WO2019202649A1 - Dispositif utilisateur et station de base - Google Patents

Dispositif utilisateur et station de base Download PDF

Info

Publication number
WO2019202649A1
WO2019202649A1 PCT/JP2018/015771 JP2018015771W WO2019202649A1 WO 2019202649 A1 WO2019202649 A1 WO 2019202649A1 JP 2018015771 W JP2018015771 W JP 2018015771W WO 2019202649 A1 WO2019202649 A1 WO 2019202649A1
Authority
WO
WIPO (PCT)
Prior art keywords
user apparatus
power class
maximum transmission
base station
power
Prior art date
Application number
PCT/JP2018/015771
Other languages
English (en)
Japanese (ja)
Inventor
高橋 秀明
大將 梅田
洋介 佐野
Original Assignee
株式会社Nttドコモ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Nttドコモ filed Critical 株式会社Nttドコモ
Priority to PCT/JP2018/015771 priority Critical patent/WO2019202649A1/fr
Publication of WO2019202649A1 publication Critical patent/WO2019202649A1/fr

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/38Transceivers, i.e. devices in which transmitter and receiver form a structural unit and in which at least one part is used for functions of transmitting and receiving
    • H04B1/3827Portable transceivers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC

Definitions

  • the present invention relates to a user apparatus and a base station.
  • Non-Patent Document 1 when a frequency band is a TDD (Time Division Division Duplex) band and 50% or more slots in a radio frame are uplink transmissions, the user apparatus has a maximum transmission power. A higher high power class cannot be used.
  • TDD Time Division Division Duplex
  • the frequency band is a TDD band and 50% or more slots in the radio frame are uplink transmissions, for example, the frequency band, the specific absorption rate of the user equipment, the country, High power class may be available depending on the region.
  • Embodiments of the present invention have been made in view of the above problems, and in a frequency band having a default power class lower than the high power class supported by the user apparatus, the high power class supported by the user apparatus is determined. Make it available more efficiently.
  • a user apparatus includes a transmission unit that supports a first power class in a certain frequency band, a reception unit that receives a radio signal transmitted by a base station, and In the frequency band having a second power class lower than one power class as a default power class, the receiving unit receives the radio signal including information indicating a specific absorption rate condition to be satisfied by the user apparatus And a control unit that determines a maximum transmission power of the transmission unit so as to satisfy a specific absorption rate that should be satisfied by the user apparatus.
  • the high power class supported by the user apparatus can be used more efficiently in a frequency band having a default power class lower than the high power class supported by the user apparatus.
  • FIG. 1 is a schematic diagram illustrating a wireless communication system according to one embodiment. It is a block diagram which shows the function structure of the user apparatus by one Example. It is a block diagram which shows the function structure of the base station by one Example. It is a flowchart which shows the example of the determination process of the maximum transmission power by one Example. It is a figure for demonstrating RequiredSAR by one Example. It is a sequence diagram which shows the example of the initial access process by one Example. It is a sequence diagram which shows the example of the hand-over process by one Example. It is a figure which shows the example (1) of the specification change by one Example. It is a figure which shows the example (2) of the specification change by one Example. It is a figure which shows the example (3) of the specification change by one Example. It is a block diagram which shows the hardware constitutions of the user apparatus and base station by one Example.
  • FIG. 1 is a schematic diagram illustrating a wireless communication system according to an embodiment of the present invention.
  • the wireless communication system 10 includes a user device 100 and a base station 200.
  • the wireless communication system 10 may typically be a wireless communication system compliant with a standard by 3GPP (Third Generation Partnership Project) such as LTE system, LTE-Advanced system, or 5G system.
  • the radio communication system 10 is not limited to this, and may be, for example, UMTS (Universal Mobile Telecommunications System), UMTS enhancement, LTE single-cluster, LTE multi-cluster, UL inter- It may be a variation of the LTE system, such as band CA, UL intra-band contiguous CA, UL intra-band non-continuous CA, Dual Connectivity.
  • only one base station 200 is shown, but a number of base stations 200 are arranged to cover the service area of the wireless communication system 10.
  • the user apparatus 100 performs wireless communication with the base station 200 via a cell or a frequency band provided by the base station 200 according to 3GPP standards such as LTE, LTE-Advanced and / or 5G.
  • the user apparatus 100 may be any appropriate information processing apparatus having a wireless communication function such as a smartphone, a mobile phone, a tablet, a mobile router, and a wearable terminal as illustrated.
  • the base station 200 is wirelessly connected to the user apparatus 100 via a cell or a frequency band according to 3GPP standards such as LTE, LTE-Advanced and / or 5G, and is connected to a higher level connected to a core network (not shown).
  • 3GPP standards such as LTE, LTE-Advanced and / or 5G
  • the downlink (DL) packet received from the station and / or the server is transmitted to the user apparatus 100
  • the uplink (UL) packet received from the user apparatus 100 is transmitted to the server.
  • the base station 200 sets a power class (hereinafter referred to as a second power class) lower than a high power class (hereinafter referred to as a first power class) supported by the user apparatus 100 as a default power class.
  • System information is transmitted in the frequency band possessed as Further, the system information transmitted by the base station 200 indicates “P-Max”, which is information indicating the maximum transmission power applied to the frequency band, and a specific absorption rate (SAR) condition to be satisfied by the user apparatus.
  • P-Max is information indicating the maximum transmission power applied to the frequency band
  • SAR specific absorption rate
  • SAR Specific Absorption Rate
  • the user apparatus 100 When receiving the system information including the above-described P-Max and Required SAR from the base station 200, the user apparatus 100 performs maximum transmission so as to satisfy the SAR conditions indicated by the Required SAR when accessing the base station 200. Determine the power.
  • the user apparatus 100 receives from the base station 200 system information including P-Max indicating the maximum transmission power of the first power class and Required SAR indicating the SAR conditions to be satisfied by the user apparatus. To do.
  • the user device 100 stores the SAR characteristics (capability) for each frequency band of the user device 100 in advance in the storage unit as a part of the terminal capability information, for example.
  • the user apparatus 100 determines whether or not the SAR characteristic of the user apparatus 100 in the frequency band satisfies the SAR condition indicated by the Required SAR included in the information in the received system. Further, when the SAR characteristic of the user apparatus 100 satisfies the SAR condition indicated by the Required SAR, the user apparatus 100 performs the maximum transmission of the first power class according to the transmission regulations of the first power class in the frequency band. The power is determined as the maximum transmission power of the user apparatus 100.
  • the user apparatus 100 sets the maximum transmission power of the default power class according to the transmission rule of the default power class in the frequency band. A maximum transmission power of 100 is determined.
  • the user apparatus 100 defines transmission specifications for the first power class in the frequency band. Accordingly, the maximum transmission power of the first power class is determined as the maximum transmission power of the user apparatus 100.
  • the transmission regulations for each power class of the frequency band include, for example, adjacent channel leakage power ratio (ACLR: AdjacentjaChannel Ratio), adjacent channel sensitivity (ACS: Adjacent Channel Selectivity), and reference sensitivity power level (REFSENS: Reference). Sensitivity (Power Level), spectrum emission mask (SEM: Spectrum Emission Mask), maximum power reduction value (MPR: Maximum Power Reduction), maximum transmission power, etc. are included (Non-patent Document 1).
  • ACLR AdjacentjaChannel Ratio
  • ACS Adjacent Channel Selectivity
  • REFSENS Reference sensitivity power level
  • Sensitivity Power Level
  • SEM Spectrum Emission Mask
  • MPR Maximum Power Reduction
  • maximum transmission power etc.
  • the user apparatus 100 can satisfy the requirement for Required SAR even when the frequency band is a TDD band and 50% or more slots in a radio frame are uplink transmissions.
  • a first power class can be utilized.
  • the high power class supported by the user apparatus 100 can be used more efficiently in a frequency band having a default power class lower than the high power class supported by the user apparatus 100.
  • FIG. 2 is a block diagram illustrating a functional configuration of a user apparatus according to an embodiment of the present invention.
  • the user device 100 includes a transmission unit 110, a reception unit 120, a control unit 130, a storage unit 140, and the like.
  • the transmission unit 110 transmits a radio signal to the base station 200.
  • the transmission unit 110 transmits various radio signals such as an uplink control channel and an uplink data channel to the base station 200.
  • the transmission unit 110 supports a first power class having a maximum transmission power larger than a default power class (second power class) in a certain frequency band.
  • the receiving unit 120 receives a radio signal transmitted from the base station 200.
  • the receiving unit 120 receives various radio signals such as a downlink control channel and a downlink data channel transmitted from the base station 200.
  • control unit 130 When the control unit 130 receives system information including the above-described P-Max and Required SAR from the base station 200 in the frequency band supporting the above-described first power class, the control unit 130 indicates the SAR indicated by Required SAR.
  • the maximum transmission power of the transmission unit 110 is determined so as to satisfy the condition.
  • the control unit 130 determines whether or not the SAR characteristics of the user apparatus 100 in the frequency band stored in advance in the storage unit 140 satisfy the condition indicated by the Required SAR. In addition, when the SAR characteristic of the user apparatus 100 satisfies the SAR condition indicated by the Required SAR, the control unit 130 increases the maximum transmission power of the first power class according to the transmission rule of the first power class in the frequency band. The maximum transmission power of the user apparatus 100 is determined.
  • the control unit 130 determines the maximum transmission power of the default power class according to the transmission rule of the default power class in the frequency band. A maximum transmission power of 100 is determined.
  • the control unit 130 defines transmission specifications for the first power class in the frequency band. Accordingly, the maximum transmission power of the first power class is determined as the maximum transmission power of the user apparatus 100. An example of a specific process performed by the control unit 130 will be described in detail later.
  • the storage unit 140 stores in advance information such as the power class supported by the user apparatus 100 in each frequency band, the SAR characteristics in each frequency band, and the like.
  • FIG. 3 is a block diagram showing a functional configuration of the base station according to one embodiment of the present invention.
  • the base station 200 includes an information transmission unit 210, a connection control unit 220, and the like.
  • the information transmission unit 210 transmits system information, for example.
  • This system information includes, for example, P-Max, which is information indicating the maximum transmission power applied in the frequency band provided by the base station 200, Required SAR, which is information indicating the SAR conditions that the user apparatus 100 should satisfy.
  • P-Max which is information indicating the maximum transmission power applied in the frequency band provided by the base station 200
  • Required SAR which is information indicating the SAR conditions that the user apparatus 100 should satisfy.
  • SIB1 SystemInformationBlockType1
  • the connection control unit 220 controls wireless connection with the user device 100. For example, when the RA preamble is received from the user apparatus 100, the connection control unit 220 transmits an RA response to the user apparatus 100 and establishes a wireless connection or RRC connection with the user apparatus 100. After establishing the wireless connection, the connection control unit 220 manages the wireless connection with the user apparatus 100 such as mobility control, and also transmits information such as P-Max and Required SAR applied in the frequency band to the user apparatus 100 by individual signaling. Notice.
  • the user apparatus 100 transmits the transmission power when accessing the base station 200 according to the maximum transmission power (P-Max) notified from the base station 200 and the SAR conditions (Required SAR) that the user apparatus 100 should satisfy. To control.
  • P-Max maximum transmission power
  • SAR Required SAR
  • FIG. 4 is a flowchart illustrating an example of the maximum transmission power determination process according to an embodiment. This process shows an example of the maximum transmission power determination process executed by the user apparatus 100 in the frequency band having the second power class lower than the first power class supported by the user apparatus 100 as the default power class. Yes. This process is executed, for example, when the user apparatus 100 transitions from the idle state to the connected state, or when a handover is performed.
  • step S1 the control unit 130 of the user apparatus 100 determines whether or not P-Max is provided from the base station 200. For example, the control unit 130 determines that the P-Max is provided from the base station 200 when the system information (SIB1) received by the receiving unit 120 or the P-MAX is included in the handover instruction or the like.
  • SIB1 system information
  • step S3 When P-Max is provided from the base station 200, the control unit 130 shifts the process to step S3. On the other hand, if P-Max is not provided from the base station 200, the process proceeds to step S2.
  • control unit 130 of the user apparatus 100 determines the maximum transmission power of the default power class in the frequency band as the maximum transmission power of the user apparatus 100.
  • step S3 the control unit 130 of the user apparatus 100 determines whether or not the provided P-Max is set to a value higher than the maximum transmission power of the default power class.
  • control unit 130 shifts the process to step S4.
  • P-Max is not set to a value higher than the maximum transmission power of the default power class
  • the control unit 130 shifts the process to step S2.
  • the control unit 130 of the user apparatus 100 determines whether or not the Required SAR is provided from the base station 200. For example, the control unit 130 determines that the required SAR is provided from the base station 200 when the required SAR is included in the system information (SIB1) received by the receiving unit 120, the handover instruction, or the like.
  • SIB1 system information
  • RequiredSAR is represented by an index (Index in IE RequiredSAR) as shown in FIG.
  • FIG. 5 is a diagram for explaining RequiredSAR according to an embodiment.
  • the index “1” is specified for the Required SAR in the band X
  • the SAR condition to be satisfied by the user apparatus 100 is “60% for 1.6 W / kg”.
  • the index “2” is specified for the Required SAR in the band X
  • the SAR condition to be satisfied by the user apparatus 100 is “80% for 1.6 W / kg”.
  • different required SARs can be notified to the user apparatus 100 even in the same frequency band (for example, band X).
  • the maximum transmission power can be controlled based on different standards depending on the country, the region, and the like.
  • Non-Patent Document 1 uses the user apparatus 100 as the first The power class cannot be used.
  • the user apparatus 100 can utilize the first power class.
  • the SAR condition that the user apparatus 100 should satisfy is “80% for 2 W / kg”. Yes.
  • step S4 when Required SAR is provided from the base station 200, the control unit 130 of the user apparatus 100 shifts the processing to step S5. On the other hand, when the Required SAR is not provided from the base station 200, the control unit 130 of the user apparatus 100 shifts the process to step S6.
  • step S5 the control unit 130 of the user apparatus 100 determines whether the SAR characteristics of the user apparatus 100 in the frequency band satisfy the SAR condition indicated by the Required SAR provided from the base station 200. To do.
  • the storage unit 140 of the user device 100 stores the SAR characteristics in each frequency band of the user device 100 in advance. Therefore, the control unit 130 acquires, from the storage unit 140, the SAR characteristic of the user apparatus 100 corresponding to the frequency band, and compares the SAR condition indicated by the Required SAR with the SAR condition indicated by the Required SAR. Can be determined.
  • control unit 130 shifts the process to step S6.
  • the control unit 130 shifts the process to step S2.
  • control unit 130 of the user apparatus 100 determines the maximum transmission power of the first power class in the frequency band as the maximum transmission power of the user apparatus 100.
  • control unit 130 of the user apparatus 100 can determine the maximum transmission power in the frequency band according to the P-Max provided from the base station 200 and the Required SAR.
  • the user apparatus 100 satisfies the requirement for Required SAR as long as the first power class is satisfied. Can be used.
  • the maximum transmission power determination process shown in FIG. 4 is an example.
  • the control unit 130 sets the default power class.
  • the maximum transmission power may be determined as the maximum transmission power of the user apparatus 100.
  • FIG. 6 is a sequence diagram illustrating an example of initial access processing according to an embodiment. This process is executed, for example, when the user apparatus 100 transitions from the idle state to the connected state.
  • step S101 it is assumed that the user apparatus 100 supports 26 dBm of PC2 in the band X having 23 dBm of PC3 as a default power class.
  • step S102 the user apparatus 100 tries to be in the band X cell.
  • the receiving unit 120 of the user apparatus 100 receives SIB1 (SystemInformationBlockType1), which is system information broadcast from the base station 200.
  • the information element (IE: IEInformation Element) of SIB1 includes P-Max indicating the maximum transmission power, Required SAR indicating the SAR conditions to be satisfied by the user apparatus 100, and the like.
  • step S104 the control unit 130 of the user apparatus 100 determines the maximum transmission power of the user apparatus 100 by the maximum transmission power determination process illustrated in FIG.
  • P-Max is set to the maximum transmission power of 26 dBm of PC2 higher than the maximum transmission power of the default power class (PC3), and the SAR characteristics of the user apparatus 100 satisfy the Required SAR.
  • the user apparatus 100 control unit 130 determines the maximum transmission power 26 dBm of the PC 2 as the maximum transmission power of the user apparatus 100.
  • P-Max is set to a maximum transmission power of 26 dBm of PC2 higher than the default power class (PC3), and the SAR characteristics of the user apparatus 100 do not satisfy the Required SAR.
  • the control unit 130 determines the maximum transmission power 23 dBm of the default power class (PC3) as the maximum transmission power of the user apparatus 100.
  • control unit 130 sets the maximum transmission power of PC2 to 26 dBm. A maximum transmission power of 100 is determined.
  • step S ⁇ b> 105 the transmission unit 110 of the user apparatus 100 transmits a random access request (RA preamble) to the base station 200 according to the power class transmission rule determined by the control unit 130 and the maximum transmission power.
  • step S106 the base station 200 returns an RA response to the RA request, and establishes an RRC connection with the user apparatus 100 in step S107.
  • step S108 the connection control unit 220 of the base station 200 transmits UE capability Enquiry to request capability information from the user apparatus 100.
  • step S ⁇ b> 109 the control unit 130 of the user apparatus 100 notifies the UE capability information indicating the terminal capability information of the user apparatus 100 to the base station 200 via the transmission unit 110.
  • the UE capability information includes information such as the power class supported by the user apparatus 100 and the SAR characteristics of the user apparatus 100 in the band X, for example.
  • the system information (SIB1) transmitted by the base station 200 may include a plurality of Required SARs for one cell.
  • the plurality of Required SARs are arranged in descending order of priority.
  • the maximum transmission is performed so as to satisfy the SAR condition indicated by the Required SAR having the highest priority among the SAR conditions supported by the user apparatus 100. Determine the power.
  • FIG. 7 is a sequence diagram illustrating an example of a handover process according to an embodiment. This process is executed, for example, when the user apparatus 100 performs a handover.
  • step S201 it is assumed that the user apparatus 100 supports the PC2 of 26 dBm in the band X having the PC3 of 23 dBm as the default power class.
  • step S202 the user apparatus 100 receives a handover instruction (RRCConnectionReconfiguration with mobilityControlInfo) from the cell # 1 of the source base station (base station A) to the cell # 1 of the target base station (base station B).
  • the handover instruction includes P-Max, Required SAR, and the like.
  • step S203 the control unit 130 of the user apparatus 100 determines the maximum transmission power of the user apparatus 100 by the maximum transmission power determination process illustrated in FIG.
  • step S ⁇ b> 204 the transmission unit 110 of the user apparatus 100 transmits a random access request (RA preamble) to the base station 200 in accordance with the power class transmission rule determined by the control unit 130 and the maximum transmission power.
  • step S205 the base station 200 returns an RA response to the RA request.
  • step S206 the user apparatus 100 transmits a handover completion notification (RRCConnectionReconfigurationComplete) indicating establishment of RRC connection with the base station 200. .
  • RRCConnectionReconfigurationComplete handover completion notification
  • the base station A may determine the required SAR index to be notified to the user apparatus 100 with reference to the terminal capability information received in step S109 of FIG. Accordingly, it is possible to reduce the notification to the user apparatus 100 of the requirement SAR not supported by the user apparatus 100 in step S202 of FIG.
  • FIG. 8 shows a modification of section 6.2.1 of 3GPP TS 38.101-1, shown in Non-Patent Document 1.
  • a description 801 related to the processing of steps S4 and S5 in FIG. 4 is added, and a table 802 that defines the Required SAR described in FIG. 5 is added.
  • the restriction 803 when the frequency band is the TDD band and 50% or more of the slots in the radio frame are uplink transmissions is deleted, and the high power class supported by the user apparatus 100 is made more efficient. It becomes available.
  • FIG. 9 shows a modification example of the FrequencyUL information element 900 transmitted by the base station 200.
  • the FrequencyUL information element 900 is an information element for providing the user apparatus 100 with basic parameters related to the uplink carrier and its transmission.
  • requiredSAR 902 is added to FrequencyUL information element 900.
  • the base station 200 provides the user equipment 100 with the FrequencyUL information element 900 including the required SAR 902 and the frequencyBandList 901.
  • the information element representing RequiredSAR is defined as shown in FIG. 10, for example.
  • each functional block may be realized by one device in which a plurality of elements are physically and / or logically combined, or two or more devices physically and / or logically separated may be directly and directly. It may be realized by a plurality of these devices connected indirectly (for example, wired and / or wirelessly).
  • both the user apparatus 100 and the base station 200 in an embodiment of the present invention may function as a computer that performs processing according to the present embodiment.
  • FIG. 11 is a diagram illustrating an example of a hardware configuration of the user apparatus 100 and the base station 200 according to the present embodiment.
  • Each of the above-described user apparatus 100 and base station 200 may be physically configured as a computer apparatus including a processor 1001, a memory 1002, a storage 1003, a communication apparatus 1004, an input apparatus 1005, an output apparatus 1006, a bus 1007, and the like. Good.
  • the term “apparatus” can be read as a circuit, a device, a unit, or the like.
  • the hardware configurations of the user apparatus 100 and the base station 200 may be configured to include one or a plurality of apparatuses indicated by 1001 to 1006 shown in the figure, or may be configured not to include some apparatuses. May be.
  • Each function in the user apparatus 100 and the base station 200 is performed by causing the processor 1001 to perform calculation by reading predetermined software (program) on hardware such as the processor 1001 and the memory 1002, communication by the communication apparatus 1004, and memory 1002. This is realized by controlling reading and / or writing of data in the storage 1003.
  • the processor 1001 controls the entire computer by operating an operating system, for example.
  • the processor 1001 may be configured by a central processing unit (CPU) including an interface with a peripheral device, a control device, an arithmetic device, a register, and the like.
  • CPU central processing unit
  • the processor 1001 reads a program (program code), software module, or data from the storage 1003 and / or the communication device 1004 to the memory 1002, and executes various processes according to these.
  • a program program that causes a computer to execute at least a part of the operations described in the above embodiments is used.
  • the transmission unit 110, the reception unit 120, the control unit 130, and the storage unit 140 of the user device 100 illustrated in FIG. 2 may be realized by a control program stored in the memory 1002 and operating on the processor 1001.
  • the information transmission unit 210 and the connection control unit 220 of the base station 200 illustrated in FIG. 3 may be realized by a control program stored in the memory 1002 and operating on the processor 1001.
  • processor 1001 may be executed simultaneously or sequentially by two or more processors 1001.
  • the processor 1001 may be implemented by one or more chips. Note that the program may be transmitted from a network via a telecommunication line.
  • the memory 1002 is a computer-readable recording medium, and includes, for example, ROM (Read Only Memory), EPROM (Erasable Programmable ROM), EEPROM (Electrically Erasable Programmable ROM), RAM (Random Access Memory), and the like. May be.
  • the memory 1002 may be called a register, a cache, a main memory (main storage device), or the like.
  • the memory 1002 can store a program (program code), a software module, and the like that can be executed to perform the processing according to the embodiment of the present invention.
  • the storage 1003 is a computer-readable recording medium such as an optical disk such as a CD-ROM (Compact Disc ROM), a hard disk drive, a flexible disk, a magneto-optical disk (for example, a compact disk, a digital versatile disk, a Blu-ray). (Registered trademark) disk, smart card, flash memory (for example, card, stick, key drive), floppy (registered trademark) disk, magnetic strip, and the like.
  • the storage 1003 may be called an auxiliary storage device.
  • the storage medium described above may be, for example, a database, server, or other suitable medium including the memory 1002 and / or the storage 1003.
  • the communication device 1004 is hardware (transmission / reception device) for performing communication between computers via a wired and / or wireless network, and is also referred to as a network device, a network controller, a network card, a communication module, or the like.
  • the transmission unit 110 and the reception unit 120 of the user device 100 may be realized by the communication device 1004.
  • the information transmission unit 210 of the base station 200 may be realized by the communication device 1004.
  • the input device 1005 is an input device (for example, a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.) that accepts an input from the outside.
  • the output device 1006 is an output device (for example, a display, a speaker, an LED lamp, etc.) that performs output to the outside.
  • the input device 1005 and the output device 1006 may have an integrated configuration (for example, a touch panel).
  • each device such as the processor 1001 and the memory 1002 is connected by a bus 1007 for communicating information.
  • the bus 1007 may be configured with a single bus or may be configured with different buses between apparatuses.
  • the user apparatus 100 and the base station 200 are respectively a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), a programmable logic device (FPD), an ASIC (Application Logic Integrated Circuit), a PLD (Programmable Logic Device), an AFP It may be configured including hardware, and a part or all of each functional block may be realized by the hardware.
  • the processor 1001 may be implemented by at least one of these hardware.
  • the operations of a plurality of functional units may be physically performed by one component, or the operations of one functional unit may be physically performed by a plurality of components.
  • the processing order may be changed as long as there is no contradiction.
  • the user apparatus 100 and the base station 200 have been described using functional block diagrams, but such an apparatus may be realized by hardware, software, or a combination thereof.
  • the software operated by the processor of the user apparatus 100 according to the embodiment of the present invention and the software operated by the processor of the base station 200 according to the embodiment of the present invention are random access memory (RAM), flash memory, and read-only, respectively. It may be stored in any appropriate storage medium such as a memory (ROM), EPROM, EEPROM, register, hard disk (HDD), removable disk, CD-ROM, database, server or the like.
  • the notification of information is not limited to the aspect / embodiment described in the present specification, and may be performed by other methods.
  • the notification of information includes physical layer signaling (for example, DCI (Downlink Control Information), UCI (Uplink Control Information)), upper layer signaling (for example, RRC (Radio Resource Control) signaling, MAC (MediumCong) It may be implemented by broadcast information (MIB (Master Information Block), SIB (System Information Block)), other signals, or a combination thereof, and RRC signaling may be referred to as an RRC message, for example, RRC Connection setup (RRC Con ection Setup) message, RRC connection reconfiguration (it may be a RRC Connection Reconfiguration) message.
  • RRC message for example, RRC Connection setup (RRC Con ection Setup) message, RRC connection reconfiguration (it may be a RRC Connection Reconfiguration) message.
  • Each aspect / embodiment described in this specification includes LTE (Long Term Evolution), LTE-A (LTE-Advanced), SUPER 3G, IMT-Advanced, 4G, 5G, FRA (Fure Radio Access), and W-CDMA.
  • LTE Long Term Evolution
  • LTE-A Long Term Evolution-Advanced
  • SUPER 3G IMT-Advanced
  • 4G 5G
  • FRA Full Radio Access
  • W-CDMA Wideband
  • GSM registered trademark
  • CDMA2000 Code Division Multiple Access 2000
  • UMB User Mobile Broadband
  • IEEE 802.11 Wi-Fi
  • IEEE 802.16 WiMAX
  • IEEE 802.20 UWB (Ultra-WideBand
  • the present invention may be applied to a Bluetooth (registered trademark), a system using another appropriate system, and / or a next generation system extended based on the system.
  • the specific operation assumed to be performed by the base station 200 in this specification may be performed by the upper node (upper node) in some cases.
  • various operations performed for communication with the user apparatus 100 may be performed by the base station 200 and / or other than the base station 200.
  • a network node for example, but not limited to MME or S-GW.
  • MME and S-GW network nodes
  • User equipment 100 can be used by those skilled in the art to a subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, It may also be referred to as a wireless terminal, remote terminal, handset, user agent, mobile client, client, or some other appropriate terminology.
  • Base station 200 may also be referred to by those skilled in the art as NB (Node B), eNB (enhanced Node B), base station (Base Station), gNB, or some other appropriate terminology.
  • NB Node B
  • eNB enhanced Node B
  • Base Station Base Station
  • gNB Base Station
  • determining may encompass a wide variety of actions.
  • “Judgment” and “determination” are, for example, judgment (judging), calculation (calculating), calculation (computing), processing (processing), derivation (investigation), investigation (investigating), search (loking up) (for example, table , Searching in a database or another data structure), considering ascertaining “determining”, “determining”, and the like.
  • “determination” and “determination” are reception (for example, receiving information), transmission (for example, transmitting information), input (input), output (output), and access. (Accessing) (for example, accessing data in a memory) may be considered as “determining” or “determining”.
  • determination and “determination” means that “resolving”, selection (selecting), selection (choosing), establishment (establishing), comparison (comparing), etc. are regarded as “determination” and “determination”. May be included. In other words, “determination” and “determination” may include considering some operation as “determination” and “determination”.
  • the phrase “based on” does not mean “based only on”, unless expressly specified otherwise. In other words, the phrase “based on” means both “based only on” and “based at least on.”

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

L'invention concerne un dispositif utilisateur comprenant : une unité de transmission qui prend en charge une première classe de puissance dans une bande de fréquence donnée ; une unité de réception pour recevoir un signal sans fil transmis par une station de base ; et une unité de commande qui, lorsque l'unité de réception a reçu un signal sans fil comprenant des informations qui indiquent une condition pour un taux d'absorption spécifique à satisfaire par le dispositif utilisateur dans une bande de fréquences ayant une seconde classe de puissance inférieure à la première classe de puissance en tant que classe de puissance par défaut, détermine la puissance transmise maximale de l'unité de transmission de façon à satisfaire le taux d'absorption spécifique à satisfaire par le dispositif utilisateur.
PCT/JP2018/015771 2018-04-16 2018-04-16 Dispositif utilisateur et station de base WO2019202649A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/015771 WO2019202649A1 (fr) 2018-04-16 2018-04-16 Dispositif utilisateur et station de base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/015771 WO2019202649A1 (fr) 2018-04-16 2018-04-16 Dispositif utilisateur et station de base

Publications (1)

Publication Number Publication Date
WO2019202649A1 true WO2019202649A1 (fr) 2019-10-24

Family

ID=68239589

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/015771 WO2019202649A1 (fr) 2018-04-16 2018-04-16 Dispositif utilisateur et station de base

Country Status (1)

Country Link
WO (1) WO2019202649A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021082993A1 (fr) * 2019-10-30 2021-05-06 中兴通讯股份有限公司 Procédé de commutation de bande de fréquences, station de base et support de stockage lisible

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012216970A (ja) * 2011-03-31 2012-11-08 Ntt Docomo Inc 移動局及び無線通信システムに使用される方法
JP2014501080A (ja) * 2010-11-16 2014-01-16 テレフオンアクチーボラゲット エル エム エリクソン(パブル) Rf暴露を最小限にするための動的なsar放出制御

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014501080A (ja) * 2010-11-16 2014-01-16 テレフオンアクチーボラゲット エル エム エリクソン(パブル) Rf暴露を最小限にするための動的なsar放出制御
JP2012216970A (ja) * 2011-03-31 2012-11-08 Ntt Docomo Inc 移動局及び無線通信システムに使用される方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"NR UE configured Tx power for both range 1 and range 2", 3GPP TSG RAN WG4 NR #2 MEETING R4-1706574, 19 June 2017 (2017-06-19), XP051308361, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/TSG_RAN/WG4_Radio/TSGR4_AHs/TSGR4_NR_Jun2017/Docs/R4-1706574.zip> [retrieved on 20180613] *
"Power Class Definition for Sub-6GHz NR", 3GPP TSG-RAN WG4 MEETING #83 R4-1705509, 6 May 2017 (2017-05-06), XP051267133, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/TSG_RAN/WG4_Radio/TSGR4_83/Docs/R4-1705509.zip> [retrieved on 20180613] *
"User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone (Release 15)", 3GPP TS 38. 101-1, March 2018 (2018-03-01), XP055649775, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Specs/archive/38_series/38.101-1/38101-1-f10.zip> [retrieved on 20180613] *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021082993A1 (fr) * 2019-10-30 2021-05-06 中兴通讯股份有限公司 Procédé de commutation de bande de fréquences, station de base et support de stockage lisible

Similar Documents

Publication Publication Date Title
WO2017195471A1 (fr) Dispositif utilisateur et station de base
US8295245B2 (en) Inter-radio access technology measurement system and method
WO2019098236A1 (fr) Dispositif d&#39;utilisateur et dispositif de station de base
CN109804677B (zh) 用户装置以及基站
JP7066751B2 (ja) 端末及び基地局
CN110574422B (zh) 用户装置、基站及随机接入方法
WO2018203417A1 (fr) Dispositif de station de base, dispositif utilisateur et procédé de communication
JP2018056857A (ja) ユーザ装置、基地局及びコアネットワーク
WO2019069750A1 (fr) Dispositif utilisateur et dispositif station de base
CN112534945A (zh) 用户装置以及基站装置
JP2019036869A (ja) ユーザ装置及びアクセス制御方法
WO2018030545A1 (fr) Réseau central et station de base
JPWO2017188453A1 (ja) ユーザ装置、基地局、及び通信方法
WO2019202649A1 (fr) Dispositif utilisateur et station de base
JP7221970B2 (ja) 端末、送信電力制御方法、基地局及び通信システム
WO2019138559A1 (fr) Dispositif utilisateur et procédé de réglage de temps de transmission de liaison montante
WO2019225602A1 (fr) Station de base
JP2020014173A (ja) 基地局および通信方法
KR102638200B1 (ko) 유저장치 및 기지국장치
KR102411093B1 (ko) 유저장치
JP2019047291A (ja) 基地局及びキャリア選択方法
WO2022097290A1 (fr) Terminal et système de communication
WO2021005759A1 (fr) Terminal et procédé de communication
WO2019211913A1 (fr) Dispositif utilisateur et dispositif station de base
JP2019129387A (ja) ユーザ装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18915136

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18915136

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP