WO2019012930A1 - 二次電池制御装置 - Google Patents

二次電池制御装置 Download PDF

Info

Publication number
WO2019012930A1
WO2019012930A1 PCT/JP2018/023396 JP2018023396W WO2019012930A1 WO 2019012930 A1 WO2019012930 A1 WO 2019012930A1 JP 2018023396 W JP2018023396 W JP 2018023396W WO 2019012930 A1 WO2019012930 A1 WO 2019012930A1
Authority
WO
WIPO (PCT)
Prior art keywords
secondary battery
charging rate
socv
value
socv2
Prior art date
Application number
PCT/JP2018/023396
Other languages
English (en)
French (fr)
Inventor
大輝 小松
晋 山内
啓 坂部
ファニー マテ
大川 圭一朗
亮平 中尾
Original Assignee
日立オートモティブシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立オートモティブシステムズ株式会社 filed Critical 日立オートモティブシステムズ株式会社
Publication of WO2019012930A1 publication Critical patent/WO2019012930A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a secondary battery control device.
  • SOCv which is calculated based on the open circuit voltage (hereinafter referred to as OCV) estimated from the voltage during charging and discharging of the secondary battery, has a small error.
  • Patent Document 1 describes an apparatus for determining an error in the calculation of SOCv.
  • the calculation of SOCv is performed using an equivalent circuit model of a battery represented by a series connection of an OCV, an internal resistance, and a parallel connection pair of a polarization resistance and a capacitance component. At this time, when the capacitance component is saturated, it is determined that the error of the calculation of SOCv is large.
  • Patent Document 1 only the condition in which the capacitance component is saturated, that is, the condition in which an error due to the equivalent circuit model of the secondary battery is likely to occur, is measured, for example, And errors due to deviations in measurement timings of the current and voltage used in the calculation.
  • the first open of the secondary battery is made from an equivalent circuit having at least a polarization component represented by parallel connection of a polarization resistance and a capacity component and an internal resistance component R of the secondary battery.
  • the secondary battery control device comprises a first open circuit of the secondary battery from an equivalent circuit having at least a polarization component represented by parallel connection of a polarization resistance and a capacity component and an internal resistance component of the secondary battery.
  • An SOCv computing unit that determines a voltage and determines a charging rate SOCv of the secondary battery from a correspondence relationship between the first open circuit voltage and the charging rate SOC of the secondary battery; and a second different from the first open circuit voltage
  • An open circuit voltage, a voltage value of the polarization component calculated according to current information of the secondary battery, and a battery voltage based on a value represented by the product of the internal resistance component and the current value of the secondary battery A battery voltage estimation unit to be estimated, and an error calculation unit to calculate an error between the battery voltage estimated by the battery voltage estimation unit and the measured voltage of the secondary battery.
  • the error of the calculation of SOCv can be calculated.
  • FIG. 1 is a diagram showing the configuration of a battery system.
  • the configuration shown in FIG. 1 is a mode used for a wide range of applications such as storage devices for mobile units, storage devices for grid connection stabilization, battery system 1 for storing electric power, and inverter for charging and discharging battery system 1 And a load 105 connected to the inverter 104, and a host controller 103 that controls the battery system 1 and the inverter 104.
  • Battery system 1 stores and discharges power to and from secondary battery 100, and charging rate SOC, which is a control value necessary for these, and degradation degree SOH, which is a control value necessary for grasping the current performance of secondary battery 100.
  • the host controller 103 performs control of the secondary battery 100 and input / output of power to the inverter 104 according to the state of the load 105, the control value of the secondary battery 100 output from the battery system 1, and other external commands.
  • the inverter 104 inputs / outputs power to / from the secondary battery 100 and the load 105 in accordance with a command from the host controller 103.
  • the load 105 is, for example, a three-phase AC motor or a power system.
  • the voltage output from the secondary battery 100 is a DC voltage that changes in accordance with the state of charge SOC, and in many cases, power can not be provided directly to the load 105 that requires AC. Therefore, the inverter 104 converts direct current into alternating current or converts voltage as necessary. With such a configuration, the battery system 1 can appropriately supply an output suitable for a load.
  • the configuration of the battery system 1 for realizing this configuration will be described.
  • the battery system 1 includes a secondary battery 100, a battery information acquisition unit 101, and a secondary battery control device 102, and performs storage and discharge of electric power to calculate control values of the secondary battery 100 such as SOC and allowable current. Do.
  • the secondary battery 100 is composed of a plurality of battery cells. Each battery cell is connected in series or in parallel depending on the output voltage and capacity required for the secondary battery 100.
  • the battery information acquisition unit 101 includes a current sensor 106 that measures a current value flowing to the secondary battery 100, a temperature sensor 107 that measures the surface temperature of the secondary battery 100, and a voltage sensor 108 that measures the voltage of the secondary battery 100. .
  • One or more current sensors 106 may be provided between the secondary battery 100 and the outside. If one is installed, the cost can be minimized. When a plurality of battery cells are installed, it is possible to grasp the current distribution between battery cells connected in parallel.
  • One or more temperature sensors 107 are provided to grasp the temperature of the secondary battery 100. If one is installed, it is possible to measure the temperature at a predictable point where the maximum temperature in the secondary battery 100 can be obtained at the minimum cost. In the case of multiple installation, by measuring the temperature variation of the battery cell, it is possible to perform control in consideration of the minimum temperature and the maximum temperature.
  • One voltage sensor 108 is provided for each battery cell. This makes it possible to measure the voltage difference between the battery cells, and based on this, it is possible to control the voltage equalization of the battery cells.
  • the battery information I, T, and V measured by the current sensor 106, the temperature sensor 107, and the voltage sensor 108 are input to the secondary battery control device 102.
  • the secondary battery control device 102 includes an SOC calculation unit 109, an SOH calculation unit 110, and an allowable current calculation unit 111.
  • the SOC calculation unit 109 includes an SOCi calculation unit 112 that calculates an SOCi from a current integration amount, and an SOCv calculation unit 113 that calculates an SOCv based on an OCV estimated from battery information. SOCi and SOCv will be described later.
  • the SOH calculating unit 110 has a SOHQ calculating unit 115 that calculates a SOHQ that is a rate of deterioration of capacity.
  • the configuration may have a SOHR calculation unit that calculates SOHR, which is the deterioration rate of the resistance, based on the battery information from the battery information acquisition unit 101 and the charging rate SOC.
  • allowable current calculation unit 111 calculates allowable current Ilimit which is the maximum chargeable / dischargeable current.
  • the secondary battery control device 102 outputs, to the host controller 103, the SOC, the SOH, and the allowable current Ilimit calculated by the SOC calculating unit 109, the SOH calculating unit 110, and the allowable current calculating unit 111, respectively.
  • the host controller 103 sends a power output command corresponding to the load 105 to the secondary battery control device 102 in consideration of the state of the secondary battery 100.
  • SOC calculating unit 109 calculates the SOC according to the following equation (1).
  • a weighting factor W for weighted addition of SOCi and SOCv is used.
  • the weighting factor W is calculated so that SOC is mainly calculated using SOCv when the absolute value of current I is small, and SOC is mainly calculated using SOCi when the absolute value of current I is large. Set the coefficient W.
  • weighting coefficient W W ⁇ SOCi + (1-W) ⁇ SOCv (1)
  • the weighting factor W is a value of 0 or more and 1 or less.
  • the SOCi calculation unit 112 obtains the SOCi of the secondary battery 100 by integrating the current I at which the secondary battery 100 is charged and discharged according to the following equation (2).
  • Qmax is a full charge capacity of the secondary battery 100, and is stored in a storage unit (not shown) in advance.
  • the SOCv computing unit 113 computes the SOCv using the equivalent circuit of the secondary battery 100.
  • An equivalent circuit model of the secondary battery 100 used for the calculation is shown in FIG.
  • the open circuit voltage OCV is expressed by the voltage source 200
  • the direct current resistance representing the resistance of the electrolytic solution is expressed by the resistance 201 (internal resistance R of the secondary battery).
  • the polarization component represented by parallel connection of the polarization resistance and the capacitance component is a resistance component 202 of the polarization derived from concentration polarization of ions in the electrolyte solution and the capacitor 203 which is the capacitance component of the polarization.
  • the current voltage (Closed) of the secondary battery 100 is obtained by adding the open circuit voltage OCV of the secondary battery 100, the voltage V 0 by the internal resistance of the secondary battery 100, and the voltage by the polarization component (hereinafter referred to as polarization voltage) Vp.
  • Circuit voltage hereinafter abbreviated as CCV
  • one example of the polarization term including the resistor 202 and the capacitor 203 is shown, but a plurality of polarization terms may be used to achieve high accuracy of the equivalent circuit model.
  • a closed circuit voltage CCV which is a voltage between terminals of secondary battery 100 is expressed by the following equation (3).
  • Vp is a polarization voltage
  • I ⁇ R corresponds to the voltage across the parallel connected pair of the resistor 202 and the capacitor 203.
  • CCV OCV + I ⁇ R + Vp (3)
  • SOCv computing unit 113 obtains open circuit voltage OCV by subtracting IR drop and polarization voltage Vp from closed circuit voltage CCV as in the following equation (4).
  • OCV CCV-I-R-Vp (4)
  • the correspondence between the open circuit voltage OCV and the SOC is determined by the characteristics of the secondary battery 100, and in the storage unit (not shown), data defining the correspondence is stored in advance as an SOC table.
  • the SOCv calculation unit 113 calculates the open circuit voltage OCV using the above-mentioned equation (4), and uses this as a key to calculate the SOCv of the secondary battery 100 by referring to the SOC table.
  • FIG. 3 is a diagram showing the configuration of the SOH calculation unit 110.
  • the SOH arithmetic unit 110 will be described as an example configured to calculate SOHQ, which is a capacity deterioration rate.
  • the SOHQ operation unit 115 includes a battery voltage estimation unit 303, an SOCv error operation unit 304, an SOCv2 point selection unit 300, a current integration unit 301, a Qmax SOCv operation unit 302, a final Qmax 'operation unit 305, and a SOHQ conversion unit 306. .
  • the battery voltage estimation unit 303 estimates the battery voltage based on the information of the equivalent circuit model of the battery. A calculation example of the estimated battery voltage V calc will be described later.
  • SOCv error calculation unit 304 calculates a value obtained by subtracting estimated battery voltage V calc from battery voltage V input from voltage sensor 108, that is, an error ⁇ between battery voltage V and estimated battery voltage V calc .
  • SOCv2 point selection unit 300 selects two points of SOCv, that is, SOCv1 and SOCv2.
  • the current I detected by the current sensor 106 may also be referred to.
  • Current integration unit 301 integrates a current value flowing between selected SOCv1 and SOCv2, and calculates a charge / discharge capacity ⁇ Idt between SOCv1 and SOCv2.
  • the Qmax SOCv computing unit 302 computes the full charge capacity Qmax SOCv using the SOCv1, 2 and ⁇ Idt.
  • the final Qmax ′ computing unit 305 computes the final Qmax ′ by performing averaging processing using the input full charge capacity Qmax SOCv and the previous result Qmax_z of the Qmax ′ computation.
  • the SOHQ conversion unit 306 calculates SOHQ by comparing the final Qmax 'with the full charge capacity Qmax at the time of new product.
  • the SOCv2 point selection unit 300 selects two SOCv1 and SOCv2 suitable for calculation from among the SOCv sequentially output from the SOCv calculation unit 113.
  • the SOCv computing unit 113 estimates the OCV using the equivalent circuit model of the secondary battery 100 to calculate the SOCv. It is important to select a value close to the SOC true value and the SOCv and to select two appropriate points of the SOCv in the equivalent circuit model of this battery with a small error.
  • selection condition 1 for selecting a point where the difference between the calculated voltage value of the battery equivalent circuit model and the measured battery voltage is small will be described as a selection condition for selecting two SOCv.
  • the selection conditions 2 to 7 will be described later.
  • the battery voltage estimation unit 303 estimates the battery voltage based on the information of the equivalent circuit model of the battery according to the following equation (5).
  • the OCV is an OCV obtained by referring to the SOC obtained based on the equation (1) by the SOC calculation unit 109 based on the correspondence relationship (SOC table) between the SOC and the OCV stored in advance in the storage unit. It is.
  • the internal resistance voltage V 0 and the polarization voltage Vp are values shown by the equivalent circuit model of the secondary battery 100.
  • the battery voltage estimation unit 303 outputs the battery voltage V calc estimated by Equation (5) to the SOCv error calculation unit 304.
  • the OCV (SOC) described in the equation (5) is the correspondence between the SOC and the OCV stored in advance in the storage unit based on the SOCi calculated based on the equation (2) by the SOCi calculation unit 112 (SOC The OCV obtained from the table) may be used. In the present embodiment, these OCVs are referred to as a second open circuit voltage.
  • the SOCv error calculation unit 304 calculates the error ⁇ by taking the difference between the battery voltage V and V calc input from the voltage sensor 108.
  • the following equation (6) is an arithmetic equation of the error ⁇ .
  • the SOCv2 point selection unit 300 When the absolute value of the error ⁇ is equal to or less than a predetermined value V threshold , the SOCv2 point selection unit 300 is activated, SOCv1 and SOCv2 of two points are selected, and are output to the subsequent operation units. On the other hand, when the absolute value of the error ⁇ is larger than the predetermined value V threshold , the SOCv of the two points is not selected and is not output to the subsequent calculation units. With such a configuration, it is possible to select an SOCv with less error.
  • FIG. 4A shows the transition of the measured battery voltage V and the model estimated voltage V calc input from the voltage sensor.
  • FIG. 4 (b) shows the transition of the error ⁇ .
  • the dotted line indicates the positive / negative determination predetermined value V threshold .
  • V calc deviates from the measured voltage at time t1 when a large current is input and a sudden voltage fluctuation occurs or at time t2 when the current is supplied for a long time.
  • the error ⁇ catches such timing, and does not select the SOCv with low accuracy. Since decreasing the predetermined value V threshold improves the accuracy of the SOHQ, the predetermined value V threshold is determined based on the allowable SOHQ error.
  • FIGS. 5A and 5B are diagrams showing the relationship between the error ⁇ and the SOCv calculation error.
  • FIG. 5A shows the transition of the SOC true value and the SOCv.
  • FIG. 5 (b) shows the error ⁇ .
  • the dotted circle in the figure is the portion where SOCv deviates from the true value.
  • the value of the error ⁇ also increases, and it can be confirmed that the error ⁇ is equal to or greater than the threshold. From this, it is possible to catch the error of SOCv by determining the error ⁇ and select SOCv1 and SOCv2 with a small error.
  • the current integration unit 301 integrates current values flowing between the SOCv1 and the SOCv2 selected under the above conditions, and calculates a charge / discharge capacity ⁇ Idt between the SOCv1 and the SOCv2.
  • the Qmax SOCv computing unit 302 computes the full charge capacity Qmax SOCv according to the following equation (7) using SOCv 1 , SOCv 2 and ⁇ Idt.
  • ⁇ SOCv
  • the Qmax SOCv thus computed is output to the final Qmax ′ computing unit 305.
  • the final Qmax ′ computing unit 305 computes the final Qmax ′ by performing the averaging process shown by the previous result Qmax_z of the Qmax ′ computing and equation (8).
  • N is the number of samplings for averaging. Since Qmax ′ does not change rapidly, the previous value and N are used to smooth the calculated value.
  • FIG. 6 is a diagram showing the transition of Qmax '.
  • the horizontal axis is time
  • the vertical axis is Qmax '.
  • the dotted line in the figure shows the case before applying the present embodiment
  • the solid line in the figure shows the case where the present embodiment is applied.
  • the error becomes large by selecting the SOCv having a large SOCv calculation error, which is largely deviated from the true value. After the application of the present embodiment, since only SOCv with high accuracy is selected, it can be confirmed that the calculation of Qmax 'is highly accurate.
  • the SOHQ conversion unit 306 receives the smoothed Qmax ′, and calculates the SOHQ by comparing the Qmax ′ with the full charge capacity Qmax at the time of a new product.
  • the arithmetic expression is the following expression (9).
  • the selection condition for selecting two SOCv the selection condition 1 is described in which the point at which the difference between the calculated voltage value of the battery equivalent circuit model and the measured battery voltage is small is selected.
  • the selection condition 2 to the selection condition 7 described below may be additionally selected. This makes it possible to calculate the full charge capacity with high accuracy.
  • Selection condition 2 Select under the condition that the absolute value of current is small
  • the SOCv computing unit 113 calculates the product of the current I and the resistor 201, so that the error as the calculation result is enlarged.
  • SOCv1 and SOCv2 are selected, it is possible to select a point where the error of the product of current I and resistance 201 is small, that is, the SOCv error is small, by selecting each under a condition where the current is small. Therefore, SOCv1 and SOCv2 select points at which the current decreases.
  • the values of the resistance 201 and the polarization resistance 202 change according to the battery temperature. In particular, when the temperature is low, the resistance becomes large, and there is a concern that the error of the product of the current I and the resistance 201 may increase. Also, in the low temperature region, the behavior of the resistance changing depending on the current is known, and the error condition to be considered increases. As for temperature, it is good to select two points about room temperature. In addition, calculation at a temperature higher than the originally intended temperature of the battery is not appropriate because an unexpected error may occur. Thus, SOCv1 and SOCv2 select points whose temperature is within a predetermined value range.
  • the values of the resistor 201 and the polarization portion resistor 202 may differ between charge and discharge. Therefore, by selecting the current sign of SOCv1 and the current sign of SOCv2 to be the same, an error due to the difference between the charge resistance and the discharge resistance can be excluded. Therefore, the sign of the current of two points of SOCv selects the same point.
  • Selection condition 6 select two points whose time to SOCv1 and SOCv2 is equal to or less than a predetermined value] If the time from SOCv1 to SOCv2 is long, there is a risk that the error may diverge due to the accumulation of the offset error or the like of the current sensor 106. Therefore, a point at which the detection times of SOCv1 and SOCv2 are not separated by a predetermined time t threshold or more is selected.
  • FIG. 7 is a diagram showing an OCV approximate curve at the time of charge and discharge.
  • the horizontal axis represents SOC
  • the vertical axis represents OCV
  • a represents an OCV approximate curve including an error due to charge polarization
  • b represents an OCV approximate curve including an error due to discharge polarization.
  • the SOCv is selected in a state in which the equivalent circuit model of the battery can not correctly express the actual battery and polarization remains on the discharge side or polarization on the charge side. If two SOCv's are selected on the discharge side, the error directions from the discharge polarization coincide with each other, so that the errors cancel each other out. However, when acquired by charging and discharging, an error due to polarization remains. For this reason, it is desirable that the error directions be consistent and that the errors be canceled out.
  • the sign of the error ⁇ between the calculated voltage value of the equivalent circuit model of the secondary battery 100 and the measured battery voltage corresponds to the error direction. Therefore, two points having the same sign of the error value ⁇ of the calculated voltage value of the equivalent circuit model of the battery and the measured battery voltage are selected.
  • the first embodiment it is possible to determine the error of SOCv calculated from the equivalent circuit model of the battery by comparing the measured voltage and the voltage of the equivalent circuit model of the battery. This makes it possible to select two highly accurate points as the SOCv used for the SOHQ operation.
  • FIG. 8 is a diagram showing the configuration of the SOH calculator according to the second embodiment.
  • the same parts as those in the configuration of the SOH calculation unit according to the first embodiment shown in FIG. 3 are assigned the same reference numerals and descriptions thereof will be omitted.
  • the difference from the first embodiment is that a weighting operation unit 400 and a weighted operation averaging Qmax ′ operation unit 401 are added.
  • two points of SOCv with high accuracy are selected by the SOCv selection unit 300.
  • the SOCv selection unit 300 depending on the selection condition of two points of SOCv, there is a difference in the expected accuracy. Since the full charge capacity can be calculated with high accuracy, it is desirable that the calculation result selected on the condition of high accuracy be greatly reflected in the final result.
  • weight operation unit 400 calculates the following weight W, and weighted operation averaging Qmax ′ operation unit 401 performs weighted averaging to achieve high accuracy. The result is made to be able to be greatly reflected in the final result.
  • Weight W The weight is set based on the magnitude of the difference ⁇ between the calculated voltage value of the equivalent circuit model of the battery and the measured battery voltage] As described in the selection condition 1 of the first embodiment, the smaller the error ⁇ calculated by the SOCv error calculation unit 304, the smaller the error of the SOCv, and the accuracy of the full charge capacity is improved. Therefore, the weight is set based on the error ⁇ . For example, weight 1 shown in the following equation (10) is introduced.
  • any of the weight 2 and the weight 3 shown below may be selected and used. By adding the weight thereafter, it becomes possible to calculate the full charge capacity with high accuracy.
  • the product of these weights may be used as the final weight W.
  • Weight 3 Set weights based on the time until SOCv1 and SOCv2]
  • the weight is set based on the time between SOCv1 and SOCv2. For example, the weight shown in the following equation (12) is introduced.
  • t threshold indicates the predetermined time indicated by the selection condition 6 in the first embodiment.
  • the weight W calculated by the weight calculation unit 400 is output to the weighted average Qmax ′ calculation unit 401.
  • the weighted average Qmax ′ computing unit 401 performs weighted averaging using the Qmax SOCv computing result in the Qmax SOCv computing unit 302 and the weight W computed under the conditions at the time of the computing. Weighted averaging is performed by the following equation (13).
  • Qmax′_z is the previous calculation result of equation (13).
  • FIG. 9 is a diagram showing the configuration of the second SOC calculation unit 114 according to the third embodiment.
  • a second SOC calculation unit 114 is provided as the SOC calculation unit in place of the SOC calculation unit 109 in the first embodiment.
  • the other configuration is the same as that of FIG. 1, and the description thereof is omitted.
  • the second SOC calculation unit 114 includes a first SOC calculation unit 109A, a battery voltage estimation unit 303, an SOCv error calculation unit 304, and a final SOC calculation unit 500.
  • the first SOC calculation unit 109A is similar to the SOC calculation unit 109 described in the first embodiment, and includes an SOCi calculation unit 112 and an SOCv calculation unit 113, and the equation (1) described in the first embodiment ) To calculate the SOC.
  • the calculated SOC is transmitted to the battery voltage estimation unit 303.
  • the SOCi calculation unit 112 is the same as the contents described in the first embodiment, and obtains the SOCi of the secondary battery 100 by integrating the current I at which the secondary battery 100 is charged and discharged according to the equation (2). , And output to the final SOC calculation unit 500.
  • the SOCv calculation unit 113 calculates SOCv from the equivalent circuit model of the secondary battery 100, and calculates V0 and Vp to the battery voltage estimation unit 303 and the SOCv to a final value, as in the first embodiment. Output to SOC calculation unit 500.
  • the battery voltage estimation unit 303 is the same as the content described in the first embodiment, and outputs the battery voltage V calc estimated by Equation (5) to the SOCv error calculation unit 304.
  • the OCV (SOC) is an OCV obtained from the correspondence relationship (SOC table) of the SOC and the OCV stored in advance in the storage unit based on the SOC obtained by the SOC calculation unit 109 based on the equation (1).
  • V 0 and V p are values shown in the equivalent circuit model of the secondary battery 100.
  • the OCV (SOC) described in the equation (5) is the correspondence between the SOC and the OCV stored in advance in the storage unit based on the SOCi calculated based on the equation (2) by the SOCi calculation unit 112 (SOC The OCV obtained from the table) may be used. In the present embodiment, these OCVs are referred to as a second open circuit voltage.
  • SOCv error calculation unit 304 calculates a difference between battery voltage V and V calc input from voltage sensor 108 based on equation (6), and outputs error ⁇ to final SOC calculation unit 500.
  • the final SOC calculation unit 500 calculates a final SOC based on the value of the error ⁇ . For example, if the error ⁇ is equal to or less than the predetermined value V threshold , it is determined that the error of the SOCv is small, and the SOCv is output to the subsequent stage as a final SOC. If the error ⁇ is larger than the predetermined value V threshold , the charging rate SOCi is output to the subsequent stage as a final SOC.
  • the present embodiment by selecting and determining the final SOC from SOCv and SOCi based on the error ⁇ , it is possible to reflect a reliable calculation result, so it is possible to improve the calculation accuracy of the SOC. .
  • the secondary battery control device 102 generates an equivalent circuit having at least a polarization component represented by parallel connection of a polarization resistance and a capacitance component and an internal resistance component R of the secondary battery 100, (1)
  • the open circuit voltage OCV is obtained, and from the relationship between the first open circuit voltage OCV and the charge rate of the secondary battery 100, the charge rate SOCv of the secondary battery 100 is obtained.
  • the secondary battery control device 102 calculates the value of the second open circuit voltage calculated from the value of the measured voltage of the secondary battery 100 by a method different from the first open circuit voltage OCV, and the current information of the secondary battery 100 The value obtained by subtracting the voltage value Vp of the polarization component calculated in accordance with the value RI expressed by the product of the internal resistance component R and the current value I of the secondary battery 100 is calculated. Thereby, the difference between the value of the measured voltage of secondary battery 100 and the value of the calculation of SOCv can be obtained.
  • the secondary battery control device 102 is configured by using an equivalent circuit including at least a polarization component represented by parallel connection of a polarization resistance and a capacitance component and an internal resistance component of the secondary battery 100.
  • the SOCv calculation unit 113 which obtains the open circuit voltage OCV and obtains the charge ratio SOCv of the secondary battery from the correspondence relationship between the first open circuit voltage OCV and the charge ratio SOC of the secondary battery differs from the first open circuit voltage OCV Based on the second open circuit voltage OCV, the voltage value Vp of the polarization component calculated according to the current information of the secondary battery, and the value RI represented by the product of the internal resistance component R and the current value I of the secondary battery
  • a battery voltage estimation unit 303 that estimates a battery voltage
  • an SOCv error calculation unit 304 that obtains an error ⁇ between the battery voltage V calc estimated by the battery voltage estimation unit 303 and the measured voltage of the secondary battery. Thereby, the error of the calculation of SOCv can be calculated.
  • the secondary battery control device 102 includes an SOCi calculation unit 112 that calculates the charging rate SOCi of the secondary battery 100 obtained by integrating the current with which the secondary battery 100 charges and discharges, and the battery voltage estimation unit 303 The value of the second open circuit voltage is determined with reference to the state of charge SOCi based on the correspondence between the first open circuit voltage and the state of charge SOC of the secondary battery. Thereby, the error of the calculation of SOCv can be calculated.
  • the secondary battery control device 102 adds the charging rate SOCi and the charging rate SOCv by weighting to obtain the charging rate SOC, and the battery voltage estimation unit 303 calculates the value of the second open circuit voltage as the first open circuit voltage. Based on the correspondence relationship between the charging rate SOC of the secondary battery and the charging rate SOC of the secondary battery, the charging rate SOC obtained by the weighting addition is referred to and determined. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 calculates the charge and discharge capacity by integrating the current value flowing to the secondary battery between the charge ratio SOCv1 and the charge ratio SOCv2 at at least two points of the charge ratio SOCv.
  • SOHQ arithmetic unit 115 including SOHQ arithmetic unit 115 which calculates secondary battery capacity deterioration ratio SOHQ using at least two charging rate SOCv1 and charging rate SOCv2 and current integral value of secondary battery.
  • the secondary battery control device 102 includes the selection unit 300 which selects the charge ratio SOCv1 and the charge ratio SOCv2 at two points from the charge ratio SOCv output from the SOCv calculation unit 113, and the selection unit 300 Is selected, the charging rate SOCv1 of two points and the charging rate SOCv2 are selected. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 includes the selection unit 300 for selecting the charge ratio SOCv1 and the charge ratio SOCv2 at two points from among the charge ratio SOCv output from the SOCv calculation unit 113.
  • the selection unit 300 for selecting the charge ratio SOCv1 and the charge ratio SOCv2 at two points from among the charge ratio SOCv output from the SOCv calculation unit 113.
  • the secondary battery control device 102 includes the selection unit 300 for selecting the charge ratio SOCv1 and the charge ratio SOCv2 at two points from among the charge ratio SOCv output from the SOCv calculation unit 113.
  • the selection unit 300 for selecting the charge ratio SOCv1 and the charge ratio SOCv2 at two points from among the charge ratio SOCv output from the SOCv calculation unit 113.
  • the secondary battery control device 102 includes the selection unit 300 which selects the charge ratio SOCv1 and the charge ratio SOCv2 at two points from the charge ratio SOCv output from the SOCv calculation unit 113, and the selection unit 300 The charging rate SOCv1 and the charging rate SOCv2 at two points where the difference between the rate SOCv1 and the charging rate SOCv2 is large are selected. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 includes the selection unit 300 that selects the charge ratio SOCv1 and the charge ratio SOCv2 at two points from among the charge ratio SOCv output from the SOCv calculation unit 113. Two points are selected: the charging rate SOCv1 and the charging rate SOCv2 at the time of discharging the secondary battery 100, or the charging rate SOCv1 and the charging rate SOCv2 at the time of charging the secondary battery 100. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 includes the selection unit 300 which selects the charge ratio SOCv1 and the charge ratio SOCv2 at two points from the charge ratio SOCv output from the SOCv calculation unit 113, and the selection unit 300 A charging rate SOCv1 and a charging rate SOCv2 of two points at which detection times of the rate SOCv1 and the charging rate SOCv2 are not separated for a predetermined time or more are selected. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 includes the selection unit 300 that selects the charge ratio SOCv1 and the charge ratio SOCv2 at two points from the charge ratio SOCv output from the SOCv calculation unit 113, and the selection unit 300 When the signs of are the same, the charging rate SOCv1 and the charging rate SOCv2 of two points are selected. Thereby, the error of the calculation of SOCv can be calculated with higher accuracy.
  • the secondary battery control device 102 includes a weighted averaging Qmax ′ computing unit 401 that performs weighted averaging of the capacity degradation rate SOHQ, and the weighted averaging Qmax ′ computing unit 401 performs a capacity degradation rate by weighting based on an error. Calculate SOHQ. As a result, it is possible to achieve high precision by reflecting reliable data greatly, and it is possible to accelerate the convergence to the true value.
  • the secondary battery control device 102 calculates a state of charge SOCi of the secondary battery 100, which is obtained by integrating the current at which the secondary battery 100 charges and discharges, the state of charge SOCi and the state of charge SOCv
  • the battery voltage estimation unit 303 calculates the value of the second open circuit voltage, the open circuit voltage OCV of the secondary battery 100, and the charge of the secondary battery.
  • the second SOC calculation unit 114 outputs the charging rate SOCv as an appropriate value when the error is less than or equal to a predetermined value, and the error is greater than the predetermined value. When it is large, the charging rate SOCi is output as an appropriate value. As a result, reliable calculation results can be reflected, and therefore, it is possible to improve the calculation accuracy of the SOC.
  • Battery system 100 Secondary battery 101: Battery information acquisition unit 102: Secondary battery control device 103: Host controller 104: Inverter 105: Load 106: Current sensor 107: Temperature sensor 108: Voltage sensor 109: SOC calculation unit 109A : First SOC calculation unit 110: SOH calculation unit 111: Allowable current calculation unit 112: SOCi calculation unit 113: SOCv calculation unit 114: Second SOC calculation unit 115: SOHQ calculation unit 200: OCV 201: DC resistance 202: polarization resistance 203: polarization capacitor 300: SOCv2 point selection unit 301: current integration unit 302: Qmax SOCv calculation unit 303: battery voltage estimation unit 304: SOCv error calculation unit 305: final Qmax 'calculation unit 306: SOHQ converter 400: weight calculator 401: Weighted averaging Qmax 'operation unit 500: Final SOC operation unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Tests Of Electric Status Of Batteries (AREA)
  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

劣化等による二次電池の等価回路モデル自体の実測との乖離等により、SOCvの演算に誤差があった。 二次電池制御装置102は、分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池100の内部抵抗成分Rと、を少なくとも有する等価回路から二次電池100の第1開回路電圧OCVを求め、第1開回路電圧OCV、および、二次電池100の充電率との関係から二次電池100の充電率SOCvを求める。そして、二次電池制御装置102は、二次電池100の実測電圧の値から、第1開回路電圧OCVとは異なる方法で演算された第2開回路電圧の値、二次電池100の電流情報に応じて演算される分極成分の電圧値Vp、および内部抵抗成分Rと二次電池100の電流値Iの積にて表される値RI、を引いた値を演算する。

Description

二次電池制御装置
 本発明は、二次電池制御装置に関する。
 近年、地球温暖化問題に対応するため、エネルギーの有効利用が可能な蓄電池に注目が集まっている。特に、移動体向け蓄電装置や系統連系安定化用蓄電装置といった電池システムは、化石燃料への依存度を下げることが可能であるため、一層の普及が期待されている。これらシステムの性能を引き出すには二次電池の充電率(State of Charge、以下SOCと略す)や劣化度(State of Health、以下SOHと略す)、充放電可能な最大電流(許容電流)といったパラメータを用いた充放電制御や、各電池の充電率の均等化を適切に行う必要がある。その為には、二次電池の充放電中の電圧から推定した開回路電圧(Open Circuit Voltage、以下OCVと略す)を元に算出したSOC(以下SOCvと略す)に誤差が少ないことが望まれる。
 特許文献1には、SOCvの演算の誤差を判定する装置が記載されている。この装置では、SOCvの演算を、OCVと、内部抵抗と、分極抵抗及びキャパシタンス成分の並列接続対との直列接続で表現される電池の等価回路モデルを用いて演算する。この際に、キャパシタンス成分が飽和した際はSOCvの演算の誤差が大きいと判定している。
特開2016-099156号公報
 特許文献1では、キャパシタンス成分が飽和した状態、すなわち、二次電池の等価回路モデルによる誤差が発生しやすい条件のみを捉えているので、例えば劣化等による二次電池の等価回路モデル自体の実測との乖離や、演算に用いている電流と電圧の計測タイミングのずれによる誤差等を捉える事ができなかった。
 本発明による二次電池制御装置は、分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池の内部抵抗成分Rと、を少なくとも有する等価回路から前記二次電池の第1開回路電圧OCVを求め、前記第1開回路電圧OCV、および、前記二次電池の充電率との関係から前記二次電池の充電率SOCvを求める二次電池制御装置であって、前記二次電池制御装置は、前記二次電池の実測電圧の値から、前記第1開回路電圧OCVとは異なる方法で演算された第2開回路電圧の値、前記二次電池の電流情報に応じて演算される前記分極成分の電圧値Vp、および前記内部抵抗成分Rと前記二次電池の電流値Iの積にて表される値RI、を引いた値を演算する。
 本発明による二次電池制御装置は、分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池の内部抵抗成分と、を少なくとも有する等価回路から前記二次電池の第1開回路電圧を求め、前記第1開回路電圧と前記二次電池の充電率SOCとの対応関係から前記二次電池の充電率SOCvを求めるSOCv演算部と、前記第1開回路電圧とは異なる第2開回路電圧、前記二次電池の電流情報に応じて演算される前記分極成分の電圧値、および前記内部抵抗成分と前記二次電池の電流値の積で表される値を元に電池電圧を推定する電池電圧推定部と、前記電池電圧推定部で推定された電池電圧と前記二次電池の実測電圧との誤差を演算する誤差演算部と、を備える。
 本発明によれば、SOCvの演算の誤差を演算することができる。
電池システムの構成を示す図である。 二次電池の等価回路モデルを示す図である。 SOH演算部の構成を示す図である。 (a)、(b)実測電圧とモデル推定電圧、及び両者の差の推移を示す図である。 (a)、(b)誤差αとSOCv演算誤差の関係を示す図である。 Qmax’の推移を示す図である。 OCV近似曲線を示す図である。 第2の実施形態によるSOH演算部の構成を示す図である。 第3の実施形態による第2のSOC演算部の構成を示す図である。
-第1の実施形態-
 以下、第1の実施形態について、図1~図7を参照して説明する。図1は、電池システムの構成を示す図である。図1で示す構成は、移動体向け蓄電装置、系統連系安定化用蓄電装置等幅広い用途で使用される形態であり、電力を蓄える電池システム1と、電池システム1に対し充放電を行うインバータ104と、インバータ104に接続された負荷105と、電池システム1やインバータ104を制御する上位コントローラ103より構成される。
 電池システム1は、二次電池100に対する電力の蓄電や放電、及びこれらに必要な制御値である充電率SOCや、二次電池100の現在の性能把握に必要な制御値である劣化度SOHの演算を行う。上位コントローラ103は、負荷105の状態や電池システム1が出力した二次電池100の制御値とその他外部からの指令とに応じ二次電池100の制御や、インバータ104に対する電力の入出力指令を行う。インバータ104は上位コントローラ103からの指令に従い、二次電池100及び負荷105に対して電力の入出力を行う。負荷105は例えば三相交流モータや電力系統である。
 二次電池100の出力する電圧は充電率SOCに応じて変化する直流電圧であり、多くの場合、交流を必要とする負荷105へ電力を直接提供することはできない。そこで、インバータ104は必要に応じ直流から交流への変換や電圧の変換を行う。このような構成にすることで、電池システム1は負荷に適した出力を適宜供給することが可能となる。以下、この構成を実現するための電池システム1の構成について述べる。
 電池システム1は、二次電池100と、電池情報取得部101と、二次電池制御装置102から構成され、電力の蓄電・放電を行い、SOC・許容電流といった二次電池100の制御値を演算する。
 二次電池100は複数の電池セルより構成される。各電池セルは、二次電池100に要求される出力電圧や容量に応じ、直列、又は並列に接続されている。
 電池情報取得部101は、二次電池100に流れる電流値を測定する電流センサ106、二次電池100の表面温度を測定する温度センサ107、二次電池100の電圧を測定する電圧センサ108を有する。
 電流センサ106は、二次電池100と外部との間に1つ、もしくは複数設置する場合がある。1つ設置した場合にはコストを最小限に抑えることが可能である。複数設置した場合には並列接続している電池セル間の電流配分を把握することが可能である。
 温度センサ107は、二次電池100の温度を把握するために1つ、もしくは複数設置する。1つ設置した場合には、最小限のコストで二次電池100内の最高温度になる予測できる地点の温度を計測できる。複数設置した場合には、電池セルの温度ばらつきを計測することで、最低温度や最高温度を考慮した制御が可能となる。
 電圧センサ108は、各電池セルに1つ設置する。これにより各電池セル間の電圧差の測定が可能となり、これを元に各電池セルの電圧の均等化制御が可能となる。電流センサ106、温度センサ107、電圧センサ108で計測された電池情報I、T、Vは二次電池制御装置102へ入力される。
 二次電池制御装置102は、SOC演算部109、SOH演算部110、許容電流演算部111を有する。SOC演算部109は、電流積算量からSOCiを演算するSOCi演算部112と、電池情報から推定したOCVを元にSOCvを演算するSOCv演算部113を有する。SOCiとSOCvは後で説明する。
 SOH演算部110は、容量の劣化率であるSOHQを演算するSOHQ演算部115を有する。また、電池情報取得部101からの電池情報と充電率SOCを元に、抵抗の劣化率であるSOHRを演算するSOHR演算部を有する構成であってもよい。
 許容電流演算部111は、SOH演算部110からのSOH及び電池情報取得部101からの電池情報を元にして充放電可能な最大電流である許容電流Ilimitを演算する。
 二次電池制御装置102は、SOC演算部109、SOH演算部110、及び許容電流演算部111がそれぞれ演算したSOC、SOH、及び許容電流Ilimitを上位コントローラ103へ出力する。上位コントローラ103は二次電池100の状態を考慮した上で、負荷105に対応した電力出力指令を二次電池制御装置102に送る。
[SOC演算部109の動作]
 SOC演算部109は、SOCi演算部112で求められたSOCiと、SOCv演算部113で求められたSOCvを元に、次式(1)により、SOCを演算する。この演算において、SOCiとSOCvを重み付け加算するための重み係数Wを用いる。一般に、重み係数Wは、電流Iの絶対値が小さいときはSOCvを主に用いてSOCを算出し、電流Iの絶対値が大きいときはSOCiを主に用いてSOCを算出するように、重み係数Wを設定する。また、二次電池100の内部抵抗Rが小さいときはSOCvを主に用いてSOCを算出し、内部抵抗Rが大きいときはSOCiを主に用いてSOCを算出するように、重み係数Wを設定する。
  SOC=W×SOCi+(1-W)×SOCv ・・・(1)
 ここで、重み係数Wは0以上1以下の値である。
[SOCi演算部112の動作]
 SOCi演算部112の動作について説明する。SOCi演算部112は、二次電池100が充放電する電流Iを次式(2)にしたがって積算することにより、二次電池100のSOCiを求める。式(2)において、Qmaxは二次電池100の満充電容量であり、予め図示省略した記憶部に格納されている。SOColdは、前回の演算周期において式(1)により算出されたSOCの値である。
  SOCi=SOCold+100×∫I/Qmax ・・・(2)
[SOCv演算部113の動作]
 次に、SOCv演算部113の動作について図2を参照して説明する。SOCv演算部113は二次電池100の等価回路を用いてSOCvを演算する。演算に用いる二次電池100の等価回路モデルを図2に示す。この等価回路モデルは、開回路電圧OCVを電圧源200で表現し、電解液の抵抗等を表現する直流抵抗を抵抗201(二次電池の内部抵抗R)で表現している。更に、分極抵抗と容量成分との並列接続で表わされる分極成分は、電解液中のイオンの濃度分極等に由来する分極の抵抗成分である抵抗202と、分極の容量成分であるキャパシタ203とにより表現している。そして、二次電池100の開回路電圧OCV,二次電池100の内部抵抗による電圧V,分極成分による電圧(以下、分極電圧)Vpを足し合わせることで二次電池100の現在の電圧(Closed circuit voltage、以下CCVと略す)を表現する。なお、本実施形態では抵抗202とキャパシタ203からなる分極項が1個の例を示したが、複数個用いて等価回路モデルの高精度化を図ってもよい。
 二次電池100に電流Iを印加すると、二次電池100の端子間電圧である閉回路電圧CCVは次式(3)で表される。式(3)において、Vpは分極電圧であり、I・Rは抵抗202とキャパシタ203の並列接続対の両端電圧に相当する。
  CCV=OCV+I・R+Vp ・・・(3)
 SOCvの算出には開回路電圧OCVが用いられるが、二次電池100が充放電している間は直接測定することができない。そこで、SOCv演算部113は、次式(4)のように閉回路電圧CCVからIRドロップと分極電圧Vpを差し引くことにより、開回路電圧OCVを求める。
  OCV=CCV-I・R-Vp ・・・(4)
 開回路電圧OCVとSOCとの対応関係は二次電池100の特性によって定まるものであり、図示省略した記憶部には、その対応関係を定義するデータがSOCテーブルとして予め格納されている。SOCv演算部113は、上述の式(4)を用いて開回路電圧OCVを算出し、これをキーにしてSOCテーブルを参照することにより、二次電池100のSOCvを算出する。
 図3は、SOH演算部110の構成を示す図である。
 SOH演算部110は、SOHQ演算部115と同様に、容量劣化率であるSOHQを算出するように構成される例で説明する。SOHQ演算部115は、電池電圧推定部303、SOCv誤差演算部304、SOCv2点選択部300、電流積算部301、QmaxSOCv演算部302、最終的なQmax’演算部305、SOHQ変換部306を有する。
 電池電圧推定部303は、電池の等価回路モデルの情報を元に電池電圧を推定する。推定電池電圧Vcalcの演算例は後述する。SOCv誤差演算部304は、電圧センサ108より入力する電池電圧Vから推定電池電圧Vcalcを引いた値、すなわち電池電圧Vと推定電池電圧Vcalcとの誤差αを演算する。SOCv2点選択部300は、誤差αの絶対値が所定値Vthreshold以下の場合、SOCvの2点、すなわちSOCv1、2を選択する。2点選択の具体例は後述するが、電流センサ106で検出されている電流Iも参照する場合がある。電流積算部301は、電流積算部301は、選択されたSOCv1、2間で流れた電流値を積算し、SOCv1、2間の充放電容量∫Idtを演算する。QmaxSOCv演算部302は、SOCv1、2と∫Idtを用いて満充電容量QmaxSOCvを演算する。最終的なQmax’演算部305は、入力される満充電容量QmaxSOCvとQmax’演算の前回結果Qmax_zとを用いた平均化処理を行うことで最終的なQmax’を演算する。SOHQ変換部306は、最終的なQmax’を新品時の満充電容量Qmaxと比較することでSOHQを演算する。
 次に、SOH演算部110の動作について説明する。
 SOCv2点選択部300は、SOCv演算部113より逐次出力されるSOCvの中から演算に適切な2点のSOCv1、SOCv2を選択する。前述したようにSOCv演算部113は二次電池100の等価回路モデルを用いてOCVを推定してSOCvを算出している。この電池の等価回路モデルに誤差が少なく、SOC真値とSOCvが近い値を選択し、且つSOCvの適切な2点を選択することが重要になる。
 以下では、SOCvを2点選択するための選択条件として、電池の等価回路モデルの演算している電圧値と実測電池電圧の差が小の点を選択する選択条件1について述べる。なお、選択条件2から選択条件7については後述する。
[選択条件1:電池の等価回路モデルの演算している電圧値と実測電池電圧の差が小の点を選択する]
 電池電圧推定部303は、以下の式(5)により電池の等価回路モデルの情報を元に電池電圧を推定する。
Figure JPOXMLDOC01-appb-M000001
 OCV(SOC)は、予め記憶部に記憶されているSOCとOCVの対応関係(SOCテーブル)に基づいて、SOC演算部109により式(1)に基づいて求めたSOCを参照して求めたOCVである。内部抵抗電圧Vと分極電圧Vpは二次電池100の等価回路モデルで示した値である。電池電圧推定部303は、式(5)で推定した電池電圧VcalcをSOCv誤差演算部304に出力する。
 なお、式(5)に記載のOCV(SOC)は、SOCi演算部112により式(2)に基づいて求めたSOCiを元に、予め記憶部に記憶されているSOCとOCVの対応関係(SOCテーブル)から求めたOCVを用いてもよい。本実施形態では、これらのOCVを第2開回路電圧と称する。
 SOCv誤差演算部304は、電圧センサ108から入力する電池電圧VとVcalcとの差をとり、誤差αを演算する。以下の式(6)が誤差αの演算式である。
Figure JPOXMLDOC01-appb-M000002
 この誤差αの絶対値が所定値Vthreshold以下の場合、SOCv2点選択部300を有効化し、2点のSOCv1、SOCv2を選択して、以降の各演算部に出力する。一方、この誤差αの絶対値が所定値Vthresholdより大きい場合は、2点のSOCvを選択せず以降の各演算部には出力しない。このような構成にすることで誤差の少ないSOCvを選択することができる。
 図4(a)は、電圧センサから入力する実測電池電圧Vとモデル推定電圧Vcalcの推移を示している。図4(b)は、誤差αの推移を示している。図4(b)において、点線は正負側の判定所定値Vthresholdを示している。図4(a)に示すように、Vcalcは大電流が入力されて急激な電圧変動が生じた時刻t1や、電流が長時間の通電した時刻t2で実測電圧から乖離する。誤差αはこのようなタイミングを捉え、精度の悪いSOCvを選択しないようにしている。所定値Vthresholdを小さくすることでSOHQの精度は向上するため、所定値Vthresholdは許容できるSOHQ誤差を元に決定する。
 図5(a)、(b)は、誤差αとSOCv演算誤差の関係を示す図である。図5(a)は、SOC真値とSOCvの推移を示している。図5(b)は、誤差αを示している。図中の点線の丸で囲った部分はSOCvが真値から乖離している部分である。同じタイミングにおいて、図5(b)に示すように、誤差αの値も増大し、誤差αが閾値以上となっていることが確認できる。このことから、誤差αを判定することでSOCvの誤差を捉え、誤差の少ないSOCv1、SOCv2を選択する事が可能である。
 電流積算部301は、上記条件で選択されたSOCv1、SOCv2間で流れた電流値を積算し、SOCv1、SOCv2間の充放電容量∫Idtを演算する。QmaxSOCv演算部302は、SOCv1、SOCv2と∫Idtを用いて満充電容量QmaxSOCvを以下の式(7)により演算する。
Figure JPOXMLDOC01-appb-M000003
 ここで、ΔSOCv=|SOCv1-SOCv2|である。
 このようにして演算されたQmaxSOCvは最終的なQmax’演算部305に出力される。最終的なQmax’演算部305では、Qmax’演算の前回結果Qmax_zと式(8)で示す平均化処理を行うことで最終的なQmax’を演算する。
Figure JPOXMLDOC01-appb-M000004
 ここで、Nとは平均化のサンプリング数である。Qmax’は急激に変動しないため、前回値とNを使用し、演算値の平滑化を図っている。
 図6は、Qmax’の推移を示す図である。この図において、横軸は時間、縦軸はQmax’であり、図中の点線は本実施形態を適用する前の場合、図中の実線は本実施形態を適用した場合を示す。本実施形態を適用する前はSOCv演算誤差の大きなSOCvを選択することで誤差が大きくなり真値から大きく乖離してしまっていた。本実施形態の適用後は精度の良いSOCvのみを選択したため、Qmax’の演算が高精度化していることが確認できる。
 SOHQ変換部306は、平滑化されたQmax’が入力され、Qmax’を新品時の満充電容量Qmaxと比較することでSOHQを演算する。演算式は以下の式(9)である。
Figure JPOXMLDOC01-appb-M000005
このような構成にすることで、SOCv演算誤差の少ない点を選択しSOHQを演算できるため、高精度なSOHQ演算が可能である。
 以上の説明では、SOCvを2点選択するための選択条件として、電池の等価回路モデルの演算している電圧値と実測電池電圧の差が小の点を選択する選択条件1について述べた。SOCvを2点選択するための条件として、以下に述べる選択条件2から選択条件7のいずれか1つ、もしくは2つ以上を追加して選択しても良い。これにより、満充電容量を精度良く算出することが可能となる。
[選択条件2:電流の絶対値が小の条件で選択する]
 二次電池100に流れる電流が大の場合、SOCv演算部113は電流Iと抵抗201の積を算出するため、算出結果である誤差が拡大してしまう。SOCv1とSOCv2を選択する場合、それぞれ電流が小の条件で選択することで電流Iと抵抗201の積の誤差が小、すなわちSOCv誤差の小さい点を選択することが出来る。よって、SOCv1とSOCv2は電流小となる点をそれぞれ選択する。
[選択条件3:電池温度が所定値以内の2点を選択する]
 電池温度によって抵抗201、分極部抵抗202の値は変化する。特に温度が低い場合には抵抗が大きくなり、電流Iと抵抗201の積の誤差の拡大が懸念される。また、低温領域では、電流に依存して抵抗が変化する挙動が知られており、考慮すべき誤差条件が増える。温度は室温程度の2点を選択するのが良い。また、電池の本来使用すべき温度よりも高い状態で演算すると想定外の誤差が発生し得るので適切ではない。よって、SOCv1とSOCv2は温度が所定値範囲内の点をそれぞれ選択する。
[選択条件4:ΔSOCvが所定値以上である2点を選択する]
 SOCv1、SOCv2それぞれの誤差が大きい場合でも、ΔSOCv=|SOCv1-SOCv2|が大きい2点を選択できれば各SOCvの誤差の影響は小さくなり、満充電容量の演算精度が向上する。よって、SOCvの2点はΔSOCvが所定値よりも大きい2点を選択する。
[選択条件5:SOCv1とSOCv2の電流の符号が同一である2点を選択する]
 二次電池100の等価回路モデルにおいて抵抗201や分極部抵抗202の値は充電と放電で異なる場合がある。そのため、SOCv1の電流符号とSOCv2の電流符号が同一になるように選択することで、この充電抵抗と放電抵抗の差による誤差を除外することができる。よって、SOCvの2点の電流の符号は同一の点を選択する。
[選択条件6:SOCv1とSOCv2までの時間が所定値以下となる2点を選択する]
 SOCv1からSOCv2に至るまでの時間が長い場合、電流センサ106のオフセット誤差等の蓄積により誤差が発散してしまう危険性がある。よって、SOCv1とSOCv2の検出時間が所定時間tthreshold以上離れていない点を選択する。
[選択条件7:電池の等価回路モデルの演算している電圧値と実測電池電圧の誤差αの符号が同一の2点を選択する]
 電池の等価回路モデルの演算している電圧値と実測電池電圧の誤差αの符号が同一のSOCvを2点選択する方が、満充電容量の演算精度が向上する。図7は、充放電時におけるOCV近似曲線を示す図である。この図において、横軸はSOCを、縦軸はOCVを、aは充電分極による誤差を含むOCV近似曲線を、bは放電分極による誤差を含むOCV近似曲線を示す。電池の等価回路モデルが実電池を正しく表現できず、放電側に分極が残った状態や充電側に分極が残った状態でSOCvを選択してしまうことが想定される。放電側同士でSOCvを2点選択すれば、放電分極由来の誤差方向が一致するため2点間で誤差は打ち消しあう。しかし充電と放電で取得してしまうと分極由来の誤差が残ってしまう。このため、誤差方向が揃い誤差を打ち消しあうことが望ましい。二次電池100の等価回路モデルの演算している電圧値と実測電池電圧の誤差αの符号は誤差方向に対応している。よつて、電池の等価回路モデルの演算している電圧値と実測電池電圧の誤差αの符号が同一の2点を選択する。
 第1の実施形態によれば、電池の等価回路モデルから演算したSOCvの誤差を実測電圧と電池の等価回路モデルの電圧の比較により、判定することが可能である。これにより、SOHQ演算に使用するSOCvとして高精度な2点を選択することが可能になる。
-第2の実施形態-
 図8は、第2の実施形態によるSOH演算部の構成を示す図である。
 図3に示した第1の実施形態によるSOH演算部の構成と同一の箇所には同一の符号を付してその説明を省略する。第1の実施形態との差異は重み演算部400と重み付け演算平均化Qmax’演算部401を追加している点である。第1の実施形態ではSOCv選択部300で精度の良いSOCvを2点選択しているが、SOCvの2点の選択条件によっては期待される精度に差がある。精度が高い条件で選択された演算結果が精度良く満充電容量を演算できるため、最終結果に大きく反映することが望ましい。そのため、SOCv2点選択部300での2点の選択条件を元に、重み演算部400で以下の重みWを演算し、重み付け演算平均化Qmax’演算部401で重み付け平均を行うことで精度の高い結果を最終結果に大きく反映できるようにしている。
 以下に重みWに関して述べる。
[重み1:電池の等価回路モデルの演算している電圧値と実測電池電圧の差αの大きさに基づいて重みを設定する]
 第1の実施形態の選択条件1で述べたように、SOCv誤差演算部304で演算した誤差αが小さいほどSOCvの誤差は小さくなり、満充電容量の精度は向上する。よって、誤差αに基づいて重みを設定する。例えば以下の式(10)式で示す重み1を導入する。
Figure JPOXMLDOC01-appb-M000006
 重み1に代えて以下に示す重み2、重み3のいずれかを選択して用いても良い。以降の重みを追加することで、満充電容量を精度良く算出することが可能となる。これらの重みを用いる際には、例えばこれらの重みの積を最終的な重みWとしてもよい。
[重み2:ΔSOCvに基づいて重みを設定する]
 第1の実施形態の選択条件4で述べたように、ΔSOCv=|SOCv1-SOCv2|が大きいほどSOHQ演算の精度は向上する。よって、ΔSOCvに基づいて重みを設定する。例えば以下の式(11)で示す重みを導入する。
Figure JPOXMLDOC01-appb-M000007
[重み3:SOCv1とSOCv2までの時間に基づいて重みを設定する]
 第1の実施形態の選択条件6で述べたように、SOCv1とSOCv2間の時間は短い方が、電流センサ106のオフセット誤差等の影響を受けにくく高精度化が可能である。よって、SOCv1とSOCv2間の時間に基づいて重みを設定する。例えば以下の式(12)で示す重みを導入する。tthresholdは第1の実施形態の選択条件6で示した所定時間を示している。
Figure JPOXMLDOC01-appb-M000008
 このようにして、重み演算部400で演算された重みWは、重み付け平均化Qmax’演算部401に出力する。重み付け平均化Qmax’演算部401ではQmaxSOCv演算部302でのQmaxSOCv演算結果と、その演算時の条件で演算した重みWにて重み付け平均を行う。重み付け平均は以下の式(13)により行う。
Figure JPOXMLDOC01-appb-M000009
 ここで、Qmax’_zは、式(13)の前回の演算結果である。
 第2の実施形態によれば、重み付け平均化により、信頼のできるデータが大きく反映されることで高精度化できるとともに、真値への収束を早めることが可能となる。
-第3の実施形態-
 図9は、第3の実施形態による第2のSOC演算部114の構成を示す図である。
 第3に実施の形態にあっては、SOC演算部として、第1の実施形態におけるSOC演算部109に代えて第2のSOC演算部114を備えている。その他の構成は図1と同様であり、その説明を省略する。
 第2のSOC演算部114は、第1のSOC演算部109Aと、電池電圧推定部303と、SOCv誤差演算部304と、最終的なSOC演算部500とを有する。
 第1のSOC演算部109Aは、第1の実施形態で説明したSOC演算部109と同様であり、SOCi演算部112とSOCv演算部113とを備え、第1の実施形態で説明した式(1)により、SOCを演算する。演算されたSOCは電池電圧推定部303に送信される。
 SOCi演算部112は、第1の実施形態で説明した内容と同様であり、二次電池100が充放電する電流Iを式(2)にしたがって積算することにより、二次電池100のSOCiを求め、最終的なSOC演算部500へ出力する。
 SOCv演算部113は、第1の実施形態で説明した内容と同様であり、二次電池100の等価回路モデルからSOCvを演算し、V0、Vpを電池電圧推定部303に、SOCvを最終的なSOC演算部500へ出力する。
 電池電圧推定部303は、第1の実施形態で説明した内容と同様であり、式(5)で推定した電池電圧VcalcをSOCv誤差演算部304に出力する。OCV(SOC)は、SOC演算部109により式(1)に基づいて求めたSOCを元に、予め記憶部に記憶されているSOCとOCVの対応関係(SOCテーブル)から求めたOCVである。VとVpは二次電池100の等価回路モデルで示した値である。
 なお、式(5)に記載のOCV(SOC)は、SOCi演算部112により式(2)に基づいて求めたSOCiを元に、予め記憶部に記憶されているSOCとOCVの対応関係(SOCテーブル)から求めたOCVを用いてもよい。本実施形態では、これらのOCVを第2開回路電圧と称する。
 SOCv誤差演算部304は、電圧センサ108から入力する電池電圧VとVcalcと差をとり誤差αを式(6)に基づいて演算し、最終的なSOC演算部500に誤差αを出力する。
 最終的なSOC演算部500にはSOCvとSOViが入力され、最終的なSOC演算部500は誤差αの値に基づいて、最終的なSOCを演算する。例えば、誤差αが所定値Vthreshold以下であれば、SOCvの誤差が小さいと判断しSOCvを最終的なSOCとして後段に出力する。誤差αが所定値Vthresholdより大きい場合は、充電率SOCiを最終的なSOCとして後段に出力する。
 なお、誤差αの値によって重みW1を式(10)により演算し、W1=Wとして式(1)により重み付け平均化しても良い。
 本実施形態によれば、最終的なSOCを誤差αに基づいてSOCvとSOCiから選択して、決定することで、信頼できる演算結果を反映できるため、SOCの演算の高精度化が可能である。
 以上説明した実施形態によれば、次の作用効果が得られる。
(1)二次電池制御装置102は、分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池100の内部抵抗成分Rと、を少なくとも有する等価回路から二次電池100の第1開回路電圧OCVを求め、第1開回路電圧OCV、および、二次電池100の充電率との関係から二次電池100の充電率SOCvを求める。そして、二次電池制御装置102は、二次電池100の実測電圧の値から、第1開回路電圧OCVとは異なる方法で演算された第2開回路電圧の値、二次電池100の電流情報に応じて演算される分極成分の電圧値Vp、および内部抵抗成分Rと二次電池100の電流値Iの積にて表される値RI、を引いた値を演算する。これにより、二次電池100の実測電圧の値とSOCvの演算の値との差を求めることができる。
(2)二次電池制御装置102は、分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池100の内部抵抗成分と、を少なくとも有する等価回路から二次電池100の第1開回路電圧OCVを求め、第1開回路電圧OCVと二次電池の充電率SOCとの対応関係から二次電池の充電率SOCvを求めるSOCv演算部113と、第1開回路電圧OCVとは異なる第2開回路電圧OCV、二次電池の電流情報に応じて演算される分極成分の電圧値Vp、および内部抵抗成分Rと二次電池の電流値Iの積で表される値RIを元に電池電圧を推定する電池電圧推定部303と、電池電圧推定部303で推定された電池電圧Vcalcと二次電池の実測電圧との誤差αを求めるSOCv誤差演算部304と、を備える。これにより、SOCvの演算の誤差を演算することができる。
(3)二次電池制御装置102は、二次電池100が充放電する電流を積算して求めた二次電池100の充電率SOCiを演算するSOCi演算部112を備え、電池電圧推定部303は、第2開回路電圧の値を、第1開回路電圧と二次電池の充電率SOCとの対応関係に基づいて、充電率SOCiを参照して求める。これにより、SOCvの演算の誤差を演算することができる。
(4)二次電池制御装置102は、充電率SOCiと充電率SOCvを重み付け加算して充電率SOCを求め、電池電圧推定部303は、第2開回路電圧の値を、第1開回路電圧と二次電池の充電率SOCとの対応関係に基づいて、重み付け加算した充電率SOCを参照して求める。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(5)二次電池制御装置102は、充電率SOCvの少なくとも2点の充電率SOCv1、充電率SOCv2を示す間で二次電池に流れた電流値を積算して充放電容量を演算する電流積算部301と、少なくとも2点の充電率SOCv1、充電率SOCv2と二次電池の電流積分値を用いて二次電池の容量劣化率SOHQを演算するSOHQ演算部115と、を備え、SOHQ演算部115は、誤差演算部304が演算した誤差が所定値以下の場合に、容量劣化率SOHQを演算する、または、演算した容量劣化率SOHQを有効とする。これにより、SOHQ演算に使用するSOCvとして高精度な2点を選択することが可能になる。
(6)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、誤差が小さい場合に、2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(7)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、二次電池100に流れる電流の絶対値が小さい場合に、前記2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(8)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、二次電池100の温度が所定値以内の場合に、2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(9)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、充電率SOCv1と充電率SOCv2の差が大きい2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(10)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、二次電池100の放電時における充電率SOCv1及び充電率SOCv2、もしくは二次電池100の充電時における充電率SOCv1及び充電率SOCv2の2点を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(11)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、充電率SOCv1と充電率SOCv2の検出時間が所定時間以上離れていない2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(12)二次電池制御装置102において、SOCv演算部113より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部300を備え、選択部300は、誤差の符号が同一である場合に2点の充電率SOCv1、充電率SOCv2を選択する。これにより、SOCvの演算の誤差をより高精度に演算することができる。
(13)二次電池制御装置102は、容量劣化率SOHQの重み付け平均化を行う重み付け平均化Qmax’演算部401を備え、重み付け平均化Qmax’演算部401は、誤差に基づく重み付けにより容量劣化率SOHQを演算する。これにより、信頼のできるデータが大きく反映されることで高精度化できるとともに、真値への収束を早めることが可能となる。
(14)二次電池制御装置102は、二次電池100が充放電する電流を積算して求めた二次電池100の充電率SOCiを演算するSOCi演算部112と、充電率SOCiと充電率SOCvを重み付け加算して充電率SOCを求める第1のSOC演算部109Aと、電池電圧推定部303は、第2開回路電圧の値を、二次電池100の開回路電圧OCVと二次電池の充電率SOCとの対応関係より、充電率SOCを参照して求め、第2のSOC演算部114は、誤差が所定値以下の場合は、充電率SOCvを適正値として出力し、誤差が所定値より大きい場合は、充電率SOCiを適正値として出力する。これにより、信頼できる演算結果を反映できるため、SOCの演算の高精度化が可能である。
 本発明は、上記の実施形態に限定されるものではなく、本発明の特徴を損なわない限り、本発明の技術思想の範囲内で考えられるその他の形態についても、本発明の範囲内に含まれる。
1  :電池システム
100:二次電池
101:電池情報取得部
102:二次電池制御装置
103:上位コントローラ
104:インバータ
105:負荷
106:電流センサ
107:温度センサ
108:電圧センサ
109:SOC演算部
109A:第1のSOC演算部
110:SOH演算部
111:許容電流演算部
112:SOCi演算部
113:SOCv演算部
114:第2のSOC演算部
115:SOHQ演算部
200:OCV
201:直流抵抗
202:分極抵抗
203:分極キャパシタ
300:SOCv2点選択部
301:電流積算部
302:QmaxSOCv演算部
303:電池電圧推定部
304:SOCv誤差演算部
305:最終的なQmax’演算部
306:SOHQ変換部
400:重み演算部 
401:重み付け平均化Qmax’演算部
500:最終的なSOC演算部

Claims (14)

  1.  分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池の内部抵抗成分Rと、を少なくとも有する等価回路から前記二次電池の第1開回路電圧OCVを求め、前記第1開回路電圧OCV、および、前記二次電池の充電率との関係から前記二次電池の充電率SOCvを求める二次電池制御装置であって、
     前記二次電池制御装置は、前記二次電池の実測電圧の値から、前記第1開回路電圧OCVとは異なる方法で演算された第2開回路電圧の値、前記二次電池の電流情報に応じて演算される前記分極成分の電圧値Vp、および前記内部抵抗成分Rと前記二次電池の電流値Iの積にて表される値RI、を引いた値を演算する二次電池制御装置。
  2.  分極抵抗と容量成分との並列接続で表わされる分極成分と、二次電池の内部抵抗成分と
    、を少なくとも有する等価回路から前記二次電池の第1開回路電圧を求め、前記第1開回路電圧と前記二次電池の充電率SOCとの対応関係から前記二次電池の充電率SOCvを求めるSOCv演算部と、
     前記第1開回路電圧とは異なる第2開回路電圧、前記二次電池の電流情報に応じて演算される前記分極成分の電圧値、および前記内部抵抗成分と前記二次電池の電流値の積で表される値を元に電池電圧を推定する電池電圧推定部と、
     前記電池電圧推定部で推定された電池電圧と前記二次電池の実測電圧との誤差を演算する誤差演算部と、
     を備える二次電池制御装置。
  3.  請求項2に記載の二次電池制御装置において、
     前記二次電池が充放電する電流を積算して求めた前記二次電池の充電率SOCiを演算するSOCi演算部を備え、
     前記電池電圧推定部は、前記第2開回路電圧の値を、前記第1開回路電圧と前記二次電池の充電率SOCとの対応関係に基づいて、前記充電率SOCiを参照して求める二次電池制御装置。
  4.  請求項3に記載の二次電池制御装置において、
     前記充電率SOCiと前記充電率SOCvを重み付け加算して充電率SOCを求め、
     前記電池電圧推定部は、前記第2開回路電圧の値を、前記第1開回路電圧と前記二次電池の充電率SOCとの対応関係に基づいて、前記重み付け加算した充電率SOCを参照して求める二次電池制御装置。
  5.  請求項2から請求項4までのいずれか一項に記載の二次電池制御装置において、
     前記充電率SOCvの少なくとも2点の充電率SOCv1、充電率SOCv2を示す間で前記二次電池に流れた電流値を積算して充放電容量を演算する電流積算部と、
     前記少なくとも2点の充電率SOCv1、充電率SOCv2と前記二次電池の電流積分値を用いて前記二次電池の容量劣化率SOHQを演算するSOHQ演算部と、
     を備え、
     前記SOHQ演算部は、
     前記誤差演算部が演算した誤差が所定値以下の場合に、容量劣化率SOHQを演算する
    、または、演算した容量劣化率SOHQを有効とする二次電池制御装置。
  6.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記誤差が小さい場合に、前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  7.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記二次電池に流れる電流の絶対値が小さい場合に、前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  8.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記二次電池の温度が所定値以内の場合に、前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  9.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記充電率SOCv1と前記充電率SOCv2の差が大きい前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  10.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記二次電池の放電時における前記充電率SOCv1及び前記充電率SOCv2、もしくは前記二次電池の充電時における前記充電率SOCv1及び前記充電率SOCv2の2点を選択する二次電池制御装置。
  11.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記充電率SOCv1と前記充電率SOCv2の検出時間が所定時間以上離れていない前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  12.  請求項5に記載の二次電池制御装置において、
     前記SOCv演算部より出力される充電率SOCvの中から2点の充電率SOCv1、充電率SOCv2を選択する選択部を備え、
     前記選択部は、前記誤差の符号が同一である場合に前記2点の充電率SOCv1、充電率SOCv2を選択する二次電池制御装置。
  13.  請求項5に記載の二次電池制御装置において、
     前記容量劣化率SOHQの重み付け平均化を行う重み付け平均化演算部を備え、
     前記重み付け平均化演算部は、前記誤差に基づく重み付けにより前記容量劣化率SOHQを演算する二次電池制御装置。
  14.  請求項2に記載の二次電池制御装置において、
     前記二次電池が充放電する電流を積算して求めた前記二次電池の充電率SOCiを演算するSOCi演算部と、
     前記充電率SOCiと前記充電率SOCvを重み付け加算して充電率SOCを求めるSOC演算部と、をさらに備え、
     前記電池電圧推定部は、前記第2開回路電圧の値を、前記二次電池の開回路電圧OCVと前記二次電池の充電率SOCとの対応関係より、前記重み付け加算した充電率SOCを参照して求め、
     前記SOC演算部は、前記誤差が所定値以下の場合は、前記充電率SOCvを適正値として出力し、前記誤差が所定値より大きい場合は、前記充電率SOCiを適正値として出力する二次電池制御装置。
PCT/JP2018/023396 2017-07-12 2018-06-20 二次電池制御装置 WO2019012930A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-136614 2017-07-12
JP2017136614A JP6821525B2 (ja) 2017-07-12 2017-07-12 二次電池制御装置

Publications (1)

Publication Number Publication Date
WO2019012930A1 true WO2019012930A1 (ja) 2019-01-17

Family

ID=65002579

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/023396 WO2019012930A1 (ja) 2017-07-12 2018-06-20 二次電池制御装置

Country Status (2)

Country Link
JP (1) JP6821525B2 (ja)
WO (1) WO2019012930A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077387A (zh) * 2019-11-28 2020-04-28 深圳市元征科技股份有限公司 电压检测***、方法、控制装置和存储介质
CN112034366A (zh) * 2020-08-25 2020-12-04 惠州市蓝微电子有限公司 一种soc动态补偿方法及电子***

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239634B (zh) * 2020-03-20 2022-10-14 中创新航科技股份有限公司 一种电池***支路状态的检测方法及装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011106953A (ja) * 2009-11-17 2011-06-02 Honda Motor Co Ltd 電池容量検出方法
JP2011106952A (ja) * 2009-11-17 2011-06-02 Honda Motor Co Ltd 電池の残容量推定方法
JP2012063244A (ja) * 2010-09-16 2012-03-29 Calsonic Kansei Corp バッテリの充電率推定装置
WO2014122721A1 (ja) * 2013-02-05 2014-08-14 日立ビークルエナジー株式会社 電池制御装置
US20150316618A1 (en) * 2014-05-05 2015-11-05 Apple Inc. Methods and apparatus for battery power and energy availability prediction
JP2017067788A (ja) * 2015-02-19 2017-04-06 三菱電機株式会社 電池状態推定装置
US20170146608A1 (en) * 2015-11-20 2017-05-25 Korea Advanced Institute Of Science And Technology Method of dynamically extracting entropy of battery

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011106953A (ja) * 2009-11-17 2011-06-02 Honda Motor Co Ltd 電池容量検出方法
JP2011106952A (ja) * 2009-11-17 2011-06-02 Honda Motor Co Ltd 電池の残容量推定方法
JP2012063244A (ja) * 2010-09-16 2012-03-29 Calsonic Kansei Corp バッテリの充電率推定装置
WO2014122721A1 (ja) * 2013-02-05 2014-08-14 日立ビークルエナジー株式会社 電池制御装置
US20150316618A1 (en) * 2014-05-05 2015-11-05 Apple Inc. Methods and apparatus for battery power and energy availability prediction
JP2017067788A (ja) * 2015-02-19 2017-04-06 三菱電機株式会社 電池状態推定装置
US20170146608A1 (en) * 2015-11-20 2017-05-25 Korea Advanced Institute Of Science And Technology Method of dynamically extracting entropy of battery

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077387A (zh) * 2019-11-28 2020-04-28 深圳市元征科技股份有限公司 电压检测***、方法、控制装置和存储介质
CN111077387B (zh) * 2019-11-28 2021-12-07 深圳市元征科技股份有限公司 电压检测***、方法、控制装置和存储介质
CN112034366A (zh) * 2020-08-25 2020-12-04 惠州市蓝微电子有限公司 一种soc动态补偿方法及电子***

Also Published As

Publication number Publication date
JP2019020174A (ja) 2019-02-07
JP6821525B2 (ja) 2021-01-27

Similar Documents

Publication Publication Date Title
JP5287844B2 (ja) 二次電池の残存容量演算装置
CN103630843B (zh) 电池状态推测装置及推测方法、电池控制装置、电池***
US8332169B2 (en) Apparatus and method for estimating state of health of battery based on battery voltage variation pattern
US7202632B2 (en) Battery management apparatus
US10725111B2 (en) Battery state detection device, secondary battery system, program product, and battery state detection method
CN102822690B (zh) 充电状态估计装置
JP6534746B2 (ja) 電池制御装置及び電池システム
CN106662620B (zh) 电池状态探测装置、二次电池***、存储介质、电池状态探测方法
JP6101714B2 (ja) 電池制御装置、電池システム
TW201007191A (en) Apparatus and method for estimating resistance characteristics of battery based on open circuit voltage estimated by battery voltage variation
US10444296B2 (en) Control device, control method, and recording medium
JP2006292565A (ja) 二次電池劣化状態判定方法及び二次電池劣化状態判定装置
WO2019012930A1 (ja) 二次電池制御装置
JP2022167921A (ja) 蓄電池制御装置および制御方法
JP2019092335A (ja) 電源制御システムおよび方法
KR20180095207A (ko) 에너지 저장장치 충전상태 추정방법
WO2020026509A1 (ja) 電池状態推定装置、電池制御装置
KR20220037169A (ko) 에너지 저장 시스템의 충전 상태 추정장치 및 방법
JP5886225B2 (ja) 電池制御装置及び電池制御方法
JP6350174B2 (ja) 電池システム用制御装置および電池システムの制御方法
WO2021157120A1 (ja) 電池管理装置、電池管理方法、電力貯蔵システム
JPWO2013057784A1 (ja) 電池制御装置、二次電池システム
JP6827527B2 (ja) 電池制御装置
WO2013146248A1 (ja) Soc推定装置
JP2023116292A (ja) 蓄電池の劣化診断システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18831672

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18831672

Country of ref document: EP

Kind code of ref document: A1