工程技术有限公司
Publication of WO2021179752A1 publication Critical patent/WO2021179752A1/zh

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/005Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like with heating or cooling means
    • B22D41/01Heating means
    • B22D41/015Heating means with external heating, i.e. the heat source not being a part of the ladle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/12Travelling ladles or similar containers; Cars for ladles
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/56Manufacture of steel by other methods
    • C21C5/562Manufacture of steel by other methods starting from scrap
    • C21C5/565Preheating of scrap
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • C22C33/06Making ferrous alloys by melting using master alloys
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the invention belongs to the technical field of metallurgical equipment, and in particular relates to a blast furnace-converter production system based on a straddle car for molten iron tanks and an operating method thereof.
  • the blast furnace-converter process is a conventional process that uses iron ore to smelt into steel. Under the situation of increasingly tight energy, the importance of effective use of energy and reduction of environmental pollution has become increasingly prominent.
  • the use of scrap steel on the one hand, will greatly increase the utilization rate of scrap steel, on the other hand, it can save a lot of energy and reduce the emission of harmful substances. It is undoubtedly an important way to promote energy conservation and emission reduction in the steel industry.
  • measures to increase the scrap ratio in steelmaking plants include: adding scrap in the blast furnace, adding scrap in the tapping process (blast furnace tapping yard), adding scrap and preheating the molten iron tank, adding scrap and preheating the scrap tank, adding scrap and preheating after the furnace.
  • the invention relates to a blast furnace-converter production system based on a straddle car for an iron ladle and an operating method thereof, which can at least solve part of the defects of the prior art.
  • the invention relates to a blast furnace-converter production system based on a molten iron tank cross car, which includes an iron-making workshop, a steel-making workshop, a molten iron transportation track and a cross car walking on the molten iron transportation track, and also includes scrap stocking ingredients
  • the molten iron transportation track sequentially connects the iron-making workshop, the steel-making workshop, and the scrap storage and batching room in sequence, and the scrap storage and batching room is equipped with a scrap transfer unit for adding scrap steel into the molten iron tank .
  • the molten iron transportation track also has a scrap steel preheating node, and a preheating roaster is arranged at the scrap steel preheating node.
  • the scrap steel preheating node is located between the iron-making workshop and the steel-making workshop.
  • the preheating roaster includes a roasting chamber and a burning roasting mechanism provided in the roasting chamber, and the molten iron transport track passes through the roasting chamber.
  • the burning and roasting mechanism includes a roasting cover suitable for covering the mouth of the hot metal ladle and a cover driving mechanism for driving the roasting cover close to or away from the mouth of the hot metal ladle,
  • a burner is provided on the cover of the baking bag.
  • the cover driving mechanism includes a hoist and a transmission structure for raising and lowering the baking cover, and the hoist is arranged on the top of the baking chamber.
  • the scrap transfer unit includes a scrap steel disk crane, and the movement stroke of the scrap steel disk crane at least covers the scrap storage and batching room and the scrap adding node of the molten iron transportation track.
  • the present invention also relates to the operating method of the blast furnace-converter production system based on the straddle car as described above, which includes the following steps:
  • Step 1 Pass the straddle to receive the molten iron from the ironmaking workshop and then run it to the steelmaking workshop, and use the lifting equipment in the steelmaking workshop to lift the molten iron tank to the converter for iron exchange;
  • Step 2 After the iron is added, the empty iron water tank is returned to the cross car.
  • Step 3 Pass the straddle car and continue to run along the molten iron transportation track to the scrap adding node, and add the scrap in the scrap storage batching room to the empty molten iron tank through the scrap transfer unit;
  • Step four walk across the straddle to the ironmaking workshop and wait for the next tapping.
  • step 4 the scrap steel in the molten iron tank is first preheated, and then the straddle carriage is driven to the ironmaking workshop.
  • a separate storage and batching room for scrap steel is set up, and the scrap steel is added to the empty iron water tank through the scrap transfer unit.
  • the work of the scrap transfer unit does not interfere with the work of the crane and other equipment in the steelmaking workshop , So as to improve the speed and efficiency of scrap steel adding without affecting the existing converter production operations.
  • the scrap storage and batching room is arranged after the steelmaking workshop, which requires less space and is compact without affecting the existing steelmaking workshop site layout.
  • Fig. 1 is a schematic diagram of the plan layout of a blast furnace-converter production system based on a straddle car for an iron ladle according to an embodiment of the present invention
  • Fig. 2 is a schematic structural diagram of a preheated roaster provided by an embodiment of the present invention.
  • an embodiment of the present invention provides a blast furnace-converter production system based on a straddle car for molten iron tanks, including an iron-making workshop 1, a steel-making workshop 5, a molten iron transportation track 2, and a molten iron transportation track 2 walking on the molten iron transportation track 2.
  • a straddle car 3 Over the straddle car 3, it also includes a scrap storage and batching room 6.
  • the molten iron transportation track 2 is connected in series with the iron-making workshop 1, the steel-making workshop 5, and the scrap storage and batching room 6 in sequence.
  • the storage room 6 is equipped with a scrap steel transfer unit 7 for adding scrap steel into the molten iron tank 4.
  • One or more molten iron tanks 4 are placed on the straddle carriage 3, and the molten iron cans 4 follow the straddle carriage 3 to receive molten iron in the ironmaking workshop 1, and then follow the straddle carriage 3 to the steelmaking workshop 5 for the next step of smelting.
  • the above-mentioned ironmaking workshop 1 is generally a blast furnace ironmaking workshop 1
  • the above-mentioned steelmaking workshop 5 is generally a converter steelmaking workshop 5, but it is not limited to such a process flow, and will not be listed in this embodiment.
  • the above-mentioned straddle car 3 is used as molten iron transfer equipment, which is equipped with power equipment and can self-drive in both directions on the molten iron transportation track 2.
  • the straddle car 3 is designed to adopt a dual-drive configuration.
  • the power supply mode of the straddle car 3 is preferably a torque type cable reel, which is installed on the car.
  • the above-mentioned molten iron transportation track 2 can be set in multiple to meet the demand of continuous production, and coordinate the production pace between the iron-making workshop 1 and the steel-making workshop 5.
  • the aforementioned scrap storage and batching room 6 is used to store scrap steel, and it is preferably arranged adjacent to the steelmaking workshop 5 so as to share the scrap steel conveying channel and the scrap steel disposal equipment with the steelmaking workshop 5. Further preferably, there are two groups of the aforementioned scrap steel stocking and batching rooms 6, and the two groups of scrap steel stocking and batching rooms 6 are distributed on both sides of the molten iron transportation track 2.
  • the iron ladle 4 on the straddle car 3 is equipped with scrap steel; in an alternative embodiment, the above two sets of scrap storage and batching rooms 6 can store different types of scrap steel, for example, one of the scrap storage and batching rooms 6 is used for stacking For storage of relatively flexible scrap steel (such as light and thin materials), another scrap storage batching room 6 is used to store large pieces of scrap steel.
  • relatively flexible scrap steel such as light and thin materials
  • another scrap storage batching room 6 is used to store large pieces of scrap steel.
  • the above-mentioned scrap transfer unit 7 may adopt a scrap steel disk crane, and the movement stroke of the scrap steel disk crane at least covers the scrap storage and batching room 6 and the scrap adding node of the molten iron transportation track 2;
  • each group of steel scrap storage and batching rooms 6 is separately equipped with a scrap steel disk crane to facilitate independent control of the two groups of scrap steel storage and batching rooms 6.
  • a separate scrap storage and batching room 6 is set up, and the scrap steel is added to the empty iron water tank 4 through the scrap transfer unit 7.
  • the work of the scrap transfer unit 7 is not the same as that of the steelmaking workshop 5. Interference in the work of vehicles and other equipment, so as to improve the speed and efficiency of scrap adding without affecting the existing converter production operations.
  • the scrap storage and batching room 6 is arranged after the steelmaking workshop 5, which requires less space and is compact without affecting the existing steelmaking workshop. 5 Site layout.
  • the scrap storage and batching room 6 can be arranged next to the steelmaking workshop 5. When the scrap is added, the residual temperature in the molten iron tank 4 is still high, and the residual heat of the molten iron tank 4 can be fully utilized to preheat the scrap and save energy consumption.
  • the molten iron transportation track 2 also has a scrap preheating node, and a preheating roaster is arranged at the scrap preheating node.
  • the preheating roaster is used to heat the scrap steel before receiving iron, and the amount of scrap steel added can be increased by supplementing the heat source; the preheating roaster is arranged online on the molten iron transportation track 2 without additional cranes, the process flow is reasonable, and the equipment The investment is small.
  • the scrap preheating node is located between the ironmaking workshop 1 and the steelmaking workshop 5. The scrap preheating node can be further close to the ironmaking workshop 1 to avoid crossing the straddle car 3 The temperature drop of the scrap steel was too large when running to the ironmaking workshop 1.
  • the above-mentioned preheating roaster includes a roasting chamber 81 and a burning roasting mechanism provided in the roasting chamber 81, and the molten iron transport rail 2 passes through the roasting chamber 81 Room 81.
  • the baking chamber 81 may be a steel structure, such as a portal steel frame, which is convenient for passing the straddle carriage 3 and the molten iron tank 4 through.
  • the above-mentioned burning and roasting mechanism includes a roasting cover 82 suitable for covering on the mouth of the hot metal ladle and a cover driving mechanism for driving the roasting cover 82 to be close to or away from the mouth of the hot metal.
  • a burner is provided on the baking bag cover 82, and the burner may be a burner provided at the bottom of the baking bag cover 82, which heats the scrap steel in the iron ladle 4 by generating a high-temperature flame in the iron ladle 4.
  • the above-mentioned cover driving mechanism can drive the roasting cover 82 up and down, so that the roasting cover 82 is closed on or away from the mouth of the molten iron tank.
  • the cover driving mechanism includes a hoist 83 and a
  • the hoisting machine 83 is arranged on the top of the baking chamber 81; of course, it is not limited to the above-mentioned lifting drive mode, nor is it limited to the above-mentioned cover movement mode
  • the baking bag cover 82 can be driven to rotate, etc., which will not be described in detail here.
  • the embodiment of the present invention also relates to the operation method of the above-mentioned blast furnace-converter production system, which includes the following steps:
  • Step 1 Pass the straddle car 3 to receive the molten iron from the ironmaking workshop 1 and then run to the steelmaking workshop 5.
  • the iron ladle 4 is lifted to the converter by the lifting equipment in the steelmaking workshop 5 for iron exchange.
  • the charging straddle crane can be used Perform iron exchange operations;
  • Step 2 After the iron is added, the empty iron water tank 4 is returned to the straddle car 3.
  • Step 3 The straddle car 3 continues to run along the molten iron transportation track 2 to the scrap adding node, and the scrap steel in the scrap storage and batching room 6 is added to the empty molten iron tank 4 through the scrap transfer unit 7;
  • Step four walk across the straddle car 3 to the ironmaking workshop 1 to wait for the next tapping.
  • step 4 the scrap steel in the molten iron tank 4 is preheated first, and then the straddle carriage 3 is driven to the ironmaking workshop 1.
  • the tapping platforms of the two blast furnaces are centrally arranged, and each blast furnace has two taps.
  • the two blast furnaces are connected to the converter steelmaking workshop 5 and the scrap storage and batching room 6 through 8 molten iron transportation tracks 2 under the swing chute of each taphole.
  • the amount of scrap steel added in each hot metal tank 4 is about 8-15t. If one blast furnace taps 40 cans per day, the average amount of scrap added per time is 12t, so one blast furnace can add 480 tons of scrap per day through this method; two blast furnaces can add 336,000 tons of scrap per year.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

一种基于铁水罐过跨车(3)的高炉-转炉生产***及其运行方法,该***包括炼铁车间(1)、炼钢车间(5)、铁水运输轨道(2)以及行走于铁水运输轨道(2)上的过跨车(3),还包括废钢堆存配料间(6),铁水运输轨道(2)依次串接炼铁车间(1)、炼钢车间(5)和废钢堆存配料间(6),废钢堆存配料间(6)配置有用于将废钢加入铁水罐(4)内的废钢转运单元(7)。单独设置废钢堆存配料间(6),废钢转运单元(7)的工作并不与炼钢车间(5)的天车等设备工作发生干涉,从而在不影响现有转炉生产作业的情况下提高废钢加入速度和效率;基于过跨车(3)无需机头牵引而可双向行走的运行特性,将废钢堆存配料间(6)布置于炼钢车间(5)之后,所需空间较小,布局紧凑而又不影响现有的炼钢车间(5)场地布置。

Description

基于铁水罐过跨车的高炉-转炉生产***及其运行方法 技术领域
本发明属于冶金设备技术领域,具体涉及一种基于铁水罐过跨车的高炉-转炉生产***及其运行方法。
背景技术
高炉-转炉工艺是利用铁矿石而冶炼为钢的常规工艺流程,在能源日益紧张的情况下,有效利用能源、减少环境污染的重要性日益凸显,如果能在高炉-转炉流程中更多地利用废钢,一方面会使得废钢的利用率得到大幅度的提升,另一方面可以节省大量能源和减少有害物质的排放,无疑是推进钢铁业节能减排的重要途径。目前提高炼钢厂废钢比的措施有:高炉增加废钢,出铁过程中加废钢(高炉出铁场)、铁水罐加废钢及预热、废钢槽加废钢及预热、炉后加废钢及预热等,其中在铁水罐中加入废钢是一种简单高效的加入方式,投资低,效率高,同时可以充分使用高温铁水的热量来熔化废钢。这种向铁水罐中加入废钢的操作一般在炼钢车间兑铁完毕之后就地加入,因而会与炼钢车间的天车等设备工作发生干涉,存在影响转炉生产作业的情况。
发明内容
本发明涉及一种基于铁水罐过跨车的高炉-转炉生产***及其运行方法,至少可解决现有技术的部分缺陷。
本发明涉及一种基于铁水罐过跨车的高炉-转炉生产***,包括炼铁车间、炼钢车间、铁水运输轨道以及行走于所述铁水运输轨道上的过跨车,还包括废钢堆存配料间,所述铁水运输轨道依次串接所述炼铁车间、所述炼钢车间和所述废钢堆存配料间,所述废钢堆存配料间配置有用于将废钢加入铁水罐内的废 钢转运单元。
作为实施方式之一,所述铁水运输轨道还具有废钢预热节点,于所述废钢预热节点处布置有预热烘烤器。
作为实施方式之一,所述废钢预热节点位于所述炼铁车间与所述炼钢车间之间。
作为实施方式之一,所述预热烘烤器包括烘烤室以及设于所述烘烤室内的燃烧烘烤机构,所述铁水运输轨道穿过所述烘烤室。
作为实施方式之一,所述燃烧烘烤机构包括适于盖合于铁水罐罐口上的烘烤包盖以及用于驱使所述烘烤包盖靠近或远离铁水罐罐口的包盖驱动机构,所述烘烤包盖上设有燃烧器。
作为实施方式之一,所述包盖驱动机构包括卷扬机和用于使所述烘烤包盖升降的传动结构,所述卷扬机布置于所述烘烤室的顶部。
作为实施方式之一,所述废钢堆存配料间有两组,两组废钢堆存配料间分布于所述铁水运输轨道两侧。
作为实施方式之一,所述废钢转运单元包括废钢磁盘吊车,所述废钢磁盘吊车的运动行程至少覆盖所述废钢堆存配料间和所述铁水运输轨道的加废钢节点。
本发明还涉及如上所述的基于铁水罐过跨车的高炉-转炉生产***的运行方法,包括如下步骤:
步骤一,过跨车从炼铁车间接收铁水后运行至炼钢车间,通过炼钢车间内的起重设备将铁水罐吊运至转炉进行兑铁;
步骤二,兑铁完毕后,使空铁水罐返回至过跨车上。
步骤三,过跨车沿铁水运输轨道继续运行至加废钢节点,通过废钢转运单 元将废钢堆存配料间内的废钢加入到空铁水罐内;
步骤四,过跨车走行至炼铁车间等待下一次出铁。
作为实施方式之一,步骤四中,先对铁水罐内废钢进行预热后再使过跨车走行至炼铁车间。
本发明至少具有如下有益效果:
本发明提供的高炉-转炉生产***,单独设置废钢堆存配料间,通过废钢转运单元将废钢加入到空铁水罐内,废钢转运单元的工作并不与炼钢车间的天车等设备工作发生干涉,从而在不影响现有转炉生产作业的情况下提高废钢加入速度和效率。基于过跨车无需机头牵引而可双向行走的运行特性,将废钢堆存配料间布置于炼钢车间之后,所需空间较小,布局紧凑而又不影响现有的炼钢车间场地布置。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。
图1为本发明实施例提供的基于铁水罐过跨车的高炉-转炉生产***的平面布置示意图;
图2为本发明实施例提供的预热烘烤器的结构示意图。
具体实施方式
下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它 实施例,都属于本发明保护的范围。
如图1,本发明实施例提供一种基于铁水罐过跨车的高炉-转炉生产***,包括炼铁车间1、炼钢车间5、铁水运输轨道2以及行走于所述铁水运输轨道2上的过跨车3,还包括废钢堆存配料间6,所述铁水运输轨道2依次串接所述炼铁车间1、所述炼钢车间5和所述废钢堆存配料间6,所述废钢堆存配料间6配置有用于将废钢加入铁水罐4内的废钢转运单元7。
过跨车3上安放一个或多个铁水罐4,铁水罐4随过跨车3在炼铁车间1承接铁水,并进一步随过跨车3运行至炼钢车间5进行下一步冶炼。上述炼铁车间1一般为高炉炼铁车间1,上述炼钢车间5一般为转炉炼钢车间5,但并不限于此种工艺流程,本实施例中不作一一例举。上述过跨车3作为铁水转运设备,其配置有动力设备,能在铁水运输轨道2上双向自驱动行走,本实施例中,其由电机经减速器联轴器带动车轮传递扭矩,其优选采用变频调速驱动方式;进一步优选地,该过跨车3设计采用双驱配置,当其中一组驱动装置失效时,另一组驱动装置仍能低速带动完成1个工作周期,安全可靠;另外,该过跨车3供电方式优选为是力矩式电缆卷筒,安装在车上。
如图1,上述铁水运输轨道2可设置为多条,以满足持续生产的需求,并协调炼铁车间1与炼钢车间5之间的生产步调。
上述废钢堆存配料间6用于堆存废钢,其优选相邻于炼钢车间5布置,以便于与炼钢车间5共用废钢输送通道及废钢处置设备。进一步优选地,上述废钢堆存配料间6有两组,两组废钢堆存配料间6分布于铁水运输轨道2两侧,该方案尤其适用于有多条铁水输送轨道的情况,能为不同的过跨车3上的铁水罐4配加废钢;在可选的实施例中,上述两组废钢堆存配料间6可堆存不同种类的废钢,例如其中一废钢堆存配料间6用于堆存柔性相对较大的废钢(例如 轻薄料),另一废钢堆存配料间6用于堆存大块废钢,在配加废钢时,可先向铁水罐4中加入柔性废钢,再加入大块废钢,可有效地缓解废钢块对铁水罐4底部的冲击。上述废钢转运单元7可采用废钢磁盘吊车,所述废钢磁盘吊车的运动行程至少覆盖所述废钢堆存配料间6和所述铁水运输轨道2的加废钢节点;在上述具有两组废钢堆存配料间6的结构中,优选为每组废钢堆存配料间6单独配置有一台废钢磁盘吊车,便于两组废钢堆存配料间6的独立控制。
本实施例提供的高炉-转炉生产***,单独设置废钢堆存配料间6,通过废钢转运单元7将废钢加入到空铁水罐4内,废钢转运单元7的工作并不与炼钢车间5的天车等设备工作发生干涉,从而在不影响现有转炉生产作业的情况下提高废钢加入速度和效率。基于过跨车3无需机头牵引而可双向行走的运行特性,将废钢堆存配料间6布置于炼钢车间5之后,所需空间较小,布局紧凑而又不影响现有的炼钢车间5场地布置。而且,废钢堆存配料间6可以紧邻炼钢车间5布置,废钢加入时铁水罐4内余温尚高,可充分地利用铁水罐4余热对废钢进行预热,节约能耗。
进一步优化上述高炉-转炉生产***,如图1,所述铁水运输轨道2还具有废钢预热节点,于所述废钢预热节点处布置有预热烘烤器。利用预热烘烤器将废钢加热后再进行受铁,通过补充热源可以提高废钢加入量;将预热烘烤器在线布置在铁水运输轨道2上,不需要额外设置起重机,工艺流程合理,设备投资小。进一步优选地,如图1,所述废钢预热节点位于所述炼铁车间1与所述炼钢车间5之间,该废钢预热节点可进一步靠近炼铁车间1,可避免过跨车3运行至炼铁车间1时废钢的温降过大。
在其中一个实施例中,如图2,上述预热烘烤器包括烘烤室81以及设于所述烘烤室81内的燃烧烘烤机构,所述铁水运输轨道2穿过所述烘烤室81。该烘 烤室81可为钢结构,例如为门式钢框架,便于过跨车3及铁水罐4通过即可。作为优选,上述燃烧烘烤机构包括适于盖合于铁水罐罐口上的烘烤包盖82以及用于驱使所述烘烤包盖82靠近或远离铁水罐罐口的包盖驱动机构,所述烘烤包盖82上设有燃烧器,该燃烧器可以是设置在烘烤包盖82底部的烧嘴,通过在铁水罐4内产生高温火焰对铁水罐4内的废钢进行加热。其中,上述包盖驱动机构可以驱使烘烤包盖82升降,以使得烘烤包盖82盖合在铁水罐罐口上或者离开该铁水罐罐口,例如,该包盖驱动机构包括卷扬机83和用于使所述烘烤包盖82升降的传动结构84,所述卷扬机83布置于所述烘烤室81的顶部;当然并不限于上述的升降驱动方式,也并不限于上述的包盖运动方式,例如可驱使该烘烤包盖82旋转等,此处不作一一详述。
本发明实施例还涉及上述高炉-转炉生产***的运行方法,包括如下步骤:
步骤一,过跨车3从炼铁车间1接收铁水后运行至炼钢车间5,通过炼钢车间5内的起重设备将铁水罐4吊运至转炉进行兑铁,一般可通过加料跨起重机进行兑铁操作;
步骤二,兑铁完毕后,使空铁水罐4返回至过跨车3上。
步骤三,过跨车3沿铁水运输轨道2继续运行至加废钢节点,通过废钢转运单元7将废钢堆存配料间6内的废钢加入到空铁水罐4内;
步骤四,过跨车3走行至炼铁车间1等待下一次出铁。
在上述设置有废钢预热节点的结构中,进一步地,步骤四中,先对铁水罐4内废钢进行预热后再使过跨车3走行至炼铁车间1。
以炼铁车间1设有两座1860立方炉容的高炉、炼钢车间5设有两座150t转炉的***为例,两座高炉的出铁场平台集中布置,每座高炉有2个出铁口,其中每个出铁口的摆动溜槽下方对应2条铁水运输轨道2;两座高炉通过8条铁 水运输轨道2与转炉炼钢车间5和废钢堆存配料间6连通。每个铁水罐4中的废钢加入量约为8~15t。以1座高炉每天出铁40罐计算,平均每次废钢加入量为12t,则1座高炉通过此方式可以每天加入废钢480t;两座高炉一年可以加入废钢33.6万t。在钢水总产量不变的前提下,相当于高炉铁水减少生产33.6万t,以吨铁产生1.18t二氧化碳计算,每年至少可以减少二氧化碳排放量39.65万t。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (10)

  1. 一种基于铁水罐过跨车的高炉-转炉生产***,包括炼铁车间、炼钢车间、铁水运输轨道以及行走于所述铁水运输轨道上的过跨车,其特征在于:还包括废钢堆存配料间,所述铁水运输轨道依次串接所述炼铁车间、所述炼钢车间和所述废钢堆存配料间,所述废钢堆存配料间配置有用于将废钢加入铁水罐内的废钢转运单元。
  2. 如权利要求1所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述铁水运输轨道还具有废钢预热节点,于所述废钢预热节点处布置有预热烘烤器。
  3. 如权利要求2所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述废钢预热节点位于所述炼铁车间与所述炼钢车间之间。
  4. 如权利要求2所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述预热烘烤器包括烘烤室以及设于所述烘烤室内的燃烧烘烤机构,所述铁水运输轨道穿过所述烘烤室。
  5. 如权利要求4所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述燃烧烘烤机构包括适于盖合于铁水罐罐口上的烘烤包盖以及用于驱使所述烘烤包盖靠近或远离铁水罐罐口的包盖驱动机构,所述烘烤包盖上设有燃烧器。
  6. 如权利要求5所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述包盖驱动机构包括卷扬机和用于使所述烘烤包盖升降的传动结构,所述卷扬机布置于所述烘烤室的顶部。
  7. 如权利要求1所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于:所述废钢堆存配料间有两组,两组废钢堆存配料间分布于所述铁水运输轨道两侧。
  8. 如权利要求1所述的基于铁水罐过跨车的高炉-转炉生产***,其特征在于: 所述废钢转运单元包括废钢磁盘吊车,所述废钢磁盘吊车的运动行程至少覆盖所述废钢堆存配料间和所述铁水运输轨道的加废钢节点。
  9. 如权利要求1至8中任一项所述的基于铁水罐过跨车的高炉-转炉生产***的运行方法,其特征在于,包括如下步骤:
    步骤一,过跨车从炼铁车间接收铁水后运行至炼钢车间,通过炼钢车间内的起重设备将铁水罐吊运至转炉进行兑铁;
    步骤二,兑铁完毕后,使空铁水罐返回至过跨车上。
    步骤三,过跨车沿铁水运输轨道继续运行至加废钢节点,通过废钢转运单元将废钢堆存配料间内的废钢加入到空铁水罐内;
    步骤四,过跨车走行至炼铁车间等待下一次出铁。
  10. 如权利要求9所述的运行方法,其特征在于,步骤四中,先对铁水罐内废钢进行预热后再使过跨车走行至炼铁车间。
PCT/CN2020/140773 2020-03-09 2020-12-29 基于铁水罐过跨车的高炉-转炉生产***及其运行方法 WO2021179752A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010156868.6A CN111304385A (zh) 2020-03-09 2020-03-09 基于铁水罐过跨车的高炉-转炉生产***及其运行方法
CN202010156868.6 2020-03-09

Publications (1)

Publication Number Publication Date
WO2021179752A1 true WO2021179752A1 (zh) 2021-09-16

Family

ID=71145587

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/140773 WO2021179752A1 (zh) 2020-03-09 2020-12-29 基于铁水罐过跨车的高炉-转炉生产***及其运行方法

Country Status (2)

Country Link
CN (1) CN111304385A (zh)
WO (1) WO2021179752A1 (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113848835A (zh) * 2021-09-26 2021-12-28 日照钢铁控股集团有限公司 一种生产调度管理***
CN114653934A (zh) * 2022-03-10 2022-06-24 重庆赛迪奇智人工智能科技有限公司 鱼雷罐车加揭盖装置
CN114934140A (zh) * 2022-05-09 2022-08-23 河北新金轧材有限公司 一种减少铁水温降的组织工艺
CN115007844A (zh) * 2022-05-17 2022-09-06 湖南华菱涟源钢铁有限公司 一种铁水罐废钢预热的高炉接铁方法
CN115647346A (zh) * 2022-11-14 2023-01-31 无锡巨力重工股份有限公司 一种采用新能源钢水罐车的钢水罐运输***和运输方式

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111304385A (zh) * 2020-03-09 2020-06-19 中冶南方工程技术有限公司 基于铁水罐过跨车的高炉-转炉生产***及其运行方法
CN114440638B (zh) * 2022-02-22 2023-06-06 中国恩菲工程技术有限公司 高温物料输送装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09263815A (ja) * 1996-03-28 1997-10-07 Kawasaki Heavy Ind Ltd 溶融金属搬送方式および溶融金属搬送設備
CN101280347A (zh) * 2007-04-04 2008-10-08 中冶赛迪工程技术股份有限公司 一种高炉-转炉界面“紧凑型一罐制”工艺
CN103433474A (zh) * 2013-08-16 2013-12-11 北京首钢国际工程技术有限公司 高炉铁水运输一罐到底工艺双向运输***
CN204311077U (zh) * 2014-12-16 2015-05-06 中冶东方工程技术有限公司 一种铁水运输***
CN105238891A (zh) * 2015-10-20 2016-01-13 北京首钢国际工程技术有限公司 炼铁-炼钢界面直连式工艺
CN109055656A (zh) * 2018-09-13 2018-12-21 中冶华天工程技术有限公司 一种配套转炉预热废钢压块的生产工艺***及其方法
CN111304385A (zh) * 2020-03-09 2020-06-19 中冶南方工程技术有限公司 基于铁水罐过跨车的高炉-转炉生产***及其运行方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2608505B2 (ja) * 1992-04-23 1997-05-07 新日本製鐵株式会社 高炉操業方法
AUPR624801A0 (en) * 2001-07-10 2001-08-02 Technological Resources Pty Limited A gas injection lance
DE102018208305A1 (de) * 2018-05-25 2019-11-28 Sms Group Gmbh Einbindung eines Schrottschmelzofens in ein Konverterstahlwerk
CN108486309A (zh) * 2018-05-31 2018-09-04 中冶南方工程技术有限公司 一种转炉炼钢***及投加废钢和铁水的方法
CN110340339B (zh) * 2019-08-05 2021-01-05 广东韶钢松山股份有限公司 警示装置、铁水罐超高警示***以及预警方法
CN212640543U (zh) * 2020-03-09 2021-03-02 中冶南方工程技术有限公司 基于铁水罐过跨车的高炉-转炉生产***

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09263815A (ja) * 1996-03-28 1997-10-07 Kawasaki Heavy Ind Ltd 溶融金属搬送方式および溶融金属搬送設備
CN101280347A (zh) * 2007-04-04 2008-10-08 中冶赛迪工程技术股份有限公司 一种高炉-转炉界面“紧凑型一罐制”工艺
CN103433474A (zh) * 2013-08-16 2013-12-11 北京首钢国际工程技术有限公司 高炉铁水运输一罐到底工艺双向运输***
CN204311077U (zh) * 2014-12-16 2015-05-06 中冶东方工程技术有限公司 一种铁水运输***
CN105238891A (zh) * 2015-10-20 2016-01-13 北京首钢国际工程技术有限公司 炼铁-炼钢界面直连式工艺
CN109055656A (zh) * 2018-09-13 2018-12-21 中冶华天工程技术有限公司 一种配套转炉预热废钢压块的生产工艺***及其方法
CN111304385A (zh) * 2020-03-09 2020-06-19 中冶南方工程技术有限公司 基于铁水罐过跨车的高炉-转炉生产***及其运行方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113848835A (zh) * 2021-09-26 2021-12-28 日照钢铁控股集团有限公司 一种生产调度管理***
CN114653934A (zh) * 2022-03-10 2022-06-24 重庆赛迪奇智人工智能科技有限公司 鱼雷罐车加揭盖装置
CN114934140A (zh) * 2022-05-09 2022-08-23 河北新金轧材有限公司 一种减少铁水温降的组织工艺
CN114934140B (zh) * 2022-05-09 2024-04-26 河北新金轧材有限公司 一种减少铁水温降的组织工艺
CN115007844A (zh) * 2022-05-17 2022-09-06 湖南华菱涟源钢铁有限公司 一种铁水罐废钢预热的高炉接铁方法
CN115007844B (zh) * 2022-05-17 2024-02-23 湖南华菱涟源钢铁有限公司 一种铁水罐废钢预热的高炉接铁方法
CN115647346A (zh) * 2022-11-14 2023-01-31 无锡巨力重工股份有限公司 一种采用新能源钢水罐车的钢水罐运输***和运输方式

Also Published As

Publication number Publication date
CN111304385A (zh) 2020-06-19

Similar Documents

Publication Publication Date Title
WO2021179752A1 (zh) 基于铁水罐过跨车的高炉-转炉生产***及其运行方法
EP3370024B1 (en) Steel scrap preheating-type electric arc furnace
CN110923394B (zh) 炼钢设备及炼钢方法
CN108866270A (zh) 一种炼钢设备
CN216005917U (zh) 熔融钢渣还原炼铁设备
CN101486088B (zh) 一种铁水罐组合盖及其加揭盖方法
CN106702078A (zh) 转炉装料装置和转炉装料方法
CN103776270A (zh) 一种电石炉电石显热回收设备及回收方法
CN211360636U (zh) 一种钢包热修装置
CN212655813U (zh) 固定密封式废钢烘烤装置和转炉废钢连续预热***
CN110388830A (zh) 废钢预热装置、电弧熔化设备及预热方法
CN211367630U (zh) 炼钢设备
CN103170612A (zh) 一种铁水罐粘铁熔化方法
CN212640543U (zh) 基于铁水罐过跨车的高炉-转炉生产***
CN208472142U (zh) 一种炼钢设备
CN116855648A (zh) 一种钢渣改质和有价元素回收装置及方法
RU2819401C1 (ru) Производственная система доменная печь - конвертер на базе рельсовой платформы с резервуаром для жидкого чугуна и способ ее работы
CN206244828U (zh) 转炉装料装置
CN201819560U (zh) 一种高温物料输送装置
CN210140606U (zh) 一种使用转炉烟气预热废钢的装置
CN208116750U (zh) 一种铁水罐的加盖保温装置
CN210458258U (zh) 一种节能燃气式台车炉
CN207391483U (zh) 一种用于冷轧取向硅钢高温退火炉清理设备
CN112094977B (zh) 一种双炉体电-转炉高效冶炼的工艺和***
CN104911289A (zh) 一种钢铁冶炼行业的物流运输方法及***

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20924598

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20924598

Country of ref document: EP

Kind code of ref document: A1