WO2018158928A1 - 設備保全支援システム及び設備保全支援方法 - Google Patents

設備保全支援システム及び設備保全支援方法 Download PDF

Info

Publication number
WO2018158928A1
WO2018158928A1 PCT/JP2017/008410 JP2017008410W WO2018158928A1 WO 2018158928 A1 WO2018158928 A1 WO 2018158928A1 JP 2017008410 W JP2017008410 W JP 2017008410W WO 2018158928 A1 WO2018158928 A1 WO 2018158928A1
Authority
WO
WIPO (PCT)
Prior art keywords
maintenance
request
staff
equipment
production
Prior art date
Application number
PCT/JP2017/008410
Other languages
English (en)
French (fr)
Inventor
下村将文
合田光司
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to JP2019502401A priority Critical patent/JP6711955B2/ja
Priority to PCT/JP2017/008410 priority patent/WO2018158928A1/ja
Priority to BR112019017928A priority patent/BR112019017928A2/pt
Publication of WO2018158928A1 publication Critical patent/WO2018158928A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management

Definitions

  • the present invention relates to a facility maintenance support system and a facility maintenance support method for supporting the work of a worker (maintenance staff) who maintains a production facility installed at a production site.
  • the system described in Japanese Patent Laid-Open No. 2001-159916 is connected to a data management device that manages equipment inspection information of various facilities, and the data management device via a communication interface device. And a portable input / output device that performs transmission and reception.
  • the data management device includes a management device-side storage unit that stores facility inspection information including a circulation order when various facilities are inspected.
  • the portable input / output device includes an input / output device side storage unit and a tour target display unit.
  • the input / output device side storage means stores facility inspection information from the data management device that is taken in via the communication interface device.
  • the traveling object display means sequentially displays the traveling object on the screen for each predetermined operation based on the traveling order included in the equipment inspection information stored in the input / output device storage means.
  • the portable input / output device can be used to efficiently and reliably check the equipment without depending on the skill level of the worker.
  • a maintenance staff or a patrol in the maintenance office using PHS (Personal Handy-phone System) or an extension telephone While confirming the work status of the maintenance staff of each individual, the person in charge of maintenance (contact personnel) is determined and dispatched to the maintenance request destination.
  • PHS Personal Handy-phone System
  • the present invention has been made in consideration of such problems.
  • Information can be shared among production sites, maintenance staff, and management offices using communication means.
  • An equipment maintenance support system and equipment maintenance support method that can grasp at a glance the progress of maintenance work in response to requests from production sites and the efficiency of maintenance staff who maintain production equipment The purpose is to provide.
  • An equipment maintenance support system is an equipment maintenance support system that supports maintenance of one or more production facilities installed at a production site, and includes at least one server and one or more servers.
  • a terminal and one or more management monitors are arranged as necessary for each maintenance staff office, production staff office, warehouse, and production line, and a maintenance request from the terminal arranged in the production line is made.
  • means for displaying at least the management monitor and the terminal a layout screen showing an arrangement position of one or more production facilities installed at the production site, and from the production line You may have a means to reflect a request
  • various requests can be input while looking directly at the layout screen using a display connected to a terminal installed at each production line or a management monitor connected to a server.
  • the input request can be reflected on the layout screen.
  • the request content for the production facility can be easily confirmed by a person other than the requested staff or the like looking at the layout screen.
  • the maintenance request includes at least primary determination information indicating a mechanical trouble or an electric trouble.
  • the maintenance request is displayed in a state in which a layout screen showing an arrangement position of one or more production facilities installed on the production site is displayed on the terminal arranged on the production line. It is preferably carried out by manual input of production staff. As a result, the maintenance request is reflected on the layout screen, so the production staff can easily check whether the maintenance request has been made correctly for the equipment that requires the maintenance request by making a maintenance request while looking at the layout screen. can do.
  • the maintenance request manually input by the production staff includes at least information on parts necessary for maintenance and a storage location of the parts.
  • the maintenance request includes information on the parts required for maintenance and the storage location of the parts, the maintenance staff can easily obtain the parts required for maintenance and perform maintenance work. The time until the start can be shortened, and the efficiency of maintenance work can be improved.
  • the maintenance request manually input by the production staff includes information on troubles that have occurred in the past.
  • the maintenance request includes information related to troubles that have occurred in the past, so maintenance personnel can efficiently carry out maintenance work while checking the information, and shorten the maintenance work time. It is possible to improve the efficiency of maintenance work.
  • the maintenance request manually input by the production staff includes information on a maintenance staff comment on the trouble that has occurred in the past.
  • the maintenance request includes information related to comments from maintenance staff regarding troubles that have occurred in the past.Even for equipment that the maintenance person is in charge of for the first time, referring to the comments enables efficient maintenance work. This makes it possible to improve the efficiency of maintenance work.
  • At least the terminal arranged on the production line is instructed by the maintenance staff when the secondary judgment made after the maintenance work by the maintenance staff is different from the primary judgment. There may be means for requesting support based on the above.
  • the maintenance staff can efficiently advance the maintenance work together with the support staff, and the efficiency of the maintenance work can be improved.
  • the support request is made by the maintenance staff in a state in which a layout screen showing an arrangement position of one or more production facilities installed on the production site is displayed on the terminal arranged on the production line. It is preferable that it is implemented by manual input by a person.
  • the support request is reflected in the layout screen, so the maintenance staff can easily check whether the support request has been made correctly for the equipment that requires the support request by making a support request while looking at the layout screen. Can be confirmed.
  • At least the terminal arranged on the production line includes means for requesting support when an elapsed time of maintenance work by the maintenance staff exceeds a preset time. You may have.
  • the time may be forgotten and the opportunity to request support may be missed. Therefore, when the elapsed time of maintenance work by the maintenance staff exceeds a preset time, a support request can be made, thereby reducing the burden on the maintenance staff.
  • the maintenance staff can efficiently perform the maintenance work together with the support staff, and the efficiency of the maintenance work can be improved.
  • At least the terminal arranged on the production line outputs an alarm indicating an abnormality of the maintenance work when the maintenance work elapsed time by the maintenance person exceeds a preset time. May be.
  • the terminal arranged on the production line may have means for displaying a maintenance plan for production facilities on the production line based on an instruction from the maintenance staff.
  • the system has an equipment monitoring system that monitors an operation status of the production equipment arranged in the production line, and the equipment monitoring system detects the abnormality of the production equipment when the abnormality is detected.
  • a maintenance request is made to the terminal installed at the maintenance staff office, and the terminal installed at the maintenance staff office further receives means for receiving the maintenance request from the equipment monitoring system, and the received maintenance request. May be displayed on at least the management monitor installed in the maintenance staff office.
  • the equipment monitoring system When the equipment monitoring system detects an abnormality in the production equipment, it issues a maintenance request to the terminal installed in the maintenance staff office, so it can issue a maintenance request more quickly than a maintenance request manually input by the production staff. .
  • the maintenance staff since the maintenance request by the equipment monitoring system is displayed on the management monitor installed in the maintenance staff office, the maintenance staff can recognize the maintenance request by the equipment monitoring system at an early stage and maintenance work is required. Maintenance work for various facilities can be carried out at an early stage.
  • At least one server, one or more terminals, and one or more management monitors include a maintenance staff office, a production staff office, a warehouse, An equipment maintenance support method that is arranged for each production line as needed and is used in an equipment maintenance support system that supports the maintenance of one or more production equipment installed at a production site.
  • information can be shared using the communication means between the production site, the maintenance staff, and the management office. And the progress of maintenance work in response to a request from the production site can be grasped at a glance, and the work efficiency of maintenance staff who maintain the production equipment can be improved.
  • FIGS. 9A to 9G are explanatory diagrams showing display examples indicating maintenance requests, support requests, replacement requests, maintenance start, maintenance interruption, and maintenance completion.
  • FIG. 10A is an explanatory diagram illustrating an example of a maintenance status list for each facility (maintenance start), and FIG. 10B is an explanatory diagram illustrating an example of a maintenance status list for each facility (maintenance suspension).
  • FIG. 11A is an explanatory diagram showing an example of the maintenance status list by facility (maintenance restart), and FIG. 11B is an explanatory diagram showing an example of the maintenance status list by facility (completion of correspondence).
  • the facility maintenance support system 10 includes one or more maintenance staff offices 12, one or more production staff offices 14, a plurality of production lines 16, and a plurality of warehouses 18, as shown in FIG. Applicable to normal production plant.
  • the equipment maintenance support system 10 includes at least one server, one or more terminals, and one or more management monitors as needed for each of the maintenance staff office 12, the production staff office 14, and the production line 16. Are arranged.
  • the maintenance staff office 12 has a maintenance management server 20.
  • the maintenance management server 20 includes a maintenance staff terminal 22 for each maintenance staff, a barcode printer 24 that issues an identification sheet (sheet with a barcode printed on the surface) to be affixed to maintenance parts, and a maintenance management monitor. 26 is connected.
  • the maintenance staff terminal 22, the barcode printer 24 and the maintenance management monitor 26 are connected to the maintenance management server 20 through an internal bus 28.
  • the production staff office 14 is provided with a production management monitor 30.
  • the production staff office 14 may also have a production management server and a production staff terminal for each production staff.
  • Each call line 32 is installed in each production line 16.
  • each production line 16 is provided with an equipment monitoring system 38 that monitors the operation status of one or more equipments arranged on the production line 16 using the sensor 36 or the like.
  • the maintenance staff terminal 22 a notebook type or desktop type information terminal placed on a desk or the like, a portable information terminal capable of performing screen display, and the like can be cited.
  • the maintenance management server 20 and the call terminal 32 of each production line 16 are connected to each other through an external bus 40. Accordingly, data is transmitted and received among the maintenance management server 20, the maintenance staff terminal 22, and the call terminal 32.
  • the maintenance staff terminal 22 is connected to a barcode reader 42 for reading a barcode (identified simply as a barcode) of an identification sheet attached to each maintenance component.
  • a barcode reader 42 for reading a barcode (identified simply as a barcode) of an identification sheet attached to each maintenance component.
  • data transmission / reception among the maintenance management server 20, the maintenance staff terminal 22, and the call terminal 32 may be performed wirelessly.
  • the maintenance management server 20 has a backbone system (for example, an operating system) including a program related to a preventive maintenance plan and production maintenance system data.
  • the maintenance management server 20 provides files and data in accordance with requests from various terminals (clients).
  • the functional units included in the call terminal 32 include a maintenance plan display processing unit 50, an equipment layout display processing unit 52, a first maintenance request processing unit 54A, a first support request processing unit 56A, a second A support request processing unit 56B, a change request processing unit 58, a maintenance start processing unit 60, a maintenance interruption processing unit 62, a maintenance restart processing unit 64, a maintenance completion processing unit 66, and a maintenance support information display processing unit 68 are provided.
  • the facility monitoring system 38 includes a second maintenance request processing unit 54B.
  • the maintenance support information display processing unit 68 includes a support / replacement request screen display processing unit 70, an equipment operation status history display processing unit 72, a maintenance work status display processing unit 74, and a repair parts list display processing unit 76. , An inventory search screen display processing unit 78, a work completion registration screen display processing unit 80, a maintenance history list display processing unit 82, and a detailed history display processing unit 84.
  • the maintenance staff terminal 22 is a portable terminal, the maintenance staff can carry the maintenance work by carrying the maintenance staff terminal 22. In this case, the maintenance staff terminal 22 can also be used as the call terminal 32.
  • a display 32a is connected to the call terminal 32.
  • the display 32a includes at least an equipment main screen 90 (see FIG. 4), a maintenance plan screen 92 (see FIG. 5), and an equipment layout.
  • a screen 94 (see FIG. 8) and the like are displayed.
  • the facility main screen 90 includes a button display area 100 in which various buttons are arranged, a message display area 102 in which a message is displayed, and the like.
  • the button display area 100 includes, for example, a maintenance request button 104, a consultation request button 106, a plan start button 108, a response completion button 110, and the like.
  • the maintenance request button 104 and the consultation request button 106 are respectively a mechanical maintenance request button 104a and a mechanism consultation request button 106a that are operated in the case of a mechanical system failure, and an electrical maintenance request button that is operated in the case of an electrical system failure. 104b and an electric consultation request button 106b.
  • mechanical system failures and consultations include abnormal motor noise, chain breakage, air leakage, and oil leakage.
  • electrical system failures and consultations include sensor failures, damp stop (no alarm line stop), electrical equipment failures, and so on.
  • the maintenance request button 104 includes a maintenance start / resume button 104c that is operated when maintenance work (including maintenance work by consultation) is started or resumed, and a maintenance interruption button that is operated when maintenance work is interrupted. 104d.
  • the plan start button 108 is operated by a maintenance staff on a preset maintenance plan date (such as the beginning of the fiscal year), thereby starting the maintenance plan display processing unit 50 (see FIG. 2).
  • the maintenance plan display processing unit 50 displays a maintenance plan screen 92 of the equipment on the display 32a and the production management monitor 30 (hereinafter referred to as the display 32a).
  • the maintenance plan screen 92 includes, for example, a part replacement schedule, a driving part check schedule, and the like. Then, the maintenance staff carries out planned maintenance for the planned equipment among the displayed maintenance plans.
  • the equipment main screen 90 has three tabs (first tab 120a to third tab 120c) as shown in FIG.
  • first tab 120a By operating the first tab 120a, the equipment main screen 90 is displayed, and by operating the second tab 120b, a pull-down menu (not shown) regarding the production support tool is displayed.
  • second tab 120b By operating the third tab 120c, a pull-down menu 122 relating to the maintenance activity support tool is displayed as shown in FIG.
  • This pull-down menu 122 has a display form in which a plurality of items for supporting maintenance activities are arranged, for example.
  • the support / change request screen display processing unit 70 By selecting and operating the first item (first item) from above, the support / change request screen display processing unit 70 (see FIG. 3) is activated.
  • the support / replacement request screen display processing unit 70 displays a support / replacement request screen 124 as shown in FIG.
  • the support / change request screen 124 includes a support request button 126 and a change request button 128.
  • the support request button 126 and the change request button 128 include a mechanism support request button 126a and a mechanism change request button 128a that are operated in the case of a mechanical system failure, respectively, and an electric support request button that is operated in the case of an electrical system failure. 126b and an electric change request button 128b.
  • Equipment main screen 90 For example, a mechanical maintenance request button 104a, an electrical maintenance request button 104b, a mechanical consultation request button 106a, an electrical consultation request button 106b on the equipment main screen 90 (see FIG. 4), and a mechanical support request on the support / replacement request screen 124 (see FIG. 7).
  • the equipment layout display processing unit 52 By operating any of the button 126a, the electric support request button 126b, the mechanical change request button 128a, and the electric change request button 128b, the equipment layout display processing unit 52 (see FIG. 2) is activated.
  • the equipment layout display processing unit 52 displays an equipment layout screen 94 as shown in FIG.
  • the equipment layout display processing unit 52 requests the maintenance management server 20 to transfer image data of the equipment layout screen 94 or additional information according to various requests and various work progresses.
  • the facility layout screen 94 is displayed based on the image data or additional information transferred from the maintenance management server 20.
  • the equipment layout screen 94 includes an image 130 simulating a plan view of a production site, a schematic diagram 132 of a plurality of production lines 16, and a plurality of productions arranged for each production line 16.
  • the form etc. which displayed the symbol image 134 which shows an installation are mentioned.
  • a red circle 136R is displayed on the right shoulder of the symbol image 134 of the requested facility. If it is a system maintenance request, for example, a yellow circle 136Y is displayed as shown in FIG. 9B.
  • a circular 136rw for example, a left part of the symbol image 134 of the requested facility, for example, red on the right shoulder
  • a circular 136yw for example, the left semicircle is partially yellow
  • a green circle 136G is displayed on the right shoulder of the symbol image 134 of the requested equipment
  • maintenance is interrupted, as shown in FIG. 9F
  • a light blue circle 136A is displayed on the right shoulder of the symbol image 134 of the requested facility
  • a circular display displayed on the right shoulder of the symbol image 134 of the requested facility, for example. Is erased. Note that nothing is displayed on the right shoulder of the symbol image 134 of the requested facility as shown in FIG. 9G for normal production facilities that have not been requested for maintenance.
  • the display of red circles and yellow circles displayed in response to the mechanical system maintenance request, electrical system maintenance request, etc. described above is merely an example, depending on the environment such as the factory where the equipment maintenance support system is installed. Can be set as appropriate.
  • the production staff or the like operates, for example, the mechanical maintenance request button 104a, the electrical maintenance request button 104b, the mechanical consultation request button 106a, or the electrical consultation request button 106b on the equipment main screen 90 (see FIG. 4), and the equipment layout screen 94 ( After displaying (see FIG. 8), the first maintenance request processing unit 54A (see FIG. 2) can display the symbol image 134 indicating the production facility subject to the maintenance request by touching with a finger or a pen-like instrument. It is activated.
  • the first maintenance request processing unit 54A makes a mechanical or electrical maintenance request. That is, the maintenance request information is transmitted to the maintenance management server 20 and the maintenance staff terminal 22.
  • the maintenance request information includes, for example, a maintenance request code, a transmission source code, a mechanical system or electrical system type, and an equipment code.
  • the first maintenance request code is an identification code for recognizing the maintenance request information in the maintenance management server 20 and each terminal. The same applies hereinafter.
  • the identification code of the call terminal 32 that is the transmission source is used.
  • equipment code equipment identification information associated with the call terminal 32 on a one-to-one basis is used. In this case, the identification information of the requested equipment is used.
  • the identification information of the requested equipment is used when a maintenance person who arrives at the requested equipment outputs information on at least parts and maintenance history related to the contents of the maintenance request to the display 32a of the call terminal 32 or the like.
  • Examples of information related to parts and maintenance history include parts necessary for maintenance and storage locations of the parts, information related to troubles that occurred in the past, information related to comments from maintenance staff regarding the troubles that occurred in the past, and the like.
  • the identification information of the requested equipment is information relating to these pieces of information (information relating to parts and maintenance history) and is used as key information for outputting these pieces of information.
  • the second maintenance request processing unit 54B is incorporated in the equipment monitoring system 38 as shown in FIG.
  • the second maintenance request processing unit 54B is activated based on the input of a signal notifying the abnormality from the sensor 36 that monitors the operation status of the equipment arranged on the production line 16, and confirms that the maintenance request has been made in the equipment.
  • mechanical or electrical classification information may be included according to the type of the sensor 36.
  • the production staff or the like selects and operates the first item of the pull-down menu 122 (see FIG. 6), thereby starting up the support / change request screen display processing unit 70 (see FIG. 2).
  • the support / change request screen display processing unit 70 displays a support / change request screen 124 (see FIG. 7) on the display 32 a of the call terminal 32.
  • the first support request processing unit 56A (see FIG. 2) is activated by touching with a finger or touching with a pen-like instrument.
  • the first support request processing unit 56A makes a mechanical support request or an electrical support request. That is, the first support request information is transmitted to the maintenance management server 20 and the maintenance staff terminal 22.
  • the first support request information includes, for example, a first support request code, a transmission source code, a mechanical system or electrical system type, an equipment code, and the like.
  • the first first support request code is an identification code for recognizing the first support request information (support request by the staff) in the maintenance management server 20 and each terminal. Since the transmission source code and the like are the same as the above-described maintenance request information, a duplicate description thereof is omitted.
  • the first support request is made in the following cases, for example. In other words, depending on the situation of the requested equipment or the like, it may be more efficient to work by a plurality of people. In addition, there are cases where the requested facility is a facility (power supply device, compressor, etc.) that is highly important in the production of products, and early repair completion is required. In such a case, the maintenance staff requests support (staff).
  • a maintenance request or consultation when a maintenance request or consultation is made, it is determined that a mechanical failure has occurred (primary determination), and a maintenance request or consultation is made by operating the mechanism maintenance request button 104a or the mechanism consultation request button 106a. If the result of the determination (secondary determination) indicates that the failure is not related to mechanical but related to electricity, a support request from a maintenance person or the like is made. A support request is also made when the primary determination is an electrical failure and the secondary determination is a mechanical failure.
  • the second support request processing unit 56B (see FIG. 2) is activated when a predetermined time (for example, 90 minutes, 120 minutes, etc.) has passed since the maintenance staff was dispatched.
  • the second support request processing unit 56B makes a support request for mechanical or electrical relations. That is, the second support request processing unit 56B transmits the second support request information to the maintenance management server 20 and the maintenance staff terminal 22.
  • the second support request information includes, for example, a second support request code, a transmission source code, a mechanical system or electrical system type, an equipment code, and the like. As the type of the mechanical system or the electrical system, the type used in the maintenance request information is used.
  • the 2nd support request processing part 56B outputs the alarm which shows abnormality of maintenance work with a support request.
  • the replacement request information includes, for example, a replacement request code, a transmission source code, a mechanical system or electrical system type, and an equipment code.
  • the head replacement request code is an identification code for recognizing that the maintenance management server 20 and each terminal are replacement request information (a replacement request by a staff member). Since the transmission source code and the like are the same as the above-described maintenance request information, a duplicate description thereof is omitted.
  • a maintenance staff requests for example in the message display area 102 of the equipment main screen 90 (see FIG. 4). A message is displayed indicating that you are moving to the facility.
  • the replacement request is made, for example, in the following cases. That is, for example, when a maintenance request or consultation is made, it is determined that a mechanical failure has occurred (primary determination) and the maintenance request or consultation is performed by operating the mechanical maintenance request button 104a or the mechanical consultation request button 106a. If the result of the determination (secondary determination) indicates that the failure is not related to the mechanical but electrical, a replacement request is made by a maintenance person or the like. A replacement request is also made when the primary judgment is an electrical fault and the secondary judgment is a mechanical fault.
  • the maintenance person who has arrived at the requested equipment operates the maintenance start / resume button 104c on the equipment main screen 90 (see FIG. 4) to activate the maintenance start processing unit 60 (see FIG. 2).
  • the maintenance start processing unit 60 notifies the maintenance management server 20 that a maintenance start has been made by a maintenance person. That is, the maintenance start processing unit 60 creates maintenance start information and transmits it to the maintenance management server 20.
  • the maintenance start information includes, for example, a maintenance start code, a transmission source code, a person-in-charge code, an equipment code, and the like.
  • the facility-specific maintenance status list 140 is displayed on the display 32a of the call terminal 32.
  • the maintenance status list 140 by facility mainly includes the date and time when the maintenance request was made (request date), the name of the equipment, the status when the maintenance request was made (status at the time of request), the current status, Stop time (minutes) is displayed. As the current situation, “moving” indicating that the maintenance staff was moving toward the requested equipment is displayed.
  • the maintenance person in charge operates the maintenance interruption button 104d (see FIG. 4) on the equipment main screen 90, whereby the maintenance interruption processing unit 62 (see FIG. 2) is activated.
  • the maintenance interruption processing unit 62 notifies the maintenance management server 20 that there has been a maintenance interruption by a maintenance person in charge. That is, the maintenance interruption processing unit 62 creates maintenance interruption information and transmits it to the maintenance management server 20.
  • the maintenance interruption information includes, for example, a maintenance interruption code, a transmission source code, a person in charge code, an equipment code, and the like.
  • the facility-specific maintenance status list 140 is displayed on the display 32a of the call terminal 32.
  • “Now working” is displayed indicating that the maintenance staff is performing maintenance work, and further, for example, a symbol indicating “Suspended” is displayed at the right end. .
  • the maintenance restart processing unit 64 notifies the maintenance management server 20 that maintenance has been restarted by the maintenance staff. That is, the maintenance restart processing unit 64 creates maintenance restart information and transmits it to the maintenance management server 20.
  • the maintenance restart information includes, for example, a maintenance restart code, a transmission source code, a person-in-charge code, an equipment code, and the like.
  • a facility-specific maintenance status list 140 is displayed on the display 32a of the call terminal 32.
  • “corresponding suspension” indicating that the maintenance work has been interrupted is displayed, and further, for example, a symbol display indicating “resume” is performed at the right end.
  • the maintenance completion processing unit 66 When the maintenance person operates the response completion button 110 (see FIG. 4) on the equipment main screen 90, the maintenance completion processing unit 66 (see FIG. 2) is activated.
  • the maintenance completion processing unit 66 notifies the maintenance management server 20 that the maintenance response has been completed by the maintenance staff. That is, the maintenance completion processing unit 66 creates maintenance completion information and transmits it to the maintenance management server 20.
  • the maintenance completion information includes, for example, a maintenance completion code, a transmission source code, a person in charge code, an equipment code, and the like.
  • the equipment-specific maintenance status list 140 is displayed on the display 32a of the call terminal 32.
  • “in response” is displayed, indicating that the maintenance staff was performing maintenance work.
  • the equipment operation status history display processing unit 72 By selecting and operating the second item in the pull-down menu 122 of FIG. 6, the equipment operation status history display processing unit 72 (see FIG. 3) is activated.
  • the facility operation status history display processing unit 72 displays a facility operation status history screen 144 on the display 32a as shown in FIG.
  • the equipment operation status history screen 144 mainly includes a production line name input field 146a, an equipment name input field 146b, a search button 146c, and the like. Then, a maintenance person or the like inputs the production line name in the production line name input field 146a, the equipment name in the equipment name input field 146b, and touches the search button 146c with a finger or a pen-like instrument, etc.
  • the equipment operating status history display processing unit 72 displays the operating status history of the corresponding equipment.
  • the contents displayed in the history include the contents of the event that has occurred and the time at which the event occurred.
  • the maintenance work status display processing unit 74 (see FIG. 3) is activated by selecting and operating the third item in the pull-down menu 122 of FIG. As shown in FIG. 13, the maintenance work status display processing unit 74 displays a maintenance facility work status list screen (referred to as an all-line monitor screen) 148 on the display 32a.
  • This all-line monitor screen 148 mainly displays a list of the current work status of facilities requested for maintenance among all the production lines.
  • the breakdown includes the time when the maintenance request is made (request time), the elapsed time of the operation stop state (stop / elapsed time), the production line name, the equipment name, the current work status, the name of the person in charge of maintenance, and the like.
  • facilities that are in maintenance are displayed in red, for example, and other facilities are displayed in blue, for example, so that the facilities that are in maintenance can be easily identified.
  • the repair parts list display processing unit 76 By selecting and operating the fourth item in the pull-down menu 122 of FIG. 6, the repair parts list display processing unit 76 (see FIG. 3) is activated.
  • the repair part list display processing unit 76 displays a repair part search screen 150 on the display 32a as shown in FIG.
  • the repair part search screen 150 mainly has a list display area 152a and a drawing display area 152b.
  • the list display area 152a displays the type and part name of the repair part in a list format.
  • an appearance, a perspective view, and the like of a repaired part selected by a selection input (selection input by a pointer, touch, etc.) to the list display area 152a are displayed.
  • the inventory search screen display processing unit 78 By selecting and operating the fifth item in the pull-down menu 122 of FIG. 6, the inventory search screen display processing unit 78 (see FIG. 3) is activated.
  • the inventory search screen display processing unit 78 displays an inventory search screen 154 on the display 32a as shown in FIG.
  • the inventory search screen 154 mainly includes a repair parts type input field 156a, a part name input field 156b, a repair parts list screen 156c, a search button 156d, and a plurality of warehouses storing repair parts.
  • An arrangement screen 156e or the like indicating the position of is displayed.
  • the repair parts list screen 156c The breakdown of the repair parts to be obtained is displayed, and the position of the warehouse where the repair parts to be obtained are stored is displayed on the arrangement screen 156e.
  • a number indicating the location of the warehouse is indicated by, for example, red display or flashing display.
  • the maintenance staff When obtaining repair parts, for example, the maintenance staff interrupts the maintenance work and obtains repair parts from the corresponding warehouse, or sends information on repair parts to other maintenance staff (model, part name, warehouse location, etc.) ) And ask them to arrange repair parts.
  • the work completion registration screen display processing unit 80 (see FIG. 3) is activated by selecting and operating the sixth item of the pull-down menu 122 shown in FIG.
  • the work completion registration screen display processing unit 80 first displays the facility-specific maintenance status list 140 (see FIG. 11B) on the display 32a.
  • this maintenance status list 140 by facility, mainly the date and time when the maintenance request was made (request date and time), the name of the facility, the status when the maintenance request was made (status at the time of request), the current status, and the downtime (Minutes) etc. are displayed.
  • the work completion registration screen display processing unit 80 displays a work completion registration screen 158 for each person in charge as shown in FIG. To do.
  • the person-in-charge work completion registration screen 158 the person-in-charge name, reception time, start time, and response time are mainly displayed for each person in charge.
  • the work completion registration screen display processing unit 80 displays a message indicating that correspondence completion has been registered for each person in charge. At this stage, the work completion registration for each person in charge is completed.
  • the maintenance history list display processing unit 82 By selecting and operating the seventh item of the pull-down menu 122 in FIG. 6, the maintenance history list display processing unit 82 (see FIG. 3) is activated.
  • the maintenance history list display processing unit 82 displays a maintenance history list screen 160 as shown in FIG.
  • the maintenance history list screen 160 mainly has an item input area 162a and a history list display area 162b.
  • the item input area 162a since the history list has a huge amount of information, the item input area 162a can be displayed by narrowing down by, for example, the period, model name, line name, and facility name. Examples of items for narrowing down include a period, model name, line name, equipment name, creation status, history type, and the like.
  • the maintenance history list display processing unit 82 requests the maintenance management server 20 to transfer the history information of the corresponding equipment. Based on the above transfer request from the call terminal 32, the maintenance management server 20 reads the maintenance history of the corresponding equipment from a maintenance history database 198 (see FIG. 19), which will be described later, and transmits it to the requested call terminal 32. To do.
  • the maintenance history list display processing unit 82 receives the maintenance history data from the maintenance management server 20, and displays the contents in the history list display area 162b (see FIG. 17).
  • the history list display area 162b mainly includes a production line name, equipment name, history type (sudden failure, consultation / plan distinction), occurrence date / time, maintenance person name, downtime, history, remarks, etc. in a list format. Is displayed.
  • the line whose type is “sudden failure” is displayed in red and the consultation / planning line is displayed in blue, for example, so that it can be easily distinguished. It has become.
  • the maintenance history list screen 160 has a history display button 164 for displaying a maintenance history detail screen 170 (see FIG. 18).
  • the history display button 164 is touched with a finger or touched with a pen-like instrument, the detailed history display processing unit 84 (see FIG. 3) is activated.
  • the detailed history display processing unit 84 displays a maintenance history detail screen 170 (see FIG. 18) for inputting a detailed history.
  • the maintenance history detail screen 170 includes items that are automatically input by the system such as department, equipment name, occurrence date and time, and stop time, and items that are input by maintenance staff in charge of events, causes, measures, and the like.
  • the maintenance staff does not need to input the department or equipment name, but can input the event, the cause, the treatment, and the like, so that the input time can be shortened.
  • the maintenance management server 20 registers the maintenance history data from the requested equipment in the maintenance history database 198 (see FIG. 19).
  • the maintenance management server 20 includes a request progress reception unit 180, a request reflection unit 182, a work progress reflection unit 184, a maintenance history management unit 186, a maintenance management screen display processing unit 188, The repair part reflecting unit 190, the request temporary storage file 192, and the work progress temporary storage file 194 are provided. Further, a maintenance history database 198 and a repair parts database 200 are connected to the maintenance management server 20.
  • the request progress accepting unit 180 performs various maintenance requests such as a first maintenance request from the call terminal 32, a second maintenance request from the equipment monitoring system 38, a support request from the call terminal 32, a replacement request, and the like. Accepts work progress information such as maintenance restart.
  • the request reflecting unit 182 registers various requests received by the request progress receiving unit 180 in the request temporary storage file 192 and further registers in the maintenance history database 198.
  • the request reflection unit 182 reflects various requests registered in the request temporary storage file 192 on the equipment layout screen 94 (see FIG. 8).
  • a red circle 136R (see FIG. 9A) is displayed on the right shoulder of the symbol image 134 of the requested facility, and if it is an electrical system maintenance request, a yellow circle is displayed. Additional information or the like for displaying 136Y (see FIG. 9B) is transmitted to all terminals to share the information.
  • the request reflection unit 182 may be, for example, a circular 136rw (see FIG. 9C) in which a part of the symbol image 134 of the requested facility is red on the right shoulder, for example, if the request is for a mechanical support or replacement request for the requested facility. If it is an electrical support request or a change request, additional information displaying a circular 136yw (see FIG. 9D) partially yellow is transmitted to all terminals to share the information. Of course, you may transmit the image data of the equipment layout screen 94 in which additional information was reflected.
  • the work progress reflecting unit 184 registers the various work progress information received by the request progress receiving unit 180 in the work progress temporary storage file 194 and further registers it in the maintenance history database 198.
  • the work progress reflecting unit 184 reflects various work progresses registered in the work progress temporary storage file 194 on the equipment layout screen 94 (see FIG. 8).
  • a green circle 136G (see FIG. 9E) is displayed on the right shoulder of the symbol image 134 of the requested facility, for example.
  • a light blue circle 136A (see FIG. 9F) is displayed on the right shoulder, and if maintenance is complete, as shown in FIG. 9G, the circular image displayed on the right shoulder, for example, of the symbol image 134 of the requested facility is deleted.
  • the work progress information is maintenance completion
  • information such as a maintenance request and a support request registered in the request temporary storage file 192 and the work progress temporary storage file 194 is deleted with respect to the requested equipment that has undergone maintenance completion. .
  • the maintenance history management unit 186 transmits the information stored in the request temporary storage file 192 and the work progress temporary storage file 194 to the requested terminals (call terminal 32, maintenance staff terminal 22, etc.). Thereby, in each call terminal 32, each maintenance staff terminal 22, etc., the request status and work progress status in each equipment are reflected in the equipment layout screen 94, equipment operation status history screen 144, all line monitor screen 148, etc.
  • the maintenance history management unit 186 stores the maintenance history information transmitted from the call terminal 32 or the maintenance staff terminal 22, that is, various information input to the maintenance history detail screen 170 in the maintenance history database 198.
  • the maintenance management screen display processing unit 188 displays a multi-screen 202 including an equipment layout screen 94 and an all-line monitor screen 148 on the maintenance management monitor 26 as shown in FIG. Thereby, the maintenance status at the requested equipment of each production line 16 can be confirmed at a glance by the text information and the image information.
  • the above-described request progress receiving unit 180 registers the information of the person in charge of maintenance from the maintenance staff terminal 22 in the maintenance history database 198, the request temporary storage file 192, and the work progress temporary storage file 194. .
  • the request progress receiving unit 180 transmits information for displaying a message (name of the person in charge of maintenance, person in charge code, etc.) to the call terminal 32 of the requested facility.
  • the repair part reflection unit 190 reflects information such as the number of repair parts used, which is input by the delivery process at the maintenance staff terminal 22, for example, in the repair part database 200.
  • the maintenance staff terminal 22 displays a request receiving unit 210 that receives various requests from the call terminal 32 and the like, and a staff current status screen 212 (see FIG. 22) showing the current status of the maintenance staff.
  • the maintenance staff terminal 22 has an equipment layout display processing unit 52. Therefore, the facility layout screen 94 reflecting the maintenance request or the like can be displayed on the display 22a and the maintenance management monitor 26.
  • the multi-screen 202 from the maintenance management server 20 is displayed on the maintenance management monitor 26, but an equipment layout screen 94 from the maintenance staff terminal 22 can also be displayed.
  • the request receiving unit 210 receives various requests such as a first maintenance request from the call terminal 32, a second maintenance request from the equipment monitoring system 38, a support request from the call terminal 32, and a replacement request.
  • the staff current status screen 212 is divided into a mechanical charge area 220a and an electrical charge area 220b.
  • the mechanical charge area 220a the same number of rectangular blocks 222 as the number of mechanical charge staff members are displayed.
  • the electric charge area 220b the same number of rectangular blocks 222 as the number of electric charge staff members are displayed.
  • the display color of the block 222 is displayed in green if currently waiting, and is displayed in gray if maintenance work is in progress (including support and change).
  • a maintenance person is selected from the maintenance staff corresponding to the block 222 displayed in green. That is, the maintenance staff on standby is contacted in advance, and when the consent is obtained, the maintenance staff is requested to be dispatched, and the maintenance staff block 222 selected this time on the staff status screen 212 is pointed with a finger. Touch or touch with a pen-like instrument. As a result, the maintenance person notifying unit 216 is activated and transmits information (person in charge code, etc.) of the maintenance person corresponding to at least the selected block 222 to the maintenance management server 20.
  • the request progress reception unit 180 (see FIG. 19) of the maintenance management server 20 displays the notified maintenance staff information and the received time (outgoing time), the maintenance history database 198, the request temporary storage file 192, and the work progress temporary storage. Register in file 194.
  • the delivery processing unit 208 (see FIG. 21) of the maintenance staff terminal 22 is activated together with the inventory search screen display processing unit 78 (see FIG. 3) by selecting and operating the fifth item of the pull-down menu 122 in FIG.
  • the inventory search screen display processing unit 78 displays an inventory search screen 154 on the display 22a as shown in FIG.
  • the maintenance person in charge performs input by subtracting the number of parts replaced from the stock quantity in the column corresponding to the model, part name, and storage location of the repaired part replaced.
  • the exit processing unit 208 transmits the input information to the maintenance management server 20.
  • the repair part reflection unit 190 (see FIG. 19) of the maintenance management server 20 receives the information from the delivery processing unit 208 and reflects the input inventory number in the repair part database 200. As a result, the actual inventory quantity in the warehouse 18 and the inventory quantity as data registered in the repair parts database 200 coincide.
  • step S1 of FIG. 23 it is determined whether or not there is a maintenance request. Specifically, the call terminal 32 determines whether there is a first maintenance request, and the facility monitoring system 38 determines whether there is a second maintenance request.
  • step S2 the maintenance plan display processing unit 50 determines whether the maintenance plan is confirmed or the maintenance work is based on the maintenance plan. This determination is made based on whether or not the planned start button 108 on the equipment main screen 90 (see FIG. 4) has been operated.
  • step S3 When the operation of the plan start button 108 on the equipment main screen 90 is performed, the process proceeds to step S3, and the maintenance plan screen 92 (see FIG. 5) is displayed on the display 32a of the call terminal 32 or the like.
  • step S4 the maintenance staff carries out planned maintenance for the target equipment in the displayed maintenance plan.
  • step S4 When the process in step S4 is completed, or when it is determined in step S2 that the planned start button 108 is not operated, the process returns to step S1, and the processes after step S1 are repeated.
  • step S1 If it is determined in step S1 that there is a first maintenance request from the call terminal 32 or a second maintenance request from the equipment monitoring system 38, the process proceeds to step S5, where the maintenance management server 20 and the maintenance staff terminal 22 accepts a first maintenance request from the call terminal 32 or a second maintenance request from the equipment monitoring system 38.
  • the request reflection unit 182 of the maintenance management server 20 registers the first maintenance request or the second maintenance request in the request temporary storage file 192 and the maintenance history database 198. Further, the first maintenance request or the second maintenance request is reflected on the facility layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S6 the maintenance staff appoints a maintenance person based on the first maintenance request from the call terminal 32 or the second maintenance request from the equipment monitoring system 38 while looking at the staff status screen 212 (see FIG. 22), for example.
  • the maintenance staff terminal 22 transmits to the maintenance management server 20 information on a maintenance person appointed in response to the first maintenance request or the second maintenance request.
  • step S7 the selected maintenance staff dispatches to the requested equipment.
  • the request progress reception unit 180 of the maintenance management server 20 registers the information of the person in charge of maintenance from the maintenance staff terminal 22 in the maintenance history database 198 and transmits it to the call terminal 32 of the requested equipment.
  • a message indicating that the maintenance staff is moving to the requested facility is displayed in the message display area 102 of the facility main screen 90 (see FIG. 4) of the call terminal 32 of the requested facility.
  • step S8 the maintenance person who has arrived at the requested facility operates the start / resume button 104c (see FIG. 4), so that the maintenance work starts.
  • the call terminal 32 notifies the maintenance management server 20 that maintenance has been started by the maintenance staff.
  • the maintenance management server 20 receives information related to the maintenance start from the call terminal 32.
  • the work progress reflecting unit 184 registers the work progress information indicating the maintenance start in the work progress temporary storage file 194 and the maintenance history database 198. Further, the fact that maintenance has started is reflected in the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S9 of FIG. 24 the call terminal 32 determines whether or not the maintenance work is interrupted. This determination is made based on whether or not the maintenance interruption button 104d (see FIG. 4) on the equipment main screen 90 has been operated. If the maintenance work is interrupted, the process proceeds to step S10, and the call terminal 32 informs the maintenance management server 20 that the maintenance person has interrupted the maintenance.
  • the maintenance management server 20 receives information regarding maintenance interruption from the call terminal 32.
  • the work progress reflecting unit 184 registers work progress information indicating maintenance interruption in the work progress temporary storage file 194 and the maintenance history database 198. Further, the fact that the maintenance has been interrupted is reflected on the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S11 the call terminal 32 determines whether or not the maintenance interruption is a support request. This determination is made based on whether or not the support request button 126 on the support / change request screen 124 (see FIG. 7) has been operated. If it is a support request, it will progress to step S12 and the call terminal 32 will notify the maintenance management server 20 that the support person in charge had the support request.
  • the maintenance management server 20 receives information related to a support request from the call terminal 32.
  • the request reflection unit 182 registers information related to the support request in the request temporary storage file 192 and the maintenance history database 198. Further, the request for support is reflected in the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S11 If it is determined in step S11 that the request is not a support request, the process proceeds to step S13, and the call terminal 32 determines whether the maintenance interruption is due to a replacement request. This determination is made based on whether or not the change request button 128 on the support / change request screen 124 (see FIG. 7) has been operated. If it is a replacement request, the process proceeds to step S14, and the call terminal 32 notifies the maintenance management server 20 that a replacement request has been made by the maintenance staff.
  • the maintenance management server 20 receives information related to the change request from the call terminal 32.
  • the request reflection unit 182 registers information regarding the replacement request in the request temporary storage file 192 and the maintenance history database 198. Further, the request for replacement is reflected on the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S15 When the process in step S12 or step S14 is completed, or when it is determined in step S13 that it is not a replacement request, for example, when it is an interruption due to a break or the like of a maintenance person, the process proceeds to step S15.
  • the call terminal 32 determines whether or not maintenance is resumed. This determination is made based on whether or not the maintenance start / resume button 104c on the equipment main screen 90 (see FIG. 4) has been operated. If the maintenance work is to be resumed, the process proceeds to step S16, and the call terminal 32 notifies the maintenance management server 20 that the maintenance person has resumed the maintenance.
  • the maintenance management server 20 receives information related to maintenance resumption from the call terminal 32.
  • the work progress reflecting unit 184 registers work progress information indicating maintenance resumption in the work progress temporary storage file 194 and the maintenance history database 198. Furthermore, the fact that maintenance has been resumed is reflected in the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S16 When the process in step S16 is completed or when it is determined in step S9 that the maintenance work is not interrupted, the process proceeds to the next step S17, and the call terminal 32 determines whether or not the maintenance work is completed. Is determined. This determination is made based on whether or not the operation of the response completion button 110 on the equipment main screen 90 (see FIG. 4) has been performed. If the maintenance work is completed, the process proceeds to step S18, and the call terminal 32 notifies the maintenance management server 20 that the maintenance person has completed the maintenance.
  • the maintenance management server 20 receives information related to maintenance completion from the call terminal 32.
  • the work progress reflecting unit 184 registers work progress information indicating completion of maintenance in the work progress temporary storage file 194 and the maintenance history database 198. Further, the completion of the maintenance is reflected on the equipment layout screen 94 (see FIG. 8) of the call terminal 32, the maintenance staff terminal 22, and the like.
  • step S19 the maintenance person or the like performs a delivery process.
  • the repair part reflection unit 190 (see FIG. 19) reflects information such as the number of repair parts used, which is input by the delivery process at the maintenance staff terminal 22, for example, in the repair part database 200.
  • step S20 the maintenance person creates a history of the current maintenance work and updates the maintenance history. That is, for example, after the maintenance history list screen 160 (see FIG. 17) is displayed on the display 22a of the maintenance staff terminal 22, the requested equipment in charge is selected and the history display button 164 is operated, thereby maintaining the maintenance history of the requested equipment. A detail screen 170 (see FIG. 18) is displayed. Then, input the event, cause, and treatment of the requested equipment, and if there are replacement parts that have been replaced, enter the type, part name, shipping location, quantity used, etc. Of course, regarding the input of the replaced repair part, the input may be omitted by associating it with the previously issued shipping process.
  • the facility maintenance support system 10 includes a request progress reception unit 180 that receives a maintenance request from the call terminal 32 arranged in the production line 16, and at least a maintenance request among a plurality of maintenance staff. Based on the contents of the maintenance staff and the current status of a plurality of maintenance staff, a maintenance request according to the staff status display processing unit 214 used for selecting a maintenance staff in accordance with the maintenance request and the request of the selected maintenance staff.
  • a maintenance support information display processing unit 68 for outputting at least parts and maintenance history information related to the contents as maintenance support information.
  • maintenance staff office 12 information can be shared using communication means between the production site, maintenance staff, and the management office (maintenance staff office 12). It is possible to grasp at a glance the progress of the maintenance work in response to the request, and it is possible to improve the work efficiency of the maintenance staff that maintains the production equipment.
  • maintenance work can proceed smoothly, and past maintenance history can be used to report on this maintenance work. Reporting stagnation can also be resolved. For example, at the start of maintenance work, the history of maintenance contents, replacement parts, past records of related personnel, etc. are presented as a maintenance history. This maintenance history can be used as meaningful information for maintenance personnel to consider trouble improvement, so maintenance work can be carried out efficiently, and maintenance work can be carried out with reduced equipment downtime. be able to.
  • an equipment layout display processing unit 52 that displays an equipment layout screen 94 indicating the location of one or more production equipment installed at a production site on at least the maintenance management monitor 26 and the call terminal 32;
  • a request reflecting unit 182 that reflects the request from the line 16 on the equipment layout screen 94 and a work progress reflecting unit 184 that reflects the progress of maintenance work by the maintenance staff on the equipment layout screen 94 are provided.
  • the maintenance request includes at least primary determination information indicating whether it is a mechanical trouble or an electric trouble.
  • the maintenance request is made by the production staff in a state where an equipment layout screen 94 showing the location of one or more production equipment installed at the production site is displayed on the call terminal 32 arranged on the production line 16. This is done manually. As a result, since the maintenance request is reflected on the equipment layout screen 94, the production staff makes a maintenance request while viewing the equipment layout screen 94, so that the maintenance request is correctly made to the equipment requiring the maintenance request. Can be easily confirmed.
  • the maintenance request manually input by the production staff includes at least information on the parts necessary for maintenance and the storage location of the parts.
  • the maintenance request includes information on the parts required for maintenance and the storage location of the parts, the maintenance staff can easily obtain the parts required for maintenance and perform maintenance work. The time until the start can be shortened, and the efficiency of maintenance work can be improved.
  • the maintenance request manually input by the production staff includes information related to trouble that has occurred in the past (key for accessing history list: equipment number, etc.).
  • the maintenance request includes information related to troubles that have occurred in the past, so maintenance personnel can efficiently carry out maintenance work while checking the information, and shorten the maintenance work time. It is possible to improve the efficiency of maintenance work.
  • the maintenance request manually input by the production staff includes information on the maintenance staff's comments regarding the trouble that has occurred in the past (key for accessing the history list: equipment number, etc.).
  • the maintenance request includes information related to comments from maintenance staff regarding troubles that have occurred in the past.Even for equipment that the maintenance person is in charge of for the first time, referring to the comments enables efficient maintenance work. This makes it possible to improve the efficiency of maintenance work.
  • At least the call terminal 32 arranged on the production line 16 supports based on the instructions of the maintenance staff when the secondary judgment made after the start of the maintenance work by the maintenance staff is different from the primary judgment.
  • the first support request processing unit 56A for making a request is included.
  • the maintenance staff can efficiently advance the maintenance work together with the support staff, and the efficiency of the maintenance work can be improved.
  • the support request is made by the maintenance person in the state where the equipment layout screen 94 showing the location of one or more production equipment installed at the production site is displayed on the call terminal 32 arranged on the production line 16. Implemented by input.
  • the maintenance staff made a support request correctly for the equipment requiring the support request by making a support request while looking at the equipment layout screen 94. It can be easily confirmed.
  • At least the call terminal 32 arranged on the production line 16 has a second support request processing unit that makes a support request when the elapsed time of maintenance work by the maintenance staff exceeds a preset time. 56B may be included.
  • the time may be forgotten and the opportunity to request support may be missed. Therefore, when the elapsed time of maintenance work by the maintenance staff exceeds a preset time, a support request can be made, thereby reducing the burden on the maintenance staff.
  • the maintenance staff can efficiently perform the maintenance work together with the support staff, and the efficiency of the maintenance work can be improved.
  • At least the call terminal 32 arranged on the production line 16 outputs an alarm indicating an abnormality of the maintenance work when the elapsed time of the maintenance work by the maintenance person exceeds a preset time.
  • the call terminal 32 arranged on the production line 16 has a maintenance plan display processing unit 50 that displays a maintenance plan of the production facility of the production line 16 based on instructions from the maintenance staff.
  • the maintenance plan can be displayed using the call terminal 32 arranged on the production line 16 during inspection by a normal maintenance staff.
  • the maintenance staff can quickly start maintenance work, and the frequency of maintenance requests can be reduced.
  • the facility monitoring system 38 that monitors the operation status of the production facilities arranged in the production line 16 is provided.
  • the facility monitoring system 38 detects an abnormality in the production facility, the maintenance staff office 12 A maintenance request is sent to the maintenance staff terminal 22 installed in the station.
  • the maintenance staff terminal 22 further includes a request progress receiving unit 180 that receives the second maintenance request from the equipment monitoring system 38, and a maintenance management monitor 26 installed at least in the maintenance staff office 12 on the received second maintenance request. And an equipment layout display processing unit 52 for displaying the information.
  • a maintenance request is sent to the maintenance staff terminal 22 installed in the maintenance staff office 12, so that the maintenance request is made more quickly than the maintenance request manually input by the production staff. Can be issued.
  • the maintenance request by the equipment monitoring system 38 is displayed on the maintenance management monitor 26 installed in the maintenance staff office 12, the maintenance staff can recognize the maintenance request by the equipment monitoring system 38 at an early stage. Therefore, maintenance work for equipment requiring maintenance work can be carried out at an early stage.
  • equipment maintenance support system and the equipment maintenance support method according to the present invention are not limited to the above-described embodiments, and various configurations can be adopted without departing from the gist of the present invention.
  • a warehouse terminal 34 may be installed in each warehouse 18.
  • the configuration of the warehouse terminal 34 may have the same configuration as the call terminal 32 and the maintenance staff terminal 22 described above.
  • a person in charge of inventory management may use the warehouse terminal 34 to perform the warehousing process and the warehousing process.
  • the barcode attached to the repair part may be read by the barcode reader 42 instead of manually inputting the information of the repair part. Thereby, inventory management of each warehouse 18 can be performed efficiently.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

本発明は、設備保全支援システム及び設備保全支援方法に関する。設備保全支援システム(10)は、生産ライン(16)に配置されたコール端末(32)からの保全要請を受け付ける手段と、複数の保全スタッフのうち、少なくとも前記保全要請の内容及び前記複数の保全スタッフの現況に基づいて、前記保全要請に応じた保全担当者の選任を行うために利用される手段(214)と、選任された保全担当者の要請に従って、保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力する手段(68)とを有する。

Description

設備保全支援システム及び設備保全支援方法
 本発明は、生産現場に設置された生産設備を保守する作業者(保全スタッフ)の作業を支援する設備保全支援システム及び設備保全支援方法に関する。
 従来、設備管理支援システムとしては、例えば特開2001-159916号公報に記載されたシステムが知られている。
 特開2001-159916号公報に記載のシステムは、各種設備の設備点検情報を管理するデータ管理装置と、このデータ管理装置と通信インターフェイス装置を介して接続され、データ管理装置との間でデータの送受を行う携帯入出力装置とを備えている。データ管理装置は、各種設備を巡回点検する際の巡回順序を含む設備点検情報を記憶する管理装置側記憶手段を備えている。携帯入出力装置は、入出力装置側記憶手段と、巡回対象表示手段とを備えている。入出力装置側記憶手段は、通信インターフェイス装置を介して取り込まれるデータ管理装置からの設備点検情報を記憶する。巡回対象表示手段は、入出力装置側記憶手段が記憶している設備点検情報に含まれている巡回順序に基づいて所定操作毎に巡回対象を画面上に順次表示する。これにより、携帯入出力装置を用いて、作業員の熟練度に依存することなく、効率よく、且つ、確実に設備の点検を行うことができる、とされている。
 また、従来では、携帯入出力装置を使用したシステムとして、例えば特開2005-040378号公報、特開2005-057521号公報及び特開2005-065852号公報に記載された病院内のナースコールシステムがある。
 ところで、工場等の生産現場においては、生産設備が故障した場合等に、現場のスタッフが保全担当部署に連絡をとり、保全スタッフを派遣してもらうことが行われている。
 具体的には、生産ラインのオペレータからの保全要請が保全事務所に行われると、PHS(Personal Handy-phone System)や内線電話を使用して、保全事務所内に待機中の保全スタッフ又は巡回中の保全スタッフの作業状況を個々に確認しながら、保全担当者(contact personnel)を決めて、保全要請先に派遣するようにしている。
 また、保全履歴において、保全担当者が保全作業を記入した専用の記録簿で管理しているものの、他の保全スタッフが保全履歴を確認したい場合に、その確認作業に手間取るという問題があった。また、保全担当者によるトラブルに対する保全作業の記録が滞り、次のトラブルに対する対応が遅れるおそれもあった。
 さらに、補修品も在庫管理はされているものの、数ヶ月毎に在庫を確認することができる管理帳票が存在するだけであり、補修品の在庫、補修品の収納場所等を確認することが困難であった。
 すなわち、従来の保全要請に関する技術では、保全要請から保全完了までの時間の短縮を図ることが困難であった。
 本発明はこのような課題を考慮してなされたものであり、生産現場と保全スタッフと管理事務所との間で、通信手段を用いて情報の共有化を図ることができ、保全スタッフの現在の状況や、生産現場からの要請に対する保全作業の進捗状況を一目で把握することができ、生産設備を保守する保全スタッフの作業効率を向上させることができる設備保全支援システム及び設備保全支援方法を提供することを目的とする。
[1] 第1の本発明に係る設備保全支援システムは、生産現場に設置された1以上の生産設備の保全を支援する設備保全支援システムであって、少なくとも1以上のサーバと、1以上の端末と、1以上の管理用モニタとが、保全スタッフ事務所、生産スタッフ事務所、倉庫及び生産ライン毎にそれぞれ必要に応じて配置され、前記生産ラインに配置された前記端末からの保全要請を受け付ける手段と、複数の保全スタッフのうち、少なくとも前記保全要請の内容及び前記複数の保全スタッフの現況に基づいて、前記保全要請に応じた保全担当者の選任を行う手段と、選任された前記保全担当者の要請に従って、前記保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力する手段とを有することを特徴とする。
 これにより、生産現場と保全スタッフと管理事務所との間で、通信手段を用いて情報の共有化を図ることができ、保全スタッフの現在の状況や、生産現場からの要請に対する保全作業の進捗状況を一目で把握することができ、生産設備を保守する保全スタッフの作業効率を向上させることができる。しかも、過去の部品及び保全履歴を参照することで、保全作業をスムーズに進めることが可能となり、過去の保全履歴を利用して、今回の保全作業についての報告も可能となることから、保全完了報告の滞りも解消することができる。例えば保全作業の開始にあたって、保全内容の経緯、交換部品、過去の関係担当者等の記録を保全履歴として提示する。この保全履歴は、保全担当者がトラブル改善を考える上で有意義な情報としても利用することができるため、効率よく保全作業を進めることが可能となり、設備停止時間を短縮して保全作業を実施することができる。
[2] 第1の本発明において、前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面を、少なくとも前記管理用モニタと前記端末に表示する手段と、前記生産ラインからの要請を前記レイアウト画面に反映する手段と、前記保全担当者による保全作業の進捗状況を前記レイアウト画面に反映する手段とを有してもよい。
 これにより、生産ライン毎に設置された端末等に接続されたディスプレイやサーバに接続された管理用モニタ等を使って、直接レイアウト画面を見ながら様々な要請(保全要請、応援要請等)を入力することができ、しかも、入力した要請をレイアウト画面に反映させることができる。その結果、要請したスタッフ等以外の者がレイアウト画面を見ることによって、生産設備に対する要請内容を容易に確認することができる。
[3] 第1の本発明において、前記保全要請は、少なくとも機械的トラブルか電気的トラブルかを示す一次判断の情報を含むことが好ましい。これにより、一次判断の情報を含めた保全要請が行われるため、保全担当者を選定する際に、一次判断の情報を有効利用することが可能となり、保全担当者の選定作業並びに選定にかかる時間を短縮することができる。
[4] 第1の本発明において、前記保全要請は、前記生産ラインに配置された前記端末に、前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面を表示した状態で、生産スタッフの手入力によって実施されることが好ましい。これにより、レイアウト画面に保全要請が反映されるため、生産スタッフは、レイアウト画面を見ながら保全要請を行うことで、保全要請が必要な設備に対して正しく保全要請を行ったどうかを容易に確認することができる。
[5] この場合、前記生産スタッフの手入力による前記保全要請は、少なくとも保全に必要な部品及び該部品の保管場所に関する情報を含むことが好ましい。これにより、保全要請には、保全に必要な部品及び該部品の保管場所に関する情報が含まれているため、保全担当者は、容易に保全に必要な部品を入手することができ、保全作業に着手するまでの時間を短縮することができ、保全作業の効率化を向上させることができる。
[6] また、前記生産スタッフの手入力による前記保全要請は、過去に発生したトラブルに関する情報を含むことが好ましい。これにより、保全要請には、過去に発生したトラブルに関する情報が含まれているため、保全担当者は、その情報を確認しながら、保全作業を効率よく進めることができ、保全作業の時間を短縮することができ、保全作業の効率化を向上させることができる。
[7] さらに、前記生産スタッフの手入力による前記保全要請は、過去に発生した前記トラブルに対する保全スタッフのコメントに関する情報を含むことが好ましい。これにより、保全要請には、過去に発生したトラブルに対する保全スタッフのコメントに関する情報が含まれているため、保全担当者が初めて担当する設備でも、そのコメントを参照することで、保全作業を効率よく進めることができ、保全作業の効率化を向上させることができる。
[8] [3]において、少なくとも前記生産ラインに配置された前記端末は、前記保全担当者による保全作業の開始後になされた二次判断が前記一次判断と異なる場合に、前記保全担当者の指示に基づいて応援要請を行う手段を有してもよい。
 これにより、一次判断の情報を含めた保全要請が行われた後、一次判断が間違いであった場合、保全担当者は例えば専門外の知識で間違った保全作業を行うおそれがある。しかし、二次判断の情報に基づいて応援要請を行うことができることから、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
[9] この場合、前記応援要請は、前記生産ラインに配置された前記端末に、前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面を表示した状態で、前記保全担当者の手入力によって実施されることが好ましい。
 これにより、レイアウト画面に応援要請が反映されるため、保全担当者は、レイアウト画面を見ながら応援要請を行うことで、応援要請が必要な設備に対して正しく応援要請を行ったどうかを容易に確認することができる。
[10] 第1の本発明において、少なくとも前記生産ラインに配置された前記端末は、前記保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、応援要請を行う手段を有してもよい。
 これにより、保全作業の実施にあたって、複雑な保全作業や事前の確認作業が煩雑である場合等においては、時間の経過を忘れ、応援を要請する機会を逸する場合がある。そこで、保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、応援要請を行えるようにすることで、保全担当者の負担を軽減することができる。しかも、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
[11] この場合、少なくとも前記生産ラインに配置された前記端末は、前記保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、保全作業の異常を示すアラームを出力してもよい。
 保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、アラームが出力されることで、保全担当者は、自動的に応援要請が行われたことを認識することができ、応援担当者に対する作業進捗の説明等を事前に準備することが可能となる。その結果、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
[12] 第1の本発明において、前記生産ラインに配置された前記端末は、前記保全スタッフの指示に基づいて、当該生産ラインの生産設備の保全計画を表示する手段を有してもよい。
 これにより、通常の保全スタッフによる巡視の際に、生産ラインに配置された端末を用いて保全計画を表示することができ、巡視した日が部品の交換日であったり、駆動部分の摩耗や異音等が発生していることが確認できた場合等に、保全スタッフは、迅速に保全作業に着手することができ、保全要請の頻度を少なくすることが可能となる。
[13] 第1の本発明において、前記生産ラインに配置された生産設備の運用状況を監視する設備監視システムを有し、前記設備監視システムは、前記生産設備の異常を検出した際に、前記保全スタッフ事務所に設置された前記端末に保全要請を行い、前記保全スタッフ事務所に設置された前記端末は、さらに、前記設備監視システムからの前記保全要請を受信する手段と、受信した保全要請を少なくとも前記保全スタッフ事務所に設置された前記管理用モニタに表示する手段とを有してもよい。
 設備監視システムが生産設備の異常を検出した際に、保全スタッフ事務所に設置された端末に保全要請を行うことから、生産スタッフによる手入力による保全要請よりも迅速に保全要請を発することができる。しかも、設備監視システムによる保全要請が保全スタッフ事務所に設置された管理用モニタに表示されることから、保全スタッフは設備監視システムによる保全要請を早期に認識することが可能となり、保全作業が必要な設備に対する保全作業を早期に実施することができる。
[14] 第2の本発明に係る設備保全支援方法は、少なくとも1以上のサーバと、1以上の端末と、1以上の管理用モニタとが、保全スタッフ事務所、生産スタッフ事務所、倉庫及び生産ライン毎にそれぞれ必要に応じて配置され、生産現場に設置された1以上の生産設備の保全を支援する設備保全支援システムにて使用される設備保全支援方法であって、前記生産ラインに配置された前記端末からの保全要請を受信するステップと、複数の保全スタッフのうち、少なくとも前記保全要請の内容及び前記複数の保全スタッフの現況に基づいて、前記保全要請に応じた保全担当者の選任を行うステップと、選任された前記保全担当者の要請に従って、前記保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力するステップとを有することを特徴とする。
 本発明に係る設備保全支援システム及び設備保全支援方法によれば、生産現場と保全スタッフと管理事務所との間で、通信手段を用いて情報の共有化を図ることができ、保全スタッフの現在の状況や、生産現場からの要請に対する保全作業の進捗状況を一目で把握することができ、生産設備を保守する保全スタッフの作業効率を向上させることができる。
本実施の形態に係る設備保全支援システムの構成を示すブロック図である。 コール端末に組み込まれた機能部を示すブロック図である。 保全支援情報表示処理部に含まれる機能部を示すブロック図である。 設備メイン画面の一例を示す説明図である。 保全計画画面の一例を示す説明図である。 設備メイン画面のプルダウンメニューの一例を示す説明図である。 応援・交代要請画面の一例を示す説明図である。 設備レイアウト画面の一例を示す説明図である。 図9A~図9Gは保全要請、応援要請、交代要請並びに保全着手、保全中断、保全完了を示す表示例を示す説明図である。 図10Aは設備別保全状況一覧(保全着手)の一例を示す説明図であり、図10Bは設備別保全状況一覧(保全中断)の一例を示す説明図である。 図11Aは設備別保全状況一覧(保全再開)の一例を示す説明図であり、図11Bは設備別保全状況一覧(対応完了)の一例を示す説明図である。 設備稼働状況履歴画面の一例を示す説明図である。 保全設備作業状況一覧画面(全ラインモニター画面)の一例を示す説明図である。 補修部品検索画面の一例を示す説明図である。 在庫検索画面の一例を示す説明図である。 担当者別作業完了登録画面の一例を示す説明図である。 保全履歴リスト画面の一例を示す説明図である。 保全履歴詳細画面の一例を示す説明図である。 保全管理用サーバに組み込まれた機能部を示すブロック図である。 マルチ画面の一例を示す説明図である。 保全スタッフ端末に組み込まれた機能部を示すブロック図である。 スタッフ現況画面の一例を示す説明図である。 本実施の形態に係る設備保全支援システムの処理動作を示すフローチャート(その1)である。 本実施の形態に係る設備保全支援システムの処理動作を示すフローチャート(その2)である。
 以下、本発明に係る設備保全支援システム及び設備保全支援方法の実施の形態例を図1~図24を参照しながら説明する。
[設備保全支援システム10の概略構成]
 本実施の形態に係る設備保全支援システム10は、図1に示すように、1以上の保全スタッフ事務所12、1以上の生産スタッフ事務所14、複数の生産ライン16及び複数の倉庫18を有する通常の生産工場に適用される。
 設備保全支援システム10は、少なくとも1以上のサーバと、1以上の端末と、1以上の管理用モニタとが、保全スタッフ事務所12、生産スタッフ事務所14、生産ライン16毎にそれぞれ必要に応じて配置されている。
 例えば保全スタッフ事務所12は、保全管理用サーバ20を有する。この保全管理用サーバ20には、保全スタッフ毎の保全スタッフ端末22と、保全部品に貼付する識別シート(表面にバーコードが印刷されたシート)を発行するバーコードプリンタ24と、保全管理用モニタ26とが接続されている。これら保全スタッフ端末22、バーコードプリンタ24及び保全管理用モニタ26が内部バス28を通じて保全管理用サーバ20に接続されている。
 生産スタッフ事務所14は、生産管理用モニタ30が設置されている。もちろん、図示しないが、生産スタッフ事務所14についても、生産管理用サーバ、並びに、生産スタッフ毎の生産スタッフ端末を有してもよい。
 各生産ライン16には、それぞれコール端末32が設置されている。好ましくは、各生産ライン16には、それぞれ生産ライン16に配置された1以上の設備をセンサ36等を用いて稼働状況を監視する設備監視システム38が設置される。
 また、保全スタッフ端末22としては、机等に載置するノート型やデスクトップ型の情報端末や、画面表示を行うことができる携帯型の情報端末等が挙げられる。保全管理用サーバ20及び各生産ライン16のコール端末32は、それぞれ外部バス40を通じて接続されている。従って、保全管理用サーバ20、保全スタッフ端末22、コール端末32間でデータの送受信が行われる。なお、保全スタッフ端末22には、それぞれ保全部品に貼付された識別シートのバーコード(単にバーコードと記す)を読み取るバーコードリーダー42が接続されている。もちろん、保全管理用サーバ20、保全スタッフ端末22、コール端末32間でのデータの送受信を無線で行うようにしてもよい。
 保全管理用サーバ20は、予防保全計画に関するプログラムや生産保全システムデータを含む基幹システム(例えばオペレーティングシステム等)を有する。保全管理用サーバ20は、各種端末(クライアント)からの要求に従ってファイルやデータを提供する。
 次に、設備保全支援システム10を1つの生産工場に適用した具体例を図2~図24を参照しながら説明する。
[コール端末32の構成]
 先ず、コール端末32に備わる機能部は、図2に示すように、保全計画表示処理部50、設備レイアウト表示処理部52、第1保全要請処理部54A、第1応援要請処理部56A、第2応援要請処理部56B、交代要請処理部58、保全着手処理部60、保全中断処理部62、保全再開処理部64、保全完了処理部66、保全支援情報表示処理部68を有する。なお、設備監視システム38には、第2保全要請処理部54Bが組み込まれている。
 保全支援情報表示処理部68は、図3に示すように、応援・交代要請画面表示処理部70、設備稼働状況履歴表示処理部72、保全作業状況表示処理部74、補修部品リスト表示処理部76、在庫検索画面表示処理部78、作業完了登録画面表示処理部80、保全履歴リスト表示処理部82、詳細履歴表示処理部84を有する。もちろん、保全スタッフ端末22が携帯可能な端末であれば、保全担当者が保全スタッフ端末22を携帯して保全作業を行うことが可能である。この場合、保全スタッフ端末22をコール端末32として兼用することも可能となる。
 また、図2に示すように、コール端末32にはディスプレイ32aが接続されており、ディスプレイ32aには、少なくとも設備メイン画面90(図4参照)、保全計画画面92(図5参照)、設備レイアウト画面94(図8参照)等が表示される。
[設備メイン画面90]
 設備メイン画面90は、例えば図4に示すように、各種ボタンが配列されたボタン表示領域100と、メッセージが表示されるメッセージ表示領域102等を有する。ボタン表示領域100には、例えば保全要請ボタン104、相談要請ボタン106、計画着手ボタン108、対応完了ボタン110等がある。
 保全要請ボタン104及び相談要請ボタン106には、それぞれメカ系統の故障の場合に操作されるメカ保全要請ボタン104a及びメカ相談要請ボタン106aと、電気系統の故障の場合に操作される電気保全要請ボタン104b及び電気相談要請ボタン106bとがある。メカ系統の故障や相談としては、モータの異音、チェーン切れ、エアー漏れ、油漏れ等が挙げられる。電気系統の故障や相談としては、センサ不良、ダンマリ停止(no alarm line stop:原因が特定できない停止)、電気機器故障等が挙げられる。
 また、保全要請ボタン104には、保全作業(相談による保全作業を含む)の着手又は再開の際に操作される保全着手/再開ボタン104cと、保全作業の中断の際に操作される保全中断ボタン104dとがある。
 計画着手ボタン108は、予め設定された保全計画の日(会計年度の期初等)に、保全スタッフによって操作されることで、保全計画表示処理部50(図2参照)が起動される。保全計画表示処理部50は、図5に示すように、ディスプレイ32aや生産管理用モニタ30(以下、ディスプレイ32a等と記す)に当該設備の保全計画画面92を表示する。保全計画画面92は、例えば部品交換の日程や駆動部分のチェック日程等を含む。そして、保全スタッフは、表示された保全計画のうち、計画対象の設備についての計画保全を実施する。
 また、設備メイン画面90は、図4に示すように、3つのタブ(第1タブ120a~第3タブ120c)を有する。第1タブ120aを操作することで、設備メイン画面90が表示され、第2タブ120bを操作することで、生産支援ツールに関するプルダウンメニュー(図示せず)が表示される。同様に、第3タブ120cを操作することで、図6に示すように、保全活動支援ツールに関するプルダウンメニュー122が表示される。
[応援・交代要請画面124(プルダウンメニュー:第1項目)]
 このプルダウンメニュー122は、例えば保全活動を支援するための複数の項目が配列された表示形態となっている。上から第1番目の項目(第1項目)を選択操作することで、応援・交代要請画面表示処理部70(図3参照)が起動される。応援・交代要請画面表示処理部70は、図7に示すように、応援・交代要請画面124を表示する。この応援・交代要請画面124には、応援要請ボタン126と交代要請ボタン128とがある。
 応援要請ボタン126及び交代要請ボタン128には、それぞれメカ系統の故障の場合に操作されるメカ応援要請ボタン126a及びメカ交代要請ボタン128aと、電気系統の故障の場合に操作される電気応援要請ボタン126b及び電気交代要請ボタン128bとがある。
[設備メイン画面90]
 例えば設備メイン画面90(図4参照)のメカ保全要請ボタン104a、電気保全要請ボタン104b、メカ相談要請ボタン106a、電気相談要請ボタン106b、応援・交代要請画面124(図7参照)のメカ応援要請ボタン126a、電気応援要請ボタン126b、メカ交代要請ボタン128a、電気交代要請ボタン128bのいずれかを操作することで、設備レイアウト表示処理部52(図2参照)が起動される。設備レイアウト表示処理部52は、図8に示すように、設備レイアウト画面94を表示する。
 すなわち、設備レイアウト表示処理部52は、保全管理用サーバ20に対して設備レイアウト画面94の画像データあるいは各種要請や各種作業進捗に応じた付加情報の転送を要求する。この要求に対して保全管理用サーバ20から転送された画像データあるいは付加情報に基づいて設備レイアウト画面94を表示する。
 設備レイアウト画面94としては、例えば図8に示すように、生産現場の平面図を模した画像130と、複数の生産ライン16の模式図132と、各生産ライン16毎に配列された複数の生産設備を示すシンボル画像134とを表示した形態等が挙げられる。
 そして、メカ系の保全要請がなされた生産設備(以下、要請設備と記す)については、図9Aに示すように、要請設備のシンボル画像134の例えば右肩に例えば赤色円形136Rが表示され、電気系の保全要請であれば、図9Bに示すように、例えば黄色円形136Yが表示される。
 同様に、メカ系の応援要請又は交代要請がなされた要請設備については、図9Cに示すように、要請設備のシンボル画像134の例えば右肩に例えば一部が赤色とされた円形136rw(例えば左半円が赤色、右半円が白色)が表示され、電気系の応援要請又は交代要請であれば、図9Dに示すように、例えば一部が黄色とされた円形136yw(例えば左半円が黄色、右半円が白色)が表示される。
 また、要請設備に対する保全着手であれば、図9Eに示すように、要請設備のシンボル画像134の例えば右肩に例えば緑色円形136Gが表示され、保全中断であれば、図9Fに示すように、要請設備のシンボル画像134の例えば右肩に例えば水色円形136Aが表示され、保全完了であれば、図9Gに示すように、要請設備のシンボル画像134の例えば右肩に表示されていた円形の表示が消去される。なお、保全要請等がなされていない正常な生産設備についても、図9Gに示すように、要請設備のシンボル画像134の右肩に何も表示されない。
 上述したメカ系の保全要請、電気系の保全要請等に応じて表示される赤色円形や黄色円形等の表示はあくまでも一例であって、設備保全支援システムが設置される工場等の環境等に応じて適宜設定することができる。
[第1保全要請、相談要請]
 そして、生産スタッフ等が設備メイン画面90(図4参照)の例えばメカ保全要請ボタン104a、電気保全要請ボタン104b、メカ相談要請ボタン106a又は電気相談要請ボタン106bを操作して、設備レイアウト画面94(図8参照)を表示させた後、保全要請対象の生産設備を示すシンボル画像134を指でタッチあるいはペン状の器具でタッチ等することで、第1保全要請処理部54A(図2参照)が起動される。
 第1保全要請処理部54Aは、メカ関係又は電気関係の保全要請を行う。すなわち、保全要請情報を保全管理用サーバ20及び保全スタッフ端末22に送信する。
 保全要請情報は、例えば保全要請コード、送信元コード、メカ系統又は電気系統の種別及び設備コード等を含む。先頭の保全要請コードは、保全管理用サーバ20並びに各端末において保全要請情報であることを認識させるための識別コードである。以下、同様である。
 送信元コードは、送信元であるコール端末32の識別コードが用いられる。設備コードは、コール端末32に一対一で対応付けられた設備の識別情報が用いられる。この場合、要請設備の識別情報が用いられる。
 この要請設備の識別情報は、要請設備に到着した保全担当者が、保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報をコール端末32のディスプレイ32a等に出力する場合等に使用される。
 部品及び保全履歴に関する情報としては、例えば保全に必要な部品及び該部品の保管場所、過去に発生したトラブルに関する情報、過去に発生した前記トラブルに対する保全スタッフのコメントに関する情報等が挙げられる。
 つまり、要請設備の識別情報は、これらの情報(部品及び保全履歴に関する情報)に関する情報であって、これらの情報を出力するためのキー情報として使用される。
[第2保全要請]
 第2保全要請処理部54Bは、図2に示すように、設備監視システム38に組み込まれている。第2保全要請処理部54Bは、生産ライン16に配置された設備の稼働状況を監視するセンサ36からの異常を知らせる信号の入力に基づいて起動され、当該設備で保全要請があったことを保全管理用サーバ20及び保全スタッフ端末22に知らせる。すなわち、保全要請情報を保全管理用サーバ20及び保全スタッフ端末22に送信する。この場合、例えばセンサ36の種類に応じてメカ又は電気の区分情報を含めるようにしてもよい。
[第1応援要請]
 生産スタッフ等が例えばプルダウンメニュー122(図6参照)の第1項目を選択操作することで、応援・交代要請画面表示処理部70(図2参照)が起動される。応援・交代要請画面表示処理部70は、コール端末32のディスプレイ32aに、応援・交代要請画面124(図7参照)を表示する。
 そして、生産スタッフ等が例えばメカ応援要請ボタン126a又は電気応援要請ボタン126bを操作して、設備レイアウト画面94(図8参照)を表示させた後、応援要請対象の生産設備を示すシンボル画像134を指でタッチあるいはペン状の器具でタッチ等することで、第1応援要請処理部56A(図2参照)が起動される。第1応援要請処理部56Aは、メカ関係又は電気関係の応援要請を行う。すなわち、第1応援要請情報を保全管理用サーバ20及び保全スタッフ端末22に送信する。
 第1応援要請情報は、例えば第1応援要請コード、送信元コード、メカ系統又は電気系統の種別及び設備コード等を含む。先頭の第1応援要請コードは、保全管理用サーバ20並びに各端末において第1応援要請情報(スタッフによる応援要請)であることを認識させるための識別コードである。送信元コード等は上述した保全要請情報と同じであるため、その重複説明を省略する。
 第1応援要請は、例えば以下のような場合に行われる。すなわち、要請設備の故障等の状況によっては、複数人で手分けして作業を進める方が効率的な場合がある。また、要請設備が製品の生産において重要度の高い設備(電源装置やコンプレッサ等)であって、早期の修理完了が必要な場合がある。このような場合に、保全担当者は応援(スタッフ)を要請する。
 その他、例えば保全要請あるいは相談の際に、メカ関係の故障と判断(一次判断)してメカ保全要請ボタン104a又はメカ相談要請ボタン106aを操作して保全要請又は相談を行ったところ、保全担当者による判断(二次判断)の結果、メカ関係ではなく、電気関係の故障であった場合、保全担当者等による応援要請が行われる。一次判断が電気関係の故障で、二次判断がメカ関係の故障の場合にも応援要請が行われる。
[第2応援要請]
 保全担当者が出動した時点から所定時間(例えば90分、120分等)を経過した段階で、第2応援要請処理部56B(図2参照)が起動される。第2応援要請処理部56Bは、メカ関係又は電気関係の応援要請を行う。すなわち、第2応援要請処理部56Bは、第2応援要請情報を保全管理用サーバ20及び保全スタッフ端末22に送信する。第2応援要請情報は、例えば第2応援要請コード、送信元コード、メカ系統又は電気系統の種別及び設備コード等を含む。メカ系統又は電気系統の種別は、保全要請情報で使用された種別が使用される。第2応援要請処理部56Bは、応援要請と共に、保全作業の異常を示すアラームを出力する。
[交代要請]
 コール端末32のディスプレイ32aに応援・交代要請画面124(図7参照)が表示されている場合に、生産スタッフ等が例えばメカ交代要請ボタン128a又は電気交代要請ボタン128bを操作して、設備レイアウト画面94(図8参照)を表示させた後、交代要請対象の生産設備を示すシンボル画像134を指でタッチあるいはペン状の器具でタッチ等することで、交代要請処理部58(図2参照)が起動される。交代要請処理部58は、メカ関係又は電気関係の交代要請を行う。すなわち、交代要請情報を保全管理用サーバ20及び保全スタッフ端末22に送信する。
 交代要請情報は、例えば交代要請コード、送信元コード、メカ系統又は電気系統の種別及び設備コード等を含む。先頭の交代要請コードは、保全管理用サーバ20並びに各端末において交代要請情報(スタッフによる交代要請)であることを認識させるための識別コードである。送信元コード等は上述した保全要請情報と同じであるため、その重複説明を省略する。
 そして、保全要請、相談要請、応援要請又は交代要請を行い、選任された保全担当者が出動した段階で、設備メイン画面90(図4参照)のメッセージ表示領域102に、例えば保全担当者が要請設備に移動中であることを示すメッセージが表示される。
 交代要請は、例えば以下のような場合に行われる。すなわち、例えば保全要請あるいは相談の際に、メカ関係の故障と判断(一次判断)してメカ保全要請ボタン104a又はメカ相談要請ボタン106aを操作して保全要請又は相談を行ったところ、保全担当者による判断(二次判断)の結果、メカ関係ではなく、電気関係の故障であった場合、保全担当者等による交代要請が行われる。一次判断が電気関係の故障で、二次判断がメカ関係の故障の場合にも交代要請が行われる。
[保全着手]
 当該要請設備に到着した保全担当者が設備メイン画面90(図4参照)の保全着手/再開ボタン104cを操作することで、保全着手処理部60(図2参照)が起動される。保全着手処理部60は、保全担当者による保全着手があったことを保全管理用サーバ20に知らせる。すなわち、保全着手処理部60は、保全着手情報を作成して、保全管理用サーバ20に送信する。保全着手情報は、例えば保全着手コード、送信元コード、担当者コード、設備コード等を含む。
 また、保全着手があった段階で、例えば図10Aに示すように、コール端末32のディスプレイ32aに、設備別保全状況一覧140が表示される。設備別保全状況一覧140には、主に、保全要請等がなされた日時(要請日時)と、設備名と、保全要請等がなされたときの状況(要請時状況)と、現在の状況と、停止時間(分)等が表示される。現在の状況としては、保全担当者が要請設備に向かって移動中であったことを示す「移動中」が表示される。
[保全中断]
 保全担当者が設備メイン画面90の保全中断ボタン104d(図4参照)を操作することで、保全中断処理部62(図2参照)が起動される。保全中断処理部62は、保全担当者による保全中断があったことを保全管理用サーバ20に知らせる。すなわち、保全中断処理部62は、保全中断情報を作成して、保全管理用サーバ20に送信する。保全中断情報は、例えば保全中断コード、送信元コード、担当者コード、設備コード等を含む。
 また、保全中断があった段階で、例えば図10Bに示すように、コール端末32のディスプレイ32aに、設備別保全状況一覧140が表示される。設備別保全状況一覧140の現在の状況には、保全担当者が保全作業中であったことを示す「対応中」が表示され、さらに、例えば右端部に「中断」を示すシンボル表示が行われる。
[保全再開]
 保全中断中に、保全担当者が設備メイン画面90の保全着手/再開ボタン104c(図4参照)を操作することで、保全再開処理部64(図2参照)が起動される。保全再開処理部64は、保全担当者による保全再開があったことを保全管理用サーバ20に知らせる。すなわち、保全再開処理部64は、保全再開情報を作成して、保全管理用サーバ20に送信する。保全再開情報は、例えば保全再開コード、送信元コード、担当者コード、設備コード等を含む。
 また、保全再開があった段階で、例えば図11Aに示すように、コール端末32のディスプレイ32aに、設備別保全状況一覧140が表示される。設備別保全状況一覧140の現在の状況には、保全作業が中断中であったことを示す「対応中断中」が表示され、さらに、例えば右端部に「再開」を示すシンボル表示が行われる。
 保全作業の再開にあたっては、保全要請によって駆けつけた保全担当者ではなく、交代要請によって駆けつけた保全担当者によって行われる場合もある。そこで、例えば保全作業を再開する際に、保全担当者の氏名や担当者コード等を入力する処理を行うようにしてもよい。入力された情報は保全管理用サーバ20に送信される。
[対応完了]
 保全担当者が設備メイン画面90の対応完了ボタン110(図4参照)を操作することで、保全完了処理部66(図2参照)が起動される。保全完了処理部66は、保全担当者による保全対応の完了があったことを保全管理用サーバ20に知らせる。すなわち、保全完了処理部66は、保全完了情報を作成して、保全管理用サーバ20に送信する。保全完了情報は、例えば保全完了コード、送信元コード、担当者コード、設備コード等を含む。
 また、対応完了があった段階で、例えば図11Bに示すように、コール端末32のディスプレイ32aに、設備別保全状況一覧140が表示される。設備別保全状況一覧140の現在の状況には、保全担当者が保全作業中であったことを示す「対応中」が表示される。
[プルダウンメニュー:第2項目]
 図6のプルダウンメニュー122の第2項目を選択操作することで、設備稼働状況履歴表示処理部72(図3参照)が起動される。設備稼働状況履歴表示処理部72は、図12に示すように、ディスプレイ32aに設備稼働状況履歴画面144を表示する。この設備稼働状況履歴画面144は、主に、生産ライン名入力欄146aと、設備名入力欄146bと、検索ボタン146c等を有する。そして、保全担当者等が、生産ライン名入力欄146aに生産ライン名、設備名入力欄146bに設備名を入力し、検索ボタン146cを指でタッチあるいはペン状の器具でタッチ等することで、設備稼働状況履歴表示処理部72は、該当する設備の稼働状況の履歴を表示する。履歴の表示内容としては、発生したイベントの内容とイベントの発生時刻等が挙げられる。
[プルダウンメニュー:第3項目]
 図6のプルダウンメニュー122の第3項目を選択操作することで、保全作業状況表示処理部74(図3参照)が起動される。保全作業状況表示処理部74は、図13に示すように、ディスプレイ32aに保全設備作業状況一覧画面(全ラインモニター画面と記す)148を表示する。この全ラインモニター画面148には、主に、全製造ラインのうち、保全要請がなされた設備の現在の作業状況が一覧表示される。その内訳は、保全要請が行われた時刻(要請時刻)、稼働停止状態の経過時間(停止/経過時間)、製造ライン名、設備名、現在の作業状況、保全担当者名等が挙げられる。このうち、保全対応中の設備については例えば赤色で表示され、それ以外の設備については例えば青色で表示されて、保全対応中の設備を容易に見分けられるようになっている。
[プルダウンメニュー:第4項目]
 図6のプルダウンメニュー122の第4項目を選択操作することで、補修部品リスト表示処理部76(図3参照)が起動される。補修部品リスト表示処理部76は、図14に示すように、ディスプレイ32aに補修部品検索画面150を表示する。この補修部品検索画面150は、主に、リスト表示領域152aと図面表示領域152bとを有する。リスト表示領域152aは、補修部品の型式と部品名とがリスト形式で表示される。図面表示領域152bは、図示を省略するが、リスト表示領域152aへの選択入力(ポインタやタッチ等による選択入力)によって選択された補修部品の外観や透視図等が表示される。
[プルダウンメニュー:第5項目]
 図6のプルダウンメニュー122の第5項目を選択操作することで、在庫検索画面表示処理部78(図3参照)が起動される。在庫検索画面表示処理部78は、図15に示すように、ディスプレイ32aに在庫検索画面154を表示する。この在庫検索画面154には、主に、補修部品の型式入力欄156aと、部品名入力欄156bと、補修部品のリスト画面156cと、検索ボタン156dと、補修部品が保管されている複数の倉庫の位置を示す配置画面156e等が表示される。
 例えば保全担当者等が補修部品を入手する場合、補修部品の保管場所、すなわち、倉庫の位置を知る必要がある。そこで、型式入力欄156aと部品名入力欄156bに該当する型式と部品名を入力し、検索ボタン156dを指でタッチあるいはペン状の器具でタッチ等することで、補修部品のリスト画面156cに、入手すべき補修部品の内訳が表示されると共に、配置画面156eに、入手すべき補修部品が保管されている倉庫の位置が表示される。この場合、倉庫の位置を示す番号が例えば赤色表示や点滅表示等で示される。
 補修部品を入手する場合は、例えば保全担当者が保全作業を中断して、該当する倉庫から補修部品を入手したり、他の保全スタッフに補修部品の情報(型式、部品名、倉庫の位置等)を伝えて、補修部品を手配してもらう等が挙げられる。
[プルダウンメニュー:第6項目]
 保全完了後に、図6に示すプルダウンメニュー122の第6項目を選択操作することで、作業完了登録画面表示処理部80(図3参照)が起動される。作業完了登録画面表示処理部80は、先ず、ディスプレイ32aに設備別保全状況一覧140(図11B参照)を表示する。この設備別保全状況一覧140では、主に、保全要請がなされた日時(要請日時)と、設備名と、保全要請がなされたときの状況(要請時状況)と、現在の状況と、停止時間(分)等が表示される。
 表示された設備のうち、担当者別の作業完了登録を行う設備を選択することで、作業完了登録画面表示処理部80は、図16に示すように、担当者別作業完了登録画面158を表示する。この担当者別作業完了登録画面158では、主に、担当者毎に、担当者名、受付時刻、着手時刻、対応時間が表示される。
 そして、担当者毎に該当する行を選択することで、作業完了登録画面表示処理部80は、担当者毎に、対応完了を登録した旨のメッセージを表示する。この段階で、担当者別の作業完了登録が終了する。
[プルダウンメニュー:第7項目]
 図6のプルダウンメニュー122の第7項目を選択操作することで、保全履歴リスト表示処理部82(図3参照)が起動される。保全履歴リスト表示処理部82は、図17に示すように、保全履歴リスト画面160を表示する。この保全履歴リスト画面160は、主に、項目入力領域162aと、履歴一覧表示領域162bとを有する。項目入力領域162aは、履歴一覧が膨大な情報量であるため、例えば期間、機種名、ライン名、設備名で絞って表示することができるようになっている。絞り込みのための項目としては、例えば期間、機種名、ライン名、設備名、作成状況、履歴種別等が挙げられる。
 そして、これらの絞り込みのための項目に入力することで、保全履歴リスト表示処理部82は、保全管理用サーバ20に対して、該当する設備の履歴情報の転送を要求する。保全管理用サーバ20は、コール端末32からの上記転送要求に基づいて、後述する保全履歴データベース198(図19参照)から該当する設備の保全履歴を読み出して、要求のあったコール端末32に送信する。
 保全履歴リスト表示処理部82は、保全管理用サーバ20からの保全履歴データを受け取り、その内容を履歴一覧表示領域162b(図17参照)に表示する。履歴一覧表示領域162bには、主に、製造ライン名、設備名、履歴種別(突発故障、相談/計画の区別)、発生日時、保全担当者名、停止時間、履歴、備考等がリスト形式で表示される。また、履歴一覧表示領域162bに表示された複数の行のうち、種類の内容が「突発故障」の行が赤色で表示され、相談/計画の行が例えば青色で表示され、容易に見分けられるようになっている。
 また、この保全履歴リスト画面160には、保全履歴詳細画面170(図18参照)を表示するための履歴表示ボタン164を有する。この履歴表示ボタン164を指でタッチあるいはペン状の器具でタッチ等することで、詳細履歴表示処理部84(図3参照)が起動される。詳細履歴表示処理部84は、詳細な履歴を入力するための保全履歴詳細画面170(図18参照)を表示する。
 保全履歴詳細画面170には、部門、設備名、発生日時、停止時間等のシステムが自動で入力する項目と、事象、原因、処置等を担当した保全スタッフが入力する項目がある。つまり、保全スタッフは、部門や設備名等を入力する必要がなく、事象、原因、処置等を入力すればよいため、入力の時間短縮を図ることができる。
 入力が完了することで、上述した保全履歴リスト表示処理部82は、図17に示す保全履歴リスト画面160のうち、履歴一覧表示領域162bに表示された履歴一覧のうち、入力対象の設備について、履歴の項目の内容を「未作成」から「作成済み」に変える。その後、保全履歴リスト表示処理部82は、入力が完了した当該設備の保全履歴データを保全管理用サーバ20に送信する。保全管理用サーバ20は、要請設備からの保全履歴データを保全履歴データベース198(図19参照)に登録する。
[保全管理用サーバ20]
 保全管理用サーバ20は、図19に示すように、要請進捗受付部180と、要請反映部182と、作業進捗反映部184と、保全履歴管理部186と、保全管理画面表示処理部188と、補修部品反映部190と、要請一時保存ファイル192と、作業進捗一時保存ファイル194とを有する。また、この保全管理用サーバ20には、保全履歴データベース198と補修部品データベース200とが接続されている。
 要請進捗受付部180は、コール端末32からの第1保全要請、設備監視システム38からの第2保全要請、コール端末32からの応援要請、交代要請等の各種要請のほか、保全着手、保全中断、保全再開等の作業進捗情報を受け付ける。
 要請反映部182は、要請進捗受付部180にて受け付けた各種要請を要請一時保存ファイル192に登録し、さらに、保全履歴データベース198に登録する。
 また、要請反映部182は、要請一時保存ファイル192に登録された各種要請を設備レイアウト画面94(図8参照)に反映する。この場合、例えば要請設備に対するメカ系の保全要請であれば、要請設備のシンボル画像134の例えば右肩に赤色円形136R(図9A参照)を表示し、電気系の保全要請であれば、黄色円形136Y(図9B参照)を表示する付加情報等を全ての端末に送信して、情報を共有する。もちろん、付加情報が反映された設備レイアウト画面94の画像データを送信してもよい。
 また、要請反映部182は、例えば要請設備に対するメカ系の応援要請又は交代要請であれば、要請設備のシンボル画像134の例えば右肩に一部が赤色とされた円形136rw(図9C参照)、電気系の応援要請又は交代要請であれば一部が黄色とされた円形136yw(図9D参照)を表示する付加情報を全ての端末に送信して、情報を共有する。もちろん、付加情報が反映された設備レイアウト画面94の画像データを送信してもよい。
 作業進捗反映部184は、要請進捗受付部180にて受け付けた各種作業進捗情報を作業進捗一時保存ファイル194に登録し、さらに、保全履歴データベース198に登録する。
 また、作業進捗反映部184は、作業進捗一時保存ファイル194に登録された各種作業進捗を設備レイアウト画面94(図8参照)に反映する。この場合、例えば要請設備に対する保全着手であれば、要請設備のシンボル画像134の例えば右肩に緑色円形136G(図9E参照)を表示し、保全中断であれば、要請設備のシンボル画像134の例えば右肩に水色円形136A(図9F参照)を表示し、保全完了であれば、図9Gに示すように、要請設備のシンボル画像134の例えば右肩に表示されていた円形の表示を消去する付加情報を全ての端末に送信して、情報を共有する。もちろん、付加情報が反映された設備レイアウト画面94の画像データを送信してもよい。
 また、作業進捗情報が保全完了であれば、保全完了となった要請設備に関し、要請一時保存ファイル192及び作業進捗一時保存ファイル194に登録されていた保全要請、応援要請等の情報が消去される。
 保全履歴管理部186は、要請一時保存ファイル192及び作業進捗一時保存ファイル194に格納された情報を、要請された各種端末(コール端末32、保全スタッフ端末22等)に送信する。これによって、各コール端末32、各保全スタッフ端末22等において、各設備での要請状況や作業進捗状況が設備レイアウト画面94、設備稼働状況履歴画面144、全ラインモニター画面148等に反映される。
 また、保全履歴管理部186は、コール端末32あるいは保全スタッフ端末22から送信された保全履歴情報、すなわち、保全履歴詳細画面170に入力した各種情報を保全履歴データベース198に保存する。
 保全管理画面表示処理部188は、図20に示すように、保全管理用モニタ26に、設備レイアウト画面94と全ラインモニター画面148とを含むマルチ画面202を表示する。これによって、各生産ライン16の要請設備での保全状況がテキスト情報と画像情報とによって一目で確認することができる。
 また、図19に示すように、上述した要請進捗受付部180は、保全スタッフ端末22からの保全担当者の情報を保全履歴データベース198、要請一時保存ファイル192、作業進捗一時保存ファイル194に登録する。また、要請進捗受付部180は、要請設備のコール端末32に対してメッセージ表示のための情報(保全担当者の名前、担当者コード等)を送信する。
 補修部品反映部190は、例えば保全スタッフ端末22等での出庫処理によって入力された補修部品の使用個数等の情報を補修部品データベース200に反映する。
[保全スタッフ端末22]
 次に、保全スタッフ端末22に備わる機能部について、図21を参照しながら説明する。
 保全スタッフ端末22は、図21に示すように、コール端末32等からの各種要請を受信する要請受信部210と、保全スタッフの現在の状況を示したスタッフ現況画面212(図22参照)を表示するスタッフ現況表示処理部214と、保全担当者通知部216と、出庫処理部218と、コール端末32と同様の保全支援情報表示処理部68とを有する。保全支援情報表示処理部68を有することから、保全スタッフ端末22からも応援要請や交代要請を行うことができる。
 また、保全スタッフ端末22は、設備レイアウト表示処理部52を有する。従って、保全要請等を反映した設備レイアウト画面94をディスプレイ22a並びに保全管理用モニタ26に表示することができる。
 通常は、保全管理用モニタ26には、保全管理用サーバ20からのマルチ画面202が表示されるが、保全スタッフ端末22からの設備レイアウト画面94も表示させることができる。
 要請受信部210は、コール端末32からの第1保全要請、設備監視システム38からの第2保全要請、コール端末32からの応援要請、交代要請等の各種要請を受信する。
 スタッフ現況画面212は、図22に示すように、メカ担当領域220aと電気担当領域220bとに分かれ、メカ担当領域220aには、メカ担当スタッフの人数と同じ数の長方形状のブロック222が表示され、電気担当領域220bには、電気担当スタッフの人数と同じ数の長方形状のブロック222が表示される。ブロック222の表示色は、現在待機中であれば、緑色に表示され、保全作業中(応援中、交代中を含む)であれば、グレーに表示される。
 従って、新たな保全要請等があれば、緑色に表示されているブロック222に対応する保全スタッフから保全担当者が選択される。すなわち、待機中の保全スタッフに事前に連絡をとり、了解が得られた段階で、当該保全スタッフに出動を要請すると共に、スタッフ現況画面212のうち、今回選択した保全スタッフのブロック222を指でタッチあるいはペン状の器具でタッチ等する。これにより、保全担当者通知部216が起動され、少なくとも選択されたブロック222に対応する保全担当者の情報(担当者コード等)を保全管理用サーバ20に送信する。
 保全管理用サーバ20の要請進捗受付部180(図19参照)は、通知された保全スタッフの情報と受信した時刻(出動時刻)を、保全履歴データベース198、要請一時保存ファイル192、作業進捗一時保存ファイル194に登録する。
 一方、保全スタッフ端末22の出庫処理部208(図21参照)は、図6のプルダウンメニュー122の第5項目を選択操作することで、在庫検索画面表示処理部78(図3参照)と共に起動される。在庫検索画面表示処理部78は、図15に示すように、ディスプレイ22aに在庫検索画面154を表示する。保全担当者は、部品交換した補修部品の型式、部品名称及び保管場所に対応する欄の在庫数から部品交換した個数だけ差し引く入力を行う。出庫処理部208は、入力された情報を保全管理用サーバ20に送信する。
 保全管理用サーバ20の補修部品反映部190(図19参照)は、上述したように、出庫処理部208からの情報を受け取って、入力された在庫数を、補修部品データベース200に反映する。これによって、倉庫18内の実際の在庫数と、補修部品データベース200に登録されたデータとしての在庫数とが一致することとなる。
 次に、本実施の形態に係る設備保全支援システムの処理動作について、図23及び図24のフローチャートも参照しながら説明する。
 先ず、図23のステップS1において、保全要請があるか否かを判別する。具体的には、コール端末32は、第1保全要請があるか否かを判別し、設備監視システム38は、第2保全要請があるか否かを判別する。
 第1保全要請及び第2保全要請がなければ、ステップS2に進み、保全計画表示処理部50は、保全計画の確認又は保全計画による保全作業であるか否かを判別する。この判別は、設備メイン画面90(図4参照)の計画着手ボタン108の操作が行われたかどうかで行われる。
 設備メイン画面90の計画着手ボタン108の操作が行われた場合は、ステップS3に進み、コール端末32のディスプレイ32a等に保全計画画面92(図5参照)を表示する。
 その後、ステップS4において、保全スタッフは、表示された保全計画のうち、計画対象の設備についての計画保全を実施する。
 上記ステップS4での処理が終了した段階、あるいは、上記ステップS2において、計画着手ボタン108の操作が行われていないと判別された場合は、上記ステップS1に戻り、ステップS1以降の処理を繰り返す。
 そして、上記ステップS1において、コール端末32からの第1保全要請又は設備監視システム38からの第2保全要請があると判別された場合は、ステップS5に進み、保全管理用サーバ20及び保全スタッフ端末22は、コール端末32からの第1保全要請又は設備監視システム38からの第2保全要請を受け付ける。このとき、保全管理用サーバ20(図19参照)の要請反映部182は、第1保全要請又は第2保全要請を要請一時保存ファイル192及び保全履歴データベース198に登録する。さらに、第1保全要請又は第2保全要請を、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 ステップS6において、保全スタッフは、コール端末32からの第1保全要請又は設備監視システム38からの第2保全要請に基づいて、例えばスタッフ現況画面212(図22参照)を見ながら保全担当者を選任する。保全スタッフ端末22は、第1保全要請又は第2保全要請に応じて選任された保全担当者の情報を保全管理用サーバ20に送信する。
 ステップS7において、選任された保全担当者が要請設備に出動する。このとき、保全管理用サーバ20の要請進捗受付部180は、保全スタッフ端末22からの保全担当者の情報を保全履歴データベース198等に登録すると共に、要請設備のコール端末32に送信する。これにより、要請設備のコール端末32の設備メイン画面90(図4参照)のメッセージ表示領域102に、例えば保全担当者が要請設備に移動中であることを示すメッセージが表示される。
 ステップS8において、要請設備に到着した保全担当者が着手/再開ボタン104c(図4参照)を操作することで、保全作業の着手が開始される。このとき、コール端末32は、保全担当者による保全着手があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの保全着手に関する情報を受け付ける。このとき、作業進捗反映部184は、保全着手を示す作業進捗情報を作業進捗一時保存ファイル194及び保全履歴データベース198に登録する。さらに、保全着手があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 その後、図24のステップS9において、コール端末32は保全作業の中断があるか否かを判別する。この判別は、設備メイン画面90の保全中断ボタン104d(図4参照)の操作が行われたかどうかで行われる。保全作業の中断であれば、ステップS10に進み、コール端末32は、保全担当者による保全中断があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの保全中断に関する情報を受け付ける。作業進捗反映部184は、保全中断を示す作業進捗情報を作業進捗一時保存ファイル194及び保全履歴データベース198に登録する。さらに、保全中断があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 その後、ステップS11において、コール端末32は、保全中断が応援要請によるものか否かを判別する。この判別は、応援・交代要請画面124(図7参照)の応援要請ボタン126の操作が行われたかどうかで行われる。応援要請であれば、ステップS12に進み、コール端末32は、保全担当者による応援要請があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの応援要請に関する情報を受け付ける。要請反映部182は、応援要請に関する情報を要請一時保存ファイル192及び保全履歴データベース198に登録する。さらに、応援要請があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 上記ステップS11において、応援要請でないと判別された場合は、ステップS13に進み、コール端末32は、保全中断が交代要請によるものか否かを判別する。この判別は、応援・交代要請画面124(図7参照)の交代要請ボタン128の操作が行われたかどうかで行われる。交代要請であれば、ステップS14に進み、コール端末32は、保全担当者による交代要請があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの交代要請に関する情報を受け付ける。要請反映部182は、交代要請に関する情報を要請一時保存ファイル192及び保全履歴データベース198に登録する。さらに、交代要請があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 上記ステップS12又は上記ステップS14での処理が終了した段階、あるいは、上記ステップS13において、交代要請でないと判別された場合、例えば保全担当者の休憩等による中断である場合は、ステップS15に進み、コール端末32は、保全再開であるか否かを判別する。この判別は、設備メイン画面90(図4参照)の保全着手/再開ボタン104cの操作が行われたかどうかで行われる。保全作業の再開であれば、ステップS16に進み、コール端末32は、保全担当者による保全再開があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの保全再開に関する情報を受け付ける。作業進捗反映部184は、保全再開を示す作業進捗情報を作業進捗一時保存ファイル194及び保全履歴データベース198に登録する。さらに、保全再開があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 上記ステップS16での処理が終了した段階、あるいは、上記ステップS9において保全作業の中断でないと判別された場合は、次のステップS17に進み、コール端末32は、保全作業の完了であるか否かを判別する。この判別は、設備メイン画面90(図4参照)の対応完了ボタン110の操作が行われたかどうかで行われる。保全作業の完了であれば、ステップS18に進み、コール端末32は、保全担当者による保全完了があったことを保全管理用サーバ20に知らせる。保全管理用サーバ20は、コール端末32からの保全完了に関する情報を受け付ける。作業進捗反映部184は、保全完了を示す作業進捗情報を作業進捗一時保存ファイル194及び保全履歴データベース198に登録する。さらに、保全完了があったことを、コール端末32、保全スタッフ端末22等の設備レイアウト画面94(図8参照)に反映する。
 その後、ステップS19において、保全担当者等は出庫処理を行う。すなわち、補修部品反映部190(図19参照)は、例えば保全スタッフ端末22等での出庫処理によって入力された補修部品の使用個数等の情報を補修部品データベース200に反映する。
 その後、ステップS20において、保全担当者は、今回の保全作業の履歴を作成して、保全履歴を更新する。すなわち、例えば保全スタッフ端末22のディスプレイ22aに保全履歴リスト画面160(図17参照)を表示した後、担当した要請設備を選択して、履歴表示ボタン164を操作することで、要請設備の保全履歴詳細画面170(図18参照)を表示する。そして、要請設備の事象、原因及び処置を入力し、交換した補修部品があれば、その形式、部品名称、出庫場所、使用数量等を入力する。もちろん、交換した補修部品の入力に関しては、先に入力した出庫処理と関連付けるようにして、入力を省略してもよい。
 このように、本実施の形態に係る設備保全支援システム10は、生産ライン16に配置されたコール端末32からの保全要請を受け付ける要請進捗受付部180と、複数の保全スタッフのうち、少なくとも保全要請の内容及び複数の保全スタッフの現況に基づいて、保全要請に応じた保全担当者の選任を行うために利用されるスタッフ現況表示処理部214と、選任された保全担当者の要請に従って、保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力する保全支援情報表示処理部68とを有する。
 これにより、生産現場と保全スタッフと管理事務所(保全スタッフ事務所12)との間で、通信手段を用いて情報の共有化を図ることができ、保全スタッフの現在の状況や、生産現場からの要請に対する保全作業の進捗状況を一目で把握することができ、生産設備を保守する保全スタッフの作業効率を向上させることができる。しかも、過去の部品及び保全履歴を参照することで、保全作業をスムーズに進めることが可能となり、過去の保全履歴を利用して、今回の保全作業についての報告も可能となることから、保全完了報告の滞りも解消することができる。例えば保全作業の開始にあたって、保全内容の経緯、交換部品、過去の関係担当者等の記録を保全履歴として提示する。この保全履歴は、保全担当者がトラブル改善を考える上で有意義な情報としても利用することができるため、効率よく保全作業を進めることが可能となり、設備停止時間を短縮して保全作業を実施することができる。
 本実施の形態において、生産現場に設置された1以上の生産設備の配置位置を示す設備レイアウト画面94を、少なくとも保全管理用モニタ26とコール端末32に表示する設備レイアウト表示処理部52と、生産ライン16からの要請を設備レイアウト画面94に反映する要請反映部182と、保全担当者による保全作業の進捗状況を設備レイアウト画面94に反映する作業進捗反映部184とを有する。
 これにより、生産ライン16毎に設置されたコール端末32等に接続されたディスプレイ32aや保全管理用サーバ20に接続された保全管理用モニタ26等を使って、直接設備レイアウト画面94を見ながら様々な要請(保全要請、応援要請等)を入力することができ、しかも、入力した要請を設備レイアウト画面94に反映させることができる。その結果、要請したスタッフ等以外の者が設備レイアウト画面94を見ることによって、生産ラインに対する要請内容を容易に確認することができる。
 本実施の形態において、保全要請は、少なくとも機械的トラブルか電気的トラブルかを示す一次判断の情報を含む。これにより、一次判断の情報を含めた保全要請が行われるため、保全担当者を選定する際に、一次判断の情報を有効利用することが可能となり、保全担当者の選定作業並びに選定にかかる時間を短縮することができる。
 本実施の形態において、保全要請は、生産ライン16に配置されたコール端末32に、生産現場に設置された1以上の生産設備の配置位置を示す設備レイアウト画面94を表示した状態で、生産スタッフの手入力によって実施する。これにより、設備レイアウト画面94に保全要請が反映されるため、生産スタッフは、設備レイアウト画面94を見ながら保全要請を行うことで、保全要請が必要な設備に対して正しく保全要請を行ったどうかを容易に確認することができる。
 この場合、生産スタッフの手入力による保全要請は、少なくとも保全に必要な部品及び該部品の保管場所に関する情報を含む。これにより、保全要請には、保全に必要な部品及び該部品の保管場所に関する情報が含まれているため、保全担当者は、容易に保全に必要な部品を入手することができ、保全作業に着手するまでの時間を短縮することができ、保全作業の効率化を向上させることができる。
 また、生産スタッフの手入力による保全要請は、過去に発生したトラブルに関する情報(履歴一覧をアクセスするためのキー:設備番号等)を含むことが好ましい。これにより、保全要請には、過去に発生したトラブルに関する情報が含まれているため、保全担当者は、その情報を確認しながら、保全作業を効率よく進めることができ、保全作業の時間を短縮することができ、保全作業の効率化を向上させることができる。
 さらに、生産スタッフの手入力による保全要請は、過去に発生したトラブルに対する保全スタッフのコメントに関する情報(履歴一覧をアクセスするためのキー:設備番号等)を含むことが好ましい。これにより、保全要請には、過去に発生したトラブルに対する保全スタッフのコメントに関する情報が含まれているため、保全担当者が初めて担当する設備でも、そのコメントを参照することで、保全作業を効率よく進めることができ、保全作業の効率化を向上させることができる。
 本実施の形態において、少なくとも生産ライン16に配置されたコール端末32は、保全担当者による保全作業の開始後になされた二次判断が一次判断と異なる場合に、保全担当者の指示に基づいて応援要請を行う第1応援要請処理部56Aを有する。
 これにより、一次判断の情報を含めた保全要請が行われた後、一次判断が間違いであった場合、保全担当者は例えば専門外の知識で間違った保全作業を行うおそれがある。しかし、二次判断の情報に基づいて応援要請を行うことができることから、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
 この場合、応援要請は、生産ライン16に配置されたコール端末32に、生産現場に設置された1以上の生産設備の配置位置を示す設備レイアウト画面94を表示した状態で、保全担当者の手入力によって実施される。
 これにより、設備レイアウト画面94に応援要請が反映されるため、保全担当者は、設備レイアウト画面94を見ながら応援要請を行うことで、応援要請が必要な設備に対して正しく応援要請を行ったどうかを容易に確認することができる。
 本実施の形態において、少なくとも生産ライン16に配置されたコール端末32は、保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、応援要請を行う第2応援要請処理部56Bを有してもよい。
 これにより、保全作業の実施にあたって、複雑な保全作業や事前の確認作業が煩雑である場合等においては、時間の経過を忘れ、応援を要請する機会を逸する場合がある。そこで、保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、応援要請を行えるようにすることで、保全担当者の負担を軽減することができる。しかも、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
 この場合、少なくとも生産ライン16に配置されたコール端末32は、保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、保全作業の異常を示すアラームを出力する。
 保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、アラームが出力されることで、保全担当者は、自動的に応援要請が行われたことを認識することができ、応援担当者に対する作業進捗の説明等を事前に準備することが可能となる。その結果、保全担当者は応援担当者と共に保全作業を効率よく進めることが可能となり、保全作業の効率化を向上させることができる。
 本実施の形態において、生産ライン16に配置されたコール端末32は、保全スタッフの指示に基づいて、当該生産ライン16の生産設備の保全計画を表示する保全計画表示処理部50を有する。
 これにより、通常の保全スタッフによる巡視の際に、生産ライン16に配置されたコール端末32を用いて保全計画を表示することができ、巡視した日が部品の交換日であったり、駆動部分の摩耗や異音等が発生していることが確認できた場合等に、保全スタッフは、迅速に保全作業に着手することができ、保全要請の頻度を少なくすることが可能となる。
 本実施の形態において、生産ライン16に配置された生産設備の運用状況を監視する設備監視システム38を有し、設備監視システム38は、生産設備の異常を検出した際に、保全スタッフ事務所12に設置された保全スタッフ端末22に保全要請を行う。保全スタッフ端末22は、さらに、設備監視システム38からの第2保全要請を受信する要請進捗受付部180と、受け付けた第2保全要請を少なくとも保全スタッフ事務所12に設置された保全管理用モニタ26に表示する設備レイアウト表示処理部52とを有する。
 設備監視システム38が生産設備の異常を検出した際に、保全スタッフ事務所12に設置された保全スタッフ端末22に保全要請を行うことから、生産スタッフによる手入力による保全要請よりも迅速に保全要請を発することができる。しかも、設備監視システム38による保全要請が保全スタッフ事務所12に設置された保全管理用モニタ26に表示されることから、保全スタッフは設備監視システム38による保全要請を早期に認識することが可能となり、保全作業が必要な設備に対する保全作業を早期に実施することができる。
 なお、本発明に係る設備保全支援システム及び設備保全支援方法は、上述の実施の形態に限らず、本発明の要旨を逸脱することなく、種々の構成を採り得ることはもちろんである。
 例えば図1に示すように、各倉庫18にそれぞれ倉庫端末34を設置するようにしてもよい。倉庫端末34の構成としては、上述したコール端末32や保全スタッフ端末22と同様の構成を有してもよい。そして、保全スタッフのほか、在庫管理を行う担当者が倉庫端末34を使用して入庫処理及び出庫処理を行うようにしてもよい。この場合、補修部品の情報の手入力に代えて、補修部品に付されたバーコードをバーコードリーダー42にて読み取るようにしてもよい。これにより、各倉庫18の在庫管理を効率よく行うことができる。

Claims (14)

  1.  生産現場に設置された1以上の生産設備の保全を支援する設備保全支援システム(10)であって、
     少なくとも1以上のサーバ(20)と、1以上の端末(22、32)と、1以上の管理用モニタ(26、30)とが、保全スタッフ事務所(12)、生産スタッフ事務所(14)、倉庫(18)及び生産ライン(16)毎にそれぞれ必要に応じて配置され、
     前記生産ライン(16)に配置された前記端末(32)からの保全要請を受け付ける手段(180)と、
     複数の保全スタッフのうち、少なくとも前記保全要請の内容及び前記複数の保全スタッフの現況に基づいて、前記保全要請に応じた保全担当者の選任を行う手段(214)と、
     選任された前記保全担当者の要請に従って、前記保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力する手段(68)とを有することを特徴とする設備保全支援システム。
  2.  請求項1記載の設備保全支援システムにおいて、
     前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面(94)を、少なくとも前記管理用モニタ(26、30)と前記端末(22、32)に表示する手段(52)と、
     前記生産ライン(16)からの要請を前記レイアウト画面(94)に反映する手段(182)と、
     前記保全担当者による保全作業の進捗状況を前記レイアウト画面(94)に反映する手段(184)と、を有することを特徴とする設備保全支援システム。
  3.  請求項1又は2記載の設備保全支援システムにおいて、
     前記保全要請は、少なくとも機械的トラブルか電気的トラブルかを示す一次判断の情報を含むことを特徴とする設備保全支援システム。
  4.  請求項1~3のいずれか1項に記載の設備保全支援システムにおいて、
     前記保全要請は、前記生産ライン(16)に配置された前記端末(32)に、前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面(94)を表示した状態で、生産スタッフの手入力によって実施されることを特徴とする設備保全支援システム。
  5.  請求項4記載の設備保全支援システムにおいて、
     前記生産スタッフの手入力による前記保全要請は、少なくとも保全に必要な部品及び該部品の保管場所に関する情報を含むことを特徴とする設備保全支援システム。
  6.  請求項5記載の設備保全支援システムにおいて、
     前記生産スタッフの手入力による前記保全要請は、過去に発生したトラブルに関する情報を含むことを特徴とする設備保全支援システム。
  7.  請求項6記載の設備保全支援システムにおいて、
     前記生産スタッフの手入力による前記保全要請は、過去に発生した前記トラブルに対する保全スタッフのコメントに関する情報を含むことを特徴とする設備保全支援システム。
  8.  請求項3記載の設備保全支援システムにおいて、
     少なくとも前記生産ライン(16)に配置された前記端末(32)は、前記保全担当者による保全作業の開始後になされた二次判断が前記一次判断と異なる場合に、前記保全担当者の指示に基づいて応援要請を行う手段(56A)を有することを特徴とする設備保全支援システム。
  9.  請求項8記載の設備保全支援システムにおいて、
     前記応援要請は、前記生産ライン(16)に配置された前記端末(32)に、前記生産現場に設置された1以上の生産設備の配置位置を示すレイアウト画面(94)を表示した状態で、前記保全担当者の手入力によって実施されることを特徴とする設備保全支援システム。
  10.  請求項1又は2記載の設備保全支援システムにおいて、
     少なくとも前記生産ライン(16)に配置された前記端末(32)は、前記保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、応援要請を行う手段(56B)を有することを特徴とする設備保全支援システム。
  11.  請求項10記載の設備保全支援システムにおいて、
     少なくとも前記生産ライン(16)に配置された前記端末(32)は、前記保全担当者による保全作業の経過時間が予め設定された時間を超えた時点で、保全作業の異常を示すアラームを出力することを特徴とする設備保全支援システム。
  12.  請求項1記載の設備保全支援システムにおいて、
     前記生産ライン(16)に配置された前記端末(32)は、前記保全スタッフの指示に基づいて、当該生産ライン(16)の生産設備の保全計画を表示する手段(50)を有することを特徴とする設備保全支援システム。
  13.  請求項1記載の設備保全支援システムにおいて、
     前記生産ライン(16)に配置された生産設備の運用状況を監視する設備監視システム(38)を有し、
     前記設備監視システム(38)は、前記生産設備の異常を検出した際に、前記保全スタッフ事務所(12)に設置された前記端末(22)に保全要請を行い、
     前記保全スタッフ事務所(12)に設置された前記端末(22)は、さらに、前記設備監視システム(38)からの前記保全要請を受信する手段(180)と、受信した保全要請を少なくとも前記保全スタッフ事務所(12)に設置された前記管理用モニタ(26)に表示する手段(68)とを有することを特徴とする設備保全支援システム。
  14.  少なくとも1以上のサーバ(20)と、1以上の端末(22、32)と、1以上の管理用モニタ(26、30)とが、保全スタッフ事務所(12)、生産スタッフ事務所(14)、倉庫(18)及び生産ライン(16)毎にそれぞれ必要に応じて配置され、生産現場に設置された1以上の生産設備の保全を支援する設備保全支援システム(10)にて使用される設備保全支援方法であって、
     前記生産ライン(16)に配置された前記端末(32)からの保全要請を受信するステップと、
     複数の保全スタッフのうち、少なくとも前記保全要請の内容及び前記複数の保全スタッフの現況に基づいて、前記保全要請に応じた保全担当者の選任を行うステップと、
     選任された前記保全担当者の要請に従って、前記保全要請の内容に関連する少なくとも部品及び保全履歴に関する情報を保全支援情報として出力するステップとを有することを特徴とする設備保全支援方法。
PCT/JP2017/008410 2017-03-03 2017-03-03 設備保全支援システム及び設備保全支援方法 WO2018158928A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2019502401A JP6711955B2 (ja) 2017-03-03 2017-03-03 設備保全支援システム及び設備保全支援方法
PCT/JP2017/008410 WO2018158928A1 (ja) 2017-03-03 2017-03-03 設備保全支援システム及び設備保全支援方法
BR112019017928A BR112019017928A2 (pt) 2017-03-03 2017-03-03 sistema de suporte de manutenção de fábrica e método de suporte de manutenção de fábrica

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/008410 WO2018158928A1 (ja) 2017-03-03 2017-03-03 設備保全支援システム及び設備保全支援方法

Publications (1)

Publication Number Publication Date
WO2018158928A1 true WO2018158928A1 (ja) 2018-09-07

Family

ID=63369855

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/008410 WO2018158928A1 (ja) 2017-03-03 2017-03-03 設備保全支援システム及び設備保全支援方法

Country Status (3)

Country Link
JP (1) JP6711955B2 (ja)
BR (1) BR112019017928A2 (ja)
WO (1) WO2018158928A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022176239A1 (ja) * 2021-02-19 2022-08-25 株式会社日立製作所 業務管理システム、業務管理方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005032069A (ja) * 2003-07-08 2005-02-03 Nec Fielding Ltd 保守運用システム
JP2012144113A (ja) * 2011-01-11 2012-08-02 Mitsubishi Heavy Ind Ltd 制御システム、保守作業員端末装置および制御装置。
JP2012168920A (ja) * 2011-01-26 2012-09-06 Mitsubishi Heavy Ind Ltd メンテナンス作業員の管理システム

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004110709A (ja) * 2002-09-20 2004-04-08 Takenaka Komuten Co Ltd 設備又は機械器具などの保全管理支援方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005032069A (ja) * 2003-07-08 2005-02-03 Nec Fielding Ltd 保守運用システム
JP2012144113A (ja) * 2011-01-11 2012-08-02 Mitsubishi Heavy Ind Ltd 制御システム、保守作業員端末装置および制御装置。
JP2012168920A (ja) * 2011-01-26 2012-09-06 Mitsubishi Heavy Ind Ltd メンテナンス作業員の管理システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022176239A1 (ja) * 2021-02-19 2022-08-25 株式会社日立製作所 業務管理システム、業務管理方法
JP7516289B2 (ja) 2021-02-19 2024-07-16 株式会社日立製作所 業務管理システム、業務管理方法

Also Published As

Publication number Publication date
BR112019017928A2 (pt) 2020-05-19
JPWO2018158928A1 (ja) 2019-11-14
JP6711955B2 (ja) 2020-06-17

Similar Documents

Publication Publication Date Title
JP4261435B2 (ja) 設備点検支援システム
US20110035326A1 (en) System And Method Of Providing Product Quality And Safety
JP4981479B2 (ja) 機器の故障診断システム
JP2004164614A (ja) 作業担当者支援方法及び作業担当者支援プログラム
JP2018174973A (ja) 医療機器洗浄管理システム及びプログラム
JP2012256276A (ja) データセンタナビゲーションシステム
JP2003108222A (ja) 設備管理システム
JP2014026415A (ja) 発注支援装置、発注支援方法および生産管理システム
JP2007042014A (ja) プラント状態監視装置およびプラント状態監視方法
JP2006199469A (ja) エレベータの点検報告システム及びその制御方法
WO2018158928A1 (ja) 設備保全支援システム及び設備保全支援方法
JP2000029958A (ja) 設備機器の部品発注装置
JP2006219258A6 (ja) 設備装置の作業支援システム
JP2016115027A (ja) 作業現場集中監視システム
CA2718478A1 (en) System and method of providing product quality and safety
JP2024068846A (ja) エレベーター情報表示システム及びエレベーター情報提供方法
JP2002073850A (ja) メンテナンス支援方法及びシステム
JP4732574B2 (ja) 医療機器の管理システム及び医療機器の管理方法
WO2023079746A1 (ja) インシデント対応支援装置及びインシデント管理システム
JP2019156548A (ja) 管理サーバ及び管理システム
WO2022249309A1 (ja) 進捗管理サーバ及び進捗管理システム
JP5058463B2 (ja) 施設管理システム
JP3117394U (ja) 下水道等の施設管理支援システム
TWM521221U (zh) 醫療院所設施安全的智能管理系統
Polavarapu Integration of human factors in hazard identification and risk assessment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17898790

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019502401

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112019017928

Country of ref document: BR

122 Ep: pct application non-entry in european phase

Ref document number: 17898790

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 112019017928

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20190828