WO2016185665A1 - 電力管理装置、電力管理システム及びプログラム - Google Patents

電力管理装置、電力管理システム及びプログラム Download PDF

Info

Publication number
WO2016185665A1
WO2016185665A1 PCT/JP2016/002036 JP2016002036W WO2016185665A1 WO 2016185665 A1 WO2016185665 A1 WO 2016185665A1 JP 2016002036 W JP2016002036 W JP 2016002036W WO 2016185665 A1 WO2016185665 A1 WO 2016185665A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
target
period
unit
message
Prior art date
Application number
PCT/JP2016/002036
Other languages
English (en)
French (fr)
Inventor
祐司 尾崎
小林 晋
雅和 足立
品川 幹夫
佑香 山本
徹也 大橋
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to JP2017518738A priority Critical patent/JP6548175B2/ja
Publication of WO2016185665A1 publication Critical patent/WO2016185665A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention generally relates to a power management device, a power management system, a program, particularly a power management device requesting reduction of power received from a power system, a power management system provided with the power management device, and a computer as the power management device.
  • a program particularly a power management device requesting reduction of power received from a power system, a power management system provided with the power management device, and a computer as the power management device.
  • Patent Document 1 there has been proposed a technology for performing a request for reduction of power received from a power system (that is, a power saving request) (see, for example, Patent Document 1).
  • a power saving request After the power saving request ends, the power saving corresponding to the problem that the power saving request is repeated in a short period of time is started by simultaneously using the devices which the consumer (power demander) endured use.
  • a request generator has been proposed.
  • the power saving request generator of Patent Document 1 defines a first threshold and a second threshold with respect to the total power of a plurality of power consumers.
  • the power saving request generation device transmits the power saving request notification when the total power becomes equal to or more than the first threshold, and then sends the power saving request end notification when the total power becomes equal to or less than the second threshold.
  • the power saving request generation device divides a plurality of power consumers into a plurality of groups, and when the total power becomes equal to or less than a second threshold, the power saving request generation device sequentially sequentially group by group at predetermined time intervals. The configuration for transmitting the power saving request end notification is described.
  • the power saving request generation device described in Patent Document 1 sets a first threshold and a second threshold for the total power consumption, and adds the total power consumption, the first threshold, and the second threshold.
  • the notification regarding the power saving request is sent based on the result of comparison with the threshold value.
  • the power saving request generation device shifts the timing of transmitting the power saving request end notification by a predetermined time interval for each group of power consumers so that the devices can be used simultaneously at the end of the power saving request. To prevent.
  • the power saving request end notification is transmitted at predetermined time intervals. That is, since the power saving request end notification is transmitted starting from the time when the condition for ending the power saving request is satisfied, the power consumer can not predict the time when the power saving request ends. Therefore, power consumers can not know how long they should endure the use of the device.
  • the present invention avoids a situation where devices are simultaneously used at the end of a power saving request, and enables the user of the power to know in advance the end point of the period when reduction of the power received from the power system is required. It is an object of the present invention to provide a power management device. Another object of the present invention is to provide a power management system including the power management apparatus and a program for causing a computer to function as the power management apparatus.
  • a power management apparatus includes: a creation unit that creates a message to notify each of a plurality of terminal devices; and a notification unit that notifies each of the plurality of terminal devices of the message
  • One terminal device is associated with each of a plurality of target spaces to be received from the electric power system, and the message is a content for requesting reduction of the power received by each of the plurality of target spaces from the electric power system.
  • the creation unit determines the end date and time of the target period in association with the plurality of target spaces.
  • a power management system includes a plurality of terminal devices disposed in each of a plurality of target spaces that receive power from a power system, and a power management device that notifies each of the plurality of terminal devices of a message.
  • the power management apparatus includes a creating unit configured to create a message to be notified to each of the plurality of terminal devices, and a notification unit configured to notify each of the plurality of terminal devices of the message.
  • Each of a plurality of target spaces is a content requesting reduction of power received from the power system, and a target period is designated, and the plurality of target devices receive power from the power system by each of the plurality of target spaces.
  • the power of a structure be adjusted to reduce with respect to a predetermined reference power, the creation unit, the end time of the target period, determined in association with the plurality of target space.
  • a program according to an aspect of the present invention is for causing a computer to function as the above-described power management apparatus.
  • the program may be provided as recorded in a computer readable recording medium or storage medium.
  • the present invention avoids a situation where devices are simultaneously used at the end of a power saving request, and enables the user of the power to know in advance the end point of the period when reduction of the power received from the power system is required. Make it
  • FIG. 1 is a block diagram showing a power management system according to an embodiment.
  • FIG. 2 is a diagram for explaining a target period in the embodiment.
  • FIG. 3 is a diagram showing a procedure of a power saving request consultation in the embodiment.
  • the power management system described below includes a power management apparatus 10 and a terminal device 20, as shown in FIG.
  • the target space 30 is a space where a consumer (consumer) who receives a contract from the power system 40 with the business operator uses power, and the power used is measured by the power meter. Used in the sense of space. That is, the power management system includes the power management apparatus 10 configured to transmit a message to the terminal apparatus 20 used by the customer, and the terminal apparatus 20 that receives the message generated by the power management apparatus 10. Ru.
  • the target space 30 is a house, an office, a store, or the like, and there are cases where one building is one target space and cases where a plurality of target spaces exist in one building.
  • one building is one target space
  • the business contractor with the customer is a power business operator, a business operator that carries out power retailing without generating power, or a business operator such as an aggregator that brings together a plurality of customers.
  • the power that can be supplied from the business operator is set so as to have a margin for the predicted value of the power that the customer receives, in preparation for fluctuations in the power received by the customer.
  • the business operator requests the customer to save electricity and urges the customer to reduce the received power, thereby reducing the total power received by the customer and securing the necessary margin.
  • the latter method is employed. That is, the business operator predicts the total power that the customer will receive in the future, and demand power saving during the period when the difference obtained by subtracting the predicted power from the maximum power that the business operator can supply becomes smaller than a predetermined value. Ask the house.
  • the business operator notifies the consumer of a period in which the power supply and demand is expected to be tight, and requests the consumer to save power in this period.
  • the total power received by a plurality of consumers in the future is predicted using a history of the total power received by the corresponding customers in the past.
  • the power history represents the transition of power in the past with the passage of time.
  • the period for requesting consumers to save electricity is not limited to the period in which the power supply and demand are tight, and is appropriately determined.
  • the period in which customers are requested to save electricity is called the target period.
  • the request for power saving by the business operator is notified to the consumer by designating the power saving target period and the upper limit value of the power in the target period.
  • the upper limit value of the power is a maximum value that limits the instantaneous value of the power received by the target space 30 in the target period.
  • a configuration example will be described in which a message requesting power saving is notified from the power management apparatus 10 managed by the business entity to the terminal device 20 managed by the customer.
  • the terminal device 20 only needs to be associated with the target space 30, and can be selected from, for example, a smartphone, a tablet terminal, a personal computer, etc. owned by a consumer.
  • the terminal device 20 described in the present embodiment includes a controller 21 that adjusts the power received by the target space 30 from the power grid 40.
  • the controller 21 controls the operation of the device 41 used in the target space 30 to adjust the power received by the target space 30 from the power grid 40.
  • various specifications are known for this kind of controller 21, in this embodiment, the case where the controller 21 is a controller of a HEMS (Home Energy Management System) is taken as an example.
  • the terminal device 20 of the present embodiment is disposed in each of the plurality of target spaces 30.
  • the controller 21 has a function of acquiring the power value measured for each branch circuit branched by the distribution board, and also has a function of controlling the operation of the device 41 by communicating with a so-called HEMS compatible device. That is, the controller 21 can monitor the power consumed by the device 41 in units of branch circuits, and can control the operation of the device 41 if the device 41 is a HEMS-compatible device.
  • the HEMS-compatible device means a device 41 capable of communicating with the HEMS controller 21 and performing at least one of operation monitoring and control by the controller 21.
  • the controller 21 monitors and controls the operation.
  • the controller 21 and the device 41 exchange information via wired communication such as power line carrier communication or wireless communication using radio waves as a transmission medium.
  • the controller 21 has a function of communicating via a telecommunication line 50 such as the Internet, and also has a function of exchanging information with the operation display device. That is, the power management apparatus 10 communicates with the controller 21.
  • the operation display device may be a dedicated device for the controller 21. However, it is also possible to divert a general-purpose device including an operation display device such as a smartphone or a tablet terminal. In other words, the controller 21 includes an interface for using the general-purpose device as the operation display device.
  • the power management device 10 communicates with the plurality of terminal devices 20 (the controller 21 in the present embodiment) through the telecommunication line 50.
  • the telecommunication line 50 is the Internet
  • the communication between the power management device 10 and the terminal device 20 is encrypted.
  • the power management apparatus 10 and the terminal device 20 may construct a VPN (Virtual Private Network).
  • the power management device 10 notifies the terminal device 20 of the message.
  • the message may only include the content for notifying the customer through the operation display device, but in the present embodiment, it includes a command (instruction) for instructing the controller 21. Further, the power management apparatus 10 is configured to notify each of the terminal devices 20 of a message.
  • the power management apparatus 10 includes a creation unit 11 that creates a message, and a notification unit 12 that notifies a message.
  • the creation unit 11 creates a message to be notified to each of the plurality of terminal devices 20, and the notification unit 12 notifies each of the plurality of terminal devices 20 of the message created by the creation unit 11.
  • the content of the message generated by the creation unit 11 is determined to request the customer to save power.
  • the information includes power information on power saving and information on a power saving target period.
  • the notification unit 12 notifies the terminal device 20 disposed in the target space 30 of the message created by the creation unit 11. That is, the terminal device 20 disposed in the target space 30 receives the information on the power contained in the message and the information on the power saving target period.
  • the message includes a command instructing the controller 21.
  • the controller 21 controls the device 41 (in fact, the HEMS-compatible device) according to the content of the message. That is, when the terminal device 20 receives a message from the power management apparatus 10, the controller 21 controls the operation of the device 41 in the target period.
  • the controller 21 of the terminal device 20 automatically calculates the power received by the target space 30 according to the content of the message. Adjust. In short, the controller 21 of the terminal device 20 that has received the message operates the device 41 so that the upper limit value of the power received from the power grid 40 is less than or equal to the power specified by the message in the target period specified by the message. Control. Therefore, the power received by the target space 30 from the power system 40 during the target period is limited such that the power specified by the message is the upper limit value.
  • the power saving means that the power received from the power system 40 in the target space 30 in the target period is reduced compared to the reference power.
  • the reference power is the power expected to be consumed when the power reception is not suppressed in the target space 30, and since this power can not be measured, it is generally used in the history of power measured for the target space 30. It is determined based on.
  • the power predicted by the power management apparatus 10 for each target space 30 will be referred to as “reference power”, and the power obtained by summing the reference power for all target spaces 30 to which power is supplied will be “baseline”. I call it ".
  • the baseline corresponds to the total power obtained by adding the reference power for all the target spaces 30 managed by the power management apparatus 10.
  • the target value of power to be saved in the target period is determined based on the baseline. For example, if the baseline is P [kW] and power saving is requested so that 90% of the baseline is at the upper limit, the target value of the power to be saved is 0.1 P [kW].
  • the power received by the target space 30 in the target period becomes smaller than the reference power. That is, the operator can reduce the supplied power as compared to the case where the power of the total (baseline) or more of the reference power set for each of the target spaces 30 under management is supplied. Therefore, when requesting the power saving from the customer, the power can be supplied from the power that the enterprise can supply, the baseline for the target space 30 managed by the enterprise, the probability that the customer is expected to accept the request for power saving, etc. It can be calculated.
  • Baseline and reference power change depending on conditions such as day of the week, day of week, season of the year, weather, etc., and also change depending on conditions such as living environment in the long term of multiple years.
  • a living environment changes with the heat insulation performance of object space 30, the purpose of use of object space 30, the age of the person who uses object space 30, the number of people, etc., for example.
  • the target space 30 is a residence, the living environment also changes depending on the configuration of the resident. Therefore, it is desirable that the reference power be determined for each target space 30 conditionally.
  • a standard value of the reference power may be determined for each of the sections into which the target space 30 is classified. For example, the usage status of the power of the target space 30 may be classified based on the power history for each target space 30, and the reference power may be determined for each classified category. In other words, the standard value of the reference power is applied according to the division to which the target space 30 belongs. Even in the case where the reference power is determined for each division of the target space 30, the reference power is set for each target period. If the classification is set by incorporating conditions such as day of the week, season, weather, etc., extraction of the classification according to the conditions of the target period becomes easy.
  • the power at the time of requesting power saving in the target space 30 corresponds to the upper limit value of the power used in the target period in the target space 30, as described above.
  • This power is set to, for example, a ratio to the reference power (for example, 80% of the reference power) or a value obtained by subtracting a predetermined value from the reference power.
  • the controller 21 controls the device 41 such that the power received from the power grid 40 in the target period is suppressed to the upper limit value or less. Determine the content.
  • the control content of the device 41 according to the upper limit value of the power is created by the controller 21 using a history or the like regarding the use of the device 41 in the target space 30.
  • the hardware resources of the controller 21 may not be sufficiently abundant in some cases, and the controller 21 has a processing capacity sufficient to determine the control content of the device 41 to make the power received from the power system 40 equal to or lower than the upper limit. May not. Therefore, in the present embodiment, the controller 21 determines the control content of the device 41 in each target space 30 and transmits the control content defined by the power management device 10 to the terminal device 20. A configuration for controlling the device 41 is adopted.
  • the creation unit 11 determines a plurality of types of target periods in association with each of the plurality of target spaces 30.
  • the target period T0 is a common period T1 commonly defined by the business operator for all the target spaces 30, and the target space 30 selected by the business person individually.
  • the common period T1 is a period applied commonly to all the target spaces 30 for which power saving is requested
  • the individual period T2 is a period applied individually to the individual target spaces 30 for which power saving is requested. is there.
  • the individual periods T2 are set for different target spaces 30, and the length of the target period T0 Are different.
  • the start date and time of the target period T0 is, in principle, the start date and time of the common period T1, and the start date and time of the target period T0 coincide in all the target spaces 30 managed by the business operator. Therefore, the end date and time of the target period T0 is a date and time according to the length of the individual period T2 for each target space 30.
  • the common period T1 is an essential period in which the consumer must be requested to save power, and corresponds to, for example, a period in which the power supply and demand is tight.
  • the common period T1 is not determined by the preparation unit 11, but a period determined to cause a tight electric power supply and demand is used. The configuration for determining the tightness of the power supply and demand will be described later.
  • the individual period T2 is a period for adjusting the date and time for the consumer to finish the power saving.
  • the individual period T2 is a period immediately after the end of the common period T1, and is set because a large number of consumers may simultaneously consume more power than usual.
  • the individual period T2 is generated by the generation unit 11, and the generation unit 11 adds the common period T1 and the individual period T2 to determine the target period T0.
  • the set temperature of the air conditioner is set in a direction (high temperature side at the time of cooling, low temperature side at the time of heating) in order to save power.
  • the set temperature of the air conditioner is set to increase the power consumption more than the comfortable temperature so that a comfortable temperature environment can be obtained in a short time from the end of the common period T1.
  • the power received by the customer may increase. That is, even if the power consumption consumed by the consumers is normal, the power supply-demand balance will not occur, but immediately after the end of the common period T1, the power consumption of the customer will increase more than usual and the power supply-demand balance will be reduced. Can occur.
  • the target period T0 includes the common period T1 and the individual period T2, and the individual period T2 is set in association with the target space 30.
  • the individual period T2 is set in association with the target space 30.
  • the individual period T2 is selected from a plurality of types prepared in advance.
  • the creation unit 11 selects the target period T0 including the common period T1 and the individual period T2 from the plurality of types in association with the target space 30.
  • the creation unit 11 determines the individual periods T2 in a plurality of stages in association with the plurality of target spaces 30.
  • the length of the individual period T2 can be determined stepwise, for example, with a step width of about 1 minute, but may be a step width of about 10 minutes to 1 hour. Under the present circumstances, since the amount of power for 30 minutes is often used to control the power in the power system 40, it is sufficient to set an individual period T2 of about 2 to 3 steps with a step width of 30 minutes. That is, the length of the individual period T2 may be selected from values such as 0 minutes, 30 minutes, 60 minutes, etc., and which value corresponds to which target space 30 is based on the power history in the target space 30. It should be determined.
  • the notification unit 12 transmits the message created by the creation unit 11 to the terminal devices 20 associated with the respective target spaces 30. Therefore, the terminal device 20 associated with each target space 30 receives a message in which target periods T0 selected from the plurality of target periods T0 are set. That is, the message for requesting power saving to the plurality of target spaces 30 under management of the business operator is information related to the power requested to each target space 30 and the target selected from the plurality of target periods T0. And information of period T0. In other words, the end date and time of the target period T0 for which power saving is requested for a plurality of target spaces 30 under management of the business operator is the date and time selected from a plurality of types according to the target space 30.
  • the power management apparatus 10 notifies the terminal device 20 associated with the target space 30 of a message requesting power saving by specifying the target period T0 corresponding to the target space 30. Therefore, it is possible to prevent all the target spaces 30 that have accepted the request for power saving among the target spaces 30 managed by the business operator from simultaneously canceling the power saving state. As a result, the load on the power system 40 takes a relatively long time to return to the normal state, and when viewed from the power system 40, it behaves as if the load had soft start.
  • the terminal device 20 that has received the message from the power management device 10 automatically controls the operation of the device 41 so as to reduce the power received by the target space 30.
  • the power saving request may not be accepted in the target period T0.
  • the request for power saving may not be necessary in the target period T0.
  • the power received by the target space 30 may increase more than that at the normal time. Moreover, if going out is scheduled during the target period T0, the power received by the target space 30 is significantly reduced compared to the requested power saving power. In this case, a request for power saving is unnecessary. Alternatively, there may be cases where the demand for power saving can not be accepted because the customer is practicing energy saving and the power received in the target period T0 in the target space 30 is originally small, and such a target space 30 can save power. It can be said that a request is unnecessary.
  • the power management apparatus 10 has a configuration that asks the day before whether the power saving request is accepted in the target period T0. That is, as shown in FIG. 1, the power management apparatus 10 has a configuration for determining whether or not power saving is necessary, a configuration for creating a plan regarding the operation content of the device 41 for each target space 30, and a plan for the customer. It comprises a configuration to make a consultation and a configuration to aggregate the results of the consultation.
  • the power management apparatus 10 has a configuration that determines the necessity of power saving, the prediction unit 13 that predicts the power (reference power) received by the target space 30 from the power grid 40, the power that can be supplied to the power grid 40, and the reference power. And a determination unit 14 that determines the necessity of power saving using the The power management apparatus 10 includes a communication unit 15 that exchanges information with the terminal device 20, and the prediction unit 13 communicates, from the terminal device 20, information related to the power received by the target space 30 from the power system 40. Receive through 15.
  • the prediction unit 13 receives, from the terminal device 20 through the communication unit 15, information on the power consumed in each target space 30 (in fact, the amount of power per unit time).
  • the unit time is selected from the range of about one second to one hour. For example, the unit time may be 30 seconds or 1 minute, but the unit time used by the prediction unit 13 may be 10 minutes or 30 minutes, for example.
  • the prediction unit 13 predicts the power (reference power) consumed in the target space 30 the next day using the history of the power received from the terminal device 20 for each unit time. Furthermore, the prediction unit 13 obtains, for each unit time, the sum of the reference powers for all the target spaces 30 managed by the power management apparatus 10, and obtains the difference with the power that can be supplied to the consumer through the power system 40.
  • the determination unit 14 determines whether there is a possibility that the power supply and demand may be tight for every unit time using the difference obtained by the prediction unit 13, and if there is a possibility that the power supply and demand may be tight, the time Extract the band.
  • the determination unit 14 extracts the time zone in which the tightness of the power supply and demand arises in units of unit time, and sets the extracted time zone as the common period T1 of the target period T0. Information on the common period T1 determined by the determination unit 14 as described above is handed over to the creation unit 11 described above.
  • the creation unit 11 has a function of creating a plan regarding the operation content of the device 41 for each target space 30. That is, the creation unit 11 creates a plan regarding the operation content of the device 41 so that the power received by the target space 30 from the power grid 40 in the target period T0 (the common period T1 and the individual period T2) is smaller than the reference power. .
  • the creation unit 11 uses the history of the past operation content of the device 41 to create a plan regarding the operation content of the device 41 in the target period T0.
  • the device 41 used in the target space 30 can be grasped by the power management device 10 communicating with the terminal device 20.
  • the terminal device 20 When the power management apparatus 10 communicates with the terminal device 20, the terminal device 20 relates to the power consumed by the device 41 used in each of the target spaces 30 in order to grasp the history of the past operation content regarding the device 41. The information is transmitted to the power management apparatus 10. However, in order for the terminal device 20 to transmit the power of each device 41 to the power management apparatus 10, it is necessary to have a function of measuring the power consumed by the device 41. Generally, the power of each branch circuit obtained by branching the wiring system in the target space 30 is transmitted from the terminal device 20 to the power management apparatus 10 instead of the power of the device 41. In this case, the terminal device 20 transmits the power of the branch circuit to the power management apparatus 10 in association with the operation state of the device 41 that the controller 21 grasps.
  • the creation unit 11 creates a plan (power saving menu) of the operation content of the device 41 in the case of saving power for each of the plurality of target spaces 30 managed by the power management apparatus 10.
  • the power saving menu not only uses the history of power when the device 41 is used in the target space 30, but also stores information on the status of acceptance in the target space 30 when power saving was requested in the past Is created in consideration of the accumulated information. In other words, whether the target space 30 can easily accept the request for power saving, and information such as the power saved when the request for power saving is accepted is additionally used in the creation of the power saving menu to receive the information in the target space 30. Easy-to-use power saving menu can be created.
  • the power management apparatus 10 needs to know in advance information on the devices 41 used in each of the target spaces 30.
  • the information on the device 41 includes the type, the specification, the age of the device 41 and the like.
  • the type of the device 41 is an air conditioner (air conditioner), a television receiver (TV), a washing machine, a ventilation fan, an IH cooking heater (IH: Induction Heating), a refrigerator, a lighting fixture, and the like.
  • the power saving menu instructs the set temperature to the air conditioner, and instructs not to use the television, the washing machine, the ventilation fan, the IH cooking heater, etc., to reduce the power consumed by the device 41. become.
  • the power saving menu may instruct to turn on the light control regarding the lighting fixture, and may instruct not to open the refrigerator.
  • the power saving menu is created by appropriately combining the contents of these instructions so as to reduce the power consumed in the target space 30 by a predetermined amount with respect to the reference power.
  • the creating unit 11 preferably creates a plurality of types of power saving menus for each target space 30. Although it is desirable to create a power saving menu for all target spaces 30 managed by the power management apparatus 10, a power saving menu is not created for a target space 30 that can not accept the request for power saving.
  • the power management apparatus 10 includes a consultation unit 16 that asks whether or not to accept a request for power saving for each target space 30, and a counting unit 17 that counts responses to the consultation made by the consultation unit 16. Furthermore, the power management apparatus 10 includes an evaluation unit 18 that evaluates the result of the counting by the counting unit 17.
  • the consultation unit 16 transmits the power saving menu created by the creating unit 11 to the terminal device 20 corresponding to each target space 30, and inquires whether the power saving menu is accepted or not. That is, the power saving menu created by the creation unit 11 is notified to the terminal device 20 through the communication unit 15. When the customer uses the terminal device 20 to make a response as to whether or not to accept the power saving menu, the consultation unit 16 receives a response from the terminal device 20.
  • the controller 21 of the terminal device 20 responds automatically to the power saving menu from the consultation unit 16
  • the power saving menu is presented to the consumer in advance before the target period T0.
  • the terminal device 20 may receive a response from the customer.
  • a customer When a customer is asked to ask for a power saving menu, it may have a margin of about one week to one month in an available period as the last day of the previous day.
  • the content of the power saving menu is, for example, dividing the power to be reduced with respect to the reference power into a plurality of stages and terminal device the content of specific actions necessary to reduce the corresponding power It should be presented on 20. That is, it is assumed that the power to be reduced is in three stages of A [kW], B [kW] and C [kW], and the relation of A ⁇ B ⁇ C is satisfied. Also, assume that the air conditioner is used for cooling.
  • the contents of the power saving menu are set, for example, as in the following example, using the power history and the like in the target space 30.
  • the power saving menu for A [kWh] is set, for example, to increase the set temperature of the air conditioner by 1 ° C. and not to turn on the television.
  • the power saving menu for B [kWh] is set, for example, to raise the set temperature of the air conditioner by 2 ° C., turn off the TV, and not use the washing machine.
  • the power saving menu for C [kWh] is set such that the set temperature of the air conditioner is increased by 2 ° C., the TV is not turned on, the washing machine is not used, the refrigerator is not opened, and the IH cooking heater is not used.
  • the power saving menu does not have to correspond one-to-one with the power to be reduced as in the example described above, and a plurality of power saving menus may be set for the power to be reduced. Further, instead of setting a power saving menu for each power to be reduced, a plurality of types of actions for reducing the power may be displayed on the terminal device 20 for each device 41. In this case, when the customer selects a possible action in the target period T0, the power to be reduced is indicated for each of the selected actions, and the total power to be reduced is indicated to the terminal device 20 when a plurality of actions is selected. It may be a configuration. That is, when the consumer designates the operation content for each of the plurality of devices 41, the total amount of power reduced by the specified operation content is indicated to the terminal device 20, and the amount of power reduced by the consumer's action The total amount may be shown to the consumer.
  • the aggregation unit 17 aggregates the contents of the response from the terminal device 20 corresponding to the target space 30 managed by the power management apparatus 10, and the total power received by the target space 30 from the power grid 40 in the target period T0 is Ask.
  • the total of the power which is the aggregation result, is given to the evaluation unit 18, and the evaluation unit 18 uses the power that can be supplied to the power system 40 in the target period T0 and the power on the demand side newly obtained for the target period T0. Furthermore, evaluate whether it is necessary to save electricity. That is, the evaluation unit 18 evaluates whether or not the sum of the power reduced with respect to the reference power in each of the target spaces 30 has reached the target value of the power to be reduced with respect to the baseline. If it does not reach the target value, it will be evaluated that power saving is necessary.
  • the evaluation unit 18 When the evaluation unit 18 further evaluates that power saving is necessary, the evaluation unit 18 requests the creating unit 11 to correct or change the power saving menu. That is, the processing by the creation unit 11, the consultation unit 16, the counting unit 17, and the evaluation unit 18 is repeated. On the other hand, when the evaluation unit 18 evaluates that further power saving is unnecessary, the generation unit 11 generates a message based on the result of the response to the consultation made by the consultation unit 16. The message is transmitted to the terminal device 20 through the notification unit 12, and the controller 21 of the terminal device 20 controls the device 41 of the target space 30 according to the plan created by the creation unit 11.
  • FIG. 3 A procedure until a power saving menu created by the power management apparatus 10 is consulted with the terminal device 20 and a power saving menu is determined is briefly shown in FIG.
  • the power management apparatus 10 communicates with a plurality of terminal devices 20.
  • the power management apparatus 10 acquires, from the terminal device 20, the power (received power) received by the target space 30 from the power grid 40 and the user information on the target space 30 (P1).
  • the power management apparatus 10 acquires information on power that can be supplied to the power system 40 or information on a power saving request from a business that supplies power (P2).
  • the power management apparatus 10 determines whether to request the terminal device 20 to save power using the acquired information (P3).
  • the creating unit 11 of the power management apparatus 10 creates a power saving menu (P4), and the terminal unit 20 is interviewed with the power saving menu through the consultation unit 16 (P5).
  • the power saving menu associates the operation content of the device 41 with the power that can save power, and is individually generated for each target space 30. Moreover, the target period T0 is designated in the power saving menu.
  • the customer or the controller 21 determines whether or not to accept the power saving menu notified to the terminal device 20, and returns from the terminal device 20 to the power management apparatus 10 a response to the acceptable power saving menu (P6) . If the power saving menu notified to the terminal device 20 can not be accepted, the terminal device 20 returns a rejection response to the power management apparatus 10 (P6).
  • the tabulating unit 17 of the power management apparatus 10 tabulates the contents of the response from the terminal device 20 (P7), and evaluates whether or not the total power reduced with respect to the baseline has reached the target value (P8). ). If the target value is not reached, the power saving menu is corrected, and if the target value is reached, the creating unit 11 generates a message specifying the target period T0.
  • the message may have the same content as the power saving menu upon acceptance from the terminal device 20, but the power saving menu can be modified depending on the information (for example, information of absence, etc.) included in the response from the terminal device 20. It is.
  • the generated message is transmitted to the terminal device 20.
  • the controller 21 of the terminal device 20 controls the device 41 used in the target space 30 according to the operation content included in the message.
  • the prediction unit 13 predicts the power received from the power grid 40 for each target space 30 and sums the predicted powers for all the target spaces 30. That is, by totaling the power measured in each target space 30, the power in the entire target space 30 is obtained.
  • the power measured on the electric path before branching the electric path to the target space 30 may be used.
  • the power measured in the power system 40 needs to be corrected in anticipation of the power loss on the electric path to the target space 30, but if this power is used, the prediction unit 13 sums up the power for each target space 30. Processing becomes unnecessary.
  • the power saving menu can be created in consideration of the heat insulation performance of the target space 30 as well as the history of power.
  • the indoor temperature is easily affected by the outside air temperature, and reducing the power used for cooling or heating tends to impair comfort. Therefore, it is useful to set the individual period T2 shorter than the target space 30 having relatively high thermal insulation performance, in the target space 30 having relatively low thermal insulation performance.
  • the target space 30 for determining whether or not a person exists is limited to the target space 30 in which the reference power predicted for the target period T0 is equal to or greater than the set reference value.
  • Information on whether or not a person exists in the target period T0 can be obtained by making the user report through the terminal device 20.
  • the action schedule that is, the action schedule
  • the action schedule of the user is registered in the terminal device 20
  • the use purpose of the target space 30 in addition to the heat insulation performance of the target space 30 described above, the use purpose of the target space 30, the age of the user, the number of users, etc. may be used. In addition, it is also possible to adjust the individual period T2 depending on whether the user of the target space 30 intends to save energy or comfort.
  • the creating unit 11 considers the use purpose of the target space 30 when creating the power saving menu. There is a need to.
  • the power used during heating and cooling may vary depending on the number of users in the target space 30. Since the power required in the target space 30 can be reduced as the number of users increases during heating, the creating unit 11 may generate a power saving menu with a longer individual period T2 as the number of users increases. On the other hand, since it is necessary to increase the required power in the target space 30 as the number of users increases during cooling, the creating unit 11 may generate a power saving menu with a shorter individual period T2 as the number of users increases.
  • the creating unit 11 can create a short power saving menu of the individual period T2 of the target space 30 for energy saving.
  • the target space 30 for energy saving is likely to accept the extension of the individual period T2. That is, the creation unit 11 can generate a power saving menu having a longer individual period T2 than a user who intends to save energy for a user who intends to save energy.
  • the target space 30 used by the energy saving oriented consumer has a wider range of adjustment regarding the length of the individual period T2.
  • the creation unit 11 appropriately replaces the user who asks for a power saving menu with a long individual period T2 every time the power saving is requested, so that the user who requests a power saving menu with a long individual period T2 does not have bias. May be
  • Whether the user of the target space 30 intends to save energy or to aim at comfort can be estimated based on the transition pattern of the power received by the target space 30 from the power grid 40.
  • energy saving it is considered that the maximum value of power is relatively small, and the fluctuation range divided into unit time of power is also relatively small.
  • This kind of classification result is distinguished as a power saving type, and is used for setting of a power saving menu.
  • the power received by the target space 30 from the electric power system 40 varies depending on whether the target space 30 includes a distributed power supply device, in addition to the heat insulation performance of the target space 30 and the power saving type.
  • the distributed power supply is selected from a solar power generation facility, a storage device, a fuel cell system, etc., and two or more types of distributed power supply may be used in the target space 30.
  • the power saving request can be easily accepted, and the convenience of the user of the target space 30 can be easily maintained even if the target period T0 is extended. Therefore, for the target space 30 in which the distributed power supply device is installed, it is possible to create a power saving menu so as to relatively reduce the power to be reduced, set a relatively long individual period T2, and the like.
  • the acquisition unit 35 provided in the power management apparatus 10 acquires the power saving type, the presence or absence of the distributed power supply apparatus, the heat insulation performance of the target space 30, and the like from the terminal apparatus 20 as user information. Note that the acquisition unit 35 also acquires, from the terminal device 20, information on the power received by the target space 30 from the power system 40. The acquiring unit 35 may not only acquire user information directly from the terminal device 20, but also acquire the result of analysis of the information related to the target space 30 acquired from the terminal device 20 by the power management apparatus 10 as user information.
  • the creation unit 11 adjusts the length of the individual period T2 according to the user information, using the user information of the target space 30 acquired by the acquisition unit 35 as a determination criterion when determining the length of the individual period T2.
  • the target space 30 in which a person is absent in the target period T0 it is expected that the power received from the power system 40 is significantly reduced with respect to the reference power. Therefore, in the target space 30 where a person is absent, the content of the power saving request message is likely to be implemented. Therefore, the information on whether or not there is a person in the target space 30 greatly contributes to the prediction of the power to be reduced.
  • the power management apparatus 10 includes a determination unit 36 that determines whether a person exists in each of the target spaces 30 using the information. The determination result by the determination unit 36 is handed over to the creation unit 11. When the determination unit 36 determines that there is no person in the target space 30 in the target period T0, the creation unit 11 generates a message of power saving request with priority to the target space 30.
  • the creation unit 11 compares the target space 30 with the target space 30. Prioritize the generation of the power saving request message. It should be noted that for the target space 30 where people are absent routinely during the target period T0, a reduction in the power received from the power system 40 can not be expected. It is possible not to generate.
  • the creation unit 11 generates a message so that the upper limit of the power received by the target space 30 from the power grid 40 returns to the reference power at the end of the target period T0.
  • the creation unit 11 may generate a message to increase the upper limit of the power received from the power grid 40 in the individual period T2 of the target period T0 with the passage of time.
  • the individual period T2 if the power that can be received increases with the passage of time, in the target space 30, it is possible to increase the devices 41 operable in the individual period T2 or to increase the output of the devices 41. Therefore, the convenience for the user of the target space 30 can be improved.
  • the controller 21 included in the terminal device 20 when the controller 21 included in the terminal device 20 receives a message from the power management apparatus 10, the controller 21 automatically controls the device 41 in the target space 30 according to the content of the message. On the other hand, it is also possible to indicate the content of the message received by the terminal device 20 to the user of the target space 30 (in the case of a residence, a resident) and operate the device 41 according to the content of the message. .
  • the above-described power management apparatus 10 includes, as a main hardware element, a device including a processor that operates according to a program.
  • a microcontroller integrally provided with a memory, a microprocessor provided separately with a memory, or the like is used. That is, the power management apparatus 10 is configured using a computer.
  • the program is used to cause the computer to function as the power management device 10.
  • This program is stored in advance in a ROM (Read Only Memory), provided on a recording medium such as a computer readable optical disc, or provided via a telecommunication network such as the Internet.
  • the power management apparatus 10 of the present embodiment described above includes the creation unit 11 and the notification unit 12.
  • the creation unit 11 creates a message to be notified to each of the plurality of terminal devices 20.
  • the notification unit 12 notifies each of the plurality of terminal devices 20 of the message.
  • the plurality of terminal devices 20 are associated with each of the plurality of target spaces 30 to which power is received from the power system 40, and the message is a content for requesting reduction of the power each of the plurality of target spaces 30 receives from the power system 40.
  • the target period T0 is specified.
  • the creation unit 11 determines the end date and time of the target period T0 in association with the plurality of target spaces 30.
  • the power management system of the present embodiment includes the terminal device 20 and the power management apparatus 10.
  • the terminal device 20 is disposed in each of a plurality of target spaces 30 that receive power from the power system 40. That is, there are a plurality of terminal devices 20.
  • the power management apparatus 10 notifies each of the plurality of terminal devices 20 of the message.
  • the power management apparatus 10 includes a creation unit 11 and a notification unit 12.
  • the creation unit 11 creates a message to be notified to each of the plurality of terminal devices 20.
  • the notification unit 12 notifies each of the plurality of terminal devices 20 of the message.
  • the message is a content for requesting reduction of the power received by the plurality of target spaces 30 from the power grid 40, and the target period T0 is designated.
  • the plurality of terminal devices 20 each include a controller 21 that adjusts the power received by the plurality of target spaces 30 from the power grid 40. Furthermore, the terminal device 20 adjusts the power received from the power system 40 in the target period T0 specified by the message to be reduced with respect to the predetermined reference power.
  • the creation unit 11 determines the end date and time of the target period T0 in association with the plurality of target spaces 30.
  • the end date and time of the target period T0 is determined in association with the target space 30. Therefore, it is possible to avoid the situation where the power increases simultaneously in the majority of the target space 30 during the target period T0 during which the power received from the power system 40 is reduced. That is, since the end date and time of the target period T0 varies depending on the target space 30, the amount of power received from the power system 40 rapidly increases at the end of the target period T0, and the possibility of imbalance of the power supply and demand is reduced. Ru.
  • the terminal device 20 preferably includes a controller 21 that adjusts the power received by the plurality of target spaces 30 from the power grid 40.
  • the terminal device 20 adjusts the power received from the power system 40 to be reduced with respect to the predetermined reference power in the target period T0 specified by the message.
  • the controller 21 of the terminal device 20 automatically adjusts the power received by the target space 30 from the power grid 40, so that the content of the power saving request is realized. It will be easier.
  • the power management apparatus 10 may include an acquisition unit 35 that acquires user information for each of the plurality of target spaces 30.
  • the user information includes at least one of a power saving type in which a transition pattern of power received from the power system 40 is classified, presence or absence of a distributed power supply, and heat insulation performance.
  • the creation unit 11 uses the user information of each of the plurality of target spaces 30 acquired by the acquisition unit 35 as a determination criterion to determine the end date and time of the target period T0 according to each of the plurality of target spaces 30.
  • the target period T0 it is possible to determine the end date and time of the target period T0 based on the user information on the target space 30. That is, since the target period T0 is adjusted based on the user information related to the target space 30, it is possible to set the target period T0 that is easy for the user of the target space 30 to accept.
  • the power management apparatus 10 may include a determination unit 36 that determines whether a person is present in each of the plurality of target spaces 30 in the target period T0.
  • the creation unit 11 may preferentially generate a message for the target space 30 determined by the determination unit 36 that there is no person in the target period T0.
  • the target space 30 is determined to be absent in the target period T0, there is a high possibility that the amount of power received from the electric power system 40 can be reduced. It becomes easier to achieve the target value of power to be reduced in the target period.
  • the target period T0 may include a common period T1 commonly determined for all of the plurality of target spaces 30, and an individual period T2 individually defined for each of the plurality of target spaces 30.
  • the creating unit 11 creates a message such that the upper limit of the power received by the power grid 40 from each of the plurality of target spaces 30 increases with the lapse of time in the individual period T2.
  • the power received from the power system 40 is increased with the elapse of time in the individual period T2 individually determined for each of the target spaces 30. Therefore, in each target space 30, it is possible to increase the usable devices 41 or to increase the output of the devices 41 in the individual period T2.
  • the creating unit 11 selects the individual period T2 may be selected from a plurality of stages.
  • the creation unit 11 may be configured to create a power saving menu including the operation content of the device 41 used in each of the plurality of target spaces 30.
  • the power saving menu is created to reduce the power received from the power system 40 in the target period T0 in each of the plurality of target spaces 30 with respect to the reference power.
  • the power management device 10 may be provided with the consultation unit 16 and the evaluation unit 18.
  • the consultation unit 16 asks the plurality of terminal devices 20 associated with each of the plurality of target spaces 30 to receive the power saving menu.
  • the evaluation unit 18 evaluates whether or not the sum of the powers reduced with respect to the reference power in the target period T0 has reached a predetermined target value based on the response to the consultation made by the consultation unit 16. Furthermore, when the evaluation unit 18 evaluates that the sum does not reach the target value, the evaluation unit 18 causes the creation unit 11 to correct the power saving menu, and causes the consultation unit 16 to make a request for acceptance of the power saving menu after the correction.
  • the terminal device 20 is asked whether to accept the power saving menu, and if the power to be reduced does not reach the target value as a result of the response to the consultation, the power saving menu is modified and the power saving menu is modified. To persuade the acceptance of Therefore, the possibility that the sum of the power to be reduced to the target space 30 can reach the target value is increased.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

節電要請の終了時に機器が一斉に使用されるという事態を回避し、かつ節電期間の終了時点を電力の使用者があらかじめ知ることを可能にすべく、電力管理装置(10)は、作成部(11)と通知部(12)とを備える。作成部(11)は、複数台の端末装置(20)それぞれに通知するメッセージを作成する。通知部(12)は、複数台の端末装置(20)それぞれにメッセージを通知する。複数台の端末装置(20)は、電力系統(40)から受電する複数の対象スペース(30)それぞれに関連付けてあり、メッセージは、複数の対象スペース(30)それぞれが電力系統(40)から受電する電力の低減を要請する内容であって対象期間T0が指定されている。作成部(11)は、対象期間T0の終了日時を、複数の対象スペース(30)に対応付けて定める。

Description

電力管理装置、電力管理システム及びプログラム
 本発明は、一般に電力管理装置、電力管理システム、プログラム、とくに電力系統から受電する電力の低減を要請する電力管理装置、この電力管理装置を備えた電力管理システム、コンピュータをこの電力管理装置として機能させるためのプログラムに関する。
 従来、電力系統から受電する電力の低減の要請(すなわち、節電要請)を行う技術が提案されている(たとえば、特許文献1参照)。特許文献1では、節電要請が終了した後に、需要家(電力需要家)が使用を我慢していた機器を一斉に使用し始めることで、短期間で節電要請が繰り返されるという問題に対応する節電要請発生装置が提案されている。
 特許文献1の節電要請発生装置は、複数の電力需要家における電力の合計に対して、第1しきい値と第2しきい値とを定めている。節電要請発生装置は、電力の合計が第1しきい値以上になると節電要請通知を送信し、その後、電力の合計が第2しきい値以下になると節電要請終了通知を送信している。また、特許文献1には、節電要請発生装置が、複数の電力需要家を複数のグループに分け、電力の合計が第2のしきい値以下になると、所定の時間間隔でグループごとに順次に、節電要請終了通知を送信する構成が記載されている。
 特許文献1に記載された節電要請発生装置は、消費電力の合計に対して第1しきい値および第2しきい値を設定し、消費電力の合計と、第1しきい値および第2しきい値とを比較した結果に基づいて、節電要請に関する通知を送信している。さらに、この節電要請発生装置は、電力需要家のグループごとに、節電要請終了通知を送信するタイミングを所定の時間間隔でずらすことによって、節電要請の終了時にすぐに機器が一斉に使用されることを防止している。
特開2014-60887号公報
 特許文献1に記載された節電要請発生装置は、消費電力の合計が第1しきい値以上である状態から第2しきい値以下である状態になると、電力需要家について定めたグループごとに、節電要請終了通知を所定の時間間隔で送信している。つまり、節電要請を終了する条件が成立した時点を起点にした時刻に、節電要請終了通知を送信しているから、電力需要家では節電要請が終了する時点を予測することができない。そのため、電力需要家は、機器の使用をいつまで我慢すればよいかを知ることができない。
 本発明は、節電要請の終了時に機器が一斉に使用されるという事態を回避し、かつ電力系統から受電する電力の低減が要請される期間の終了時点を電力の使用者があらかじめ知ることを可能にした電力管理装置を提供することを目的とする。また、本発明は、この電力管理装置を備えた電力管理システム、およびコンピュータをこの電力管理装置として機能させるためのプログラムを提供することを目的とする。
 本発明の一態様に係る電力管理装置は、複数台の端末装置それぞれに通知するメッセージを作成する作成部と、前記複数台の端末装置それぞれに前記メッセージを通知する通知部とを備え、前記複数台の端末装置は、電力系統から受電する複数の対象スペースそれぞれに関連付けてあり、前記メッセージは、前記複数の対象スペースそれぞれが前記電力系統から受電する電力の低減を要請する内容であって対象期間が指定されており、前記作成部は、前記対象期間の終了日時を、前記複数の対象スペースに対応付けて定める。
 本発明の一態様に係る電力管理システムは、電力系統から受電する複数の対象スペースそれぞれに配置された複数台の端末装置と、前記複数台の端末装置それぞれにメッセージを通知する電力管理装置とを備え、前記電力管理装置は、前記複数台の端末装置それぞれに通知するメッセージを作成する作成部と、前記複数台の端末装置それぞれに前記メッセージを通知する通知部とを備え、前記メッセージは、前記複数の対象スペースそれぞれが前記電力系統から受電する電力の低減を要請する内容であって対象期間が指定されており、前記複数台の端末装置は、前記複数の対象スペースそれぞれが前記電力系統から受電する電力を調節するコントローラを含んでおり、前記メッセージで指定された前記対象期間において前記電力系統から受電する電力を、所定の基準電力に対して低減させるように調節する構成であり、前記作成部は、前記対象期間の終了日時を、前記複数の対象スペースに対応付けて定める。
 本発明の一態様に係るプログラムは、コンピュータを、上述の電力管理装置として機能させるためのものである。なお、プログラムは、コンピュータで読取可能な記録媒体あるいは記憶媒体に記録された状態で提供されてもよい。
 本発明は、節電要請の終了時に機器が一斉に使用されるという事態を回避し、かつ電力系統から受電する電力の低減が要請される期間の終了時点を電力の使用者があらかじめ知ることを可能にする。
図1は、実施形態に係る電力管理システムを示すブロック図である。 図2は、実施形態における対象期間を説明する図である。 図3は、実施形態における節電要請の打診の手順を示す図である。
 以下に説明する電力管理システムは、図1に示すように、電力管理装置10と端末装置20とを備える。以下の説明において、対象スペース30は、事業者との間で電力系統40から受電する契約を行っている需要家(consumer)が電力を使うスペースであって、使用した電力が電力メータで計測されるスペースの意味で用いる。すなわち、電力管理システムは、需要家が使用する端末装置20に対してメッセージを送信するように構成された電力管理装置10と、電力管理装置10が生成したメッセージを受け取る端末装置20とで構成される。
 対象スペース30は、住宅、事務所、または店舗などであり、1つの建物が1つの対象スペースである場合と、1つの建物に複数の対象スペースが存在する場合とがある。たとえば、戸建て住宅では1つの建物が1つの対象スペースであり、集合住宅では1つの建物に複数の対象スペースが存在する。需要家と契約する事業者は、発電事業者のほか、発電を行わずに電力小売を行う事業者、あるいは複数の需要家を集約するアグリゲータのような事業者である。
 ところで、電力系統40を通して事業者から需要家(つまり、対象スペース30)に電力を供給する場合に、事業者が供給する電力と需要家が受電する電力とを瞬時単位で一致させる必要がある。そのため、事業者から供給可能な電力は、需要家が受電する電力の変動に備えて、需要家が受電する電力の予測値に対して余裕を持つように定められている。
 言い換えると、事業者から供給可能な最大の電力に対して、複数の需要家が受電する合計の電力の予測値は、所要の余裕分以上に小さいという制約条件を満たす必要がある。
 このような制約条件を満足させる方法には、事業者から供給可能な最大の電力を複数の需要家が受電する合計の電力の予測値に応じて増加させる方法と、事業者から供給可能な最大の電力に基づいて複数の需要家が受電する合計の電力を減少させる方法とがある。前者の方法は、採用すると電力を調達するための費用が発生し、また発電設備の構成と規模とによっては採用できない場合もある。
 したがって、近年では、事業者から需要家に対して節電を要請し、受電する電力の低減を需要家に促すことによって、需要家が受電する合計の電力を減少させ、所要の余裕分を確保する後者の方法が採用されている。すなわち、事業者は、需要家が将来に受電する合計の電力を予測し、事業者が供給可能な最大の電力から予測した電力を減算した差分が所定値よりも小さくなる期間に、節電を需要家に要請する。
 言い換えると、事業者は、電力需給が逼迫することが予測される期間を需要家に通知し、この期間における節電を需要家に要請する。複数の需要家が将来に受電する合計の電力は、過去に該当する需要家が受電した合計の電力に関する履歴を用いて予測される。電力に関する履歴は、時間経過に伴う過去の電力の推移を表す。また、節電を需要家に要請する期間は、電力需給が逼迫する期間だけではなく適宜に定められる。以下では、需要家に節電を要請する期間を対象期間という。事業者による節電の要請は、節電の対象期間と、対象期間における電力の上限値とを指定して需要家に通知される。電力の上限値は、対象期間に対象スペース30が受電する電力の瞬時値を制限する最大値である。
 本実施形態では、事業者が管理する電力管理装置10から需要家が管理する端末装置20に対して節電を要請するメッセージが通知される構成例を説明する。端末装置20は、対象スペース30に関連付けられていればよく、たとえば、需要家が保有するスマートフォン、タブレット端末、パーソナルコンピュータなどから選択することが可能である。本実施形態で説明する端末装置20は、対象スペース30が電力系統40から受電する電力を調節するコントローラ21を含んでいる。
 コントローラ21は、対象スペース30で使用される機器41の動作を制御することにより、対象スペース30が電力系統40から受電する電力を調節する。この種のコントローラ21には種々の仕様が知られているが、本実施形態では、コントローラ21が、HEMS(Home Energy Management System)のコントローラである場合を例とする。本実施形態の端末装置20は、複数の対象スペース30それぞれに配置される。
 コントローラ21は、分電盤で分岐した分岐回路ごとに計測された電力値を取得する機能を有し、また、いわゆるHEMS対応機器と通信することにより機器41の動作を制御する機能を有する。つまり、コントローラ21は、分岐回路を単位として機器41が消費した電力を監視することが可能であり、機器41がHEMS対応機器であれば、機器41の動作を制御することが可能である。
 なお、HEMS対応機器は、HEMSのコントローラ21と通信することが可能であって、コントローラ21により動作の監視と制御との少なくとも一方が行われる機器41を意味する。ここに、本実施形態の機器41は、コントローラ21により動作の監視および制御が行われる。コントローラ21と機器41とは、電力線搬送通信のような有線通信、あるいは電波を伝送媒体とした無線通信で情報を授受する。
 コントローラ21は、インターネットのような電気通信回線50を通して通信する機能を有し、また、操作表示装置との間で情報を授受する機能を有している。すなわち、電力管理装置10はコントローラ21と通信する。また、操作表示装置は、コントローラ21の専用装置であってもよいが、スマートフォン、タブレット端末など操作表示装置を備える汎用装置を流用することも可能である。言い換えると、コントローラ21は、汎用装置を操作表示装置として使用するためのインターフェイスを備える。
 電力管理装置10は、複数の端末装置20(本実施形態では、コントローラ21)と電気通信回線50を通して通信する。電気通信回線50がインターネットである場合、電力管理装置10と端末装置20との間の通信は暗号化される。なお、電力管理装置10と端末装置20は、VPN(Virtual Private Network)を構築していてもよい。
 電力管理装置10は、端末装置20にメッセージを通知する。メッセージは、操作表示装置を通して需要家に通知する内容を含むだけでもよいが、本実施形態では、コントローラ21に指示するコマンド(命令)を含んでいる。また、電力管理装置10は、端末装置20それぞれにメッセージを通知するように構成されている。
 電力管理装置10は、メッセージを作成する作成部11と、メッセージを通知する通知部12とを備える。作成部11は、複数台の端末装置20それぞれに通知するメッセージを作成し、通知部12は、作成部11が作成したメッセージを複数台の端末装置20それぞれに通知する。作成部11が生成するメッセージの内容は、本実施形態では、需要家に節電を要請するように定められる。
 作成部11が作成するメッセージは、節電を要請する内容であるから、上述のように、節電に関する電力の情報と節電の対象期間の情報とを含む。通知部12は、作成部11が作成したメッセージを対象スペース30に配置された端末装置20に通知する。つまり、対象スペース30に配置された端末装置20は、メッセージに含まれる電力の情報および節電の対象期間の情報を受け取る。
 本実施形態では、メッセージがコントローラ21に指示するコマンドを含んでおり、コントローラ21は、メッセージの内容に従って機器41(実際は、HEMS対応機器)を制御する。すなわち、端末装置20が電力管理装置10からメッセージを受け取ると、コントローラ21が、対象期間において機器41の動作を制御する。
 したがって、電力管理装置10が、対象スペース30に関連付けた端末装置20に節電を要請するメッセージを送信すると、端末装置20のコントローラ21が、対象スペース30が受電する電力をメッセージの内容に従って自動的に調節する。要するに、メッセージを受け取った端末装置20のコントローラ21は、メッセージで指定された対象期間において、電力系統40から受電する電力の上限値が、メッセージで指定された電力以下になるように機器41の動作を制御する。したがって、対象スペース30それぞれが電力系統40から対象期間に受電する電力は、メッセージで指定された電力を上限値とするように制限される。
 ここに、節電とは、対象スペース30において対象期間に電力系統40から受電する電力を、基準の電力よりも低減させるという意味である。基準の電力は、対象スペース30で受電を抑制しない場合に消費されることが予測される電力であり、この電力は測定できないから、一般的には、対象スペース30について計測された電力の履歴に基づいて定められる。以下では、電力管理装置10が対象スペース30それぞれについて予測した電力を「基準電力」と呼び、電力の供給対象であるすべての対象スペース30について基準電力を合計することにより得られる電力を「ベースライン」と呼ぶ。
 ベースラインは、電力管理装置10が管理するすべての対象スペース30について、基準電力を合算した総電力に相当する。対象期間において節電すべき電力の目標値は、ベースラインに基づいて定められる。たとえば、ベースラインがP[kW]であり、ベースラインの90%が上限となるように節電を要請する場合であれば、節電する電力の目標値は0.1P[kW]になる。
 需要家が節電を実施すると、対象期間に対象スペース30で受電される電力が基準電力よりも小さくなる。すなわち、事業者は、管理下の対象スペース30それぞれについて定めた基準電力の合計(ベースライン)以上の電力を供給する場合に比べると、供給する電力を低減することが可能になる。したがって、事業者が供給可能な電力、事業者の管理下の対象スペース30に関するベースライン、需要家が節電の要請を受け入れると予想される確率などから、需要家に節電を要請する際の電力が算出可能になる。
 ベースラインと基準電力とは、1日の時間帯、1週間の曜日、年間の季節、気象などの条件によって変化し、また、複数年の長期においては居住環境のような条件によっても変化する。居住環境は、たとえば、対象スペース30の断熱性能、対象スペース30の利用目的、対象スペース30を使用する人の年齢、人数などにより変化する。また、対象スペース30が住居であれば、居住者の構成によっても居住環境は変化する。したがって、基準電力は、対象スペース30ごとに条件別に定められることが望ましい。
 ただし、対象スペース30それぞれについて個別に基準電力を計算するのではなく、対象スペース30を分類した区分ごとに基準電力の標準値を定めてもよい。たとえば、対象スペース30ごとの電力の履歴に基づいて、対象スペース30の電力の使用状況を分類し、分類した区分ごとに基準電力を定めてもよい。言い換えると、対象スペース30が属する区分に応じて、基準電力の標準値が当て嵌められる。対象スペース30の区分ごとに基準電力を定める場合でも、基準電力は対象期間ごとに定められる。区分は、曜日、季節、気象などの条件を折り込んで設定されていれば、対象期間の条件に応じた区分の抽出が容易になる。
 対象スペース30に節電を要請するときの電力は、すでに述べたように、対象スペース30で対象期間において使用する電力の上限値に相当する。この電力は、たとえば、基準電力に対する割合(たとえば、基準電力の80%など)、または、基準電力から所定値を減算した値に定められる。
 コントローラ21は、対象期間に使用可能な電力の上限値が電力管理装置10から示されると、対象期間において電力系統40から受電する電力が、この上限値以下に抑えられるように、機器41の制御内容を定める。電力の上限値に応じた機器41の制御内容は、対象スペース30での機器41の使用に関する履歴などを用いてコントローラ21が作成する。
 ただし、コントローラ21のハードウェア資源は十分に豊富と言えない場合があり、電力系統40から受電する電力を上限値以下にするように機器41の制御内容を定めるほどの処理能力をコントローラ21が備えていない場合もある。そのため、本実施形態においては、電力管理装置10が、個々の対象スペース30における機器41の制御内容を定め、電力管理装置10が定めた制御内容を端末装置20に送信することによって、コントローラ21が機器41を制御する構成を採用している。
 ところで、作成部11は、複数の対象スペース30それぞれに対応付けて複数種類の対象期間を定める。図2に示すように、本実施形態において、対象期間T0は、事業者がすべての対象スペース30に対して共通に定めた共通期間T1と、事業者が選択した対象スペース30に対して個別に定めた個別期間T2とを含んでいる。共通期間T1は、節電が要請されるすべての対象スペース30について共通に適用される期間であり、個別期間T2は、節電が要請される個々の対象スペース30に対して個別に適用される期間である。
 すなわち、図2においてAで示す対象期間T0と、図2においてBで示す対象期間T0との例では、異なる対象スペース30に対してそれぞれ個別期間T2が設定されており、対象期間T0の長さが異なっている。対象期間T0の開始日時は、原則として共通期間T1の開始日時であり、事業者が管理するすべての対象スペース30において対象期間T0の開始日時は一致する。したがって、対象期間T0の終了日時は、個々の対象スペース30に対する個別期間T2の長さに応じた日時になる。
 共通期間T1は、需要家に節電を要求しなければならない必須の期間であって、たとえば電力需給が逼迫する期間に相当する。共通期間T1は、作成部11において定めるのではなく、電力需給の逼迫が生じると判断された期間が用いられる。電力需給の逼迫を判断する構成については後述する。一方、個別期間T2は、需要家に節電を終了させる日時を調節する期間である。個別期間T2は、共通期間T1が終了した直後の期間であって、多数の需要家が通常よりも多くの電力を一斉に消費する可能性があるために設定されている。個別期間T2は、作成部11が生成し、作成部11が共通期間T1と個別期間T2とを合算して対象期間T0を定める。
 たとえば、共通期間T1において、節電のために、エアコンの設定温度が快適な温度よりも消費する電力が減少する方向(冷房時には高温側、暖房時には低温側)に設定されていたとする。この場合、共通期間T1が終了した時点から短時間で快適な温度環境が得られるように、エアコンの設定温度を快適な温度よりも消費する電力が増加する方向に設定する可能性がある。共通期間T1に停止させていた機器41を、共通期間T1の終了に伴って運転させる場合にも、需要家で受電する電力が増加する可能性がある。つまり、需要家が消費する電力が通常程度であれば電力需給の逼迫は生じないとしても、共通期間T1の終了直後には、需要家の消費する電力が通常よりも増加して電力需給の逼迫が生じる可能性がある。
 事業者が管理するすべての対象スペース30で対象期間T0が一致していると、対象期間T0の終了直後に対象スペース30で受電する電力が一斉に増加し、その結果として、電力需給の逼迫が生じる可能性がある。そこで、本実施形態では、対象期間T0が共通期間T1と個別期間T2とを含んでおり、個別期間T2が対象スペース30に対応付けて設定されている。このように、対象期間T0が個別期間T2を含むことによって、対象期間T0の終了日時が対象スペース30のすべてで一致することが防止され、共通期間T1の終了直後に電力需給の逼迫が生じるという事象が回避される。
 ここに、個別期間T2は、あらかじめ用意されている複数種類から選択される。言い換えると、作成部11は、共通期間T1と個別期間T2とを含む対象期間T0を、対象スペース30に対応付けて複数種類から選択する。作成部11は、複数の対象スペース30に対応付けて個別期間T2を複数段階に定める。
 個別期間T2の長さは、たとえば1分程度の刻み幅で段階的に定めることが可能であるが、10分から1時間程度の刻み幅であってもよい。現状では、電力系統40における電力の制御には30分間の電力量を用いることが多いから、30分の刻み幅で2~3段階程度の個別期間T2を設定しておけばよい。すなわち、個別期間T2の長さは、0分、30分、60分などの値から選択すればよく、どの値をどの対象スペース30に対応させるかは、対象スペース30における電力の履歴に基づいて定めればよい。
 通知部12は、個々の対象スペース30に関連付けられている端末装置20に対して作成部11が作成したメッセージを送信する。したがって、個々の対象スペース30に関連付けられた端末装置20は、複数段階の対象期間T0から選択された対象期間T0が設定されたメッセージを受け取ることになる。つまり、事業者の管理下である複数の対象スペース30に対して節電を要請するメッセージは、個々の対象スペース30に対して要請する電力に関する情報と、複数段階の対象期間T0から選択された対象期間T0の情報とを含む。言い換えると、事業者の管理下である複数の対象スペース30に対して節電が要請される対象期間T0の終了日時は、対象スペース30に応じて複数種類から選択された日時になる。
 以上説明したように、電力管理装置10は、対象スペース30に関連付けた端末装置20に対して、対象スペース30に対応する対象期間T0を指定して節電を要請するメッセージを通知する。したがって、事業者が管理する対象スペース30のうち節電の要請を受け入れていた対象スペース30のすべてが一斉に節電の状態を解除するという事態が回避される。その結果、電力系統40に対する負荷が、比較的長い時間をかけて通常の状態に復帰することになり、電力系統40から見ると、あたかも負荷がソフトスタートを行ったかのような振る舞いになる。
 上述した動作例では、電力管理装置10からメッセージを受け取った端末装置20が、対象スペース30で受電する電力を低減させるように自動的に機器41の動作を制御している。ここで、対象スペース30の都合によっては、対象期間T0において節電の要請を受け入れることができない場合が生じる。逆に、対象スペース30の状況によっては、対象期間T0において節電の要請が不要である場合も生じる。
 たとえば、対象期間T0に来客が予定されている場合であれば、対象スペース30で受電する電力は、通常時よりも増加することがある。また、対象期間T0に外出が予定されている場合であれば、対象スペース30が受電する電力は、要請された節電の電力に比べて大幅に低減されることになる。この場合、節電の要請は不要である。あるいは、需要家が省エネルギーを実践しており、対象スペース30で対象期間T0に受電する電力がもともと少ないために、節電の要請を受け入れられない場合があり、このような対象スペース30には節電の要請が不要であるとも言える。
 したがって、対象スペース30において節電の要請を受け入れるか否かは、対象期間T0よりも前に定めておく必要がある。以下では、電力管理装置10が、対象期間T0の前日に節電の要請を受け入れるか否かを定める場合を例として説明する。
 電力管理装置10は、対象期間T0に節電の要請を受け入れるか否かを前日に打診する構成を備える。つまり、電力管理装置10は、図1に示すように、節電が必要か否かを判断する構成と、対象スペース30ごとの機器41の動作内容に関する計画を作成する構成と、需要家に計画を打診する構成と、打診の結果を集計する構成とを備える。
 電力管理装置10は、節電の要否を判定する構成として、対象スペース30が電力系統40から受電する電力(基準電力)を予測する予測部13と、電力系統40に供給可能な電力と基準電力とを用いて節電の要否を判断する判断部14とを備える。電力管理装置10は端末装置20との間で情報を授受する通信部15を備え、予測部13は、個々の対象スペース30が電力系統40から受電した電力に関する情報を、端末装置20から通信部15を通して受け取る。
 予測部13は、個々の対象スペース30で消費した電力(実際には単位時間ごとの電力量)の情報を端末装置20から通信部15を通して受け取る。単位時間は、1秒~1時間程度の範囲から選択される。たとえば、単位時間は30秒または1分とすることが可能であるが、予測部13が用いる単位時間は、たとえば、10分あるいは30分でよい。
 予測部13は、端末装置20から受け取った電力の履歴を用いて、対象スペース30で翌日に消費する電力(基準電力)を単位時間ごとに予測する。さらに、予測部13は、電力管理装置10が管理するすべての対象スペース30に関する基準電力の合計を単位時間ごとに求め、電力系統40を通して需要家に供給可能な電力との差分を求める。
 判断部14は、予測部13が求めた差分を用いて、単位時間ごとに電力需給が逼迫する可能性があるか否かを判断し、電力需給の逼迫が生じる可能性があれば、その時間帯を抽出する。判断部14は、電力需給の逼迫が生じる時間帯を単位時間刻みで抽出し、抽出した時間帯を、対象期間T0のうちの共通期間T1に定める。このように判断部14が定めた共通期間T1の情報は、上述した作成部11に引き渡される。
 作成部11は、対象スペース30ごとの機器41の動作内容に関する計画を作成する機能を有する。すなわち、作成部11は、対象期間T0(共通期間T1と個別期間T2)において対象スペース30が電力系統40から受電する電力を基準電力よりも減らすように、機器41の動作内容に関する計画を作成する。
 作成部11は、対象期間T0における機器41の動作内容に関する計画を作成するために、機器41に関する過去の動作内容の履歴を用いる。ここに、対象スペース30で使用されている機器41は、電力管理装置10が端末装置20と通信することによって把握可能である。また、対象スペース30で用いられる機器41に関して過去の動作内容の履歴も把握可能である。
 電力管理装置10が端末装置20と通信することによって、機器41に関する過去の動作内容の履歴を把握するために、端末装置20は、個々の対象スペース30で使用される機器41が消費した電力に関する情報を電力管理装置10に送信する。ただし、機器41ごとの電力を端末装置20が電力管理装置10に送信するには、機器41が消費した電力を計測する機能を有している必要がある。一般的には、対象スペース30において配線系統を分岐させた分岐回路ごとの電力が機器41の電力に代えて端末装置20から電力管理装置10に送信される。この場合、端末装置20は、分岐回路の電力とコントローラ21が把握している機器41の動作状態と関連付けて電力管理装置10に送信する。
 作成部11は、電力管理装置10が管理している複数の対象スペース30それぞれについて、節電する場合の機器41の動作内容の計画(節電メニュー)を作成する。節電メニューは、対象スペース30で機器41が使用されたときの電力の履歴を用いるだけではなく、過去に節電が要請されたときの対象スペース30での受け入れの状況に関する情報が蓄積されている場合は、蓄積された情報も加味して作成される。すなわち、対象スペース30が、節電の要請を受け入れやすいか否か、節電の要請を受け入れた場合に節電した電力などの情報を、節電メニューの作成に付加的に用いることにより、対象スペース30において受け入れやすい節電メニューが作成可能になる。
 作成部11が節電メニューを作成する場合、対象スペース30それぞれで使用される機器41に関する情報を、電力管理装置10があらかじめ把握している必要がある。機器41に関する情報は、機器41の種類、仕様、使用年数などである。機器41の種類は、エアコンディショナ(エアコン)、テレビジョン受像機(テレビ)、洗濯機、換気扇、IHクッキングヒータ(IH:Induction Heating)、冷蔵庫、照明器具などである。節電メニューは、たとえば、エアコンに対しては設定温度を指示し、テレビ、洗濯機、換気扇、IHクッキングヒータなどに対しては不使用を指示するというように、機器41が消費する電力を低減させる内容になる。節電メニューは、照明器具に関して調光点灯を指示する場合があり、冷蔵庫に関しては開けないことを指示する場合がある。節電メニューは、対象スペース30で消費する電力を基準電力に対して所定量低減させるように、これらの指示内容を適宜に組み合わせて作成される。
 作成部11は、対象スペース30ごとに、複数種類の節電メニューを作成することが望ましい。節電メニューは、電力管理装置10が管理するすべての対象スペース30について作成することが望ましいが、節電の要請を受け入れることができない対象スペース30に対しては、節電メニューは作成されない。
 ところで、電力管理装置10は、対象スペース30ごとに節電の要請を受け入れるか否かを打診する打診部16と、打診部16が行った打診に対する応答を集計する集計部17とを備える。さらに、電力管理装置10は、集計部17による集計の結果を評価する評価部18を備える。
 打診部16は、作成部11が作成した節電メニューを、個々の対象スペース30に対応する端末装置20に向けて送信し、節電メニューを受け入れるか否かを問い合わせる。つまり、作成部11が作成した節電メニューは、通信部15を通して端末装置20に通知される。需要家が端末装置20を用いて節電メニューを受け入れるか否かの応答を行うと、打診部16が端末装置20からの応答を受け取る。
 打診部16からの節電メニューに対して、端末装置20のコントローラ21が自動的に応答する構成を採用することは可能であるが、対象期間T0の前に事前に需要家に節電メニューを提示し、端末装置20を通して需要家からの応答を受けてもよい。需要家に節電メニューを打診する場合、前日を最終日として応答可能な期間に1週間から1ヶ月程度の余裕を持たせてもよい。
 節電メニューを需要家に通知する場合、節電メニューの内容は、たとえば、基準電力に対して低減させる電力を複数段階に分け、該当する電力を低減するのに必要な具体的行動の内容を端末装置20に提示すればよい。つまり、低減させる電力を、A[kW]、B[kW]、C[kW]の3段階とし、A<B<Cの関係であると仮定する。また、エアコンは冷房に用いる場合を想定する。
 節電メニューは、対象スペース30での電力の履歴などを用いて、たとえば、以下の例のように内容が設定される。A[kWh]に対する節電メニューは、たとえば、エアコンの設定温度を1℃上げ、テレビをつけないという内容が設定される。B[kWh]に対する節電メニューは、たとえば、エアコンの設定温度を2℃上げ、テレビをつけない、洗濯機を使わないという内容が設定される。C[kWh]に対する節電メニューは、たとえば、エアコンの設定温度を2℃上げ、テレビをつけず、洗濯機を使わず、冷蔵庫を開けない、IHクッキングヒータを使わないという内容が設定される。
 このような節電メニューが、対象スペース30を管理する需要家の端末装置20に通知されると、需要家は具体的行動(機器41の具体的操作)の内容を見て、行動に対応する電力の低減が可能か否かを判断することが可能になる。したがって、需要家は、対象期間T0に可能な行動を選択するように端末装置20を操作すれば、行動に対応した電力の低減を、需要家が受け入れたという応答を打診部16に返すことができる。
 節電メニューは、上述した例のように、低減させる電力と一対一に対応している必要はなく、低減させる電力に対して複数種類の節電メニューが設定されていてもよい。また、低減する電力ごとに節電メニューが設定されるのではなく、機器41ごとに電力を低減させる複数種類の行動が端末装置20に示されるようにしてもよい。この場合、需要家が、対象期間T0に可能な行動を選択すると、選択した行動ごとに低減される電力が示され、複数の行動を選択すると低減される合計の電力が端末装置20に示される構成であってもよい。つまり、複数の機器41について、需要家が機器41ごとに操作内容を指定すると、指定された操作内容によって低減される電力の総量を端末装置20に示し、需要家の行動により低減される電力の総量を需要家に示してもよい。
 集計部17は、電力管理装置10が管理している対象スペース30に対応する端末装置20からの応答の内容を集計し、対象スペース30が対象期間T0において電力系統40から受電する電力の合計を求める。集計結果である電力の合計は評価部18に与えられ、評価部18は、対象期間T0において電力系統40に供給可能な電力と、対象期間T0について新たに求めた需要側の電力とを用い、さらに節電が必要か否かを評価する。すなわち、評価部18は、対象スペース30それぞれで基準電力に対して削減される電力の総和が、ベースラインに対して削減すべき電力の目標値に達しているか否かを評価し、電力の総和が目標値に達していない場合は、さらに節電が必要と評価する。
 さらに節電が必要であると評価部18が評価した場合、評価部18は作成部11に対して、節電メニューの修正または変更を要求する。つまり、作成部11、打診部16、集計部17、評価部18による処理を繰り返す。一方、評価部18において、さらなる節電が不要と評価された場合は、打診部16が行った打診に対する応答の結果に基づいて、作成部11がメッセージを生成する。メッセージは、通知部12を通して端末装置20に送信され、端末装置20のコントローラ21が、作成部11で作成された計画に従って対象スペース30の機器41を制御する。
 電力管理装置10が作成した節電メニューを、端末装置20に対して打診し、節電メニューを決定するまでの手順を図3に簡単に示す。図3において、電力管理装置10は複数台の端末装置20と通信する。電力管理装置10は、端末装置20から対象スペース30が電力系統40から受電した電力(受電電力)と、対象スペース30に関するユーザ情報とを取得する(P1)。また、電力管理装置10は、電力供給を行う事業者から電力系統40に供給可能な電力の情報、あるいは節電要請の情報を取得する(P2)。電力管理装置10は、取得した情報を用いて端末装置20に対して節電要請を行うか否かを判断する(P3)。
 節電要請が必要と判断すると、電力管理装置10の作成部11は節電メニューを生成し(P4)、打診部16を通して節電メニューを端末装置20に打診する(P5)。節電メニューは機器41の動作内容と節電可能な電力とを関連付けてあり、対象スペース30ごとに個別に生成される。また、節電メニューは対象期間T0が指定されている。需要家あるいはコントローラ21は、端末装置20に通知された節電メニューを受け入れるか否かを判断し、受け入れ可能な節電メニューに対して応諾する応答を端末装置20から電力管理装置10に返す(P6)。また、端末装置20に通知された節電メニューを受け入れることができない場合は、端末装置20から電力管理装置10に拒否の応答を返す(P6)。
 電力管理装置10の集計部17は、端末装置20からの応答の内容を集計し(P7)、ベースラインに対して低減される電力の合計が目標値に達しているか否かを評価する(P8)。目標値に達していない場合は、節電メニューを修正し、目標値に達している場合は、作成部11において対象期間T0を指定したメッセージが生成される。メッセージは、端末装置20から応諾を受けたときの節電メニューと同内容でよいが、端末装置20からの応答に含まれる情報(たとえば、不在の情報など)によっては節電メニューを修正することが可能である。生成されたメッセージは、端末装置20に送信される。端末装置20のコントローラ21は、対象スペース30で使用される機器41をメッセージに含まれる動作内容に従って制御する。
 上述した構成例において、予測部13は個々の対象スペース30について電力系統40から受電する電力を予測し、すべての対象スペース30について予測した電力を合計している。つまり、個々の対象スペース30で計測された電力が集計されることにより、すべての対象スペース30の全体での電力が求められている。この構成に対し、電力系統40において、対象スペース30への電路を分岐する前の電路上で計測した電力を用いてもよい。電力系統40において計測した電力は、対象スペース30までの電路上での電力損失を見込んで補正する必要があるが、この電力を用いると、予測部13では、対象スペース30ごとの電力を合計する処理が不要になる。
 節電メニューは、電力の履歴のほかに、対象スペース30の断熱性能を考慮して作成することも可能である。とくに、節電メニューのうち対象期間T0に含まれる個別期間T2は、対象スペース30の断熱性能を考慮して定めることが望ましい。たとえば、断熱性能の低い対象スペース30では、屋内の温度が外気温の影響を受けやすく、冷房あるいは暖房に用いる電力を削減すると快適性が損なわれやすくなる。したがって、断熱性能が相対的に低い対象スペース30は、断熱性能が相対的に高い対象スペース30よりも個別期間T2を短く設定することが有用である。
 また、節電メニューは、対象スペース30において対象期間T0に人が存在するか否かの情報に応じて作成することが有用である。対象スペース30において対象期間T0に人が存在しない場合は、需要家が節電の要求を受け入れる可能性が高くなる。もっとも、対象期間T0において日常的に人が不在である対象スペース30では、基準電力に対する電力の削減を見込めない。したがって、人が存在するか否かを判断する対象スペース30は、対象期間T0について予測される基準電力が、設定された基準値以上である対象スペース30に限ることが有用である。
 対象期間T0に人が存在するか否かの情報は、端末装置20を通して使用者に申告させることにより得られる。また、端末装置20に使用者の行動予定(つまり、行動のスケジュール)が登録されている場合、行動予定の内容に基づいて対象期間T0に人が存在するか否かを判断することも可能である。
 節電メニューにおける個別期間T2を調節する基準として、上述した対象スペース30の断熱性能のほか、対象スペース30の利用目的、使用者の年齢、使用者の人数などを用いてもよい。また、対象スペース30の使用者が省エネルギーを志向するか、快適性を志向するかに応じて個別期間T2を調節することも可能である。
 たとえば、対象スペース30に、高齢者あるいは病気療養者などが長く滞在する場合には、快適な環境に維持する必要があるから、節電を要請しないか、要請する場合でも個別期間T2を短くすることが有用である。ここに、一般的には、使用する電力が日々変動する対象スペース30に比べて、使用する電力の変動が少ない対象スペース30のほうが、対象期間T0における基準電力を予測しやすく節電を要請する際に削減する電力を決めやすいと言える。ただし、高齢者あるいは病気療養者などが使用する対象スペース30では、節電の要請を受け入れることが困難な場合があるから、作成部11は、節電メニューの作成時に、対象スペース30の利用目的に配慮する必要がある。
 また、暖房時および冷房時において使用する電力は、対象スペース30における使用者の人数に応じて変化する可能性がある。暖房時には使用者の人数が多いほど対象スペース30で必要な電力を低減可能であるから、作成部11は、人数が多いほど個別期間T2の長い節電メニューを生成することとしてもよい。一方、冷房時には使用者の人数が多いほど対象スペース30で必要な電力を増加させる必要があるから、作成部11は、人数が多いほど個別期間T2の短い節電メニューを生成することとしてもよい。
 対象スペース30の使用者が省エネルギーを志向する場合、快適性を志向する場合よりも、対象期間T0の終了時点において対象スペース30が電力系統40から受電する電力の増分は比較的少ないと考えられる。したがって、このような対象スペース30では対象期間T0の終了時点における電力系統40への影響は少ないと言える。したがって、作成部11は、省エネルギーを志向する対象スペース30の個別期間T2の短い節電メニューを生成することが可能である。その一方で、省エネルギーを志向する対象スペース30は個別期間T2の延長を受け入れる可能性が高いとも言える。つまり、作成部11は、省エネルギーを志向する使用者に対して、快適性を志向する使用者よりも個別期間T2の長い節電メニューを生成することが可能になる。
 言い換えると、省エネルギーを志向する需要家が使用する対象スペース30は、個別期間T2の長さに関する調節の幅が広くなると言える。なお、個別期間T2の長い節電メニューを要請する使用者に偏りが生じないように、作成部11は、節電を要請するたびに、個別期間T2の長い節電メニューを打診する使用者を適宜に入れ替えてもよい。
 対象スペース30の使用者が、省エネルギーを志向するか快適性を志向するかは、対象スペース30が電力系統40から受電する電力の推移パターンに基づいて推定することが可能である。省エネルギーを志向する場合には、電力の最大値が比較的小さく、また電力の単位時間ごとに区分した変動範囲も比較的小さいと考えられる。このような電力の推移パターンを分類することにより、対象スペース30の使用者が、省エネルギーを志向するか快適性を志向するかの分類が可能になる。この種の分類結果は、節電タイプとして区別され、節電メニューの設定に用いられる。
 対象スペース30が電力系統40から受電する電力は、対象スペース30の断熱性能と節電タイプとのほかに、対象スペース30が分散型電源装置を備えているか否かによっても変化する。分散型電源装置は、太陽光発電設備、蓄電装置、燃料電池システムなどから選択され、2種類以上の分散型電源装置が対象スペース30で用いられている場合もある。分散型電源装置を備える対象スペース30では、節電要請を受け入れやすく、また対象期間T0が延長されても対象スペース30の使用者の利便性を保ちやすい。したがって、分散型電源装置が設置された対象スペース30については、削減する電力を比較的多くするように節電メニューを作成すること、比較的長い個別期間T2を設定することなどが可能になる。
 上述した節電タイプ、分散型電源装置の有無、対象スペース30の断熱性能などは、電力管理装置10に設けた取得部35が、ユーザ情報として端末装置20から取得する。なお、対象スペース30が電力系統40から受電する電力の情報も端末装置20から取得部35が取得する。取得部35は、端末装置20からユーザ情報を直接取得するだけではなく、端末装置20から取得した対象スペース30に関する情報を電力管理装置10で分析した結果をユーザ情報として取得する場合もある。作成部11は、個別期間T2の長さを決める際の判断基準として、取得部35が取得した対象スペース30のユーザ情報を用い、ユーザ情報に応じて個別期間T2の長さを調節する。
 ところで、対象期間T0において人が不在である対象スペース30では、電力系統40から受電する電力は基準電力に対して大幅に低減されることが予想される。したがって、人が不在である対象スペース30では、節電要請のメッセージの内容が実施される可能性が高くなる。したがって、対象スペース30に人が存在するか否かの情報は、削減する電力の予測に大きく寄与する。
 対象期間T0において対象スペース30に人が存在するか否かは、端末装置20を通して対象スペース30の使用者に申告させた情報、対象スペース30の使用者に関する行動計画の情報などに基づいて予測する。また、対象スペース30の行動に規則性がある場合、対象期間T0において対象スペース30に人が存在するか否かは、対象スペース30における電力の推移の履歴に関する情報に基づいて予測することが可能である。電力管理装置10は、これらの情報を用いて対象スペース30それぞれに人が存在するか否かを判定する判定部36を備える。判定部36による判定結果は、作成部11に引き渡される。作成部11は、対象期間T0において対象スペース30に人が存在しないと判定部36が判定した場合に、節電要請のメッセージをこの対象スペース30に対して優先的に生成する。
 すなわち、常時は基準電力に等しい電力を消費している対象スペース30において、対象期間T0には人が不在であると判定部36が判定した場合に、作成部11は、この対象スペース30に対して節電要請のメッセージを優先的に生成する。なお、対象期間T0において日常的に人が不在である対象スペース30については、電力系統40から受電する電力の低減を期待できないから、このような対象スペース30に対しては、節電要請のメッセージを生成しないこととしてもよい。
 上述した構成例では、作成部11は、対象期間T0の終了時点において、対象スペース30が電力系統40から受電する電力の上限が基準電力に復帰するようにメッセージを生成する処理を行っている。この処理に対して、作成部11は、対象期間T0のうちの個別期間T2において電力系統40から受電する電力の上限を時間経過に伴って増加させるようにメッセージを生成してもよい。個別期間T2において、受電可能な電力が時間経過に伴って増加すれば、対象スペース30では、個別期間T2において動作可能な機器41を増やすこと、または機器41の出力を高めることが可能になる。したがって、対象スペース30の使用者にとっての利便性を向上させることが可能になる。
 上述した構成例において、端末装置20が備えるコントローラ21は、電力管理装置10からのメッセージを受け取ると、メッセージの内容に従って、対象スペース30の機器41を自動的に制御している。これに対して、端末装置20が受け取ったメッセージの内容を、対象スペース30の使用者(住宅であれば、住人)に示し、使用者がメッセージの内容に従って機器41を操作することも可能である。
 上述した電力管理装置10は、プログラムに従って動作するプロセッサを備えるデバイスを主なハードウェア要素として備える。この種のデバイスは、メモリを一体に備えるマイコン(microcontroller)、あるいはメモリを別に設けるマイクロプロセッサなどが用いられる。すなわち、電力管理装置10は、コンピュータを用いて構成される。プログラムは、このコンピュータを、電力管理装置10として機能させるために用いられる。このプログラムは、ROM(Read Only Memory)にあらかじめ記憶させておくほか、コンピュータで読取可能な光ディスクのような記録媒体で提供されるか、インターネットのような電気通信網を通して提供される。
 以上説明した本実施形態の電力管理装置10は、作成部11と通知部12とを備える。
 作成部11は、複数台の端末装置20それぞれに通知するメッセージを作成する。通知部12は、複数台の端末装置20それぞれにメッセージを通知する。複数台の端末装置20は、電力系統40から受電する複数の対象スペース30それぞれに関連付けてあり、メッセージは、複数の対象スペース30それぞれが電力系統40から受電する電力の低減を要請する内容であって対象期間T0が指定されている。作成部11は、対象期間T0の終了日時を、複数の対象スペース30に対応付けて定める。
 また、本実施形態の電力管理システムは、端末装置20と電力管理装置10とを備える。端末装置20は、電力系統40から受電する複数の対象スペース30それぞれに配置される。すなわち、端末装置20は複数台ある。電力管理装置10は、複数台の端末装置20それぞれにメッセージを通知する。この電力管理装置10は、作成部11と通知部12とを備える。作成部11は、複数台の端末装置20それぞれに通知するメッセージを作成する。通知部12は、複数台の端末装置20それぞれにメッセージを通知する。メッセージは、複数の対象スペース30それぞれが電力系統40から受電する電力の低減を要請する内容であって対象期間T0が指定されている。複数台の端末装置20は、複数の対象スペース30それぞれが電力系統40から受電する電力を調節するコントローラ21を含んでいる。さらに、端末装置20は、メッセージで指定された対象期間T0において電力系統40から受電する電力を、所定の基準電力に対して低減させるように調節する。作成部11は、対象期間T0の終了日時を、複数の対象スペース30に対応付けて定める。
 上述した電力管理装置10および電力管理システムは、対象スペース30に対応付けて対象期間T0の終了日時が定められている。したがって、電力系統40から受電する電力を低減させている対象期間T0が、大多数の対象スペース30で一斉に電力が増加するという事態が避けられる。すなわち、対象期間T0の終了日時が対象スペース30に応じて異なるから、対象期間T0の終了時点で電力系統40からの受電量が急激に増加して、電力需給のバランスが乱れる可能性が低減される。
 端末装置20は、複数の対象スペース30それぞれが電力系統40から受電する電力を調節するコントローラ21を含むことが望ましい。この端末装置20は、電力系統40から受電する電力を、メッセージで指定された対象期間T0において所定の基準電力に対して低減させるように調節する。
 この構成によれば、端末装置20にメッセージが通知されると、端末装置20のコントローラ21が対象スペース30が電力系統40から受電する電力を自動的に調節するから、節電要請の内容が実現されやすくなる。
 電力管理装置10は、複数の対象スペース30それぞれについて、ユーザ情報を取得する取得部35を備えてもよい。ユーザ情報は、電力系統40から受電する電力の推移パターンを分類した節電タイプと、分散型電源装置の有無と、断熱性能とのうちの少なくとも1種類を含む。この場合、作成部11は、取得部35が取得した複数の対象スペース30それぞれのユーザ情報を判断基準に用いて、複数の対象スペース30それぞれに応じた対象期間T0の終了日時を定める。
 この構成によれば、対象スペース30に関するユーザ情報に基づいて、対象期間T0の終了日時を定めることが可能になる。つまり、対象スペース30に関連するユーザ情報に基づいて対象期間T0を調節するから、対象スペース30の使用者にとって受け入れやすい対象期間T0の設定が可能になる。
 電力管理装置10は、対象期間T0において複数の対象スペース30それぞれに人が存在するか否かを判定する判定部36を備えてもよい。この場合、作成部11は、対象期間T0に人が存在しないと判定部36が判定した対象スペース30については、メッセージを優先的に生成してもよい。
 すなわち、対象期間T0に不在と判定される対象スペース30であれば、電力系統40からの受電量を削減できる可能性が高いから、他の対象スペース30に優先してメッセージを生成することにより、対象期間に削減すべき電力の目標値を達成しやすくなる。
 対象期間T0は、複数の対象スペース30のすべてに共通に定めた共通期間T1と、複数の対象スペース30それぞれに個別に定めた個別期間T2とを含むこととしてもよい。この場合、作成部11は、個別期間T2において、複数の対象スペース30それぞれが電力系統40から受電する電力の上限が時間経過に伴って増加するようにメッセージを作成する。
 この構成によれば、対象スペース30それぞれに個別に定めた個別期間T2に、電力系統40から受電する電力を時間経過に伴って増加させている。したがって、個々の対象スペース30では個別期間T2に、使用可能な機器41を増やすこと、あるいは機器41の出力を高めることなどが可能になる。
 また、対象期間T0は、複数の対象スペース30のすべてに共通に定めた共通期間T1と、複数の対象スペース30それぞれに個別に定めた個別期間T2とを含む場合、作成部11は、個別期間T2を複数段階から選択する構成であってもよい。
 この構成によれば、対象スペース30それぞれに個別に個別期間T2を定める際に、個別期間T2を複数段階から選択するだけであるから、対象スペース30それぞれの対象期間T0を簡単に設定することができる。
 作成部11は、複数の対象スペース30それぞれで使用される機器41の動作内容を含む節電メニューを作成するように構成されていてもよい。節電メニューは、複数の対象スペース30それぞれにおいて対象期間T0に電力系統40から受電する電力を基準電力に対して低減させるように作成される。電力管理装置10は、打診部16と評価部18とを備えることとしてもよい。打診部16は、複数の対象スペース30それぞれに関連付けた複数台の端末装置20それぞれに節電メニューの受け入れを打診する。評価部18は、打診部16が行った打診に対する応答に基づいて、対象期間T0において基準電力に対して低減される電力の総和が所定の目標値に達したか否かを評価する。さらに、評価部18は、総和が目標値に達していないと評価した場合、作成部11に節電メニューを修正させ、打診部16に修正後の節電メニューの受け入れを打診させる。
 この構成によれば、節電メニューを受け入れるか否かを端末装置20に打診し、打診に対する応答の結果により、低減させる電力が目標値に達していなければ、節電メニューを修正し、修正した節電メニューの受け入れを打診する。したがって、対象スペース30に低減させる電力の総和を目標値に到達させられる可能性が高められる。
 なお、上述した実施形態は本発明の一例である。このため、本発明は、上述の実施形態に限定されることはなく、この実施形態以外であっても、本発明に係る技術的思想を逸脱しない範囲であれば、設計等に応じて種々の変更が可能であることはもちろんのことである。
 10 電力管理装置
 11 作成部
 12 通知部
 16 打診部
 18 評価部
 20 端末装置
 21 コントローラ
 30 対象スペース
 35 取得部
 36 判定部
 40 電力系統
 41 機器

Claims (9)

  1.  複数台の端末装置それぞれに通知するメッセージを作成する作成部と、
     前記複数台の端末装置それぞれに前記メッセージを通知する通知部とを備え、
     前記複数台の端末装置は、電力系統から受電する複数の対象スペースそれぞれに関連付けてあり、
     前記メッセージは、前記複数の対象スペースそれぞれが前記電力系統から受電する電力の低減を要請する内容であって対象期間が指定されており、
     前記作成部は、前記対象期間の終了日時を、前記複数の対象スペースに対応付けて定める
     電力管理装置。
  2.  前記端末装置は、
     前記複数の対象スペースそれぞれが前記電力系統から受電する電力を調節するコントローラを含み、前記メッセージで指定された前記対象期間において前記電力系統から受電する電力を、所定の基準電力に対して低減させるように調節する
     請求項1記載の電力管理装置。
  3.  前記複数の対象スペースそれぞれについて、前記電力系統から受電する電力の推移パターンを分類した節電タイプと、分散型電源装置の有無と、断熱性能とのうちの少なくとも1種類のユーザ情報を取得する取得部をさらに備え、
     前記作成部は、
     前記取得部が取得した前記複数の対象スペースそれぞれのユーザ情報を判断基準に用いて、前記複数の対象スペースそれぞれに応じた前記対象期間の終了日時を定める
     請求項1又は2記載の電力管理装置。
  4.  前記対象期間において前記複数の対象スペースそれぞれに人が存在するか否かを判定する判定部をさらに備え、
     前記作成部は、
     前記対象期間に人が存在しないと前記判定部が判定した対象スペースに対して、前記メッセージを優先的に生成する
     請求項1~3のいずれか1項に記載の電力管理装置。
  5.  前記対象期間は、前記複数の対象スペースのすべてに共通に定めた共通期間と、前記複数の対象スペースそれぞれに個別に定めた個別期間とを含み、
     前記作成部は、前記個別期間において、前記複数の対象スペースそれぞれが前記電力系統から受電する電力の上限が時間経過に伴って増加するように前記メッセージを作成する
     請求項1~4のいずれか1項に記載の電力管理装置。
  6.  前記対象期間は、前記複数の対象スペースのすべてに共通に定めた共通期間と、前記複数の対象スペースそれぞれに個別に定めた個別期間とを含み、
     前記作成部は、前記個別期間を複数段階から選択する
     請求項1~4のいずれか1項に記載の電力管理装置。
  7.  前記作成部は、前記複数の対象スペースそれぞれにおいて前記対象期間に前記電力系統から受電する電力を基準電力に対して低減させるように、前記複数の対象スペースそれぞれで使用される機器の動作内容を含む節電メニューを作成するように構成されており、
     前記複数の対象スペースそれぞれに関連付けた前記複数台の端末装置それぞれに前記節電メニューの受け入れを打診する打診部と、
     前記打診部が行った打診に対する応答に基づいて、前記対象期間において前記基準電力に対して低減される電力の総和が所定の目標値に達したか否かを評価する評価部とをさらに備え、
     前記評価部は、前記総和が前記目標値に達していないと評価した場合、前記作成部に前記節電メニューを修正させ、前記打診部に修正後の節電メニューの受け入れを打診させる
     請求項1~6のいずれか1項に記載の電力管理装置。
  8.  電力系統から受電する複数の対象スペースそれぞれに配置された複数台の端末装置と、
     前記複数台の端末装置それぞれにメッセージを通知する電力管理装置とを備え、
     前記電力管理装置は、
     前記複数台の端末装置それぞれに通知するメッセージを作成する作成部と、
     前記複数台の端末装置それぞれに前記メッセージを通知する通知部とを備え、
     前記メッセージは、前記複数の対象スペースそれぞれが前記電力系統から受電する電力の低減を要請する内容であって対象期間が指定されており、
     前記複数台の端末装置は、
     前記複数の対象スペースそれぞれが前記電力系統から受電する電力を調節するコントローラを含んでおり、前記メッセージで指定された前記対象期間において前記電力系統から受電する電力を、所定の基準電力に対して低減させるように調節する構成であり、
     前記作成部は、前記対象期間の終了日時を、前記複数の対象スペースに対応付けて定める
     電力管理システム。
  9.  コンピュータを、請求項1~7のいずれか1項に記載の電力管理装置として機能させるためのプログラム。
PCT/JP2016/002036 2015-05-18 2016-04-15 電力管理装置、電力管理システム及びプログラム WO2016185665A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017518738A JP6548175B2 (ja) 2015-05-18 2016-04-15 電力管理装置、電力管理システム及びプログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-101076 2015-05-18
JP2015101076 2015-05-18

Publications (1)

Publication Number Publication Date
WO2016185665A1 true WO2016185665A1 (ja) 2016-11-24

Family

ID=57319793

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/002036 WO2016185665A1 (ja) 2015-05-18 2016-04-15 電力管理装置、電力管理システム及びプログラム

Country Status (2)

Country Link
JP (1) JP6548175B2 (ja)
WO (1) WO2016185665A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019068513A (ja) * 2017-09-28 2019-04-25 積水化学工業株式会社 電力管理装置および電力管理方法
US11056882B2 (en) * 2017-08-09 2021-07-06 Sumitomo Electric Industries, Ltd. Power management device, power management system, power management method, and control program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04271231A (ja) * 1991-02-26 1992-09-28 Matsushita Seiko Co Ltd 電力デマンド制御装置
JP2011254582A (ja) * 2010-05-31 2011-12-15 Eneres Corp 電力需要管理装置、および電力需要管理システム
JP2013090389A (ja) * 2011-10-14 2013-05-13 Hitachi Ltd 電力需要調整システム及び電力需要調整装置
JP2014220892A (ja) * 2013-05-07 2014-11-20 株式会社東芝 情報発行装置、情報発行方法およびプログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5310880B2 (ja) * 2012-01-11 2013-10-09 ダイキン工業株式会社 エネルギー制御装置及びエネルギー制御装置を備えたエネルギー制御システム
JP2015023692A (ja) * 2013-07-19 2015-02-02 関西電力株式会社 消費電力量コントロール装置、消費電力量コントロール方法及び消費電力量コントロールプログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04271231A (ja) * 1991-02-26 1992-09-28 Matsushita Seiko Co Ltd 電力デマンド制御装置
JP2011254582A (ja) * 2010-05-31 2011-12-15 Eneres Corp 電力需要管理装置、および電力需要管理システム
JP2013090389A (ja) * 2011-10-14 2013-05-13 Hitachi Ltd 電力需要調整システム及び電力需要調整装置
JP2014220892A (ja) * 2013-05-07 2014-11-20 株式会社東芝 情報発行装置、情報発行方法およびプログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11056882B2 (en) * 2017-08-09 2021-07-06 Sumitomo Electric Industries, Ltd. Power management device, power management system, power management method, and control program
JP2019068513A (ja) * 2017-09-28 2019-04-25 積水化学工業株式会社 電力管理装置および電力管理方法

Also Published As

Publication number Publication date
JP6548175B2 (ja) 2019-07-24
JPWO2016185665A1 (ja) 2018-03-15

Similar Documents

Publication Publication Date Title
KR101872557B1 (ko) 에너지 소비 관리
US9864391B2 (en) Tablet based distributed intelligent load management
CN102377182B (zh) 无ami/amr***的需求响应的甩负载***
JP5908302B2 (ja) 蓄電蓄熱最適化装置、最適化方法及び最適化プログラム
US8880226B2 (en) System and method to predict optimized energy consumption
JP5807073B2 (ja) 一つ以上の電気施設から供給される電力の消費量を能動管理するための方法及び装置
US10135248B2 (en) Control apparatus, control system, control method, and recording medium for controlling devices to charge or discharge electricity storage apparatus
US20150214768A1 (en) On-demand multiple power source management system, on-demand multiple power source management system program, and computer-readable recording medium recording the program
Hassan et al. Framework for minimum user participation rate determination to achieve specific demand response management objectives in residential smart grids
US20120233094A1 (en) Energy management system and power feed control device
US20140316599A1 (en) Consumer energy management system and consumer energy management method
US20180241210A1 (en) Management server, management method and management system
JP2016007135A (ja) 電力需要調整システム及び電力需要調整方法
JP5768097B2 (ja) 情報処理装置及びサービス提供方法
WO2013069619A1 (ja) エネルギー管理装置
JP5656921B2 (ja) 電力融通装置、電力融通システム、電力融通方法及びプログラム
Zhang et al. A packetized direct load control mechanism for demand side management
US20180276768A1 (en) Information processing apparatus, information processing method, and program
Baharlouei et al. Tackling co-existence and fairness challenges in autonomous demand side management
JP6250077B2 (ja) 判定装置、判定システム、判定方法、及び、プログラム
US20140180440A1 (en) Demand response system, terminal apparatus, server, controlling method, and recording medium
JP6548175B2 (ja) 電力管理装置、電力管理システム及びプログラム
JP6173382B2 (ja) 制御装置、エネルギー管理システム、制御方法及びプログラム
WO2014185014A1 (ja) 管理装置、機器管理方法、管理システム
JP7165874B2 (ja) 電力制御方法、プログラム、電力制御システム、アグリゲーションシステム、及び通信端末

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16796062

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017518738

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16796062

Country of ref document: EP

Kind code of ref document: A1