WO2019026700A1 - 流体制御システムおよび流量測定方法 - Google Patents

流体制御システムおよび流量測定方法 Download PDF

Info

Publication number
WO2019026700A1
WO2019026700A1 PCT/JP2018/027755 JP2018027755W WO2019026700A1 WO 2019026700 A1 WO2019026700 A1 WO 2019026700A1 JP 2018027755 W JP2018027755 W JP 2018027755W WO 2019026700 A1 WO2019026700 A1 WO 2019026700A1
Authority
WO
WIPO (PCT)
Prior art keywords
valve
flow rate
pressure
flow
closing
Prior art date
Application number
PCT/JP2018/027755
Other languages
English (en)
French (fr)
Inventor
哲 山下
洋平 澤田
正明 永瀬
西野 功二
池田 信一
Original Assignee
株式会社フジキン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社フジキン filed Critical 株式会社フジキン
Priority to US16/634,603 priority Critical patent/US11460869B2/en
Priority to CN201880046755.1A priority patent/CN110892357A/zh
Priority to JP2019534064A priority patent/JP7208634B2/ja
Priority to KR1020197033503A priority patent/KR102250969B1/ko
Publication of WO2019026700A1 publication Critical patent/WO2019026700A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D7/00Control of flow
    • G05D7/06Control of flow characterised by the use of electric means
    • G05D7/0617Control of flow characterised by the use of electric means specially adapted for fluid materials
    • G05D7/0629Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means
    • G05D7/0635Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D7/00Control of flow
    • G05D7/06Control of flow characterised by the use of electric means
    • G05D7/0617Control of flow characterised by the use of electric means specially adapted for fluid materials
    • G05D7/0629Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means
    • G05D7/0635Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means
    • G05D7/0641Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means using a plurality of throttling means
    • G05D7/0658Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means using a plurality of throttling means the plurality of throttling means being arranged for the control of a single flow from a plurality of converging flows
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/05Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects
    • G01F1/34Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects by measuring pressure or differential pressure
    • G01F1/36Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects by measuring pressure or differential pressure the pressure or differential pressure being created by the use of flow constriction
    • G01F1/363Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects by measuring pressure or differential pressure the pressure or differential pressure being created by the use of flow constriction with electrical or electro-mechanical indication
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F15/00Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
    • G01F15/005Valves

Definitions

  • the present invention relates to a fluid control system and a flow rate measuring method, and more particularly to a fluid control system including a flow rate measuring device connected downstream of a flow rate controller and a flow rate measuring method using the same.
  • a gas supply system provided in a semiconductor manufacturing apparatus or the like generally supplies various types of gas to a gas use target such as a process chamber via a flow rate controller provided for each supply gas type. Is configured.
  • the buildup method is a method of measuring the flow rate by detecting the amount of fluid per unit time flowing into a known buildup volume.
  • Patent Document 1 discloses an example of flow rate measurement by a buildup method.
  • a plurality of gas supply lines are provided, and an on-off valve provided in a common gas supply path from an on-off valve on the downstream side of the flow rate controller connected to each gas supply line The flow path up to is used as a buildup volume.
  • Patent Document 2 discloses an example of flow rate measurement by a build-down method.
  • the measurement accuracy of the flow rate measurement may decrease due to the relatively small reference volume and the relatively short measurement time of pressure rise. .
  • the present invention has been made in view of the above problems, and its main object is to provide a fluid control system capable of performing flow rate measurement with improved accuracy.
  • a fluid control system includes a first valve provided downstream of a flow controller, a flow measuring device provided downstream of the first valve, and a second valve, and the second And a control unit for controlling the opening and closing operation of the first valve and the second valve, wherein the opening and closing of the first valve is controlled according to a signal output from the opening and closing detector.
  • control unit controls the timing of an opening / closing instruction to be output to the first valve based on the opening / closing of the second valve detected based on the signal output from the opening / closing detector.
  • the flow rate measuring device further includes a pressure sensor disposed upstream of the second valve, and a pressure rise in the flow path after closing the second valve is detected using the pressure sensor. It is configured to measure, and the starting point of the pressure rise is determined based on the signal output from the open / close detector.
  • the fluid control system is commonly connected to a plurality of first flow paths each having the flow rate controller and the first valve, and to the downstream side of the plurality of first flow paths, and the flow rate It includes a second flow path for supplying a fluid whose flow rate is controlled by the controller to an object of use, and a third flow path provided so as to branch from the second flow path and having the flow rate measuring device.
  • the flow rate controller is a pressure type flow control device including a control valve, a throttle unit, and an upstream pressure sensor that measures the pressure on the upstream side of the throttle unit.
  • a flow rate measurement method includes a first valve provided downstream of a flow rate controller, and a flow rate measurement provided downstream of the first valve and having a pressure sensor, a temperature sensor, and a second valve.
  • a flow rate measuring method performed in a fluid control system comprising: an apparatus, an open / close detector provided in the second valve, and a control unit controlling an open / close operation of the first valve and the second valve, The first valve and the second valve are opened to flow the gas, and the second valve is closed in a state where the gas is flowing, and the second valve is closed, and then the build-up time has elapsed.
  • the opening / closing is performed when the point at which the second valve is closed is determined based on the output from the open / close detector, and the first valve and the second valve are simultaneously closed in the second step.
  • the timing of the open / close command output to the first valve is controlled according to the signal output from the detector.
  • flow rate measurement can be appropriately performed.
  • FIG. 2 is a schematic view of a fluid control system according to an embodiment of the present invention.
  • FIG. 2 shows an exemplary configuration of a pressure based flow control device used in an embodiment of the present invention. It is a figure which shows the valve
  • FIG. 1 shows a fluid control system 1 according to an embodiment of the present invention.
  • the fluid control system 1 is configured to be able to supply the gas from the gas supply source 4 to the gas use target such as the process chamber 2 of the semiconductor manufacturing apparatus at a controlled flow rate.
  • the fluid control system 1 includes a plurality of first flow paths L1 connected to different gas supply sources 4 and second flow paths L2 and third flow paths L3 on the downstream side thereof.
  • a flow rate controller 10 and a first valve 21 installed downstream of the flow rate controller 10 are provided in each of the first flow paths L1.
  • Each first flow passage L1 and the flow rate controller 10 and the first valve 21 provided in each may be integrally provided in one flow rate control unit (gas box).
  • a second flow path L2 for supplying a gas at a flow rate controlled by the flow rate controller 10 to the process chamber 2 is connected.
  • the second flow path L2 is provided in common to the plurality of first flow paths L1, and the gas from any of the first flow paths L1 is supplied to the process chamber 2 through the second flow paths L2.
  • the vacuum pump 3 is connected to the process chamber 2 provided in the second flow path L2, and the gas from the gas supply source 4 is typically operated by the vacuum pump 3 to reduce the pressure in the flow path In the state, it is supplied to the process chamber 2 through the flow rate controller 10. Further, the shutoff valve 5 is provided in the second flow path L2, and the flow of the gas to the process chamber 2 can be shut off as needed.
  • a third flow passage L3 is provided so as to branch from the second flow passage L2. Similarly to the second flow path L2, the third flow path L3 is also provided commonly to the plurality of first flow paths L1.
  • An upstream shutoff valve 6 and a flow rate measuring device 30 are provided in the third flow path L 3, and the downstream side of the flow rate measuring device 30 is connected to the vacuum pump 31.
  • the shutoff valve 5 of the second flow passage L2 is closed, and the shutoff valve 6 of the third flow passage L3 is opened.
  • the flow rate measurement can be performed by circulating the gas through.
  • each flow rate controller 10 provided in the first flow path L1 may be a pressure type flow rate control device 10a as shown in FIG.
  • the pressure type flow control device 10a includes a throttle portion 11 having a fine opening (orifice), a control valve 14 (a valve 14a and its drive portion 14b) provided on the upstream side of the throttle portion 11, a throttle portion 11 and a control valve
  • a pressure sensor (upstream pressure sensor) 12 and a temperature sensor 13 which are provided between them and 14 are provided.
  • a critical nozzle or a sonic nozzle can also be used as the throttling portion 11.
  • the diameter of the orifice or nozzle is set to, for example, 10 ⁇ m to 500 ⁇ m.
  • the control valve 14 for example, a piezo element control type control valve in which a metal diaphragm valve (valve 14a) is driven by a piezo actuator (drive portion 14b) can be used.
  • the pressure sensor 12 and the temperature sensor 13 are connected to the control circuit 16 via an AD converter.
  • the control circuit 16 is also connected to the drive unit 14b of the control valve 14, generates a control signal based on the outputs of the pressure sensor 12 and the temperature sensor 13, and controls the operation of the control valve 14 by this control signal.
  • the control circuit 16 is provided in each pressure type flow control device 10a, but in another aspect, a common control circuit 16 is provided outside the plurality of pressure type flow control devices 10a. It may be The AD converter may be built in the control circuit 16.
  • the pressure type flow rate control device 10a has critical expansion condition P U / P D ⁇ about 2 (where P U : gas pressure on the upstream side of the throttling part (upstream pressure), P D : gas pressure on the downstream side of the throttling part (downstream pressure) ), and about 2 is satisfied in the case of nitrogen gas), the flow rate of gas passing through the throttle portion is fixed to the speed of sound, flow rate utilizes the principle that determined by the upstream pressure P U regardless of the downstream pressure P D Flow control is performed.
  • the flow rate is calculated from K 2 ⁇ P D m (P U -P D ) n , and the control valve 14 is feedback-controlled so that the flow rate approaches the input target flow rate.
  • the flow rate obtained by the calculation may be displayed as a flow rate output value.
  • the one used as the flow rate controller 10 is not limited to the pressure type flow rate control device 10a of such type, and, for example, a thermal type flow rate control device or other It may be a type of flow control device.
  • the flow rate measuring device 30 is provided in the third flow path L3.
  • the flow rate measuring device 30 is arranged in the third flow path L3 branched from the second flow path L2 leading to the process chamber 2, but in another aspect, it is arranged to intervene in the middle of the second flow path L2 It may be done.
  • the vacuum pump 31 provided on the downstream side of the flow rate measuring device 30 may be used as the vacuum pump 3 provided on the downstream side of the second flow path L2.
  • the flow rate measuring device 30 is provided in communication with the downstream side of the flow rate controller 10, it can be arranged in various manners.
  • the flow rate measuring device 30 of the present embodiment includes a second valve 22, a pressure sensor 23 and a temperature sensor 24.
  • the pressure sensor 23 and the temperature sensor 24 are provided near the upstream side of the second valve 22 and can measure the pressure and temperature of the flow passage between the first valve 21 and the second valve 22.
  • the flow rate measuring device 30 further includes an open / close detector 26 for detecting the actual opening / closing operation of the second valve 22.
  • an open / close detector 26 for detecting the actual opening / closing operation of the second valve 22.
  • various sensors such as a position sensor capable of detecting the movement of the valve body of the second valve 22 can be used.
  • a limit switch which detects up-and-down motion of a stem, etc. may be used as the opening and closing detector 26. it can.
  • the open / close detector 26 may be provided in various manners as long as it can immediately detect the actual open / close state of the second valve 22.
  • the fluid control system 1 includes a control unit 25, and the output signal from the pressure sensor 23 and the temperature sensor 24 of the flow rate measuring device 30 and the output signal from the open / close detector 26 are input to the control unit 25.
  • the control unit 25 may be provided integrally with the pressure sensor 23, the temperature sensor 24, and the second valve 22, or may be a processing device provided outside.
  • control unit 25 is connected to them so as to control the operation of the first valve 21 and the second valve 22.
  • the operation of the first valve 21 and the second valve 22 may be controlled by a control unit provided separately from the control unit 25.
  • the control unit 25 typically incorporates a part or all of a memory (storage device) M such as a CPU, a ROM, a RAM, etc., an A / D converter, etc., and executes the flow rate measurement operation described later. It may include a configured computer program, and may be realized by a combination of hardware and software.
  • the control unit 25 may include an interface for exchanging information with an external device such as a computer, whereby the external device can write programs and data to the ROM.
  • an on-off valve (cutoff valve) is used, and for example, a fluid drive valve such as AOV (Air Operated Valve) or an electrically operated valve such as a solenoid valve or a motorized valve is used.
  • the first valve 21 may be built in the flow rate controller 10.
  • valves are used for the first valve 21 and the second valve 22, and more specifically, a smaller valve is used as the first valve 21.
  • a larger valve for example, a 3/8 inch valve
  • the responsiveness of the second valve 22 is lower than the responsiveness of the first valve 21.
  • the design of the AOV also causes a difference in valve responsiveness.
  • the AOV includes, for example, a valve mechanism including a valve element interposed in a flow path, and a pneumatic line tube connected to the valve mechanism, and by feeding compressed air from the compressor to the pneumatic line tube via a regulator or the like. You can close the valve.
  • the driving pressure of the air supplied to the valve mechanism may cause a difference in the driving speed of the valve, which causes a difference in responsiveness between the first valve 21 and the second valve 22. It may occur.
  • the responsiveness also changes depending on the length of the pneumatic line tube, and the longer the tube, the lower the responsiveness.
  • the first valve 21 may actually close earlier than the second valve 22.
  • the second valve 22 having low responsiveness is used, the second valve 22 is actually closed after a delay command is issued. For this reason, if the time when the closing command is issued is regarded as the time when the second valve 22 is closed, a temporal error occurs, which may lower the accuracy of flow rate measurement.
  • the actual opening / closing of the second valve 22 is detected based on the signal output from the opening / closing detector 26, and the opening / closing time of the second valve 22 is specified more accurately. I am able to do it. As a result, as described below, when measuring the flow rate by, for example, a build-up method, it becomes possible to measure the flow rate with improved accuracy compared to the prior art.
  • a flow path (a portion shown by a thick line in FIG. 1) between the first valve 21 and the second valve 22 can be used as the buildup capacity 20 (volume: Vs).
  • Vs volume: Vs
  • the flow control characteristic of the flow control device 10 changes after being incorporated into the fluid control system 1, or the shape of the throttling portion changes due to long-term use, the relationship between the upstream pressure and the flow changes. There is.
  • the fluid control system 1 since the flow rate can be measured at any time by the buildup method using the flow rate measuring device 30, the accuracy of the flow rate controller 10 can be guaranteed over a long period of time Can.
  • FIGS. 3 and 4 show exemplary valve operation sequences (opening and closing timings of the first valve 21 and the second valve 22) at the time of flow rate measurement by the buildup method and the pressure P output from the pressure sensor 23 of the flow rate measuring device 30. It is a figure showing one mode.
  • FIG. 3 shows a comparative example in which the open / close detector 26 is not provided, and
  • FIG. 4 shows an embodiment in which the open / close detector 26 is used.
  • the flow measurement is started, for example, from the state where the first valve 21 and the second valve 22 are closed.
  • the shutoff valve 5 of the second flow passage L2 shown in FIG. 1 is closed, the shutoff valve 6 of the third flow passage is opened, and the gas from the first flow passage L1 flows into the third flow passage L3. It is made to flow selectively.
  • the set flow rate of the flow rate controller 10 is set to an arbitrary one (for example, 50% flow rate when the maximum flow rate is 100%)
  • the corresponding first valve 21 is opened.
  • the first valve 21 of the first flow passage L1 other than the flow measurement target is maintained in the closed state, and in the present embodiment, the flow measurement is performed for one first flow passage L1 at a time. It will be.
  • the present invention is not limited thereto.
  • the flow rate measurement is started from the state where the first valve 21 and the second valve 22 are open (after time t1). There is also.
  • the first valve 21 and the second valve 22 are simultaneously closed from the state in which the gas is flowing in the third flow passage L3 at the set flow rate.
  • this measures the amount or pressure of gas in a state (gas sealed state) where no gas flow occurs, and a build-up method To correct the measured flow rate determined by By performing such correction, it is possible to reduce the line dependency of the measurement error, to more accurately determine the actual gas flow rate flowing in at the time of build-up, and to perform more accurate flow rate measurement.
  • a closing instruction is issued to the first valve 21 and the second valve 22 simultaneously.
  • the second valve 22 is closed later and is closed at time t2 'delayed by a from time t2.
  • the first valve 21 and the second valve 22 are opened as shown in FIGS. 3 and 4. Then, the gas is allowed to flow in the third flow path L3 and the flow rate measuring device 30 again at the set flow rate.
  • a close command is issued only to the second valve 22.
  • the gas accumulates in the buildup volume and the internal pressure P rises.
  • the pressure P measured by the pressure sensor 23, when it reaches a predetermined pressure P A determines that the build-up has been completed, the first valve 21 is also closed and sealed condition after gas inlet.
  • Predetermined pressure P A the volume and the build-up capacity, can be based on such a set flow rate, in advance arbitrarily set. Further, the timing at which the first valve 21 is closed (build-up completion timing) may be when a predetermined time set in advance has elapsed since the second valve 22 was closed.
  • the pressure and temperature (P A , T A ) after rising are measured using the pressure sensor 23 and the temperature sensor 24.
  • the pressure P A and the temperature T A, in sealed condition after the build-up it may be desirable to measure in a state where inflow of gas subsided. This is because immediately after the first valve 21 is closed, the temperature may temporarily rise due to the influence of adiabatic compression. Therefore, it is also possible to measure the pressure P A and the temperature T A post-build-up in the gas stable state after a predetermined time by closing the first valve 21.
  • the pressure sensor 23 is used to measure the pressure increase in the flow passage after the second valve 22 is closed. Further, in order to obtain the amount of gas inflow (that is, the flow rate) per unit time, the buildup time (pressure rise time) ⁇ t is obtained, and the flow rate is calculated based on this.
  • P A and T A are pressures at time t5 at which the first valve 21 is closed and gas inflow is stopped after buildup (or time when a predetermined time has elapsed while maintaining the sealed state after time t5) and It is a temperature
  • P B and T B are the pressure and temperature in the sealing state after closing the 1st valve 21 and the 2nd valve 22 simultaneously at time t2.
  • R is a gas constant
  • Vs is a volume of buildup capacity.
  • the gas flow rate Q (sccm) can be determined from R ⁇ ⁇ t).
  • ⁇ t is a time (build up time) from closing the second valve 22 to start buildup to closing the first valve 21 to stop the flow of gas.
  • the buildup time ⁇ t is set to, for example, 2 to 20 seconds.
  • the buildup time is from the time t4 at which the second valve 22 is instructed to close.
  • the pressure P is measured by time to time t5 'which first valve 21 reaches the P a is closed.
  • the volume Vs of the buildup volume 20 can be measured by various conventional methods.
  • the second valve 22 is closed using the open / close detector 26 even when the ⁇ P / ⁇ t is determined in order to measure the volume Vs of the buildup capacity 20. Since the time point can be detected and the starting point of the pressure rise can be determined based on this, it is possible to more accurately measure ⁇ t and obtain the volume Vs of the buildup capacity with more improved accuracy. When the volume Vs of the buildup capacity is determined, the volume Vs can be determined more accurately by performing measurement at a specific flow rate setting in which an error from the reference value is reduced.
  • the order of performing the first step and the second step may be reversed.
  • the pressure (starting pressure Px) corresponding to the set flow rate at the start be the same in the first step and the second step.
  • the flow rate can be determined by calculation.
  • the flow rate measured in this manner may be used for comparison and verification with the flow rate setting of the flow rate controller 10, and the flow rate setting of any flow rate controller 10 may be made based on the flow rate obtained by the buildup method described above. Calibration can also be performed.
  • the pressure and temperature were measured when the first valve 21 and the second valve 22 were simultaneously or substantially simultaneously closed from the state of flowing gas to make a sealed state
  • the pressure and temperature after rising may be measured after the first valve 21 is closed after the predetermined time ⁇ t 'has elapsed since the second valve 22 was closed.
  • the predetermined time ⁇ t ′ in the second step is set to a shorter time than the buildup time ⁇ t in the first step, and is set to, for example, half or less.
  • flow rate measurement can be performed with improved accuracy.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Fluid Mechanics (AREA)
  • Measuring Volume Flow (AREA)
  • Flow Control (AREA)

Abstract

流体制御システム(1)は、流量制御器(10)の下流側に設けられた第1バルブ(21)と、第1バルブ(21)の下流側に設けられ第2バルブ(22)を有する流量測定装置(30)と、第2バルブ(22)に設けられた開閉検出器(26)と、第1バルブ(21)および第2バルブ(22)の開閉動作を制御する制御部(25)とを備えており、制御部(25)が、開閉検出器(26)が出力する信号に応じて第1バルブ(21)の開閉を制御する。

Description

流体制御システムおよび流量測定方法
 本発明は、流体制御システムおよび流量測定方法に関し、特に、流量制御器の下流側に接続された流量測定装置を備える流体制御システムおよびこれを用いた流量測定方法に関する。
 半導体製造装置等に設けられたガス供給システムは、一般的に、各供給ガス種毎に設けた流量制御器を介して、多種類のガスをプロセスチャンバ等のガス使用対象に切換えて供給するように構成されている。
 流量制御器の運用において、随時、流量精度の確認や流量校正を行うことが望まれており、流量測定方法として、ビルドアップ法が流量精度の確認や流量校正に用いられることがある。ビルドアップ法は、既知のビルドアップ容量に流れ込む単位時間あたりの流体の量を検出することによって流量を測定する方法である。
 ビルドアップ法では、流量制御器の下流に設けられた所定のビルドアップ容量(V)に下流側の弁を閉じた状態でガスを流し、そのときの圧力上昇率(ΔP/Δt)と温度(T)とを測定することにより、例えば、Q=22.4(ΔP/Δt)×V/RT(Rは気体定数)から流量Qを演算により求めることができる。
 特許文献1には、ビルドアップ法による流量測定の一例が開示されている。特許文献1に記載のガス供給装置では、複数のガス供給ラインが設けられており、各ガス供給ラインに接続された流量制御器の下流側の開閉弁から共通ガス供給路に設けられた開閉弁までの流路がビルドアップ容量として用いられている。また、特許文献2には、ビルドダウン法による流量測定の一例が開示されている。
特開2006-337346号公報 国際公開第2013/179550号
 しかしながら、特に上記のようにガス流路をビルドアップ容量として用いるときなどにおいて、基準容積が比較的小さく圧力上昇の測定時間が比較的短いことによって、流量測定の測定精度が低下する場合があった。
 本発明は、上記課題を鑑みてなされたものであり、流量測定をより向上した精度で行うことができる流体制御システムを提供することをその主たる目的とする。
 本発明の実施形態による流体制御システムは、流量制御器の下流側に設けられた第1バルブと、前記第1バルブの下流側に設けられ、第2バルブを有する流量測定装置と、前記第2バルブに設けられた開閉検出器と、前記第1バルブおよび前記第2バルブの開閉動作を制御する制御部とを備え、前記開閉検出器が出力する信号に応じて前記第1バルブの開閉を制御する。
 ある実施形態において、前記制御部は、前記開閉検出器が出力する信号に基づいて検知された前記第2バルブの開閉に基づいて、前記第1バルブへ出力する開閉命令のタイミングを制御する。
 ある実施形態において、前記流量測定装置は前記第2バルブの上流側に配置された圧力センサをさらに有し、前記第2バルブを閉じた後の流路内の圧力上昇を前記圧力センサを用いて測定するように構成されており、前記圧力上昇の起点を、前記開閉検出器が出力する信号に基づいて決定する。
 ある実施形態において、前記流体制御システムは、それぞれが前記流量制御器および前記第1バルブを有する複数の第1流路と、前記複数の第1流路の下流側に共通に接続され、前記流量制御器によって流量が制御された流体を使用対象に供給するための第2流路と、前記第2流路から分岐するように設けられ前記流量測定装置を有する第3流路とを含む。
 ある実施形態において、前記流量制御器は、コントロール弁と、絞り部と、前記絞り部の上流側の圧力を測定する上流圧力センサとを備える圧力式流量制御装置である。
 本発明の実施形態による流量測定方法は、流量制御器の下流側に設けられた第1バルブと、前記第1バルブの下流側に設けられ、圧力センサ、温度センサおよび第2バルブを有する流量測定装置と、前記第2バルブに設けられた開閉検出器と、前記第1バルブおよび前記第2バルブの開閉動作を制御する制御部とを備える流体制御システムにおいて行われる流量測定方法であって、前記第1バルブと前記第2バルブとを開いてガスを流し、ガスが流れている状態で前記第2バルブを閉じ、前記第2バルブを閉じた後、ビルドアップ時間が経過した後に前記第1バルブを閉じ、前記第1バルブを閉じた後の圧力および温度を前記圧力センサおよび前記温度センサを用いて測定する第1工程と、前記第1バルブと前記第2バルブとを開いてガスを流し、ガスが流れている状態で前記第1バルブと前記第2バルブとを同時に閉じ、前記第1バルブおよび前記第2バルブを閉じた後の圧力および温度を前記圧力センサおよび前記温度センサを用いて測定する第2工程と、前記第1工程で測定した圧力および温度と、前記第2工程で測定した圧力および温度とに基づいて流量を演算する第3工程とを包含し、前記第1工程において、前記第2バルブが閉じた時点を、前記開閉検出器からの出力に基づいて判断し、前記第2工程において前記第1バルブと前記第2バルブとを同時に閉じる動作を行うとき、前記開閉検出器が出力する信号に応じて、前記第1バルブへ出力する開閉命令のタイミングを制御する。
 ある実施形態において、前記第3工程は、前記第1工程で測定した圧力PAおよび温度TAと、前記第2工程で測定した圧力PBおよび温度TBとを用いて、Q=22.4・Vs・(PA/TA-PB/TB)/(R・Δt)(ここで、Vsはビルドアップ容量、Rは気体定数、Δtは前記第1工程において前記第2バルブを閉じてから前記第1バルブを閉じるまでの前記ビルドアップ時間)に従って流量Qを演算する工程を含む。
 本発明の実施形態によれば、流量測定を適切に行うことができる。
本発明の実施形態による流体制御システムを示す模式図である。 本発明の実施形態において用いられる圧力式流量制御装置の例示的な構成を示す図である。 比較形態における流量測定のバルブ動作シーケンス等を示す図である。 実施形態における流量測定のバルブ動作シーケンス等を示す図である。
 以下、図面を参照しながら本発明の実施形態を説明するが、本発明は以下の実施形態に限定されるものではない。
 図1は、本発明の実施形態に係る流体制御システム1を示す。流体制御システム1は、ガス供給源4からのガスを半導体製造装置のプロセスチャンバ2などのガス使用対象に制御した流量で供給できるように構成されている。
 流体制御システム1は、それぞれ別のガス供給源4に接続された複数の第1流路L1と、その下流側の第2流路L2および第3流路L3とを有している。第1流路L1のそれぞれには、流量制御器10と、流量制御器10の下流側に設置された第1バルブ21とが設けられている。各第1流路L1およびそれぞれに設けられた流量制御器10および第1バルブ21は、一体として1つの流量制御ユニット(ガスボックス)内に設けられていてもよい。
 第1流路L1の下流側には、流量制御器10によって制御された流量のガスをプロセスチャンバ2に供給するための第2流路L2が接続されている。第2流路L2は、複数の第1流路L1に対して共通に設けられており、いずれの第1流路L1からのガスも第2流路L2を通してプロセスチャンバ2に供給される。
 第2流路L2に設けられたプロセスチャンバ2には真空ポンプ3が接続されており、ガス供給源4からのガスは、典型的には、真空ポンプ3を動作させて流路が減圧された状態で、流量制御器10を介してプロセスチャンバ2へと供給される。また、第2流路L2には、遮断弁5が設けられており、必要に応じてプロセスチャンバ2へのガスの流れを遮断することができる。
 また、第1流路L1の下流側において、第2流路L2から分岐するようにして第3流路L3が設けられている。第3流路L3も第2流路L2と同様に、複数の第1流路L1に対して共通に設けられている。
 第3流路L3には、上流側の遮断弁6と流量測定装置30とが設けられており、流量測定装置30の下流側は真空ポンプ31に接続されている。本実施形態の流体制御システム1では、第2流路L2の遮断弁5を閉じるとともに第3流路L3の遮断弁6を開いた状態で、第3流路L3の流量測定装置30に選択的にガスを流通させることによって流量測定を行うことができる。
 本実施形態の流体制御システム1において、第1流路L1に設けられた各流量制御器10は、図2に示すような圧力式流量制御装置10aであってよい。圧力式流量制御装置10aは、微細開口(オリフィス)を有する絞り部11と、絞り部11の上流側に設けられたコントロール弁14(バルブ14aおよびその駆動部14b)と、絞り部11とコントロール弁14との間に設けられた圧力センサ(上流圧力センサ)12および温度センサ13とを備えている。絞り部11としては、オリフィスプレートなどのオリフィス部材の他に、臨界ノズルまたは音速ノズルを用いることもできる。オリフィスまたはノズルの口径は、例えば10μm~500μmに設定される。また、コントロール弁14としては、例えば、金属製ダイヤフラムバルブ(バルブ14a)をピエゾアクチュエータ(駆動部14b)によって駆動するピエゾ素子駆動型コントロール弁を用いることができる。
 圧力センサ12および温度センサ13は、ADコンバータを介して制御回路16に接続されている。制御回路16は、コントロール弁14の駆動部14bにも接続されており、圧力センサ12および温度センサ13の出力などに基づいて制御信号を生成し、この制御信号によってコントロール弁14の動作を制御する。本実施形態では、制御回路16は、各圧力式流量制御装置10aに設けられているが、他の態様において、複数の圧力式流量制御装置10aに対して共通の制御回路16が外部に設けられていてもよい。なお、ADコンバータは、制御回路16に内蔵されたものであってもよい。
 圧力式流量制御装置10aは、臨界膨張条件PU/PD≧約2(ただし、PU:絞り部上流側のガス圧力(上流圧力)、PD:絞り部下流側のガス圧力(下流圧力)であり、約2は窒素ガスの場合)を満たすとき、絞り部を通過するガスの流速は音速に固定され、流量は下流圧力PDによらず上流圧力PUによって決まるという原理を利用して流量制御が行われる。臨界膨張条件を満たすとき、絞り部下流側の流量Qは、Q=K1・PU(K1は流体の種類と流体温度に依存する定数)によって与えられ、流量Qは、上流圧力センサ12によって測定される上流圧力PUに比例する。また、他の態様において、絞り部11の下流側に下流圧力センサ(図示せず)を備える場合、上流圧力PUと下流圧力PDとの差が小さく、臨界膨張条件を満足しない場合であっても流量を算出することができ、各圧力センサによって測定された上流圧力PUおよび下流圧力PDに基づいて、所定の計算式Q=K2・PD m(PU-PDn(ここでK2は流体の種類と流体温度に依存する定数、m、nは実際の流量を元に導出される指数)から流量Qを算出することができる。
 流量制御を行うために、設定流量が制御回路16に入力され、制御回路16は、圧力センサ12の出力(上流圧力PU)などに基づいて、上記のQ=K1・PUまたはQ=K2・PD m(PU-PDnから流量を演算により求め、この流量が入力された目標流量に近づくようにコントロール弁14をフィードバック制御する。演算により求められた流量は、流量出力値として表示されてもよい。
 ただし、本実施形態の流体制御システム1において、流量制御器10として用いられるものはこのようなタイプの圧力式流量制御装置10aに限られるものではなく、例えば、熱式流量制御装置や、その他のタイプの流量制御装置であってもよい。
 再び図1を参照する。上述したように、第3流路L3には、流量測定装置30が設けられている。流量測定装置30は、プロセスチャンバ2へと通じる第2流路L2から分岐した第3流路L3に配置されているが、他の態様において、第2流路L2の途中に介在するように配置されていてもよい。また、流量測定装置30の下流側に設けられた真空ポンプ31は、第2流路L2の下流側に設けられた真空ポンプ3が兼用していてもよい。流量測定装置30は、流量制御器10の下流側に連通するように設けられている限り、種々の態様で配置され得る。
 図1に示すように、本実施形態の流量測定装置30は、第2バルブ22と、圧力センサ23および温度センサ24とを備えている。圧力センサ23および温度センサ24は、第2バルブ22の上流側近傍に設けられており、第1バルブ21と第2バルブ22との間の流路の圧力および温度を測定することができる。
 流量測定装置30は、さらに、第2バルブ22の実際の開閉動作を検出するための開閉検出器26を有している。開閉検出器26としては、第2バルブ22の弁体の移動を検出することができる位置センサなどの各種センサを用いることができる。また、第2バルブ22として後述するAOVを用いる場合、弁体と連動して動くピストンの位置を測定する変位計や、ステムの上下動を検知するリミットスイッチなどを開閉検出器26として用いることができる。開閉検出器26は、第2バルブ22の実際の開閉状態を即座に検知できるもので限り、種々の態様で設けられていてよい。
 また、流体制御システム1は制御部25を備え、流量測定装置30の圧力センサ23および温度センサ24からの出力信号および開閉検出器26からの出力信号が、制御部25に入力される。制御部25は、圧力センサ23、温度センサ24、第2バルブ22とともに一体的に設けられていてもよいし、外部に設けられた処理装置であってもよい。
 本実施形態では、制御部25は、第1バルブ21および第2バルブ22の動作を制御できるようにこれらに接続されている。ただし、他の態様において、第1バルブ21および第2バルブ22の動作は、制御部25とは別に設けられた制御部で制御されてもよい。
 制御部25は、典型的には、CPU、ROMやRAMなどのメモリ(記憶装置)M、A/Dコンバータ等の一部または全部を内蔵しており、後述する流量測定動作を実行するように構成されたコンピュータプログラムを含んでいてよく、ハードウェアおよびソフトウェアの組み合わせによって実現され得る。制御部25は、コンピュータ等の外部装置と情報を交換するためのインターフェイスを備えていてもよく、これにより、外部装置からROMへのプログラム及びデータの書込みなどを行うことができる。
 第1バルブ21、第2バルブ22としては、開閉弁(遮断弁)が用いられ、例えばAOV(Air Operated Valve)などの流体駆動弁や、電磁弁、電動弁などの電気的動作弁が用いられる。他の態様において、第1バルブ21は、流量制御器10に内蔵されたものであってもよい。
 ただし、本実施形態においては、第1バルブ21と第2バルブ22とで異なるタイプのものが用いられており、より具体的には、第1バルブ21として、より小型のバルブが用いられ、第2バルブ22として、より大型のバルブ(例えば、3/8インチバルブ)が用いられている。その結果、第2バルブ22の応答性は、第1バルブ21の応答性よりも低くなっている。
 また、第1バルブ21および第2バルブ22としてAOVが用いられている場合、AOVの設計によっても弁の応答性に差が生じる。AOVは、例えば、流路に介在する弁体を含む弁機構と、弁機構に接続された圧空ラインチューブとを備えており、圧空ラインチューブにコンプレッサからレギュレータなどを介して圧縮空気を送り込むことによって弁を閉じることができる。
 AOVを用いる場合、弁機構に供給する空気の供給圧(動作圧)によって弁の駆動速度に差が生じることがあり、これによって、第1バルブ21と第2バルブ22とで応答性に差が生じる場合がある。また、AOVでは、圧空ラインチューブの長さによっても応答性が変化し、チューブが長いほど応答性が低下する。
 このため、例えば、第1バルブ21と第2バルブ22とに同時に閉命令を出したとしても、実際には、第1バルブ21が、第2バルブ22よりも早く閉じることがある。また、応答性が低い第2バルブ22を用いているときには、閉命令が出されたときから遅延して第2バルブ22が実際に閉じられる。このため、閉命令が出されたときを第2バルブ22が閉じた時刻と見なすと時間的な誤差が生じ、このことが原因で流量測定精度が低下するおそれがある。
 そこで、本実施形態の流体制御システム1では、開閉検出器26が出力する信号に基づいて、第2バルブ22の実際の開閉を検知するようにし、より正確に第2バルブ22の開閉時を特定できるようにしている。これにより、以下に説明するように、例えばビルドアップ法によって流量測定を行うときに、従来よりも向上した精度で流量測定を行うことが可能になる。
 以下、本実施形態におけるビルドアップ法による流量測定方法を具体的に説明する。
 本流量測定方法においては、第1バルブ21と第2バルブ22との間の流路(図1において太線で示す部分)をビルドアップ容量20(体積:Vs)として用いることができる。このように、別途にビルドアップタンクを設けることなく流路の一部をビルドアップ容量として用いることで、流量測定装置30の小型化・低コスト化を実現できるとともに、短時間で流量測定を行うことができるという利点が得られる。
 なお、流量制御器10は、流体制御システム1に組み込んだ後に流量制御特性が変化したり、また、長年の使用によって絞り部の形状が変化して上流圧力と流量との関係性が変化する場合がある。これに対して、流体制御システム1によれば、流量測定装置30を用いてビルドアップ法により任意の時点で向上した精度で流量を測定できるので、流量制御器10の精度を長期にわたって保証することができる。
 図3および図4は、ビルドアップ法による流量測定時のバルブ動作シーケンス(第1バルブ21および第2バルブ22の開閉タイミング)および流量測定装置30の圧力センサ23が出力する圧力Pの例示的な一態様を示す図である。図3は、開閉検出器26を有しない場合の比較形態を示し、図4は、開閉検出器26を用いる場合の実施形態を示している。
 図3の比較形態および図4の実施形態に示すように、流量測定は、例えば、第1バルブ21および第2バルブ22が閉じた状態から開始される。このとき、図1に示した第2流路L2の遮断弁5は閉じられ、第3流路の遮断弁6は開けられており、第1流路L1からのガスが第3流路L3に選択的に流れる状態にされている。
 次に、流量測定を行う対象の第1流路L1において、流量制御器10の設定流量を任意のもの(例えば、最大流量を100%としたときの50%流量など)に設定するとともに、時刻t1において、対応する第1バルブ21を開く。なお、流量測定を行う対象以外の第1流路L1の第1バルブ21は閉じられた状態のまま維持されており、本実施形態では、一度に1つの第1流路L1について流量測定が行われる。
 また、時刻t1では、第2バルブ22にも開命令が出され、これによって第2流路L2にガスが設定流量で流れる。このとき、圧力センサ23の測定圧力Pは、設定流量に応じた大きさの圧力Pxとなる。
 ただし、このとき、図3および図4に示すように、第2バルブ22の応答性が低いため、実際には、第1バルブ21および第2バルブ22に対して時刻t1に開命令が出されたとしても、この時刻t1からわずかに遅れて第2バルブ22が開くことになる。なお、本比較形態および本実施形態では、第1バルブ21として、開閉命令からほとんど遅延なく開閉できるバルブが用いられている。
 なお、上記には、流量測定の開始時に第1バルブ21および第2バルブ22が閉じている例を説明したが、これに限られない。流量制御されたガスを流している状態から流量測定を行う場合など、他の態様においては、第1バルブ21および第2バルブ22が開いた状態(時刻t1の後)から流量測定を開始することもある。
 次に、時刻t2において、設定流量で第3流路L3にガスが流れている状態から、第1バルブ21と第2バルブ22とが同時に閉じられる。これは、本願出願人によって出願されたPCT/JP2018/4325に開示されているように、ガスの流れが生じていない状態(ガス封止状態)でガス量またはガス圧を測定し、ビルドアップ法で求める測定流量を補正するためである。このような補正を行うことによって、測定誤差のライン依存性を低減し、ビルドアップ時に流れ込んだ実際のガス流量をより正確に求めることができ、より正確な流量測定を行うことが可能になる。
 上記のガス封止状態を得るために、典型的には、第1バルブ21と第2バルブ22とに対して同時に閉命令が出される。しかし、実際には第2バルブ22が遅れて閉じ、時刻t2からαだけ遅れた時刻t2’に閉じることになる。
 このため、図3に示す比較形態においては、第1バルブ21と第2バルブ22とが同時に閉じたときの理想圧力推移X1(破線で示すグラフ)から、実際の圧力推移X2(実線で示すグラフ)がずれ、圧力センサ23によって測定される封止時圧力PBはより低い値となる。これは、第2バルブ22の閉動作が遅れることによって第1バルブ21閉止後にもガスの流出が生じ、その後のガス封止状態での圧力PBが低下するからである。なお、ガス封止状態で温度センサ24によって測定される温度TBも、第2バルブ22の動作遅延によって理想的な測定温度からずれる可能性がある。
 一方、図4に示す実施形態においては、時刻t2に閉命令が出されたとき、第2バルブ22が実際に閉じたことを開閉検出器26(図1参照)の出力信号に基づいて検知し、検知した閉状態に基づいて、第1バルブ21への閉命令のタイミングを調整する。より具体的には、本実施形態では、第1バルブ21の応答性が高いので、開閉検出器26が第2バルブ22の閉状態を検知したときに、第1バルブ21への閉命令を出力するようにしている。このようにすれば、第2バルブ22の応答性が低い場合にも、第1バルブ21と第2バルブ22との閉じるタイミングを同期させて双方を略同時に閉じることが可能になる。したがって、図4に実線で示す実際の圧力推移X2が理想圧力推移と同じになり、封止時圧力PBを良好な精度で測定することができる。
 なお、上記には、開閉検出器26が第2バルブ22の閉状態を検知したときに、第1バルブ21への閉命令を出力する態様を説明したがこれに限られない。例えば開閉検出器26が第2バルブ22の開閉度を連続的に検出できるときには、第2バルブ22が閉じる直前の状態を検出したときに、第1バルブ21へ閉命令を出力するようにしてもよい。これにより、第1バルブ21が閉命令からわずかに遅れて閉じるような場合であっても、第1バルブ21と第2バルブ22とが閉じるタイミングを同期させることが可能になる。第1バルブ21へ閉命令を出すタイミングは、第1バルブ21および第2バルブ22の応答性を考慮して任意に調整され得る。
 以上のようにして、設定流量での封止状態における圧力および温度(PB,TB)を測定したあと、図3および図4に示すように、第1バルブ21および第2バルブ22を開いて、再び設定流量で第3流路L3および流量測定装置30にガスを流す定常流状態とする。
 その後、時刻t4において、第1バルブ21の開状態を維持したまま第2バルブ22のみに閉命令を出す。これにより、ビルドアップ容量内にガスが溜まり、内部の圧力Pが上昇する。そして、圧力センサ23によって測定した圧力Pが、所定の圧力PAに達したときに、ビルドアップが完了したと判断し、第1バルブ21も閉じてガス流入後の封止状態とする。所定の圧力PAは、ビルドアップ容量の容積や、設定流量などに基づいて、予め任意に設定しておくことができる。また、第1バルブ21を閉じるタイミング(ビルドアップ終了タイミング)は、第2バルブ22を閉じてから予め設定された所定時間が経過したときであってもよい。
 第1バルブ21を閉じて封止状態とした後、上昇後の圧力および温度(PA,TA)を、圧力センサ23および温度センサ24を用いて測定する。なお、圧力PAおよび温度TAは、ビルドアップ後の封止状態において、ガスの流入が収まった状態で測定することが望ましいことがある。これは、第1バルブ21を閉じた直後では、断熱圧縮の影響により温度が一時的に上昇している可能性があるからである。したがって、第1バルブ21を閉じて所定時間経過後のガス安定状態においてビルドアップ後の圧力PAおよび温度TAを測定するようにしてもよい。
 ビルドアップ法では、圧力センサ23を用いて、第2バルブ22を閉じた後の流路の圧力上昇を測定するように構成されている。また、単位時間当たりのガス流入量(すなわち、流量)を求めるためにビルドアップ時間(圧力上昇時間)Δtを求めて、これに基づいて流量を算出するようにしている。
 より具体的に説明すると、本実施形態の流量測定方法では、ビルドアップ後のガスのモル数nAを、nA=PAVs/RTAから求めるとともに、上記の封止状態でのガスのモル数nBをnB=PBVs/RTBから求め、実際に流入したと考えられるガスのモル数Δn=nA-nB=(PAVs/RTA)-(PBVs/RTB)=Vs/R・(PA/TA-PB/TB)を求める。ここで、PA、TAは、ビルドアップ後に第1バルブ21を閉じてガス流入を停止させた時刻t5(または時刻t5後の封止状態を維持しつつ所定時間経過した時刻)における圧力および温度であり、PB、TBは、時刻t2において第1バルブ21および第2バルブ22を同時に閉じた後の封止状態における圧力および温度である。また、Rは気体定数であり、Vsはビルドアップ容量の体積である。
 そして、流量Qは、単位時間あたりに流入したガスの体積であるので、Q=22.4・Δn/Δt=22.4・Vs・(PA/TA-PB/TB)/(R・Δt)からガス流量Q(sccm)を求めることができる。ここで、Δtは、第2バルブ22を閉じてビルドアップを開始してから、第1バルブ21を閉じてガスの流入を停止させるまでの時間(ビルドアップ時間)である。ビルドアップ時間Δtは、例えば2~20秒に設定される。
 ここで、図3に示す比較形態では、第2バルブ22が実際に閉じた時刻t4’を測定していないので、ビルドアップ時間は、第2バルブ22に閉命令が出された時刻t4から、圧力PがPAに達して第1バルブ21が閉じられる時刻t5’までの時間で計測される。このため、理想圧力推移X1からずれて実際の圧力推移X2が生じているにも関わらす、ビルドアップ時間としては本来のビルドアップ時間Δt(=t5-t4)に遅延分αが加算されたΔt+α(=t5’-t4)が用いられることになる。このために、流量測定精度が低下し得る。
 一方、図4に示す実施形態では、開閉検出器26を用いて第2バルブ22が実際に閉じた時刻t4’を検知することができる。このため、ビルドアップ時間として、より正確なビルドアップ時間Δt=t5’-t4’を検出することができる。従って、流量測定の精度を向上させることができる。
 このようにして、ビルドアップ法による流量測定が完了した後は、時刻t6において第1バルブ21および第2バルブ22を開状態にすると、再びガスが流れ出すとともに、封止空間内のガス圧力は、ガス定常流時の圧力まで低下する。
 以上に説明したように、本実施形態では、開閉検出器26を用いて、定常流からの封止状態における圧力PBと、ビルドアップ時間Δtとをより精度よく検出することが可能になるので、測定精度を向上させることができる。
 なお、図1に示す流体制御システム1のように、流量制御器10の下流側の流路をビルドアップ容量20として用いる場合、流量制御器10を接続して流体制御システム1を構築した後に、ビルドアップ容量20の体積Vsを測定により求めることが好ましい場合がある。ビルドアップ容量20の体積Vsは、例えば、設定流量Qsでビルドアップ容量20にガスを流した状態において第2バルブ22を閉じた後の圧力変化率を測定することによって、Qs=(ΔP/Δt)×(Vs/RT)に基づいて求めることができる。ビルドアップ容量20の体積Vsは、従来の種々の方法によって測定することが可能である。このようにして、ビルドアップ容量20の体積Vsを測定するために、ΔP/Δtを求めるときにも、本実施形態の流体制御システム1では、開閉検出器26を用いて第2バルブ22が閉じた時点を検知し、これに基づいて圧力上昇の起点を決めることができるので、Δtをより正確に計測して、より向上した精度で、ビルドアップ容量の体積Vsを求めることが可能である。なお、ビルドアップ容量の体積Vsを求めるときには、基準値との誤差が低減された特定の流量設定で測定を行うことによって、より精度よく体積Vsを求めることも可能である。
 以上には、第1バルブ21と第2バルブ22とを時刻t2に同時に閉じた後の圧力PBおよび温度TBを測定する工程(第2工程)の後に、ビルドアップ後のガスの圧力PAおよび温度TAを測定する工程(第1工程)の行う態様を説明したが、第1工程と第2工程とを行う順番は逆であってもよい。ただし、第1工程と第2工程とで、開始時の設定流量に対応する圧力(開始時圧力Px)は、同じであることが好適である。
 第1工程と第2工程とを行った後であれば、第1工程で得られた測定圧力PAおよび温度TAと、第2工程で得られた測定圧力PBおよび温度TBとを用いて、流量が演算により求めることができる。このようにして測定した流量は、流量制御器10の流量設定との比較検証に用いられてもよく、上記のビルドアップ法によって求めた流量に基づいて、任意の流量制御器10の流量設定の校正を行うこともできる。
 以上、本発明の実施形態について説明したが、種々の改変が可能である。例えば、上記には、第2工程として、ガスが流れている状態から第1バルブ21と第2バルブ22とを同時または略同時に閉じて封止状態としたときの圧力および温度を測定したが、第2バルブ22を閉じてから所定時間Δt’が経過した後に第1バルブ21を閉じた後に、上昇後圧力および温度を測定するようにしてもよい。
 ただし、第2工程における上記の所定時間Δt’は、第1工程におけるビルドアップ時間Δtに比べて短い時間に設定され、例えば、半分以下の時間に設定される。流量演算は、第1工程で求めたガス量nから、第2工程で求めたガス量n’を減算してΔn=n-n’を求めるとともに、流入時間をΔt-Δt’として流量を演算により求めることができる。このときにも、開閉検出器26を用いて検知した実際の第2バルブ22の閉じた時刻に基づいて圧力上昇時間等を決定することにより、より向上した精度で流量測定を行い得る。
 本発明の実施形態による流体制御システムによれば、流量測定を向上した精度で行うことができる。
 1 流体制御システム
 2 プロセスチャンバ
 3 真空ポンプ
 4 ガス供給源
 10 流量制御器
 11 絞り部
 12 圧力センサ
 13 温度センサ
 14 コントロール弁
 16 制御回路
 20 ビルドアップ容量
 21 第1バルブ
 22 第2バルブ
 23 圧力センサ
 24 温度センサ
 25 制御部
 26 開閉検出器
 30 流量測定装置

Claims (7)

  1.  流量制御器の下流側に設けられた第1バルブと、
     前記第1バルブの下流側に設けられ、第2バルブを有する流量測定装置と、
     前記第2バルブに設けられた開閉検出器と、
     前記第1バルブおよび前記第2バルブの開閉動作を制御する制御部と
    を備え、
     前記開閉検出器が出力する信号に応じて前記第1バルブの開閉を制御する、流体制御システム。
  2.  前記制御部は、前記開閉検出器が出力する信号に基づいて検知された前記第2バルブの開閉に基づいて、前記第1バルブへ出力する開閉命令のタイミングを制御する、請求項1に記載の流体制御システム。
  3.  前記流量測定装置は前記第2バルブの上流側に配置された圧力センサをさらに有し、前記第2バルブを閉じた後の流路内の圧力上昇を前記圧力センサを用いて測定するように構成されており、前記圧力上昇の起点を、前記開閉検出器が出力する信号に基づいて決定する、請求項1または2に記載の流体制御システム。
  4.  それぞれが前記流量制御器および前記第1バルブを有する複数の第1流路と、
     前記複数の第1流路の下流側に共通に接続され、前記流量制御器によって流量が制御された流体を使用対象に供給するための第2流路と、
     前記第2流路から分岐するように設けられ前記流量測定装置を有する第3流路と
     を含む、請求項1から3のいずれかに記載の流体制御システム。
  5.  前記流量制御器は、コントロール弁と、絞り部と、前記絞り部の上流側の圧力を測定する上流圧力センサとを備える圧力式流量制御装置である、請求項1から4のいずれかに記載の流体制御システム。
  6.  流量制御器の下流側に設けられた第1バルブと、前記第1バルブの下流側に設けられ、圧力センサ、温度センサおよび第2バルブを有する流量測定装置と、前記第2バルブに設けられた開閉検出器と、前記第1バルブおよび前記第2バルブの開閉動作を制御する制御部とを備える流体制御システムにおいて行われる流量測定方法であって、
     前記第1バルブと前記第2バルブとを開いてガスを流し、ガスが流れている状態で前記第2バルブを閉じ、前記第2バルブを閉じた後、ビルドアップ時間が経過した後に前記第1バルブを閉じ、前記第1バルブを閉じた後の圧力および温度を前記圧力センサおよび前記温度センサを用いて測定する第1工程と、
     前記第1バルブと前記第2バルブとを開いてガスを流し、ガスが流れている状態で前記第1バルブと前記第2バルブとを同時に閉じ、前記第1バルブおよび前記第2バルブを閉じた後の圧力および温度を前記圧力センサおよび前記温度センサを用いて測定する第2工程と、
     前記第1工程で測定した圧力および温度と、前記第2工程で測定した圧力および温度とに基づいて流量を演算する第3工程とを包含し、
     前記第1工程において、前記第2バルブが閉じた時点を、前記開閉検出器からの出力に基づいて判断し、
     前記第2工程において前記第1バルブと前記第2バルブとを同時に閉じる動作を行うとき、前記開閉検出器が出力する信号に応じて、前記第1バルブへ出力する開閉命令のタイミングを制御する、流量測定方法。
  7.  前記第3工程は、前記第1工程で測定した圧力PAおよび温度TAと、前記第2工程で測定した圧力PBおよび温度TBとを用いて、Q=22.4・Vs・(PA/TA-PB/TB)/(R・Δt)、ここで、Vsはビルドアップ容量、Rは気体定数、Δtは前記第1工程において前記第2バルブを閉じてから前記第1バルブを閉じるまでの前記ビルドアップ時間、に従って流量Qを演算する工程を含む、請求項6に記載の流量測定方法。
PCT/JP2018/027755 2017-07-31 2018-07-24 流体制御システムおよび流量測定方法 WO2019026700A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US16/634,603 US11460869B2 (en) 2017-07-31 2018-07-24 Fluid control system and flow rate measurement method
CN201880046755.1A CN110892357A (zh) 2017-07-31 2018-07-24 流体控制***以及流量测定方法
JP2019534064A JP7208634B2 (ja) 2017-07-31 2018-07-24 流体制御システムおよび流量測定方法
KR1020197033503A KR102250969B1 (ko) 2017-07-31 2018-07-24 유체 제어 시스템 및 유량 측정 방법

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017148264 2017-07-31
JP2017-148264 2017-07-31

Publications (1)

Publication Number Publication Date
WO2019026700A1 true WO2019026700A1 (ja) 2019-02-07

Family

ID=65232578

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/027755 WO2019026700A1 (ja) 2017-07-31 2018-07-24 流体制御システムおよび流量測定方法

Country Status (6)

Country Link
US (1) US11460869B2 (ja)
JP (1) JP7208634B2 (ja)
KR (1) KR102250969B1 (ja)
CN (1) CN110892357A (ja)
TW (1) TWI695244B (ja)
WO (1) WO2019026700A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102162046B1 (ko) * 2017-02-10 2020-10-06 가부시키가이샤 후지킨 유량 측정 방법 및 유량 측정 장치
KR102437772B1 (ko) 2020-09-07 2022-08-30 한국알프스 주식회사 압력센서를 이용한 유량 측정 장치 및 방법
TWI816362B (zh) * 2022-04-14 2023-09-21 相弘科技股份有限公司 多管氣體流量檢測裝置與方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000305630A (ja) * 1999-04-16 2000-11-02 Tadahiro Omi 並列分流型の流体供給装置
WO2012093436A1 (ja) * 2011-01-06 2012-07-12 株式会社フジキン ガス供給装置用流量制御器の流量測定装置及び流量測定方法

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4617953A (en) * 1984-11-13 1986-10-21 Kendall Tobias Michael W Fluid flow control system
AU1553288A (en) * 1987-05-04 1988-11-10 Irro Controls Group Moisture and pressure sensitive fluid control circuit
TW479773U (en) * 1996-12-01 2002-03-11 Tadahiro Ohmi Fluid control valve and fluid supply/exhaust system
ATE268917T1 (de) * 1998-07-17 2004-06-15 Horiba Ltd Vorrichtung zur regelung des durchflusses eines gases
JP3522544B2 (ja) * 1998-08-24 2004-04-26 忠弘 大見 流体可変型流量制御装置
US6948194B2 (en) * 2001-08-30 2005-09-27 Toto, Ltd. Stool flushing device
JP4082901B2 (ja) * 2001-12-28 2008-04-30 忠弘 大見 圧力センサ、圧力制御装置及び圧力式流量制御装置の温度ドリフト補正装置
JP3706601B2 (ja) * 2002-07-30 2005-10-12 三菱重工業株式会社 流量制御装置
US7647844B2 (en) * 2003-07-11 2010-01-19 Mitsui Mining & Smelting Co., Ltd. Device and method of detecting flow rate/liquid kind, and device and method of detecting liquid kind
JP4648098B2 (ja) 2005-06-06 2011-03-09 シーケーディ株式会社 流量制御機器絶対流量検定システム
JP4856905B2 (ja) 2005-06-27 2012-01-18 国立大学法人東北大学 流量レンジ可変型流量制御装置
TWI325142B (en) * 2006-06-16 2010-05-21 Hon Hai Prec Ind Co Ltd Opening/closing detecting apparatus and controlling system using the same
DE102007046279A1 (de) * 2007-09-27 2009-04-09 Siemens Ag Betriebsverfahren für eine Kühlstrecke mit zentralisierter Erfassung von Ventilcharakteristiken und hiermit korrespondierende Gegenstände
JP5346628B2 (ja) * 2009-03-11 2013-11-20 株式会社堀場エステック マスフローコントローラの検定システム、検定方法、検定用プログラム
WO2011130625A1 (en) * 2010-04-16 2011-10-20 Claros Diagnostics, Inc. Feedback control in microfluidic systems
JP5538119B2 (ja) * 2010-07-30 2014-07-02 株式会社フジキン ガス供給装置用流量制御器の校正方法及び流量計測方法
JP5754853B2 (ja) * 2012-01-30 2015-07-29 株式会社フジキン 半導体製造装置のガス分流供給装置
KR101737373B1 (ko) 2012-05-31 2017-05-18 가부시키가이샤 후지킨 빌드다운 방식 유량 모니터 장착 유량 제어 장치
CN102832096B (zh) 2012-09-20 2015-11-25 中微半导体设备(上海)有限公司 一种用于真空处理装置的气体供应装置及其气体供应及切换方法
US9605992B2 (en) * 2014-03-14 2017-03-28 Hitachi Metals, Ltd. On-tool mass flow controller diagnostic systems and methods
NO2948624T3 (ja) * 2013-03-15 2018-03-31
US9454158B2 (en) * 2013-03-15 2016-09-27 Bhushan Somani Real time diagnostics for flow controller systems and methods
CN103968900A (zh) * 2014-05-19 2014-08-06 中国航空动力机械研究所 流体流量测量***及测量方法
CN204480057U (zh) * 2015-04-07 2015-07-15 包明金 户用自来水管泄漏监控***
US10768641B2 (en) * 2015-08-26 2020-09-08 Fujikin Incorporated Flow dividing system
KR102031574B1 (ko) * 2016-01-15 2019-10-14 가부시키가이샤 후지킨 유량 측정 가능한 가스 공급 장치, 유량계, 및 유량 측정 방법
TWM528413U (zh) 2016-02-17 2016-09-11 De-Feng Xie 冷凍系統及其壓力平衡控制裝置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000305630A (ja) * 1999-04-16 2000-11-02 Tadahiro Omi 並列分流型の流体供給装置
WO2012093436A1 (ja) * 2011-01-06 2012-07-12 株式会社フジキン ガス供給装置用流量制御器の流量測定装置及び流量測定方法

Also Published As

Publication number Publication date
TWI695244B (zh) 2020-06-01
KR102250969B1 (ko) 2021-05-12
CN110892357A (zh) 2020-03-17
JP7208634B2 (ja) 2023-01-19
JPWO2019026700A1 (ja) 2020-05-28
TW201910956A (zh) 2019-03-16
US11460869B2 (en) 2022-10-04
US20200159257A1 (en) 2020-05-21
KR20190134787A (ko) 2019-12-04

Similar Documents

Publication Publication Date Title
JP7245600B2 (ja) 流量制御装置、及び、流量制御装置用プログラム
US12007797B2 (en) Flow rate control device and flow rate control method
KR102421587B1 (ko) 유량 제어 방법 및 유량 제어 장치
WO2019026700A1 (ja) 流体制御システムおよび流量測定方法
US11269362B2 (en) Flow rate control method and flow rate control device
CN109478074B (zh) 压力式流量控制装置
JP2019028747A (ja) 流量制御装置、流量制御方法、及び、流量制御装置用プログラム
TWI661180B (zh) 流量測量方法及流量測量裝置
JP7148302B2 (ja) 流量制御装置
JP7244940B2 (ja) 流量制御システム及び流量測定方法
JP7495732B2 (ja) 流量制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18840751

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019534064

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20197033503

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18840751

Country of ref document: EP

Kind code of ref document: A1