WO2016166991A1 - 太陽光発電設備の診断システムおよびプログラム - Google Patents

太陽光発電設備の診断システムおよびプログラム Download PDF

Info

Publication number
WO2016166991A1
WO2016166991A1 PCT/JP2016/002067 JP2016002067W WO2016166991A1 WO 2016166991 A1 WO2016166991 A1 WO 2016166991A1 JP 2016002067 W JP2016002067 W JP 2016002067W WO 2016166991 A1 WO2016166991 A1 WO 2016166991A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
power generation
determination
pattern
unit
Prior art date
Application number
PCT/JP2016/002067
Other languages
English (en)
French (fr)
Inventor
浩基 數野
浩一 高岡
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to JP2017512205A priority Critical patent/JPWO2016166991A1/ja
Publication of WO2016166991A1 publication Critical patent/WO2016166991A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Definitions

  • the present invention relates to a diagnostic system and program for photovoltaic power generation facilities.
  • Patent Document 1 a technique for determining whether the output of a solar cell is normal or abnormal based on the electrical output of the solar cell is known (see, for example, Patent Document 1).
  • Patent Document 1 the ratio of the output power value of the solar cell at a predetermined sunshine time to the standard output power value corresponding to the sunshine time is calculated, and whether the output of the solar cell is normal or abnormal is determined based on this ratio. is doing.
  • Patent Document 1 describes a technique in which a maximum value of an output power value repeatedly measured for each daylight time over a plurality of days is used as a standard output power value at the daylight time.
  • Patent Document 1 diagnoses whether or not the solar cell array is properly installed at the time of introduction of the solar power generation facility, and diagnoses deterioration or failure of the power generation capability due to the temporal change of the solar cell array. Therefore, the standard output power value of the solar cell is used.
  • the photovoltaic power generation facility diagnosis system includes a first data acquisition interface, a second data acquisition interface, and a processing unit.
  • the first data acquisition interface is configured to acquire, as first data, power data output in a predetermined time period from a photovoltaic power generation facility including a solar battery.
  • the second data acquisition interface is configured to acquire, as second data, solar radiation intensity data output from the pyranometer during the time period.
  • the processing unit is configured to diagnose the photovoltaic power generation facility based on the first data and the second data.
  • the processing unit includes a calculation unit and a diagnosis unit.
  • the calculation unit obtains an evaluation coefficient that is a ratio of a measured value of the amount of solar radiation obtained from the second data and a product of the solar battery capacity of the solar battery and the amount of electric power obtained from the second data. Composed.
  • the diagnosis unit is configured to diagnose the photovoltaic power generation facility based on the evaluation coefficient obtained by the calculation unit for each of a plurality of predetermined determination periods.
  • the determination period is a period corresponding to any one of a plurality of division periods of one year according to the climate, and is determined to include a plurality of days in which the same season or solar altitude is similar.
  • the program according to the present invention is characterized by causing a computer to function as the above-described diagnostic system for photovoltaic power generation facilities.
  • FIG. 1 illustrates one or more embodiments in accordance with the present disclosure, but are by way of example and not limitation.
  • like numerals refer to the same or similar elements.
  • FIG. 1 It is a block diagram which shows embodiment. It is explanatory drawing of the predetermined time slot
  • the solar power generation facility diagnostic system described below is intended for medium to large scale solar power generation facilities.
  • the diagnostic system for the photovoltaic power generation facility according to each embodiment of the present disclosure may be a single device, or may be configured to distribute any of its own functions to a plurality of devices.
  • the diagnostic system for photovoltaic power generation facilities is referred to as a “diagnosis device”.
  • the power generation scale of the solar power generation facility is not particularly limited, but the solar power generation facility to which the diagnostic device described below is applied assumes a power generation scale of several hundred or more solar panels. .
  • the power generation scale is about 250 kW, 1000 or more solar cell panels are arranged, and if the power generation scale is about 1 MW, the installation area of the solar cell panel is about 1 ha.
  • the technology described below can be applied to a small-scale photovoltaic power generation facility of about several kW for home use or the like.
  • the solar power generation facility includes a solar cell, a power conversion device for converting DC power output from the solar cell into AC power, and a pyranometer regardless of the power generation scale.
  • the pyranometer is configured to measure the solar radiation intensity on the solar cell.
  • the pyranometer is arranged adjacent to the solar cell at the same angle as the inclination angle of the solar cell.
  • the power converter is a so-called power conditioner.
  • the photovoltaic power generation facility described below includes a power receiving / transforming facility having a function of supplying AC power generated by the power conversion device to the power system.
  • a solar cell is composed of a plurality of modules (solar power generation panels) connected in series to form a string.
  • a plurality of strings are connected to the junction box, and the plurality of strings constitute a solar cell array.
  • the junction box has a string monitor and monitors the current output by each string.
  • the DC power output from the solar cell (solar cell array) is supplied to the power converter through the connection box.
  • the photovoltaic power generation facility includes a measurement device that monitors the input voltage of the power conversion device.
  • the measuring device also has a function of acquiring a current value for each string monitored by the string monitor.
  • the electric power generated by the solar cell can be obtained from the current value monitored by the string monitor and the voltage value monitored by the measuring device.
  • the string monitor may be configured not only to monitor the current output from each string but also to monitor the output voltage of the string.
  • Diagnostic device diagnoses whether there is a malfunction in the photovoltaic power generation facility based on both the value of the electric power output from the solar cell and the solar radiation intensity measured by the pyranometer.
  • the diagnostic device described below can diagnose items such as solar cell failure, solar cell degradation, and solar cell contamination.
  • the diagnostic device obtains an evaluation coefficient based on the amount of power generated by the solar cell and the actual value of the amount of solar radiation measured by the pyranometer, and changes in the evaluation coefficient over time. Evaluate the way (behavior of the evaluation coefficient).
  • the Japanese Industrial Standard defines a method for estimating the amount of generated power of a solar power generation system (solar power generation facility).
  • the amount of generated power is determined by the output determined by the specifications of the solar cell module, the number of solar cell modules, the installation mode of the solar cell module, etc. (ie, the solar cell capacity), and the actual amount of solar radiation.
  • the design coefficient Specifically, the amount of generated power is determined by multiplying the product of the power generation capacity and the amount of solar radiation by a design factor including the conversion efficiency of the power conditioner.
  • the design coefficient a fixed value determined by factors constituting the photovoltaic power generation system, the environment, and the like is used.
  • the diagnostic device includes a component that accumulates data for diagnosing the presence or absence of a defect related to the photovoltaic power generation facility, and a component that diagnoses the presence or absence of a defect based on the accumulated data.
  • These two components can be realized by one apparatus, but may be realized by different apparatuses.
  • a component that accumulates data generated by a photovoltaic power generation facility is provided in the photovoltaic power generation facility, and a component that diagnoses the presence or absence of a malfunction of the photovoltaic power generation facility is a photovoltaic power generation through an electric communication line such as the Internet. It can be provided in a diagnostic server that communicates with the facility.
  • data from the photovoltaic power generation facility may be collected by a cloud computing system, and the diagnostic device may be realized by a terminal device managed by an administrator of the photovoltaic power generation facility.
  • Diagnostic devices are used by businesses that use solar power generation facilities to perform power generation businesses, EPC (Engineering, Procurement and Construction) contractors that have received maintenance contracts from power generation businesses, or solar power generation facility maintenance businesses.
  • EPC Engineing, Procurement and Construction
  • the number of sites of the photovoltaic power generation facility handled by one diagnostic apparatus is assumed to be 100 to 500 sites.
  • the number of sites of photovoltaic power generation facilities handled by the diagnostic devices can be increased as necessary.
  • the criterion for diagnosing the presence or absence of a defect in the photovoltaic power generation facility is the above-described evaluation coefficient, but the presence or absence of a defect in the photovoltaic power generation facility is diagnosed by a change in the evaluation coefficient. Therefore, it is necessary to match the conditions for obtaining the evaluation coefficient between the various evaluations.
  • the diagnostic device described below defines conditions for obtaining the evaluation coefficient so that the actually measured values of the amount of solar radiation when obtaining the evaluation coefficient substantially coincide between the various evaluations.
  • the condition for obtaining the evaluation coefficient is that the amount of solar radiation corresponding to a clear day and the solar altitude are similar. Under this condition, the actual measurement value of the amount of solar radiation at the time of obtaining the evaluation coefficient is substantially matched between various evaluations. A technique for determining such a condition will be described later.
  • the diagnostic device 10 is configured to receive data from the photovoltaic power generation facility 20 through the electric communication line 31.
  • the telecommunication line 31 is selected from a VPN (Virtual Private Network) using the Internet, a mobile communication network, a dedicated line, or the like.
  • the diagnostic device 10 functions as a computer server configured to communicate with a terminal device 32 managed by an operator who performs operation management or maintenance / inspection management of the photovoltaic power generation facility 20. That is, the diagnostic device 10 constructs an abnormality monitoring system together with the terminal device 32.
  • a solid line represents a power path
  • a broken line represents a signal path.
  • a solar power generation facility 20 shown in FIG. 1 includes, in addition to the solar cell 21, a power conversion device 24 configured to convert DC power output from the solar cell 21 into AC power, and a solar radiation meter 25.
  • the solar radiation meter 25 is configured to measure the solar radiation intensity to the solar cell 21 (strictly, the solar radiation intensity corresponding to the solar radiation intensity to the solar cell 21).
  • the pyranometer 25 is disposed adjacent to the solar cell 21.
  • the solar radiation meter 25 may be an all solar radiation meter configured to measure the solar radiation intensity to the solar cell 21 to obtain the total solar radiation amount.
  • thermometer may be arranged in addition to the pyranometer 25.
  • the photovoltaic power generation facility 20 includes a power receiving / transforming facility 26 that supplies AC power generated by the power converter 24 to the power system 27.
  • the solar cell 21 is composed of one or a plurality of solar panels (or strings). In the example of FIG. 1, the solar cell 21 is composed of a plurality of strings 211, and the electric output of each of the strings 211 is monitored by a string monitor 221.
  • the connection box 22 stores, for example, a plurality of string monitors 221 that are electrically connected to each of the plurality of strings 211 constituting one solar cell array.
  • the photovoltaic power generation facility 20 includes a plurality of connection boxes 22, and a plurality of strings 211 are connected to each connection box 22. Therefore, the number of string monitors 221 corresponding to the number of the plurality of strings 211 to be connected is accommodated in one connection box 22.
  • the string monitor 221 may be provided separately from the connection box 22.
  • the connection box 22 is configured to collect the DC power output from the string 211 and supply it to the power converter 24.
  • the string monitor 221 is configured to measure the current from the corresponding string 211 through a current sensor.
  • a current sensor a configuration in which a Hall element or a magnetoresistive element is attached to a magnetic core is used. The current measurement may be performed through a shunt resistor.
  • the photovoltaic power generation facility 20 includes a measuring device 23 configured to monitor (measure) an input voltage to the power conversion device 24.
  • the measuring device 23 has a function of acquiring a current value output from each of the strings 211 from the string monitor 221 and a function of acquiring an electric output value of the pyranometer 25.
  • the pyranometer 25 may be connected to the power conversion device 24, and the measurement device 23 may acquire the value of the electric output of the pyranometer 25 via the power conversion device 24.
  • the measuring device 23 may obtain the power value based on the current value and the voltage value.
  • the measuring device 23 includes a communication unit 231 for communicating with the diagnostic device 10 through the above-described electric communication line 31.
  • the diagnostic device 10 is configured to receive, from the measuring device 23, the power data (first data) output from the solar cell 21 and the solar radiation intensity data (second data) measured by the solar radiation meter 25. .
  • the diagnostic device 10 includes a first data acquisition interface 11 configured to acquire power data, and a second data acquisition interface 12 configured to receive solar radiation intensity data.
  • the diagnostic device 10 includes a processing unit 13 configured to diagnose the photovoltaic power generation facility 20 based on power data and solar radiation intensity data.
  • the first data acquisition interface 11 is configured to acquire power data for each constant sampling period 101 from each of the plurality of strings 211 constituting the solar cell 21.
  • the second data acquisition interface 12 is configured to acquire the data of the solar radiation intensity from the solar radiation meter 25 for each constant sampling period 101.
  • the sampling period 101 can be selected from the range of about 30 seconds to 10 minutes, but is preferably set to 1 minute, for example.
  • the diagnostic device 10 includes a built-in clock (timer) 14 such as a real-time clock in order to measure the date and time and to determine the sampling period 101.
  • the diagnostic device 10 includes a built-in clock (timer) 14, but the present embodiment is not limited to this.
  • the measuring device 23 includes a timer, acquires power data of the solar cell 21 and solar radiation intensity data of the pyranometer 25 for each sampling period 101, and transmits each data to the diagnostic device 10 ( It may be configured to be supplied to the data acquisition interfaces 11 and 12).
  • the timer is provided in any of the diagnostic device 10 and the photovoltaic power generation facility 20
  • the first and second data acquisition interfaces 11 and 12 correspond to the first data and the second data, respectively. It is desirable to obtain the time information together with the corresponding time information for each of the first data and the second data.
  • the time information is information on the time at which the corresponding data is acquired, and is date information in this embodiment.
  • the diagnostic device 10 obtains the data of the current value for each string 211 and the voltage value input to the power converter 24 through the telecommunication line 31 from the measuring device 23, and obtains the power value generated for each string 211. If there is no abnormality in the corresponding string 211, the power value has a predetermined relationship with the value of the solar radiation intensity received by the corresponding string 211.
  • the diagnosis device 10 may be configured to receive power value data from the measurement device 23 instead of receiving the current value and voltage value data from the measurement device 23. That is, the measurement device 23 may be configured to calculate the power value from the current value and the voltage value.
  • the measurement device 23 acquires the power data (first data) of the solar cell 21 and the solar radiation intensity data (second data) of the pyranometer 25, and the first through the communication unit 231.
  • the first data and the second data are configured to be supplied to the diagnostic device 10 (data acquisition interfaces 11 and 12).
  • the power data includes a power value or a current value and a voltage value for obtaining the power value.
  • the solar radiation intensity data includes the solar radiation intensity value when the solar radiation meter 25 is configured to output the solar radiation intensity value obtained from the solar radiation intensity, and the solar radiation meter 25 measures the solar radiation intensity to measure the amount of solar radiation (for example, the total sky In the case of being configured to obtain (amount of solar radiation), the amount of solar radiation obtained from the solar radiation intensity is included.
  • the solar radiation intensity data includes a value related to the solar radiation intensity.
  • the first data acquisition interface 11 can acquire power data for each string 211 from the measurement device 23. Further, the first data acquisition interface 11 can acquire the data of the total power of all the strings 211 from the measurement device 23. On the other hand, the second data acquisition interface 12 can acquire the data of the solar radiation intensity measured by the solar radiation meter 25 from the measurement device 23.
  • the first data acquisition interface 11 and the second data acquisition interface 12 acquire data for each predetermined sampling period 101.
  • the sampling period 101 is 1 minute.
  • the processing unit 13 is configured to diagnose the photovoltaic power generation facility 20 based on the integrated value or average value of the power value and the solar radiation intensity in the sampling period (sampling period) 102 for each sampling period 101.
  • the sampling period 101 being one minute is an example, and may be appropriately selected from a range of about 30 seconds to 10 minutes.
  • the diagnostic device 10 includes the data of the power from the solar cell 21 in the period (predetermined time (sunshine hours)) 110 including the time in the south and the solar radiation meter 25. Based on the measured solar radiation intensity data, the solar cell 21 is diagnosed. For example, the diagnosis is performed based on data obtained in the period 110 from 10:00 to 13:00.
  • a sampling period (sampling period) 102 for acquiring values related to a plurality of power values of the solar cell 21 and a plurality of solar radiation intensities of the pyranometer 25 for each sampling period 101 Each sampling period 101 is provided.
  • both ends of each sampling period 101 are sampling points, values in the sampling period 102 immediately before the sampling point are acquired for each sampling point.
  • this configuration is referred to as “configuration A”.
  • the present embodiment is not limited to this configuration A.
  • the present embodiment may have a configuration in which the sampling period 102 is not provided in each sampling period 101 (hereinafter referred to as “configuration B”).
  • the first and second data acquisition interfaces 11 and 12 acquire the first data and the second data, respectively, for each sampling period 101, and the first data and the second data. Is supplied to the processing unit 13.
  • the first data for each sampling period 101 to the processing unit 13 is an average value of a plurality of power values, which is a plurality of power values obtained in the corresponding sampling period 102 or a plurality of power values. It is obtained from a plurality of current values and a plurality of voltage values for obtaining a power value.
  • the second data for each sampling period 101 to the processing unit 13 is an average value of values relating to a plurality of solar radiation intensities, which is obtained from values relating to a plurality of solar radiation intensities obtained in the corresponding sampling period 102. can get.
  • the first data for each sampling period 101 to the processing unit 13 includes a power value obtained at the time of sampling.
  • the 2nd data for every sampling period 101 to the process part 13 contains the value regarding the solar radiation intensity obtained at the sampling time.
  • the value regarding the solar radiation intensity is the solar radiation amount obtained from the solar radiation intensity value or the solar radiation intensity value as described above.
  • the sampling interval in the sampling period 102 is controlled by, for example, a timer (built-in clock 14).
  • the solar power generation facility 20 is installed at the sunrise or sunset time. It depends on the topography. Therefore, the time zone when the solar cells 21 are irradiated with the morning sun and the sunset changes according to the site where the photovoltaic power generation facility 20 is installed, and the solar radiation intensity irradiated to the solar cells 21 in this time zone is also the sun. It changes according to the site where the photovoltaic power generation facility 20 is installed. Furthermore, the time zone when the solar cells 21 are irradiated with the morning sun and the sunset changes depending on the season.
  • the diagnostic device 10 is configured to perform a diagnosis based on the amount of solar radiation in a predetermined time zone 110 that includes the south-central time.
  • the time zone 110 may be within a range of 1 hour to 5 hours, for example, but is preferably 3 hours.
  • This evaluation coefficient Kp represents the degree of total loss that has occurred in the photovoltaic power generation facility 20. That is, the evaluation coefficient Kp includes the angle of the solar cell (solar panel), the inclination of the solar cell, the loss in the electric wire, the conversion efficiency of the power conversion device 24, the loss caused by dirt on the surface of the solar cell, the reflection on the surface of the solar cell. This includes loss due to In addition, since the time zone 110 is a time zone including the South-China time, the evaluation coefficient obtained from the data of the time zone 110 is not affected by obstacles and topography, and the overall power generation facility 20 The degree of loss.
  • the diagnostic apparatus 10 obtains the above-described evaluation coefficient (standard evaluation coefficient) for each time zone 110 including the time between South and Central, and uses the evaluation coefficient obtained from the time zone 110 in a different determination period (air saving) as its standard. By comparing with the evaluation coefficient, the solar power generation facility 20 is diagnosed.
  • the time zone 110 can be a period of 3 hours from 10:00 to 13:00 so as to include the time in South and Central.
  • the time zone 110 is composed of a plurality of calculation periods 111 in units of 30 minutes, and six calculation periods 111 are provided from 10:00 to 13:00.
  • the determination period 100 is a period for classifying seasons, and generally ranges from about two weeks to one month.
  • the determination period 100 includes a plurality of days (15 days) included in one of the twenty-four airs. ) Period is desirable.
  • a plurality of days in the first half of each month, a plurality of days in the second half of each month, or a plurality of days in one month can be employed.
  • a period in which the solar altitudes are almost equal is selected as the determination period 100.
  • a solid line L1 in FIG. 3 indicates how the evaluation coefficient for each time zone 110 changes with time.
  • the evaluation coefficient for each time zone 110 is a calculation period 111 in units of 30 minutes in the time zone 110.
  • the horizontal axis of FIG. 3 represents the time in units of the determination period (energy saving) 100, and it can be seen that the evaluation coefficient for each time zone 110 changes gently.
  • 3 represents (average value of evaluation coefficient + 0.025)
  • broken line L22 represents (average value of evaluation coefficient ⁇ 0.025).
  • the range between the broken line L21 and the broken line L22 represents the range of variation regarding the evaluation coefficient in units of 30 minutes.
  • the evaluation coefficient obtained for 30 minutes as the calculation period 111 is an evaluation coefficient obtained in fine weather
  • the experimental result indicates that the evaluation coefficient is generally within the range of the broken line L21 and the broken line L22 regardless of the determination period (air saving) 100. Is obtained.
  • the average value of the six evaluation coefficients Kp obtained in the six calculation periods 111 changes gently in the determination period 100. From these, it can be seen that the average value of the evaluation coefficient or the like for one determination period (energy saving) 100 may be used as the representative value.
  • the period T E not described evaluation coefficient in Figure 3 the condition is not satisfied as fine weather, it represents a period in which proper evaluation coefficients can not be obtained.
  • the processing unit 13 of the diagnostic apparatus 10 includes a calculation unit 131 for obtaining an evaluation coefficient Kp.
  • the calculation unit 131 obtains the amount of solar radiation for each calculation period 111 from the data of the solar radiation intensity measured by the solar radiation meter 25, and the product of the amount of solar radiation (measured value) and the solar cell capacity (power generation capacity) determined by the specifications of the solar cell 21. Ask for. Furthermore, the calculation part 131 calculates
  • the diagnostic device 10 includes the amount of power obtained from the plurality of first data, the amount of solar radiation obtained from the plurality of second data, and the solar cell 21 (each string for each calculation period 111 of the time zone 110. 211), the evaluation coefficient Kp is calculated.
  • the power amount (power generation amount) obtained from the plurality of first data for each calculation period 111 is an integral value of a plurality of power values obtained in the plurality of sampling periods 101 in the calculation period 111.
  • the amount of solar radiation obtained from the plurality of second data for each calculation period 111 is an integrated value or an average value of values related to the plurality of solar radiation intensities obtained in the plurality of sampling periods 101 in the calculation period 111. That is, the solar radiation amount is an integral value when the solar radiation intensity data acquired by the measuring device 23 includes a solar radiation intensity value, and is an average value when the solar radiation intensity data includes the solar radiation intensity.
  • the diagnostic apparatus 10 obtains a representative value of the evaluation coefficient from the plurality of evaluation coefficients Kp, and uses the representative value of the evaluation coefficient as a representative value (standard evaluation coefficient) of another evaluation coefficient stored in the storage unit 1321.
  • the photovoltaic power generation facility 20 is configured to be diagnosed.
  • the representative value of the evaluation coefficient is an evaluation coefficient for each determination period 100, and this is a plurality of evaluations (6 in the example of FIG. 2 ⁇ days of the determination period 100) obtained for each determination period 100. The average value of the coefficients.
  • the evaluation coefficient for each determination period 100 is obtained from the evaluation coefficient for each time zone 110 within the determination period 100.
  • the diagnostic device 10 diagnoses that the photovoltaic power generation facility 20 is normal when the evaluation coefficient for each determination period 100 is within a threshold range (see FIG. 3) including the standard evaluation coefficient in the middle (preferably the center). Configured to obtain results.
  • the threshold range may be within the range of “representative value of evaluation coefficient + 0.05” to “representative value of evaluation coefficient ⁇ 0.05”, but “representative value of evaluation coefficient + 0.025” to “evaluation”. Desirably, the coefficient is within a range of “ ⁇ 0.025”.
  • the evaluation coefficient is obtained for each determination period (energy saving) from the actual measurement value of the electric energy and the actual measurement value of the solar radiation corresponding to the clear sky conditions. That is, six calculation periods 111 are provided per day, and an evaluation coefficient for each time zone 110 is obtained for each string 211. Therefore, the number of evaluation coefficients obtained for one time zone 110 is 6 ⁇ (the number of strings 211).
  • the processing unit 13 of the diagnostic apparatus 10 includes a diagnostic unit 132 configured to diagnose the photovoltaic power generation facility 20 based on the evaluation coefficient for each determination period 100.
  • the diagnosis unit 132 diagnoses the photovoltaic power generation facility 20 based on the evaluation coefficient obtained for each of the plurality of determination periods (energy saving) 100. That is, the diagnosis unit 132 performs diagnosis based on a plurality of evaluation coefficients. As described above, since one evaluation coefficient is obtained for one air saving for each determination period 100, the evaluation coefficient for each air saving can be rephrased as the evaluation coefficient for each determination period 100.
  • the diagnosis unit 132 diagnoses the photovoltaic power generation facility 20 based on the evaluation coefficients obtained for the plurality of determination periods (plurality of air savings) 100, respectively. Based on the evaluation coefficient for each determination period 100, the diagnosis unit 132 removes a short-circuit failure of the bypass diode mounted on the solar cell 21, deterioration over time of the solar cell 21, and contamination of the surface (light receiving surface) of the solar cell 21. Diagnose as a malfunction of the photovoltaic power generation facility 20.
  • the diagnosis unit 132 includes a storage unit 1321, a comparison unit 1322, and a determination unit 1323.
  • storage part 1321 memorize
  • the standard evaluation coefficient is stored in the storage unit 1321 for a plurality of determination periods 100.
  • the storage unit 1321 desirably stores, for example, standard evaluation coefficients for one year or more.
  • the comparison unit 1322 has a function of obtaining a divergence rate related to the evaluation coefficient obtained for each determination period (energy saving) 100. Further, the comparison unit 1322 has a function of obtaining a difference between the evaluation coefficient for each determination period 100 obtained by the calculation unit 131 during operation of the photovoltaic power generation facility 20 and the standard evaluation coefficient stored in the storage unit 1321. . The determination unit 1323 determines whether or not a failure has occurred in the photovoltaic power generation facility 20 based on the comparison result in the comparison unit 1322.
  • the comparison unit 1322 obtains a divergence rate related to the evaluation coefficient for each string 211 and compares the two divergence rates.
  • n represents the order of the determination period (energy saving) 100.
  • the divergence rate is calculated by using the evaluation coefficient Kp (n) obtained in a specific determination period (energy saving) 100 (n) immediately before the specific determination period (energy saving) 100 (n).
  • the value subtracted from the evaluation coefficient Kp (n ⁇ 1) obtained in the determination period (energy saving) 100 (n ⁇ 1) of the evaluation coefficient Kp (n) obtained in the specific determination period (energy saving) 100 (n) ) Is defined as the value divided by.
  • the deviation rate obtained for one determination period (energy saving) 100 (n) is obtained for each string 211.
  • the divergence rate can be defined by another calculation formula as long as it is a value obtained by dividing the difference between the evaluation coefficients obtained for adjacent determination periods (energy savings) 100 by one evaluation coefficient.
  • the determination unit 1323 is configured to determine that the solar cell 21 has failed when the difference between the two divergence rates compared by the comparison unit 1322 exceeds a predetermined failure threshold.
  • the failure of the solar cell 21 means an event such as a short circuit of the bypass diode. If there is no failure of this type, the divergence rate changes smoothly as shown by a broken line L31 in FIG. 4, but if a failure occurs, the divergence rate changes abruptly as shown by a solid line L41 in FIG. Therefore, the determination unit 1323 calculates a difference between two deviation rates obtained for two adjacent determination periods (energy saving) 100, and when this difference exceeds a failure threshold, Judge that a failure has occurred.
  • the comparison unit 1322 is stored in the storage unit 1321 and the evaluation coefficient for each determination period 100 obtained by the calculation unit 131 during operation of the photovoltaic power generation facility 20. Compare with the standard evaluation factor. Specifically, the comparison unit 1322 obtains a difference obtained by subtracting the evaluation coefficient for each determination period 100 obtained by the calculation unit 131 from the standard evaluation coefficient for the corresponding determination period 100 stored in the storage unit 1321. That is, the corresponding determination period 100 is a past determination period (energy saving) 100 that is the same as the evaluation coefficient determination period 100. For example, in FIG.
  • the determination unit 1323 compares the difference obtained by the comparison unit 1322 with a predetermined deterioration threshold, and determines that the solar cell 21 may be deteriorated when the difference exceeds the deterioration threshold.
  • the determination unit 1323 determines the standard evaluation coefficient stored in the storage unit 1321 and the determination period 100 obtained by the calculation unit 131 in a plurality of determination periods (energy saving) 100 before the corresponding determination period (energy saving) 100. It is verified whether or not the difference from the evaluation coefficient increases with time. And when the difference is increasing with progress of time like FIG. 5, the judgment part 1323 judges that the solar cell 21 has deteriorated.
  • a broken line L ⁇ b> 32 represents a standard evaluation coefficient obtained for each determination period (energy saving) 100
  • a solid line L ⁇ b> 42 represents an evaluation coefficient obtained for each determination period (energy saving) 100 during operation of the photovoltaic power generation facility 20.
  • the solar cell 21 deteriorates over time, it is desirable to detect it as a malfunction when the degree of deterioration is larger than expected.
  • the evaluation coefficient represents the total loss of the photovoltaic power generation facility 20, when an event as shown in FIG. 5 occurs, it is determined not only the solar cell 21 but also the power conversion device 24 is deteriorated. You may make it do.
  • the comparison unit 1322 performs the determination period 100 obtained by the calculation unit 131 during the operation of the solar power generation facility 20, as in the case of determining the deterioration of the solar cell 21. And the standard evaluation coefficient stored in the storage unit 1321 is obtained. As described above, this difference increases as the solar cell 21 deteriorates over time, and thus increases gradually as shown by a solid line L33 in FIG. On the other hand, if dust or yellow sand or the like adheres to the surface of the solar cell 21 and the period without rain continues for a long time, the dust or yellow sand or the like accumulates, and as shown by the broken line L43 in FIG.
  • the power output from the power supply decreases in a shorter time than when it deteriorates. That is, since the evaluation coefficient is proportional to the actual measurement value of the electric energy, if the power output from the solar cell 21 decreases, the evaluation function decreases (see the equation for Kp), resulting in a large difference from the standard evaluation coefficient. Become.
  • the determination unit 1323 determines the increase rate of the difference. Based on this, the deterioration of the solar cell 21 and the adhesion of dirt to the solar cell 21 are distinguished. That is, the determination unit 1323 makes a determination based on three levels of threshold values, ie, a first threshold value, a second threshold value, and a third threshold value (first threshold value ⁇ second threshold value ⁇ third threshold value).
  • the determination unit 1323 determines that the solar cell 21 is deteriorated if the increase rate is equal to or higher than the first threshold value and lower than the second threshold value, and determines that the solar cell 21 is dirty if the increase rate is equal to or higher than the third threshold value.
  • the processing unit 13 of the present embodiment can determine three types of malfunctions with respect to the photovoltaic power generation facility 20, but it is configured to determine at least one of the three types of malfunctions described above. It may be. In other words, the above-described configuration can be omitted as appropriate according to the type of defect to be determined.
  • the first data acquisition interface 11 can acquire data related to electric power in units of the strings 211 of the solar cells 21. Therefore, the diagnostic apparatus 10 can perform a diagnosis with the string 211 as a unit.
  • the diagnosis unit 132 obtains an evaluation coefficient corresponding to each of the plurality of strings 211 based on the power data of each of the plurality of strings 211. For example, the diagnosis unit 132 obtains an evaluation coefficient for each determination period 100 for each string 211. The diagnosis unit 132 can diagnose whether or not a failure has occurred for each string 211 based on the evaluation coefficient obtained for the plurality of strings 211.
  • the evaluation coefficient for each string 211 can be used for diagnosis of failure of the solar cell 21, deterioration of the solar cell 21, contamination of the solar cell 21, and the like.
  • the determination unit 1323 can identify the string 211 in which a defect has occurred by comparing evaluation coefficients obtained for each of the plurality of strings 211 with each other. That is, it is possible to diagnose whether a plurality of strings 211 are individually defective.
  • the determination unit 1323 can determine the defect of the string 211 by comparing the evaluation coefficients of the plurality of strings 211 with each other when the string 211 that may be defective is extracted. .
  • the rate of change of the evaluation coefficient obtained for two adjacent determination periods (energy saving) 100 may be compared.
  • the number of days of saving is a constant value, so that the change rate of the evaluation coefficient can be compared using only the numerator.
  • the rate of change of the evaluation coefficient obtained by the above equation is ⁇ X for the specific string 211 and the range of Y ⁇ Z for the remaining string 211
  • the rate of change of the evaluation coefficient It may be determined that a failure has occurred in the string 211 in which is ⁇ X.
  • the determination unit 1323 determines that the string 211 corresponding to the portion where the change rate is concentrated is normal based on the distribution of the change rate of the evaluation coefficient, and the string 211 corresponding to the outlier of the change rate is defective. Is determined to have occurred.
  • the first data for example, power data
  • the second data for example, solar radiation intensity data
  • the evaluation coefficient described above are data obtained in fine weather. Therefore, it is necessary to determine whether or not these data are obtained in fine weather. In addition, it is necessary to ensure that both the power data and the solar radiation intensity data are data on a clear day.
  • the processing unit 13 has a function of determining whether or not the power data and the solar radiation intensity data are data in fine weather by the following processing.
  • the processing unit 13 includes a temporary pattern extraction unit 133, a pattern storage unit 134, a pattern determination unit 135, and a clear sky determination unit 136 in order to determine whether or not the weather is fine.
  • the time zone 110 is a period including the time between south and middle, the influence of obstacles and topography on solar radiation is reduced, but changes in solar radiation intensity due to clouds occur every moment. For this reason, even in the time zone 110, it is not guaranteed that a period of fine weather continues.
  • the temporary pattern extraction unit 133 determines the maximum power of the same time from a plurality of days (specifically, 15 days) included in one determination period (energy saving) 100 for the power data acquired by the first data acquisition interface 11. A value is obtained, and processing for associating the obtained maximum value with the time is performed.
  • provisional pattern data in which the maximum value of power data is associated with time is referred to as a “provisional pattern”.
  • Data constituting the temporary pattern is stored in the pattern storage unit 134 as a “sunny sky pattern” when a clear sky condition described later is satisfied.
  • the temporary pattern extraction unit 133 obtains the maximum value at the same time from a plurality of days included in one determination period (energy saving) 100 for the solar radiation intensity data acquired by the second data acquisition interface 12. The process of associating the maximum value with the time is performed. A temporary pattern of solar radiation intensity is also stored in the pattern storage unit 134.
  • the temporary pattern extraction unit 133 uses the solar radiation intensity data from the first day to the 15th day to calculate the same day. The maximum value of the data at the time is extracted, and the maximum value is associated with the time. By this process, a solar radiation pattern as shown in FIG. 8 is obtained.
  • FIG. 7 and FIG. 8 illustrate the solar radiation intensity data, the process for generating a temporary pattern based on the power data is the same.
  • the provisional pattern and the solar radiation pattern are based on data in a period in which the solar altitudes are almost the same, they can be handled as data for one day while using data on different days.
  • the provisional pattern is generated with the maximum value at the same time among the power of multiple days
  • the solar radiation pattern is generated with the maximum value at the same time among the solar radiation intensities of multiple days. It is estimated that.
  • the diagnostic apparatus 10 is continuously operated and only the clear sky pattern satisfying the clear sky condition is stored in the pattern storage unit 134. If the clear weather pattern stored in the pattern storage unit 134 is initially operated to ensure that it is clear weather, it will automatically be cleared with clear weather data that satisfies the clear sky conditions in the continuous operation thereafter. Registered. After the clear weather patterns for one year are stored in the pattern storage unit 134, the same clear sky patterns can be used for the same determination period (energy saving) 100. Moreover, after the clear sky pattern for one year is stored in the pattern memory
  • the clear sky condition is based on the degree of similarity between the temporary pattern extracted by the temporary pattern extraction unit 133 during a specific determination period (energy saving) 100 and the clear sky pattern obtained during the determination period 100 before the specific determination period 100.
  • the condition is that it is higher than the value.
  • the clear sky pattern determination period 100 is required to be a determination period 100 that is earlier than the determination period 100 from which the temporary pattern to be compared is extracted and is close to the temporary pattern determination period 100.
  • the determination period 100 for the clear sky pattern is preferably the determination period 100 immediately before the determination period 100 from which the temporary pattern is extracted.
  • the clear sky pattern is not clear in the previous determination period 100 due to irregular weather or occurrence of a new shadow. The pattern may not be generated. Accordingly, it is desirable that the clear sky pattern determination period 100 allows the determination period 100 to be traced back to the previous determination period 100 or the previous determination period 100 with respect to the determination period 100 in which the temporary pattern is generated.
  • the pattern determination unit 135 evaluates the degree of similarity between the temporary pattern and the clear sky pattern, and determines that the corresponding temporary pattern satisfies the clear sky condition if the degree of similarity is equal to or greater than the reference value.
  • the degree of similarity is evaluated based on a difference between data of the same time (calculation period 111) for the temporary pattern and the clear sky pattern. In other words, if the temporary pattern and the clear sky pattern substantially match, the difference is considered to be a substantially constant value in the time zone 110. Therefore, the pattern determination unit 135 may determine that the similarity is greater than or equal to the reference value when the difference is within a predetermined allowable range.
  • the pattern determination unit 135 evaluates the degree of similarity between the temporary pattern and the clear sky pattern based on the difference distribution in the time zone 110, the envelope of the difference in the time zone 110, and the like.
  • one of the temporary patterns with different determination periods (energy saving) 100 is temporarily regarded as a clear sky pattern, and is adopted as a clear sky pattern if the clear sky conditions are satisfied. You may do it.
  • the temporary pattern of the specific determination period (energy saving) 100 determined by the pattern determination unit 135 to satisfy the sunny weather condition is stored in the pattern storage unit 134 as the clear sky pattern of the determination period 100.
  • the pattern determination unit 135 notifies the user terminal device 32 through the output unit 15 by a push method. For example, an alarm signal is transmitted to the terminal device 32.
  • the terminal device 32 is a client for the diagnostic device 10 that is a server, and is generally composed of a personal computer configured to communicate with the diagnostic device 10.
  • a communication path selected from a VPN (Virtual Private Network) using the Internet, a mobile communication network, a dedicated line, or the like is used.
  • the terminal device 32 can be selected from a tablet terminal, a smartphone, and the like in addition to a personal computer, and may be a thin client. Further, the notification from the output unit 15 to the terminal device 32 may be performed by e-mail.
  • the clear sky pattern is obtained from the power data, but the clear sky pattern is also obtained for the solar radiation intensity data by the same processing.
  • a temporary pattern is generated from the solar radiation intensity data, and it is determined whether or not the clear weather condition is satisfied for the temporary pattern for a specific determination period (energy saving) 100.
  • the temporary pattern that satisfies the clear sky condition is stored in the pattern storage unit 134 as a clear sky pattern for a specific determination period 100.
  • the clear sky determination unit 136 compares the clear sky pattern obtained from the power data with the clear sky pattern obtained from the solar radiation intensity data, and whether both the solar cell 21 and the solar radiation meter 25 are data in fine weather. Determine whether or not. That is, the clear sky determination unit 136 obtains a difference in data at the same time for a clear sky pattern related to electric power and a clear sky pattern related to solar radiation intensity, and when the difference is a substantially constant value, both clear weather patterns are data when clear weather. It is determined that it is configured. That is, the clear sky determination unit 136 determines a predetermined allowable range for the difference, and determines that the data on the clear sky is obtained from the solar cell 21 and the pyranometer 25 if the obtained difference is within the allowable range.
  • the clear sky determination unit 136 evaluates the clear sky pattern obtained for power and solar radiation intensity based on the difference distribution in the time zone 110, the envelope of the difference in the time zone 110, and the like.
  • the fine weather judgment unit 136 When at least one of the electric power and the solar radiation intensity is not data at the time of fine weather, the fine weather judgment unit 136 notifies the terminal device 32 through the output unit 15 by a push method, and the evaluation coefficient obtained by the calculation unit 131 performs diagnosis. Notify users that they cannot. In addition, when the clear sky determination unit 136 determines that the cause is an unfavorable weather or an influence of a newly generated shadow, it is desirable to notify the terminal device 32 of the cause as well.
  • the clear sky pattern related to electric power and the clear sky pattern related to solar radiation intensity are determined to be data at the time of clear sky by the pattern determination unit 135, and therefore the processing of the clear sky determination unit 136 is a process for improving safety. It can be omitted.
  • the processing unit 13 includes a time correction unit 137.
  • the time correction unit 137 is configured to correct the deviation in the time axis direction for the power data acquired by the first data acquisition interface 11 and the solar radiation intensity data acquired by the second data acquisition interface 12. Yes.
  • the photovoltaic power generation facility 20 includes the power conversion device 24, and the first data acquisition interface 11 outputs not only the power output from the solar cell 21 but also the power conversion device 24. Data on power can also be obtained.
  • the processing unit 13 corrects the shift in the time axis direction for both data. It is desirable to be configured.
  • the processing unit 13 performs processing in the following order. That is, in the processing unit 13, the temporary pattern extraction unit 133 generates a temporary pattern based on the power data and the solar radiation intensity data, and the pattern determination unit 135 determines the clear sky pattern.
  • the time correction unit 137 eliminates the deviation in the time axis direction. Correction in the time axis direction is not essential, and the time correction unit 137 can be omitted.
  • the clear sky determination unit 136 evaluates whether the clear sky pattern related to electric power and the clear sky pattern related to solar radiation intensity are both data in clear weather.
  • the processing unit 13 cancels the time difference between the power data of the power converter 24 and the power data output from the solar cell 21. Correction in the time axis direction is performed for two types of data.
  • the calculation unit 131 obtains an evaluation coefficient based on data of these clear sky patterns.
  • the diagnosis unit 132 evaluates the evaluation coefficient and performs various diagnoses regarding the photovoltaic power generation facility 20.
  • the above-described diagnostic apparatus 10 of the photovoltaic power generation facility 20 includes a device (first device) including one or more processors that execute a program, and an interface device (second device) for connecting an external device. It is provided as a main hardware element.
  • the first device is selected from one or a plurality of microprocessors that are separately connected to a memory, and one or a plurality of microcomputers (microcontrollers) that are integrally provided with a memory.
  • the program may be provided in a state written in a ROM (Read Only Memory) in advance, but is provided using a computer-readable recording medium so that it can be stored in a rewritable nonvolatile memory. It is desirable. Further, the program may be provided through an electric communication line such as the Internet instead of the recording medium.
  • ROM Read Only Memory
  • the diagnostic device 10 of the photovoltaic power generation facility 20 described above includes a first data acquisition interface 11, a second data acquisition interface 12, and a processing unit 13.
  • the 1st data acquisition interface 11 is comprised so that the data of the electric power output in the predetermined time slot
  • the second data acquisition interface 12 is configured to acquire the solar radiation intensity data output from the solar radiation meter 25 in the time zone 110 as the second data.
  • the processing unit 13 is configured to diagnose the photovoltaic power generation facility 20 based on the first data and the second data.
  • the processing unit 13 includes a calculation unit 131 and a diagnosis unit 132.
  • the calculation unit 131 is configured to obtain an evaluation coefficient that is a ratio between the measured value of the amount of solar radiation obtained from the second data and the product of the solar battery capacity of the solar battery 21 and the amount of power obtained from the first data.
  • the diagnosis unit 132 diagnoses the photovoltaic power generation facility 20 based on the evaluation coefficient obtained by the calculation unit 131 for each of a plurality of predetermined determination periods 100.
  • the judgment period 100 is a period corresponding to any one of a plurality of division periods of one year according to the season (or synchronized with the climate), and is preferably set to include a plurality of days.
  • the determination period 100 may be a period corresponding to any of the 24 categories of energy saving.
  • the calculation unit 131 is preferably configured to obtain a plurality of evaluation coefficients Kp for each of the plurality of calculation periods 111 and obtain an average value of the plurality of evaluation coefficients Kp as a daily evaluation coefficient.
  • the calculation period 111 is obtained by dividing a predetermined time zone 110 of the day including the South-China time.
  • the first data and the second data are used in the time zone including the south-central time when the solar radiation is not easily affected by the obstacle and the terrain, the first data and the second data For each, it is easy to obtain data in fine weather, and it is possible to obtain data that is less affected by seasonal fluctuations.
  • the diagnosis unit 132 preferably includes a comparison unit 1322, which includes two determination periods obtained from the determination period and the determination period adjacent to the determination period for each of the determination periods 100 respectively corresponding to the plurality of segment periods. A divergence rate that is a value obtained by dividing the difference between the evaluation coefficients by one of the two evaluation coefficients is obtained, and the two divergence rates obtained for two adjacent determination periods 100 are compared.
  • the diagnosis unit 132 is configured to determine that the solar cell 21 has failed when the difference between the two divergence rates compared by the comparison unit 1322 exceeds a predetermined failure threshold.
  • the diagnosis unit 132 may include a storage unit 1321, a comparison unit 1322, and a determination unit 1323.
  • the storage unit 1321 has a plurality of evaluation coefficients obtained by the calculation unit 131 for each of the plurality of determination periods 100 when the photovoltaic power generation facility 20 is operating normally. Is stored as a standard evaluation coefficient.
  • the comparison unit 1322 is a determination period in which the evaluation coefficient obtained by the calculation unit 131 during operation of the photovoltaic power generation facility 20 matches the evaluation coefficient determination period 100 among the plurality of standard evaluation coefficients stored in the storage unit 1321. It is configured to be compared with a standard evaluation factor at 100.
  • the determination unit 1323 is configured to determine whether or not the photovoltaic power generation facility 20 has a defect based on the comparison result of the comparison unit 1322.
  • the solar power generation facility 20 is diagnosed on the basis of the standard evaluation coefficient obtained in the normal state and the evaluation coefficient to be compared, so that it is possible to diagnose the deterioration or contamination of the solar cell 21.
  • the determination unit 1323 is configured to determine whether or not the difference (first difference) between the standard evaluation coefficient obtained by the comparison unit 1322 and the evaluation coefficient exceeds a predetermined deterioration threshold.
  • the diagnosis unit 132 determines whether or not the difference (each second difference) between the evaluation coefficient and the standard evaluation coefficient in each of the plurality of determination periods 100 before the corresponding determination period 100 increases with time. Configured to judge.
  • the diagnosis unit 132 is configured to determine that the solar cell 21 is deteriorated when the first difference exceeds the deterioration threshold and each second difference increases with time.
  • the deterioration of the solar cell 21 can be diagnosed.
  • the determination unit 1323 continues to increase the difference between the standard evaluation coefficient obtained by the comparison unit 1322 and the evaluation coefficient over time in the plurality of determination periods 100, and the increase rate of the difference is equal to or greater than the first threshold value. If it is less than the second threshold value, it is determined that the solar cell 21 is deteriorated. On the other hand, the determination unit 1323 is configured to determine that the solar cell 21 is dirty if the increase rate is equal to or greater than a third threshold value that is greater than the second threshold value.
  • the first data acquisition interface 11 is configured to acquire power data for each of the plurality of strings 211 from the plurality of strings 211 constituting the solar cell 21.
  • the determination unit 1323 is configured to determine the change rate of the difference between the standard evaluation coefficient and the evaluation coefficient obtained by the comparison unit 1322 in the two adjacent determination periods 100 for each of the plurality of strings 211. Then, the determination unit 1323 is configured to determine whether there is a problem for each of the plurality of strings 211 based on the distribution of the plurality of change rates obtained for each of the plurality of strings 211.
  • the processing unit 13 preferably includes a temporary pattern extraction unit 133, a pattern storage unit 134, and a pattern determination unit 135.
  • the temporary pattern extraction unit 133 obtains the maximum value at the same time from a plurality of days included in the determination period 100 for each of the power data and the solar radiation intensity data in the determination period 100, and associates the maximum value with the time. It is configured to extract a pattern.
  • the pattern storage unit 134 is configured to store the temporary pattern as a clear sky pattern in the determination period 100 when the temporary pattern satisfies a predetermined clear sky condition.
  • the pattern determination unit 135 is configured to evaluate the degree of similarity between the temporary pattern extracted by the temporary pattern extraction unit 133 during the specific determination period 100 and the clear sky pattern of the determination period 100 before the specific determination period 100. The Then, when the degree of similarity is higher than the reference value, the pattern determination unit 135 determines that the temporary pattern in the specific determination period 100 satisfies the clear sky condition, and determines the temporary pattern in the specific determination period 100 as the specific determination period. It is configured to have 100 clear sky patterns.
  • the calculation unit 131 is configured to obtain an evaluation coefficient based on the clear sky pattern data.
  • the processing unit 13 obtains a difference at the same time between a clear sky pattern related to solar radiation intensity and a clear sky pattern related to electric power in the same determination period 100 of a plurality of years, and whether or not the difference value is within an allowable range set for a predetermined determination value. It is desirable to include a clear sky determination unit 136 configured to determine whether or not.
  • the diagnostic device 10 preferably includes an output unit 15 configured to notify a predetermined terminal device 32 when the difference value is out of the allowable range.
  • both the clear sky pattern related to electric power and the clear sky pattern related to solar radiation intensity are data in clear weather. Further, when at least one of the clear sky pattern related to electric power and the clear sky pattern related to solar radiation intensity is not data at the time of clear weather, the terminal device 32 is notified, and thus the evaluation coefficient obtained for the corresponding determination period 100 is not appropriate. This makes it possible for the user to recognize this.
  • the processing unit 13 is configured to correct the deviation in the time axis direction for the power data acquired by the first data acquisition interface 11 and the solar radiation intensity data acquired by the second data acquisition interface 12. It is desirable to include a correction unit 137.
  • a correction unit 137 For example, when the built-in clock 14 is provided in the diagnostic device 10 as shown in FIG. 1, the power data and the solar radiation intensity data may be shifted in the time axis direction as shown in the example of FIG. For this reason, the time correction unit 137, for example, adjusts the power data and the solar radiation intensity so that the rise or fall of the waveform obtained from the power data coincides with the rise or fall of the waveform obtained from the solar radiation data. Any one of the data is configured to shift in the time axis direction.
  • the solar power generation facility 20 includes a power conversion device 24 that converts the DC power output from the solar cell 21 into AC power.
  • the first data acquisition interface 11 acquires first data related to the power output from the solar cell 21 and second data related to the power output from the power conversion device 24.
  • the processing unit 13 is configured to correct the shift in the time axis direction for the first data and the second data.
  • the power converter 24 can be diagnosed.
  • the program according to the present embodiment causes a computer to function as the diagnostic device 10 of the photovoltaic power generation facility 20.
  • the processing unit 13 of the diagnostic apparatus 10 includes the sampling periods 101 (see FIG. 2) within the plurality of second pattern extraction periods 210 included in the first pattern extraction period 200.
  • the data constituting the reference pattern is extracted from the maximum output value of the photovoltaic power generation facility 20 for each reference).
  • the first pattern extraction period 200 is a period including a plurality of days.
  • the first pattern extraction period 200 is the same period as the (current) determination period 100 in order to immediately apply the data constituting the reference pattern to be obtained from the period 200 to the diagnosis of the photovoltaic power generation facility 20.
  • Each of the plurality of second pattern extraction periods 210 is a period that includes the South-China time, and is preferably a period that is not less than the time zone 110 and not more than the sunshine time. In the example of FIG. 7, each of the plurality of second pattern extraction periods 210 is set to a period longer than the time zone 110 illustrated in the example of FIG.
  • Each of the plurality of maximum output values of the photovoltaic power generation facility 20 obtained during the first pattern extraction period 200 is the maximum output value (for example, the maximum current value or the maximum power value) of the solar cell 21 or the maximum of the pyranometer 25. This is the output value (maximum value for solar radiation intensity).
  • the output value on the vertical axis includes a plurality of output values (for example, solar radiation intensity values) of the solar power generation facility 20.
  • Such a plurality of output values also include a plurality of output values obtained during the cloudy time, and thus often include a plurality of downward peaks (see broken-line peaks) as shown in the example of FIG. If data constituting the reference pattern is extracted from a plurality of output values including a plurality of such downward peaks, it is difficult to obtain the reference pattern as a high-precision clear sky pattern.
  • the processing unit 13 determines the maximum output value 20 MAX of the photovoltaic power generation facility 20 for each sampling period 101 within the plurality of second pattern extraction periods 210.
  • Data constituting the reference pattern is extracted.
  • each of the plurality of maximum output values 20 MAX of the photovoltaic power generation facility 20 obtained during the first pattern extraction period 200 is the maximum output value (maximum solar intensity value) of the solar radiation meter 25. is there.
  • data constituting the reference pattern is extracted from such a plurality of maximum output values 20 MAX , as shown in the example of FIG. 11, data 20 REF constituting the reference pattern as a high-accuracy clear sky pattern can be obtained. .
  • the processing unit 13 determines a predetermined extraction time 220 from a plurality of maximum output values 20 MAX obtained during the first pattern extraction period 200. Each time, the average rate of change is calculated from the two maximum output values 20 MAX corresponding to the times at both ends of the extraction time 220 and the extraction time 220.
  • the average rate of change is preferably a value obtained by dividing the difference between the two maximum output values 20 MAX by the extraction time 220.
  • the extraction time 220 is preferably 30 times the sampling period, but may be set within a range of 20 to 40 times the sampling period 101.
  • the processing unit 13 shifts the extraction time 220 for each sampling period 101 so that the start point of the extraction time 220 shifts from the start point of the time zone 110 to the end point, thereby obtaining a plurality of average change rates. Configured to calculate.
  • the processing unit 13 extracts the maximum output value of the calculated average change rate if the calculated average change rate is within a predetermined allowable range.
  • the data 20 REF constituting the reference pattern is extracted.
  • the maximum output value of the average change rate to be extracted is at least the maximum output value at the start point of the extraction time 220 corresponding to the average change rate.
  • the permissible range is a permissible time range among a plurality of permissible ranges for each time of day.
  • Each of the plurality of allowable ranges is a range including a standard change rate in between.
  • the plurality of standard change rates in the plurality of allowable ranges are average change rates for one day corresponding to a sunny day.
  • the processing unit 13 is configured to store each of a plurality of maximum output values constituting the data 20 REF in the storage unit 1321 as a reference value together with corresponding time information.
  • the processing unit 13 is configured to calculate a single south / middle time for a plurality of time zones 110 included in the (current) determination period 100 from the data 20 REF constituting the extracted reference pattern. Is done.
  • FIG. 12 is a graph showing how the time of south-intermediate time at a point changes over a year, where the north latitude and longitude of the point are 35 degrees and 135 degrees, respectively.
  • the south-central time at an arbitrary point changes from time to time throughout the year. Further, the south / central time also depends on the installation state of the solar cell 21.
  • the processing unit 13 obtains, for each determination period 100, a single South / Central time for a plurality of time zones 110 included in the determination period 100 from the data 20 REF constituting the extracted reference pattern. It is calculated.
  • the processing unit 13 extracts the time when the slope of the tangent 230 with respect to the reference pattern constituted by the extracted data 20 REF becomes zero as the single south-central time. Configured. In the example of FIG. 14, the processing unit 13 obtains a slope value for each value included in the extracted data 20 REF , and extracts the time corresponding to the slope value 240 that is zero as the single south-central time. Configured. In such a configuration, the solar power generation facility 20 can faithfully respond to the changing South / Central time by stably including the actually measured South / Central time in each of the plurality of time zones 110 in the first pattern extraction period 200. A plurality of output values following the above can be obtained.
  • the processing unit 13 determines the time corresponding to the slope value 240 being zero if the sign of the slope value before and after the time corresponding to the slope value 240 being zero is positive and negative, respectively. It is configured to extract as South-Central time. In this configuration, since the single south / intermediate time can be more accurately calculated from the data 20 REF constituting the reference pattern, a plurality of outputs that reliably follow the changing south / intermediate time from the photovoltaic power generation facility 20. A value can be obtained.
  • the processing unit 13 when a plurality of slope values that are zero are obtained from the data 20 REF constituting the reference pattern, the processing unit 13 performs time corresponding to the slope value of the maximum output value among the obtained slope values. Are extracted as the single south-central time. Even in this configuration, a single south / intermediate time can be calculated more accurately from the data 20 REF constituting the reference pattern, so that a plurality of outputs that reliably follow the changing south / intermediate time from the photovoltaic power generation facility 20. A value can be obtained.
  • Diagnosis apparatus 11 1st data acquisition interface 12 2nd data acquisition interface 13 Processing part 15 Output part 20 Solar power generation equipment 21 Solar cell 24 Power converter 25 Solar radiation meter 131 Calculation part 132 Diagnosis part 133 Temporary pattern extraction part 134 Pattern storage unit 135 Pattern determination unit 136 Fine weather determination unit 137 Time correction unit 211 String 1321 Storage unit 1322 Comparison unit 1323 Determination unit

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

太陽光発電設備の診断を精度よく行うべく、診断装置(10)は、太陽電池(21)を備える太陽光発電設備(20)から所定の時間帯の電力のデータを取得する第1のデータ取得インタフェース(11)と、日射計(25)から上記時間帯の日射強度のデータを取得する第2のデータ取得インタフェース(12)と、電力のデータと日射強度のデータとに基づいて太陽光発電設備(20)の診断を行う処理部(13)とを備える。処理部(13)は、日射強度のデータから求められる日射量の実測値および太陽電池(21)の太陽電池容量の積と電力のデータから求められる電力量との比率である評価係数を求める計算部(131)と、計算部(131)が所定の複数の判定期間ごとに求めた複数の評価係数に基づいて太陽光発電設備(20)の診断を行う診断部(132)とを備える。

Description

太陽光発電設備の診断システムおよびプログラム
 本発明は、太陽光発電設備の診断システムおよびプログラムに関する。
 従来、太陽電池の電気出力に基づいて太陽電池の出力が正常か異常かを判定する技術が知られている(たとえば、特許文献1参照)。特許文献1では、所定の日照時刻における太陽電池の出力電力値の、当該日照時刻に対応する標準出力電力値に対する比を算出し、この比に基づいて太陽電池の出力が正常か異常かを判定している。また、特許文献1には、複数日にわたって日照時刻毎に繰り返し実測した出力電力値の最大値を日照時刻における標準出力電力値とする技術が記載されている。
 特許文献1に記載された発明は、太陽光発電設備の導入時に太陽電池アレイが適切に設置されているか否かを診断し、また太陽電池アレイの経時変化による発電能力の劣化や故障について診断するために、太陽電池の標準出力電力値を用いている。
 一方、近年では、広い敷地(たとえば、1ha以上)に多数枚(たとえば、1000枚以上)の太陽電池モジュールが配置される中規模ないし大規模の太陽光発電設備が設置されている。このような太陽光発電設備では、標準出力電力値は、日射の回り込み、あるいは雲の影などの影響を受ける。すなわち、中規模ないし大規模の太陽光発電設備では、特許文献1に記載された技術によって、劣化や故障を精度よく診断することは難しい。
特開2005-340464号公報
 本発明は、太陽光発電設備の診断を精度よく行うことを可能にした太陽光発電設備の診断システムを提供することを目的とする。また、本発明は、コンピュータをこの太陽光発電設備の診断システムとして機能させるプログラムを提供することを目的とする。
 本発明に係る太陽光発電設備の診断システムは、第1のデータ取得インタフェースと、第2のデータ取得インタフェースと、処理部とを備える。前記第1のデータ取得インタフェースは、太陽電池を備える太陽光発電設備から所定の時間帯に出力される電力のデータを、第1のデータとして取得するように構成される。前記第2のデータ取得インタフェースは、日射計からの上記時間帯に出力される日射強度のデータを、第2のデータとして取得するように構成される。前記処理部は、前記第1のデータと前記第2のデータに基づいて前記太陽光発電設備の診断を行うように構成される。前記処理部は、計算部と、診断部とを備える。前記計算部は、前記第2のデータから求められる日射量の実測値および前記太陽電池の太陽電池容量の積と前記第2のデータから求められる電力量との比率である評価係数を求めるように構成される。前記診断部は、前記計算部が複数の所定の判定期間ごとに求めた評価係数に基づいて前記太陽光発電設備の診断を行うように構成される。判定期間は、気候に応じた1年の複数の区分期間の何れかに対応する期間であり、同じ季節あるいは太陽高度が同程度である複数日を含むように定められている。
 本発明に係るプログラムは、コンピュータを、上記した太陽光発電設備の診断システムとして機能させることを特徴とする。
 図面は本開示に従って一又は複数の実施例を示すが、限定するものではなく例に過ぎない。図面において、同様の符号は同じか類似の要素を指す。
実施形態を示すブロック図である。 実施形態における所定の時間帯、計算期間および判定期間の説明図である。 実施形態においてどのように評価係数が時間(季節)変化するかを示すグラフである。 実施形態における故障判断の例を示すための乖離率の時間変化を示すグラフである。 実施形態における劣化判断の例を示すための評価係数の時間変化を示すグラフである。 実施形態における汚れ判断の例を示すための差分の時間変化を示すグラフである。 実施形態における日射強度の時間変化を示すグラフである。 実施形態における仮パターンの例を示すための日射強度の時間変化を示すグラフである。 実施形態において日射強度に対する電力値との関係の時間変化を示すグラフである。 別の実施形態において、第1のパターン抽出期間の間に太陽光発電設備から得られる複数の出力値が単一の第2のパターン抽出期間の間にどのように時間変化をするかを示すグラフである。 第1のパターン抽出期間の間に太陽光発電設備から得られる複数の最大出力値と、その複数の最大出力値から得られる基準パターンを構成するデータが、単一の第2のパターン抽出期間の間にどのように時間変化をするかを示すグラフである。 ある地点の南中時刻が1年間にどのように時間変化するかを示すグラフである。 基準パターンのデータが単一の第2のパターン抽出期間の間に時間変化するグラフにおいて、基準パターンに対する傾きゼロの接線を例示する。 抽出した基準パターンを構成するデータに含まれる値ごとに求められる傾き値がどのように時間変化をするかを示すグラフである。
 以下に説明する太陽光発電設備の診断システムは、中規模から大規模の太陽光発電設備を対象にしている。ここで、本開示の各実施形態の太陽光発電設備の診断システムは、単一の装置でもよく、あるいは、それ自身の何れかの機能をそれぞれ複数の装置に分散するように構成されてもよい。以下、太陽光発電設備の診断システムを「診断装置」という。太陽光発電設備の発電規模には、とくに制限はないが、以下に説明する診断装置を適用する太陽光発電設備は、数百枚以上の太陽電池パネルが並ぶ程度の発電規模を想定している。たとえば、発電規模が250kW程度であれば、1000枚以上の太陽電池パネルが並び、また、発電規模が1MW程度であれば太陽電池パネルの設置面積は1ha程度になる。ただし、以下に説明する技術は、家庭用などの数kW程度の小規模の太陽光発電設備に適用することも可能である。
 太陽光発電設備は、発電規模にかかわらず、太陽電池と、太陽電池が出力した直流電力を交流電力に変換するための電力変換装置と、日射計とを備える。日射計は、太陽電池への日射強度を計測するように構成される。たとえば、日射計は、太陽電池に隣接して、太陽電池の傾斜角度と同じ角度で配置される。電力変換装置は、いわゆるパワーコンディショナである。また、以下に説明する太陽光発電設備は、電力変換装置で生成された交流電力を電力系統に供給する機能を有した受変電設備を備える。
 太陽電池は、複数枚のモジュール(太陽光発電パネル)が直列に接続されてストリングを構成している。ストリングは、複数個ずつ接続箱に接続され、その複数のストリングが太陽電池アレイを構成する。接続箱はストリングモニタを備え、ストリングそれぞれが出力する電流を監視する。太陽電池(太陽電池アレイ)が出力する直流電力は、接続箱を通して電力変換装置に供給される。太陽光発電設備は、電力変換装置の入力電圧を監視する計測装置を備える。計測装置は、ストリングモニタが監視したストリングごとの電流値を取得する機能も有する。太陽電池が発電した電力は、ストリングモニタが監視した電流値と、計測装置が監視した電圧値とにより求めることが可能である。ストリングモニタは、ストリングそれぞれが出力する電流を監視するだけではなく、ストリングの出力電圧も併せて監視するように構成されていてもよい。
 診断装置は、太陽電池が出力する電力の値と、日射計が計測する日射強度との両方に基づいて、太陽光発電設備に不具合があるか否かを診断する。以下に説明する診断装置は、太陽電池の故障、太陽電池の劣化、太陽電池の汚れなどの項目について診断することが可能である。これらの項目の診断を行うために、診断装置は、太陽電池が発電した電力量と日射計が計測した日射量の実測値とに基づいて評価係数を求め、時間経過に伴う評価係数の変化の仕方(評価係数の振る舞い)を評価する。
 ところで、日本工業規格(JIS C8907)には、太陽光発電システム(太陽光発電設備)の発電電力量推定方法が規定されている。この推定方法では、発電電力量が、太陽電池モジュールの仕様によって決まる出力、太陽電池モジュールの枚数、太陽電池モジュールの設置形態などで定まる発電容量(すなわち、太陽電池容量)と、日射量の実測値と、設計係数とによって推定される。具体的には、発電容量と日射量との積に、パワーコンディショナの変換効率を含む設計係数を乗じることによって、発電電力量が求められている。設計係数は、太陽光発電システムを構成する要素、環境などにより定めた固定値が用いられている。
 ところで、上述した発電量推定方法は、推定発電量=設計係数×発電容量×日射量という形式に簡略化することができる。以下に説明する診断装置は、この数式を変形し、発電量を推定する代わりに、発電量の実測値と発電容量と日射量の実測値とから設計係数に相当する評価係数を求める。すなわち、評価係数は、評価係数=発電量の実測値/(発電容量×日射量の実測値)という形式で表される。
 診断装置は、太陽光発電設備に関する不具合の有無を診断するためのデータを蓄積する構成要素と、蓄積したデータに基づいて不具合の有無を診断する構成要素とを備える。これらの2つの構成要素は、1つの装置で実現することが可能であるが、異なる装置で実現されてもよい。たとえば、太陽光発電設備で生じたデータを蓄積する構成要素は、太陽光発電設備に設け、太陽光発電設備の不具合の有無を診断する構成要素は、インターネットのような電気通信回線を通して太陽光発電設備と通信する診断用のサーバに設けることが可能である。また、クラウドコンピューティングシステムにより太陽光発電設備からのデータを収集し、診断装置は、太陽光発電設備の管理者が管理する端末装置で実現してもよい。
 診断装置は、太陽光発電設備を用いて発電事業を行う事業者、発電事業者からメンテナンス委託を受けたEPC(Engineering, Procurement and Construction)業者、あるいは太陽光発電設備のメンテナンス事業者などが用いる。1台の診断装置が扱う太陽光発電設備のサイト数は、たとえば100~500サイトを想定している。ただし、診断装置の台数を増加させるか、診断装置の処理能力を高めることにより、診断装置が扱う太陽光発電設備のサイト数は、必要に応じて増加させることが可能である。
 ところで、以下に説明する診断装置では、太陽光発電設備における不具合の有無を診断するための基準は、上述した評価係数であるが、評価係数の変化により太陽光発電設備の不具合の有無を診断するには、評価係数を求める際の条件を種々の評価の間で一致させる必要がある。発電量を変動させる要因は様々であり、太陽電池の温度の変化などが含まれるが、なかでも日射強度は短時間で変化する場合があり、結果的に発電量に大きい影響を与える。そのため、以下に説明する診断装置は、評価係数を求める際の日射量の実測値が種々の評価の間でほぼ一致するように、評価係数を求める条件を定めている。
 具体的には、晴天日に相当する日射量、かつ太陽高度が同程度であることを、評価係数を求める条件に定めている。この条件により、評価係数を求める際の日射量の実測値を種々の評価の間でほぼ一致させている。このような条件を判断する技術は後に説明する。
 (実施形態)
 診断装置10は、図1のように、太陽光発電設備20から電気通信回線31を通してデータを受け取るように構成されている。電気通信回線31は、インターネットを用いたVPN(Virtual Private Network)、移動体通信網、または専用回線などから選択される。また、診断装置10は、太陽光発電設備20の運転管理あるいは保守点検管理を行う事業者が管理する端末装置32と通信するように構成されるコンピュータサーバとして機能する。すなわち、診断装置10は、端末装置32と併せて異常監視システムを構築する。図1において、実線は電力の経路を表し、破線は信号の経路を表す。
 図1に示す太陽光発電設備20は、太陽電池21のほかに、太陽電池21が出力した直流電力を交流電力に変換するように構成される電力変換装置24と、日射計25とを備える。
 日射計25は、太陽電池21への日射強度(厳密には太陽電池21への日射強度に相当する日射強度)を計測するように構成される。たとえば、日射計25は、太陽電池21に隣接して配置される。一具体例として、日射計25は、太陽電池21への日射強度を計測して全天日射量を得るように構成される全天日射計でもよい。
 本実施形態には具備されないが、太陽光発電設備20では、日射計25に加えて温度計が配置されていてもよい。また、太陽光発電設備20は、電力変換装置24で生成された交流電力を電力系統27に供給する受変電設備26を備える。太陽電池21は、1又は複数のソーラパネル(又はストリング)から構成される。図1の例では、太陽電池21は、複数のストリング211で構成されており、ストリング211それぞれの電気出力がストリングモニタ221で監視される。
 接続箱22には、たとえば、一つの太陽電池アレイを構成する複数個のストリング211それぞれと電気的に接続される複数個のストリングモニタ221が収納されている。本実施形態では、太陽光発電設備20は、複数個の接続箱22を備え、接続箱22それぞれに複数個ずつのストリング211が接続される。したがって、1個の接続箱22には、接続される複数個のストリング211の個数に応じた個数のストリングモニタ221が収納される。なお、ストリングモニタ221は、接続箱22とは別に設けられていてもよい。接続箱22は、ストリング211から出力された直流電力を集約して電力変換装置24に供給するように構成される。ストリングモニタ221は、電流センサを通じて、対応するストリング211からの電流を計測するように構成される。電流センサは、ホール素子あるいは磁気抵抗素子を磁気コアに取り付けた構成などが用いられる。電流の計測は、シャント抵抗を通じて行われてもよい。
 太陽光発電設備20は、電力変換装置24への入力電圧を監視(計測)するように構成される計測装置23を備えている。計測装置23は、ストリング211それぞれが出力する電流値をストリングモニタ221から取得する機能と、日射計25の電気出力の値を取得する機能とを有している。なお、日射計25が電力変換装置24に接続され、計測装置23が電力変換装置24を経由して日射計25の電気出力の値を取得してもよい。ストリング211が出力した電圧を電流と併せてストリングモニタ221が計測できる場合には、電流値と電圧値とに基づいて計測装置23が電力値を求めてもよい。計測装置23は、上述した電気通信回線31を通して診断装置10と通信するための通信部231を備える。
 診断装置10は、太陽電池21が出力した電力のデータ(第1のデータ)と、日射計25が計測した日射強度のデータ(第2のデータ)とを計測装置23から受け取るように構成される。診断装置10は、電力のデータを取得するように構成される第1のデータ取得インタフェース11と、日射強度のデータを受け取るように構成される第2のデータ取得インタフェース12とを備える。さらに、診断装置10は、電力のデータおよび日射強度のデータに基づいて太陽光発電設備20の診断を行うように構成される処理部13を備える。
 図2に示すように、第1のデータ取得インタフェース11は、太陽電池21を構成する複数のストリング211それぞれから、一定のサンプリング周期101ごとに電力のデータを取得するように構成される。同様に、第2のデータ取得インタフェース12は、日射計25から一定のサンプリング周期101ごとに日射強度のデータを取得するように構成される。サンプリング周期101は、30秒から10分程度の範囲から選択することが可能であるが、たとえば1分に定めることが望ましい。診断装置10は、日時を計時し、またサンプリング周期101を定めるために、リアルタイムクロックのような内蔵時計(タイマ)14を備える。
 図1の例では、診断装置10が内蔵時計(タイマ)14を備えるが、本実施形態は、これに限らない。たとえば、計測装置23が、タイマを備え、サンプリング周期101ごとに、太陽電池21の電力のデータと日射計25の日射強度のデータを取得し、通信部231を通じて、それぞれのデータを診断装置10(データ取得インタフェース11および12)に供給するように構成されてもよい。タイマが診断装置10および太陽光発電設備20の何れに具備される構成においても、第1および第2のデータ取得インタフェース11および12が、それぞれ、第1のデータおよび第2のデータを、対応する時刻情報とともに取得し、第1のデータおよび第2のデータそれぞれに、対応する時刻情報が割り当てられることが望ましい。上記時刻情報は、対応するデータが取得される時刻の情報であり、本実施形態では、日時の情報である。
 診断装置10は、計測装置23から、電気通信回線31を通してストリング211ごとの電流値および電力変換装置24に入力される電圧値のデータを取得し、ストリング211ごとに発電した電力値を求める。この電力値は、対応するストリング211に異常がなければ、その対応するストリング211が受けた日射強度の値と所定の関係を持つ。なお、診断装置10が計測装置23から電流値および電圧値のデータを受け取るのではなく、診断装置10が計測装置23から電力値のデータを受け取るように構成されていてもよい。つまり、計測装置23が電流値と電圧値とから電力値を計算する構成であってもよい。
 要するに、本実施形態では、計測装置23は、太陽電池21の電力のデータ(第1のデータ)と日射計25の日射強度のデータ(第2のデータ)を取得し、通信部231を通じて、第1のデータと第2のデータを診断装置10(データ取得インタフェース11および12)に供給するように構成される。ここで、電力のデータは、電力値、または電力値を得るための電流値および電圧値を含む。日射強度のデータは、日射計25が日射強度から得られる日射強度値を出力するように構成される場合は日射強度値を含み、日射計25が日射強度を計測して日射量(たとえば全天日射量)を得るように構成される場合は日射強度から得られる日射量を含む。要するに、日射強度のデータは、日射強度に関する値を含む。
 図1の例では、第1のデータ取得インタフェース11は、計測装置23からストリング211ごとの電力のデータを取得することが可能である。また、第1のデータ取得インタフェース11は、計測装置23からすべてのストリング211の合計の電力のデータを取得することが可能である。一方、第2のデータ取得インタフェース12は、計測装置23から日射計25が計測した日射強度のデータを取得することが可能である。
 図2に示すように、第1のデータ取得インタフェース11および第2のデータ取得インタフェース12は、所定のサンプリング周期101ごとのデータを取得する。以下に説明する構成例では、サンプリング周期101は1分間である。処理部13は、サンプリング周期101ごとの、サンプリング期間(サンプリング用期間)102における電力値および日射強度それぞれの積算値または平均値に基づいて太陽光発電設備20の診断を行うように構成される。サンプリング周期101が1分間であることは一例であって、30秒から10分程度の範囲から適宜に選択すればよい。また、診断装置10は、診断時の条件を揃えるために、南中時刻を間に含む期間(所定の時間(日照時間)帯)110における太陽電池21からの電力のデータと、日射計25が計測した日射強度のデータとに基づいて、太陽電池21の診断を行う。たとえば、10時から13時の期間110に得られたデータに基づいて診断が行われる。
 要するに、図2の例に示すように、サンプリング周期101ごとに太陽電池21の複数の電力値と日射計25の複数の日射強度に関する値を取得するためのサンプリング期間(サンプリング用期間)102が、各サンプリング周期101内に設けられている。この場合、各サンプリング周期101の両端のそれぞれがサンプリング時点であるので、サンプリング時点ごとに、そのサンプリング時点直前のサンプリング期間102内の値が取得されることになる。以下、この構成を「構成A」という。なお、本実施形態は、この構成Aに限らない。たとえば、本実施形態は、各サンプリング周期101内にサンプリング期間102が設けられない構成(以下「構成B」という)でもよい。
 したがって、本実施形態では、第1および第2のデータ取得インタフェース11および12は、それぞれ、サンプリング周期101ごとに、第1のデータおよび第2のデータを取得して、第1のデータおよび第2のデータを処理部13に供給するように構成される。構成Aでは、処理部13へのサンプリング周期101ごとの第1のデータは、複数の電力値の平均値であり、これは、対応するサンプリング期間102に得られた複数の電力値、または複数の電力値を得るための複数の電流値および複数の電圧値から得られる。同様に、処理部13へのサンプリング周期101ごとの第2のデータは、複数の日射強度に関する値の平均値であり、これは、対応するサンプリング期間102に得られた複数の日射強度に関する値から得られる。構成Bでは、処理部13へのサンプリング周期101ごとの第1のデータは、サンプリング時点で得られる電力値を含む。同様に、処理部13へのサンプリング周期101ごとの第2のデータは、サンプリング時点で得られる日射強度に関する値を含む。なお、日射強度に関する値は、上述の如く、日射強度値または日射強度値から得られる日射量である。また、サンプリング期間102におけるサンプリング間隔は、たとえばタイマ(内蔵時計14)によって制御される。
 太陽光発電設備20の周囲に存在する建物、樹木のような障害物などは、太陽光発電設備20の設置現場によって異なり、また日出時刻あるいは日入時刻は、太陽光発電設備20が設置されている地形によって異なる。そのため、朝日および夕日が太陽電池21に照射される時間帯は、太陽光発電設備20が設置されている現場に応じて変化し、この時間帯において太陽電池21に照射される日射強度も、太陽光発電設備20が設置されている現場に応じて変化する。さらに、朝日および夕日が太陽電池21に照射される時間帯は、季節によっても変化する。
 一方、南中時刻を間に含む期間110であれば、晴天日には季節によらず太陽電池21に太陽光が照射される可能性が高く、また太陽光発電設備20の周囲の障害物、太陽光発電設備20が設置されている場所の地形の影響を受けにくい。そのため、診断装置10は、南中時刻を間に含む所定の時間帯110の日射量に基づいて診断を行うように構成される。時間帯110は、たとえば、1時間から5時間の範囲内でもよいが、3時間であることが望ましい。
 診断装置10による太陽光発電設備20の診断用の評価係数をKpと定義すると、Kp=発電量の実測値/(発電容量×日射量の実測値)という形式で表される。この評価係数Kpは、太陽光発電設備20で生じた総合的な損失の程度を表している。つまり、評価係数Kpには、太陽電池(ソーラパネル)の角度、太陽電池の傾斜、電線での損失、電力変換装置24の変換効率、太陽電池表面の汚れなどで生じる損失、太陽電池表面の反射による損失などが含まれている。また、時間帯110が南中時間を間に含む時間帯であるから、時間帯110のデータから求めた評価係数は、障害物および地形の影響を受けずに、太陽光発電設備20の総合的な損失の程度を表すことができる。
 すなわち、診断装置10は、南中時刻を間に含む時間帯110ごとに上述した評価係数(標準評価係数)を求め、異なる判定期間(節気)の時間帯110から求めた評価係数を、その標準評価係数と比較することにより、太陽光発電設備20の診断を行う。時間帯110は、南中時刻を間に含むように10時から13時までの3時間の期間が可能である。本実施形態では、図2に示すように、時間帯110を30分単位の複数の計算期間111から構成し、10時から13時において6個の計算期間111を設けている。
 ところで、同じ季節とみなせる複数日では、同時刻の太陽高度はほぼ等しいから、晴天時の日射強度もほぼ等しい。以下では、同じ季節とみなせる複数日を含む期間を「判定期間100(図2参照)」という。判定期間100は、季候を区分する期間であって、一般的には、2週間から1ヶ月程度の範囲であり、たとえば、二十四節気のうちの1つの節気に含まれる複数日(15日間)の期間が望ましい。判定期間100として、毎月の前半の複数日および毎月の後半の複数日、あるいは1ヶ月の複数日などを採用することも可能である。要するに、太陽高度がほぼ等しい期間が判定期間100として選択される。
 図3における実線L1は、時間帯110ごとの評価係数がどのように時間変化をするかを示し、ここで、時間帯110ごとの評価係数は、時間帯110内の30分単位の計算期間111で求めた複数(図2の例では6個)の評価係数Kpの平均値を表している。図3の横軸は判定期間(節気)100を単位とする時間を表しており、時間帯110ごとの評価係数がなだらかに変化することがわかる。なお、図3における破線L21は(評価係数の平均値+0.025)を表し、破線L22は(評価係数の平均値-0.025)を表している。破線L21と破線L22との範囲は、30分単位の評価係数に関するばらつきの範囲を表している。すなわち、30分を計算期間111として求めた評価係数は、晴天時に求めた評価係数であれば、判定期間(節気)100によらず、おおむね破線L21と破線L22との範囲内に収まるという実験結果が得られている。また、図3によれば、6個の計算期間111に求めた6個の評価係数Kpの平均値は、判定期間100においてなだらかに変化することがわかる。これらのことから、1つの判定期間(節気)100について評価係数の平均値などを代表値として用いてもよいことがわかる。なお、図3において評価係数を記載していない期間Tは、晴天という条件が満たされず、適切な評価係数が得られなかった期間を表している。
 図1に示すように、診断装置10の処理部13は、評価係数Kpを求めるための計算部131を備える。計算部131は、日射計25が計測した日射強度のデータから計算期間111ごとに日射量を求め、日射量(実測値)と太陽電池21の仕様によって決まる太陽電池容量(発電容量)との積を求める。さらに、計算部131は、太陽電池21の電力のデータから計算期間111ごとに太陽電池21(各ストリング211)の電力量(発電量)を求め、電力量(実測値)を上記積の値で除算することによって、計算期間111ごとに評価係数Kpを求める。
 本実施形態では、診断装置10は、時間帯110の計算期間111ごとに、複数の第1のデータから得られる電力量と複数の第2のデータから得られる日射量と太陽電池21(各ストリング211)の発電容量から、評価係数Kpを算出するように構成される。ここで、計算期間111ごとの複数の第1のデータから得られる電力量(発電量)は、計算期間111内の複数のサンプリング周期101で得られる複数の電力値の積分値である。計算期間111ごとの複数の第2のデータから得られる日射量は、計算期間111内の複数のサンプリング周期101で得られる複数の日射強度に関する値の積分値または平均値である。つまり、日射量は、計測装置23が取得する日射強度のデータが日射強度値を含む場合は積分値であり、日射強度のデータが日射量を含む場合は平均値である。
 この場合、診断装置10は、複数の評価係数Kpから評価係数の代表値を求め、その評価係数の代表値を、記憶部1321に記憶された別の評価係数の代表値(標準評価係数)と比較して、太陽光発電設備20の診断を行うように構成される。本実施形態では、評価係数の代表値は、判定期間100ごとの評価係数であり、これは、判定期間100ごとに得られる複数(図2の例では6個×判定期間100の日数)の評価係数の平均値である。換言すると、判定期間100ごとの評価係数は、判定期間100内の時間帯110ごとの評価係数から得られる。
 さらに、診断装置10は、判定期間100ごとの評価係数が標準評価係数を間(望ましくは中心)に含むしきい範囲(図3参照)内にある場合、太陽光発電設備20が正常である診断結果を得るように構成される。ここで、しきい範囲は、「評価係数の代表値+0.05」から「評価係数の代表値-0.05」の範囲内でもよいが、「評価係数の代表値+0.025」から「評価係数の代表値-0.025」の範囲であることが望ましい。
 このように、本実施形態では、晴天の条件に対応した電力量の実測値および日射量の実測値から、判定期間(節気)ごとに評価係数を求めている。つまり、1日当たり6個の計算期間111を設け、時間帯110ごとの評価係数はストリング211ごとに求められる。したがって、1つの時間帯110について求められる評価係数の個数は、6×(ストリング211の個数)になる。
 診断装置10の処理部13は、判定期間100ごとの評価係数に基づいて太陽光発電設備20の診断を行うように構成される診断部132を備えている。診断部132は、複数の判定期間(節気)100それぞれについて求めた評価係数に基づいて、太陽光発電設備20の診断を行う。つまり、診断部132は複数個の評価係数に基づいて診断を行う。上述したように、判定期間100ごとに1個の評価係数が1つの節気に対して求められるから、節気ごとの評価係数は、判定期間100ごとの評価係数と言い換えることができる。
 以下では、診断部132が、複数の判定期間(複数の節気)100についてそれぞれ求めた評価係数に基づいて、太陽光発電設備20の診断を行う技術について説明する。診断部132は、判定期間100ごとの評価係数に基づいて、太陽電池21に搭載されたバイパスダイオードの短絡故障、太陽電池21の経年的な劣化、太陽電池21の表面(受光面)の汚れを、太陽光発電設備20の不具合として診断する。
 診断部132は、記憶部1321と比較部1322と判断部1323とを備える。記憶部1321は、太陽光発電設備20が正常に稼働している状態であるときに計算部131が求めた判定期間100ごとの評価係数を標準評価係数として記憶する。標準評価係数は、複数の判定期間100について記憶部1321に格納される。記憶部1321は、たとえば1年分以上の標準評価係数を格納していることが望ましい。
 比較部1322は、判定期間(節気)100ごとに求めた評価係数に関する乖離率を求める機能を有する。また、比較部1322は、太陽光発電設備20の運転中に計算部131が求めた判定期間100ごとの評価係数と、記憶部1321が記憶している標準評価係数との差を求める機能を有する。判断部1323は、比較部1322での比較結果に基づいて、太陽光発電設備20に不具合が生じているか否かを判断する。
 たとえば、判断部1323が太陽電池21の故障を判断する場合、比較部1322は評価係数に関する乖離率をストリング211ごとに求め、2つの乖離率を比較する。乖離率は、判定期間(節気)100ごとの評価係数をKp(n)とすると、乖離率={Kp(n-1)-Kp(n)}/Kp(n)で求められる。ここに、nは判定期間(節気)100の順番を表している。図2の例では、乖離率は、特定の判定期間(節気)100(n)で得られた評価係数Kp(n)を、特定の判定期間(節気)100(n)に対して一つ前の判定期間(節気)100(n-1)で得られた評価係数Kp(n-1)から引いた値を、特定の判定期間(節気)100(n)で得られた評価係数Kp(n)で除した値として定義している。この場合、1つの判定期間(節気)100(n)について求められる乖離率は、ストリング211ごとに求められる。なお、乖離率は、隣り合う判定期間(節気)100について求めた評価係数の差を、一方の評価係数で除算した値であれば、他の計算式で定義することが可能である。
 判断部1323は、比較部1322が比較した2つの乖離率の差が所定の故障閾値を超える場合に太陽電池21の故障と判断するように構成される。太陽電池21の故障は、バイパスダイオードの短絡などの事象を意味している。この種の故障がなければ、乖離率は図4に破線L31で示すようになだらかに推移するが、故障が発生すると、乖離率は図4に実線L41で示すように急に変化する。したがって、判断部1323は、隣り合う2つの判定期間(節気)100に対して求められた2つの乖離率の差を求め、この差が故障閾値を超えている場合に、バイパスダイオードの短絡などの故障が生じたと判断する。
 判断部1323が太陽電池21の劣化を判断する場合、比較部1322は太陽光発電設備20の運転中に計算部131が求めた判定期間100ごとの評価係数と、記憶部1321に格納されている標準評価係数とを比較する。具体的には、比較部1322は、計算部131が求めた判定期間100ごとの評価係数を、記憶部1321に格納されている対応する判定期間100の標準評価係数から引いた差を求める。つまり、その対応する判定期間100は、上記評価係数の判定期間100と同じ過去の判定期間(節気)100である。たとえば、図3において、上記評価係数の判定期間100が節気6であれば、対応する判定期間100は、過去(たとえば1年前)の節気6である。判断部1323は、比較部1322が求めた差を所定の劣化閾値と比較し、差が劣化閾値を超えた場合に、太陽電池21に劣化の可能性があると判断する。
 この場合、判断部1323は、該当する判定期間(節気)100以前の複数の判定期間(節気)100において、記憶部1321に格納されている標準評価係数と計算部131が求めた判定期間100ごとの評価係数との差が時間経過に伴って増加しているか否かを検証する。そして、図5のように、時間経過に伴って差が増加している場合に、判断部1323は、太陽電池21が劣化していると判断する。図5において破線L32は判定期間(節気)100ごとに求めた標準評価係数を表し、実線L42は太陽光発電設備20の運転中において判定期間(節気)100ごとに求めた評価係数を表す。なお、太陽電池21は経年的に劣化するから、想定されるよりも劣化の程度が大きい場合に不具合として検知することが望ましい。また、評価係数は、太陽光発電設備20の総合的な損失を表しているから、図5のような事象が生じた場合には、太陽電池21だけではなく、電力変換装置24の劣化を判断するようにしてもよい。
 判断部1323が太陽電池21の汚れを判断する場合、太陽電池21の劣化を判断する場合と同様に、比較部1322は太陽光発電設備20の運転中に計算部131が求めた判定期間100ごとの評価係数と、記憶部1321に格納された標準評価係数との差を求める。上述したように、この差は太陽電池21の経年的な劣化に伴って増加するから、経年的な劣化に対しては、図6に実線L33で示すように、緩やかに増加する。一方、太陽電池21の表面に土埃あるいは黄砂などが付着し、降雨のない期間が長く続いたとすれば、土埃あるいは黄砂などが堆積することによって、図6に破線L43で示すように、太陽電池21から出力される電力が劣化時よりも短時間で低下する。すなわち、評価係数は電力量の実測値に比例するから、太陽電池21から出力される電力が低下すれば評価関数が低下し(Kpの式参照)、結果的に標準評価係数との差が大きくなる。
 そこで、判断部1323は、標準評価係数と判定期間100ごとの評価係数との差が、複数の判定期間(節気)100において時間経過に伴って増加を続けている場合に、差の増加率に基づいて、太陽電池21の劣化と太陽電池21への汚れの付着とを区別する。すなわち、判断部1323は、第1閾値と第2閾値と第3閾値との3段階の閾値に基づいて判断をする(第1閾値<第2閾値<第3閾値)。判断部1323は、増加率が第1閾値以上で第2閾値未満であれば太陽電池21の劣化と判断し、増加率が第3閾値以上であれば太陽電池21の汚れと判断する。
 本実施形態の処理部13は、上述したように、太陽光発電設備20について3種類の不具合を判断することが可能であるが、上述した3種類の不具合のうちの少なくとも1種類を判断する構成であてもよい。すなわち、判断する不具合の種類に応じて、上述した構成は適宜に省略することが可能である。
 上述した動作例は、太陽光発電設備20の不具合を太陽光発電設備20の全体について一括して診断している。一方、第1のデータ取得インタフェース11は、太陽電池21のストリング211を単位として電力に関するデータを取得することが可能である。そのため、診断装置10は、ストリング211を単位とした診断を行うことが可能である。
 具体的には、診断部132において、複数のストリング211それぞれの電力のデータに基づいて、複数のストリング211それぞれに対応した評価係数を求める。たとえば、診断部132は、ストリング211ごとに、判定期間100ごとの評価係数を求める。診断部132は、複数のストリング211について求めた評価係数に基づいて、ストリング211ごとに不具合が生じているか否かを診断することが可能になる。ここに、ストリング211ごとの評価係数は、太陽電池21の故障、太陽電池21の劣化、太陽電池21の汚れなどの診断に用いることが可能である。
 ところで、この構成では、複数のストリング211について評価係数を求めるから、複数の評価係数が得られる。このことを利用し、判断部1323は、複数のストリング211それぞれについて求めた評価係数を互いに比較することによって、不具合が生じているストリング211を特定することが可能である。すなわち、複数のストリング211について、個々に不具合が生じているか否かを診断することが可能である。
 さらに、不具合が生じている可能性があるストリング211が抽出された場合に、複数のストリング211の評価係数を相互に比較すれば、不具合が生じているストリング211が特定される。したがって、判断部1323は、不具合が生じている可能性のあるストリング211が抽出された場合に、複数のストリング211の評価係数を相互に比較することによって、ストリング211の不具合を確定することができる。
 ここに、複数のストリング211の評価係数を相互に比較するのではなく、隣り合う2つの判定期間(節気)100について求めた評価係数の変化率を比較してもよい。評価係数の変化率は、変化率={Kp(n)-Kp(n-1)}/(判定期間100の日数)などの形式で求められる。なお、判定期間100が節気の場合、節気の日数は一定値であるから、分子のみを用いても評価係数の変化率を比較することが可能である。ここに、上式のようにして求めた評価係数の変化率が、特定のストリング211については-Xであり、残りのストリング211についてはY±Zの範囲であるときに、評価係数の変化率が-Xであるストリング211に不具合が生じていると確定すればよい。言い換えると、判断部1323は、評価係数の変化率の分布に基づいて、変化率が集中している部分に対応するストリング211は正常と判断し、変化率の外れ値に対応するストリング211は不具合が生じていると判断する。
 ところで、上述した評価係数を求めるための第1のデータ(たとえば電力のデータ)と第2のデータ(たとえば日射強度のデータ)とは晴天時に得られたデータであることを前提にしている。したがって、これらのデータが晴天時に得られたか否かを判定する必要がある。また、電力のデータと日射強度のデータとがともに晴天時のデータであることを保証する必要がある。
 処理部13は、以下の処理によって、電力のデータと日射強度のデータとが晴天時のデータであるか否かを判定する機能を有している。処理部13は、晴天か否かを判定するために、仮パターン抽出部133とパターン記憶部134とパターン判定部135と晴天判定部136とを備える。
 上述したように、時間帯110が南中時刻を間に含む期間であるから、日射に対する障害物および地形の影響は軽減されるが、雲による日射強度の変化は時々刻々と生じている。そのため、時間帯110であっても晴天である期間が継続していることは保証されない。
 そこで、仮パターン抽出部133は、第1のデータ取得インタフェース11が取得した電力のデータについて、1つの判定期間(節気)100に含まれる複数日(具体的には15日)から同時刻の最大値を求め、求めた最大値を時刻に対応付ける処理を行う。以下では、電力のデータについて最大値を時刻に対応付けたデータを「仮パターン」と呼ぶ。仮パターンを構成するデータは、後述する晴天条件を満足すると「晴天パターン」としてパターン記憶部134に格納される。
 同様にして、仮パターン抽出部133は、第2のデータ取得インタフェース12が取得した日射強度のデータについて、1つの判定期間(節気)100に含まれる複数日から同時刻の最大値を求め、求めた最大値を時刻に対応付ける処理を行う。日射強度の仮パターンもパターン記憶部134に格納される。
 たとえば、1つの判定期間(節気)100において、日射強度が図7のように変化した場合、仮パターン抽出部133は、1日目から15日目までの日射強度のデータから、各日の同時刻におけるデータのうちの最大値を抽出し、最大値を時刻に対応付ける。この処理によって、図8に示すような日射パターンが得られる。図7および図8は日射強度のデータを例示しているが、電力のデータに基づいて仮パターンを生成する処理も同様である。
 仮パターンおよび日射パターンは、太陽高度がほぼ一致している期間のデータに基づいているから、異なる日のデータを用いながらも、1日分のデータとして扱うことが可能である。また、仮パターンは複数日の電力のうち同時刻の最大値で生成され、日射パターンは複数日の日射強度のうち同時刻の最大値で生成されているから、多くの時刻において晴天時のデータであると推測される。
 もちろん、1つの判定期間(節気)100に含まれる複数日において、晴天の状態が1日も得られない時刻が生じる可能性はある。しかしながら、中規模から大規模の太陽光発電設備20を設置する場合には、日照時間が比較的長い場所が選択されると考えられるから、比較的高い確率で晴天日のデータが得られる。
 以下では、診断装置10を継続的に運用している状態であって、晴天条件を満足した晴天パターンのみがパターン記憶部134に格納されている状態を想定して説明する。パターン記憶部134に格納される晴天パターンは、最初に晴天時であることを保証する作業を行っておけば、その後に継続的に運用している状態では、晴天条件を満足した晴天データで自動的に登録される。1年分の晴天パターンがパターン記憶部134に格納された後は、同じ判定期間(節気)100について同じ晴天パターンを用いることが可能である。また、1年分の晴天パターンがパターン記憶部134に格納された後、晴天パターンを判定期間(節気)100ごとに更新するように構成してもよい。
 晴天条件は、特定の判定期間(節気)100に仮パターン抽出部133が抽出した仮パターンと、この特定の判定期間100より前の判定期間100に得られた晴天パターンとの類似の程度が基準値より高いことを条件にしている。晴天パターンの判定期間100は、比較対象である仮パターンが抽出された判定期間100より前であり、かつ仮パターンの判定期間100に近い判定期間100であることが要求される。晴天パターンの判定期間100は、仮パターンが抽出された判定期間100の1つ前の判定期間100であることが望ましいが、1つ前の判定期間100において天候不順あるいは新たな影の発生により晴天パターンが生成されていない場合がある。したがって、晴天パターンの判定期間100は、仮パターンが生成された判定期間100に対して、最大で2前の判定期間100あるいは3つ前の判定期間100まで遡ることを許容することが望ましい。
 パターン判定部135は、仮パターンと晴天パターンとの類似の程度の評価を行い、類似の程度が基準値以上であれば、該当する仮パターンが晴天条件を満足したと判定する。類似の程度は、仮パターンと晴天パターンとについて、同時刻(計算期間111)のデータの差分を求め、この差分に基づいて評価する。すなわち、仮パターンと晴天パターンとがほぼ一致していれば、時間帯110において、差分はほぼ一定値になると考えられる。したがって、パターン判定部135は、この差分が所定の許容範囲内であるときに、類似度が基準値以上であると判断すればよい。
 一方、仮パターンと晴天パターンとが異なっていると、時間帯110において、差分は一定値にならず、天候不順の場合には差分が時刻に対して不規則に変動し、新たな影が生じた場合には差分がなだらかに変化すると考えられる。つまり、パターン判定部135は、時間帯110における差分の分布、時間帯110における差分の包絡線などに基づいて、仮パターンと晴天パターンとの類似の程度を評価する。
 なお、最初に晴天時であると推定される晴天パターンを登録するために、異なる判定期間(節気)100の仮パターンの一方を仮に晴天パターンとみなし、晴天条件を満足すれば晴天パターンとして採用するようにしてもよい。
 パターン判定部135において晴天条件を満足したと判定された特定の判定期間(節気)100の仮パターンは、この判定期間100の晴天パターンとしてパターン記憶部134に格納される。一方、特定の判定期間100の仮パターンが晴天パターンを満足しない場合には、パターン判定部135は、出力部15を通してユーザの端末装置32にプッシュ方式で通知をする。たとえば、アラームのための信号が端末装置32に伝送される。
 端末装置32は、サーバである診断装置10に対してクライアントであって、一般的には、診断装置10と通信するように構成されるパーソナルコンピュータから構成される。診断装置10と端末装置32との通信には、インターネットを用いたVPN(Virtual Private Network)、移動体通信網、専用回線などから選択される通信路を用いる。端末装置32は、パーソナルコンピュータのほか、タブレット端末、スマートフォンなどから選択することが可能であり、また、シンクライアント(thin client)であってもよい。また、出力部15から端末装置32への通知は、電子メールで行ってもよい。
 上述の例では、晴天パターンを電力のデータから求めているが、日射強度のデータについても同様の処理によって晴天パターンが求められる。すなわち、日射強度のデータから仮パターンが生成され、特定の判定期間(節気)100の仮パターンについて晴天条件を満足するか否かが判定される。また、晴天条件を満足する仮パターンは特定の判定期間100の晴天パターンとしてパターン記憶部134に格納される。
 ところで、複数年のうちの同じ判定期間(節気)100において、太陽電池21と日射計25との一方について晴天パターンが得られない場合、正しい評価係数が得られない。そのため、晴天判定部136は、電力のデータから求めた晴天パターンと、日射強度のデータから求めた晴天パターンとを比較し、太陽電池21と日射計25とが両方とも晴天時のデータであるか否かを判定する。すなわち、晴天判定部136は、電力に関する晴天パターンと日射強度に関する晴天パターンとについて、同時刻のデータの差分を求め、差分がほぼ一定値である場合には、両方の晴天パターンが晴天時のデータで構成されていると判定する。つまり、晴天判定部136は、差分について所定の許容範囲を定め、求めた差分が許容範囲内であれば、太陽電池21と日射計25とから晴天時のデータが得られていると判定する。
 ここで、複数年のうちの同じ判定期間(節気)100について、電力に関する晴天パターンと日射強度に関する晴天パターンとの差分が許容範囲を逸脱する場合には、差分が時刻に対して不規則に変動するか(天候不順)、差分がなだらかに変化する(新たな影)。したがって、晴天判定部136は、時間帯110における差分の分布、時間帯110における差分の包絡線などに基づいて、電力と日射強度とについて得られた晴天パターンの評価を行うことが望ましい。
 電力と日射強度との少なくとも一方が晴天時のデータではない場合には、晴天判定部136は、出力部15を通して端末装置32にプッシュ方式で通知をし、計算部131が求めた評価係数では診断ができないことをユーザに通知する。また、晴天判定部136によって、原因が天候不順あるいは新たに生じた影の影響であることが判定される場合には、原因についても端末装置32に通知することが望ましい。
 なお、電力に関する晴天パターンと日射強度に関する晴天パターンとは、パターン判定部135によって晴天時のデータであると判定されているので、晴天判定部136の処理は安全性を高めるための処理であって省略することが可能である。
 ところで、電力のデータと日射強度のデータとは、太陽電池21と日射計25との位置関係、あるいはデータの処理の時間差などによって、図9に示すように、時間軸方向にずれが生じる可能性がある。図9では日射強度のデータを符号L5で示し、電力のデータを符号L6で示している。上述したように、評価係数を求める場合、晴天パターンを求める場合などにおいて、電力のデータと日射強度のデータとは時刻を一致させる必要がある。そのため、処理部13は、時刻補正部137を備えている。時刻補正部137は、第1のデータ取得インタフェース11が取得した電力のデータと、第2のデータ取得インタフェース12が取得した日射強度のデータとについて時間軸方向のずれを補正するように構成されている。
 また、上述したように、太陽光発電設備20は、電力変換装置24を備えており、第1のデータ取得インタフェース11は、太陽電池21が出力する電力だけではなく、電力変換装置24が出力する電力に関するデータも取得することが可能である。ここで、太陽電池21が出力する電力のデータと、電力変換装置24が出力する電力のデータとについても時間差が生じるから、処理部13は、両方のデータについて時間軸方向のずれを補正するように構成されていることが望ましい。
 以上説明したように、処理部13は、以下の順序で処理を行う。すなわち、処理部13において、電力のデータおよび日射強度のデータに基づいて、仮パターン抽出部133が仮パターンを生成し、パターン判定部135が晴天パターンの判定を行う。ここで、晴天パターンについて、電力のデータと日射強度のデータとに時間軸方向のずれがあれば、時刻補正部137が時間軸方向のずれを解消する。時間軸方向の補正は必須ではなく、時刻補正部137は省略可能である。その後、電力に関する晴天パターンと日射強度に関する晴天パターンとが、ともに晴天時のデータか否かが晴天判定部136で評価される。
 なお、電力変換装置24の電力のデータを取得する場合、処理部13は、電力変換装置24の電力のデータと太陽電池21から出力された電力のデータとの間の時間差を解消するように、2種類のデータについて時間軸方向の補正を行う。
 電力に関する晴天パターンと日射強度に関する晴天パターンとが得られると、これらの晴天パターンのデータに基づいて、計算部131が評価係数を求める。評価係数が求められると、診断部132が評価係数を評価し、太陽光発電設備20に関するさまざまな診断を行う。
 上述した太陽光発電設備20の診断装置10は、プログラムを実行する1又は複数のプロセッサを備えるデバイス(第1デバイス)と、外部装置を接続するためのインターフェイス用のデバイス(第2デバイス)とを主なハードウェア要素として備える。第1デバイスは、メモリを別に接続する1又は複数のマイクロプロセッサのほか、メモリを一体に備える1又は複数のマイコン(Microcontroller)などから選択される。
 プログラムは、あらかじめROM(Read Only Memory)に書き込まれた状態で提供されるようにしてもよいが、書換可能な不揮発性メモリに格納できるように、コンピュータで読み取り可能な記録媒体を用いて提供されることが望ましい。また、プログラムは、記録媒体に代えて、インターネットのような電気通信回線を通して提供されてもよい。
 以上説明した太陽光発電設備20の診断装置10は、第1のデータ取得インタフェース11と第2のデータ取得インタフェース12と処理部13とを備える。第1のデータ取得インタフェース11は、太陽電池21を備える太陽光発電設備20から所定の時間帯110に出力される電力のデータを、第1のデータとして取得するように構成される。第2のデータ取得インタフェース12は、日射計25から上記時間帯110に出力される日射強度のデータを、第2のデータとして取得するように構成される。処理部13は、第1のデータと第2のデータとに基づいて太陽光発電設備20の診断を行うように構成される。処理部13は、計算部131と診断部132とを備える。計算部131は、第2のデータから求められる日射量の実測値および太陽電池21の太陽電池容量の積と第1のデータから求められる電力量との比率である評価係数を求めるように構成される。診断部132は、計算部131が複数の所定の判定期間100ごとに求めた評価係数に基づいて太陽光発電設備20の診断を行う。
 この構成によれば、太陽光発電設備20の設置現場に応じた評価係数を生成することが可能になり、診断の精度を高めることができる。
 判定期間100は、季候に応じた(または気候に同調した)1年の複数の区分期間の何れかに対応する期間であって、複数日を含むように定められていることが望ましい。たとえば、判定期間100は、節気の24区分の何れかに対応する期間でもよい。
 すなわち、季候が同じ判定期間100では、日毎の太陽高度がほぼ等しいから、判定期間100に含まれる複数日は太陽高度に関して同条件であるとみなすことができる。また、1日だけでは晴天時のデータが得られない場合でも、複数日のデータによって晴天時のデータを得られる可能性が高くなる。
 計算部131は、複数の計算期間111それぞれの複数の評価係数Kpを求め、その複数の評価係数Kpの平均値を1日の評価係数として求めるように構成されることが望ましく、ここにおいて、複数の計算期間111は、南中時刻を含む1日の所定の時間帯110を区分することによって得られる。
 この構成によれば、日射が障害物および地形の影響を受けにくい南中時刻を間に含む時間帯における第1のデータおよび第2のデータを用いるから、第1のデータおよび第2のデータのそれぞれについて、晴天時のデータが得やすい上に、季節変動の影響が少ないデータを得ることができる。
 診断部132は、比較部1322を備えることが望ましく、これは、複数の区分期間にそれぞれ対応する複数の判定期間100ごとに、当該判定期間と当該判定期間に隣接する判定期間から得られる2つの評価係数の差を、その2つの評価係数の一方で割った値である乖離率を求め、隣り合う2つの判定期間100に対して求めた2つの乖離率を比較するように構成される。診断部132は、比較部1322が比較した2つの乖離率の差が所定の故障閾値を超える場合に太陽電池21の故障と判断するように構成される。
 この構成では、太陽電池21に設けたバイパスダイオードの短絡などの故障を検出することが可能である。
 また、診断部132は、記憶部1321と比較部1322と判断部1323とを備えていてもよい。記憶部1321は、太陽光発電設備20が正常に稼働している状態であるときに計算部131が複数の判定期間100ごとに求めた複数の評価係数を、複数の判定期間100に対応する複数の標準評価係数として記憶するように構成される。比較部1322は、太陽光発電設備20の運転中に計算部131が求めた評価係数を、記憶部1321に記憶された複数の標準評価係数のうち当該評価係数の判定期間100に一致する判定期間100における標準評価係数と比較するように構成される。判断部1323は、比較部1322の比較結果に基づいて太陽光発電設備20に不具合があるか否かを判断するように構成される。
 この構成によれば、正常時に得られる標準評価係数と比較対象である評価係数とに基づいて太陽光発電設備20の診断を行うから、太陽電池21の劣化あるいは汚れの診断が可能になる。
 この場合、判断部1323は、比較部1322が求めた標準評価係数と評価係数との差(第1の差)が所定の劣化閾値を超えたか否かを判断するように構成される。また、診断部132は、該当する判定期間100以前の複数の判定期間100それぞれにおける評価係数と標準評価係数との差(各第2の差)が時間経過に伴って増加しているか否かを判断するように構成される。診断部132は、第1の差が劣化閾値を超え、かつ各第2の差が時間経過に伴って増加している場合に、太陽電池21の劣化と判断するように構成される。
 この構成によれば、太陽電池21の劣化の診断が可能になる。
 また、判断部1323は、比較部1322が求めた標準評価係数と評価係数との差が、複数の判定期間100において時間経過に伴って増加を続け、それらの差の増加率が第1閾値以上で第2閾値未満であれば太陽電池21の劣化と判断するように構成される。一方、判断部1323は、その増加率が第2閾値より大きい第3閾値以上であれば太陽電池21の汚れと判断するように構成される。
 この構成によれば、太陽電池21の劣化と太陽電池21の汚れとを区別して診断することが可能になる。
 第1のデータ取得インタフェース11は、太陽電池21を構成する複数のストリング211から複数のストリング211それぞれについて電力のデータを取得するように構成される。また、判断部1323は、複数のストリング211ごとに、隣接する2つの判定期間100で比較部1322が求めた標準評価係数と評価係数との差の変化率を求めるように構成される。そして、判断部1323は、複数のストリング211ごとに求めた複数の変化率の分布に基づいて、複数のストリング211ごとに不具合があるか否かを判断するように構成される。
 この構成によれば、ストリング211を単位として不具合があるか否かの診断が可能になる。
 ところで、処理部13は、仮パターン抽出部133とパターン記憶部134とパターン判定部135とを備えることが望ましい。仮パターン抽出部133は、判定期間100における電力のデータと日射強度のデータとのそれぞれについて、判定期間100に含まれる複数日から同時刻の最大値を求め、最大値を時刻に対応付けた仮パターンを抽出するように構成される。パターン記憶部134は、仮パターンが所定の晴天条件を満たす場合に仮パターンを判定期間100の晴天パターンとして記憶するように構成される。パターン判定部135は、特定の判定期間100に仮パターン抽出部133が抽出した仮パターンと、特定の判定期間100より前の判定期間100の晴天パターンとについて類似の程度を評価するように構成される。そして、パターン判定部135は、当該類似の程度が基準値より高いときに、特定の判定期間100の仮パターンが晴天条件を満たしたと判定し、特定の判定期間100の仮パターンを特定の判定期間100の晴天パターンとするように構成される。計算部131は、晴天パターンのデータに基づいて評価係数を求めるように構成される。
 この構成によれば、計算部131が評価係数を求めるためのデータが、晴天時のデータになる可能性を高めることができる。言い換えると、晴天時ではないデータに基づいて評価係数を求める可能性が低減される。
 処理部13は、複数年のうちの同じ判定期間100において日射強度に関する晴天パターンと電力に関する晴天パターンとの同時刻における差分を求め、差分の値が所定の判定値に対して設定した許容範囲内か否かを判定するように構成される晴天判定部136を備えることが望ましい。診断装置10は、差分の値が許容範囲を逸脱している場合に、所定の端末装置32に通知をするように構成される出力部15を備えることが望ましい。
 この構成によれば、電力に関する晴天パターンと日射強度に関する晴天パターンとがともに晴天時のデータであることが確認される。また、電力に関する晴天パターンと日射強度に関する晴天パターンと少なくとも一方が晴天時のデータではない場合には、端末装置32に通知がされるから、該当する判定期間100について求めた評価係数が適切ではないことをユーザに認識させることが可能になる。
 処理部13は、第1のデータ取得インタフェース11が取得した電力のデータと、第2のデータ取得インタフェース12が取得した日射強度のデータとについて時間軸方向のずれを補正するように構成される時刻補正部137を備えることが望ましい。たとえば、図1のように、内蔵時計14が診断装置10に設けられている場合、電力のデータと日射強度のデータが図9の例に示すように時間軸方向にずれることがある。このため、時刻補正部137は、たとえば、電力のデータから得られる波形の立上りまたは立下りが日射強度のデータから得られる波形の立上りまたは立下りと一致するように、電力のデータと日射強度のデータの何れか一方を時間軸方向にシフトするように構成される。
 この構成によれば、電力のデータと日射強度のデータとの時刻を一致させることによって、より精度よく評価係数を求めることが可能になる。
 太陽光発電設備20は、太陽電池21が出力した直流電力を交流電力に変換する電力変換装置24を備える。この場合、第1のデータ取得インタフェース11は、太陽電池21から出力される電力に関する第1のデータと、電力変換装置24から出力される電力に関する第2のデータとを取得することが望ましい。また、処理部13は、第1のデータと第2のデータとについて時間軸方向のずれを補正するように構成されていることが望ましい。
 この構成では、太陽電池21の出力だけではなく電力変換装置24の出力も監視するから、電力変換装置24の診断も可能になる。
 本実施形態のプログラムは、コンピュータを、太陽光発電設備20の診断装置10として機能させるものである。
 望ましい実施形態において、図7の例に示すように、診断装置10の処理部13は、第1のパターン抽出期間200に含まれる複数の第2のパターン抽出期間210内のサンプリング周期101(図2参照)ごとの太陽光発電設備20の最大出力値から、基準パターンを構成するデータを抽出するように構成される。ここで、第1のパターン抽出期間200は複数日を含む期間である。第1のパターン抽出期間200は、期間200から得られるべき基準パターンを構成するデータを、すぐに太陽光発電設備20の診断に適用するために、(現在の)判定期間100と同じ期間であることが望ましいが、判定期間100の半分以上で判定期間100より短い期間であって前の判定期間または現在の判定期間に含まれる期間であってもよい。複数の第2のパターン抽出期間210のそれぞれは、南中時刻を間に含む期間であり、時間帯110以上で日照時間以下の期間であることが望ましい。図7の例では、複数の第2のパターン抽出期間210のそれぞれは、図2の例に示す時間帯110よりも長い期間に設定されている。第1のパターン抽出期間200の間に得られる太陽光発電設備20の複数の最大出力値のそれぞれは、太陽電池21の最大出力値(たとえば最大電流値または最大電力値)または日射計25の最大出力値(日射強度に関する最大値)である。
 出力値の縦軸と単一の第2のパターン抽出期間210を含む横軸とを持つ二次元座標上に、ある第1のパターン抽出期間200の間に得られた太陽光発電設備20の複数の出力値をプロットすることにより、図10の例に示すグラフが得られた。図10の例では、縦軸の出力値は、上記太陽光発電設備20の複数の出力値(たとえば日射強度値)を含む。このような複数の出力値は、曇りの時間時間に得られた複数の出力値も含むため、図10の例に示すように下向きの複数のピーク(破線のピーク参照)をしばしば含む。そのような下向きの複数のピークを含む複数の出力値から基準パターンを構成するデータを抽出すると、その基準パターンを、高精度の晴天パターンとして得ることが難しくなる。
 そこで、本実施形態では、図8の例に示すように、処理部13は、複数の第2のパターン抽出期間210内のサンプリング周期101ごとの太陽光発電設備20の最大出力値20MAXから、基準パターンを構成するデータを抽出するのである。図8の例では、第1のパターン抽出期間200の間に得られた太陽光発電設備20の複数の最大出力値20MAXのそれぞれは、日射計25の最大出力値(最大日射強度値)である。このような複数の最大出力値20MAXから基準パターンを構成するデータを抽出すると、図11の例に示すように、高精度の晴天パターンとしての基準パターンを構成するデータ20REFを得ることができる。
 上記実施形態の一具体例において、図8の例に示すように、処理部13は、第1のパターン抽出期間200の間に得られた複数の最大出力値20MAXから、所定の抽出時間220ごとに、抽出時間220の両端の時刻に対応する2つの最大出力値20MAXと抽出時間220とから平均変化率を算出するように構成される。ここで、平均変化率は、2つの最大出力値20MAXの差分を抽出時間220で除した値であることが望ましい。抽出時間220は、サンプリング周期の30倍の時間であることが望ましいが、サンプリング周期101の20倍から40倍の範囲内に設定されてもよい。この場合、処理部13は、抽出時間220の開始点が時間帯110の開始点から終了点にシフトするように、抽出時間220をサンプリング周期101ごとにシフトすることにより、複数の平均変化率を算出するように構成される。
 また、処理部13は、複数の平均変化率のそれぞれを算出するごとに、算出された平均変化率が所定の許容範囲内にあれば、その算出された平均変化率の最大出力値を抽出することにより、基準パターンを構成するデータ20REFを抽出するように構成される。ここで、抽出される平均変化率の最大出力値は、少なくとも、その平均変化率に対応する抽出時間220の開始点の最大出力値である。許容範囲は、1日の時刻ごとの複数の許容範囲のうち対応する時刻の許容範囲である。複数の許容範囲のそれぞれは、標準変化率を間に含む範囲である。複数の許容範囲の複数の標準変化率は、晴天日に相当する1日分の平均変化率である。処理部13は、データ20REFを構成する複数の最大出力値のそれぞれを、対応する時刻情報とともに基準値として記憶部1321に記憶するように構成される。
 この実施形態では、曇りの時間時間に得られる複数の出力値が除去されるので、高精度の晴天パターンとしての基準パターンを構成するデータ20REFを得ることができる。
 望ましい実施形態において、処理部13は、抽出した基準パターンを構成するデータ20REFから、(現在の)判定期間100に含まれる複数の時間帯110に対する単一の南中時刻を算出するように構成される。
 図12は、ある地点の南中時刻が1年間にどのように時間変化するかを示すグラフであり、ここで、その地点の北緯および経度は、それぞれ35度および135度である。この図12から分かるように、任意の地点の南中時刻は、1年間を通して時々刻々変化することが分かる。また、南中時刻は、太陽電池21の設置状況にも依存する。
 このため、本実施形態では、処理部13は、判定期間100ごとに、判定期間100に含まれる複数の時間帯110に対する単一の南中時刻を、抽出した基準パターンを構成するデータ20REFから算出するのである。
 たとえば、図13に示すように、処理部13は、抽出したデータ20REFにより構成される基準パターンに対する接線230の傾きがゼロになるときの時刻を、上記単一の南中時刻として抽出するように構成される。図14の例では、処理部13は、抽出したデータ20REFに含まれる値ごとに傾き値を求め、ゼロである傾き値240に対応する時刻を、上記単一の南中時刻として抽出するように構成される。このような構成では、第1のパターン抽出期間200内の複数の時間帯110のそれぞれに実測した南中時刻を安定的に含めることにより、太陽光発電設備20から、変化する南中時刻に忠実に追従する複数の出力値を得ることができる。
 望ましくは、処理部13は、ゼロである傾き値240に対応する時刻の前後の傾き値の符号がそれぞれ正および負であれば、ゼロである傾き値240に対応する時刻を、上記単一の南中時刻として抽出するように構成される。この構成では、基準パターンを構成するデータ20REFから単一の南中時刻をより正確に算出することができるので、太陽光発電設備20から、変化する南中時刻に確実に追従する複数の出力値を得ることができる。
 別例において、処理部13は、基準パターンを構成するデータ20REFからゼロである複数の傾き値が得られた場合、得られた複数の傾き値のうち最大出力値の傾き値に対応する時刻を、上記単一の南中時刻として抽出するように構成される。この構成でも、基準パターンを構成するデータ20REFから単一の南中時刻をより正確に算出することができるので、太陽光発電設備20から、変化する南中時刻に確実に追従する複数の出力値を得ることができる。
 上記の最良の形態および/または他の実施例であると考えられるものについて説明したが、種々の改変がなされてもよく、本明細書で開示される主題は種々の形態および実施例で実施されてもよく、そしてそれらは多数のアプリケーションに適用されてもよいものであり、その最適の幾つかが本明細書に記載されている。以下の特許請求の範囲によって、本開示の真の範囲内に入る任意およびすべての修正および変形を請求するものである。
 10 診断装置
 11 第1のデータ取得インタフェース
 12 第2のデータ取得インタフェース
 13 処理部
 15 出力部
 20 太陽光発電設備
 21 太陽電池
 24 電力変換装置
 25 日射計
 131 計算部
 132 診断部
 133 仮パターン抽出部
 134 パターン記憶部
 135 パターン判定部
 136 晴天判定部
 137 時刻補正部
 211 ストリング
 1321 記憶部
 1322 比較部
 1323 判断部

Claims (13)

  1.  太陽電池を備える太陽光発電設備から所定の時間帯に出力される電力のデータを、第1のデータとして取得するように構成される第1のデータ取得インタフェースと、
     日射計からの上記時間帯に出力される日射強度のデータを、第2のデータとして取得するように構成される第2のデータ取得インタフェースと、
     前記第1のデータと前記第2のデータとに基づいて前記太陽光発電設備の診断を行うように構成される処理部とを備え、
     前記処理部は、
     前記第2のデータから求められる日射量の実測値および前記太陽電池の太陽電池容量の積と前記第1のデータから求められる電力量との比率である評価係数を求めるように構成される計算部と、
     前記計算部が複数の所定の判定期間ごとに求めた評価係数に基づいて前記太陽光発電設備の診断を行うように構成される診断部とを備える
     ことを特徴とする太陽光発電設備の診断システム。
  2.  前記判定期間は、気候に応じた1年の複数の区分期間の何れかに対応する期間であって、複数日を含むように定められていることを特徴とする請求項1記載の太陽光発電設備の診断システム。
  3.  前記計算部は、複数の計算期間それぞれの複数の評価係数を求め、前記複数の評価係数の平均値を1日の評価係数として求めるように構成され、ここにおいて、前記複数の計算期間は、南中時刻を含む1日の所定の時間帯を区分することによって得られることを特徴とする請求項2記載の太陽光発電設備の診断システム。
  4.  前記診断部は、比較部を備え、これは、
     前記複数の区分期間にそれぞれ対応する複数の判定期間ごとに、当該判定期間と当該判定期間に隣接する判定期間から得られる2つの評価係数の差を、その2つの評価係数の一方で割った値である乖離率を求め、
     隣り合う2つの判定期間に対して求めた2つの乖離率を比較する
    ように構成され、
     前記診断部は、前記比較部が比較した前記2つの乖離率の差が所定の故障閾値を超える場合に前記太陽電池の故障と判断するように構成される
     ことを特徴とする請求項2又は3記載の太陽光発電設備の診断システム。
  5.  前記診断部は、
     前記太陽光発電設備が正常に稼働している状態であるときに前記計算部が前記複数の判定期間ごとに求めた前記複数の評価係数を、前記複数の判定期間に対応する複数の標準評価係数として記憶するように構成される記憶部と、
     前記太陽光発電設備の運転中に前記計算部が求めた評価係数を、前記記憶部に記憶された複数の標準評価係数のうち当該評価係数の判定期間に一致する判定期間における標準評価係数と比較するように構成される比較部と、
     前記比較部の比較結果に基づいて前記太陽光発電設備に不具合があるか否かを判断するように構成される判断部とを備える
     請求項2又は3記載の太陽光発電設備の診断システム。
  6.  前記判断部は、前記比較部が求めた前記標準評価係数と前記評価係数との差が所定の劣化閾値を超えた場合であって、かつ該当する判定期間以前の複数の判定期間それぞれにおける評価係数と標準評価係数と差が時間経過に伴って増加している場合に、前記太陽電池の劣化と判断するように構成されることを特徴とする請求項5記載の太陽光発電設備の診断システム。
  7.  前記判断部は、前記比較部が求めた前記標準評価係数と前記評価係数との差が、複数の判定期間において時間経過に伴って増加を続け、それらの差の増加率が第1閾値以上で第2閾値未満であれば前記太陽電池の劣化と判断し、その増加率が前記第2閾値より大きい第3閾値以上であれば前記太陽電池の汚れと判断するように構成されることを特徴とする請求項5記載の太陽光発電設備の診断システム。
  8.  前記第1のデータ取得インタフェースは、前記太陽電池を構成する複数のストリングから前記複数のストリングそれぞれについて電力のデータを取得するように構成され、
     前記判断部は、前記複数のストリングごとに、隣接する2つの判定期間で前記比較部が求めた前記標準評価係数と前記評価係数との差の変化率を求め、前記複数のストリングごとに求めた複数の変化率の分布に基づいて、前記複数のストリングごとに不具合があるか否かを判断するように構成される
     ことを特徴とする請求項5~7のいずれか1項に記載の太陽光発電設備の診断システム。
  9.  前記処理部は、
     前記判定期間における前記電力のデータと前記日射強度のデータとのそれぞれについて、前記判定期間に含まれる前記複数日から同時刻の最大値を求め、前記最大値を時刻に対応付けた仮パターンを抽出するように構成される仮パターン抽出部と、
     前記仮パターンが所定の晴天条件を満たす場合に前記仮パターンを前記判定期間の晴天パターンとして記憶するように構成されるパターン記憶部と、
     特定の判定期間に前記仮パターン抽出部が抽出した前記仮パターンと、前記特定の判定期間より前の判定期間の晴天パターンとについて類似の程度を評価し、当該類似の程度が基準値より高いときに、前記特定の判定期間の仮パターンが前記晴天条件を満たしたと判定し、前記特定の判定期間の仮パターンを前記特定の判定期間の晴天パターンとするように構成されるパターン判定部とを備え、
     前記計算部は、前記晴天パターンのデータに基づいて前記評価係数を求めるように構成される
     ことを特徴とする請求項2~8のいずれか1項に記載の太陽光発電設備の診断システム。
  10.  前記処理部は、
     複数年のうちの同じ判定期間において前記日射強度に関する晴天パターンと前記電力に関する晴天パターンとの同時刻における差分を求め、前記差分の値が所定の判定値に対して設定した許容範囲内か否かを判定するように構成される晴天判定部を備え、
     診断装置は、前記差分の値が前記許容範囲を逸脱している場合に、所定の端末装置に通知をするように構成される出力部をさらに備える
     ことを特徴とする請求項9記載の太陽光発電設備の診断システム。
  11.  前記処理部は、前記第1のデータ取得インタフェースが取得した前記電力のデータと、前記第2のデータ取得インタフェースが取得した前記日射強度のデータとについて時間軸方向のずれを補正するように構成される時刻補正部を備えることを特徴とする請求項1~10のいずれか1項に記載の太陽光発電設備の診断システム。
  12.  前記太陽光発電設備は、前記太陽電池が出力した直流電力を交流電力に変換するように構成される電力変換装置をさらに備え、
     前記第1のデータ取得インタフェースは、前記太陽電池から出力される電力に関する第1のデータと、前記電力変換装置から出力される電力に関する第2のデータとを取得するように構成され、
     前記処理部は、前記第1のデータと前記第2のデータとについて時間軸方向のずれを補正するように構成されている
     ことを特徴とする請求項1~11のいずれか1項に記載の太陽光発電設備の診断システム。
  13.  コンピュータを、請求項1~12のいずれか1項に記載の太陽光発電設備の診断システムとして機能させることを特徴とするプログラム。
PCT/JP2016/002067 2015-04-17 2016-04-15 太陽光発電設備の診断システムおよびプログラム WO2016166991A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017512205A JPWO2016166991A1 (ja) 2015-04-17 2016-04-15 太陽光発電設備の診断システムおよびプログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-085389 2015-04-17
JP2015085389 2015-04-17

Publications (1)

Publication Number Publication Date
WO2016166991A1 true WO2016166991A1 (ja) 2016-10-20

Family

ID=57126736

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/002067 WO2016166991A1 (ja) 2015-04-17 2016-04-15 太陽光発電設備の診断システムおよびプログラム

Country Status (2)

Country Link
JP (1) JPWO2016166991A1 (ja)
WO (1) WO2016166991A1 (ja)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111929586A (zh) * 2020-06-22 2020-11-13 山东信通电子股份有限公司 一种无源无线监拍装置的充电状态评估方法及设备
WO2020261960A1 (ja) * 2019-06-25 2020-12-30 住友電気工業株式会社 集光型太陽光発電装置の監視システム、追尾ずれの検出方法、及び、追尾ずれの検出プログラム
JP2021118570A (ja) * 2020-01-23 2021-08-10 富士電機株式会社 太陽電池ストリング診断システム及び太陽電池ストリング診断方法
CN113242018A (zh) * 2021-06-17 2021-08-10 合肥阳光智维科技有限公司 一种光伏设备故障诊断方法及其应用装置
WO2021256170A1 (ja) * 2020-06-18 2021-12-23 株式会社カネカ 異常判定システム及び発電システム
WO2023095387A1 (ja) * 2021-11-29 2023-06-01 住友電気工業株式会社 判定装置および判定方法
RU2803314C1 (ru) * 2022-11-01 2023-09-12 Федеральное государственное бюджетное образовательное учреждение высшего образования "Удмуртский государственный университет" Солнечный модуль с блоком диагностики
CN116800200A (zh) * 2023-08-28 2023-09-22 广州丰久新能源科技有限公司 一种基于数据分析的太阳能电板安全监控***
US11923803B2 (en) 2019-01-15 2024-03-05 Kabushiki Kaisha Toshiba Anomaly factor diagnosis apparatus and method, and anomaly factor diagnosis system
KR20240048244A (ko) * 2022-10-06 2024-04-15 정원석 스마트 접속함

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01135078A (ja) * 1987-11-20 1989-05-26 Mazda Motor Corp 太陽電池機能診断装置
JP2000040838A (ja) * 1998-07-24 2000-02-08 Toshiba Corp 太陽光発電設備の異常検出装置
JP2011216811A (ja) * 2010-04-02 2011-10-27 Sharp Corp 太陽電池異常診断システム、太陽電池異常診断装置および太陽電池異常診断方法
JP2012054401A (ja) * 2010-09-01 2012-03-15 Ntt Facilities Inc 太陽光発電診断装置
JP2012055090A (ja) * 2010-09-01 2012-03-15 Ntt Facilities Inc 太陽光発電診断装置
JP2012138448A (ja) * 2010-12-27 2012-07-19 National Institute Of Advanced Industrial & Technology 太陽光発電の出力低下検出装置及び検出方法
JP2013084759A (ja) * 2011-10-11 2013-05-09 Contec Co Ltd 太陽光発電設備の直流接続箱および太陽光発電設備
JP2014053337A (ja) * 2012-09-05 2014-03-20 Hioki Ee Corp 太陽電池パネルの異常検出装置
JP2014175478A (ja) * 2013-03-08 2014-09-22 Shimizu Corp 太陽光発電システムの異状判定装置、太陽光発電システムの異状判定方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011016420A1 (ja) * 2009-08-03 2011-02-10 株式会社エヌ・ピー・シー 太陽電池の欠陥検査装置、欠陥検査方法、およびプログラム
JP2012043857A (ja) * 2010-08-16 2012-03-01 Tokyo Electric Power Co Inc:The 快晴時判定装置および太陽光発電量予測システム

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01135078A (ja) * 1987-11-20 1989-05-26 Mazda Motor Corp 太陽電池機能診断装置
JP2000040838A (ja) * 1998-07-24 2000-02-08 Toshiba Corp 太陽光発電設備の異常検出装置
JP2011216811A (ja) * 2010-04-02 2011-10-27 Sharp Corp 太陽電池異常診断システム、太陽電池異常診断装置および太陽電池異常診断方法
JP2012054401A (ja) * 2010-09-01 2012-03-15 Ntt Facilities Inc 太陽光発電診断装置
JP2012055090A (ja) * 2010-09-01 2012-03-15 Ntt Facilities Inc 太陽光発電診断装置
JP2012138448A (ja) * 2010-12-27 2012-07-19 National Institute Of Advanced Industrial & Technology 太陽光発電の出力低下検出装置及び検出方法
JP2013084759A (ja) * 2011-10-11 2013-05-09 Contec Co Ltd 太陽光発電設備の直流接続箱および太陽光発電設備
JP2014053337A (ja) * 2012-09-05 2014-03-20 Hioki Ee Corp 太陽電池パネルの異常検出装置
JP2014175478A (ja) * 2013-03-08 2014-09-22 Shimizu Corp 太陽光発電システムの異状判定装置、太陽光発電システムの異状判定方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11923803B2 (en) 2019-01-15 2024-03-05 Kabushiki Kaisha Toshiba Anomaly factor diagnosis apparatus and method, and anomaly factor diagnosis system
WO2020261960A1 (ja) * 2019-06-25 2020-12-30 住友電気工業株式会社 集光型太陽光発電装置の監視システム、追尾ずれの検出方法、及び、追尾ずれの検出プログラム
JP2021118570A (ja) * 2020-01-23 2021-08-10 富士電機株式会社 太陽電池ストリング診断システム及び太陽電池ストリング診断方法
WO2021256170A1 (ja) * 2020-06-18 2021-12-23 株式会社カネカ 異常判定システム及び発電システム
CN111929586A (zh) * 2020-06-22 2020-11-13 山东信通电子股份有限公司 一种无源无线监拍装置的充电状态评估方法及设备
CN111929586B (zh) * 2020-06-22 2023-09-05 山东信通电子股份有限公司 一种无源无线监拍装置的充电状态评估方法及设备
CN113242018B (zh) * 2021-06-17 2023-08-04 阳光智维科技股份有限公司 一种光伏设备故障诊断方法及其应用装置
CN113242018A (zh) * 2021-06-17 2021-08-10 合肥阳光智维科技有限公司 一种光伏设备故障诊断方法及其应用装置
WO2023095387A1 (ja) * 2021-11-29 2023-06-01 住友電気工業株式会社 判定装置および判定方法
KR20240048244A (ko) * 2022-10-06 2024-04-15 정원석 스마트 접속함
KR102668522B1 (ko) * 2022-10-06 2024-05-28 주식회사 넘버제로 스마트 접속함
RU2803314C1 (ru) * 2022-11-01 2023-09-12 Федеральное государственное бюджетное образовательное учреждение высшего образования "Удмуртский государственный университет" Солнечный модуль с блоком диагностики
CN116800200A (zh) * 2023-08-28 2023-09-22 广州丰久新能源科技有限公司 一种基于数据分析的太阳能电板安全监控***
CN116800200B (zh) * 2023-08-28 2023-12-29 广州丰久新能源科技有限公司 一种基于数据分析的太阳能电板安全监控***

Also Published As

Publication number Publication date
JPWO2016166991A1 (ja) 2017-12-28

Similar Documents

Publication Publication Date Title
WO2016166991A1 (ja) 太陽光発電設備の診断システムおよびプログラム
US8290745B2 (en) Systems and methods for identifying faulty sensors within a power generation system
Dhimish et al. Fault detection algorithm for grid-connected photovoltaic plants
Dhimish et al. Parallel fault detection algorithm for grid-connected photovoltaic plants
Platon et al. Online fault detection in PV systems
JP5856294B2 (ja) 太陽光発電監視方法及びその方法に用いられる太陽光発電監視システム
Ventura et al. Utility scale photovoltaic plant indices and models for on-line monitoring and fault detection purposes
Ducange et al. An intelligent system for detecting faults in photovoltaic fields
US9048781B2 (en) Abnormality diagnosis device, method therefor, and computer-readable medium
EP3640760B1 (en) Photovoltaic system failure and alerting
JP6115764B2 (ja) 太陽光発電システム、異常判断処理装置、異常判断処理方法、およびプログラム
JP5617695B2 (ja) 太陽光発電ユニットの診断装置
US20140188410A1 (en) Methods for Photovoltaic Performance Disaggregation
KR101201863B1 (ko) 단위 모듈 감시가 가능한 태양광 진단 시스템
JP2011216811A (ja) 太陽電池異常診断システム、太陽電池異常診断装置および太陽電池異常診断方法
Ventura et al. Development of models for on-line diagnostic and energy assessment analysis of PV power plants: The study case of 1 MW Sicilian PV plant
KR102523891B1 (ko) 태양광 발전 스트링 및 저장 매체의 작동 상태를 인식하는 방법 및 장치
JP6287306B2 (ja) 電力推定装置、電力推定方法、および、プログラム
JP2013258796A (ja) 自然エネルギーを利用した発電システムの劣化診断装置
JP2017169321A (ja) 要因推定装置、要因推定装置の制御方法、制御プログラムおよび記録媒体
Sarkar et al. IoT based wireless sensor network (WSN) for condition monitoring of low power rooftop PV panels
KR101207310B1 (ko) 계통연계형 태양광발전 시스템의 발전성능 추정 방법 및 그 장치
TW201727559A (zh) 再生能源電廠的管理方法與系統
JP5800069B2 (ja) 太陽光発電ユニットの診断装置、診断方法、及び太陽光発電システム
TW201740296A (zh) 再生能源發電量預測方法與系統

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16779783

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017512205

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16779783

Country of ref document: EP

Kind code of ref document: A1