WO2014167905A1 - インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置 - Google Patents

インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置 Download PDF

Info

Publication number
WO2014167905A1
WO2014167905A1 PCT/JP2014/054671 JP2014054671W WO2014167905A1 WO 2014167905 A1 WO2014167905 A1 WO 2014167905A1 JP 2014054671 W JP2014054671 W JP 2014054671W WO 2014167905 A1 WO2014167905 A1 WO 2014167905A1
Authority
WO
WIPO (PCT)
Prior art keywords
turbine shaft
fastening
impeller
vibration
turbine
Prior art date
Application number
PCT/JP2014/054671
Other languages
English (en)
French (fr)
Inventor
寛 采浦
真一 金田
祐一 大東
Original Assignee
株式会社Ihi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Ihi filed Critical 株式会社Ihi
Priority to CN201480003632.1A priority Critical patent/CN104884747B/zh
Priority to JP2015511148A priority patent/JPWO2014167905A1/ja
Priority to DE112014001921.6T priority patent/DE112014001921B4/de
Publication of WO2014167905A1 publication Critical patent/WO2014167905A1/ja
Priority to US14/740,868 priority patent/US9891123B2/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/12Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for measuring axial thrust in a rotary shaft, e.g. of propulsion plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/003Arrangements for testing or measuring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/04Antivibration arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/02Blade-carrying members, e.g. rotors
    • F01D5/04Blade-carrying members, e.g. rotors for radial-flow machines or engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/02Blade-carrying members, e.g. rotors
    • F01D5/10Anti- vibration means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/26Rotors specially for elastic fluids
    • F04D29/266Rotors specially for elastic fluids mounting compressor rotors on shafts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L1/00Measuring force or stress, in general
    • G01L1/10Measuring force or stress, in general by measuring variations of frequency of stressed vibrating elements, e.g. of stressed strings
    • G01L1/106Constructional details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/24Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for determining value of torque or twisting moment for tightening a nut or other member which is similarly stressed
    • G01L5/246Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for determining value of torque or twisting moment for tightening a nut or other member which is similarly stressed using acoustic waves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/40Application in turbochargers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2260/00Function
    • F05D2260/96Preventing, counteracting or reducing vibration or noise

Definitions

  • the present invention relates to an impeller fastening inspection method, an impeller fastening inspection method, an impeller fastening inspection device, and an impeller fastening device for confirming whether or not a fastening force when a rotating member is fastened to a turbine shaft is appropriate.
  • a conventional supercharger includes a bearing housing and a turbine shaft rotatably supported by the bearing housing, provided with a turbine impeller at one end and a compressor impeller at the other end.
  • the turbocharger is connected to the engine, rotates a turbine impeller by exhaust gas discharged from the engine, and rotates the compressor impeller through the turbine shaft by the rotation of the turbine impeller.
  • the supercharger compresses air as the compressor impeller rotates and supercharges the engine.
  • the turbine shaft has a step portion formed on the compressor impeller side with respect to the portion where the radial bearing is provided.
  • the outer diameter of the stepped portion is smaller than the outer diameter of the portion where the radial bearing is provided.
  • Patent Document 1 discloses a technique for specifying this axial force.
  • the turbine shaft has a chamfered portion extending in the axial direction at a portion where the compressor impeller is attached.
  • a strain gauge is attached to the chamfered portion.
  • the axial force is derived from the turbine shaft strain measured by a strain gauge.
  • the strain gauge lead wire is drawn to the outside through a hole communicating from the chamfered portion to the shaft end of the turbine shaft.
  • the technique for deriving the axial force based on the output value of the strain gauge is effective when measuring an accurate axial force with respect to a testing machine or the like.
  • An object of the present invention is to provide an impeller fastening inspection method, an impeller fastening inspection method, and an impeller fastening inspection device capable of confirming whether or not the axial force of a turbine shaft, a rotating member, and a compressor impeller is appropriate at low cost. And providing an impeller fastening device.
  • a first aspect of the present invention is an impeller fastening inspection method, wherein the impeller is inserted into a bearing housing, provided with both ends protruding from the bearing housing, and at least one of the impellers is fastened by a fastening member. And a step of applying vibration directly or indirectly to the turbine shaft to which the rotating member that rotates integrally with the impeller is fastened by the fastening force of the fastening member, and the vibration of the turbine shaft is measured.
  • the gist is to include a step and a step of determining whether or not the measured vibration frequency that is a peak of the vibration of the turbine shaft is included in a preset setting range.
  • a method for fastening an impeller wherein at least one of the impellers is fastened to a turbine shaft that is inserted into a bearing housing and has impellers provided at both ends protruding from the bearing housing. And fastening the rotating member that rotates integrally with the impeller to the turbine shaft with the fastening force of the fastening member, and directly or indirectly applying vibration to the turbine shaft. And measuring the vibration of the turbine shaft, and determining whether or not the measured frequency of the turbine shaft vibration peak is included in a preset setting range. The gist.
  • a third aspect of the present invention is an impeller fastening inspection device, which is inserted into a bearing housing, provided with impellers at both ends protruding from the bearing housing, and at least one of the impellers is fastened by a fastening member.
  • a vibration unit that directly or indirectly applies vibration to the turbine shaft to which the rotating member that rotates integrally with the impeller is fastened, and vibration of the turbine shaft.
  • the gist of the invention is to include a measuring unit that measures and a determination unit that determines whether or not the measured vibration frequency that is the peak vibration of the turbine shaft is included in a preset setting range.
  • a fastening device for an impeller wherein one of the impellers is fastened to a turbine shaft that is inserted into a bearing housing and provided with impellers at both ends protruding from the bearing housing.
  • a fastening portion that fastens the rotating member that rotates integrally with the impeller with a fastening force of the fastening member, and a vibration portion that directly or indirectly applies vibration to the turbine shaft.
  • a measurement unit that measures the vibration of the turbine shaft, and a determination unit that determines whether or not the measured frequency of the turbine shaft vibration peak is included in a preset setting range. This is the gist.
  • FIG. 1 is a schematic cross-sectional view of a supercharger according to an embodiment of the present invention.
  • FIG. 2 is a schematic sectional view of the turbocharger before the turbine housing and the compressor housing are attached.
  • FIG. 3 is an explanatory diagram for explaining the fastening of the turbine shaft, the rotating member, and the compressor impeller.
  • FIG. 4A and FIG. 4B are explanatory diagrams for explaining the relationship between the frequency and the axial force.
  • FIG. 5 is a functional block diagram of the assembling apparatus according to the embodiment of the present invention.
  • FIG. 6 is a first diagram for explaining the assembling apparatus.
  • FIG. 7 is a second view for explaining the assembling apparatus.
  • FIG. 8 is a flowchart for explaining the process flow of the impeller fastening method.
  • FIG. 1 is a schematic sectional view of the supercharger C.
  • the direction indicated by the arrow L in FIG. 1 will be described as the left side of the supercharger C
  • the direction indicated by the arrow R will be described as the right side of the supercharger C.
  • the supercharger C includes a supercharger main body 1.
  • the supercharger main body 1 includes a bearing housing 2, a turbine housing 4 connected to the left side of the bearing housing 2 by a fastening mechanism 3, and a compressor housing 6 connected to the right side of the bearing housing 2 by fastening bolts 5. .
  • the supercharger main body 1 is formed by integrating them.
  • a projection 2 a protruding in the radial direction of the bearing housing 2 is provided on the outer peripheral surface of the bearing housing 2 in the vicinity of the turbine housing 4. Further, a protrusion 4 a that protrudes in the radial direction of the turbine housing 4 is provided on the outer peripheral surface of the turbine housing 4 in the vicinity of the bearing housing 2.
  • the bearing housing 2 and the turbine housing 4 are fixed by fastening the protrusions 2 a and 4 a with the fastening mechanism 3.
  • the fastening mechanism 3 includes a coupling that holds the protrusions 2a and 4a.
  • the bearing housing 2 is formed with a bearing hole 2b that penetrates the supercharger C in the left-right direction.
  • a radial bearing 7 is provided in the bearing hole 2b.
  • the radial bearing 7 rotatably supports the turbine shaft 8.
  • a turbine impeller 9 is integrally fixed to the left end (one end) of the turbine shaft 8.
  • the turbine impeller 9 is rotatably accommodated in the turbine housing 4.
  • a compressor impeller 10 is integrally fixed to the right end (other end) of the turbine shaft 8.
  • the compressor impeller 10 is rotatably accommodated in the compressor housing 6.
  • An intake port 11 is formed in the compressor housing 6.
  • the intake port 11 opens to the right side of the supercharger C and is connected to an air cleaner (not shown).
  • the facing surfaces of the two housings 2 and 6 form a diffuser flow path 12 that pressurizes air.
  • the diffuser flow path 12 is formed in an annular shape from the radially inner side to the outer side of the turbine shaft 8 (compressor impeller 10), and communicates with the intake port 11 via the compressor impeller 10 on the radially inner side. Yes.
  • the compressor housing 6 is provided with an annular compressor scroll passage 13 positioned on the radially outer side of the turbine shaft 8 (compressor impeller 10) with respect to the diffuser passage 12.
  • the compressor scroll passage 13 communicates with an intake port of an engine (not shown) and also communicates with the diffuser passage 12.
  • a discharge port 14 is formed in the turbine housing 4.
  • the discharge port 14 opens to the left side of the supercharger C and is connected to an exhaust gas purification device (not shown).
  • the turbine housing 4 is provided with a flow path 15 and an annular turbine scroll flow path 16 positioned on the radially outer side of the turbine shaft 8 (turbine impeller 9) with respect to the flow path 15.
  • the turbine scroll passage 16 communicates with an exhaust gas inlet (not shown) and also communicates with the passage 15. Accordingly, the exhaust gas is discharged from an exhaust manifold of an engine (not shown) and then led to the gas inlet. Further, the exhaust gas is guided from the gas inlet to the turbine scroll flow path 16 and is guided to the discharge port 14 via the flow path 15 and the turbine impeller 9.
  • the exhaust gas rotates the turbine impeller 9.
  • the rotational force of the turbine impeller 9 is transmitted to the compressor impeller 10 via the turbine shaft 8.
  • the air is pressurized by the rotational force of the compressor impeller 10 and guided to the intake port of the engine.
  • FIG. 2 is a schematic cross-sectional view of the supercharger C before the turbine housing 4 and the compressor housing 6 are attached.
  • the direction indicated by the arrow L in FIG. 2 will be described as the left side of the supercharger C
  • the direction indicated by the arrow R will be described as the right side of the supercharger C.
  • two thrust bearings 20 and 21 are provided inside the bearing housing 2.
  • the thrust bearings 20 and 21 are arranged on the left and right with the thrust collar 22 interposed therebetween and receive a thrust load acting on the turbine shaft 8.
  • the turbine shaft 8 is inserted through the thrust bearings 20 and 21 and the thrust collar 22.
  • An oil drain 23 is adjacent to the right side of the thrust collar 22.
  • the left end of the oil drain 23 is inserted through the thrust bearing 21.
  • the right side of the oil drain 23 is inserted through the seal plate 24.
  • the oil drainer 23 has a portion protruding radially outward. This part is located near the seal plate 24 between the thrust bearing 21 and the seal plate 24 and scatters the lubricating oil radially outward, thereby suppressing leakage of the lubricating oil from the seal plate 24 to the right side.
  • the compressor impeller 10 is adjacent to the right side of the oil drain 23.
  • the rotating member 25 includes a thrust collar 22 and an oil drainer 23.
  • the rotating member 25 and the compressor impeller 10 are fastened to the turbine shaft 8 so as to rotate integrally with the turbine shaft 8.
  • a gap is provided between the thrust bearing 20 and the turbine shaft 8 in the radial direction so that they can rotate relative to each other.
  • a gap is also provided between the oil drainer 23 and the thrust bearing 21 in the radial direction, and they are rotatable relative to each other. Further, a gap is also provided between the oil drain 23 and the seal plate 24 so that they can rotate relative to each other.
  • FIG. 3 is an explanatory diagram for explaining the fastening of the turbine shaft 8, the rotating member 25, and the compressor impeller 10.
  • the turbine impeller 9 is fixed to the turbine shaft 8 by welding or the like, and rotates integrally with the turbine shaft 8.
  • the compressor impeller 10 is fastened to the turbine shaft 8 by a nut 26 (fastening member) so as to rotate integrally with the turbine shaft 8 together with the thrust collar 22 and the oil drain 23.
  • the nut 26 is screwed into a thread groove 8 b provided on the shaft end side of the turbine shaft 8.
  • the turbine shaft 8 has a stepped portion 8a.
  • the turbine shaft 8 is formed such that the outer diameter on the turbine impeller 9 side is larger than the outer diameter on the compressor impeller 10 side with the stepped portion 8a as a boundary.
  • the thrust collar 22 is inserted through the turbine shaft 8 to a position where it comes into contact with the stepped portion 8a.
  • the oil drainer 23 is inserted through the turbine shaft 8 to a position where it comes into contact with the thrust collar 22.
  • the compressor impeller 10 is inserted through the turbine shaft 8 to a position where it comes into contact with the oil drain 23.
  • the rotating member 25 and the compressor impeller 10 are tightened by the nut 26 by inserting the turbine shaft 8 into the bearing housing 2 and the radial bearing 7 and attaching the thrust bearings 20 and 21 and the seal plate 24. Done in state. Therefore, the rotating member 25 and the compressor impeller 10 are covered with the bearing housing 2. For example, it cannot be visually recognized from the outside whether the turbine shaft 8 is inserted to a position where the step portion 8a, the thrust collar 22, the oil drain 23, and the compressor impeller 10 abut on each other in the axial direction. In addition, by applying external force to the thrust collar 22 and the oil drain 23, they cannot be rotated in the rotational direction of the turbine shaft 8. That is, it is difficult to confirm whether or not the axial force acting directly on the thrust collar 22 and the oil drain 23 is appropriate. Therefore, in this embodiment, the vibration of the turbine shaft 8 is measured and analyzed to indirectly check whether the axial force is appropriate.
  • the measuring unit 27 when the turbocharger C is assembled, the measuring unit 27 is installed on the outer peripheral surface 26 a of the nut 26 before the turbine housing 4 and the compressor housing 6 are attached.
  • the measuring unit 27 includes an accelerometer (pickup) that directly detects vibration of an object.
  • vibration is applied to the turbine shaft 8.
  • a small impact is applied in the radial direction of the turbine shaft 8 to the outer peripheral surface of the protruding portion 9a in the axial direction of the turbine impeller 9 (hammering).
  • the measurement unit 27 may be configured with a sound level meter that detects sound generated in association with the vibration described above.
  • the vibration applied to the turbine shaft 8 is set so small that it does not affect the balance and strength of the rotating parts constituted by the turbine shaft 8 and the like.
  • the measurement unit 27 directly detects the vibration.
  • the eigenvalue when the axial force is less than or equal to the threshold value ⁇ , the eigenvalue is approximately the frequency a. From the threshold value ⁇ to the threshold value ⁇ greater than the threshold value ⁇ , the eigenvalue takes a value proportional to the axial force from the frequency a to the frequency b greater than the frequency a. Further, when the axial force is greater than or equal to the threshold value ⁇ , the eigenvalue is approximately the vibration frequency b.
  • the rotary member 25 and the compressor impeller 10 act as weights on the turbine shaft 8, and thus the eigenvalue is low. In this state, the axial force is insufficient. Further, when the axial force is equal to or greater than the threshold value ⁇ , the axial force is sufficiently generated, and the turbine shaft 8, the rotating member 25, and the compressor impeller 10 are vibrated together, and the eigenvalue is high. In this state, the axial force is sufficiently generated. The axial force is in the transition state from the threshold value ⁇ to the threshold value ⁇ .
  • the axial force is appropriate based on the eigenvalue.
  • the measuring unit 27 is installed on the outer peripheral surface 26 a of the nut 26, and the axially protruding portion 9 a of the turbine impeller 9 Apply vibration and measure and analyze the vibration.
  • an approximate range (setting range) of eigenvalues is specified in advance in consideration of vibration measurement errors and the like. This setting range is set so as not to include at least the vibration frequency a which is an eigenvalue of vibration when the axial force as described above is insufficient. Further, the setting range may be specified at least once for the same type of supercharger C.
  • the measuring unit 27 is installed on the outer peripheral surface 26a of the nut 26, and vibration is applied to the axial projecting portion 9a of the turbine impeller 9. Measure and analyze.
  • the measurement unit 27 indirectly measures the vibration of the turbine shaft 8 that vibrates integrally with the nut 26 by measuring the vibration of the nut 26.
  • the characteristic value of the vibration of the turbine shaft 8 is included in a preset setting range. In other words, it is determined whether or not the peak of the vibration of the turbine shaft 8 appears at a frequency within a preset setting range.
  • the turbine shaft 8 is discharged from the assembly apparatus line.
  • FIG. 5 is a functional block diagram of the assembly apparatus 100.
  • arrows indicate the signal flow.
  • the assembling apparatus 100 includes a fastening part 101, an excitation part 102, a measurement part 27, and a control part 103 (determination part). Specific processing of each functional unit will be described in detail with reference to the explanatory diagrams of FIGS.
  • FIG. 6 is a first diagram for explaining the assembling apparatus 100
  • FIG. 7 is a second diagram for explaining the assembling apparatus 100.
  • the assembly apparatus 100 includes a first assembly apparatus 110 and a second assembly apparatus 120.
  • the heating unit 111 includes a disk-shaped turntable 111a and a heater (not shown).
  • the central portion of the turntable 111a is supported downward by a pillar member 111b standing on the base 110a, and rotates around the pillar member 111b by power such as a motor (not shown).
  • the heater is inserted through a hole in the compressor impeller 10 through which the turbine shaft 8 is inserted. While the turntable 111a is rotating, the compressor impeller 10 is heated by the heater, thereby expanding the inner diameter of the hole.
  • the turbocharger C before the turbine housing 4, the compressor impeller 10, the nut 26, and the compressor housing 6 are attached, that is, the supercharger C before the compressor impeller 10 is press-fitted (hereinafter referred to as a supercharger C1) It is attached to the jig J1 and conveyed below the turntable 111a.
  • the insertion portion 111c inserts the turbine shaft 8 of the supercharger C1 into the compressor impeller 10. Then, after the jig J1 is replaced with the jig J2, the supercharger C1 is conveyed to the press-fitting portion 112.
  • the press-fitting unit 112 includes an actuator 112 a such as a hydraulic cylinder.
  • the actuator 112 a presses the compressor impeller 10 with a pressure according to the control of the control unit 103. By this pressing, the turbine shaft 8 of the supercharger C1 is press-fitted into the compressor impeller 10.
  • the supercharger C into which the compressor impeller 10 is press-fitted, that is, the supercharger C before the fastening by the nut 26 is completed (hereinafter referred to as supercharger C2) is cooled in a state where the pressure by the actuator 112a is continued. Part (not shown).
  • the cooling of the cooling unit is performed by, for example, injection of compressed air.
  • the cooled supercharger C2 is conveyed to the carry-out unit 113.
  • the jig J2 is removed from the supercharger C2.
  • the supercharger C ⁇ b> 2 is transported to the second assembly device 120.
  • the nut 26 is temporarily tightened on the shaft end side of the turbine shaft 8 on the compressor impeller 10 side.
  • a fastening part 101, a carry-out part 121, and an inspection part 122 are provided above the base 120a.
  • the supercharger C2 is conveyed to the fastening part 101, and the jig J3 is attached. At this time, the nut 26 remains in a temporarily tightened state.
  • the fastening part 101 has a nut runner 101a.
  • the nut runner 101a finally tightens the nut 26, which has been temporarily tightened in the supercharger C2, with a torque according to the control of the control unit 103.
  • the nut 26 is finally tightened, and the supercharger C (hereinafter referred to as supercharger C3) before the axial force inspection is conveyed to the carry-out unit 121.
  • the carry-out unit 121 removes the jig J3 from the supercharger C3. Thereafter, the supercharger C3 is conveyed to the inspection unit 122.
  • a measuring unit 27 is installed on the outer peripheral surface 26a (see FIG. 2) of the nut 26.
  • the inspection unit 122 includes the excitation unit 102 and the measurement unit 27 described above.
  • the vibration unit 102 is configured by, for example, a robot arm having a metal rod 102a attached to the tip, and vibrates the axially protruding portion 9a (see FIG. 2) of the turbine impeller 9 in accordance with the control of the control unit 103.
  • the configuration of the excitation unit 102 can be arbitrarily configured within a range where desired vibration can be applied.
  • the control unit 103 determines whether or not the characteristic value of the vibration of the turbine shaft 8 (nut 26) is included in the preset setting range based on the output value of the measurement unit 27. The control unit 103 determines that the axial force is sufficiently generated if the eigenvalue of the vibration of the turbine shaft 8 is included in the preset setting range. In this case, the control unit 103 advances the supercharger C that has been inspected to the fastening process of the turbine housing 4 and the compressor housing 6.
  • control unit 103 discharges the supercharger C out of the assembly apparatus 100 line.
  • FIG. 8 is a flowchart for explaining the process flow of the impeller fastening method.
  • the supercharger C assembles the supercharger C up to the state before the press-fitting (S200). That is, the supercharger C1 is assembled in the process of S200.
  • the heating unit 111 heats the compressor impeller 10 (S202), and the press-fitting unit 112 press-fits the compressor impeller 10 into the turbine shaft 8 of the supercharger C1 (S204).
  • the nut 26 is temporarily tightened to the turbine shaft 8 of the supercharger C2 (S206), and is finally tightened by the fastening portion 101 (S208).
  • the turbine shaft 8 is inserted into the bearing housing 2, protrudes from the bearing housing 2, and the impellers (the turbine impeller 9 and the compressor impeller 10) are provided at both ends thereof.
  • the compressor impeller 10 is fastened to the turbine shaft 8 by a nut 26.
  • the rotating member 25 and the compressor impeller 10 are fastened to the turbine shaft 8 integrally with the compressor impeller 10 by the fastening force (axial force) by the nut 26 at this time.
  • the measuring unit 27 is installed on the outer peripheral surface 26a (see FIG. 2) of the nut 26 (S210). Then, the vibration part 102 gives a vibration indirectly with respect to the turbine shaft 8 by giving a vibration to the protrusion part 9a (refer FIG. 2) of the axial direction of the turbine impeller 9 welded to the turbine shaft 8 (refer FIG. 2). S212).
  • the measurement part 27 on the outer peripheral surface 26a measures the vibration of the turbine shaft 8 indirectly from the vibration of the nut 26 (S214).
  • the control unit 103 determines whether or not the natural value of the vibration of the turbine shaft 8 measured by the measurement unit 27 is included in a preset setting range (S216). If included in the setting range (YES in S216), the control unit 103 performs processing such as fastening of the turbine housing 4 and the compressor housing 6. When not included in the setting range (NO in S216), the control unit 103 discharges the assembly apparatus 100 out of the line (S218). In addition, when it is confirmed that the torque finally tightened by the nut runner 101a is smaller than the preset torque, the control unit 103 resets the tightening torque of the nut runner 101a and performs the process of the final tightening processing step S208. You may return.
  • the assembly device 100 and the impeller fastening method of the supercharger C have been described.
  • an impeller fastening inspection device including a vibration unit 102, a measurement unit 27, and a control unit 103 (determination unit) that perform a process of inspecting whether or not the axial force acting on the compressor impeller 10 is appropriate.
  • An inspection method for performing the vibration processing step S212, the measurement processing step S214, and the determination processing step S216 is also provided.
  • the impeller fastening inspection device and the impeller fastening inspection method have the same effects as the assembly device 100 and the impeller fastening method described above.
  • the case where the measurement unit 27 is installed on the outer peripheral surface 26a of the nut 26 and a radial impact is applied to the axial projecting portion 9a of the turbine impeller 9 has been described. May be installed in any of the turbine impeller 9, the compressor impeller 10, the turbine shaft 8, and the rotating member 25 shown in FIG. 5 or may be always installed in the assembly apparatus 100, the impeller fastening inspection apparatus, or the jig J4. It may be. In this case, the work of attaching / detaching the measuring unit 27 to / from the supercharger C3 can be omitted. Moreover, the part which gives an impact is the turbine shaft 8, and you may vibrate the turbine shaft 8 directly. Further, any other place may be used as long as vibration can be generated in the turbine shaft 8. Further, the turbine shaft 8 may be vibrated by an external force other than an impact.
  • the assembling apparatus 100 is configured by the first assembling apparatus 110 and the second assembling apparatus 120 has been described.
  • the assembling apparatus is configured by one apparatus, and the first assembling apparatus 110 and the second assembling apparatus 120 are combined.
  • the processing performed in the two assembling apparatus 120 may be performed.
  • the processing performed by the fastening unit 101 is different from the place where the processing by the inspection unit 122 is performed in the second assembly device 120 is described.
  • the processing by the fastening unit 101 and the processing by the inspection unit 122 are performed.
  • the place where it is performed may be the same.
  • the work of transporting the supercharger C3 can be omitted.
  • the rotating member 25 is configured by the thrust collar 22 and the oil drainer 23 .
  • the thrust collar 22 and the oil drainer 23 are not essential configurations, and the nut Another member that is fastened integrally with the turbine shaft 8 with a fastening force of 26 may be included in the rotating member.
  • the present invention is used for an impeller fastening inspection method, an impeller fastening inspection method, an impeller fastening inspection device, and an impeller fastening device for confirming whether or not the fastening force when the rotating member is fastened to the turbine shaft is appropriate. be able to.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Supercharger (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

 インペラの締結検査方法は、ベアリングハウジングに挿通され、ベアリングハウジングから突出する両端にインペラが設けられ、インペラのうち、少なくとも一方が締結部材で締結されると共に、締結部材による締結力で、インペラと一体的に回転する回転部材が締結されたタービン軸に対し、直接、または、間接的に振動を与える工程(S212)と、タービン軸の振動を測定する工程(S214)と、測定したタービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する工程(S216)と、を含む。

Description

インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置
 本発明は、タービン軸に回転部材を締結したときの締結力が適正であるかどうかを確認するインペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置に関する。
 従来の過給機は、ベアリングハウジングと、ベアリングハウジングに回転自在に支持され、一端にタービンインペラが設けられ他端にコンプレッサインペラが設けられたタービン軸と、を備える。この過給機はエンジンに接続され、エンジンから排出される排気ガスによってタービンインペラを回転させ、このタービンインペラの回転によって、タービン軸を介してコンプレッサインペラを回転させる。こうして、過給機は、コンプレッサインペラの回転に伴い空気を圧縮してエンジンに過給する。
 タービン軸は、ラジアル軸受が設けられる部位よりもコンプレッサインペラ側に形成された段部を有する。段部の外径は、ラジアル軸受が設けられる部位の外径よりも小さい。このタービン軸には、段部まで、スラストカラー、油切りなどの回転部材とコンプレッサインペラが軸方向に隙間なく順次取り付けられる。最後にナットがタービン軸の軸端側に螺合する。この螺合によって、段部、回転部材、および、コンプレッサインペラ間の当接部分にタービン軸の軸力(ナットによる締結力)が掛かる。この軸力は、エンジン運転時における回転部材やコンプレッサインペラとタービン軸の回転ずれを抑制する。このナット締めには、例えば、締め付けトルクを設定できるプリセット型のトルクレンチが用いられる。
 ナット締めにプリセット型のトルクレンチを用いる場合、ナットの締め付けトルクに対して発生する軸力にバラつきが発生する。これは、ナット締めされる回転部材およびコンプレッサインペラ間の摩擦係数の個体差などに起因する。従って、ナット締めにおいて適切なトルク管理が求められる。また、例えばコンプレッサインペラが圧入によってタービン軸に取り付けられる場合などでは、スラストカラーや油切りに所望の軸力を掛けるために、これらを隙間無くタービン軸に挿入させる必要がある。従ってこの場合には、コンプレッサインペラの圧入に対して適切な荷重管理(以下、圧入力管理と称す)などが求められる。
 特許文献1では、この軸力を特定するための技術が開示されている。この技術において、タービン軸は、コンプレッサインペラが取り付けられる部位に、軸方向に延伸する面取り部を有する。また、この面取り部には、歪みゲージが取り付けられる。軸力は、歪みゲージによって計測されたタービン軸の歪みから導出される。なお、歪みゲージのリード線は、面取り部からタービン軸の軸端まで連通する孔を通じて、外部に引き出されている。
特開2009-228446号公報
 上述した特許文献1のように、歪みゲージの出力値によって軸力を導出する技術は、試験機などに対して正確な軸力を測定する場合に有効である。しかし、量産機に対して行うには、歪みゲージの回収が困難である上、測定のための工数が多くコスト高となる。
 本発明の目的は、低コストでタービン軸と回転部材およびコンプレッサインペラの軸力が適正であるかどうかを確認することが可能となるインペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置を提供することである。
 本発明の第1の態様はインペラの締結検査方法であって、ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられ、該インペラのうち、少なくとも一方が締結部材で締結されると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材が締結されたタービン軸に対し、直接、または、間接的に振動を与える工程と、前記タービン軸の振動を測定する工程と、測定した前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する工程と、を含むことを要旨とする。
 本発明の第2の態様はインペラの締結方法であって、ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられたタービン軸に対し、該インペラのうちの少なくとも一方を締結部材で締結すると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材を該タービン軸に締結する工程と、前記タービン軸に対し、直接、または、間接的に振動を与える工程と、前記タービン軸の振動を測定する工程と、測定した前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する工程と、を含むことを要旨とする。
 本発明の第3の態様はインペラの締結検査装置であって、ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられ、該インペラのうち、少なくとも一方が締結部材で締結されると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材が締結されたタービン軸に対し、直接、または、間接的に振動を与える加振部と、前記タービン軸の振動を測定する測定部と、測定された前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する判定部と、を備えることを要旨とする。
 本発明の第4の態様はインペラの締結装置であって、ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられたタービン軸に対し、該インペラのうちの一方を、締結部材で締結すると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材を締結する締結部と、前記タービン軸に対し、直接、または、間接的に振動を与える加振部と、前記タービン軸の振動を測定する測定部と、測定された前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する判定部と、を備えることを要旨とする。
 本発明によれば、低コストでタービン軸と回転部材およびコンプレッサインペラの軸力が適正であるかどうかを確認することが可能となる。
図1は、本発明の実施形態に係る過給機の概略断面図である。 図2は、タービンハウジングとコンプレッサハウジングを取り付ける前の過給機の概略断面図である。 図3は、タービン軸と回転部材およびコンプレッサインペラの締結を説明するための説明図である。 図4(a)及び図4(b)は、振動数と軸力の関係について説明するための説明図である。 図5は、本発明の実施形態に係る組立装置の機能ブロック図である。 図6は、組立装置について説明するための第1の図である。 図7は、組立装置について説明するための第2の図である。 図8は、インペラの締結方法の処理の流れを説明するためのフローチャートである。
 以下に添付図面を参照しながら、本発明の実施形態について説明する。かかる実施形態に示す寸法、材料、その他具体的な数値等は、発明の理解を容易とするための例示にすぎず、特に断る場合を除き、本発明を限定するものではない。なお、本明細書および図面において、実質的に同一の機能、構成を有する要素については、同一の符号を付することにより重複説明を省略し、また本発明に直接関係のない要素は図示を省略する。
 図1は、過給機Cの概略断面図である。以下では、図1の矢印Lで示す方向を過給機Cの左側とし、矢印Rで示す方向を過給機Cの右側として説明する。図1に示すように、過給機Cは、過給機本体1を備える。過給機本体1は、ベアリングハウジング2と、締結機構3によってベアリングハウジング2の左側に連結されるタービンハウジング4と、締結ボルト5によってベアリングハウジング2の右側に連結されるコンプレッサハウジング6と、を備える。過給機本体1は、これらの一体化によって、形成されている。
 ベアリングハウジング2のタービンハウジング4近傍の外周面には、ベアリングハウジング2の径方向に突出する突起2aが設けられている。また、タービンハウジング4のベアリングハウジング2近傍の外周面には、タービンハウジング4の径方向に突出する突起4aが設けられている。ベアリングハウジング2とタービンハウジング4は、突起2a、4aを締結機構3によってバンド締結して固定される。締結機構3は、突起2a、4aを挟持するカップリングで構成される。
 ベアリングハウジング2には、過給機Cの左右方向に貫通する軸受孔2bが形成されている。軸受孔2bにはラジアル軸受7が設けられている。ラジアル軸受7は、タービン軸8を回転自在に支持する。タービン軸8の左端部(一端)にはタービンインペラ9が一体的に固定されている。タービンインペラ9は、タービンハウジング4内に回転自在に収容されている。また、タービン軸8の右端部(他端)にはコンプレッサインペラ10が一体的に固定されている。コンプレッサインペラ10は、コンプレッサハウジング6内に回転自在に収容されている。
 コンプレッサハウジング6には吸気口11が形成されている。吸気口11は、過給機Cの右側に開口し、エアクリーナ(図示せず)に接続される。また、締結ボルト5によってベアリングハウジング2とコンプレッサハウジング6とが連結された状態では、これら両ハウジング2、6の対向面が、空気を昇圧するディフューザ流路12を形成する。ディフューザ流路12は、タービン軸8(コンプレッサインペラ10)の径方向内側から外側に向けて環状に形成されており、上記の径方向内側において、コンプレッサインペラ10を介して吸気口11に連通している。
 また、コンプレッサハウジング6には、ディフューザ流路12よりもタービン軸8(コンプレッサインペラ10)の径方向外側に位置する環状のコンプレッサスクロール流路13が設けられている。コンプレッサスクロール流路13は、エンジン(図示せず)の吸気口と連通し、ディフューザ流路12にも連通している。コンプレッサインペラ10が回転すると、吸気口11からコンプレッサハウジング6内に空気が吸気され、当該吸気された空気は、コンプレッサインペラ10の翼間を流通する過程において遠心力の作用により増速され、ディフューザ流路12およびコンプレッサスクロール流路13で昇圧されてエンジンの吸気口に導かれる。
 タービンハウジング4には吐出口14が形成されている。吐出口14は、過給機Cの左側に開口し、排気ガス浄化装置(図示せず)に接続される。また、タービンハウジング4には、流路15と、この流路15よりもタービン軸8(タービンインペラ9)の径方向外側に位置する環状のタービンスクロール流路16とが設けられている。タービンスクロール流路16は、排気ガスのガス流入口(図示せず)と連通し、流路15にも連通している。したがって、排気ガスは、エンジン(図示せず)の排気マニホールドから排出された後、ガス流入口に導かれる。さらに、排気ガスは、ガス流入口からタービンスクロール流路16に導かれ、流路15およびタービンインペラ9を介して吐出口14に導かれる。この流通過程において、排気ガスはタービンインペラ9を回転させる。タービンインペラ9の回転力は、タービン軸8を介してコンプレッサインペラ10に伝達される。その結果、コンプレッサインペラ10の回転力によって、空気が昇圧され、エンジンの吸気口に導かれる。
 図2は、タービンハウジング4とコンプレッサハウジング6を取り付ける前の過給機Cの概略断面図である。図1と同様、図2の矢印Lが示す方向を過給機Cの左側とし、矢印Rが示す方向を過給機Cの右側として説明する。図2に示すように、ベアリングハウジング2の内部には2つのスラスト軸受20、21が設けられている。スラスト軸受20、21はスラストカラー22を挟んで左右に配され、タービン軸8に作用するスラスト荷重を受ける。スラスト軸受20、21およびスラストカラー22には、タービン軸8が挿通されている。
 スラストカラー22の右側には油切り23が隣接している。油切り23の左側の端部が、スラスト軸受21に挿通されている。油切り23の右側は、シールプレート24に挿通されている。油切り23は、径方向外方に突出した部位を有する。この部位は、スラスト軸受21およびシールプレート24の間におけるシールプレート24寄りに位置し、潤滑油を径方向外方に飛散させることで、シールプレート24から右側への潤滑油漏れを抑制する。また、油切り23の右側にはコンプレッサインペラ10が隣接している。
 回転部材25は、スラストカラー22と油切り23で構成される。回転部材25とコンプレッサインペラ10は、タービン軸8と一体的に回転するようにタービン軸8に締結されている。径方向におけるスラスト軸受20とタービン軸8との間には隙間が設けられ、互いに相対的に回転可能となっている。径方向における油切り23とスラスト軸受21との間にも隙間が設けられ、互いに相対的に回転可能となっている。さらに、油切り23とシールプレート24との間にも隙間が設けられ、互いに相対回転可能となっている。
 図3は、タービン軸8と回転部材25およびコンプレッサインペラ10の締結を説明するための説明図である。タービンインペラ9は、タービン軸8に溶接などで固定され、タービン軸8と一体的に回転する。一方、コンプレッサインペラ10は、スラストカラー22や油切り23と共に、タービン軸8と一体的に回転するように、ナット26(締結部材)によってタービン軸8に締結されている。ナット26は、タービン軸8の軸端側に設けられたネジ溝8bに螺合する。
 図3に示すように、タービン軸8には段部8aが形成されている。タービン軸8は、タービンインペラ9側の外径が、段部8aを境に、コンプレッサインペラ10側の外径よりも大きくなるように形成されている。スラストカラー22は、段部8aに当接する位置までタービン軸8に挿通される。
 油切り23は、スラストカラー22に当接する位置までタービン軸8に挿通される。コンプレッサインペラ10は、油切り23に当接する位置までタービン軸8に挿通される。
 コンプレッサインペラ10がタービン軸8に圧入された後、ナット26がタービン軸8のネジ溝8bに螺合する。タービン軸8の段部8aとナット26の間にスラストカラー22、油切り23、および、コンプレッサインペラ10が位置した状態で、ナット26がこれらを締め付ける。この締め付け(即ち、ナット26による締結力)が、タービン軸8の軸方向の圧縮力(軸力)を生じさせる。さらに、この軸力が、段部8a、スラストカラー22、油切り23、コンプレッサインペラ10、および、ナット26それぞれの当接部分に摩擦抵抗を生じさせる。そのため、タービン軸8に対し、各回転部材25やコンプレッサインペラ10が相対回転してしまう回転ずれが抑制され、回転部材25やコンプレッサインペラ10がタービン軸8と一体的に回転する。
 また、コンプレッサインペラ10にタービン軸8を圧入することで、タービン軸8のうち、コンプレッサインペラ10への挿通部位とコンプレッサインペラ10の摩擦抵抗が大きくなる。従って、コンプレッサインペラ10とタービン軸8の回転ずれが一層抑制される。しかし、コンプレッサインペラ10にタービン軸8を圧入すると、タービン軸8の軸方向への移動に対しても摩擦抵抗が大きくなる。このため、コンプレッサインペラ10が隙間なく、スラストカラー22や油切り23まで挿入させるために、圧入力管理などが必要となる。
 また、図2に示すように、ナット26による回転部材25やコンプレッサインペラ10の締め付けは、ベアリングハウジング2やラジアル軸受7にタービン軸8を挿通し、スラスト軸受20、21やシールプレート24を取り付けた状態で行われる。そのため、回転部材25やコンプレッサインペラ10はベアリングハウジング2に覆われている。例えば、段部8a、スラストカラー22、油切り23、および、コンプレッサインペラ10が軸方向に当接する位置までタービン軸8が挿通されているかを外部から視認できない。また、スラストカラー22や油切り23に外部から力を加えることで、これらをタービン軸8の回転方向に回すこともできない。すなわち、直接的にスラストカラー22や油切り23に作用する軸力が適正であるかどうかを確認することは困難である。そこで、本実施形態では、タービン軸8の振動を測定および解析して、間接的に軸力が適正であるかどうかを確認する。
 具体的には、図2に示すように、過給機Cの組立時、タービンハウジング4やコンプレッサハウジング6を取り付ける前の段階で、測定部27がナット26の外周面26aに設置される。測定部27は、物体の振動を直接検知する加速度計(ピックアップ)などで構成される。測定部27が設置された後、タービン軸8に振動が与えられる。例えば、図2中の矢印で示すように、タービンインペラ9の軸方向の突出部位9aの外周面に、タービン軸8の径方向に小さな衝撃が加えられる(ハンマリング)。なお、測定部27は、上記の振動に伴って発生する音を検知する騒音計で構成されてもよい。ただし、タービン軸8に加えられる振動は、タービン軸8などで構成される回転部品のバランスや強度に影響を与えない程度に小さく設定される。この場合、騒音計では、振動に伴って発生する音と周囲の雑音との判別が難しくなる可能性がある。従って、加えられる振動の大きさによっては、測定部27は振動を直接検知する構成が望ましい場合がある。
 図4(a)及び図4(b)は、振動数と軸力の関係について説明するための説明図である。測定部27の出力値に基づいて、タービン軸8の振動を解析して固有値を求めると、振動のピークを示す振動数a、または、振動数bなどの振動数(固有値)が観測される(図4(a)参照)。
 図4(b)に示すように、軸力が閾値α以下の場合、固有値は大凡振動数aとなる。そして、軸力が閾値αから閾値αより大きい閾値βまでは、振動数aから振動数aよりも大きい振動数bまで、固有値が軸力に比例した値をとる。また、軸力が閾値β以上の場合、固有値が大凡振動数bとなる。
 軸力が閾値α以下の場合、タービン軸8に対し、回転部材25やコンプレッサインペラ10が重りとして作用するため、固有値が低くなっている。この状態では軸力が不足している。また、軸力が閾値β以上の場合、軸力が十分に発生し、タービン軸8と回転部材25およびコンプレッサインペラ10が一体となって振動している状態であり、固有値が高くなっている。この状態では軸力が十分に生じている。軸力が閾値αから閾値βまでは、その遷移状態となっている。
 このような軸力と固有値の関係から、固有値に基づいて軸力が適正であるかどうかを確認することが可能となる。例えば、図3に示す状態において、軸力が十分に生じていることを直接的に確認し、ナット26の外周面26aに測定部27を設置し、タービンインペラ9の軸方向の突出部位9aに振動を与え、その振動を測定および解析する。そして、振動の測定誤差などを勘案して、固有値の大凡の範囲(設定範囲)を予め特定しておく。この設定範囲には、少なくとも、上記のような軸力が不足しているときの振動の固有値である振動数aが含まれないように設定される。また、設定範囲は、同一の型の過給機Cに関して、少なくとも一度特定すればよい。
 そして、図2に示す状態まで過給機Cを組み立てた上で、ナット26の外周面26aに測定部27を設置し、タービンインペラ9の軸方向の突出部位9aに振動を与え、その振動を測定および解析する。ここでは、測定部27は、ナット26の振動を測定することで、ナット26と一体に振動するタービン軸8の振動を間接的に測定している。
 そして、タービン軸8の振動の固有値が、予め設定された設定範囲に含まれるか否かを判定する。換言すれば、タービン軸8の振動について、予め設定された設定範囲の振動数でピークが表れるか否かを判定する。
 その結果、タービン軸8の振動の固有値が、予め設定された設定範囲に含まれれば、軸力が十分に発生し、タービン軸8と回転部材25およびコンプレッサインペラ10が一体となっていることがわかる。また、タービン軸8の振動の固有値が、予め設定された設定範囲に含まれなければ(予め設定された設定範囲の振動数でピークが表れなければ)、組立装置のラインから排出する。
 図5は、組立装置100の機能ブロック図である。図5中、矢印は信号の流れを示す。図5に示すように、組立装置100(インペラの締結装置)は、締結部101と、加振部102と、測定部27と、制御部103(判定部)とを備える。各機能部の具体的な処理については、図6、7の説明図を参照しながら詳述する。
 図6は、組立装置100について説明するための第1の図であり、図7は、組立装置100について説明するための第2の図である。図6、7に示すように、組立装置100は、第1組立装置110および第2組立装置120で構成される。
 図6に示す第1組立装置110においては、基台110aの上方に、加熱部111、圧入部112、搬出部113が設置されている。加熱部111は、円盤状のターンテーブル111aとヒータ(図示せず)を有する。ターンテーブル111aは、基台110aに立設する柱部材111bによって中央部分が下方支持され、柱部材111bを中心にモータ(図示せず)などの動力によって回転する。
 コンプレッサインペラ10がターンテーブル111a上に搬送された後、ヒータがタービン軸8を挿通するためのコンプレッサインペラ10の孔に挿通される。ターンテーブル111aが回転している間、コンプレッサインペラ10はヒータによって加熱され、これにより当該孔の内径が拡大する。
 タービンハウジング4、コンプレッサインペラ10、ナット26、および、コンプレッサハウジング6が取り付けられる前の過給機C、すなわち、コンプレッサインペラ10圧入前の過給機C(以下、過給機C1と称す)は、冶具J1に取り付けられて、ターンテーブル111aの下方に搬送される。
 そして、コンプレッサインペラ10が、ターンテーブル111aの回転によって過給機C1の上方に到達すると、組入部111cが、過給機C1のタービン軸8を、コンプレッサインペラ10に挿通させる。そして、冶具J1が冶具J2に取り換えられた後、過給機C1は、圧入部112に搬送される。
 圧入部112は、油圧シリンダなどのアクチュエータ112aを有する、アクチュエータ112aは、制御部103の制御に応じた圧力でコンプレッサインペラ10を押圧する。この押圧によって、過給機C1のタービン軸8がコンプレッサインペラ10に圧入される。コンプレッサインペラ10が圧入された過給機C、すなわち、ナット26による締結が完了する前の過給機C(以下、過給機C2と称す)は、アクチュエータ112aによる押圧が継続した状態で、冷却部(図示せず)によって冷却される。冷却部の冷却は、例えば、圧縮空気の噴射によって遂行される。
 冷却された過給機C2は、搬出部113に搬送される。冶具J2は、過給機C2から取り外される。その後、過給機C2は第2組立装置120に搬送される。このとき、タービン軸8のコンプレッサインペラ10側の軸端側に、ナット26が仮締めされる。
 図7に示す第2組立装置120においては、基台120aの上方に、締結部101、搬出部121、検査部122が設けられている。過給機C2は、締結部101に搬送され、冶具J3が取り付けられる。このとき、ナット26は仮締めされたままの状態にある。
 締結部101は、ナットランナー101aを有する。ナットランナー101aは、制御部103の制御に応じたトルクで、過給機C2の仮締めされていたナット26を本締めする。
 ナット26が本締めされ、軸力の検査前の過給機C(以下、過給機C3と称す)は、搬出部121に搬送される。搬出部121は、冶具J3を過給機C3から取り外す。その後、過給機C3は検査部122に搬送される。
 そして、過給機C3は、冶具J4に載置される。さらに、ナット26の外周面26a(図2参照)には、測定部27が設置される。
 検査部122は、加振部102、および、上記の測定部27を有する。加振部102は、例えば、先端に金属棒102aが取り付けられたロボットアームで構成され、制御部103の制御に応じ、タービンインペラ9の軸方向の突出部位9a(図2参照)に振動を与える。ここで、加振部102の構成は、所望の振動を与えられる範囲内において、任意に構成できる。
 制御部103は、測定部27の出力値に基づいて、タービン軸8(ナット26)の振動の固有値が、予め設定された設定範囲に含まれるか否かを判定する。制御部103は、タービン軸8の振動の固有値が、予め設定された設定範囲に含まれれば、軸力が十分に発生しているものと判定する。この場合、制御部103は、検査を終えた過給機Cを、タービンハウジング4やコンプレッサハウジング6の締結工程に進める。
 一方、タービン軸8の振動の固有値が、予め設定された設定範囲に含まれていない場合、軸力が不十分である可能性が高い。従って、制御部103は、過給機Cを組立装置100のライン外に排出する。
 図8は、インペラの締結方法の処理の流れを説明するためのフローチャートである。図8に示すように、まず、過給機Cは、上記の圧入前の状態まで、過給機Cを組み立てる(S200)。即ち、S200の工程において、過給機C1が組み上がる。そして、加熱部111はコンプレッサインペラ10を加熱し(S202)、圧入部112は過給機C1のタービン軸8にコンプレッサインペラ10を圧入する(S204)。その後、ナット26が過給機C2のタービン軸8に仮締めされ(S206)、締結部101によって本締めされる(S208)。
 このように、タービン軸8は、ベアリングハウジング2に挿通され、ベアリングハウジング2から突出し、その両端にインペラ(タービンインペラ9およびコンプレッサインペラ10)が設けられる。このタービン軸8に対して、コンプレッサインペラ10が、ナット26によって締結される。このときのナット26による締結力(軸力)によって、回転部材25とコンプレッサインペラ10とが、コンプレッサインペラ10と一体的にタービン軸8に締結される。
 過給機C3において、測定部27がナット26の外周面26a(図2参照)に設置される(S210)。続いて、加振部102は、タービン軸8に溶接されたタービンインペラ9の軸方向の突出部位9a(図2参照)に振動を与えることで、タービン軸8に対し間接的に振動を与える(S212)。
 そして、外周面26a(図2参照)上の測定部27は、ナット26の振動から、間接的にタービン軸8の振動を測定する(S214)。
 制御部103は、測定部27が測定したタービン軸8の振動の固有値が、予め設定された設定範囲に含まれるか否かを判定する(S216)。設定範囲に含まれれば(S216におけるYES)、制御部103は、タービンハウジング4やコンプレッサハウジング6の締結などの処理を行う。設定範囲に含まれない場合(S216におけるNO)、制御部103は、組立装置100のライン外に排出する(S218)。なお、ナットランナー101aによって本締めされたトルクが予め設定されたトルクよりも小さいと確認された場合、制御部103は、ナットランナー101aの締付けトルクを再設定し、本締め処理ステップS208の処理に戻ってもよい。
 上述した組立装置100およびインペラの締結方法によれば、製造コストの上昇を抑えて、タービン軸8と回転部材25間の軸力が適正であるかどうかを確認することが可能となる。
 また、上述した実施形態では、過給機Cの組立装置100およびインペラの締結方法について説明したが、かかる組立装置100およびインペラの締結方法のうち、タービン軸8の段部8a、回転部材25、および、コンプレッサインペラ10に作用する軸力が適正であるかどうかを検査する処理を遂行する加振部102、測定部27、制御部103(判定部)を備えるインペラの締結検査装置、および、加振処理ステップS212、測定処理ステップS214、および、判定処理ステップS216を行う検査方法も提供される。かかるインペラの締結検査装置およびインペラの締結検査方法によっても、上述した組立装置100およびインペラの締結方法と同様の効果を有する。
 上述した実施形態では、測定部27をナット26の外周面26aに設置し、タービンインペラ9の軸方向の突出部位9aに径方向の衝撃を与える場合について説明したが、測定部27は、図3に示すタービンインペラ9、コンプレッサインペラ10、タービン軸8、および、回転部材25のいずれに設置してもよいし、あるいは、組立装置100、インペラの締結検査装置、または、冶具J4などに常時設置されていてもよい。この場合、測定部27を過給機C3に着脱する作業を省くことができる。また、衝撃を与える部位は、タービン軸8であって直接的にタービン軸8に加振してもよい。また、タービン軸8に振動を生じさせることができれば、他の何れの場所であってもよい。また、衝撃以外の外力によってタービン軸8に振動を与えてもよい。
 また、上述した実施形態では、組立装置100が第1組立装置110と第2組立装置120で構成される場合について説明したが、組立装置を一つの装置で構成し、第1組立装置110と第2組立装置120で行われる処理を遂行させてもよい。
 また、上述した実施形態では、第2組立装置120において、締結部101による処理と検査部122による処理が行われる場所が異なる場合について説明したが、締結部101による処理と検査部122による処理が行われる場所が同じであってもよい。この場合、過給機C3を搬送する作業を省くことが可能となる。
 また、上述した実施形態では、回転部材25がスラストカラー22と油切り23で構成される場合について説明したが、回転部材として、スラストカラー22および油切り23は必須の構成ではなく、また、ナット26の締結力でタービン軸8と一体的に締結される他の部材を回転部材に含んでもよい。
 以上、添付図面を参照しながら本発明の好適な実施形態について説明したが、本発明はかかる実施形態に限定されないことは言うまでもない。当業者であれば、特許請求の範囲に記載された範疇において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。
 本発明は、タービン軸に回転部材を締結したときの締結力が適切であるかどうかを確認するインペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置に利用することができる。

Claims (4)

  1.  ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられ、該インペラのうち、少なくとも一方が締結部材で締結されると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材が締結されたタービン軸に対し、直接、または、間接的に振動を与える工程と、
     前記タービン軸の振動を測定する工程と、
     測定した前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する工程と、
    を含むことを特徴とするインペラの締結検査方法。
  2.  ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられたタービン軸に対し、該インペラのうちの少なくとも一方を締結部材で締結すると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材を該タービン軸に締結する工程と、
     前記タービン軸に対し、直接、または、間接的に振動を与える工程と、
     前記タービン軸の振動を測定する工程と、
     測定した前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する工程と、
    を含むことを特徴とするインペラの締結方法。
  3.  ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられ、該インペラのうち、少なくとも一方が締結部材で締結されると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材が締結されたタービン軸に対し、直接、または、間接的に振動を与える加振部と、
     前記タービン軸の振動を測定する測定部と、
     測定された前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する判定部と、
    を備えることを特徴とするインペラの締結検査装置。
  4.  ベアリングハウジングに挿通され、該ベアリングハウジングから突出する両端にインペラが設けられたタービン軸に対し、該インペラのうちの一方を、締結部材で締結すると共に、該締結部材による締結力で、該インペラと一体的に回転する回転部材を締結する締結部と、
     前記タービン軸に対し、直接、または、間接的に振動を与える加振部と、
     前記タービン軸の振動を測定する測定部と、
     測定された前記タービン軸の振動のピークとなる振動数が、予め設定された設定範囲に含まれるか否かを判定する判定部と、
    を備えることを特徴とするインペラの締結装置。
PCT/JP2014/054671 2013-04-12 2014-02-26 インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置 WO2014167905A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201480003632.1A CN104884747B (zh) 2013-04-12 2014-02-26 叶轮的紧固检查方法、叶轮的紧固方法、叶轮的紧固检查装置以及叶轮的紧固装置
JP2015511148A JPWO2014167905A1 (ja) 2013-04-12 2014-02-26 インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置
DE112014001921.6T DE112014001921B4 (de) 2013-04-12 2014-02-26 Verfahren zum Prüfen der Befestigung von Rädern, Verfahren zum Befestigen von Rädern, Vorrichtung zum Prüfen der Befestigung von Rädern und Vorrichtung zum Befestigen von Rädern
US14/740,868 US9891123B2 (en) 2013-04-12 2015-06-16 Wheel fastening inspection method, wheel fastening method, wheel fastening inspection device and wheel fastening device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013084013 2013-04-12
JP2013-084013 2013-04-12

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/740,868 Continuation US9891123B2 (en) 2013-04-12 2015-06-16 Wheel fastening inspection method, wheel fastening method, wheel fastening inspection device and wheel fastening device

Publications (1)

Publication Number Publication Date
WO2014167905A1 true WO2014167905A1 (ja) 2014-10-16

Family

ID=51689321

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/054671 WO2014167905A1 (ja) 2013-04-12 2014-02-26 インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置

Country Status (5)

Country Link
US (1) US9891123B2 (ja)
JP (1) JPWO2014167905A1 (ja)
CN (1) CN104884747B (ja)
DE (1) DE112014001921B4 (ja)
WO (1) WO2014167905A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10302598B2 (en) 2016-10-24 2019-05-28 General Electric Company Corrosion and crack detection for fastener nuts

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017149671A1 (ja) * 2016-03-01 2017-09-08 三菱重工業株式会社 軸受装置および排気タービン過給機
US10502660B2 (en) * 2016-03-25 2019-12-10 Garrett Transportation I Inc. Turbocharger compressor wheel assembly
EP3604763B1 (en) * 2017-11-24 2022-11-09 Mitsubishi Heavy Industries Engine & Turbocharger, Ltd. Supercharger vibration suppressing method, and supercharger
CN111734568B (zh) * 2020-07-02 2021-09-24 哈尔滨电机厂有限责任公司 一种确定水轮机动静干涉振动能量的方法
CN114459776B (zh) * 2020-11-10 2024-05-07 一汽-大众汽车有限公司 用于考察待测车辆的车轮紧固性能的场地测试方法
CN115406571B (zh) * 2022-07-11 2023-09-29 安徽达因汽车空调有限公司 一种压缩机吸盘紧固及吸合摩擦扭矩一体化测试方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002214034A (ja) * 2001-01-18 2002-07-31 Nippon Soken Inc 高速回転機器の振動レベル演算確認装置及び方法
JP2002367492A (ja) * 2001-06-07 2002-12-20 Hitachi Engineering & Services Co Ltd 遮断器のボルトの緩み診断評価方法および装置
JP2009228446A (ja) * 2008-03-19 2009-10-08 Ihi Corp 過給機及びタービン軸のセンサ出力線収容方法
JP2011033348A (ja) * 2009-07-29 2011-02-17 Railway Technical Res Inst レール軸力測定装置、レール軸力測定方法
JP2012012995A (ja) * 2010-06-30 2012-01-19 Hino Motors Ltd 車両の情報取得蓄積装置及び診断装置

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4705463A (en) * 1983-04-21 1987-11-10 The Garrett Corporation Compressor wheel assembly for turbochargers
JP3065086B2 (ja) * 1988-09-12 2000-07-12 日本特殊陶業株式会社 ボールベアリングタイプのロータ
DE8812569U1 (de) * 1988-10-06 1988-11-17 Frenco Verzahnungslehren GmbH, 8503 Altdorf Prüfvorrichtung
JP2747939B2 (ja) * 1990-08-22 1998-05-06 日本特殊陶業株式会社 過給機
JP2878905B2 (ja) * 1992-06-15 1999-04-05 株式会社日本非破壊計測研究所 ボルト締付診断装置
JP2743145B2 (ja) * 1994-06-06 1998-04-22 株式会社日本非破壊計測研究所 ボルト締付力の検査装置
JP3116298B2 (ja) * 1994-12-19 2000-12-11 株式会社ジャスト ボルトの軸力測定方法および装置と測定用治具
US6364634B1 (en) * 2000-09-29 2002-04-02 General Motors Corporation Turbocharger rotor with alignment couplings
JP2002340710A (ja) * 2001-05-17 2002-11-27 Kawasaki Heavy Ind Ltd ボルトの軸力測定方法および装置
EP1293657A1 (de) * 2001-09-17 2003-03-19 ABB Turbo Systems AG Turbolader mit Torsionsschwingungsdämpfer
US6711952B2 (en) * 2001-10-05 2004-03-30 General Electric Company Method and system for monitoring bearings
US7152475B2 (en) * 2002-07-25 2006-12-26 Takanori Nakamura Device and method for measuring axial force of bolt
US6896479B2 (en) * 2003-04-08 2005-05-24 General Motors Corporation Turbocharger rotor
JP4755071B2 (ja) * 2006-11-20 2011-08-24 三菱重工業株式会社 排気ターボ過給機
JP5204796B2 (ja) * 2010-01-22 2013-06-05 淳 今井 ボルトの軸力測定方法及びボルトの軸力測定装置
JP4605307B1 (ja) * 2010-04-05 2011-01-05 センサ・システム株式会社 ボルト締付力検査装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002214034A (ja) * 2001-01-18 2002-07-31 Nippon Soken Inc 高速回転機器の振動レベル演算確認装置及び方法
JP2002367492A (ja) * 2001-06-07 2002-12-20 Hitachi Engineering & Services Co Ltd 遮断器のボルトの緩み診断評価方法および装置
JP2009228446A (ja) * 2008-03-19 2009-10-08 Ihi Corp 過給機及びタービン軸のセンサ出力線収容方法
JP2011033348A (ja) * 2009-07-29 2011-02-17 Railway Technical Res Inst レール軸力測定装置、レール軸力測定方法
JP2012012995A (ja) * 2010-06-30 2012-01-19 Hino Motors Ltd 車両の情報取得蓄積装置及び診断装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10302598B2 (en) 2016-10-24 2019-05-28 General Electric Company Corrosion and crack detection for fastener nuts

Also Published As

Publication number Publication date
DE112014001921B4 (de) 2022-02-10
DE112014001921T5 (de) 2015-12-31
US20150276523A1 (en) 2015-10-01
CN104884747A (zh) 2015-09-02
US9891123B2 (en) 2018-02-13
CN104884747B (zh) 2016-09-07
JPWO2014167905A1 (ja) 2017-02-16

Similar Documents

Publication Publication Date Title
WO2014167905A1 (ja) インペラの締結検査方法、インペラの締結方法、インペラの締結検査装置、およびインペラの締結装置
JP6622266B2 (ja) 排気ガスターボチャージャ
US9897107B2 (en) Compressor wheel and unbalance detection device for compressor assembly
US8215181B1 (en) Evaluation technique for bonded, dual wall static and rotating airfoil materials
EP2510194B1 (en) Coupling for rotor balancing
CN110333052B (zh) 高温旋转部件测试平台
US20090269192A1 (en) Support member for optimizing dynamic load distribution and attenuating vibration
JP4318271B2 (ja) 可変静翼アセンブリの組立固定具及び方法
CN107030449A (zh) 用于空气循环机压缩机壳体的焊料修补
CN101300726A (zh) 自动监控发电机运行的方法
CN102828993A (zh) 叶轮和可更换的突鼻件
US20130259658A1 (en) Variable vane inner platform damping
KR20150036586A (ko) 밸런스 교정 및 포지티브 파일럿팅을 이용하는 압축기 휠
CN113639917A (zh) 一种螺栓拧紧力矩的确定装置及方法
CN113063343B (zh) 一种基于应变信号波形失真评价的转轴裂纹检测方法
US20080034854A1 (en) Torque Converter Non-Destructive Inspection and Verification for Remanufacturing
KR20120084747A (ko) 배기가스 터보차저 마찰 베어링의 베어링 유극을 확인하는 방법
Croccolo et al. Fretting fatigue of interference fitted joints: development of a novel specimen for four-point rotating-bending tests and experimental results
JP2009209731A (ja) タービン軸の軸力測定方法及び過給機
JP6392164B2 (ja) 補機トルクの測定方法
KR20210075495A (ko) 등속조인트의 레디얼 래쉬 측정용 지그 모듈
JP2015151901A (ja) 締結方法、および、締結装置
CN116067655B (zh) 一种零件测试装置、零件测试设备和零件测试方法
JP6687119B2 (ja) 過給機および過給機の組立方法
Deshpande et al. Experimental study of effect of eccentricity on vibration of shafts

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14782497

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015511148

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 1120140019216

Country of ref document: DE

Ref document number: 112014001921

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14782497

Country of ref document: EP

Kind code of ref document: A1