WO2017138276A1 - 生産設備投資企画支援システム及び商品生産システム - Google Patents
生産設備投資企画支援システム及び商品生産システム Download PDFInfo
- Publication number
- WO2017138276A1 WO2017138276A1 PCT/JP2016/088968 JP2016088968W WO2017138276A1 WO 2017138276 A1 WO2017138276 A1 WO 2017138276A1 JP 2016088968 W JP2016088968 W JP 2016088968W WO 2017138276 A1 WO2017138276 A1 WO 2017138276A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- production
- date
- production facility
- support system
- investment
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 368
- 238000013439 planning Methods 0.000 title claims abstract description 59
- 238000000034 method Methods 0.000 claims description 37
- 230000008569 process Effects 0.000 claims description 21
- 238000012384 transportation and delivery Methods 0.000 claims description 6
- 238000012790 confirmation Methods 0.000 claims description 2
- 238000011282 treatment Methods 0.000 claims description 2
- 238000004364 calculation method Methods 0.000 abstract description 25
- 230000010354 integration Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 238000009825 accumulation Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000000605 extraction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000284 extract Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000003442 weekly effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06314—Calendaring for a resource
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/04—Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Definitions
- the present invention relates to a production facility investment planning support system that supports planning and planning of investment costs for production facilities (for example, dies) used for production (manufacturing) of future products and parts (work), and future products.
- the present invention relates to a product production system that supports planning and planning of investment costs of products used in manufacturing of products.
- This method is based on external information including model planning information, drawing information, material arrival information, external work arrival information, and parts arrival information.
- the processing schedule is determined separately for the previous period (several weeks ago) and for the short term (immediately before the start of processing until several weeks ago).
- a plan corresponding to the work processing capacity is created for each level, and in the short-term schedule determination process, a work allocation plan is established.
- the production of production equipment such as molds is naturally started after the mass production drawings of the product and its parts are finalized. Therefore, for example, when a production schedule for a production facility is planned using the schedule determination method described in Japanese Patent No. 4528425, for example, the production schedule is naturally based on the period from the drawing date of the drawing to the introduction deadline of the production facility. Will be set. That is, as shown in FIG. 15, the production period of the production facility is concentrated from the date of drawing out the drawing to the period of introduction of the production facility.
- the investment cost related to the production facility is taken into consideration, it is possible to reduce the investment cost if the production facility is manufactured at the cheapest production facility factory.
- the production capacity of the lowest-priced factory, particularly the production capacity at the time of ordering is small, it is necessary to use a factory other than the lowest-priced factory, and the effect of reducing investment costs may be reduced.
- schedule management of production equipment for a certain period is also important, but reduction of investment cost of production equipment is also an important factor.
- energy costs including wage rates, material costs, and electricity differ from country to country, and land prices and manufacturing equipment depreciation expenses vary from country to country.
- the present invention has been made in consideration of such a problem, and the schedule that is the lowest price in the planning and planning of the investment cost of production equipment used for the production (manufacturing) of future products and parts (workpieces). It is an object of the present invention to provide a production facility investment planning support system capable of easily proposing.
- Another object of the present invention is to provide a product production system capable of easily proposing a schedule with the lowest price when planning and drafting investment costs of products produced at a production site. To do.
- the production facility investment planning support system is a production facility investment planning support system that supports planning and planning of investment costs of production facilities used for the production of future products and parts thereof.
- a database in which a date constraint including at least the drawing date of the drawing of the product and its parts and the introduction deadline of the production facility and the date of start of mass production of the product and its parts is input, and at least the date Restrictions, as well as production equipment production in progress for each production equipment in a plurality of production equipment production factories that produce the production equipment, and the maximum number of production processes per unit period for the production equipment in each production equipment production factory Means for considering, means for calculating at least the necessary lead time from a plurality of data related to the plurality of production equipment manufacturing factories, and at least The date restriction is canceled, and at least one of the drawing date of the drawing and the introduction time limit of the production facility is a date within a desired range and a date before the date or the date And a means for setting a later date as a new date, and
- the date before the drawing date of drawing is set as a new drawing candidate date, and the investment cost from the due date (drawing date of drawing) to the installation deadline of production equipment is calculated, and the calculated investment cost easily propose a schedule for the lowest price, with the date before the drawing date of the drawing registered in the database as the new drawing date, such as resetting the candidate date for the lowest price as the drawing date. It becomes possible to do.
- the date before the installation deadline of the production equipment is set as a candidate date for the new introduction deadline, and the investment cost from the drawing date to the candidate date (production equipment introduction deadline) is calculated. Almost propose a schedule for the lowest price, with the new installation deadline as the date before the production equipment introduction deadline registered in the database, such as resetting the candidate date with the lowest cost as the production equipment introduction deadline. There is an effect.
- the first aspect of the present invention it is preferable to have a display for displaying the investment cost of the production facility.
- a display for displaying the investment cost of the production facility it is possible to propose a schedule that can make the investment cost of the production facility the lowest value.
- the maximum production processing number of the production equipment at each production equipment production factory is stopped while the deadline restriction is released, and the production among the plurality of production equipment production plants
- the investment cost of the production facility may be predicted by allocating the total required man-hours of the production facility to the production facility manufacturing factory which is the lowest price in the facility.
- the lowest investment cost when the investment cost of the production facility is predicted, the lowest investment cost may be displayed. In other words, by canceling the due date constraint, it is possible to display the due date candidate with the lowest investment cost, the cheapest investment cost, etc., including dates other than the constraint due date.
- the one having the minimum necessary capacity may be displayed. That is, by canceling the due date constraint, it is possible to display the due date candidate with the minimum required capability, the minimum required capability, etc., including dates other than the constraint due date.
- the display is a graph and may be color-coded. This makes it possible to easily confirm the date candidate date with the minimum required capacity, the minimum required capacity, and the like.
- the lowest investment cost and the minimum necessary capacity may be displayed.
- the due date constraint including the dates other than the constrained due date
- the investment cost is the lowest and the required date is the lowest due date, the lowest investment cost and the lowest required capacity, etc. Can be displayed.
- the display is a graph and may be color-coded. As a result, it is possible to easily confirm the due date candidate with the lowest investment cost and the lowest required capacity, the lowest investment cost, the lowest required capacity, and the like.
- At least the predicted investment cost may be displayed in the currency of the investing country. This makes it possible to smoothly adjust the schedule with the person in charge in the investing country.
- the plurality of pieces of data relating to the production equipment manufacturing factory include transportation costs and transportation days between the country where the production equipment production factory is located and the country where the customer is using the production equipment.
- the included means for calculating the lead time may calculate a necessary lead time including the transportation cost and the number of transportation days.
- the transportation cost may include customs duties.
- the plurality of data relating to the production equipment manufacturing factory includes a country where the production equipment manufacturing factory is located, and an exchange rate between the local currency of the country where the production equipment is located and the investment base currency.
- the means for predicting the investment cost of the production facility may predict the investment cost of the production facility including the exchange rate. In this case as well, it is possible to propose a schedule that can minimize the investment cost for production equipment such as molds, including domestic and overseas production equipment manufacturing factories.
- a product production system is a product production system for planning production of a product, and includes a date including at least a planned order confirmation date of the product and a delivery date of the product.
- a database in which constraints are input, at least the due date constraints, and production in-process and inventory for each product at a plurality of production bases that produce the product, and per unit period for the product at each production base Means for taking into account the maximum production number, means for calculating at least man-hours and necessary lead time from a plurality of data related to the production base, at least releasing the due date constraint, and determining the order specification finalization date and the delivery
- At least one of the due dates is a date within a desired range, and the due date before the due date or the due date after the due date is a new date. It means for setting as a relevant date, based on at least set the new date, and having a means for predicting the production costs of the product.
- the production facility investment planning support system According to the production facility investment planning support system according to the present invention, it is the lowest price when planning and planning the investment cost of production facilities (molds, etc.) used for the production (manufacturing) of future products and parts (workpieces). It becomes possible to easily propose a schedule.
- the product production system it is possible to easily propose a schedule that provides the lowest price when planning and drafting investment costs of products produced at a production site.
- FIG. 13A and FIG. 13B are explanatory diagrams showing display forms by the third support system. It is a block diagram which shows the goods production system which concerns on this Embodiment. It is a graph which shows an example of the fluctuation
- the production facility investment planning support system 10 includes a database 12, a scheduler 14, a lead time calculation unit 16, a date setting unit 18, an investment cost prediction unit 20, And an investment cost display control unit 22.
- various data are registered through a network or an input device such as a keyboard.
- a date constraint that includes the due date for the drawing of the future product and its parts (work), the introduction deadline for production equipment (such as molds), and the due date for mass production of the product and its parts is entered. ing.
- various data about a plurality of production equipment manufacturing factories are registered. Examples of various data include the following (a) to (c).
- A Transportation costs (including customs duties) between the country where the production equipment manufacturing factory is located and the country where the business partner (manufacturer using the mold) is located
- B Days of transportation
- (a) and (b) have almost no change, but (c) varies from day to day, so it may be updated every predetermined time. For example, a prediction rate based on fluctuations in the past several months may be used. Of course, an average rate for the past several months may be adopted.
- the scheduler 14 is installed in each of a plurality of production equipment production factories that produce production equipment, or in a country that is the center of the country where these production equipment production factories are located. There are cases where a schedule is transmitted through a network.
- the scheduler 14 has at least a date constraint, a production facility production mechanism for each production facility in a plurality of production facility production factories that produce production facilities, and a unit period for a production facility in each production facility production plant. Scheduling is performed in consideration of the maximum number of production processes and unit cost (cost / number).
- the scheduler 14 is installed in each of a plurality of production facility production factories, the in-process, the maximum number of production processes per unit period, and the like are registered in the database 12 through the network.
- a scheduler described in Japanese Patent No. 4528425 can be used.
- the lead time calculation unit 16 calculates at least a necessary lead time from a plurality of data related to a plurality of production equipment production factories (the maximum number of production processes per unit period for the production equipment). In addition to the lead time, the man-hour may be calculated.
- the due date setting unit 18 accepts the release of the due date constraint by an input device such as a keyboard (not shown) or the touch panel of the display 24, and at least removes the due date constraint. , At least one of the dates within a desired range (for example, within two months before and after) and the date before the date or the date after the date is set as a new date.
- the desired range may be set in advance.
- the investment cost prediction unit 20 predicts the investment cost of the production equipment based on the set new date.
- the investment cost display control unit 22 displays the investment cost predicted for each new date on the display 24, for example.
- the due date setting unit 18 is due to an input device such as a keyboard (not shown) or a touch panel of the display 24.
- the due date constraint is removed, and the drawing due date is set to a date within a desired range, and the due date before the due date is set as a new due date (date due date).
- the desired range may be set in advance, or the number of months and days before and after, or the actual period may be set when accepting the release of the due date constraint.
- the first support system 10A predicts the investment cost of the production facility.
- the lead time calculation unit (hereinafter referred to as the first lead time calculation unit 16A) of the first support system 10A determines the number of in-process items on the candidate date of the production facility manufacturing factory selected as the cost calculation target, Calculate the total lead time with the number of production equipment to be manufactured. This calculation is based on information from the scheduler 14, that is, the number of devices in process for the other production facilities remaining on the due date and the production facility to be produced this time, and the maximum production per unit period of the production equipment to be produced this time. This is based on the number of treatments and the number of production facilities to be manufactured this time. That is, the sum of the number of in-process devices on the candidate date and the number of production facilities to be produced this time is divided by the maximum number of production processes per unit period to be produced.
- the investment cost prediction unit (hereinafter referred to as the first investment cost prediction unit 20A) of the first support system 10A includes a factory information registration unit 26, a production facility number calculation unit 28, and a production unit.
- the facility number updating unit 30, a factory information table TBa, and an investment cost information table TBb are provided.
- the factory information registration unit 26 registers the identification numbers of a plurality of production equipment manufacturing factories in the factory information table TBa in order from the lowest production cost, based on the foreign exchange rate of the database 12 as a reference, in yen. That is, the identification number of the cheapest production facility manufacturing factory is registered at the head of the factory information table TBa.
- the registration order of the identification numbers in the factory information table TBa is arbitrary, and any table configuration or the like that can refer to the identification numbers in order from the lowest production cost may be used.
- the investment reference currency is shown as an example of yen, it may be dollars or euros. The same applies hereinafter.
- the production facility number calculation unit 28 calculates the number of production facilities that can be manufactured by the production facility manufacturing factory selected as the target of the cost calculation.
- the production facility number update unit 30 subtracts the number of production facilities calculated by the production facility number calculation unit 28 from the number of production facilities to be manufactured first, and updates it as the number of production facilities to be newly manufactured. .
- the factory information registration unit 26 registers the identification numbers of a plurality of production equipment manufacturing factories in the factory information table TBa in order from the lowest production cost.
- step S3 the first investment cost prediction unit 20A stores the number of production facilities to be manufactured this time in the number update register Ra used for updating the number to be manufactured.
- step S6 the first lead time calculating unit 16A stores the in-process number of the nth factory on the date candidate date (m days before the drawing date registered in the database 12) and the number update register Ra. The lead time of the total number with the number to be manufactured is calculated.
- step S7 the first investment cost prediction unit 20A calculates a set period from the due date candidate to the production facility introduction deadline.
- step S8 of FIG. 4 it is determined whether or not the set period is less than the lead time. If the set period is less than the lead time, the process proceeds to the next step S9, and the first investment cost prediction unit 20A calculates the number Na that the nth factory can manufacture in the set period for the production equipment to be manufactured.
- step S10 the first investment cost prediction unit 20A subtracts the number Na obtained in step S9 from the number stored in the number update register Ra, and stores it again in the number update register Ra. That is, the number to be manufactured is updated.
- step S11 the first investment cost prediction unit 20A calculates the cost Cn of the nth factory by multiplying the number that can be manufactured in the set period described above by the unit cost of the nth factory.
- step S12 the first investment cost prediction unit 20A adds the cost Cn obtained in step S11 to the cost up to the current stage stored in the cost integration register Rh, and stores it again in the cost integration register Rh. .
- step S13 the first investment cost prediction unit 20A updates the value of the factory update counter n by +1.
- step S6 the process returns to step S6 in FIG. 3, and the processes after step S6 are repeated.
- step S8 in FIG. 4 determines whether the set period is equal to or longer than the lead time. If it is determined in step S8 in FIG. 4 that the set period is equal to or longer than the lead time, the process proceeds to step S14, and the first investment cost prediction unit 20A determines the number of the nth factory to be manufactured. Multiply the unit cost to calculate the cost Cn of the nth factory.
- step S15 the first investment cost prediction unit 20A adds the cost Cn obtained in step S14 to the cost up to the current stage stored in the cost integration register Rh, and stores it again in the cost integration register Rh. .
- step S16 the first investment cost prediction unit 20A uses the value of the cost accumulation register Rh as the cost from m days before the drawing date of the drawing registered in the database 12 to the deadline for introducing the production equipment, in the investment cost information table TBb. Register with.
- step S17 the due date setting unit 18 updates the value of the number of days update counter m by +1.
- step S18 the due date setting unit 18 determines whether or not the value of the number of days update counter m is equal to or greater than a predetermined number of days set in advance. If the value of the number-of-days updating counter m is less than the predetermined number of days set in advance, the process returns to step S3 in FIG. 3, and the processes after step S3 are repeated.
- step S18 of FIG. 4 if the value of the number of days update counter m is equal to or greater than the predetermined number of days set in advance, the process proceeds to the next step S19, and the investment cost display control unit 22 stores the value in the investment cost information table TBb.
- the total investment cost registered for each due date is read and displayed on the display 24.
- the due date is set on the horizontal axis and the total investment cost for each due date is set on the vertical axis, and displayed in the form of a bar graph, for example.
- the date before the drawing date of drawing is set as a new drawing candidate date, and the investment cost from the date candidate date (drawing date of drawing) to the introduction deadline of the production facility is set.
- the date before the drawing due date of the drawing registered in the database 12 is set as a new drawing due date, such as resetting the due date with the lowest investment cost calculated as the drawing due date, etc. It is possible to easily propose a schedule that is the lowest price.
- the candidate date for drawing date is set on a daily basis, but the candidate date for drawing date may be set on a weekly or monthly basis. Roughly, you can find out the candidates for the best date for drawing in a short time.
- the drawing date of the drawing is a date within the desired range, and the date before the date is set as a new date (date date candidate).
- a date within that date and after the due date may be set as a new due date (date date candidate).
- the due date is set on the horizontal axis
- the total investment cost for each candidate date is set on the vertical axis, and displayed on the display 24 or the like in the form of a bar graph, for example.
- a production facility investment planning support system (hereinafter referred to as a second support system 10B) according to a second specific example will be described with reference to FIGS.
- the due date setting unit 18 cancels the due date constraint by inputting the due date constraint with an input device such as a keyboard (not shown) or the touch panel of the display 24, and thus the introduction deadline of the production facility is set.
- the day within the desired range and the day after the introduction deadline is set as a new deadline (deadline candidate day).
- the desired range may be set in advance, or the number of months and days before and after, or the actual period may be set when accepting the release of the due date constraint.
- the second support system 10B predicts the investment cost of the production facility. That is, the difference from the above-described first support system 10A is that the production equipment introduction deadline is used instead of the drawing date.
- the lead time calculation unit 16B of the second support system 10B uses the database 12 for the production facility manufacturing factory selected as the object of cost calculation.
- the total lead time of the number of in-process items on the drawing date and the number of production facilities to be manufactured this time is calculated. This calculation is based on information from the scheduler 14, that is, the number of devices in process for other production equipment remaining on the drawing date, the maximum number of production processes per unit period of the production equipment to be produced this time, This is based on the number of production facilities to be manufactured. That is, it is obtained by dividing the sum of the number of in-process items on the drawing date and the number of production facilities to be produced this time by the maximum number of production processes per unit period to be produced.
- the investment cost prediction unit of the second support system 10B (hereinafter referred to as the second investment cost prediction unit 20B) is a factory information registration unit similar to the first investment cost prediction unit 20A described above. 26, a production facility number calculating unit 28 and a production facility number updating unit 30.
- steps S101 to S105 in FIG. 7 the same processing (steps S1 to S5) as that of the first support system 10A described above is performed, so that the duplicated explanation is omitted.
- step S106 the second lead time calculating unit 16B calculates the lead time of the total number of the number of in-process items in the nth factory on the drawing date and the number to be manufactured stored in the number update register Ra. calculate.
- step S107 the second investment cost prediction unit 20B calculates a set period from the drawing date to the due date candidate (m days after the introduction deadline registered in the database 12).
- the second investment cost prediction unit 20B determines whether or not the set period from the drawing start date to the due date candidate is less than the lead time. If the set period is less than the lead time, the process proceeds to the next step S109, and the second investment cost prediction unit 20B calculates the number Na that can be manufactured by the nth factory in the set period among the numbers to be manufactured.
- step S110 the second investment cost prediction unit 20B subtracts the number Na obtained in step S109 from the number stored in the number update register Ra, and stores it again in the number update register Ra. That is, the number to be manufactured is updated.
- step S111 the second investment cost prediction unit 20B calculates the cost Cn of the nth factory by multiplying the number that can be manufactured in the set period described above by the unit cost of the nth factory.
- step S112 the second investment cost prediction unit 20B adds the cost obtained in step S111 to the cost up to the current stage stored in the cost integration register Rh, and stores it again in the cost integration register Rh.
- step S113 the second investment cost prediction unit 20B updates the value of the factory update counter n by +1.
- step S106 the process returns to step S106 in FIG. 7, and the processing after step S106 is repeated.
- step S108 in FIG. 8 determines whether the set period is equal to or longer than the lead time. If it is determined in step S108 in FIG. 8 that the set period is equal to or longer than the lead time, the process proceeds to step S114, and the second investment cost prediction unit 20B sets the number of the nth factory to the number to be manufactured. Multiply the unit cost to calculate the cost Cn of the nth factory.
- step S115 the second investment cost prediction unit 20B adds the cost Cn obtained in step S114 to the cost up to the current stage stored in the cost integration register Rh, and stores it again in the cost integration register Rh. .
- step S116 the second investment cost prediction unit 20B uses the value of the cost accumulation register Rh as the investment cost information as the cost from the drawing date of the drawing registered in the database 12 to the due date candidate (m days after the introduction deadline). Register in table TBb.
- step S117 the due date setting unit 18 updates the value of the number of days update counter m by +1.
- step S118 the due date setting unit 18 determines whether or not the value of the number of days updating counter m is equal to or greater than a predetermined number of days set in advance. If the value of the number-of-days updating counter m is less than the predetermined number of days set in advance, the process returns to step S103, and the processes after step S103 are repeated.
- the process proceeds to the next step S119, and the investment cost display control unit 22 adds the total registered for each due date candidate in the investment cost information table TBb.
- the investment cost is read and displayed on the display 24.
- a deadline candidate date is set on the horizontal axis
- a total investment cost for each deadline candidate date is set on the vertical axis and displayed in a bar graph form, for example.
- a date after the introduction deadline of the production facility is set as a new introduction deadline candidate date (deadline candidate date), and the investment cost from the drawing date to the deadline candidate date is calculated.
- the newest due date is set as the date after the introduction date of the production facility registered in the database 12, such as resetting the candidate date for which the calculated investment cost is the cheapest as the deadline date for the production facility.
- the candidate date for introduction deadline is set on a daily basis, but the candidate date for introduction deadline may be set on a weekly or monthly basis. Roughly, you can know the candidates for the cheapest introduction deadline in a short time.
- the production equipment introduction deadline is set to a date within the desired range, and the date after the deadline is set as a new deadline (deadline candidate date). And a date before the introduction deadline may be set as a new introduction deadline (deadline candidate date).
- the due date is set on the horizontal axis and the total investment cost for each due date is set on the vertical axis and displayed in the form of a bar graph, for example.
- a production facility investment planning support system (hereinafter referred to as a third support system 10C) according to a third specific example will be described with reference to FIGS. 10 to 13B.
- the due date setting unit 18 releases the due date constraint by inputting an unillustrated input device such as a keyboard or the touch panel of the display 24, so that the due date constraint is canceled and the factory with the lowest price is obtained.
- the drawing date is a date within a desired range, and the date before the date is set as a new date (date date candidate). It should be noted that the desired range may be set in advance, or the number of months and days before and after, or the actual period may be set when accepting the release of the due date constraint. Further, the third support system 10C allocates the total required man-hours of the production facility this time, that is, cancels the restriction on the capacity, and predicts the investment cost of the production facility.
- the lead time calculation unit (hereinafter referred to as the third lead time calculation unit 16C) of the third support system 10C is the cheapest production facility manufacturing factory selected as the cost calculation target.
- the total lead time of the number of work in progress on the due date candidate and the number of production equipment to be manufactured this time is calculated. This calculation is based on information from the scheduler 14, that is, the number of work in progress for other production facilities remaining on the due date, the maximum number of production processes per unit period of the production equipment to be produced this time, Based on the number of power production facilities. That is, the sum of the number of in-process devices on the candidate date and the number of production facilities to be produced this time is divided by the maximum number of production processes per unit period to be produced.
- the investment cost prediction unit (hereinafter referred to as the third investment cost prediction unit 20C) of the third support system 10C includes a factory information registration unit 26, a lowest price factory extraction unit 32, and a production as shown in FIG.
- the facility number calculation unit 28, the necessary capacity prediction unit 34, the factory information table TBa, the investment cost information table TBb, and the necessary capacity information table TBc are provided.
- the lowest price factory extraction unit 32 extracts the lowest price production equipment production factory, for example, an identification number, from the plurality of registered production equipment production factories.
- the production facility number calculation unit 28 calculates the number of production facilities that can be manufactured by the cheapest production facility manufacturing plant extracted as a cost calculation target.
- the necessary capacity prediction unit 34 predicts the capacity (for example, the number of manufactured items / day) necessary for setting the period from the due date candidate to the introduction deadline to be the same as the lead time for the cheapest factory, and the necessary capacity information. Register in table TBc.
- the investment cost display control unit (hereinafter referred to as the third investment cost display control unit 22C) of the third support system 10C displays, for example, the investment cost and required capacity predicted for each new date on the display 24.
- the factory information registration unit 26 uses the foreign exchange rate in the database 12 as a reference and sets the reference number as a reference to a plurality of production facility manufacturing factories in order from the lowest production cost. Register in the information table TBa.
- step S202 the cheapest factory extraction unit 32 extracts the information (identification number, etc.) of the cheapest factory from the head of the factory information table TBa.
- step S204 the third lead time calculation unit 16C calculates the number of in-process units in the factory at the lowest price on the date candidate date (m days before the drawing date registered in the database 12) and the number to be manufactured this time. Calculate the total number of lead times.
- step S205 the third investment cost prediction unit 20C calculates a set period from the due date candidate to the production facility introduction deadline.
- step S206 the necessary capacity prediction unit 34 predicts the capacity (for example, the number of production / day) necessary for the set period to be the same as the lead time and registers it in the necessary capacity information table TBc.
- the third investment cost prediction unit 20C predicts the production cost at the cheapest factory by multiplying the number to be produced by the unit cost at the cheapest factory.
- step S208 the third investment cost prediction unit 20C uses the investment cost information as the cost up to m days before the drawing date of the drawing registered in the database 12 and the production equipment introduction date. Register in table TBb.
- step S209 the due date setting unit 18 updates the value of the number of days update counter m by +1.
- step S210 the due date setting unit 18 determines whether or not the value of the number of days update counter m is equal to or greater than a predetermined number of days set in advance. If the value of the number-of-days updating counter m is less than the predetermined number of days set in advance, the process returns to step S205 in FIG. 11 and the processes after step S205 are repeated.
- step S210 of FIG. 12 If the value of the number of days updating counter m is equal to or greater than a predetermined number of days set in advance in step S210 of FIG. 12, the process proceeds to the next step S211 and the third investment cost display control unit 22C The total investment cost registered in TBb for each due date is read and displayed on the display 24. In addition, in step S212, the third investment cost display control unit 22C reads out the necessary capacity registered for each due date candidate in the necessary capacity information table TBc and displays it on the display 24.
- the first graph displayed in the form of a bar graph for example, in which the due date is set on the horizontal axis and the total investment cost for each due date is set on the vertical axis, is shown in FIG.
- the date candidate date is set on the horizontal axis
- the required capacity for each date candidate date is set on the vertical axis
- the second graph displayed in the form of, for example, a bar graph is displayed together.
- Bar graph with the lowest total investment cost (2) Bar graph with the lowest necessary capacity. (3) A bar graph with the lowest total investment cost and the lowest necessary capacity.
- the drawing date of the drawing is a date within the desired range, and the date before the date is set as a new date (date date candidate).
- a date within that date and after the due date may be set as a new due date (date date candidate).
- the due date is set on the horizontal axis
- the total investment cost for each due date is set on the vertical axis and displayed in the form of, for example, a bar graph.
- the necessary ability is displayed together.
- the database 12 may register a country of production of products and parts (a country that uses production equipment) and a production country (manufacturing country) of production equipment used for the production (production) of products and parts.
- the investment cost display control unit 22 may display the predicted investment cost in the currency of the production country or production country (yen display, dollar display, original display, euro display, peso display, etc.). This makes it possible to smoothly adjust the schedule with the person in charge in the investing country.
- the database 12 may include domestic and overseas factories. In this case, it is preferable to register a country code indicating the country where each factory is located. By including the country code, it becomes easy to reflect the transportation cost between the country where it is located and the business partner (producing country), the number of days of transportation, the local currency of the country where it is located, and foreign exchange fluctuations in the investment cost.
- the database 12 it is preferable to register in the database 12 the required man-hours, unit costs, production time (unit lead time) per production equipment, etc. of the production equipment to be produced for each of a plurality of products and parts.
- in-house in-house
- outside-in-house out-house
- the name of the outside company company name
- man-hours and units in the outside company It is preferable to register the cost, the production time (unit lead time) per production facility, and the like.
- the unit transportation cost (unit cost / tariff) between the production country of the product or part (work) and the country where it is located, the number of days required for transportation, etc. can be registered. preferable.
- the maximum number of production processes (capacity) per unit time for example, monthly production
- the maximum production processing number (capacity) may be obtained from the scheduler 14 installed in each factory, but by registering the above information in the database 12, the information acquisition destination is consolidated in the database 12. And rapid information processing can be realized.
- the product production system 100 has substantially the same configuration as the production facility investment planning support system 10 described above, and includes a database 102, a scheduler 104, a lead time calculation unit 106, The due date setting unit 108, the investment cost prediction unit 110, and the investment cost display control unit 112 are included.
- various data are registered through a network or an input device such as a keyboard.
- a due date constraint that includes a scheduled date for finalizing the order specification of the product and a delivery date of the product is registered.
- various data about a plurality of product manufacturing factories are registered in addition to the data described above. Examples of various data include the following (d) to (f).
- (F) may be updated every predetermined time as described above, or may be a predicted rate based on fluctuations in the past several months, for example. Of course, an average rate for the past several months may be adopted.
- the scheduler 104 is installed in each of a plurality of product manufacturing factories that manufacture products, or is installed in a country that is the center of the country where these product manufacturing factories are located, and schedules are sent to a plurality of product manufacturing factories through a network. There are cases where it is transmitted.
- the scheduler 104 includes at least a date constraint, a product manufacturing in progress for each product in a plurality of product manufacturing plants that manufacture products, and the maximum number of manufacturing processes and units per unit period for each product in each product manufacturing plant. Scheduling is performed in consideration of cost (cost / number).
- the scheduler 104 is installed in each of a plurality of product manufacturing factories, the in-process and the maximum number of manufacturing processes per unit period are registered in the database 102 through the network.
- the lead time calculation unit 106 calculates at least a necessary lead time from a plurality of data related to a plurality of product manufacturing factories (such as the maximum number of production processes per unit period for a product). In addition to the lead time, the man-hour may be calculated.
- the due date setting unit 108 accepts the release of the due date constraint by using an input device such as a keyboard (not shown) or the touch panel of the display 24, and at least removes the due date constraint. At least one of the dates within a desired range and a date before the due date or a date after the due date is set as a new due date.
- the investment cost prediction unit 110 predicts the investment cost of the product based on the set new date.
- the investment cost display control unit 112 displays the investment cost predicted for each new date on the display 24, for example.
- the product production system 100 is also described above. Any one of the first support system 10A to the third support system 10C can be applied, and the same effect as the first support system 10A to the third support system 10C can be obtained.
- production facility investment planning support system and the product production system according to the present invention are not limited to the above-described embodiments, and various configurations can be adopted without departing from the gist of the present invention.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Technology Law (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Description
(b) 輸送日数
(c) 当該生産設備製作工場の所在国が日本以外であれば、現地通貨と円等の外国為替変動(レート:単位現地通貨=○○○円)
(2) 必要能力が最も低い棒グラフ。
(3) 合計投資費用が最安値であって、且つ、必要能力が最も低い棒グラフ。
データベース12には、製品や部品の生産国(生産設備を使用する国)や、製品や部品の生産(製造)に使用される生産設備の製作国(製造国)が登録されていてもよい。この場合、投資費用表示制御部22は、予想された投資費用を生産国や製作国の通貨で表示(円表示、ドル表示、元表示、ユーロ表示、ペソ表示等)するようにしてもよい。これにより、投資国の担当者とのスケジュール調整等をスムーズに行うことが可能となる。
(e) 輸送日数
(f) 当該商品製造工場の所在国が日本以外であれば、現地通貨と円等の外国為替変動(レート:単位現地通貨=○○○円)
Claims (12)
- 将来の製品やその部品の生産に使用される生産設備の投資費用の企画・立案を支援する生産設備投資企画支援システム(10)であって、
少なくとも前記製品やその部品の図面の出図期日及び前記生産設備の導入期限と、前記製品とその部品の量産開始の期日とが含まれた期日制約が入力されたデータベース(12)と、
少なくとも前記期日制約、並びに前記生産設備を製作する複数の生産設備製作工場における各前記生産設備についての生産設備製作仕掛りや、各前記生産設備製作工場における、前記生産設備についての単位期間当たりの最大製作処理数を考慮する手段(14)と、
複数の前記生産設備製作工場に関連する複数のデータから少なくとも必要なリードタイムを算出する手段(16)と、
少なくとも前記期日制約を解除して、前記図面の出図期日及び前記生産設備の導入期限のうち、少なくともいずれかを、所望の範囲内の日で、且つ、当該期日の前の期日、又は当該期日の後の期日を、新たな期日として設定する手段(18)と、
少なくとも設定された前記新たな期日に基づいて、前記生産設備の投資費用を予測する手段(20)とを有することを特徴とする生産設備投資企画支援システム。 - 請求項1記載の生産設備投資企画支援システムにおいて、
前記生産設備の投資費用を表示するディスプレイ(24)を有することを特徴とする生産設備投資企画支援システム。 - 請求項2記載の生産設備投資企画支援システムにおいて、
前記期日制約を解除しつつ、各前記生産設備製作工場における前記生産設備の最大製作処理数の考慮を止め、複数の前記生産設備製作工場のうち、前記生産設備における最安値である生産設備製作工場に、前記生産設備の総必要工数を振り分けて、前記生産設備の投資費用を予測することを特徴とする生産設備投資企画支援システム。 - 請求項2記載の生産設備投資企画支援システムにおいて、
前記生産設備の投資費用を予測した際に、最安値の投資費用を表示することを特徴とする生産設備投資企画支援システム。 - 請求項3記載の生産設備投資企画支援システムにおいて、
前記生産設備の投資費用を予測した際に、必要能力が最低のものを表示することを特徴とする生産設備投資企画支援システム。 - 請求項5記載の生産設備投資企画支援システムにおいて、
前記表示は、グラフであって、色分けされていることを特徴とする生産設備投資企画支援システム。 - 請求項3記載の生産設備投資企画支援システムにおいて、
前記生産設備の投資費用を予測した際に、最安値の投資費用であって、必要能力が最低のものを表示することを特徴とする生産設備投資企画支援システム。 - 請求項7記載の生産設備投資企画支援システムにおいて、
前記表示は、グラフであって、色分けされていることを特徴とする生産設備投資企画支援システム。 - 請求項1記載の生産設備投資企画支援システムにおいて、
少なくとも前記予測した投資費用を、投資国の通貨で表示することを特徴とする生産設備投資企画支援システム。 - 請求項1記載の生産設備投資企画支援システムにおいて、
前記生産設備製作工場に関する複数のデータには、該生産設備製作工場の所在国と該生産設備を使用する取引先の所在国間の輸送費及び輸送日数が含まれ、
前記リードタイムを算出する手段(16)は、前記輸送費及び輸送日数を含めて必要なリードタイムを算出することを特徴とする生産設備投資企画支援システム。 - 請求項1記載の生産設備投資企画支援システムにおいて、
前記生産設備製作工場に関する複数のデータには、該生産設備製作工場の所在国と、該所在国の現地通貨と投資基準通貨との為替レートとが含まれ、
前記生産設備の投資費用を予測する手段(20)は、前記為替レートも含めて前記生産設備の投資費用を予測することを特徴とする生産設備投資企画支援システム。 - 商品の生産計画を行う商品生産システムであって、
少なくとも前記商品の発注仕様確定予定日と、前記商品の納品期日とが含まれた期日制約が入力されたデータベース(102)と、
少なくとも前記期日制約、並びに前記商品を生産する複数の生産拠点における各前記商品についての生産仕掛り及び在庫や、各前記生産拠点における、前記商品についての単位期間当たりの最大生産数を考慮する手段(104)と、
前記生産拠点に関連する複数のデータから工数、必要なリードタイムを少なくとも算出する手段(106)と、
少なくとも前記期日制約を解除して、前記発注仕様確定予定日及び前記納品期日のうち、少なくともいずれかを、所望の範囲内の日で、且つ、当該期日の前の期日、又は当該期日の後の期日を、新たな当該期日として設定する手段(108)と、
少なくとも設定された前記新たな期日に基づいて、前記商品の生産費用を予測する手段(110)とを有することを特徴とする商品生産システム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201680081675.0A CN108604325B (zh) | 2016-02-12 | 2016-12-27 | 生产设备投资规划辅助***和商品生产*** |
GB1814850.2A GB2564298A (en) | 2016-02-12 | 2016-12-27 | Production facility investment planning assistance system and commodity production system |
US16/076,333 US20190050773A1 (en) | 2016-02-12 | 2016-12-27 | Production facility investment planning assistance system and commodity production system |
JP2017566545A JP6667557B2 (ja) | 2016-02-12 | 2016-12-27 | 生産設備投資企画支援システム及び商品生産システム |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016-025161 | 2016-02-12 | ||
JP2016025161 | 2016-02-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017138276A1 true WO2017138276A1 (ja) | 2017-08-17 |
Family
ID=59563633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2016/088968 WO2017138276A1 (ja) | 2016-02-12 | 2016-12-27 | 生産設備投資企画支援システム及び商品生産システム |
Country Status (5)
Country | Link |
---|---|
US (1) | US20190050773A1 (ja) |
JP (1) | JP6667557B2 (ja) |
CN (1) | CN108604325B (ja) |
GB (1) | GB2564298A (ja) |
WO (1) | WO2017138276A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113592665A (zh) * | 2021-06-09 | 2021-11-02 | 瑞祥集团(河北)科技材料有限公司 | 一种工业信息化业务前端和工业生产后端管理方法和*** |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2022161499A (ja) * | 2021-04-09 | 2022-10-21 | セイコーエプソン株式会社 | 成形機管理システム |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06214996A (ja) * | 1993-01-20 | 1994-08-05 | Hitachi Ltd | 生産管理方法 |
JP2002024515A (ja) * | 2000-07-11 | 2002-01-25 | Omron Corp | 売上情報管理システム |
JP2002091538A (ja) * | 2000-09-14 | 2002-03-29 | Honda Motor Co Ltd | 金型製造スケジュール決定方法 |
JP2003091309A (ja) * | 2001-07-11 | 2003-03-28 | Class Technology Co Ltd | 生産管理システムおよび生産管理方法 |
JP2003203151A (ja) * | 2001-10-26 | 2003-07-18 | Mitsubishi Electric Corp | 経営計画作成システム |
JP2003271797A (ja) * | 2002-03-14 | 2003-09-26 | Hitachi Ltd | 生産計画支援方法、生産計画支援システム、および、生産計画支援プログラム |
JP2003331114A (ja) * | 2002-05-10 | 2003-11-21 | Hitachi Ltd | 設計変更評価装置、設計変更評価方法およびプログラム |
JP2004185167A (ja) * | 2002-12-02 | 2004-07-02 | Hitachi Ltd | 資材発注支援システムおよび資材発注支援方法 |
JP2006099283A (ja) * | 2004-09-28 | 2006-04-13 | Matsushita Electric Ind Co Ltd | 生産計画立案システム |
JP2008171237A (ja) * | 2007-01-12 | 2008-07-24 | Konica Minolta Holdings Inc | サプライチェーンの効率的管理支援方法 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW548570B (en) * | 1999-04-02 | 2003-08-21 | American Standard Internationa | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
JP3758453B2 (ja) * | 2000-03-15 | 2006-03-22 | 株式会社デンソー | コスト見積方法およびコスト見積装置 |
JP2002244711A (ja) * | 2001-02-13 | 2002-08-30 | Toshiba Corp | 受注組立生産システム、及び受注組立生産方法 |
CN1400555A (zh) * | 2001-08-06 | 2003-03-05 | 英业达股份有限公司 | 生产规划方法以及*** |
CN1402173A (zh) * | 2001-08-07 | 2003-03-12 | 株式会社理光 | 成本估计方法及*** |
US7003359B2 (en) * | 2001-08-17 | 2006-02-21 | Air Products And Chemicals, Inc. | Multiple process plant product lines from a common set of engineered components |
US20040034555A1 (en) * | 2002-03-18 | 2004-02-19 | Dismukes John P. | Hierarchical methodology for productivity measurement and improvement of complex production systems |
CN1661608A (zh) * | 2004-02-28 | 2005-08-31 | 鸿富锦精密工业(深圳)有限公司 | 出货管制***及方法 |
US7844486B2 (en) * | 2007-11-05 | 2010-11-30 | Faction GmbH | System and method for determining and increasing an accuracy of costing |
CN101918904B (zh) * | 2008-01-18 | 2013-08-14 | 新日铁住金株式会社 | 配合计划生成装置及方法 |
US20110035322A1 (en) * | 2008-11-17 | 2011-02-10 | The Nevets Process, Inc. | System and methods for multi-platform procurement |
US9547822B2 (en) * | 2011-05-12 | 2017-01-17 | Air Products And Chemicals, Inc. | Methods for improved production and distribution |
US9697554B2 (en) * | 2013-10-17 | 2017-07-04 | Plethora Corporation | Method for quoting part production |
CA2933190A1 (en) * | 2013-12-16 | 2015-06-25 | Shell Internationale Research Maatschappij B.V. | Method and system for estimating the cost of constructing a hydrocarbon fluid production and/or processing facility |
US20150186928A1 (en) * | 2013-12-31 | 2015-07-02 | Anto Chittilappilly | Real-time marketing portfolio optimization and reapportioning |
US20150254586A1 (en) * | 2014-03-07 | 2015-09-10 | Apriori Technologies, Inc. | Manufacturing cost estimator |
CN103955766B (zh) * | 2014-04-29 | 2017-05-10 | 上海交通大学 | 大批量定制生产***的预防维护协同调度优化的方法 |
-
2016
- 2016-12-27 CN CN201680081675.0A patent/CN108604325B/zh active Active
- 2016-12-27 JP JP2017566545A patent/JP6667557B2/ja active Active
- 2016-12-27 GB GB1814850.2A patent/GB2564298A/en not_active Withdrawn
- 2016-12-27 WO PCT/JP2016/088968 patent/WO2017138276A1/ja active Application Filing
- 2016-12-27 US US16/076,333 patent/US20190050773A1/en not_active Abandoned
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06214996A (ja) * | 1993-01-20 | 1994-08-05 | Hitachi Ltd | 生産管理方法 |
JP2002024515A (ja) * | 2000-07-11 | 2002-01-25 | Omron Corp | 売上情報管理システム |
JP2002091538A (ja) * | 2000-09-14 | 2002-03-29 | Honda Motor Co Ltd | 金型製造スケジュール決定方法 |
JP2003091309A (ja) * | 2001-07-11 | 2003-03-28 | Class Technology Co Ltd | 生産管理システムおよび生産管理方法 |
JP2003203151A (ja) * | 2001-10-26 | 2003-07-18 | Mitsubishi Electric Corp | 経営計画作成システム |
JP2003271797A (ja) * | 2002-03-14 | 2003-09-26 | Hitachi Ltd | 生産計画支援方法、生産計画支援システム、および、生産計画支援プログラム |
JP2003331114A (ja) * | 2002-05-10 | 2003-11-21 | Hitachi Ltd | 設計変更評価装置、設計変更評価方法およびプログラム |
JP2004185167A (ja) * | 2002-12-02 | 2004-07-02 | Hitachi Ltd | 資材発注支援システムおよび資材発注支援方法 |
JP2006099283A (ja) * | 2004-09-28 | 2006-04-13 | Matsushita Electric Ind Co Ltd | 生産計画立案システム |
JP2008171237A (ja) * | 2007-01-12 | 2008-07-24 | Konica Minolta Holdings Inc | サプライチェーンの効率的管理支援方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113592665A (zh) * | 2021-06-09 | 2021-11-02 | 瑞祥集团(河北)科技材料有限公司 | 一种工业信息化业务前端和工业生产后端管理方法和*** |
Also Published As
Publication number | Publication date |
---|---|
JPWO2017138276A1 (ja) | 2018-06-28 |
US20190050773A1 (en) | 2019-02-14 |
GB201814850D0 (en) | 2018-10-24 |
CN108604325B (zh) | 2021-10-26 |
GB2564298A (en) | 2019-01-09 |
JP6667557B2 (ja) | 2020-03-18 |
CN108604325A (zh) | 2018-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7039480B2 (en) | Planning operation management support system, and planning operation management support program | |
US20100287021A1 (en) | Constraint-based production planning and scheduling | |
CN111915139B (zh) | 推移式高效高准确性的智能生产排程算法及信息记录介质 | |
KR20030024538A (ko) | 생산관리시스템 | |
WO2017138276A1 (ja) | 生産設備投資企画支援システム及び商品生産システム | |
Huang | Information architecture for effective Workload Control: an insight from a successful implementation | |
JP2007213141A (ja) | 人員配置システム、人員配置方法、人員配置プログラム、及びこの人員配置プログラムを格納した記録媒体 | |
Jeong et al. | Internal relationship modeling and production planning optimization for the manufactured housing | |
JP2006209630A (ja) | コスト管理システム及びプログラム | |
Christ et al. | A three-step approach for decision support in operational production planning of complex manufacturing systems | |
Solomon et al. | Lead time prediction using simulation in leather shoe manufacturing | |
JP2009134399A (ja) | 販売生産計画方法、販売生産計画システム及びコンピュータプログラム | |
JP6242362B2 (ja) | 損益予測装置及び損益予測プログラム | |
JP6809718B2 (ja) | 情報処理装置 | |
JP3412382B2 (ja) | 生産計画立案方法及びシステム、並びに鉄鋼製品生産計画立案方法及びシステム | |
JPH08235274A (ja) | 在庫管理システム | |
JP2001318714A (ja) | オブジェクト展開型生産管理システム | |
Schönsleben | Time Management and Scheduling | |
WO2024147352A1 (ja) | 鋼板の生産装置、受注・生産・販売支援装置、鋼板の受注・生産・販売方法、及び鋼板の受注・生産・販売プログラム | |
JPH1177492A (ja) | 生産枠作成装置 | |
JP2021144507A (ja) | 販売計画策定システム及び販売計画策定方法 | |
Luszczak | Production Control | |
Bertocchi | Stochastic programming models for distribution logistics, bikesharing and production management | |
Adelfar et al. | Balancing inventory levels and setup times-An analysis and outline of a decision-making model | |
Elekidis | Optimization-based Techniques for Production Scheduling of Continuous and Batch Processes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16889975 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2017566545 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 201814850 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20161227 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1814850.2 Country of ref document: GB |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16889975 Country of ref document: EP Kind code of ref document: A1 |