WO2014192481A1 - 作業車両、及び作業車両の制御方法 - Google Patents

作業車両、及び作業車両の制御方法 Download PDF

Info

Publication number
WO2014192481A1
WO2014192481A1 PCT/JP2014/061828 JP2014061828W WO2014192481A1 WO 2014192481 A1 WO2014192481 A1 WO 2014192481A1 JP 2014061828 W JP2014061828 W JP 2014061828W WO 2014192481 A1 WO2014192481 A1 WO 2014192481A1
Authority
WO
WIPO (PCT)
Prior art keywords
current value
pressure
electromagnetic proportional
value information
valve
Prior art date
Application number
PCT/JP2014/061828
Other languages
English (en)
French (fr)
Inventor
健夫 山田
智裕 中川
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to PCT/JP2014/061828 priority Critical patent/WO2014192481A1/ja
Priority to CN201480000766.8A priority patent/CN104220675B/zh
Priority to US14/380,851 priority patent/US9382693B2/en
Priority to DE112014000058.2T priority patent/DE112014000058B4/de
Priority to KR1020147021487A priority patent/KR101628795B1/ko
Priority to JP2014547606A priority patent/JP5756890B2/ja
Publication of WO2014192481A1 publication Critical patent/WO2014192481A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/14Booms only for booms with cable suspension arrangements; Cable suspensions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • E02F9/2012Setting the functions of the control levers, e.g. changing assigned functions among operations levers, setting functions dependent on the operator or seat orientation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/08Servomotor systems without provision for follow-up action; Circuits therefor with only one servomotor
    • F15B11/10Servomotor systems without provision for follow-up action; Circuits therefor with only one servomotor in which the servomotor position is a function of the pressure also pressure regulators as operating means for such systems, the device itself may be a position indicating system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B13/00Details of servomotor systems ; Valves for servomotor systems
    • F15B13/02Fluid distribution or supply devices characterised by their adaptation to the control of servomotors
    • F15B13/04Fluid distribution or supply devices characterised by their adaptation to the control of servomotors for use with a single servomotor
    • F15B13/0401Valve members; Fluid interconnections therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B21/00Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
    • F15B21/08Servomotor systems incorporating electrically operated control means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/12Actuating devices; Operating means; Releasing devices actuated by fluid
    • F16K31/42Actuating devices; Operating means; Releasing devices actuated by fluid by means of electrically-actuated members in the supply or discharge conduits of the fluid motor
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D7/00Control of flow
    • G05D7/06Control of flow characterised by the use of electric means
    • G05D7/0617Control of flow characterised by the use of electric means specially adapted for fluid materials
    • G05D7/0629Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means
    • G05D7/0635Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means
    • G05D7/0641Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means using a plurality of throttling means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/50Pressure control
    • F15B2211/575Pilot pressure control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/63Electronic controllers
    • F15B2211/6303Electronic controllers using input signals
    • F15B2211/6306Electronic controllers using input signals representing a pressure
    • F15B2211/6316Electronic controllers using input signals representing a pressure the pressure being a pilot pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/63Electronic controllers
    • F15B2211/6303Electronic controllers using input signals
    • F15B2211/6346Electronic controllers using input signals representing a state of input means, e.g. joystick position
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/635Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements
    • F15B2211/6355Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements having valve means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/665Methods of control using electronic components
    • F15B2211/6653Pressure control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/67Methods for controlling pilot pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T137/00Fluid handling
    • Y10T137/0318Processes
    • Y10T137/0324With control of flow by a condition or characteristic of a fluid
    • Y10T137/0379By fluid pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T137/00Fluid handling
    • Y10T137/8593Systems
    • Y10T137/87096Valves with separate, correlated, actuators
    • Y10T137/87113Interlocked

Definitions

  • the present invention relates to a work vehicle and a work vehicle control method.
  • the work vehicle drives a work machine and performs a desired work.
  • a working machine for a hydraulic excavator includes an arm, a boom, and a bucket.
  • Each of the arm, boom, and bucket is driven by a hydraulic cylinder.
  • each cylinder drives an arm, boom, or bucket.
  • each cylinder is connected to a switching valve, and the switching direction of the hydraulic oil to each cylinder is switched by each switching valve.
  • each cylinder expands and contracts to drive the arm, boom, or bucket.
  • Each switching valve is driven by a pilot pressure controlled by a pilot pressure control valve.
  • the pilot pressure control valve controls the pilot pressure according to the operation amount of the operation lever.
  • An electromagnetic proportional valve is installed between the pilot pressure control valve and each pilot port of each switching valve.
  • a control part controls an electromagnetic proportional valve based on the pilot pressure applied from a pilot pressure control valve, and automatic control of each cylinder is attained (refer to patent documents 1).
  • the control unit controls the current value of the current output to the electromagnetic proportional valve to open and close the electromagnetic proportional valve, and as a result, each cylinder can be automatically controlled.
  • the automatic control is a concept including automatic control including a part of the operator's work.
  • a work vehicle includes a work machine, a switching valve, an operation member, a pilot pressure control valve, an electromagnetic proportional valve, an upstream pilot flow path, a pressure sensor, and a control unit.
  • the switching valve is configured to switch a supply direction of the first working fluid supplied to the work machine.
  • the operation member is configured to operate the work machine.
  • the pilot pressure control valve is configured to control the pressure of the second working fluid that drives the switching valve in accordance with the operation amount of the operation member.
  • the electromagnetic proportional valve is installed between the switching valve and the pilot pressure control valve.
  • the upstream pilot flow path connects the pilot pressure control valve and the electromagnetic proportional valve.
  • the pressure sensor is configured to sense the pressure of the second working fluid in the upstream pilot flow path.
  • the control unit selects at least one current value information from the plurality of current value information based on the pressure detected by the pressure sensor.
  • the control unit is configured to set a current value of a current output to the electromagnetic proportional valve based on the selected current value information.
  • the current value information indicates a correspondence relationship between the current value of the current output to the electromagnetic proportional valve and the pressure of the second working fluid output from the electromagnetic proportional valve.
  • the control unit selects at least one current value information from a plurality of current value information based on the pressure detected by the pressure sensor. And a control part sets the electric current value of the electric current output to an electromagnetic proportional valve based on the selected electric current value information. For this reason, the electromagnetic proportional valve is driven by a current having a more appropriate current value. As a result, an appropriate pilot pressure is applied by the switching valve, and the work implement is appropriately automatically controlled.
  • the pressure (input pressure) of the working fluid input to the electromagnetic proportional valve is not necessarily equal to the pressure of the working fluid (output pressure) output from the electromagnetic proportional valve.
  • the output pressure may be different even if a current having the same current value is output to the electromagnetic proportional valve.
  • the control unit estimates the operating speed of the work implement based on the input pressure. For this reason, for example, when the input pressure is higher than the output pressure, the operating speed of the work implement estimated by the control unit is faster than the actual operating speed of the work implement.
  • the following phenomenon occurs when the excavator performs leveling work on the terrain along the design surface.
  • the operator performs the excavation operation of the arm and the lowering operation of the boom so that the blade edge of the bucket moves along the design surface.
  • the control unit performs control to raise the boom when it is determined that the cutting edge is likely to move downward from the design surface. If the arm operating speed estimated by the control unit is faster than the actual arm operating speed, the control unit moves the boom higher than necessary, and the cutting edge moves above the design surface. Will occur. For example, such a phenomenon can occur particularly when the pilot pressure increases when the arm operation lever is further tilted to increase the working speed.
  • the control unit sets the current value of the current output to the electromagnetic proportional valve based on appropriate current value information corresponding to the input pressure. For this reason, for example, the pressure of the second working fluid input to the electromagnetic proportional valve can be made substantially equal to the pressure of the second working fluid output from the electromagnetic proportional valve. As a result, the operating speed of the work implement estimated by the control unit is substantially equal to the actual operating speed of the work implement. Therefore, the work vehicle according to the present invention can appropriately automatically control the work machine.
  • control unit is based on the at least one selected current value information so that the pressure of the second working fluid output from the electromagnetic proportional valve is equal to the pressure detected by the pressure sensor. Is configured to set a current value to be output to.
  • the plurality of current value information is information set for each of a plurality of specific pressures input to the electromagnetic proportional valve.
  • the control unit selects at least one piece of current value information of a specific pressure close to the pressure detected by the pressure sensor from the plurality of pieces of current value information.
  • the control unit sets the current value of the current output to the electromagnetic proportional valve based on the selected at least one current value information.
  • control unit is configured to select the first current value information from the plurality of current value information when the pressure detected by the pressure sensor is the first pressure. Further, when the pressure detected by the pressure sensor is the second pressure, the control unit is configured to select the second current value information from the plurality of current value information. When the pressure detected by the pressure sensor is between the first pressure and the second pressure, the control unit sets the current value of the current output to the electromagnetic proportional valve by interpolation.
  • the control unit sets the current value of the current output to the electromagnetic proportional valve by linear interpolation.
  • the control unit selects the first and second current value information from the plurality of current value information. And a control part sets the electric current value of the electric current output to an electromagnetic proportional valve using the interpolation of the electric current value set based on 1st electric current value information, and the electric current value set based on 2nd electric current value information To do.
  • the work machine has a cylinder driven by the first working fluid.
  • the switching valve is configured to switch the supply direction of the first working fluid supplied to the cylinder.
  • the work machine further includes a vehicle body.
  • the work machine includes a boom, an arm, a boom cylinder, and an arm cylinder.
  • the boom is rotatably attached to the vehicle body.
  • the arm is rotatably attached to the boom.
  • the boom cylinder is configured to drive the boom.
  • the arm cylinder is configured to drive the arm.
  • the switching valve is configured to switch the supply direction of the first working fluid supplied to the arm cylinder.
  • a work vehicle includes a work implement, a switching valve, an operation member, a pilot pressure control valve, an electromagnetic proportional valve, an upstream pilot flow path, a pressure sensor, and a control unit.
  • the switching valve is configured to switch a supply direction of the first working fluid supplied to the work machine.
  • the operation member is configured to operate the work machine.
  • the pilot pressure control valve is configured to control the pressure of the second working fluid that drives the switching valve in accordance with the operation amount of the operation member.
  • the electromagnetic proportional valve is installed between the switching valve and the pilot pressure control valve.
  • the upstream pilot flow path connects the pilot pressure control valve and the electromagnetic proportional valve.
  • the pressure sensor is configured to sense the pressure of the second working fluid in the upstream pilot flow path.
  • the control unit selects at least one current value information from the plurality of current value information based on the pressure detected by the pressure sensor.
  • the control unit is configured to set the current value of the current output to the electromagnetic proportional valve based on the selected current value information.
  • the current value information indicates a correspondence relationship between the current value of the current input to the electromagnetic proportional valve and the pressure of the second working fluid output from the electromagnetic proportional valve.
  • the control method is a method for controlling a work machine of a work vehicle.
  • This control method includes steps (a) to (c).
  • Step (a) obtains a pressure signal indicating the pressure of the second working fluid supplied from the pilot pressure control valve to the electromagnetic proportional valve.
  • Step (b) selects at least one piece of current value information from a plurality of pieces of current value information based on the pressure obtained in step (a).
  • the current value information indicates a correspondence relationship between the current value of the current output to the electromagnetic proportional valve and the pressure of the second working fluid output from the electromagnetic proportional valve.
  • Step (c) sets the current value of the current output to the electromagnetic proportional valve based on the current value information selected in step (b).
  • control method further includes steps (d) to (f).
  • step (d) the current value set in step (c) is output to the electromagnetic proportional valve to control the electromagnetic proportional valve.
  • step (e) a pilot pressure is applied to the switching valve by the second working fluid output from the electromagnetic proportional valve controlled in step (d).
  • step (f) the supply direction of the first working fluid supplied to the work implement is switched based on the pilot pressure applied in step (e).
  • the work implement can be automatically controlled appropriately.
  • the perspective view of a hydraulic excavator The perspective view inside a cab. Schematic of the structure which transmits / receives information to a hydraulic excavator. Schematic which shows the operation
  • FIG. 1 is a perspective view of a hydraulic excavator 100.
  • front and rear mean the front and rear of the vehicle body 101.
  • right”, “left”, “upper”, and “lower” in the following description indicate directions based on a state of looking forward from the driver's seat.
  • Vehicle width direction and “left-right direction” are synonymous.
  • the excavator 100 includes a vehicle main body 101 and a work implement 10.
  • the excavator 100 performs a desired work using the work machine 10.
  • the vehicle body 101 includes a traveling body 102 and a turning body 103.
  • the traveling body 102 includes a pair of traveling devices 104 and 105.
  • the traveling device 104 has a crawler belt 106, and the traveling device 105 has a crawler belt 107.
  • the traveling devices 104 and 105 travel the hydraulic excavator 100 by obtaining driving force from the engine 30 and driving the crawler belts 106 and 107.
  • the turning body 103 is placed on the traveling body 102 and is provided so as to be able to turn with respect to the traveling body 102.
  • the swivel body 103 includes a cab 108, a fuel tank 109, a hydraulic oil tank 110, and an engine room 111.
  • the fuel tank 109 stores fuel for driving the engine 30 (see FIG. 5).
  • the fuel tank 109 is disposed in front of the hydraulic oil tank 110.
  • the hydraulic oil tank 110 stores hydraulic oil.
  • the hydraulic oil tank 110 is arranged side by side with the fuel tank 109 in the front-rear direction.
  • the engine room 111 houses the engine 30, the first to third hydraulic pumps 31 to 33, and the like.
  • the engine room 111 is disposed behind the cab 108, the fuel tank 109, and the hydraulic oil tank 110.
  • the work machine 10 is attached to the front part of the revolving structure 103.
  • the work machine 10 is driven by hydraulic oil.
  • the work machine 10 includes a boom 11, an arm 12, a bucket 13, a boom cylinder 14, an arm cylinder 15, and a bucket cylinder 16.
  • the working machine 10 according to the present embodiment includes a pair of boom cylinders 14.
  • the base end portion of the boom 11 is rotatably connected to the swing body 103. Further, the base end portion of the arm 12 is rotatably connected to the tip end portion of the boom 11. Bucket 13 is rotatably connected to the tip of arm 12.
  • Each boom cylinder 14, arm cylinder 15 and bucket cylinder 16 are hydraulic cylinders and are driven by hydraulic oil. Each cylinder 14 to 16 is driven by hydraulic oil discharged from a first hydraulic pump 31 described later.
  • Each boom cylinder 14 operates the boom 11.
  • the arm cylinder 15 operates the arm 12.
  • the bucket cylinder 16 operates the bucket 13.
  • the work machine 10 is driven by driving these cylinders 14-16.
  • FIG. 2 is a perspective view showing the inside of the cab 108.
  • a driver's seat 112 is installed inside the cab 108.
  • a front window is formed in the front portion of the cab 108.
  • the front window is transparent. For this reason, the operator sitting in the driver's seat 112 can visually recognize the outside of the cab 108 through the front window. For example, the operator can check the bucket 13 through the front window.
  • a monitor device 116 is installed at the front of the cab 108.
  • the monitor device 116 is disposed in the right front part or the left front part in the cab 108.
  • the monitor device 116 according to the present embodiment is disposed in the right front portion.
  • the monitor device 116 is attached to the front pillar. For this reason, the operator can easily see both the work machine 10 and the monitor device 116.
  • a traveling operation unit 113 is installed in front of the driver's seat 112.
  • the travel operation unit 113 includes a right travel operation lever 114 and a left travel operation lever 115.
  • the right traveling operation lever 114 operates the right traveling device 104
  • the left traveling operation lever 115 operates the left traveling device 105.
  • a first operating lever 117 is installed on the right side of the driver's seat 112. The operator drives the boom 11 and the bucket 13 of the work machine 10 by operating the first operation lever 117.
  • a second operation lever 118 is installed on the left side of the driver's seat 112. The operator operates the second operation lever 118 to drive the arm 12 of the work machine 10 or to turn the swing body 103.
  • FIG. 3 is a schematic diagram of a configuration for transmitting and receiving information to and from the excavator 100.
  • the excavator 100 includes a control unit 20, a communication terminal 91, and an antenna 92.
  • the control unit 20 controls the operation of the work machine 10, the turning of the turning body 103, the running of the traveling body 102, and the like.
  • the control unit 20 and the monitor device 116 are connected via a bidirectional network communication cable 97.
  • the control unit 20 and the monitor device 116 can transmit and receive information to and from each other via the network communication cable 97.
  • Each of the control unit 20 and the monitor device 116 is mainly configured by a computer device such as a microcomputer.
  • control unit 20 and the external monitoring station 96 communicate via satellite communication.
  • a communication terminal 91 having a satellite communication antenna 92 is connected to the control unit 20.
  • the satellite communication antenna 92 is installed on the revolving structure 103.
  • a network control station 95 is connected to the ground monitoring station 96 via the Internet or the like.
  • the network control station 95 is connected to a communication earth station 94 that communicates with the communication satellite 93 via a dedicated communication line via a dedicated line. Thereby, data is transmitted and received between the control unit 20 and the predetermined monitoring station 96 via the communication terminal 91, the communication satellite 93, the communication earth station 94, and the network control station 95.
  • the control unit 20 stores construction design data created by three-dimensional CAD (Computer Aided Design).
  • the monitor device 116 displays the position of the excavator 100 received from the outside on the screen in real time. For this reason, the operator can always check the working state of the excavator 100 by the monitor device 116.
  • the control unit 20 compares the construction design data with the position and orientation of the work machine 10 in real time. And the control part 20 controls the working machine 10 by driving a hydraulic circuit based on the comparison result. Specifically, as illustrated in FIG. 4, the control unit 20 compares the design surface S with the position of the bucket 13. And the control part 20 controls the working machine 10 so that the blade edge
  • the design surface S means the surface formed by constructing according to construction design data.
  • FIG. 5 is a hydraulic circuit diagram of the excavator 100.
  • the excavator 100 includes an engine 30, a plurality of hydraulic pumps 31 to 33, a plurality of cylinders 14 to 16, travel motors 17 and 18, a plurality of switching valves 36 to 40, and a plurality of pilot pressure control valves. 41 to 48, a control unit 20, a plurality of hydraulic sensors (an example of pressure sensors) 61 to 66, and a plurality of electromagnetic proportional valves 71 to 77.
  • the excavator 100 includes first to third hydraulic pumps 31 to 33 as a plurality of hydraulic pumps.
  • the excavator 100 includes the above-described boom cylinder 14, arm cylinder 15, and bucket cylinder 16 as a plurality of cylinders.
  • the excavator 100 includes an arm switching valve 36, a boom switching valve 37, a bucket switching valve 38, a right traveling switching valve 39, and a left traveling switching valve 40 as a plurality of switching valves.
  • the excavator 100 includes first to eighth pilot pressure control valves 41 to 48 as a plurality of pilot pressure control valves.
  • the excavator 100 includes first to sixth hydraulic sensors 61 to 66 as a plurality of hydraulic sensors.
  • the excavator 100 includes first to seventh electromagnetic proportional valves 71 to 77 as a plurality of electromagnetic proportional valves.
  • the first to third hydraulic pumps 31 to 33 are driven by the engine 30.
  • the first and second hydraulic pumps 31 and 32 drive hydraulic actuators such as the boom cylinder 14, the arm cylinder 15, the bucket cylinder 16, and the traveling motors 17 and 18.
  • the hydraulic oil (an example of the first hydraulic fluid) discharged by the first and second hydraulic pumps 31 and 32 is supplied to each hydraulic actuator via each switching valve 36-40. Thereby, each hydraulic actuator is driven.
  • the hydraulic oil discharged from each hydraulic actuator is discharged to the tank 35 via the switching valves 36 to 40.
  • the hydraulic oil supplied to each hydraulic actuator is referred to as a first hydraulic oil.
  • the third hydraulic pump 33 discharges hydraulic oil (an example of the second hydraulic fluid) for applying a pilot pressure to the switching valves 36 to 40.
  • hydraulic oil discharged by the third hydraulic pump 33 is depressurized by the pilot pressure control valves 41 to 46.
  • the reduced hydraulic fluid applies pilot pressure to the pilot ports p1, p2 of the switching valves 36-40.
  • the hydraulic oil that applies the pilot pressure to the switching valves 36 to 40 is referred to as a second hydraulic oil.
  • the switching valves 36 to 40 are configured to switch the supply direction of the first hydraulic oil supplied to the hydraulic actuators. Specifically, each of the switching valves 36 to 40 has first and second pilot ports p1 and p2. When the pilot pressure is applied to the first or second pilot port p1, p2, the switching valves 36 to 40 are driven.
  • the arm switching valve 36 is configured to switch the supply direction of the first hydraulic oil supplied to the arm cylinder 15.
  • the arm switching valve 36 switches the supply direction of the first hydraulic oil
  • the first hydraulic oil is supplied to either the bottom side oil chamber 151 of the arm cylinder 15 or the head side oil chamber 152 of the arm cylinder 15. Is done.
  • the arm cylinder 15 expands and contracts.
  • the arm switching valve 36 can select a neutral state in which the first hydraulic oil is not supplied to either the bottom side oil chamber 151 or the head side oil chamber 152.
  • the arm switching valve 36 when a pilot pressure is applied to the first pilot port p 1 of the arm switching valve 36, the arm switching valve 36 causes the first hydraulic oil from the second hydraulic pump 32 to flow into the head side oil chamber 152 of the arm cylinder 15. The supply direction of the first hydraulic oil is switched so as to be supplied to When the pilot pressure is applied to the second pilot port p2 of the arm switching valve 36, the arm switching valve 36 causes the first hydraulic oil from the second hydraulic pump 32 to flow into the bottom side oil chamber 151 of the arm cylinder 15. The supply direction of the first hydraulic oil is switched so as to be supplied to
  • the boom switching valve 37 is configured to switch the supply direction of the first hydraulic oil supplied to the boom cylinder 14.
  • the boom switching valve 37 switches the supply direction of the first hydraulic oil
  • the first hydraulic oil is supplied to either the bottom side oil chamber 141 of the boom cylinder 14 or the head side oil chamber 142 of the boom cylinder 14.
  • the boom cylinder 14 expands and contracts.
  • the boom switching valve 37 can also select a neutral state in which the first hydraulic oil is not supplied to either the bottom side oil chamber 141 or the head side oil chamber 142.
  • the boom switching valve 37 causes the first hydraulic oil from the first hydraulic pump 31 to flow into the bottom side oil chamber 141 of the boom cylinder 14.
  • the supply direction of the first hydraulic oil is switched so as to be supplied to
  • the boom switching valve 37 causes the first hydraulic oil from the first hydraulic pump 31 to flow into the head side oil chamber 142 of the boom cylinder 14.
  • the supply direction of the first hydraulic oil is switched so as to be supplied to
  • the bucket switching valve 38 is configured to switch the supply direction of the first hydraulic oil supplied to the bucket cylinder 16.
  • the bucket switching valve 38 switches the supply direction of the first hydraulic oil
  • the first hydraulic oil is supplied to either the bottom side oil chamber 161 of the bucket cylinder 16 or the head side oil chamber 162 of the bucket cylinder 16.
  • the bucket cylinder 16 expands and contracts.
  • the bucket switching valve 38 can select a neutral state in which the first hydraulic oil is not supplied to either the bottom side oil chamber 161 or the head side oil chamber 162.
  • the bucket switching valve 38 when a pilot pressure is applied to the first pilot port p ⁇ b> 1 of the bucket switching valve 38, the bucket switching valve 38 causes the first hydraulic oil from the first hydraulic pump 31 to flow into the head side oil chamber 162 of the bucket cylinder 16. The supply direction of the first hydraulic oil is switched so as to be supplied to When the pilot pressure is applied to the second pilot port p2 of the bucket switching valve 38, the bucket switching valve 38 causes the first hydraulic oil from the first hydraulic pump 31 to flow into the bottom side oil chamber 161 of the bucket cylinder 16. The supply direction of the first hydraulic oil is switched so as to be supplied to
  • the left travel switching valve 40 is configured to switch the supply direction of the first hydraulic oil supplied to the travel motor 18.
  • the right travel switching valve 39 is configured to switch the supply direction of the first hydraulic oil supplied to the travel motor 17.
  • the pilot pressure control valves 41 to 48 are configured to control pilot pressures for driving the switching valves 36 to 40.
  • the first pilot pressure control valve 41 controls the pilot pressure applied to the second pilot port p2 of the boom switching valve 37.
  • the second pilot pressure control valve 42 controls the pilot pressure applied to the first pilot port p 1 of the boom switching valve 37.
  • the third pilot pressure control valve 43 controls the pilot pressure applied to the second pilot port p2 of the bucket switching valve 38.
  • the fourth pilot pressure control valve 44 controls the pilot pressure applied to the first pilot port p1 of the bucket switching valve 38.
  • the fifth pilot pressure control valve 45 controls the pilot pressure applied to the first pilot port p1 of the arm switching valve 36.
  • the sixth pilot pressure control valve 46 controls the pilot pressure applied to the second pilot port p2 of the arm switching valve 36.
  • the seventh pilot pressure control valve 47 controls the pilot pressure applied to the first pilot port of the motor switching valve (not shown).
  • the eighth pilot pressure control valve 48 controls the pilot pressure applied to the second pilot port of the motor switching valve (not shown).
  • Each pilot pressure control valve 41 to 48 has a pump port p3, a tank port p4, and a supply port p5.
  • Each pump port p ⁇ b> 3 is connected to the pump flow path 21.
  • Each tank port p4 is connected to the tank flow path 22.
  • Each supply port p5 is connected to each upstream pilot channel 51 to 58 described later.
  • the pump flow path 21 and the tank flow path 22 are connected to the tank 35.
  • a third hydraulic pump 33 is installed in the pump passage 21.
  • the third hydraulic pump 33 discharges the second hydraulic oil to the pilot pressure control valves 41 to 48 via the pump passage 21.
  • the third hydraulic pump 33 is a pump separate from the first hydraulic pump 31 and the second hydraulic pump 32 described above. However, the first hydraulic pump 31 or the second hydraulic pump 32 may be used instead of the third hydraulic pump 33.
  • Each pilot pressure control valve 41 to 48 can be switched between an output state and a discharge state.
  • the pump port p3 and the supply port p5 communicate with each other.
  • the tank port p4 and the supply port p5 communicate with each other.
  • the upstream pilot channels 51 to 56 are channels that connect the pilot pressure control valves 41 to 46 and the electromagnetic proportional valves 71 to 76, respectively.
  • Each upstream pilot flow path 51 to 56 is connected to a supply port p5 of each pilot pressure control valve 41 to 46.
  • the downstream pilot channels 81 to 86 are channels that connect the electromagnetic proportional valves 71 to 76 and the switching valves 36 to 40, respectively.
  • the downstream pilot channels 81 to 86 are connected to the first or second pilot ports p1 and p2 of the switching valves 36 to 40, respectively.
  • the first upstream pilot flow path 51 connects the supply port p5 of the first pilot pressure control valve 41 and the first electromagnetic proportional valve 71.
  • the first downstream pilot flow path 81 connects the first electromagnetic proportional valve 71 and the second pilot port p ⁇ b> 2 of the boom switching valve 37.
  • the second upstream pilot flow path 52 connects the supply port p5 of the second pilot pressure control valve 42 and the second electromagnetic proportional valve 72.
  • the second downstream pilot flow path 82 connects the second electromagnetic proportional valve 72 and the first pilot port p1 of the boom switching valve 37.
  • the third upstream pilot flow path 53 connects the supply port p5 of the third pilot pressure control valve 43 and the third electromagnetic proportional valve 73.
  • the third downstream pilot flow path 83 connects the third electromagnetic proportional valve 73 and the second pilot port p ⁇ b> 2 of the bucket switching valve 38.
  • the fourth upstream pilot flow path 54 connects the supply port p5 of the fourth pilot pressure control valve 44 and the fourth electromagnetic proportional valve 74.
  • the fourth downstream pilot flow path 84 connects the fourth electromagnetic proportional valve 74 and the first pilot port p1 of the bucket switching valve 38.
  • the fifth upstream pilot flow path 55 connects the supply port p5 of the fifth pilot pressure control valve 45 and the fifth electromagnetic proportional valve 75.
  • the fifth downstream pilot flow path 85 connects the fifth electromagnetic proportional valve 75 and the first pilot port p1 of the arm switching valve 36.
  • the sixth upstream pilot flow path 56 connects the supply port p5 of the sixth pilot pressure control valve 46 and the sixth electromagnetic proportional valve 76.
  • the sixth downstream pilot flow path 86 connects the sixth electromagnetic proportional valve 76 and the second pilot port p ⁇ b> 2 of the arm switching valve 36.
  • the seventh upstream pilot flow path 57 connects the supply port p5 of the seventh pilot pressure control valve 47 and the first pilot port of the motor switching valve.
  • the eighth upstream pilot flow path 58 connects the supply port p5 of the eighth pilot pressure control valve 48 and the second pilot port of the motor switching valve.
  • the ninth upstream pilot flow path 59 is connected to the third hydraulic pump 33 and the seventh electromagnetic proportional valve 77.
  • the ninth downstream pilot flow path 89 connects the seventh electromagnetic proportional valve 77 and the second downstream pilot flow path 82.
  • the ninth downstream pilot channel 89 is connected to the second downstream pilot channel 82 via the shuttle valve 80.
  • the high-pressure channel supplies the second hydraulic oil to the first pilot port p 1 of the boom switching valve 37 via the shuttle valve 80. Supply.
  • the first and second operation levers 117 and 118 are members for operating the pilot pressure control valves 41 to 48.
  • the first operating lever 117 is connected to the first to fourth pilot pressure control valves 41 to 44.
  • First to fourth pilot pressure control valves 41 to 44 are arranged so as to correspond to the front / rear and left / right movements of the first operating lever 117.
  • the second operation lever 118 is connected to the fifth to eighth pilot pressure control valves 45 to 48.
  • the fifth to eighth pilot pressure control valves 45 to 48 are arranged so as to correspond to the front / rear and left / right movements of the second operation lever 118.
  • the first to fourth pilot pressure control valves 41 to 44 are switched to the output state or the discharge state. Further, when the operator operates the second operation lever 118, the fifth to eighth pilot pressure control valves 45 to 48 are switched to the output state or the discharge state.
  • each pilot pressure control valve 41 to 48 When each pilot pressure control valve 41 to 48 is in a discharge state, the second hydraulic oil in each upstream pilot flow path 51 to 58 passes through each supply port p5, tank port p4, and tank flow path 22 to the tank. To 35.
  • first pilot pressure control valve 41 and the second pilot pressure control valve 42 are paired.
  • the first pilot pressure control valve 41 and the second pilot pressure control valve 42 correspond to the operation directions of the first operation lever 117 opposite to each other.
  • the third pilot pressure control valve 43 and the fourth pilot pressure control valve 44 are paired.
  • the third pilot pressure control valve 43 and the fourth pilot pressure control valve 44 correspond to the operation directions of the first operation lever 117 opposite to each other.
  • the first pilot pressure control valve 41 when the first operating lever 117 is tilted forward, the first pilot pressure control valve 41 is in the output state, and when the first operating lever 117 is tilted backward, the second pilot pressure control valve 42 is in the output state. .
  • the output state of the first pilot pressure control valve 41 and the output state of the second pilot pressure control valve 42 are alternatively selected by the first operation lever 117.
  • the first pilot pressure control valve 41 is in the output state
  • the second pilot pressure control valve 42 When the first pilot pressure control valve 41 is in the output state, the second pilot pressure control valve 42 is in the discharge state.
  • the third pilot pressure control valve 43 is in the output state
  • the fourth pilot pressure control valve 44 is in the output state.
  • the output state of the third pilot pressure control valve 43 and the output state of the fourth pilot pressure control valve 44 are alternatively selected by the first operating lever 117.
  • the third pilot pressure control valve 43 is in the output state
  • the fourth pilot pressure control valve 44 is in the discharge state.
  • the third pilot pressure control valve 43 is in the discharge state.
  • the fifth pilot pressure control valve 45 and the sixth pilot pressure control valve 46 are paired.
  • the fifth pilot pressure control valve 45 and the sixth pilot pressure control valve 46 correspond to the operation directions of the second operation lever 118 opposite to each other.
  • the seventh pilot pressure control valve 47 and the eighth pilot pressure control valve 48 are paired.
  • the seventh pilot pressure control valve 47 and the eighth pilot pressure control valve 48 correspond to the operation directions of the second operation lever 118 opposite to each other.
  • the fifth pilot pressure control valve 45 when the second operation lever 118 is tilted to the left, the fifth pilot pressure control valve 45 is in the output state, and when the second operation lever 118 is tilted to the right, the sixth pilot pressure control valve 46 is in the output state.
  • the output state of the fifth pilot pressure control valve 45 and the output state of the sixth pilot pressure control valve 46 are alternatively selected by the second operation lever 118.
  • the sixth pilot pressure control valve 46 When the fifth pilot pressure control valve 45 is in the output state, the sixth pilot pressure control valve 46 is in the discharge state. Further, when the sixth pilot pressure control valve 46 is in the output state, the fifth pilot pressure control valve 45 is in the discharge state.
  • the seventh pilot pressure control valve 47 is in the output state
  • the eighth pilot pressure control valve 48 is in the output state.
  • the output state of the seventh pilot pressure control valve 47 and the output state of the eighth pilot pressure control valve 48 are alternatively selected by the second operation lever 118.
  • the electromagnetic proportional valves 71 to 76 are installed between the switching valves 36 to 38 and the pilot pressure control valves 41 to 46, respectively.
  • the electromagnetic proportional valves 71 to 76 are connected to the pilot pressure control valves 41 to 46 via the upstream pilot flow paths 51 to 56, respectively. Further, the electromagnetic proportional valves 71 to 76 are connected to the switching valves 36 to 38 via the downstream pilot flow paths 81 to 86, respectively.
  • the electromagnetic proportional valves 71 to 76 are controlled by the current output from the control unit 20. Specifically, the opening degree of each of the electromagnetic proportional valves 71 to 76 is controlled according to the current value of the current output from the control unit 20. For this reason, the hydraulic pressure of the second hydraulic fluid output from each of the electromagnetic proportional valves 71 to 76 is controlled by a command from the control unit 20.
  • the seventh electromagnetic proportional valve 77 is installed between the third hydraulic pump 33 and the boom switching valve 37.
  • the seventh electromagnetic proportional valve 77 is connected to the third hydraulic pump 33 via the ninth upstream pilot flow path 59.
  • the seventh electromagnetic proportional valve 77 is connected to the second downstream pilot flow path 82 via the ninth downstream pilot flow path 89.
  • the seventh electromagnetic proportional valve 77 is controlled by the current output from the control unit 20. Specifically, the opening degree of the seventh electromagnetic proportional valve 77 is controlled according to the current value of the current output from the control unit 20.
  • the hydraulic pressure sensors 61 to 66 are configured to detect the hydraulic pressure of the second hydraulic oil in the upstream pilot channels 51 to 56. That is, the hydraulic pressure sensors 61 to 66 are configured to detect the hydraulic pressure of the second hydraulic fluid discharged from the pilot pressure control valves 41 to 46 to the electromagnetic proportional valves 71 to 76, respectively.
  • the first hydraulic pressure sensor 61 is installed in the first upstream pilot flow path 51 and is configured to detect the hydraulic pressure of the second hydraulic oil in the first upstream pilot flow path 51.
  • the second hydraulic pressure sensor 62 is installed in the second upstream pilot flow path 52 and is configured to detect the hydraulic pressure of the second hydraulic oil in the second upstream pilot flow path 52.
  • the third hydraulic pressure sensor 63 is installed in the third upstream pilot flow path 53 and is configured to detect the hydraulic pressure of the second hydraulic oil in the third upstream pilot flow path 53.
  • the fourth hydraulic pressure sensor 64 is installed in the fourth upstream pilot flow path 54 and is configured to detect the hydraulic pressure of the second hydraulic oil in the fourth upstream pilot flow path 54.
  • the fifth hydraulic pressure sensor 65 is installed in the fifth upstream pilot flow path 55 and is configured to detect the hydraulic pressure of the second hydraulic oil in the fifth upstream pilot flow path 55.
  • the sixth hydraulic pressure sensor 66 is installed in the sixth upstream pilot flow path 56 and is configured to detect the hydraulic pressure of the second hydraulic oil in the sixth upstream pilot flow path 56.
  • Each hydraulic sensor 61 to 66 outputs the detection result to the control unit 20 as a hydraulic signal.
  • the hydraulic pressure signal is an electrical signal corresponding to the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66.
  • the control unit 20 is configured to select at least one piece of current value information from a plurality of pieces of current value information based on the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66.
  • the control unit 20 is configured to set the current value of the current output to each of the electromagnetic proportional valves 71 to 76 based on the selected at least one current value information.
  • the current value information includes the current value of the current output to each of the electromagnetic proportional valves 71 to 76, and the hydraulic pressure of the second hydraulic oil output from each of the electromagnetic proportional valves 71 to 76. The correspondence relationship is shown.
  • the control unit 20 determines at least one of the plurality of current value information based on the hydraulic pressure detected by the first hydraulic pressure sensor 61. Select current value information.
  • the control unit 20 obtains at least one current value information from a plurality of current value information based on the hydraulic pressure detected by the second hydraulic pressure sensor 62. select.
  • the control unit 20 obtains at least one current value information from a plurality of current value information based on the hydraulic pressure detected by the third hydraulic pressure sensor 63. select.
  • the control unit 20 When setting the current value of the current output to the fourth electromagnetic proportional valve 74, the control unit 20 obtains at least one current value information from a plurality of current value information based on the hydraulic pressure detected by the fourth hydraulic pressure sensor 64. select.
  • the control unit 20 When setting the current value of the current output to the fifth electromagnetic proportional valve 75, the control unit 20 obtains at least one current value information from a plurality of current value information based on the hydraulic pressure detected by the fifth hydraulic pressure sensor 65. select.
  • the control unit 20 When setting the current value of the current output to the sixth electromagnetic proportional valve 76, the control unit 20 obtains at least one current value information from a plurality of current value information based on the hydraulic pressure detected by the sixth hydraulic pressure sensor 66. select.
  • the control unit 20 stores a plurality of pieces of current value information as shown in FIG. Each current value information is set for each hydraulic pressure of the second hydraulic oil input to each of the electromagnetic proportional valves 71 to 76 (an example of the specific pressure of the present invention). For example, the control unit 20 stores first to fifth current value information. The control unit 20 selects at least one current value information from the first to fifth current value information.
  • FIG. 6 is a graph showing the first to fifth current value information. The horizontal axis of the graph of FIG. 6 indicates the current value of the current output to each of the electromagnetic proportional valves 71 to 76. In addition, the vertical axis of the graph of FIG. 6 indicates the hydraulic pressure of the second hydraulic oil output from the electromagnetic proportional valves 71 to 76 to the first or second pilot ports p1 and p2.
  • a straight line connecting point A and point F in FIG. 6 indicates the first current value information.
  • the straight line connecting point A and point E and the straight line connecting point E and point G in FIG. 6 indicate the second current value information.
  • the straight line connecting point A and point D and the straight line connecting point D and point H in FIG. 6 indicate the third current value information.
  • the straight line connecting point A and point C and the straight line connecting point C and point I in FIG. 6 indicate the fourth current value information.
  • the straight line connecting point A and point B and the straight line connecting point B and point J in FIG. 6 indicate the fifth current value information.
  • the control unit 20 selects the first current value information when the oil pressure detected by the oil pressure sensors 61 to 66 is the first oil pressure.
  • the control unit 20 selects the second current value information when the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66 is the second hydraulic pressure.
  • the control unit 20 selects the third current value information when the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66 is the third hydraulic pressure.
  • the control unit 20 selects the fourth current value information when the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66 is the fourth hydraulic pressure.
  • the control unit 20 selects the fifth current value information when the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66 is the fifth hydraulic pressure.
  • the first hydraulic pressure, the second hydraulic pressure, the third hydraulic pressure, the fourth hydraulic pressure, and the fifth hydraulic pressure in descending order of the hydraulic pressure.
  • the first current value information is linear from point A to point B
  • the second to fifth current value information is a line formed by two straight lines having different slopes. expressed. That is, the second to fifth current value information is bent at a certain point.
  • the second current value information is bent at point E
  • the third current value information is bent at point D
  • the fourth current value information is bent at point C
  • the fifth current value information is bent at point B.
  • the oil pressure at the bending points B to E decreases in the order of the second current value information, the third current value information, the fourth current value information, and the fifth current value information. That is, as the oil pressure detected by each of the oil pressure sensors 61 to 66 is smaller, the control unit 20 selects current value information in which the oil pressure at the bending point is smaller.
  • the control unit 20 sets the current value of the current output to each of the electromagnetic proportional valves 71 to 76 by linear interpolation. To do. For example, when the oil pressure detected by each of the oil pressure sensors 61 to 66 is between the first oil pressure and the second oil pressure, the control unit 20 determines each electromagnetic wave based on the first current value information and the second current value information. The current value of the current output to the proportional valves 71 to 76 is set by linear interpolation.
  • the control unit 20 uses the linear interpolation between the current value set based on the first current value information and the current value set based on the second current value information, to each of the electromagnetic proportional valves 71 to 76. Set the output current value.
  • the current value information is common to the electromagnetic proportional valves 71 to 76, but is not particularly limited thereto. For example, each current value information may be different for each electromagnetic proportional valve 71-76.
  • the control unit 20 is also configured to output a current to the seventh electromagnetic proportional valve 77.
  • control unit 20 estimates the operating speed of each hydraulic actuator based on the hydraulic pressure detected by each hydraulic sensor 61-66. For example, the control unit 20 estimates the operating speed of the arm 12 based on the hydraulic pressure detected by the sixth hydraulic sensor 66.
  • the operator operates the first operation lever 117 and the second operation lever 118 to lower the boom 11 and cause the arm 12 to perform excavation.
  • the blade edge 131 of the bucket 13 draws an arcuate locus. For this reason, when the design surface S is a flat surface, the operator needs to cause the arm 12 to perform excavation and lower the boom 11.
  • the operator operates the second operation lever 118 to cause the arm 12 to perform excavation. That is, the operator operates the second operation lever 118 to set the sixth pilot pressure control valve 46 to the output state.
  • the second hydraulic oil having a pressure corresponding to the operation amount of the second operation lever 118 is supplied to the arm switching valve 36.
  • a pilot pressure is applied to the second pilot port p ⁇ b> 2 of the arm switching valve 36 by the second hydraulic oil supplied to the arm switching valve 36.
  • the excavation operation of the arm 12 is performed.
  • the operator operates the first operation lever 117 simultaneously with the excavation operation of the arm 12 to lower the boom 11. That is, the operator operates the first operation lever 117 to set the first pilot pressure control valve 41 to the output state.
  • the second hydraulic oil having a pressure corresponding to the operation amount of the first operation lever 117 is supplied to the boom switching valve 37. Pilot pressure is applied to the second pilot port p ⁇ b> 2 of the boom switching valve 37 by the second hydraulic oil supplied to the boom switching valve 37. As a result, the boom 11 is lowered.
  • the control unit 20 can forcibly raise the boom 11. Specifically, when it is determined that the cutting edge 131 of the bucket 13 is likely to move downward from the design surface S, the control unit 20 controls the first electromagnetic proportional valve 71 and the seventh electromagnetic proportional valve 77. That is, the control unit 20 controls the current value of the current output to the first electromagnetic proportional valve 71 to close the first electromagnetic proportional valve 71. Further, the control unit 20 opens the seventh electromagnetic proportional valve 77.
  • the hydraulic pressure of the second hydraulic oil discharged from the third hydraulic pump 33 from the third hydraulic pump 33 is applied to the shuttle valve 80.
  • the shuttle valve 80 communicates the ninth downstream pilot channel 89 and the second downstream pilot channel 82. Therefore, the hydraulic pressure of the second hydraulic oil discharged from the third hydraulic pump 33 is applied to the first pilot port p1 of the boom switching valve 37. Thus, the boom 11 is raised.
  • the control unit 20 can also control the respective electromagnetic proportional valves 72 to 76 other than the first electromagnetic proportional valves 71 and 77.
  • the control unit 20 controls the electromagnetic proportional valves 72 to 77, so that the hydraulic actuators can be operated and the operations of the hydraulic actuators can be stopped regardless of the operation of the operator. Further, the control unit 20 controls the electromagnetic proportional valves 71 to 77, whereby the operation speed or the operation range of each hydraulic actuator can be controlled.
  • FIG. 7 is a flowchart showing the operation of the control unit 20.
  • the operator operates the second operation lever 118 to set the sixth pilot pressure control valve 46 to the output state.
  • the second hydraulic oil discharged from the third hydraulic pump 33 is supplied from the sixth pilot pressure control valve 46 to the sixth electromagnetic proportional valve 76.
  • the hydraulic pressure of the second hydraulic oil supplied to the sixth upstream pilot flow path 56 corresponds to the operation amount of the second operation lever 118.
  • the hydraulic pressure of the second hydraulic oil in the sixth upstream pilot channel 56 is detected by the sixth hydraulic sensor 66.
  • the sixth hydraulic sensor 66 outputs the detection result to the control unit 20 as a hydraulic pressure signal.
  • the control unit 20 acquires information related to the hydraulic pressure detected by the sixth hydraulic pressure sensor 66 (step S1). Specifically, the control unit 20 acquires the hydraulic signal output by the sixth hydraulic sensor 66.
  • the control unit 20 selects at least one piece of current value information from a plurality of pieces of current value information based on the hydraulic pressure signal acquired in Step S1 (Step S2). Specifically, the control unit 20 stores a plurality of pieces of current value information as shown in FIGS. In addition, the control part 20 does not need to memorize
  • the control unit 20 sets the current value of the current output to the sixth electromagnetic proportional valve 76 based on the current value information selected in step S2 (step S3). Specifically, the controller 20 outputs at least the second hydraulic oil having a hydraulic pressure substantially equal to the hydraulic pressure detected by the sixth hydraulic pressure sensor 66 so that the sixth electromagnetic proportional valve 76 outputs at least selected in step S2. Based on one piece of current value information, the current value of the current output to the sixth electromagnetic proportional valve 76 is set. More specifically, the hydraulic pressure detected by the sixth hydraulic sensor 66 is regarded as the pressure of the second hydraulic oil output from the sixth electromagnetic proportional valve 76, and based on the selected current value information, the sixth electromagnetic proportional The current value output to the valve 76 is set.
  • control unit 20 outputs a current having the current value set in step S3 to the sixth electromagnetic proportional valve 76 (step S4).
  • the sixth electromagnetic proportional valve 76 performs the second operation with a hydraulic pressure substantially equal to the hydraulic pressure detected by the sixth hydraulic pressure sensor 66. Oil is output to the arm switching valve 36. That is, the pilot pressure is applied to the second pilot port p2 of the arm switching valve 36. As a result, the arm switching valve 36 switches the supply direction of the first hydraulic oil from the second hydraulic pump 32. Then, the first hydraulic oil from the second hydraulic pump 32 is supplied to the bottom side oil chamber 151 of the arm cylinder 15.
  • control unit 20 may control the electromagnetic proportional valves 71 to 75 other than the sixth electromagnetic proportional valve 76 in the same manner. That is, the control unit 20 selects at least one piece of current value information selected from the plurality of pieces of current value information based on the hydraulic pressure detected by each of the hydraulic pressure sensors 61 to 66. Then, the control unit 20 sets the current value of the current output to each of the electromagnetic proportional valves 71 to 75 based on the selected at least one current value information.
  • the excavator 100 according to the present embodiment has the following characteristics.
  • the control unit 20 sets the current value of the current output to the sixth electromagnetic proportional valve 76 based on the appropriate current value information corresponding to the input hydraulic pressure. For this reason, the hydraulic pressure of the second hydraulic fluid input to the sixth electromagnetic proportional valve 76 and the hydraulic pressure of the second hydraulic fluid output from the sixth electromagnetic proportional valve 76 can be made substantially equal. As a result, the operation speed of the arm 12 estimated by the control unit 20 is substantially equal to the actual operation speed of the arm 12. For this reason, for example, when the control unit 20 performs control to raise the boom 11 according to the operating speed of the arm 12, the control unit 20 can more appropriately control the boom 11.
  • control unit 20 selects at least one piece of current value information from the five pieces of current value information, but the number of pieces of current value information is not particularly limited to this.
  • the control unit 20 may select at least one current value information from less than five pieces of current value information, or may select at least one current value information from six or more pieces of current value information.
  • Modification 2 Although the hydraulic excavator 100 to which the present invention is applied has been described in the above embodiment, the present invention can also be applied to other work vehicles such as a wheel loader or a motor grader.
  • the current value information represents the correspondence between the current value of the current output to each of the electromagnetic proportional valves 71 to 76 and the hydraulic pressure of the second hydraulic fluid output from each of the electromagnetic proportional valves 71 to 76. Although shown, it is not limited to this.
  • the current value information may indicate a correspondence relationship between the current value of the current input to each of the electromagnetic proportional valves 71 to 76 and the hydraulic pressure of the second hydraulic oil output from each of the electromagnetic proportional valves 71 to 76. Good.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

 油圧ショベル(100)は、アームシリンダ(15)と、アーム用切替弁(36)と、第6パイロット圧制御弁(46)と、第6電磁比例弁(76)と、第6上流パイロット流路(56)と、第6油圧センサ(66)と、制御部(20)とを備える。制御部(20)は、第6油圧センサ(66)によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部(20)は、選択された電流値情報に基づき、第6電磁比例弁(76)へ出力される電流の電流値を設定するよう構成される。

Description

作業車両、及び作業車両の制御方法
 本発明は、作業車両、及び作業車両の制御方法に関するものである。
 作業車両は、作業機を駆動し、所望の作業を行う。例えば、油圧ショベルの作業機は、アーム、ブーム、及びバケットを有している。アーム、ブーム、及びバケットのそれぞれは、油圧シリンダによって駆動される。各シリンダに作動油を供給することによって、各シリンダが、アーム、ブーム、またはバケットを駆動する。詳細には、各シリンダには切換弁が接続されており、各切換弁によって各シリンダへの作動油の供給方向を切り換える。これによって、各シリンダが伸縮し、アーム、ブーム、又はバケットを駆動する。
 各切換弁は、パイロット圧制御弁によって制御されたパイロット圧によって駆動される。なお、パイロット圧制御弁は、操作レバーの操作量に応じて、パイロット圧を制御する。このパイロット圧制御弁と各切換弁の各パイロットポートとの間に電磁比例弁を設置する。そして、パイロット圧制御弁から印加されるパイロット圧に基づいて制御部が電磁比例弁を制御することによって、各シリンダの自動制御が可能となる(特許文献1参照)。例えば、制御部が電磁比例弁に出力する電流の電流値を制御することによって、電磁比例弁を開閉し、その結果、各シリンダを自動制御することができる。なお、自動制御とは、オペレータの作業を一部含む自動制御も包含する概念である。
特開平9-105152号公報
 上述したように各シリンダを自動制御することによって、作業機を自動制御することができる。しかしながら、パイロット圧制御弁と各切換弁の各パイロットポートとの間に電磁比例弁を設置し、パイロット圧制御弁から印加されるパイロット圧に基づいて制御部が電磁比例弁を制御する構成を採用した場合、操作レバーの操作によってパイロット圧が変化すると、作業機が適切に自動制御されないおそれがあった。例えば、油圧ショベルにおいて、設計面に沿ってバケットの刃先を動かす制御の実行中に、操作レバーの操作量を増やすとブームが必要以上に上方に移動してしまい、刃先が設計面よりも上方を移動することがあった。
 本発明は、適切に作業機を自動制御することができる作業車両を提供することにある。
 本発明の第1側面に係る作業車両は、作業機と、切替弁と、操作部材と、パイロット圧制御弁と、電磁比例弁と、上流パイロット流路と、圧力センサと、制御部とを備える。切替弁は、作業機へ供給される第1作動流体の供給方向を切り換えるよう構成される。操作部材は、作業機を操作するように構成される。パイロット圧制御弁は、操作部材の操作量に応じて、切換弁を駆動する第2作動流体の圧力を制御するように構成される。電磁比例弁は、切換弁とパイロット圧制御弁との間に設置される。上流パイロット流路は、パイロット圧制御弁と電磁比例弁とを接続する。圧力センサは、上流パイロット流路内の第2作動流体の圧力を検知するよう構成される。制御部は、圧力センサによって検知された圧力に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部は、選択された電流値情報に基づき、電磁比例弁へ出力される電流の電流値を設定するよう構成される。電流値情報は、電磁比例弁へ出力される電流の電流値と、電磁比例弁から出力される第2作動流体の圧力と、の対応関係を示す。
 この構成によれば、制御部は、圧力センサによって検知された圧力に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。そして、制御部は、選択された電流値情報に基づき、電磁比例弁へ出力される電流の電流値を設定する。このため、電磁比例弁は、より適切な電流値の電流によって、駆動される。この結果、切換弁により適切なパイロット圧が印加され、ひいては作業機は適切に自動制御される。
 一般的に、電磁比例弁に入力される作動流体の圧力(入力圧力)と、電磁比例弁から出力される作動流体の圧力(出力圧力)とは等しいとは限らない。具体的には、入力圧力が異なると、同じ電流値の電流を電磁比例弁に出力しても出力圧力が異なる場合がある。制御部は、入力圧力によって作業機の動作速度を推定している。このため、例えば、入力圧力の方が出力圧力よりも高い場合、制御部が推定する作業機の動作速度は、実際の作業機の動作速度よりも速くなる。
 以上のような現象が原因となって、油圧ショベルによって、設計面に沿って地形を整地する作業を行う場合、次のような現象が生じる。オペレータは、バケットの刃先が設計面に沿って移動するように、アームの掘削操作を行うとともに、ブームの下降操作を行う。ここで、制御部は、刃先が設計面よりも下方に移動する可能性が高いと判断すると、ブームを上昇させる制御を行う。制御部によって推定されるアームの動作速度が実際のアームの動作速度よりも速いと、制御部は、ブームを必要以上に上方に移動させてしまい、刃先が設計面よりも上方を移動するという現象が発生する。例えば、このような現象は、作業スピードを上げるためにアーム操作レバーをさらに倒したときに、パイロット圧が増えることによって特に生じ得る。
 本願発明に係る制御部は、上述したように、入力圧力に対応する適切な電流値情報に基づいて、電磁比例弁に出力する電流の電流値を設定する。このため、例えば、電磁比例弁に入力される第2作動流体の圧力と、電磁比例弁から出力される第2作動流体の圧力とを実質的に等しくすることができる。この結果、制御部によって推定される作業機の動作速度と、実際の作業機の動作速度とが実質的に等しくなる。したがって、本発明に係る作業車両は、適切に作業機を自動制御することができる。
 好ましくは、制御部は、電磁比例弁が出力する第2作動流体の圧力が、圧力センサによって検知された圧力と等しくなるように、選択された少なくとも1つの前記電流値情報に基づき、電磁比例弁へ出力される電流値を設定するように構成される。
 好ましくは、複数の電流値情報は、電磁比例弁に入力される複数の特定圧力ごとに設定された情報である。制御部は、複数の電流値情報から、圧力センサによって検知された圧力に近い特定圧力の電流値情報を少なくとも1つ選択する。制御部は、選択された少なくとも1つの電流値情報に基づき、電磁比例弁へ出力される電流の電流値を設定する。
 好ましくは、圧力センサによって検知された前記圧力が第1圧力のときに、制御部は、複数の電流値情報から第1電流値情報を選択するように構成される。また、圧力センサによって検知された圧力が第2圧力のときに、制御部は、複数の電流値情報から第2電流値情報を選択するように構成される。圧力センサによって検知された圧力が第1圧力と第2圧力との間にあるときに、制御部は、電磁比例弁に出力する電流の電流値を補間によって設定する。
 好ましくは、圧力センサによって検知された圧力が第1圧力と第2圧力との間にあるときに、制御部は、電磁比例弁に出力する電流の電流値を線形補間によって設定する。
 好ましくは、圧力センサによって検知された圧力が第1圧力と第2圧力との間にあるときに、制御部は、複数の電流値情報から第1及び第2電流値情報を選択する。そして、制御部は、第1電流値情報に基づき設定された電流値と第2電流値情報に基づき設定された電流値との補間を用いて、電磁比例弁に出力する電流の電流値を設定する。
 好ましくは、作業機は、第1作動流体によって駆動されるシリンダを有する。切換弁は、シリンダに供給される第1作動流体の供給方向を切り換えるように構成される。
 好ましくは、作業機は、車両本体をさらに備える。作業機は、ブーム、アーム、ブームシリンダ、及びアームシリンダを有する。ブームは、車両本体に回転可能に取り付けられる。アームは、ブームに回転可能に取り付けられる。ブームシリンダは、ブームを駆動するよう構成される。アームシリンダは、アームを駆動するよう構成される。切換弁は、アームシリンダへ供給される第1作動流体の供給方向を切り換えるように構成される。
 本発明の第2側面に係る作業車両は、作業機と、切替弁と、操作部材と、パイロット圧制御弁と、電磁比例弁と、上流パイロット流路と、圧力センサと、制御部とを備える。切替弁は、作業機へ供給される第1作動流体の供給方向を切り換えるよう構成される。操作部材は、作業機を操作するように構成される。パイロット圧制御弁は、操作部材の操作量に応じて、切換弁を駆動する第2作動流体の圧力を制御するように構成される。電磁比例弁は、切換弁とパイロット圧制御弁との間に設置される。上流パイロット流路は、パイロット圧制御弁と電磁比例弁とを接続する。圧力センサは、上流パイロット流路内の第2作動流体の圧力を検知するよう構成される。制御部は、圧力センサによって検知された圧力に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部は、選択された電流値情報に基づき、電磁比例弁に出力される電流の電流値を設定するよう構成される。電流値情報は、電磁比例弁に入力される電流の電流値と、電磁比例弁から出力される第2作動流体の圧力と、の対応関係を示す。
 本発明の第3側面に係る制御方法は、作業車両の作業機を制御する方法である。この制御方法は、ステップ(a)~(c)を含む。ステップ(a)は、パイロット圧制御弁から電磁比例弁に供給される第2作動流体の圧力を示す圧力信号を取得する。ステップ(b)は、ステップ(a)において取得した圧力に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。なお、電流値情報は、電磁比例弁へ出力される電流の電流値と電磁比例弁から出力される第2作動流体の圧力との対応関係を示す。ステップ(c)は、ステップ(b)において選択された電流値情報に基づき、電磁比例弁へ出力される電流の電流値を設定する。
好ましくは、制御方法は、ステップ(d)~(f)をさらに含む。ステップ(d)は、ステップ(c)において設定された電流値を電磁比例弁に出力して電磁比例弁を制御する。ステップ(e)は、ステップ(d)において制御された電磁比例弁から出力される第2作動流体によって、切換弁にパイロット圧を印加する。ステップ(f)は、ステップ(e)において印加されたパイロット圧に基づき、作業機へ供給する第1作動流体の供給方向を切り換える。
 本発明によれば、適切に作業機を自動制御することができる。
油圧ショベルの斜視図。 キャブ内部の斜視図。 油圧ショベルに情報の送受信を行う構成の概略図。 油圧ショベルの作業を示す概略図。 油圧ショベルの油圧回路図。 第1~第5電流値情報を示すグラフ。 制御部の動作を示すフローチャート。
 以下、本発明に係る作業車両の実施形態である油圧ショベル100について図面を参照しつつ説明する。図1は、油圧ショベル100の斜視図である。なお、以下の説明において、「前」及び「後」とは車両本体101の前後を意味する。また、以下の説明における「右」、「左」、「上」、及び「下」とは運転席から前方を見た状態を基準とする方向を示す。「車幅方向」と「左右方向」とは同義である。
 図1に示すように、油圧ショベル100は、車両本体101と作業機10とを備えている。油圧ショベル100は、作業機10を用いて所望の作業を行う。
 車両本体101は、走行体102と旋回体103とを有する。走行体102は、一対の走行装置104,105を有する。走行装置104は履帯106を有し、走行装置105は履帯107を有する。走行装置104,105は、エンジン30から駆動力を得て各履帯106,107を駆動することによって、油圧ショベル100を走行させる。
 旋回体103は、走行体102上に載置され、走行体102に対して旋回可能に設けられる。旋回体103は、キャブ108、燃料タンク109、作動油タンク110、及びエンジンルーム111を有する。
 燃料タンク109は、エンジン30(図5参照)を駆動するための燃料を貯留する。燃料タンク109は、作動油タンク110の前方に配置される。作動油タンク110は、作動油を貯留する。作動油タンク110は、燃料タンク109と前後方向に並んで配置されている。
 エンジンルーム111は、エンジン30、及び第1~第3油圧ポンプ31~33などを収容する。エンジンルーム111は、キャブ108、燃料タンク109、及び作動油タンク110の後方に配置される。
 作業機10は、旋回体103の前部に取り付けられている。作業機10は、作動油によって駆動される。作業機10は、ブーム11、アーム12、バケット13、ブームシリンダ14、アームシリンダ15、及びバケットシリンダ16を有する。なお、本実施形態の作業機10は、一対のブームシリンダ14を有する。
 ブーム11の基端部は、旋回体103に回転可能に連結される。また、アーム12の基端部はブーム11の先端部に回転可能に連結される。バケット13は、アーム12の先端部に回転可能に連結される。各ブームシリンダ14、アームシリンダ15およびバケットシリンダ16は、油圧シリンダであり、作動油によって駆動される。各シリンダ14~16は、後述する第1油圧ポンプ31から吐出された作動油によって駆動される。各ブームシリンダ14は、ブーム11を動作させる。アームシリンダ15は、アーム12を動作させる。バケットシリンダ16は、バケット13を動作させる。これらのシリンダ14~16が駆動されることによって作業機10が駆動される。
 図2は、キャブ108の内部を示す斜視図である。図2に示すように、キャブ108の内部には運転席112が設置されている。キャブ108の前部には、前窓が形成されている。前窓は透明である。このため、運転席112に座ったオペレータは、前窓を介してキャブ108の外部を視認可能である。例えば、オペレータは、前窓を介してバケット13を確認することができる。
 キャブ108内の前部に、モニタ装置116が設置されている。モニタ装置116は、キャブ108内の右前部、又は左前部に配置される。なお、本実施形態に係るモニタ装置116は、右前部に配置される。例えば、モニタ装置116はフロントピラーに取り付けられている。このため、オペレータは、作業機10とモニタ装置116との両方を容易に見ることができる。
 キャブ108内において、運転席112の前方に走行操作部113が設置されている。走行操作部113は、右走行操作レバー114と左走行操作レバー115とを備えている。右走行操作レバー114は、右側の走行装置104を操作し、左走行操作レバー115は、左側の走行装置105を操作する。
 運転席112の右側には、第1操作レバー117が設置されている。オペレータは、第1操作レバー117を操作することによって、作業機10のブーム11及びバケット13を駆動する。運転席112の左側には、第2操作レバー118が設置されている。オペレータは、第2操作レバー118を操作することによって、作業機10のアーム12を駆動したり、旋回体103を旋回させたりする。
 図3は、油圧ショベル100に情報の送受信を行う構成の概略図である。図3に示すように、油圧ショベル100は、制御部20、通信端末91、及びアンテナ92を備えている。制御部20は、作業機10の動作、旋回体103の旋回、及び走行体102の走行などを制御する。制御部20とモニタ装置116とは、双方向のネットワーク通信ケーブル97を介して接続されている。制御部20とモニタ装置116とは、ネットワーク通信ケーブル97を介して、互いに情報を送受信可能である。なお、制御部20及びモニタ装置116はそれぞれ、マイクロコンピュータなどのコンピュータ装置を主体として構成される。
 制御部20と外部の監視局96との間で、情報の送受信が可能である。本実施形態では、制御部20と監視局96とは、衛星通信を介して通信している。制御部20に、衛星通信アンテナ92を有する通信端末91が接続されている。衛星通信アンテナ92は、旋回体103に設置されている。
 地上の監視局96には、ネットワーク管制局95がインターネットなどを介して接続されている。ネットワーク管制局95は、通信衛星93と専用通信回線によって通信する通信地球局94と専用回線で接続されている。これにより、通信端末91、通信衛星93、通信地球局94、及びネットワーク管制局95を経由して、制御部20と所定の監視局96との間でデータが送受信される。
 制御部20には、3次元CAD(Computer Aided Design)で作成された施工設計データが保存される。モニタ装置116は、外部から受信した油圧ショベル100の位置を画面上にリアルタイムで表示する。このため、オペレータは、油圧ショベル100の作業状態をモニタ装置116によって常時確認することができる。
 制御部20は、施工設計データと、作業機10の位置及び姿勢とを、リアルタイムで比較する。そして、制御部20は、その比較結果に基づき、油圧回路を駆動することによって作業機10を制御する。具体的には、図4に示すように、制御部20は、設計面Sと、バケット13の位置とを比較する。そして、制御部20は、設計面よりも掘り過ぎてしまわないよう、バケット13の刃先131が設計面Sよりも低く位置しないように作業機10を制御する。なお、設計面Sとは、施工設計データの通りに施工することによって形成される面を意味する。
 図5は、油圧ショベル100の油圧回路図である。図5に示すように、油圧ショベル100は、エンジン30、複数の油圧ポンプ31~33、複数のシリンダ14~16、走行モータ17,18、複数の切換弁36~40、複数のパイロット圧制御弁41~48、制御部20、複数の油圧センサ(圧力センサの一例)61~66、及び複数の電磁比例弁71~77を備えている。
 なお、油圧ショベル100は、複数の油圧ポンプとして、第1~第3油圧ポンプ31~33を有する。また、油圧ショベル100は、複数のシリンダとして、上述したブームシリンダ14、アームシリンダ15、及びバケットシリンダ16を有する。また、油圧ショベル100は、複数の切換弁として、アーム用切換弁36、ブーム用切換弁37、バケット用切換弁38、右走行用切換弁39、及び左走行用切換弁40を有する。また、油圧ショベル100は、複数のパイロット圧制御弁として、第1~第8パイロット圧制御弁41~48を有する。また、油圧ショベル100は、複数の油圧センサとして、第1~第6油圧センサ61~66を有する。また、油圧ショベル100は、複数の電磁比例弁として、第1~第7電磁比例弁71~77を有する。
 第1~第3油圧ポンプ31~33は、エンジン30によって駆動される。第1及び第2油圧ポンプ31,32は、ブームシリンダ14、アームシリンダ15、バケットシリンダ16、及び走行モータ17,18などの各油圧アクチュエータを駆動する。詳細には、第1及び第2油圧ポンプ31,32によって吐出された作動油(第1作動流体の一例)が、各切換弁36~40を介して各油圧アクチュエータに供給される。これによって、各油圧アクチュエータが駆動される。なお、各油圧アクチュエータから排出された作動油は、各切換弁36~40を介してタンク35に排出される。なお、以下の説明において、各油圧アクチュエータに供給される作動油を第1作動油と称する。
 第3油圧ポンプ33は、各切換弁36~40にパイロット圧を与えるための作動油(第2作動流体の一例)を吐出する。詳細には、第3油圧ポンプ33によって吐出された作動油が各パイロット圧制御弁41~46によって減圧される。そして、この減圧された作動油が、各切換弁36~40の各パイロットポートp1、p2にパイロット圧を与える。なお、以下の説明において、各切換弁36~40にパイロット圧を与える作動油を第2作動油と称する。
 各切換弁36~40は、各油圧アクチュエータへ供給される第1作動油の供給方向を切り換えるように構成されている。詳細には、各切換弁36~40はそれぞれ、第1及び第2パイロットポートp1、p2を有している。第1又は第2パイロットポートp1、p2にパイロット圧が印加されることによって、各切換弁36~40は駆動される。
 アーム用切換弁36は、アームシリンダ15へ供給される第1作動油の供給方向を切り換えるように構成されている。アーム用切換弁36が第1作動油の供給方向を切り換えることによって、第1作動油は、アームシリンダ15のボトム側油室151、又はアームシリンダ15のヘッド側油室152のどちらか一方に供給される。これによって、アームシリンダ15が伸縮する。また、アーム用切換弁36は、ボトム側油室151とヘッド側油室152とのどちらにも第1作動油を供給しない中立状態も選択可能である。
 例えば、アーム用切換弁36の第1パイロットポートp1にパイロット圧が印加されると、アーム用切換弁36は、第2油圧ポンプ32からの第1作動油がアームシリンダ15のヘッド側油室152へと供給されるように、第1作動油の供給方向を切り換える。また、アーム用切換弁36の第2パイロットポートp2にパイロット圧が印加されると、アーム用切換弁36は、第2油圧ポンプ32からの第1作動油がアームシリンダ15のボトム側油室151へと供給されるように、第1作動油の供給方向を切り換える。
 なお、ボトム側油室151に第1作動油が供給されると、ヘッド側油室152内の第1作動油はタンク35へと排出される。この結果、アームシリンダ15が伸びる。一方、ヘッド側油室152に第1作動油が供給されると、ボトム側油室151内の第1作動油はタンク35へと排出される。この結果、アームシリンダ15は収縮する。
 ブーム用切換弁37は、ブームシリンダ14へ供給される第1作動油の供給方向を切り換えるように構成されている。ブーム用切換弁37が第1作動油の供給方向を切り換えることによって、第1作動油は、ブームシリンダ14のボトム側油室141、又はブームシリンダ14のヘッド側油室142のどちら一方に供給される。これによって、ブームシリンダ14が伸縮する。また、ブーム用切換弁37は、ボトム側油室141とヘッド側油室142とのどちらにも第1作動油を供給しない中立状態も選択可能である。
 例えば、ブーム用切換弁37の第1パイロットポートp1にパイロット圧が印加されると、ブーム用切換弁37は、第1油圧ポンプ31からの第1作動油がブームシリンダ14のボトム側油室141へと供給されるように、第1作動油の供給方向を切り換える。また、ブーム用切換弁37の第2パイロットポートp2にパイロット圧が印加されると、ブーム用切換弁37は、第1油圧ポンプ31からの第1作動油がブームシリンダ14のヘッド側油室142へと供給されるように、第1作動油の供給方向を切り換える。
 なお、ボトム側油室141に第1作動油が供給されると、ヘッド側油室142内の第1作動油はタンク35へと排出される。この結果、ブームシリンダ14が伸びる。一方、ヘッド側油室142に第1作動油が供給されると、ボトム側油室141内の第1作動油はタンク35へと排出される。この結果、ブームシリンダ14は収縮する。
 バケット用切換弁38は、バケットシリンダ16へ供給される第1作動油の供給方向を切り換えるように構成されている。バケット用切換弁38が第1作動油の供給方向を切り換えることによって、第1作動油は、バケットシリンダ16のボトム側油室161、又はバケットシリンダ16のヘッド側油室162のどちら一方に供給される。これによって、バケットシリンダ16が伸縮する。また、バケット用切換弁38は、ボトム側油室161とヘッド側油室162とのどちらにも第1作動油を供給しない中立状態も選択可能である。
 例えば、バケット用切換弁38の第1パイロットポートp1にパイロット圧が印加されると、バケット用切換弁38は、第1油圧ポンプ31からの第1作動油がバケットシリンダ16のヘッド側油室162へと供給されるように、第1作動油の供給方向を切り換える。また、バケット用切換弁38の第2パイロットポートp2にパイロット圧が印加されると、バケット用切換弁38は、第1油圧ポンプ31からの第1作動油がバケットシリンダ16のボトム側油室161へと供給されるように、第1作動油の供給方向を切り換える。
 なお、ボトム側油室161に第1作動油が供給されると、ヘッド側油室162内の第1作動油はタンク35へと排出される。この結果、バケットシリンダ16が伸びる。一方、ヘッド側油室162に第1作動油が供給されると、ボトム側油室161内の第1作動油はタンク35へと排出される。この結果、バケットシリンダ16は収縮する。
 左走行用切換弁40は、走行モータ18へ供給される第1作動油の供給方向を切り換えるように構成されている。右走行用切換弁39は、走行モータ17へ供給される第1作動油の供給方向を切り換えるように構成されている。
 各パイロット圧制御弁41~48は、各切換弁36~40を駆動するためのパイロット圧を制御するように構成されている。
 第1パイロット圧制御弁41は、ブーム用切換弁37の第2パイロットポートp2に印加されるパイロット圧を制御する。第2パイロット圧制御弁42は、ブーム用切換弁37の第1パイロットポートp1に印加されるパイロット圧を制御する。第3パイロット圧制御弁43は、バケット用切換弁38の第2パイロットポートp2に印加されるパイロット圧を制御する。第4パイロット圧制御弁44は、バケット用切換弁38の第1パイロットポートp1に印加されるパイロット圧を制御する。
 第5パイロット圧制御弁45は、アーム用切換弁36の第1パイロットポートp1に印加されるパイロット圧を制御する。第6パイロット圧制御弁46は、アーム用切換弁36の第2パイロットポートp2に印加されるパイロット圧を制御する。第7パイロット圧制御弁47は、モータ用切換弁(図示省略)の第1パイロットポートに印加されるパイロット圧を制御する。第8パイロット圧制御弁48は、モータ用切換弁(図示省略)の第2パイロットポートに印加されるパイロット圧を制御する。
 各パイロット圧制御弁41~48はそれぞれ、ポンプポートp3、タンクポートp4、及び供給ポートp5を有している。各ポンプポートp3は、ポンプ流路21に接続されている。各タンクポートp4は、タンク流路22に接続されている。各供給ポートp5は、後述する各上流パイロット流路51~58に接続されている。ポンプ流路21及びタンク流路22は、タンク35に接続されている。
 ポンプ流路21には、第3油圧ポンプ33が設置されている。第3油圧ポンプ33は、ポンプ流路21を介して、各パイロット圧制御弁41~48に第2作動油を吐出する。第3油圧ポンプ33は、上述した第1油圧ポンプ31及び第2油圧ポンプ32とは別個のポンプである。ただし、第3油圧ポンプ33に代えて第1油圧ポンプ31又は第2油圧ポンプ32が用いられてもよい。
 各パイロット圧制御弁41~48は、出力状態と排出状態とに切り換え可能である。各パイロット圧制御弁41~48が出力状態になると、ポンプポートp3と供給ポートp5とが連通する。また、各パイロット圧制御弁41~48が排出状態になると、タンクポートp4と供給ポートp5とが連通する。
 
 各上流パイロット流路51~56は、各パイロット圧制御弁41~46と、各電磁比例弁71~76とを接続する流路である。なお、各上流パイロット流路51~56は、各パイロット圧制御弁41~46の供給ポートp5に接続されている。
 各下流パイロット流路81~86は、各電磁比例弁71~76と、各切換弁36~40とを接続する流路である。なお、各下流パイロット流路81~86は、各切換弁36~40の第1又は第2パイロットポートp1、p2に接続される。
 詳細には、第1上流パイロット流路51は、第1パイロット圧制御弁41の供給ポートp5と、第1電磁比例弁71とを接続する。第1下流パイロット流路81は、第1電磁比例弁71と、ブーム用切換弁37の第2パイロットポートp2とを接続する。第2上流パイロット流路52は、第2パイロット圧制御弁42の供給ポートp5と、第2電磁比例弁72とを接続する。第2下流パイロット流路82は、第2電磁比例弁72と、ブーム用切換弁37の第1パイロットポートp1とを接続する。
 第3上流パイロット流路53は、第3パイロット圧制御弁43の供給ポートp5と、第3電磁比例弁73とを接続する。第3下流パイロット流路83は、第3電磁比例弁73と、バケット用切換弁38の第2パイロットポートp2とを接続する。第4上流パイロット流路54は、第4パイロット圧制御弁44の供給ポートp5と、第4電磁比例弁74とを接続する。第4下流パイロット流路84は、第4電磁比例弁74と、バケット用切換弁38の第1パイロットポートp1とを接続する。
 第5上流パイロット流路55は、第5パイロット圧制御弁45の供給ポートp5と、第5電磁比例弁75とを接続する。第5下流パイロット流路85は、第5電磁比例弁75と、アーム用切換弁36の第1パイロットポートp1とを接続する。第6上流パイロット流路56は、第6パイロット圧制御弁46の供給ポートp5と、第6電磁比例弁76とを接続する。第6下流パイロット流路86は、第6電磁比例弁76と、アーム用切換弁36の第2パイロットポートp2とを接続する。
 第7上流パイロット流路57は、第7パイロット圧制御弁47の供給ポートp5と、モータ用切換弁の第1パイロットポートとを接続する。第8上流パイロット流路58は、第8パイロット圧制御弁48の供給ポートp5と、モータ用切換弁の第2パイロットポートとを接続する。
 第9上流パイロット流路59は、第3油圧ポンプ33と第7電磁比例弁77と接続する。第9下流パイロット流路89は、第7電磁比例弁77と、第2下流パイロット流路82とを接続している。なお、第9下流パイロット流路89は、シャトル弁80を介して第2下流パイロット流路82に接続されている。第2下流パイロット流路82と第9下流パイロット流路89とのうち、高圧側の流路が、シャトル弁80を介して、ブーム用切換弁37の第1パイロットポートp1に第2作動油を供給する。
 第1及び第2操作レバー117,118は、各パイロット圧制御弁41~48を操作するための部材である。
 第1操作レバー117は、第1~第4パイロット圧制御弁41~44に接続されている。第1操作レバー117の前後左右の動きに対応するように、第1~第4パイロット圧制御弁41~44が配置されている。
 第2操作レバー118は、第5~第8パイロット圧制御弁45~48に接続されている。第2操作レバー118の前後左右の動きに対応するように、第5~第8パイロット圧制御弁45~48が配置されている。
 オペレータが第1操作レバー117を操作することによって、第1~第4パイロット圧制御弁41~44を出力状態又は排出状態に切り換える。また、オペレータが第2操作レバー118を操作することによって、第5~第8パイロット圧制御弁45~48を出力状態又は排出状態に切り換える。
 各パイロット圧制御弁41~48が出力状態にあるとき、第1又は第2操作レバー117,118の操作量に応じた圧力の第2作動油が、各供給ポートp5を介して各上流パイロット流路51~58に供給される。
 各パイロット圧制御弁41~48が排出状態にあるとき、各上流パイロット流路51~58内の第2作動油が、各供給ポートp5、タンクポートp4、及びタンク流路22を介して、タンク35へと排出される。
 具体的には、第1パイロット圧制御弁41と第2パイロット圧制御弁42とは、対になっている。第1パイロット圧制御弁41と第2パイロット圧制御弁42とは、互いに反対向きの第1操作レバー117の操作方向に対応している。また、第3パイロット圧制御弁43と第4パイロット圧制御弁44とは、対になっている。第3パイロット圧制御弁43と第4パイロット圧制御弁44とは、互いに反対向きの第1操作レバー117の操作方向に対応している。
 例えば、第1操作レバー117が前方向に倒されると第1パイロット圧制御弁41が出力状態となり、第1操作レバー117が後ろ方向に倒されると第2パイロット圧制御弁42が出力状態となる。なお、第1パイロット圧制御弁41の出力状態と、第2パイロット圧制御弁42の出力状態とは、第1操作レバー117によって択一的に選択される。第1パイロット圧制御弁41が出力状態にあるとき、第2パイロット圧制御弁42は排出状態である。また、第2パイロット圧制御弁42が出力状態にあるとき、第1パイロット圧制御弁41は排出状態にある。
 同様に、第1操作レバー117が右方向に倒されると第3パイロット圧制御弁43が出力状態となり、第1操作レバー117が左方向に倒されると第4パイロット圧制御弁44が出力状態となる。なお、第3パイロット圧制御弁43の出力状態と、第4パイロット圧制御弁44の出力状態とは、第1操作レバー117によって択一的に選択される。第3パイロット圧制御弁43が出力状態にあるとき、第4パイロット圧制御弁44は排出状態である。また、第4パイロット圧制御弁44が出力状態にあるとき、第3パイロット圧制御弁43は排出状態にある。
 また、第5パイロット圧制御弁45と第6パイロット圧制御弁46とは、対になっている。第5パイロット圧制御弁45と第6パイロット圧制御弁46とは、互いに反対向きの第2操作レバー118の操作方向に対応している。第7パイロット圧制御弁47と第8パイロット圧制御弁48は、対になっている。第7パイロット圧制御弁47と第8パイロット圧制御弁48とは、互いに反対向きの第2操作レバー118の操作方向に対応している。
 例えば、第2操作レバー118が左方向に倒されると第5パイロット圧制御弁45が出力状態となり、第2操作レバー118が右方向に倒されると第6パイロット圧制御弁46が出力状態となる。なお、第5パイロット圧制御弁45の出力状態と、第6パイロット圧制御弁46の出力状態とは、第2操作レバー118によって択一的に選択される。第5パイロット圧制御弁45が出力状態にあるとき、第6パイロット圧制御弁46は排出状態である。また、第6パイロット圧制御弁46が出力状態にあるとき、第5パイロット圧制御弁45は排出状態にある。
 同様に、第2操作レバー118が前方向に倒されると第7パイロット圧制御弁47が出力状態となり、第2操作レバー118が後ろ方向に倒されると第8パイロット圧制御弁48が出力状態となる。なお、第7パイロット圧制御弁47の出力状態と、第8パイロット圧制御弁48の出力状態とは、第2操作レバー118によって択一的に選択される。第7パイロット圧制御弁47が出力状態にあるとき、第8パイロット圧制御弁48は排出状態である。また、第8パイロット圧制御弁48が出力状態にあるとき、第7パイロット圧制御弁47は排出状態にある。
 各電磁比例弁71~76は、各切換弁36~38と各パイロット圧制御弁41~46との間に設置されている。各電磁比例弁71~76は、各上流パイロット流路51~56を介して各パイロット圧制御弁41~46と接続されている。また、各電磁比例弁71~76は、各下流パイロット流路81~86を介して、各切換弁36~38と接続されている。
 各電磁比例弁71~76は、制御部20から出力される電流によって制御される。詳細には、制御部20から出力される電流の電流値に応じて、各電磁比例弁71~76の開度が制御される。このため、制御部20からの指令によって、各電磁比例弁71~76から出力される第2作動油の油圧が制御される。
 第7電磁比例弁77は、第3油圧ポンプ33とブーム用切換弁37との間に設置されている。第7電磁比例弁77は、第9上流パイロット流路59を介して、第3油圧ポンプ33に接続される。また、第7電磁比例弁77は、第9下流パイロット流路89を介して、第2下流パイロット流路82に接続される。第7電磁比例弁77は、制御部20から出力される電流によって制御される。詳細には、制御部20から出力される電流の電流値に応じて、第7電磁比例弁77の開度が制御される。
 各油圧センサ61~66は、各上流パイロット流路51~56内の第2作動油の油圧を検知するように構成されている。すなわち、各油圧センサ61~66は、各パイロット圧制御弁41~46から各電磁比例弁71~76へと吐出される第2作動油の油圧を検知するように構成されている。
 詳細には、第1油圧センサ61は、第1上流パイロット流路51に設置され、第1上流パイロット流路51内の第2作動油の油圧を検知するように構成される。第2油圧センサ62は、第2上流パイロット流路52に設置され、第2上流パイロット流路52内の第2作動油の油圧を検知するように構成される。第3油圧センサ63は、第3上流パイロット流路53に設置され、第3上流パイロット流路53内の第2作動油の油圧を検知するように構成される。
 第4油圧センサ64は、第4上流パイロット流路54に設置され、第4上流パイロット流路54内の第2作動油の油圧を検知するように構成される。第5油圧センサ65は、第5上流パイロット流路55に設置され、第5上流パイロット流路55内の第2作動油の油圧を検知するように構成される。第6油圧センサ66は、第6上流パイロット流路56に設置され、第6上流パイロット流路56内の第2作動油の油圧を検知するように構成される。
 各油圧センサ61~66は、検知結果を油圧信号として、制御部20に出力する。なお、油圧信号とは、各油圧センサ61~66によって検知された油圧に応じた電気的な信号である。
 制御部20は、各油圧センサ61~66によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択するように構成される。制御部20は、この選択された少なくとも1つの電流値情報に基づき、各電磁比例弁71~76に出力される電流の電流値を設定するように構成される。なお、電流値情報とは、図6に示すように、各電磁比例弁71~76に出力される電流の電流値と、各電磁比例弁71~76から出力される第2作動油の油圧との対応関係を示す。
 詳細には、制御部20は、第1電磁比例弁71に出力する電流の電流値を設定する際は、第1油圧センサ61によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部20は、第2電磁比例弁72に出力する電流の電流値を設定する際は、第2油圧センサ62によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部20は、第3電磁比例弁73に出力する電流の電流値を設定する際は、第3油圧センサ63によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。
 制御部20は、第4電磁比例弁74に出力する電流の電流値を設定する際は、第4油圧センサ64によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部20は、第5電磁比例弁75に出力する電流の電流値を設定する際は、第5油圧センサ65によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。制御部20は、第6電磁比例弁76に出力する電流の電流値を設定する際は、第6油圧センサ66によって検知された油圧に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する。
 制御部20は、図6に示すような複数の電流値情報を記憶している。各電流値情報は、各電磁比例弁71~76に入力される第2作動油の油圧毎(本発明の特定圧力の一例)に設定されている。例えば、制御部20は、第1~第5電流値情報を記憶している。制御部20は、第1~第5電流値情報から少なくとも1つの電流値情報を選択する。なお、図6は、第1~第5電流値情報を示すグラフである。図6のグラフの横軸は、各電磁比例弁71~76に出力される電流の電流値を示す。また、図6のグラフの縦軸は、各電磁比例弁71~76が第1又は第2パイロットポートp1、p2へ出力する第2作動油の油圧を示す。
 例えば、図6の点Aと点Fとを結んだ直線が第1電流値情報を示す。図6の点Aと点Eとを結んだ直線、及び点Eと点Gとを結んだ直線が第2電流値情報を示す。図6の点Aと点Dとを結んだ直線、及び点Dと点Hとを結んだ直線が第3電流値情報を示す。図6の点Aと点Cとを結んだ直線、及び点Cと点Iとを結んだ直線が第4電流値情報を示す。図6の点Aと点Bとを結んだ直線、及び点Bと点Jとを結んだ直線が第5電流値情報を示す。
 制御部20は、各油圧センサ61~66によって検知された油圧が第1油圧のときに、第1電流値情報を選択する。制御部20は、各油圧センサ61~66によって検知された油圧が第2油圧のときに、第2電流値情報を選択する。制御部20は、各油圧センサ61~66によって検知された油圧が第3油圧のときに、第3電流値情報を選択する。制御部20は、各油圧センサ61~66によって検知された油圧が第4油圧のときに、第4電流値情報を選択する。制御部20は、各油圧センサ61~66によって検知された油圧が第5油圧のときに、第5電流値情報を選択する。
 例えば、油圧が大きい順に、第1油圧、第2油圧、第3油圧、第4油圧、及び第5油圧である。図6に示すように、第1電流値情報は点Aから点Bまで直線状であるのに対して、第2~第5電流値情報は、傾きの異なる2つの直線によって構成された線によって表される。すなわち、第2~第5電流値情報は、ある点において屈曲している。例えば、第2電流値情報は点Eにおいて、第3電流値情報は点Dにおいて、第4電流値情報は点Cにおいて、第5電流値情報は点Bにおいて、屈曲している。この屈曲する点B~点Eにおける油圧は、第2電流値情報、第3電流値情報、第4電流値情報、第5電流値情報の順で小さくなる。すなわち、各油圧センサ61~66によって検知された油圧が小さいほど、制御部20は、上述した屈曲点における油圧が小さい電流値情報を選択する。
 制御部20は、各油圧センサ61~66によって検知された油圧が上記第1~第5油圧ではないとき、各電磁比例弁71~76に出力する電流の電流値を線形補間によって電流値を設定する。例えば、各油圧センサ61~66によって検知された油圧が第1油圧と第2油圧との間にある場合、制御部20は、第1電流値情報と第2電流値情報とに基づき、各電磁比例弁71~76に出力する電流の電流値を線形補間によって設定する。詳細には、制御部20は、第1電流値情報に基づき設定された電流値と第2電流値情報に基づき設定された電流値との線形補間を用いて、各電磁比例弁71~76に出力する電流の電流値を設定する。なお、各電流値情報は、各電磁比例弁71~76で共通しているが、特にこれに限定されない。例えば、各電流値情報は、各電磁比例弁71~76ごとに異なっていてもよい。また、制御部20は、第7電磁比例弁77にも電流を出力するように構成されている。
 また、制御部20は、各油圧センサ61~66によって検知された油圧に基づき、各油圧アクチュエータの動作速度などを推定する。例えば、制御部20は、第6油圧センサ66によって検知された油圧に基づき、アーム12の動作速度を推定する。
 次に、上述した油圧ショベル100によって、整地作業を行う方法について説明する。具体的には、図4に示すように、設計面Sに沿って地形を整地する作業について説明する。
 まず、オペレータは第1操作レバー117及び第2操作レバー118を操作して、ブーム11を下降させるとともに、アーム12に掘削動作をさせる。なお、アーム12が掘削動作をする際、バケット13の刃先131は円弧状の軌跡を描く。このため、設計面Sが平坦面である場合、オペレータは、アーム12に掘削動作をさせるとともに、ブーム11を下降させる必要がある。
 具体的には、オペレータは、第2操作レバー118を操作して、アーム12に掘削動作をさせる。すなわち、オペレータが第2操作レバー118を操作して、第6パイロット圧制御弁46を出力状態とする。この結果、第2操作レバー118の操作量に応じた圧力の第2作動油が、アーム用切換弁36に供給される。このアーム用切換弁36に供給された第2作動油によって、アーム用切換弁36の第2パイロットポートp2にパイロット圧が印加される。この結果、アーム12の掘削動作が行われる。
 また、オペレータは、アーム12の掘削操作と同時に、第1操作レバー117を操作して、ブーム11を下降させる。すなわち、オペレータが第1操作レバー117を操作して、第1パイロット圧制御弁41を出力状態とする。この結果、第1操作レバー117の操作量に応じた圧力の第2作動油が、ブーム用切換弁37に供給される。このブーム用切換弁37に供給された第2作動油によって、ブーム用切換弁37の第2パイロットポートp2にパイロット圧が印加される。この結果、ブーム11が下降する。
 ここで、バケット13の刃先131が設計面Sよりも下方に移動して掘り過ぎてしまうことを防ぐため、制御部20はブーム11を強制的に上昇させることができる。詳細には、制御部20は、バケット13の刃先131が設計面Sよりも下方に移動する可能性が高いと判断すると、第1電磁比例弁71および第7電磁比例弁77を制御する。すなわち、制御部20は、第1電磁比例弁71に出力する電流の電流値を制御して、第1電磁比例弁71を閉状態とする。また、制御部20は、第7電磁比例弁77を開状態とする。
 これによって、第3油圧ポンプ33からの第3油圧ポンプ33から吐出された第2作動油の油圧がシャトル弁80に印加される。この結果、シャトル弁80は、第9下流パイロット流路89と第2下流パイロット流路82とを連通する。よって、第3油圧ポンプ33から吐出された第2作動油の油圧が、ブーム用切換弁37の第1パイロットポートp1に印加される。以上により、ブーム11が上昇する。
 なお、制御部20は第1電磁比例弁71,77以外の各電磁比例弁72~76も制御することができる。制御部20が各電磁比例弁72~77を制御することによって、オペレータの操作に関わらず、各油圧アクチュエータを動作させたり、各油圧アクチュエータの動作を停止させたりできる。また、制御部20が各電磁比例弁71~77を制御することによって、各油圧アクチュエータの動作速度又は動作範囲を制御することができる。
 次に、アーム12の掘削操作の際の制御部20の動作について、図7を参照しつつ説明する。なお、図7は、制御部20の動作を示すフローチャートである。
 上述したように、アーム12に掘削動作を行わせるために、オペレータは第2操作レバー118を操作して第6パイロット圧制御弁46を出力状態とする。これによって、第6パイロット圧制御弁46から第6電磁比例弁76へ、第3油圧ポンプ33から吐出された第2作動油が供給される。なお、第6上流パイロット流路56へ供給される第2作動油の油圧は、第2操作レバー118の操作量と対応する。
 第6上流パイロット流路56内の第2作動油の油圧は、第6油圧センサ66によって検知される。第6油圧センサ66は、検知結果を油圧信号として制御部20に出力する。
 図7に示すように、まず、制御部20は、第6油圧センサ66によって検知された油圧に関する情報を取得する(ステップS1)。詳細には、第6油圧センサ66によって出力された油圧信号を、制御部20が取得する。
 次に、制御部20は、ステップS1において取得した油圧信号に基づき、複数の電流値情報から少なくとも1つの電流値情報を選択する(ステップS2)。詳細には、制御部20は、図6~図10に示すような複数の電流値情報を記憶している。なお、制御部20は、各電流値情報を記憶していなくてもよい。例えば、制御部20は、各電流値情報を外部記憶装置から取得してもよい。そして、制御部20は、ステップS1において取得した油圧信号に基づき、複数の電流値情報から1つの電流値情報を選択する。
 次に、制御部20は、ステップS2において選択された電流値情報に基づき、第6電磁比例弁76に出力する電流の電流値を設定する(ステップS3)。具体的には、第6油圧センサ66によって検知された油圧と実質的に等しい油圧の第2作動油を第6電磁比例弁76が出力するように、制御部20は、ステップS2において選択した少なくとも1つの電流値情報に基づき、第6電磁比例弁76に出力する電流の電流値を設定する。より詳細には、第6油圧センサ66によって検知された油圧を、第6電磁比例弁76から出力される第2作動油の圧力とみなして、選択された電流値情報に基づき、第6電磁比例弁76へ出力される電流値を設定する。
 次に、制御部20は、ステップS3において設定された電流値を有する電流を、第6電磁比例弁76に出力する(ステップS4)。
 以上のようにして制御部20から第6電磁比例弁76に出力された電流によって、第6電磁比例弁76は、第6油圧センサ66によって検知された油圧と実質的に等しい油圧の第2作動油をアーム用切換弁36に出力する。すなわち、アーム用切換弁36の第2パイロットポートp2にパイロット圧が印加される。この結果、アーム用切換弁36は、第2油圧ポンプ32からの第1作動油の供給方向を切り換える。そして、アームシリンダ15のボトム側油室151に、第2油圧ポンプ32からの第1作動油が供給される。
 なお、制御部20は、第6電磁比例弁76以外の各電磁比例弁71~75も同様の方法で制御してもよい。すなわち、制御部20は、各油圧センサ61~66によって検知された油圧に基づいて、複数の電流値情報から選択された少なくとも一つの電流値情報を選択する。そして、制御部20は、この選択された少なくとも一つの電流値情報に基づいて、各電磁比例弁71~75に出力する電流の電流値を設定する。
 [特徴]
 本実施形態に係る油圧ショベル100は、次の特徴を有する。
 制御部20は、上述したように、入力油圧に対応する適切な電流値情報に基づいて、第6電磁比例弁76に出力する電流の電流値を設定する。このため、第6電磁比例弁76に入力される第2作動油の油圧と、第6電磁比例弁76から出力される第2作動油の油圧とを実質的に等しくすることができる。この結果、制御部20によって推定されるアーム12の動作速度と、実際のアーム12の動作速度とが実質的に等しくなる。このため、例えば、制御部20がアーム12の動作速度に応じてブーム11を上昇させる制御を行う場合、制御部20は、より適切にブーム11を制御することができる。
 [変形例]
 以上、本発明の実施形態について説明したが、本発明はこれらに限定されるものではなく、本発明の趣旨を逸脱しない限りにおいて種々の変更が可能である。
 変形例1
 上記実施形態では、制御部20は、5つの電流値情報から、少なくとも1つの電流値情報を選択するが、電流値情報の数は特にこれに限定されない。例えば、制御部20は、5つ未満の電流値情報から少なくとも1つの電流値情報を選択してもよいし、6つ以上の電流値情報から少なくとも1つの電流値情報を選択してもよい。
 変形例2
 上記実施形態では、本発明を適用した油圧ショベル100を説明したが、本発明は、ホイールローダ、又はモータグレーダなどの他の作業車両にも適用することができる。
 変形例3
 上記実施形態では、電流値情報とは、各電磁比例弁71~76に出力される電流の電流値と、各電磁比例弁71~76から出力される第2作動油の油圧との対応関係を示すが、特にこれに限定されない。例えば、電流値情報は、各電磁比例弁71~76に入力される電流の電流値と、各電磁比例弁71~76から出力される第2作動油の油圧との対応関係を示していてもよい。
 36~40  切換弁
 10  作業機
 11  ブーム
 12  アーム
 14  ブームシリンダ
 15  アームシリンダ
 20  制御部
 41~46  パイロット圧制御弁
 61~66  油圧センサ
 51~56  上流パイロット流路
 71~76  電磁比例弁
 100  油圧ショベル

Claims (11)

  1.  作業機と、
     前記作業機へ供給される第1作動流体の供給方向を切り換える切換弁と、
     前記作業機を操作するための操作部材と、
     前記操作部材の操作量に応じて、前記切換弁を駆動する第2作動流体の圧力を制御するパイロット圧制御弁と、
     前記切換弁と前記パイロット圧制御弁との間に設置された電磁比例弁と、
     前記パイロット圧制御弁と前記電磁比例弁とを接続する上流パイロット流路と、
     前記上流パイロット流路内の第2作動流体の圧力を検知する圧力センサと、
     前記電磁比例弁へ出力される電流の電流値と前記電磁比例弁から出力される第2作動流体の圧力との対応関係を示す複数の電流値情報から、前記圧力センサによって検知された圧力に基づき少なくとも1つの前記電流値情報を選択し、選択された少なくとも1つの前記電流値情報に基づき、前記電磁比例弁へ出力される電流の電流値を設定する制御部と、
    を備える、作業車両。
  2.  前記制御部は、前記電磁比例弁から出力される第2作動流体の圧力が、前記圧力センサによって検知された圧力と等しくなるように、選択された少なくとも1つの前記電流値情報に基づき、前記電磁比例弁へ出力される前記電流値を設定する、
    請求項1に記載の作業車両。
  3.  前記複数の電流値情報は、前記電磁比例弁に入力される複数の特定圧力ごとに設定された情報であり、
     前記制御部は、前記複数の電流値情報から、前記圧力センサによって検知された圧力に近い特定圧力の電流値情報を少なくとも1つ選択し、選択された少なくとも1つの前記電流値情報に基づき、前記電磁比例弁へ出力される電流の電流値を設定する、
    請求項1又は2に記載の作業車両。
  4.  前記制御部は、前記圧力センサによって検知された前記圧力が第1圧力のときに前記複数の電流値情報から第1電流値情報を選択し、前記圧力センサによって検知された前記圧力が第2圧力のときに前記複数の電流値情報から第2電流値情報を選択するように構成され、
     前記圧力センサによって検知された圧力が前記第1圧力と前記第2圧力との間にあるときに、前記制御部は、前記電磁比例弁に出力する電流の電流値を補間によって設定する、
    請求項1または2に記載の作業車両。
  5.  前記圧力センサによって検知された圧力が前記第1圧力と前記第2圧力との間にあるときに、前記制御部は、前記電磁比例弁に出力する電流の電流値を線形補間によって設定する、
    請求項4に記載の作業車両。
  6.  前記圧力センサによって検知された圧力が前記第1圧力と前記第2圧力との間にあるときに、前記制御部は、前記複数の電流値情報から前記第1及び第2電流値情報を選択し、前記第1電流値情報に基づき設定された電流値と前記第2電流値情報に基づき設定された電流値との補間を用いて、前記電磁比例弁に出力する電流の電流値を設定する、
    請求項4に記載の作業車両。
  7.  前記作業機は、前記第1作動流体によって駆動されるシリンダを有し、
     前記切換弁は、前記シリンダに供給される前記第1作動流体の供給方向を切り換えるように構成される、
    請求項1または2に記載の作業車両。
  8.  車両本体をさらに備え、
     前記作業機は、
      前記車両本体に回転可能に取り付けられたブームと、
      前記ブームに回転可能に取り付けられたアームと、
      前記ブームを駆動するブームシリンダと、
      前記アームを駆動するアームシリンダと、
    を有し、
     前記切換弁は、前記アームシリンダへ供給される前記第1作動流体の供給方向を切り換える、
    請求項1または2に記載の作業車両。
  9.  作業機と、
     前記作業機へ供給される第1作動流体の供給方向を切り換える切換弁と、
     前記作業機を操作するための操作部材と、
     前記操作部材の操作量に応じて、前記切換弁を駆動する第2作動流体の圧力を制御するパイロット圧制御弁と、
     前記切換弁と前記パイロット圧制御弁との間に設置された電磁比例弁と、
     前記パイロット圧制御弁と前記電磁比例弁とを接続する上流パイロット流路と、
     前記上流パイロット流路内の第2作動流体の圧力を検知する圧力センサと、
     前記電磁比例弁に入力される電流の電流値と前記電磁比例弁から出力される第2作動流体の圧力との対応関係を示す複数の電流値情報から、前記圧力センサによって検知された圧力に基づき少なくとも1つの前記電流値情報を選択し、前記選択された少なくとも1つの前記電流値情報に基づき、前記電磁比例弁へ出力される電流の電流値を設定する制御部と、
    を備える、作業車両。
  10. 作業車両の作業機を制御する方法であって、
    (a)パイロット圧制御弁から電磁比例弁に供給される第2作動流体の圧力を示す圧力信号を取得するステップと、
    (b)前記電磁比例弁へ出力される電流の電流値と前記電磁比例弁から出力される第2作動流体の圧力との対応関係を示す複数の電流値情報から、前記ステップ(a)において取得した前記圧力信号に基づき少なくとも1つの前記電流値情報を選択するステップと、
    (c)前記ステップ(b)において選択された少なくとも1つの前記電流値情報に基づき、前記電磁比例弁へ出力される電流の電流値を設定するステップと、
    を含む、制御方法。
  11. (d)前記ステップ(c)において設定された電流値を前記電磁比例弁に出力して前記電磁比例弁を制御するステップと、
    (e)前記ステップ(d)において制御された前記電磁比例弁から出力される第2作動流体によって、切換弁にパイロット圧を印加するステップと、
    (f)前記ステップ(e)において印加されたパイロット圧に基づき、作業機へ供給する第1作動流体の供給方向を切り換えるステップと、
    を含む、請求項10に記載の制御方法。
PCT/JP2014/061828 2014-04-28 2014-04-28 作業車両、及び作業車両の制御方法 WO2014192481A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PCT/JP2014/061828 WO2014192481A1 (ja) 2014-04-28 2014-04-28 作業車両、及び作業車両の制御方法
CN201480000766.8A CN104220675B (zh) 2014-04-28 2014-04-28 作业车辆及作业车辆的控制方法
US14/380,851 US9382693B2 (en) 2014-04-28 2014-04-28 Work vehicle and work vehicle control method
DE112014000058.2T DE112014000058B4 (de) 2014-04-28 2014-04-28 Arbeitsfahrzeug und Arbeitsfahrzeug-Steuerverfahren
KR1020147021487A KR101628795B1 (ko) 2014-04-28 2014-04-28 작업 차량 및 작업 차량의 제어 방법
JP2014547606A JP5756890B2 (ja) 2014-04-28 2014-04-28 作業車両、及び作業車両の制御方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/061828 WO2014192481A1 (ja) 2014-04-28 2014-04-28 作業車両、及び作業車両の制御方法

Publications (1)

Publication Number Publication Date
WO2014192481A1 true WO2014192481A1 (ja) 2014-12-04

Family

ID=51988519

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/061828 WO2014192481A1 (ja) 2014-04-28 2014-04-28 作業車両、及び作業車両の制御方法

Country Status (6)

Country Link
US (1) US9382693B2 (ja)
JP (1) JP5756890B2 (ja)
KR (1) KR101628795B1 (ja)
CN (1) CN104220675B (ja)
DE (1) DE112014000058B4 (ja)
WO (1) WO2014192481A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809174A (zh) * 2022-04-12 2022-07-29 三一重机有限公司 液压***控制方法、装置及挖掘机

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5405649B1 (ja) * 2012-12-07 2014-02-05 株式会社小松製作所 作業車両の旋回装置
WO2016167377A1 (ko) * 2015-04-13 2016-10-20 볼보 컨스트럭션 이큅먼트 에이비 건설기계의 유압장치 및 그 제어방법
CN108368688B (zh) * 2016-11-09 2021-04-02 株式会社小松制作所 作业车辆以及数据校正方法
JP7086764B2 (ja) * 2018-07-12 2022-06-20 日立建機株式会社 作業機械
CN112313381B (zh) * 2019-03-28 2022-06-03 日立建机株式会社 作业机械
CN112390196B (zh) * 2019-09-25 2022-03-18 河南嘉晨智能控制股份有限公司 一种安全起升的控制***
CN116399331B (zh) * 2023-06-08 2023-08-08 太原理工大学 一种挖掘机驾驶员远程操控状态监测装置及监测方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0885974A (ja) * 1994-09-19 1996-04-02 Hitachi Constr Mach Co Ltd 建設機械の操作システム
JPH08177085A (ja) * 1994-12-26 1996-07-09 Hitachi Constr Mach Co Ltd 建設機械の操作システム
JPH08333778A (ja) * 1995-06-09 1996-12-17 Yutani Heavy Ind Ltd 建設機械の旋回回路

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3664781B2 (ja) 1995-10-11 2005-06-29 日立建機株式会社 建設機械の作業範囲制限制御装置
JP3622142B2 (ja) * 1999-08-04 2005-02-23 新キャタピラー三菱株式会社 作業機械の作業腕制御装置
JP4647325B2 (ja) * 2004-02-10 2011-03-09 株式会社小松製作所 建設機械の作業機の制御装置、建設機械の作業機の制御方法、及びこの方法をコンピュータに実行させるプログラム
CN201538977U (zh) 2009-09-23 2010-08-04 北汽福田汽车股份有限公司 挖掘机铲斗控制装置
CN102102370B (zh) 2010-12-08 2012-06-27 太原重工股份有限公司 矿用液压挖掘机动臂下放控制***
CN201962707U (zh) 2011-01-11 2011-09-07 徐州徐工挖掘机械有限公司 提高挖掘机挖掘操纵特性和平整作业特性的装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0885974A (ja) * 1994-09-19 1996-04-02 Hitachi Constr Mach Co Ltd 建設機械の操作システム
JPH08177085A (ja) * 1994-12-26 1996-07-09 Hitachi Constr Mach Co Ltd 建設機械の操作システム
JPH08333778A (ja) * 1995-06-09 1996-12-17 Yutani Heavy Ind Ltd 建設機械の旋回回路

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809174A (zh) * 2022-04-12 2022-07-29 三一重机有限公司 液压***控制方法、装置及挖掘机

Also Published As

Publication number Publication date
DE112014000058T5 (de) 2015-05-13
JPWO2014192481A1 (ja) 2017-02-23
US9382693B2 (en) 2016-07-05
US20150345112A1 (en) 2015-12-03
CN104220675A (zh) 2014-12-17
KR101628795B1 (ko) 2016-06-09
DE112014000058B4 (de) 2022-08-04
KR20150135739A (ko) 2015-12-03
JP5756890B2 (ja) 2015-07-29
CN104220675B (zh) 2017-03-08

Similar Documents

Publication Publication Date Title
JP5756890B2 (ja) 作業車両、及び作業車両の制御方法
US9476180B2 (en) Hydraulic excavator
JP6474908B2 (ja) 作業機械の油圧システム
JP6523554B2 (ja) 建設機械の駆動制御装置
US20060048508A1 (en) Oil pressure circuit for working machines
EP2910795B1 (en) Work machine
KR20180102644A (ko) 작업 기계
JP5823060B2 (ja) 油圧ショベル
CN109844230B (zh) 工程机械
JP5583872B1 (ja) 油圧ショベル
US20210207345A1 (en) Work Machine
US20140166362A1 (en) Implement Pose Control System and Method
WO2017061220A1 (ja) 建設機械
JP5756576B2 (ja) 油圧ショベル
JP2018135704A (ja) 油圧ショベル
US11970840B2 (en) Work machine
JP6151265B2 (ja) 作業機械および作業機械の油圧駆動制御方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 20147021487

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14380851

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2014547606

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 112014000058

Country of ref document: DE

Ref document number: 1120140000582

Country of ref document: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14804304

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 14804304

Country of ref document: EP

Kind code of ref document: A1