WO2016147456A1 - 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム - Google Patents

発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム Download PDF

Info

Publication number
WO2016147456A1
WO2016147456A1 PCT/JP2015/077658 JP2015077658W WO2016147456A1 WO 2016147456 A1 WO2016147456 A1 WO 2016147456A1 JP 2015077658 W JP2015077658 W JP 2015077658W WO 2016147456 A1 WO2016147456 A1 WO 2016147456A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
power
control
amount
output
Prior art date
Application number
PCT/JP2015/077658
Other languages
English (en)
French (fr)
Inventor
雅人 小山
孝一郎 武内
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to JP2017506011A priority Critical patent/JP6677242B2/ja
Publication of WO2016147456A1 publication Critical patent/WO2016147456A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Definitions

  • the present invention is based on a Japanese patent application: Japanese Patent Application No. 2015-051226 (filed on March 13, 2015), and the entire description of the application is incorporated herein by reference.
  • the present invention relates to a power generation device monitoring control system, a power system, a control device, a management device, a method, and a program, and more particularly, a power generation device monitoring control system, a power system, and a control for a power generation device that generates power mainly by renewable energy.
  • the present invention relates to an apparatus, a management apparatus, a method, and a program.
  • Patent Document 1 discloses a power generation system that can effectively use solar power generation by individually suppressing the output of each solar power generation while considering the total power generation amount of a plurality of solar power generations.
  • the same document receives information on the power generation amount limit value from an output suppression management device that manages a plurality of power conditioners, and also transmits a communication unit that transmits information on the power generation amount of the own device, and the power generation amount limit value.
  • a power conditioner including a suppression control unit that suppresses output power of the device itself is disclosed.
  • the output suppression management device is configured such that the total generated power that is the sum of the power generation amounts of the plurality of power conditioners managed by the output suppression management device that manages the own device is the sum of the power generation amounts of the plurality of power conditioners. It describes that the power generation amount limit value is set so as not to exceed the total power generation upper limit value that is the upper limit value of the sum.
  • Non-Patent Document 1 discloses a distribution automation system used for distribution system operation on the power system side.
  • Non-Patent Document 1 the power system switches the distribution network for various reasons such as accident recovery, equipment maintenance, overload elimination, etc.
  • Non-Patent Document 1 page 211, Table 1, “2 Control” Section.
  • the power generation apparatus is connected to the power distribution network and executes power sale through the power distribution network. For this reason, when switching of the distribution network occurs, power is sold through different distribution paths, so that the reverse power flow increases in the specific path and the power system may become unstable.
  • Patent Document 1 suppresses the generation of surplus power as described above, but does not assume a situation in which a large number of power generation devices using renewable energy are dispersed and arranged in a wide area. It does not take into account that the equipment is affected by the distribution automation system.
  • An object of the present invention is to provide a power generation apparatus monitoring control system, a power system, a control apparatus, a management apparatus, a management method, a power generation apparatus control method, and a program that can contribute to solving the above-described surplus power problem.
  • a power generation device monitoring control system including a control device connected to at least one power generation device and a management device connected to be able to communicate with the control device.
  • the management device calculates an output power generation amount to be generated by the power generation device based on connection information indicating a power generation device that outputs power to a power system and an output instruction that instructs the power system to output power amount. Means, and transmission means for transmitting the calculated output power generation amount to the control device.
  • the control device includes control means for controlling the power generation device based on the output power amount transmitted by the management device.
  • a power system system including a management device connected to the control device and a power system from which power is output from the power generation device.
  • the management device is configured to calculate an output power generation amount of the power generation device based on connection information indicating a power generation device that outputs power to the power system and an output instruction that instructs an output power amount to the power system; Transmitting means for transmitting the calculated output power generation amount to the control device.
  • the control device includes control means for controlling the power generation device based on the output power generation amount transmitted by the management device.
  • a control device and a management device that constitute the above-described power generation device monitoring control system are provided.
  • a method for operating the above-described management apparatus based on connection information indicating a power generation apparatus that can output power to the power system and an output instruction that instructs the power system to output power.
  • the method includes a calculation step of calculating the output power generation amount of the power generation device, and a transmission step of transmitting the output power generation amount to the control device.
  • a method for operating the above-described control device the receiving step receiving an output power generation amount from the management device, and the power generation device based on the output power generation amount received in the reception step And a control step for controlling.
  • Each method described above is associated with a specific machine such as a control device and a management device.
  • a computer program for realizing the functions of the control device and the management device described above is provided.
  • This program can be recorded on a computer-readable (non-transient) storage medium. That is, the present invention can be embodied as a computer program product.
  • a power generator monitoring control system including a control device group 110 that controls the power generator 120 and a management device 200 that monitors and controls the control device 110. Can be realized.
  • control device 110 reports the output power generation amount of at least one power generation device 120 connected to the own device to the management device 200 that manages the area to which each device is connected.
  • the management device 200 calculates the output power generation amount that the power generation device should generate based on the connection information of the power generation device 120 received from the power system 300 and the output instruction that instructs the power system to output power amount. 203, and transmission means 204 for transmitting the calculated output power generation amount to the control device.
  • the connection information is information indicating to which power distribution path in the distribution network the power generation apparatus is connected, that is, the power generation apparatus 120 that outputs power to the power system 300, and is created by the distribution automation system. .
  • connection information described above can be used as information that causes the management apparatus 200 to determine whether or not the power generation apparatus is a control target of the own apparatus. For example, when the power generation device 120c is out of the power distribution network to be controlled by the own device, the management device 200 subsequently removes the power generation device 120c from the control target. On the other hand, when another power generation device is connected to the power distribution network to be controlled by the own device, the management device 200 subsequently adds the power generation device to the control target.
  • the output instruction is an instruction for controlling the amount of power generation to the management apparatus 200 transmitted from the power system 300.
  • a suppressed power generation amount, a suppressed power generation rate, a target power generation amount, a target power generation rate, a stop signal, or the like of a group of power generation devices to be managed by the management device 200 can be considered.
  • the group divides the power generation devices into specific areas (areas such as Tokyo and Minato-ku) or specific groups (a group of power generation devices whose total power generation amount is 500 kw or less). It may be a thing.
  • the management apparatus 200 When receiving the connection information and the output instruction from the power system 300 side, the management apparatus 200 instructs the output power generation amount to the control apparatus 110 under its control based on these information. For example, output from the power system 300 that the power generation device 120 is connected to the distribution network A to be managed by the own device and that the power generation amount of the power distribution path A is XX kW ⁇ h.
  • the management apparatus 200 instructs the control apparatus 110 to change the output power generation amount of the power generation apparatus 120 to ⁇ kW ⁇ h based on these instructions.
  • the control device 110 includes control means (see reference numeral 116 in FIG. 2) for controlling the power generation device 120 based on the output power amount transmitted by the management device 200, and adjusts the output power generation amount according to an instruction from the management device 200. .
  • control means for controlling the power generation device 120 based on the output power amount transmitted by the management device 200, and adjusts the output power generation amount according to an instruction from the management device 200.
  • the control device 110 performs the control to suppress the output power generation amount.
  • the management device 200 includes a first acquisition unit 201 that acquires connection information of the power generation device 120 from the power system 300, and a second acquisition unit 202 that acquires an output instruction from the power system 300. It can also be set as the structure provided with. In this case, both or one of the first acquisition unit 201 and the second acquisition unit 202 may be configured as another device that receives connection information or / and an output instruction from the power system 300 side and transmits the connection information to the management device 200. it can. Further, as shown in FIG. 2, the first acquisition unit 201 and the second acquisition unit 202 may be independent as functions, and do not need to be independent as devices. For example, it may be realized as a message receiver that can acquire the two pieces of information from the power system 300 side using a predetermined protocol.
  • the management apparatus 200 has been described with an example in which the output power generation amount is instructed to one control apparatus 110.
  • the management apparatus 200 includes a plurality of control apparatuses. It is also possible to instruct the output power generation amounts of the power generation devices 120a to 120c to 110a to 110c.
  • a configuration in which one control device 110 controls a plurality of power generation devices 120a and 120b can be employed.
  • FIG. 4 is a diagram showing a basic system configuration according to the first embodiment of the present invention. Referring to FIG. 4, a configuration is shown in which a management device 200 is arranged between a power distribution automation system 320 on the power system side, a central power feeding system 310, a control device 110, and a power generation device group 120.
  • the central power supply system (hereinafter, “medium supply system”) 310 calculates the excess or deficiency of the power supply and demand based on the system-integrated power generation amount of each system and the assumed power demand, and sets a control schedule in the management apparatus 200. Send.
  • the distribution automation system (hereinafter referred to as “distribution system”) 320 switches the distribution network for reasons such as accident recovery, facility maintenance, overload elimination, and the like, and transmits connection information of the power generation apparatus to the management apparatus 200 side. .
  • the management device 200 is connected to the control device 110 via a network (not shown). Moreover, the management apparatus 200 is arrange
  • the control device 110 is a device that monitors and controls the power generation devices 120 arranged in various places.
  • the management device 200 transmits a suppression signal to each control device 110 based on the suppression schedule received from the mid-supply system 310.
  • the management device 200 aggregates the individual PV power generation amount information (individual power generation amount) received from the control device 110 and transmits it to the mid-supply system 310.
  • the management device 200 and the control device 110 may be connected via a communication network such as a mobile communication network or the Internet.
  • a communication network such as a mobile communication network or the Internet.
  • the device (parent) 230 may be configured to distribute the processing to a plurality of management devices (child) 220.
  • FIG. 5 the system of the electric power system side shown to the upper stage of FIG. 4, FIG. 5 is an example to the last, and is changed according to the system structure of each electric power company.
  • FIG. 6 is a schematic diagram of FIG. 4 for simply explaining the configuration and functions of the management apparatus. Referring to FIG. 6, a configuration is shown in which the management device 200 is arranged between the power supply / demand information management unit 311, the PV connection information management unit 321, and the wide area network to which the control device 110 is connected. ing.
  • the supply and demand information management unit 311 corresponds to the above-described middle supply system 310, adjusts the supply and demand balance of power, and plans a power generation schedule.
  • the supply and demand information management unit 311 of the present embodiment has a function of transmitting a suppression schedule (one form of output instruction) to the management apparatus 200.
  • the supply and demand information management unit 311 may create and transmit a suppression schedule for each area to each management device 200.
  • the suppression schedule of the entire system is transmitted to the upper management apparatus (parent) 230, and the management apparatus (parent) 230 creates an area-by-area suppression schedule. )
  • a configuration of transmitting to 220 may be adopted.
  • the PV connection information management unit 321 corresponds to the above-described self-distribution system 320, and controls a switch for managing the distribution route of each PV connected to the power system and changing the distribution route. Further, the PV connection information management unit 321 has a function of transmitting PV connection information (power generation apparatus connection information) to the management apparatus 200.
  • the management device 200 communicates with the higher-order bidirectional communication unit 231 for communicating with the system on the power system side, the control unit 232, and the lower-order bidirectional communication for communicating with the control device 110 under the wide-area communication network.
  • the control unit 232 creates a suppression schedule for each PV based on the PV connection information held in the management information storage unit 234 and the suppression schedule, and transmits it to each control device 110.
  • the transmission of the suppression schedule may be transmitted by the supply and demand information management unit 311 in response to a transmission request for the suppression schedule from the management device 200.
  • the management information storage unit 234 stores the PV connection information and the suppression schedule transmitted from the power system side. In addition, the management information storage unit 234 manages the specifications of each PV / PCS received from each control device 110, the real-time power generation amount of each PV, the suppression schedule of each PV calculated by the control unit 232, and the like. Store information.
  • the control device 110 is a terminal that includes the display unit 113 that displays the PV operating state and the like, and monitors the power generation device 120.
  • the control device 110 receives the suppression schedule from the management device 200, the control device 110 instructs the power generation device 120 to perform PV suppression control.
  • the control apparatus 110 reports the alternating current power output in the electric power generating apparatus 120 to the management apparatus 200 as PV electric power generation amount.
  • the power generation device 120 includes an inverter or the like, and includes a device called a power conditioner (PCS) having a function of converting DC power output from the PV into AC power.
  • the power generation device 120 of the present embodiment performs suppression control by adjusting the conversion efficiency of the power generated by the PV by controlling the inverter based on the suppression schedule received from the control device 110. It is possible.
  • the power generation apparatus 120 according to the present embodiment has a function of transmitting a PV power generation amount and the like to the control apparatus 110 at a predetermined cycle.
  • the control unit 110 may request the power generation device 120 to acquire the PV power generation amount and the like, and may acquire the PV from the power generation device 120.
  • the electric power generating apparatus 120 is not restricted to this aspect.
  • the PCS and the power generation device may be configured independently. Even in this case, the control device 110 controls the power generation device via the PCS.
  • the functions of the management apparatus 200 and the control apparatus 110 shown in FIG. 6 can also be realized by a computer program that causes a computer constituting these apparatuses to execute the above-described processes using the hardware.
  • the management apparatus 200 can be realized by a configuration including a CPU 2320, a storage device 2340, a communication device 2310, an input device 2311, and an output device 2312.
  • FIG. 7 is a diagram for explaining the operation (power generation amount report processing) of the first embodiment of the present invention.
  • the power generation device 120 transmits the PV power generation information to the control device 110 at predetermined time intervals.
  • the control device 110 aggregates the PV power generation amount received from the power generation device 120 for a certain period, and then transmits it to the management device 200. For example, the control device 110 counts the PV power generation amount received from the power generation device 120 at intervals of 30 seconds every 30 minutes, and with respect to the management device 200, the total power generation amount for 30 minutes (30 minutes integrated value of the power generation amount). Is transmitted (step S001). In the example of FIG. 7, the control device 110 actively transmits the PV power generation amount to the management device 200, but the control device 110 transmits the PV power generation amount in response to a request from the management device 200. It may be.
  • the management apparatus 200 that has received the PV power generation amount stores the PV power generation amount in the management information storage unit 234 (step S002). Moreover, the management apparatus 200 calculates the average PV power generation amount of each PV (step S003). This average PV power generation amount can be included in the information transmitted to the management apparatus 200.
  • the management device 200 that has received the PV power generation amount transmits the PV power generation amount to the power system side at predetermined time intervals.
  • the management device 200 actively transmits the PV power generation amount to the power system side, but the management device may transmit the PV power generation amount in response to a request from the power system side. .
  • the power generation amount of the PV to be managed can be reported to the power system side.
  • FIG. 8 is a diagram for explaining the operation (power generation amount control process) of the first embodiment of the present invention.
  • the PV connection information management unit 321 on the power system side transmits PV connection information to the management apparatus 200.
  • the management apparatus 200 Upon receiving the PV connection information, the management apparatus 200 stores the received PV connection information in the management information storage unit 234 (step S101).
  • the power supply / demand information management unit 311 transmits an area suppression schedule to the management device 200 in consideration of the power supply / demand balance.
  • the management device 200 stores the received area suppression schedule in the management information storage unit 234 (step S102). Note that reception of connection information and reception of an area suppression schedule in the management apparatus can be performed independently and asynchronously.
  • the management apparatus 200 creates a PV suppression schedule based on the area suppression schedule received from the power system side and the PV connection information (step S103).
  • this suppression schedule for example, a round robin method for selecting power generation devices to be suppressed in the order shown in FIGS. 9 and 10 can be considered, but fairness and suppression efficiency among other PV (PV owners).
  • PV owners PV owners
  • Various modifications in consideration of the characteristics can be used. These will be described as another embodiment.
  • the management apparatus 200 answers back the created suppression schedule to the supply and demand information management unit 311, but the answer back can be omitted.
  • the management device 200 transmits PV suppression control information (instruction of output power generation amount) to the control device 110 that manages the PV to be suppressed in accordance with the created PV suppression schedule (step S104).
  • the management device 200 transmits PV suppression control information to the control device 110 that manages the PV that has reached the PV suppression execution time.
  • the management device 200 transmits the PV suppression control information all at once to all suppression target PVs. It is also possible to adopt a method of
  • the control apparatus 110 which received PV suppression control information displays the presence or absence of suppression implementation on the display part 113 (step S105). Furthermore, the control device 110 transmits suppression control information to the power generation device 120.
  • the power generation device 120 that has received the suppression control information performs suppression control of the PV output power. In the example of FIG. 6, the power generation device 120 answers the control device 110 whether or not the suppression control is successful and transmits it to the power system side, but the answerback may be omitted. .
  • the management apparatus 200 instructs suppression control based on the connection information and the suppression schedule. More specifically, the power generation system is connected to a specific power distribution path that changes the power distribution path in view of power distribution such as accident recovery, facility maintenance, and overload elimination in the distribution network 320. However, according to the configuration in which the management device 200 is arranged, since the suppression schedule is implemented using the connection information, there is a reverse power flow in the specific power distribution path. It is possible to avoid the situation that occurs.
  • FIG. 9 is a diagram illustrating a method of switching the power generation device (PV) for suppression control in the above-described round robin method.
  • the example of FIG. 9 is an example in which the suppression instruction period in the area suppression schedule received from the power system side is distributed to four power generation devices (PV).
  • two or more power generators 120 may be controlled simultaneously. For example, as shown in FIG. 10, it is possible to reduce the amount of suppressed power generation instructed to each power generation device 120 so that necessary power generation is performed in each power generation device (PV).
  • PV power generation device
  • the suppression time is equally distributed to each power generator 120, but the suppression control period of each power generator 120 may be determined in consideration of other factors.
  • the PV of an owner who has a special contract to reduce and shorten the suppression amount and the suppression period can be shortened, or conversely, the PV of the owner who has a special contract to preferentially apply suppression control. Variations such as increasing the suppression control time or increasing the suppression amount are conceivable.
  • FIG. 11 is a diagram showing a configuration of a power generator monitoring control system according to the second embodiment of the present invention.
  • the difference from the first embodiment shown in FIG. 6 is that a pyranometer 114 is added to the control device 110.
  • the control apparatus 110 in this embodiment transmits the sensor value of the pyranometer 114 with respect to the management apparatus 200 with the PV power generation amount of step S001 of FIG.
  • FIG. 12 is a diagram showing an example of a suppression schedule in the second embodiment of the present invention.
  • the management device 200 according to the second embodiment has the amount of solar radiation exceeding a predetermined value based on the value of the pyranometer received from the control device 110 before the creation of the suppression schedule.
  • a power generation device 120 (for example, solar radiation amount> 0) for which the amount is expected is selected.
  • the reason for selecting the power generation device 120 whose solar radiation amount is larger than the predetermined value is that the power generation device 120 whose solar radiation amount is smaller than the predetermined value is small in the first place, so it is necessary even if it is selected as an object of suppression. This is because it cannot contribute to the achievement of a sufficient amount of suppression.
  • the power generation device 4 since the solar radiation amount of the power generation device 4 is 0, the power generation device 4 is excluded from the suppression target, and the remaining power generation devices 1 to 3 perform suppression control.
  • the control device 110 is provided with the pyranometer 114, but the control device 110 is not necessarily provided with the pyranometer 114.
  • the management device 200 can directly obtain a value of a pyranometer arranged in the vicinity of the PV, or can use mesh solar radiation data, local nowcast information, etc. of the Japan Meteorological Agency or a private weather company.
  • the third embodiment is an example in which the power generation amount is used instead of the solar radiation amount data of the second embodiment. Since the third embodiment can be realized with the same configuration (FIGS. 6 and 11) as the first embodiment (FIG. 6) or the second embodiment (FIG. 11), the difference will be described below. The explanation will focus on the points.
  • FIG. 13 is a diagram showing an example of a suppression schedule in the third embodiment of the present invention.
  • the management device 200 selects a power generation device whose power generation amount exceeds a predetermined value based on the power generation amount received from the control device 110 before creating the suppression schedule.
  • the power generation device 3 since the power generation amount of the power generation device 3 is less than or equal to a predetermined value, the power generation device 3 is excluded from the suppression target, and the remaining power generation device 1, power generation device 2, and power generation device 4 perform suppression control. As described above, according to this embodiment, it is possible to achieve the same effect as that of the second embodiment without using solar radiation data.
  • the fourth embodiment is a method in which each power generation device (control device) creates a suppression schedule by selecting a power generation device that is subject to suppression control in consideration of the accumulated time that has been subject to suppression. Since the fourth embodiment can be realized with the same configuration (FIGS. 6 and 11) as the first embodiment (FIG. 6) or the second embodiment (FIG. 11), the difference will be described below. The explanation will focus on the points.
  • FIG. 14 is a diagram showing an example of a suppression schedule in the fourth embodiment of the present invention.
  • the management apparatus 200 refers to the management information storage unit 234 before creating the suppression schedule, and the cumulative suppression time so far is less than a predetermined value (for example, the cumulative suppression time ⁇ predetermined value).
  • a predetermined value for example, the cumulative suppression time ⁇ predetermined value.
  • the power generation device 1 and the power generation device 4 are subjected to suppression control because they are excluded from suppression.
  • the fifth embodiment is a method in which each power generation device (control device) creates a suppression schedule by selecting a power generation device to be subjected to suppression control in consideration of the cumulative suppression power generation amount by the suppression instruction. Since the fifth embodiment can be realized with the same configuration (FIGS. 6 and 11) as the first embodiment (FIG. 6) or the second embodiment (FIG. 11), the difference will be described below. The explanation will focus on the points.
  • FIG. 15 is a diagram illustrating an example of a suppression schedule according to the fifth embodiment of the present invention.
  • the management apparatus 200 refers to the management information storage unit 234 before creating a suppression schedule, and the cumulative power generation amount thus far is less than a predetermined value (for example, cumulative suppression time ⁇ predetermined value).
  • a power generator is selected.
  • the cumulative suppressed power generation amount can be calculated, for example, by adding the suppressed power generation amount obtained by multiplying the power generation amount when the corresponding power generation device is not subjected to suppression control by the suppression rate.
  • an estimated power generation amount can be obtained from the above-mentioned pyranometer data, or the latest reported power generation amount before suppression can be used.
  • the power generation device 2 and the power generation device 4 are subjected to suppression control because they are out of the suppression target.
  • FIG. 16 is a diagram showing an example of a suppression schedule in the sixth embodiment of the present invention.
  • the management device 200 has a pyranometer value that exceeds a predetermined value before the generation of the suppression schedule, and the cumulative suppression power generation amount thus far is less than the predetermined value (for example, the cumulative suppression A power generator with a time ⁇ predetermined value) is selected.
  • the management apparatus 200 has created a schedule for performing suppression control on the remaining power generation apparatus 1 and power generation apparatus 2.
  • the present embodiment it is possible to create a suppression schedule that takes into consideration both the effectiveness of suppression control and the fairness among owners of power generation facilities (PV).
  • the present invention is not limited to the combination of the second embodiment and the fourth embodiment described above, and the second to fifth embodiments can be freely combined.
  • a method for creating a suppression schedule by selecting a power generation device to be subjected to suppression control in consideration of whether or not each power generation device 120 includes a power storage device 115 or a load capable of consuming power is.
  • FIG. 17 is a diagram showing a configuration of a power generator monitoring control system according to a seventh embodiment of the present invention.
  • the difference from the first embodiment shown in FIG. 6 is that there are the control device 110 and the power generation device 120 provided with the power storage device 115 (the top two in the example of FIG. 17).
  • the management device 200 according to the present embodiment holds the presence or absence of the power storage device 115 (or load) in the management information storage unit 234 as the specification of the power generation device 120.
  • the power storage device 115 a power storage device dedicated to PV can be used.
  • a storage battery of an electric vehicle (EV) that can be used as a home power supply or a home storage battery for peak shift can be used. it can.
  • EV electric vehicle
  • FIG. 18 is a diagram illustrating an example of a suppression schedule according to the seventh embodiment of the present invention.
  • the management device 200 according to the seventh embodiment refers to the management information storage unit 234 and selects a power generation device having the power storage device 115 (or load) before creating the suppression schedule.
  • the power generation device 3 and the power generation device 4 are excluded from suppression because the power storage device 115 does not have a load that can consume power. For this reason, the management apparatus 200 has created a schedule for performing suppression control on the remaining power generation apparatus 1 and power generation apparatus 2.
  • the suppression control in the present embodiment is not limited to the output power generation reduction control by the power generation device 120. For example, it is possible to achieve the suppression of the power generation amount by charging the storage battery with the power generation amount that has received the suppression instruction or consuming it with a load.
  • the present embodiment it is possible to achieve the instructed suppressed power generation amount without suppressing the output of the power generation amount in the power generation device 120.
  • a power generation device to be suppressed refer to not only the presence or absence of a rechargeable battery or a load, but also the state of chargeable capacity (SOC) of the power storage device 115 and the availability state of the load. Can do.
  • the power stored in the power storage device 115 can be used at a time when power cannot be generated such as at night.
  • energy can be effectively utilized while realizing a suppressed power generation amount instructed from the management device 200.
  • the present embodiment can construct a system having high affinity with a home energy management system (HEMS) or a system constituting a smart grid.
  • HEMS home energy management system
  • the eighth embodiment is a method in which the sixth embodiment is developed and a suppression schedule is created by setting priorities, using three or more parameters, and selecting a power generation device to be suppressed.
  • FIG. 19 is a diagram for explaining a power generation device selection logic according to the eighth embodiment of the present invention.
  • the priority is set to the selection parameter of the power generation device in the order of the amount of solar radiation (weather information)> cumulative suppression time> (power generation capacity) (each PV).
  • cumulative suppression time power generation capacity
  • 360 hours is set as the upper limit threshold of the cumulative suppression time (30 days with 12 hours of power generation per day).
  • the management device 200 selects the power generation devices 1 to 3 as suppression targets based on the amount of solar radiation (weather information).
  • the management device 200 refers to the cumulative suppression time (cumulative suppression days) of the power generation devices 1 to 3 and selects the power generation device to be suppressed.
  • the cumulative suppression time (cumulative suppression days) since the cumulative suppression time (cumulative suppression days) has not reached 360 hours, any one of the power generators 1 to 3 remains as the suppression target.
  • the management device 200 refers to the power generation capacity of the power generation devices 1 to 3 and selects a power generation device to be suppressed. For example, when the area suppression power generation amount instructed from the power system side is 150 kW ⁇ h, the management device 200 selects the power generation devices in descending order of the power generation capacity. In this case, when the power generation device 3 and the power generation device 2 are selected in descending order of the power generation capacity, the power generation device 1 is excluded from the suppression target because the area suppression power generation amount instructed from the power system side is reached.
  • the management apparatus 200 selects the power generation apparatus 2 and the power generation apparatus 3 and creates a suppression schedule.
  • FIG. 20 is a diagram for explaining the operation in the case where the cumulative suppression time has reached the upper limit with the same power generation device selection logic.
  • the management device 200 selects the power generation devices 1 to 3 as suppression targets based on the amount of solar radiation (weather information). Up to this point, it is the same as the example of FIG.
  • the management device 200 refers to the cumulative suppression time (cumulative suppression days) of the power generation devices 1 to 3 and selects a power generation device to be suppressed.
  • the management apparatus 200 refers to the power generation capacities of the power generation apparatus 1 and the power generation apparatus 3 and selects a power generation apparatus to be suppressed. For example, when the area suppression power generation amount instructed from the power system side is 90 kW ⁇ h, the management device 200 selects the power generation devices in descending order of the power generation capacity, and selects the power generation device 3 when the power generation device 3 is selected.
  • FIGS. 19 and 20 are merely examples, and the present embodiment can be modified in various ways.
  • a method of preferentially selecting a power storage device having a large power storage capacity or a power generation device / control device having a load capable of storing energy can be employed.
  • the present invention is a power generation device that generates power using renewable energy such as wind power, hydropower, tide, geothermal heat, and the like.
  • renewable energy such as wind power, hydropower, tide, geothermal heat, and the like.
  • the present invention can be similarly applied to the case where the configuration is provided.
  • the management device is a power generation device monitoring control system that transmits an output power generation amount generated by the power generation device acquired from the control device to the power system.
  • the control device is a power generation device monitoring control system that acquires an output power generation amount generated by the power generation device from the power generation device, and transmits the acquired output power generation amount generated by the power generation device to the management device.
  • the output power generation amount is a power generation device monitoring control system including at least one of a suppressed power generation amount, a suppressed power generation rate, a target power generation amount, a target power generation rate, and a stop signal for the power generation device.
  • the power generator connection control information is a power generator monitoring and control system, which is information indicating a relationship between the power generator and the power system created by the power distribution automation system.
  • the management device is a power generation device monitoring control system that generates a suppression schedule in the power generation device and suppresses an output power generation amount of the power generation device.
  • the control device is connected to a plurality of power generation devices,
  • the said management apparatus is a power generator monitoring control system which produces the suppression schedule which selects and suppresses the power generation apparatus which instruct
  • the power generation apparatus monitoring control system wherein the predetermined condition is to select a power generation apparatus having a cumulative suppression time or a cumulative power generation amount of a predetermined value or less.
  • the predetermined condition is a power generation apparatus monitoring control system for selecting a solar power generation apparatus to be suppressed from a solar power generation apparatus for which a predetermined power generation amount is expected.
  • the power generation device monitoring and control system, wherein the predetermined condition is to select a power generation device connected to a power storage device capable of storing suppression power or a control device provided with a load capable of consuming suppression power.
  • Control device 110, 110a to 110c Control device 113 Display unit 114 Pyrometer 115 Power storage device 116 Control unit 120, 120a to 120c Power generation device 200 Management device 201 First acquisition unit 202 Second acquisition unit 203 Calculation unit 204 Transmission unit 220 Management unit (child) ) 230 Management device (parent) 231 Upper-level bidirectional communication unit 232 Control unit 233 Lower-side bidirectional communication unit 234 Management information storage unit 300 Power system 310 Central power supply system (medium supply system) 311 Supply / Demand Information Management Department 320 Power Distribution Automation System (Distribution System) 321 PV connection information management unit 2310 Communication device 2311 Input device 2312 Output device 2320 CPU 2340 storage device

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 余剰電力問題の解決に貢献する。発電装置監視制御システムは、少なくとも1つの発電装置と接続されている制御装置と、前記制御装置と通信可能に接続される管理装置と、により構成される。前記管理装置は、電力系統へ電力を出力する発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置が発電すべき出力発電量を算出する算出手段と、前記算出した出力発電量を前記制御装置に送信する送信手段と、を備える。前記制御装置は、前記管理装置により送信された出力電力量に基づいて前記発電装置を制御する制御手段を備える。

Description

発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム
 [関連出願についての記載]
 本発明は、日本国特許出願:特願2015-051226号(2015年 3月13日出願)に基づくものであり、同出願の全記載内容は引用をもって本書に組み込み記載されているものとする。
 本発明は、発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラムに関し、特に、主に再生可能エネルギーにより発電を行う発電装置の発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラムに関する。
 特許文献1に、複数の太陽光発電の総発電量を考慮しつつ、各太陽光発電の出力抑制を個別に行なうことにより、太陽光発電を有効利用できるという発電システムが開示されている。同文献には、複数のパワーコンディショナを管理する出力抑制管理装置から発電量制限値に関する情報を受信するとともに、自装置の発電量に関する情報を送信する通信部と、前記発電量制限値に基づき、自装置の出力電力を抑制する抑制制御部とを備えたパワーコンディショナが開示されている。また、出力抑制管理装置は、自装置を管理する出力抑制管理装置により管理される複数のパワーコンディショナの各発電量の総和であるトータル発電電力が、当該複数のパワーコンディショナの各発電量の総和の上限値であるトータル発電電力上限値を超えないように発電量制限値を設定することが記載されている。
 非特許文献1には、電力系統側における配電系統運用に用いられる配電自動化システムが開示されている。
特開2013-207862号公報
日立評論 1989年3月号、"特集 配電技術 配電自動化計算機制御システム"、[online]、[平成27年1月29日検索]、インターネット〈URL:http://digital.hitachihyoron.com/pdf/1989/03/1989_03_02.pdf〉
 以下の分析は、本発明によって与えられたものである。近年、太陽光発電(photovoltaics、solar photovoltaicsとも言う。以下、「PV」と記す)や風量に代表される再生可能エネルギーを用いた分散型電源(発電装置)の急増により、電力系統に逆潮流する余剰電力が増加し、電力系統が不安定となる問題が生じている。
 非特許文献1に示すように、電力系統側で、事故復旧、設備保守、過負荷解消等さまざまな理由により配電網の切り替えが行われる(非特許文献1の211頁 表1 「2 制御」の項参照)。ここで、発電装置は、配電網に接続され、配電網を介して売電を実行する。そのため、配電網の切替が発生すると、異なる配電経路にて売電が行われるため、特定経路で、逆潮流が大きくなり、電力系統が不安定となる可能性が生じる。
 特許文献1は、上記した余剰電力の発生を抑制するものであるが、再生可能エネルギーを用いた発電装置が広範な地域に、分散されて多数配置される状況を想定しておらず、これら発電装置が配電自動化システムの影響を受ける点についても考慮されていない。
 本発明は、上記した余剰電力問題の解決に貢献できる発電装置監視制御システム、電力系統システム、制御装置、管理装置、管理方法、発電装置の制御方法及びプログラムを提供することを目的とする。
 第1の視点によれば、少なくとも1つの発電装置と接続されている制御装置と、前記制御装置と通信可能に接続される管理装置と、により構成される発電装置監視制御システムが提供される。前記管理装置は、電力系統へ電力を出力する発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置が発電すべき出力発電量を算出する算出手段と、前記算出した出力発電量を前記制御装置に送信する送信手段と、を備える。また、前記制御装置は、前記管理装置により送信された出力電力量に基づいて前記発電装置を制御する制御手段を備える。
 第2の視点によれば、前記制御装置と接続されている管理装置と、前記発電装置から電力が出力される電力系統と、により構成された電力系統システムが提供される。前記管理装置は、前記電力系統へ電力を出力する発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置の出力発電量を算出する算出手段と、前記算出した出力発電量を前記制御装置に送信する送信手段と、を備える。また、前記制御装置は、前記管理装置により送信された出力発電量に基づいて前記発電装置を制御する制御手段を備える。
 第3の視点によれば、上記した発電装置監視制御システムを構成する制御装置及び管理装置が提供される。
 第4の視点によれば、上述した管理装置を作動させる方法であって、前記電力系統へ電力を出力できる発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて前記発電装置の出力発電量を算出する算出ステップと、前記制御装置に対して、前記出力発電量を送信する送信ステップとを含む方法が提供される。
 第5の視点によれば、上述した制御装置を作動させる方法であって、前記管理装置からの出力発電量を受信する受信ステップと、前記受信ステップで受信した出力発電量に基づいて前記発電装置を制御する制御ステップと、を含む方法が提供される。
 なお、上記した各方法は、それぞれ制御装置及び管理装置という、特定の機械に結びつけられている。
 第6の視点によれば、上記した制御装置及び管理装置の機能を実現するためのコンピュータプログラムが提供される。なお、このプログラムは、コンピュータが読み取り可能な(非トランジエントな)記憶媒体に記録することができる。即ち、本発明は、コンピュータプログラム製品として具現することも可能である。
 本発明によれば、余剰電力問題の解決に貢献することが可能となる。
本発明の一実施形態の基本システム構成を示す図である。 本発明の一実施形態の管理装置と制御装置の構成例を示す図である。 本発明の一実施形態の基本システム構成の変形例を示す図である。 本発明の第1の実施形態のシステム構成を示す図である。 本発明の第1の実施形態の別のシステム構成の例を示す図である。 本発明の第1の実施形態の発電装置監視制御システムの構成を示す図である。 本発明の第1の実施形態の動作(発電量報告処理)を説明するための図である。 本発明の第1の実施形態の動作(発電量制御処理)を説明するための図である。 本発明の第1の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第1の実施形態における発電抑制スケジュールの別の一例を示す図である。 本発明の第2の実施形態の発電装置監視制御システムの構成を示す図である。 本発明の第2の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第3の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第4の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第5の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第6の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第7の実施形態の発電装置監視制御システムの構成を示す図である。 本発明の第7の実施形態における発電抑制スケジュールの一例を示す図である。 本発明の第8の実施形態の動作を説明するための図である。 本発明の第8の実施形態の別の動作を説明するための図である。 本発明の一実施形態の基本システム構成の変形例を示す図である。 本発明の第1の実施形態の管理装置のハードウェア構成の一例を示す図である。
 はじめに本発明の一実施形態の概要について図面を参照して説明する。なお、この概要に付記した図面参照符号は、理解を助けるための一例として各要素に便宜上付記したものであり、本発明を図示の態様に限定することを意図するものではない。
 本発明は、その一実施形態において、図1に示すように、発電装置120を制御する制御装置群110と、前記制御装置110を監視して制御する管理装置200とを含む発電装置監視制御システムにて実現できる。
 より具体的には、前記制御装置110は、各装置が接続されたエリアを管轄する管理装置200に対して、自装置に接続された少なくとも1つの発電装置120の出力発電量を報告する。
 管理装置200は、電力系統300から受信した発電装置120の接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置が発電すべき出力発電量を算出する算出手段203と、前記算出した出力発電量を前記制御装置に送信する送信手段204と、を備える。ここで、接続情報とは、発電装置が配電網内のどの配電経路に接続されているか、即ち、電力系統300へ電力を出力する発電装置120を示す情報であり、配電自動化システムより作成される。また、前記接続情報として、制御装置110と配電経路との対応関係を取得してもよい。
 また、前記した接続情報は、管理装置200に発電装置が自装置の制御対象になっているか否かを判断させる情報として用いることができる。例えば、発電装置120cが自装置の制御対象となる配電網から外れている場合、管理装置200は、以後、発電装置120cを制御対象から外すことになる。反対に、別の発電装置が自装置の制御対象となる配電網に接続された場合、管理装置200は、以後、当該発電装置を制御対象に加えることになる。
 また、前記出力指示とは、電力系統300から送信される管理装置200に対する発電量の制御指示である。具体的には、前記出力指示としては、管理装置200の管理対象となる発電装置のグループの抑制発電量や抑制発電率、目標発電量、目標発電率、停止信号等が考えられる。なお、前記グループは、配電経路だけでなく、特定エリア(東京都、港区などの地域)や、特定のグループ(総発電量が500kw以下となる発電装置群)などで発電装置をグループ分けするものであってもよい。
 管理装置200は、前記電力系統300側から、接続情報と、出力指示を受信すると、これらに基づいて自装置が管轄する制御装置110に対して、出力発電量を指示する。例えば、電力系統300から、発電装置120が、自装置の管理対象の配電網Aに接続されているとの接続情報と、配電経路Aの発電量を○○kW・hにせよ、との出力指示を受けた場合、管理装置200は、これらに基づいて、制御装置110に対して発電装置120の出力発電量を△△kW・hに変更するよう指示する。
 制御装置110は、管理装置200により送信された出力電力量に基づいて発電装置120を制御する制御手段(図2の符号116参照)を備え、管理装置200からの指示に従って出力発電量を調節する。ここで例えば、管理装置200からの指示が出力発電量の抑制を指示するものであった場合、制御装置110は、出力発電量の抑制制御を実施する。
 なお、図2に示したように、管理装置200は、電力系統300から発電装置120の接続情報を取得する第1取得手段201と、電力系統300から出力指示を取得する第2取得手段202とを備える構成とすることもできる。この場合、第1取得手段201と第2取得手段202の双方又は一方を、電力系統300側から接続情報又は/及び出力指示を受信して管理装置200に送信する別の装置として構成することもできる。また、第1取得手段201と第2取得手段202は、図2に示したように、機能として独立であればよく、装置として独立している必要はない。例えば、所定のプロトコルで電力系統300側から前記2つの情報を取得可能なメッセージ受信部として実現することも可能である。
 以上のように、電力系統側からの接続情報と、出力指示とに基づいて出力発電量の指示を行うことで、上述した意図しない逆潮流や過負荷状況等の発生を抑制することが可能となる。
 なお、上記した例では、管理装置200が1台の制御装置110に対して出力発電量を指示する例を挙げて説明したが、図3に示すように、管理装置200が複数台の制御装置110a~110cに対して発電装置120a~120cの出力発電量の指示を行うことも可能である。同様に、図21に示すように、1台の制御装置110が複数台の発電装置120a、120bを制御する構成も採用可能である。
[第1の実施形態]
 続いて、太陽光発電装置(PV)の抑制制御を行う本発明の第1の実施形態について図面を参照して詳細に説明する。図4は、本発明の第1の実施形態の基本システム構成を示す図である。図4を参照すると、電力系統側の配電自動化システム320と、中央給電システム310と、制御装置110及び発電装置群120との間に、管理装置200が配置された構成が示されている。
 中央給電システム(以下、「中給システム」)310は、各系統の系統集約発電量と、想定される電力需要とに基づいて、電力需給の過不足を計算し、管理装置200に抑制スケジュールを送信する。
 配電自動化システム(以下、「配自システム」)320は、事故復旧、設備保守、過負荷解消等の理由により配電網の切り替えを実施し、管理装置200側に、発電装置の接続情報を送信する。
 管理装置200は、図示省略するネットワークを介して、制御装置110と接続されている。また、管理装置200は、配電網の任意の単位で分割したエリア毎に配置される。
 制御装置110は、各地に配置された発電装置120を監視、制御する機器である。
 管理装置200は、中給システム310から受信した抑制スケジュールに基づいて、個々の制御装置110に対し抑制信号を送信する。また、管理装置200は、制御装置110から受信した個々のPVの発電量情報(個別発電量)を集約して中給システム310に送信する。
 なお、図4に示した構成は本発明を簡単に説明するためのものであり、種々の変更を加えることが可能である。例えば、管理装置200と制御装置110とは、移動体通信網やインターネット等の通信網を介して接続されていてもよい。また例えば、PV(不図示)、発電装置120及び制御装置110が多数、広範なエリアに配置されている場合、図5に示すように、管理装置を複数、階層的に配置し、上位の管理装置(親)230が、複数の管理装置(子)220に処理を分散できるよう構成することも可能である。また、図4、図5の上段に示した電力系統側のシステムもあくまで一例であり、各電力会社のシステム構成に応じて変更される。
 続いて、上述した管理装置200の構成及び機能について、より詳細に説明する。図6は、管理装置の構成及び機能を簡単に説明するために、図4を模式化した図である。図6を参照すると、電力系統側の需給情報管理部311と、PV接続情報管理部321と、制御装置110が接続された広域ネットワークとの間に、管理装置200が配置された構成が示されている。
 需給情報管理部311は、上述の中給システム310に相当し、電力の需給バランスを調整し、発電スケジュールの計画を行う。また、本実施形態の需給情報管理部311は、管理装置200に対して、抑制スケジュール(出力指示の一形態)を送信する機能を有している。なお、管理装置200が複数配置されている場合、需給情報管理部311が、個々の管理装置200にエリア単位の抑制スケジュールを作成して送信することとしてもよい。また、図5に例示されているように、上位の管理装置(親)230に系全体の抑制スケジュールを送信し、管理装置(親)230にエリア単位の抑制スケジュールを作成させ、管理装置(子)220に送信する構成を採用してもよい。
 PV接続情報管理部321は、上述の配自システム320に相当し、電力系統に接続している各PVの配電ルートの管理及び配電ルートの変更のための開閉器を制御する。また、PV接続情報管理部321は、管理装置200に対して、PVの接続情報(発電装置の接続情報)を送信する機能を有している。
 管理装置200は、電力系統側のシステムと通信するための上位側双方向通信部231と、制御部232と、広域通信網を介して配下の制御装置110と通信するための下位側双方向通信部233と、管理情報記憶部234とを備えている。
 制御部232は、管理情報記憶部234に保持されたPV接続情報と、抑制スケジュールに基づいて、各PVの抑制スケジュールを作成し、各制御装置110に送信する。また、前記抑制スケジュールの送信は、管理装置200からの抑制スケジュールの送信要求に応じて需給情報管理部311が送信する形態であってもよい。
 管理情報記憶部234は、電力系統側から送信されたPVの接続情報や抑制スケジュールを記憶する。また、管理情報記憶部234は、個々の制御装置110から受信した各PV/PCSの仕様や、各PVのリアルタイムの発電量や、制御部232にて計算された各PVの抑制スケジュール等の管理情報を記憶する。
 制御装置110は、PVの稼働状態等を表示する表示部113を備え、発電装置120を監視する端末である。本実施形態の制御装置110は、管理装置200から抑制スケジュールを受信すると、発電装置120に対して、PV抑制制御を指示する。また、制御装置110は、発電装置120にて出力される交流電力をPVの発電量として管理装置200に報告する。
 発電装置120は、インバータ等を備え、PVから出力される直流電力を交流電力に変換する機能を備えているパワーコンディショナー(PCS)とも呼ばれる機器を含む。また、本実施形態の発電装置120は、制御装置110から受信した抑制スケジュールに基づいて、インバータを制御することにより、PVにて発電される電力の変換効率を調整することにより、抑制制御を実施可能となっている。本実施形態の発電装置120は、制御装置110に対して、所定の周期でPVの発電量等を送信する機能を備えている。前記PVの発電量等は、制御装置110が発電装置120に要求し、発電装置120から取得する形態であってもよい。なお、発電装置120はこの態様に限られない。例えば、PCSと発電装置が独立して構成されていてもよい。この場合においても制御装置110は、PCSを介して発電装置を制御することになる。
 なお、図6に示した管理装置200や制御装置110の機能は、これらの装置を構成するコンピュータに、そのハードウェアを用いて、上記した各処理を実行させるコンピュータプログラムにより実現することもできる。例えば、管理装置200は、図22に示すように、CPU2320、記憶装置2340、通信デバイス2310、入力デバイス2311及び出力デバイス2312を備える構成にて実現することができる。
 続いて、本実施形態の動作について図面を参照して詳細に説明する。はじめに管理装置による電力系統側へのPV発電量報告処理について説明する。図7は、本発明の第1の実施形態の動作(発電量報告処理)を説明するための図である。図7に示したとおり、発電装置120は、所定の時間間隔で制御装置110にPV発電情報を送信する。
 制御装置110は、発電装置120から受信したPV発電量を一定期間集約した後、管理装置200に送信する。例えば、制御装置110は、30秒間隔で発電装置120から受信したPV発電量を30分毎に集計し、管理装置200に対して、30分間の累計発電量(発電量の30分積算値)を送信する(ステップS001)。なお、図7の例では、制御装置110が能動的に管理装置200に対してPV発電量を送信しているが、管理装置200からの要求に応じて制御装置110がPV発電量を送信することでもよい。
 前記PV発電量を受信した管理装置200は、管理情報記憶部234にPV発電量を保存する(ステップS002)。また管理装置200は、各PVの平均PV発電量を算出する(ステップS003)。この平均PV発電量は、管理装置200に送信する情報に含めることができる。
 前記PV発電量を受信した管理装置200は、所定の時間間隔で、電力系統側に対してPV発電量を送信する。なお、図7の例では、管理装置200が能動的に電力系統側にPV発電量を送信しているが、電力系統側からの要求に応じて管理装置がPV発電量を送信することでもよい。
 以上のようにすることで、電力系統側に対して、管理対象のPVの発電量を報告することができる。
 続いて、管理装置によるPVの発電量抑制制御について説明する。図8は、本発明の第1の実施形態の動作(発電量制御処理)を説明するための図である。図8に示すとおり、電力系統側のPV接続情報管理部321が、管理装置200に対し、PVの接続情報を送信する。管理装置200は、PVの接続情報を受信すると、管理情報記憶部234に、前記受信したPVの接続情報を保存する(ステップS101)。
 また、前記PVの接続情報の送信とは独立して、電力系統側の需給情報管理部311が、電力の需給バランスを考慮して、管理装置200に対して、エリア抑制スケジュールを送信する。管理装置200は、エリア抑制スケジュールを受信すると、管理情報記憶部234に受信したエリア抑制スケジュールを保存する(ステップS102)。なお、管理装置における接続情報の受信と、エリア抑制スケジュールの受信も独立して非同期に行うようにすることができる。
 次に、管理装置200は、電力系統側から受信したエリア抑制スケジュールと、PVの接続情報を基に、PVの抑制スケジュールを作成する(ステップS103)。この抑制スケジュールとしては、例えば、図9、図10に示すような順番に抑制対象の発電装置を選択するラウンドロビン方式が考えられるが、その他のPV(PVオーナー)間での公平性や抑制効率性を考慮した種々の変形例を用いることができる。これらについては、別の実施形態として説明する。なお、図8の例では、管理装置200が、需給情報管理部311に対して、作成した抑制スケジュールをアンサーバックしているが、アンサーバックを省略することも可能である。
 次に、管理装置200は、前記作成したPVの抑制スケジュールに従って、抑制対象のPVを管理する制御装置110に対して、PV抑制制御情報(出力発電量の指示)を送信する(ステップS104)。図8の例では、管理装置200が、PV抑制実施時刻になったPVを管理する制御装置110に対してPV抑制制御情報を送信している。あるいは、PV抑制制御情報に、抑制開始時刻と、抑制終了時刻(又は抑制継続時間)を含めることで、管理装置200が、すべての抑制対象PVに対して、一括してPV抑制制御情報を送信する方法も採用可能である。
 PV抑制制御情報を受信した制御装置110は、表示部113に抑制実施の有無を表示する(ステップS105)。さらに、制御装置110は、発電装置120に対して、抑制制御情報を送信する。抑制制御情報を受信した発電装置120は、PV出力電力の抑制制御を実施する。なお、図6の例では、発電装置120が、制御装置110に対して、抑制制御の成功可否をアンサーバックし、電力系統側まで伝達させているが、アンサーバックを省略することも可能である。
 以上のようにすることで、電力系統側で作成したエリア抑制スケジュールを満足するPVの抑制制御を実施することが可能となる。その理由は、管理装置200が、接続情報と抑制スケジュールに基づいて、抑制制御を指示するためである。より具体的には、配自システム320が配電網の中で、事故復旧、設備保守、過負荷の解消といった配電という観点で、配電経路を変化させる、特定の配電経路に、発電装置が接続されていると、逆潮流が発生してしまう可能性が生じるが、上記管理装置200を配置した構成によれば、接続情報を用いて抑制スケジュールを実施するため、前記特定の配電経路に逆潮流が発生する事態を回避することが可能となる。
 続いて、上記ステップS103における抑制スケジュールの作成方法について説明する。図9は、上述のラウンドロビン方式で抑制制御の発電装置(PV)を切り替えていく方法を表している図である。図9の例では、電力系統側から受信したエリア抑制スケジュールにおける抑制指示期間を4つの発電装置(PV)に振り分けている例である。
 なお、同時に2以上の発電装置120を抑制対象としてもよい。例えば、図10に示すように、個々の発電装置120に指示する抑制発電量を減らすことで、各発電装置(PV)において必要な発電が行われるようにすることも可能である。
 また図9、図10では、各発電装置120に均等に抑制時間を振り分けているが、その他の要素を考慮して、各発電装置120の抑制制御期間を決定してもよい。例えば、抑制量や抑制期間を小さく、短くする特約を結んだオーナーのPVの抑制発電量や抑制制御時間を短くしたり、逆に、抑制制御を優先的に適用する特約を結んだオーナーのPVの抑制制御時間を長くしたり、抑制量を増やすこと等の変形が考えられる。
[第2の実施形態]
 続いて、上記PV抑制スケジュールの作成方法に変更を加えた第2~8の実施形態について図面を参照して詳細に説明する。第2の実施形態は、上記第1の実施形態と同様の構成にて実現可能であるので、以下、その相違点を中心に説明する。
 図11は、本発明の第2の実施形態の発電装置監視制御システムの構成を示す図である。図6に示した第1の実施形態との相違点は、制御装置110に日射計114が追加されている点である。本実施形態における制御装置110は、例えば、図7のステップS001のPV発電量とともに、管理装置200に対して、日射計114のセンサ値を送信する。
 図12は、本発明の第2の実施形態における抑制スケジュールの一例を示す図である。まず、第2の実施形態の管理装置200は、抑制スケジュールの作成の前に、制御装置110から受信した日射計の値に基づいて、日射量が所定値を超えている、即ち、所定の発電量が見込まれる発電装置120(例えば日射量>0)を選出する。ここで、日射量が所定値よりも大きい発電装置120を選択する理由は、日射量が所定値よりも小さい発電装置120は、そもそも発電量が少ないため、抑制の対象として選定しても、必要な抑制量の達成に貢献できないからである。
 図12の例では、発電装置4の日射量が0であるため、抑制対象外となり、残る発電装置1~発電装置3で抑制制御が行われている。
 以上のように、本実施形態によれば、第1の実施形態と比較して、より確実性の高い抑制スケジュールを作成できるという効果が奏される。なお、上記した説明では、制御装置110に日射計114が備えられているものとして説明したが、必ずしも制御装置110に日射計114が備えられている必要はない。例えば、PVの近傍に配置済みの日射計の値を管理装置200が直接入手するようにしたり、気象庁や民間気象会社のメッシュ日射量データ、局地ナウキャスト情報等を用いることもできる。
[第3の実施形態]
 第3の実施形態は、第2の実施形態の日射量データに代えて、発電量を用いた例である。第3の実施形態は、上記第1の実施形態(図6)又は第2の実施形態(図11)と同様の構成(図6、図11)にて実現可能であるので、以下、その相違点を中心に説明する。
 図13は、本発明の第3の実施形態における抑制スケジュールの一例を示す図である。まず、第3の実施形態の管理装置200は、抑制スケジュールの作成の前に、制御装置110から受信した発電量に基づいて、発電量が所定値を超えている発電装置を選出する。
 図13の例では、発電装置3の発電量が所定値以下であるため、抑制対象外となり、残る発電装置1、発電装置2、発電装置4で抑制制御が行われている。以上のように、本実施形態によれば、日射データを用いずに第2の実施形態と同等の効果を達成することができる。
[第4の実施形態]
 第4の実施形態は、各発電装置(制御装置)が、抑制対象となった累計時間を考慮して抑制制御の対象となる発電装置を選択して抑制スケジュールを作成する方法である。第4の実施形態は、上記第1の実施形態(図6)又は第2の実施形態(図11)と同様の構成(図6、図11)にて実現可能であるので、以下、その相違点を中心に説明する。
 図14は、本発明の第4の実施形態における抑制スケジュールの一例を示す図である。まず、第4の実施形態の管理装置200は、抑制スケジュールの作成の前に、管理情報記憶部234を参照し、これまでの累計抑制時間が所定値未満(例えば累計抑制時間<所定値)である発電装置を選出する。
 図14の例では、発電装置2、発電装置3の累計抑制時間が所定値以上であるため、抑制対象外となり、残る発電装置1、発電装置4で抑制制御が行われている。
 以上のように、本実施形態によれば、第1の実施形態と比較して、発電設備(PV)のオーナー間の公平性を考慮した抑制スケジュールを作成できるという効果が奏される。
[第5の実施形態]
 第5の実施形態は、各発電装置(制御装置)が、抑制指示による累計抑制発電量を考慮して抑制制御の対象となる発電装置を選択して抑制スケジュールを作成する方法である。第5の実施形態は、上記第1の実施形態(図6)又は第2の実施形態(図11)と同様の構成(図6、図11)にて実現可能であるので、以下、その相違点を中心に説明する。
 図15は、本発明の第5の実施形態における抑制スケジュールの一例を示す図である。まず、第5の実施形態の管理装置200は、抑制スケジュールの作成の前に、管理情報記憶部234を参照し、これまでの累計抑制発電量が所定値未満(例えば累計抑制時間<所定値)である発電装置を選出する。なお、累計抑制発電量は、例えば、該当発電装置を抑制制御しなかった場合の発電量に、抑制率を乗じた抑制発電量を積算することで算出することができる。また、前記発電装置を抑制しなかった場合の発電量は、前述の日射計データから推定発電量を求めたり、抑制前の直近の報告発電量を用いることができる。
 図15の例では、発電装置1、発電装置3の累計抑制発電量が所定値以上であるため、抑制対象外となり、残る発電装置2、発電装置4で抑制制御が行われている。
 以上のように、本実施形態によれば、第4の実施形態と同様に、発電設備(PV)のオーナー間の公平性を考慮した抑制スケジュールを作成できるという効果が奏される。
[第6の実施形態]
 第6の実施形態は、第2の実施形態と第4の実施形態とを組み合わせ、日射量と累計抑制時間との双方を考慮して抑制制御の対象となる発電装置を選択して抑制スケジュールを作成する方法である。また、第6の実施形態は、上記第2の実施形態(図11)と同様の構成(図11)にて実現可能であるので、以下、その相違点を中心に説明する。
 図16は、本発明の第6の実施形態における抑制スケジュールの一例を示す図である。まず、第6の実施形態の管理装置200は、抑制スケジュールの作成の前に、日射計の値が所定値を超えており、かつ、これまでの累計抑制発電量が所定値未満(例えば累計抑制時間<所定値)である発電装置を選出する。
 図16の例では、発電装置3は、累計抑制時間が所定値以上であるため抑制対象外となり、発電装置4は、日射量=0のため抑制対象外となっている。このため、管理装置200は、残る発電装置1、発電装置2で抑制制御を行うスケジュールを作成している。
 以上のように、本実施形態によれば、抑制制御の実効性や、発電設備(PV)のオーナー間の公平性との双方を考慮した抑制スケジュールを作成できるという効果が奏される。なお、上記した第2の実施形態と第4の実施形態の組み合わせに限られず、第2~第5の実施形態は、自由に組み合わせることが可能である。
[第7の実施形態]
 第7の実施形態は、各発電装置120に蓄電装置115又は電力消費可能な負荷が備えられているか否かを考慮して抑制制御の対象となる発電装置を選択して抑制スケジュールを作成する方法である。
 図17は、本発明の第7の実施形態の発電装置監視制御システムの構成を示す図である。図6に示した第1の実施形態との相違点は、蓄電装置115が備えられている制御装置110及び発電装置120が存在する点(図17の例では上2つ)である。本実施形態における管理装置200は、発電装置120の仕様として蓄電装置115(又は負荷)の有無をその管理情報記憶部234に保持している。蓄電装置115としては、PV専用の蓄電装置を用いることも可能であるが、例えば、家庭用の電源としても使用可能な電気自動車(EV)の蓄電池やピークシフト用の家庭用蓄電池を用いることができる。
 図18は、本発明の第7の実施形態における抑制スケジュールの一例を示す図である。まず、第7の実施形態の管理装置200は、抑制スケジュールの作成の前に、管理情報記憶部234を参照し、蓄電装置115(又は負荷)を持っている発電装置を選出する。
 図18の例では、発電装置3、発電装置4は、蓄電装置115も電力消費可能な負荷を持っていないため抑制対象外となっている。このため、管理装置200は、残る発電装置1、発電装置2で抑制制御を行うスケジュールを作成している。なお、本実施形態での抑制制御は、発電装置120による出力発電量の減少制御に限られない。例えば、抑制指示を受けた発電量を、蓄電池に充電したり、負荷で消費することで発電量の抑制を達成することが可能となる。
 以上のように、本実施形態によれば、発電装置120での発電量の出力抑制を行わずに、指示された抑制発電量を達成することが可能となる。なお、抑制対象の発電装置を選択する際には、充電池や負荷の有無のみならず、蓄電装置115の充電可能容量(SOC;State Of Charge)状態や負荷の使用可否状態等を参照することができる。また、蓄電装置115に蓄電した電力は、夜間等の発電できない時間に使用することができる。また、前述の負荷としてヒートポンプシステムや家庭用燃料水素システムの熱源ユニットを用いることで、管理装置200から指示された抑制発電量を実現しながら、エネルギーを有効活用することができる。
 また、以上の説明からも明らかなとおり、本実施形態は、ホームエネルギーマネジメントシステム(HEMS)やスマートグリッドを構成するシステムとも親和性の高いシステムを構築することができる。
[第8の実施形態]
 第8の実施形態は、第6の実施形態を発展させ、3以上のパラメータを用い、それぞれ優先度を設定し、抑制対象の発電装置を選択して抑制スケジュールを作成する方法である。
 図19は、本発明の第8の実施形態における発電装置選定ロジックを説明するための図である。例えば、前述の日射量(天候情報)>累積抑制時間>(各PV)の発電容量という順序で発電装置の選択パラメータに優先度が設定されているものとする。また、累積抑制時間の上限閾値として360時間(1日の発電可能な時間を12時間として30日分)が設定されているものとする。
 図19の例では、まず、管理装置200は、日射量(天候情報)を基に、発電装置1~発電装置3を抑制対象として選択する。
 次に、管理装置200は、発電装置1~3の累積抑制時間(累積抑制日数)を参照し、抑制対象となる発電装置を選択する。図19の例では、いずれも累積抑制時間(累積抑制日数)が360時間に到っていないので、発電装置1~3のいずれもが抑制対象として残っている。
 次に、管理装置200は、発電装置1~3の発電容量を参照し、抑制対象となる発電装置を選択する。例えば、電力系統側から指示されたエリア抑制発電量が150kW・hである場合、管理装置200は、発電容量の大きい順に、発電装置を選択する。この場合、発電容量が大きい順に、発電装置3と発電装置2を選択した段階で、電力系統側から指示されたエリア抑制発電量に到達したため、発電装置1は抑制対象外となる。
 最終的に、管理装置200は、発電装置2、発電装置3を選択して抑制スケジュールを作成する。
 図20は、同一の発電装置選定ロジックで累積抑制時間が上限に達してしまっている場合の動作を説明するための図である。図20の例では、まず、管理装置200は、日射量(天候情報)を基に、発電装置1~発電装置3を抑制対象として選択する。ここまでは、図19の例と同様である。
 次に、管理装置200は、発電装置1~発電装置3の累積抑制時間(累積抑制日数)を参照し、抑制対象となる発電装置を選択する。図20の例では、発電装置2の累積抑制時間(累積抑制日数)が360時間に達してしまっているため、発電装置1、発電装置3が抑制対象として選択される。次に、管理装置200は、発電装置1、発電装置3の発電容量を参照し、抑制対象となる発電装置を選択する。例えば、電力系統側から指示されたエリア抑制発電量が90kW・hである場合、管理装置200は、発電容量の大きい順に発電装置を選択し、発電装置3を選択した段階で抑制対象の発電装置は決定する。なお、電力系統側から指示されたエリア抑制発電量が150kW・hである場合、発電装置3、発電装置1を選択した段階でなお40kW・hの抑制不足が発生する。この場合は、例外的に発電装置2を抑制対象とする方法や、電力系統側に図8に示す抑制スケジュールをアンサーバックする際等のスケジューリング不調である旨を応答し、電力系統側に再度調整を依頼する方法等が考えられる。
 なお、図19、図20に示した例はあくまで一例であり、本実施形態は、種々の変更を加えることができる。例えば、上記第7の実施形態を組み合わせて、蓄電容量の大きい蓄電装置やエネルギーの蓄積可能な負荷を持つ発電装置/制御装置を優先的に選択する方法も採用可能である。
 以上、本発明の各実施形態を説明したが、本発明は、上記した実施形態に限定されるものではなく、本発明の基本的技術的思想を逸脱しない範囲で、更なる変形・置換・調整を加えることができる。例えば、各図面に示したネットワーク構成、各要素の構成、メッセージの表現形態は、本発明の理解を助けるための一例であり、これらの図面に示した構成に限定されるものではない。
 また、上記した実施形態では、発電装置としてPVを採用した例を挙げて説明したが、本発明は、風力、水力、潮汐、地熱等の再生可能エネルギーにて発電を行う発電装置やこれらが混在する構成を備える場合にも同様に適用することが可能である。
 最後に、本発明の好ましい形態を要約する。
[第1の形態]
 (上記第1の視点による発電装置監視制御システム参照)
[第2の形態]
 第1の形態の発電装置監視制御システムにおいて、
 前記管理装置は、前記制御装置から取得した前記発電装置で発電されている出力発電量を前記電力系統へ送信する発電装置監視制御システム。
[第3の形態]
 第2の形態の発電装置監視制御システムにおいて、
 前記制御装置は、前記発電装置から前記発電装置で発電されている出力発電量を取得し、取得した前記発電装置で発電されている出力発電量を前記管理装置に送信する発電装置監視制御システム。
[第4の形態]
 第1から第3いずれか一の形態の発電装置監視制御システムにおいて、
 前記出力発電量は、前記発電装置に対する抑制発電量、抑制発電率、目標発電量、目標発電率、及び停止信号のうち少なくとも1つを含む発電装置監視制御システム。
[第5の形態]
 第1から第4いずれか一の形態の発電装置監視制御システムにおいて、
 前記出力指示は、抑制発電量、抑制発電率、目標発電量、目標発電率、及び停止信号のうち少なくとも1つを含む発電装置監視制御システム。
[第6の形態]
 第1から第5いずれか一の形態の発電装置監視制御システムにおいて、
 前記発電装置の接続情報は、前記電力系統の配電自動化システムによって作成された発電装置と電力系統との関係を示す情報である発電装置監視制御システム。
[第7の形態]
 第1から第6いずれか一の形態の発電装置監視制御システムにおいて、
 前記管理装置は、前記発電装置における抑制スケジュールを作成して前記発電装置の出力発電量を抑制する発電装置監視制御システム。
[第8の形態]
 第7の形態の発電装置監視制御システムにおいて、
 前記制御装置は、複数の発電装置に接続されており、
 前記管理装置は、複数の前記発電装置の中から、所定条件で抑制制御を指示する発電装置を選択して抑制制御する抑制スケジュールを作成して出力発電量を抑制する発電装置監視制御システム。
[第9の形態]
 第8の形態の発電装置監視制御システムにおいて、
 前記所定条件は、前記発電装置の累積抑制時間又は累積発電量が所定値以下の発電装置を選択するものである発電装置監視制御システム。
[第10の形態]
 第8又は第9の形態の発電装置監視制御システムにおいて、
 前記所定条件は、所定の発電量が見込まれる太陽光発電装置から抑制対象の太陽光発電装置を選択するものである発電装置監視制御システム。
[第11の形態]
 第8から第10いずれか一の形態の発電装置監視制御システムにおいて、
 前記所定条件は、抑制電力を蓄積可能な蓄電装置又は抑制電力を消費可能な負荷が備えられている制御装置に接続された発電装置を選択するものである発電装置監視制御システム。
[第12の形態]
 (上記第2の視点による電力系統システム参照)
[第13の形態]
 (上記第3の視点による制御装置及び管理装置参照)
[第14の形態]
 (上記第4の視点による方法参照)
[第15の形態]
 (上記第5の視点による方法参照)
[第16の形態]
 (上記第6の視点によるコンピュータプログラム参照)
 なお、上記第12~第16の形態は、第1の形態と同様に、第2~第11の形態に展開することが可能である。
 なお、上記の特許文献および非特許文献の各開示を、本書に引用をもって繰り込むものとする。本発明の全開示(請求の範囲を含む)の枠内において、さらにその基本的技術思想に基づいて、実施形態ないし実施例の変更・調整が可能である。また、本発明の開示の枠内において種々の開示要素(各請求項の各要素、各実施形態ないし実施例の各要素、各図面の各要素等を含む)の多様な組み合わせ、ないし選択が可能である。すなわち、本発明は、請求の範囲を含む全開示、技術的思想にしたがって当業者であればなし得るであろう各種変形、修正を含むことは勿論である。特に、本書に記載した数値範囲については、当該範囲内に含まれる任意の数値ないし小範囲が、別段の記載のない場合でも具体的に記載されているものと解釈されるべきである。
 110、110a~110c 制御装置
 113 表示部
 114 日射計
 115 蓄電装置
 116 制御手段
 120、120a~120c 発電装置
 200 管理装置
 201 第1取得手段
 202 第2取得手段
 203 算出手段
 204 送信手段
 220 管理装置(子)
 230 管理装置(親)
 231 上位側双方向通信部
 232 制御部
 233 下位側双方向通信部
 234 管理情報記憶部
 300 電力系統
 310 中央給電システム(中給システム)
 311 需給情報管理部
 320 配電自動化システム(配自システム)
 321 PV接続情報管理部
 2310 通信デバイス
 2311 入力デバイス
 2312 出力デバイス
 2320 CPU
 2340 記憶装置

Claims (18)

  1.  少なくとも1つの発電装置と接続されている制御装置と、
     前記制御装置と通信可能に接続される管理装置と、により構成され、
     前記管理装置は、電力系統へ電力を出力する発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置が発電すべき出力発電量を算出する算出手段と、
     前記算出した出力発電量を前記制御装置に送信する送信手段と、を備え、
     前記制御装置は、前記管理装置により送信された出力電力量に基づいて前記発電装置を制御する制御手段を備える、
     ことを特徴とする発電装置監視制御システム。
  2.  前記管理装置は、前記制御装置から取得した前記発電装置で発電されている出力発電量を前記電力系統へ送信する請求項1の発電装置監視制御システム。
  3.  前記制御装置は、前記発電装置から前記発電装置で発電されている出力発電量を取得し、取得した前記発電装置で発電されている出力発電量を前記管理装置に送信することを特徴とする請求項2に記載の発電装置監視制御システム。
  4.  前記出力発電量は、前記発電装置に対する抑制発電量、抑制発電率、目標発電量、目標発電率、及び停止信号のうち少なくとも1つを含むことを特徴とする請求項1から3いずれか一に記載の発電装置監視制御システム。
  5.  前記出力指示は、抑制発電量、抑制発電率、目標発電量、目標発電率、及び停止信号のうち少なくとも1つを含むことを特徴とする請求項1から4いずれか一に記載の発電装置監視制御システム。
  6.  前記発電装置の接続情報は、前記電力系統の配電自動化システムによって作成された発電装置と電力系統との関係を示す情報である請求項1から5いずれか一の発電装置監視制御システム。
  7.  前記管理装置は、前記発電装置における抑制スケジュールを作成して前記発電装置の出力発電量を抑制する請求項1から6いずれか一の発電装置監視制御システム。
  8.  前記制御装置は、複数の発電装置に接続されており、
     前記管理装置は、複数の前記発電装置の中から、所定条件で抑制制御を指示する発電装置を選択して抑制制御する抑制スケジュールを作成して出力発電量を抑制する請求項7の発電装置監視制御システム。
  9.  前記所定条件は、前記発電装置の累積抑制時間又は累積発電量が所定値以下の発電装置を選択するものである請求項8の発電装置監視制御システム。
  10.  前記所定条件は、所定の発電量が見込まれる太陽光発電装置から抑制対象の太陽光発電装置を選択するものである請求項8又は9の発電装置監視制御システム。
  11.  前記所定条件は、抑制電力を蓄積可能な蓄電装置又は抑制電力を消費可能な負荷が備えられている制御装置に接続された発電装置を選択するものである請求項8から10いずれか一の発電装置監視制御システム。
  12.  少なくとも1つの発電装置と接続されている制御装置と、
     前記制御装置と接続されている管理装置と、
     前記発電装置から電力が出力される電力系統と、により構成され、
     前記管理装置は、前記電力系統へ電力を出力する発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置の出力発電量を算出する算出手段と、
     前記算出した出力発電量を前記制御装置に送信する送信手段と、を備え、
     前記制御装置は、前記管理装置により送信された出力発電量に基づいて前記発電装置を制御する制御手段を備える、
     ことを特徴とする電力系統システム。
  13.  少なくとも1つの制御装置が接続される管理装置であって、
     前記電力系統へ電力を出力できる発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて、前記発電装置の出力発電量を算出する算出手段と、
     前記制御装置に対して、前記出力発電量を送信する送信手段と、を備える、
     ことを特徴とする管理装置。
  14.  少なくとも1つの制御装置が接続される管理装置であって、
     電力系統へ電力を出力できる少なくとも一つ以上の発電装置を示す接続情報を取得する第1取得手段と、
     電力系統へ出力電力量を指示する出力指示を取得する第2取得手段と、
     前記接続情報と前記出力指示とから算出される、前記各発電装置の出力発電量を送信する送信手段と、
     を備える管理装置。
  15.  電力系統へ電力を出力できる発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて発電装置の出力発電量を算出する算出手段と、前記算出した出力発電量を制御装置に送信する送信手段と、を備える管理装置と、少なくとも1つの発電装置と、通信可能に接続され、
     前記管理装置により送信された出力発電量に基づいて前記発電装置を制御する制御手段を備える、
     ことを特徴とする制御装置。
  16.  管理装置を作動させる方法であって、
     前記電力系統へ電力を出力できる発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて前記発電装置の出力発電量を算出する算出ステップと、
     制御装置に対して、前記出力発電量を送信する送信ステップと、
     を含む方法。
  17.  電力系統へ電力を出力できる発電装置を示す接続情報と前記電力系統へ出力電力量を指示する出力指示とに基づいて発電装置の出力発電量を算出する算出手段と、前記算出した出力発電量を制御装置に送信する送信手段と、を備える管理装置と、少なくとも1つの発電装置と、通信可能に接続される制御装置を作動させる方法であって、
     前記管理装置からの出力発電量を受信する受信ステップと、
     前記受信ステップで受信した出力発電量に基づいて前記発電装置を制御する制御ステップと、
     を含む方法。
  18.  少なくとも1つの発電装置を制御する制御装置と、
     前記制御装置と通信可能に接続される管理装置と、により構成され、
     前記管理装置は、前記発電装置が電力系統の管理する配電網に接続されている経路を示す接続情報と前記配電網の少なくとも一部に対する抑制発電量または抑制発電率である出力指示とを取得する取得手段と、
     前記発電装置の抑制発電量又は抑制発電率を前記制御装置に送信する送信手段と、を備え、
     前記制御装置は、前記管理装置により送信された前記抑制発電量又は前記抑制発電率に基づいて前記発電装置を制御する制御手段を備える、
     ことを特徴とする発電装置監視制御システム。
PCT/JP2015/077658 2015-03-13 2015-09-30 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム WO2016147456A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017506011A JP6677242B2 (ja) 2015-03-13 2015-09-30 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015051226 2015-03-13
JP2015-051226 2015-03-13

Publications (1)

Publication Number Publication Date
WO2016147456A1 true WO2016147456A1 (ja) 2016-09-22

Family

ID=56918520

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/077658 WO2016147456A1 (ja) 2015-03-13 2015-09-30 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム

Country Status (2)

Country Link
JP (1) JP6677242B2 (ja)
WO (1) WO2016147456A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019017191A (ja) * 2017-07-07 2019-01-31 パナソニックIpマネジメント株式会社 制御装置、電力変換システム、及び発電システム
JP2020005399A (ja) * 2018-06-27 2020-01-09 京セラ株式会社 サーバ装置、制御システム、及び制御方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011048944A1 (ja) * 2009-10-21 2011-04-28 日本電気株式会社 制御装置、エネルギーシステム及びその制御方法
WO2011129003A1 (ja) * 2010-04-15 2011-10-20 日本風力開発株式会社 蓄電池併設型自然エネルギー発電システムに用いる電力管理制御システム
JP2012039769A (ja) * 2010-08-06 2012-02-23 Chugoku Electric Power Co Inc:The 太陽光発電パネル及び太陽光発電出力調整システム
JP2013183622A (ja) * 2012-03-05 2013-09-12 Toshiba Corp 分散電源システム及び電圧調整方法
JP2013207862A (ja) * 2012-03-27 2013-10-07 Sharp Corp 発電システム、並びに当該発電システムに用いるパワーコンディショナおよび出力抑制管理装置
JP2014050168A (ja) * 2012-08-30 2014-03-17 Hitachi Ltd 系統安定化システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4734059B2 (ja) * 2005-08-04 2011-07-27 株式会社東芝 電力取引入札支援システムと方法、およびプログラム
JP5992870B2 (ja) * 2013-06-20 2016-09-14 ヤフー株式会社 電力小売管理装置および電力小売管理方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011048944A1 (ja) * 2009-10-21 2011-04-28 日本電気株式会社 制御装置、エネルギーシステム及びその制御方法
WO2011129003A1 (ja) * 2010-04-15 2011-10-20 日本風力開発株式会社 蓄電池併設型自然エネルギー発電システムに用いる電力管理制御システム
JP2012039769A (ja) * 2010-08-06 2012-02-23 Chugoku Electric Power Co Inc:The 太陽光発電パネル及び太陽光発電出力調整システム
JP2013183622A (ja) * 2012-03-05 2013-09-12 Toshiba Corp 分散電源システム及び電圧調整方法
JP2013207862A (ja) * 2012-03-27 2013-10-07 Sharp Corp 発電システム、並びに当該発電システムに用いるパワーコンディショナおよび出力抑制管理装置
JP2014050168A (ja) * 2012-08-30 2014-03-17 Hitachi Ltd 系統安定化システム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019017191A (ja) * 2017-07-07 2019-01-31 パナソニックIpマネジメント株式会社 制御装置、電力変換システム、及び発電システム
JP2020005399A (ja) * 2018-06-27 2020-01-09 京セラ株式会社 サーバ装置、制御システム、及び制御方法
JP7005444B2 (ja) 2018-06-27 2022-01-21 京セラ株式会社 サーバ装置、制御システム、及び制御方法

Also Published As

Publication number Publication date
JP6677242B2 (ja) 2020-04-08
JPWO2016147456A1 (ja) 2018-01-18

Similar Documents

Publication Publication Date Title
Kaur et al. Coordinated power control of electric vehicles for grid frequency support: MILP-based hierarchical control design
Rahbar et al. Shared energy storage management for renewable energy integration in smart grid
Guo et al. Optimal power management of residential customers in the smart grid
JP5350011B2 (ja) 系統連系装置及び配電システム
JP5872571B2 (ja) 電力管理システム、電力管理方法及びネットワークサーバ
JP6495510B2 (ja) 電力管理システム、電力管理方法及び電力管理装置
EP3070813A1 (en) Power supplying device and power receiving device
Shahryari et al. Demand side management using the internet of energy based on fog and cloud computing
US9830672B2 (en) Power management message bus system
JP2015015865A (ja) サーバ装置及び電力需給制御方法
JP6677241B2 (ja) 管理装置、電力系統システム、発電量の制御方法、及びプログラム
WO2016157576A1 (ja) 発電装置監視制御システム、制御装置及び制御方法
CN104484757B (zh) 一种应用于智能微电网的异质载荷调度和能量管理方法
WO2016147456A1 (ja) 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム
JP5922138B2 (ja) 電力管理システム、電力管理方法及び上位電力管理装置
Fatima et al. A brief review on smart grid residential network schemes
JP6439861B2 (ja) 発電装置監視制御システム、電力系統システム、管理装置、制御装置及び方法
JP5923100B2 (ja) 電力管理システム、電力管理方法及び上位電力管理装置
JP6128999B2 (ja) 電力融通システム及び該電力融通システム用の制御手順決定装置
JP2017108526A (ja) 電力管理装置、電力管理方法およびプログラム
EP3493360A1 (en) A method and a system for efficient distribution of electrical energy in a peer-to-peer distributed energy network
JP2015125536A (ja) エネルギー管理装置、エネルギー管理システム、エネルギー管理方法およびエネルギー管理プログラム
JP2017127189A (ja) 通信装置、外部装置及び通信方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15885548

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017506011

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15885548

Country of ref document: EP

Kind code of ref document: A1