WO2014103351A1 - 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム - Google Patents

電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム Download PDF

Info

Publication number
WO2014103351A1
WO2014103351A1 PCT/JP2013/056410 JP2013056410W WO2014103351A1 WO 2014103351 A1 WO2014103351 A1 WO 2014103351A1 JP 2013056410 W JP2013056410 W JP 2013056410W WO 2014103351 A1 WO2014103351 A1 WO 2014103351A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
bus
control
conversion unit
battery
Prior art date
Application number
PCT/JP2013/056410
Other languages
English (en)
French (fr)
Inventor
西川 武男
潤一郎 山田
亘 岡田
大橋 誠
美宣 砂畑
Original Assignee
オムロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by オムロン株式会社 filed Critical オムロン株式会社
Publication of WO2014103351A1 publication Critical patent/WO2014103351A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/06Two-wire systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the present disclosure relates to a power control device, a power control method, a program, and an energy management system, and more particularly, to a power control device, a power control method, a program, and an energy management that can simplify control of a DC bus. About the system.
  • Patent Document 1 discloses a system capable of stably using power even when a power failure occurs.
  • FIG. 1 shows an example of the configuration of an energy management system.
  • a power control device 12 is connected to a power system 14 via an ammeter 13, and the power control device 12 includes a PV 15, a battery 16, and an alternating current (AC) load 17. Are connected and configured.
  • the power control device 12 is configured to include an AC / DC conversion unit 21, a PV DC / DC conversion unit 22, a battery DC / DC conversion unit 23, and a control unit 24.
  • the terminal on the AC side of the AC / DC conversion unit 21 is connected to the power system 14 and the AC load 17.
  • the DC side terminal of the AC / DC conversion unit 21 is connected to the PV 15 via the PV DC / DC conversion unit 22 and connected to the battery 16 via the battery DC / DC conversion unit 23 .
  • the wiring connected to the DC-side terminal of the AC / DC conversion unit 21 for supplying DC power between the PV DC / DC conversion unit 22 and the battery DC / DC conversion unit 23 will be described below. It is referred to as DC bus 25 as appropriate.
  • the control unit 24 controls the AC / DC conversion unit 21, the PV DC / DC conversion unit 22, and the battery DC / DC conversion unit 23 according to the state of the energy management system 11.
  • the operation mode of the energy management system 11 includes a self-sufficient self-sufficient operation mode in which power management is performed independently of the power supplied from the power system 14 as much as possible, and the control unit 24 performs control according to the operation mode. I do.
  • the control unit 24 is in the power state of the energy management system 11 (for example, grid connection in which power can be supplied from the power system 14 to the energy management system 11 or power failure). Control is performed according to the self-sustaining operation in which the power system 14 can not supply power to the energy management system 11 due to the generation.
  • the power supply path in the self-sufficient self-sufficient operation mode will be described with reference to FIG. In FIG. 2, the control unit 24 is not shown.
  • the electric power generated by the PV 15 is DC / DC converted by the PV DC / DC conversion unit 22. It is supplied to the AC / DC conversion unit 21 and the battery DC / DC conversion unit 23 through the DC bus 25. Then, the power AC / DC converted by the AC / DC converter 21 is supplied to the AC load 17, and the power DC / DC converted by the battery DC / DC converter 23 is charged in the battery 16.
  • control unit 24 controls the AC / DC conversion unit 21 so as to output power following the power consumption of the AC load 17. Further, the control unit 24 controls the PV DC / DC conversion unit 22 so as to output power in accordance with MPPT (Maximum. Power Point Tracker) control for extracting power from the PV 15 at an output voltage which is maximum power. Then, the control unit 24 performs charge control such that the voltage of the DC bus 25 becomes constant (that is, control of charging when the voltage of the DC bus 25 is high and discharging when the voltage of the DC bus 25 is low). Control for the battery DC / DC conversion unit 23 is performed. Therefore, for example, when the power consumption of the AC load 17 is 1 kW while the PV 15 is generating 4 kW, the battery 16 is charged with 3 kW of power.
  • MPPT Maximum. Power Point Tracker
  • the battery DC / DC conversion unit 23 can not charge the battery 16 .
  • the power generated by the PV 15 is DC / DC converted by the PV DC / DC conversion unit 22 and supplied to the AC / DC conversion unit 21 via the DC bus 25. While being AC / DC converted by the AC / DC conversion unit 21 and supplied to the AC load 17, the surplus power is reversely flowed to the power system 14.
  • control unit 24 controls the PV DC / DC conversion unit 22 so as to output power according to the MPPT control. Further, the control unit 24 performs control on the AC / DC conversion unit 21 so as to perform output control such that the voltage of the DC bus 25 becomes constant (that is, control for surplus power to reversely flow to the power system 14). . Further, the battery DC / DC conversion unit 23 is in the stop state. Therefore, for example, when the power consumption of the AC load 17 is 1 kW while the PV 15 is generating 4 kW, the power grid 14 reverses the power of 3 kW.
  • the electric power generated by the PV 15 is DC / DC converted by the PV DC / DC converter 22 and supplied to the AC / DC converter 21 through the DC bus 25 as shown in C of FIG. , AC / DC converted by the AC / DC converter 21 and supplied to the AC load 17.
  • control unit 24 performs the output control such that the voltage of the DC bus 25 becomes constant (that is, the control to use the output of the PV 15 according to the AC load 17).
  • control unit 24 controls the AC / DC conversion unit 21 for PV based on the power state of the energy management system 11, the power generation state of the PV 15, the charge state of the battery 16, the power consumption state of the AC load 17, and the like.
  • Control contents for the DC / DC conversion unit 22 and the battery DC / DC conversion unit 23 are selected.
  • any one of the AC / DC conversion unit 21, the PV DC / DC conversion unit 22, and the battery DC / DC conversion unit 23 serves as a control main body to control the voltage of the DC bus 25 constant (
  • the control content is appropriately set to perform DC bus voltage control.
  • FIG. 3 shows control contents selected by the control unit 24.
  • the control unit 24 performs the first control.
  • the battery DC / DC conversion unit 23 performs DC bus voltage control
  • the AC / DC conversion unit 21 performs output control to output power to the AC load 17 so as not to reversely flow to the power system 14.
  • the battery DC / DC conversion unit 23 is set to perform the MPPT control.
  • the power management state of the energy management system 11 is grid connection
  • the power generation state of the PV 15 is generating power
  • the charge state of the battery 16 is not chargeable
  • the power consumption state of the AC load 17 is PV15.
  • the control unit 24 selects the second control content if the amount of power generation is less than or equal to the amount of generated power.
  • AC / DC converter 21 performs DC bus voltage control
  • battery DC / DC converter 23 performs MPPT control
  • battery DC / DC converter 23 is set to stop. ing.
  • the control unit 24 sets the power state of the energy management system 11, the power generation state of the PV 15, the charge state of the battery 16, and the power consumption state of the AC load 17.
  • the thirteenth control content can be selected from the three control contents.
  • FIG. 4 and 5 show flowcharts for the control unit 24 to execute the process of selecting the control content.
  • FIG. 4 shows a flowchart in the case where the power state of the energy management system 11 is grid connection
  • FIG. 5 shows a flowchart in the case where the power state of the energy management system 11 is in the stand-alone operation. It is shown.
  • step S11 the control unit 24 determines whether the power generation state of the PV 15 is generating power, and the power generation of the PV 15 is performed. If it is determined that the state is generating power, the process proceeds to step S12. Then, in step S12, the control unit 24 determines whether the charge state of the battery 16 is chargeable / dischargeable, chargeable or not dischargeable.
  • step S12 when the control unit 24 determines that the charge state of the battery 16 is chargeable / dischargeable, the process proceeds to step S13.
  • step S13 the control unit 24 performs an AC load so that the battery DC / DC conversion unit 23 performs DC bus voltage control (surplus charging, insufficient discharge) and the AC / DC conversion unit 21 does not reverse flow to the power system 14.
  • the output control for outputting power at 17 (maximum discharge when power is insufficient) is performed, and the PV DC / DC conversion unit 22 selects the first control content for performing the MPPT control, and the process is ended.
  • step S12 determines in step S12 that the charge state of the battery 16 is not chargeable
  • the process proceeds to step S14, and the control unit 24 determines that the power consumption state of the AC load 17 is less than the power generation amount Determine if there is.
  • step S14 when the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount, the process proceeds to step S15.
  • step S15 in the control unit 24, the AC / DC conversion unit 21 performs DC bus voltage control (surplus power flows backward to the power system 14), and the PV DC / DC conversion unit 22 performs MPPT control. The second control content to be stopped by the DC / DC conversion unit 23 is selected, and the process is ended.
  • step S14 when the control unit 24 determines that the power consumption state of the AC load 17 is not equal to or less than the power generation amount (larger than the power generation amount), the process proceeds to step S16.
  • step S16 the control unit 24 controls the AC load 17 so that the battery DC / DC conversion unit 23 performs DC bus voltage control (underdischarge) and the AC / DC conversion unit 21 does not reverse flow to the power system 14.
  • the PV DC / DC conversion unit 22 selects the third control content for performing the MPPT control, and the process is terminated.
  • step S12 when the control unit 24 determines that the charge state of the battery 16 is not dischargeable, the process proceeds to step S17, and the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount. Determine if there is.
  • step S17 when the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount, the process proceeds to step S18.
  • control unit 24 controls DC bus voltage control (surplus charge) for battery DC / DC conversion unit 23, and power is supplied to AC load 17 so that AC / DC conversion unit 21 does not reverse flow to power system 14.
  • the PV DC / DC conversion unit 22 selects the fourth control content for MPPT control, and the process is terminated.
  • step S17 when the control unit 24 determines that the power consumption state of the AC load 17 is not less than or equal to the power generation amount (greater than the power generation amount), the process proceeds to step S19.
  • step S19 in the control unit 24, the AC / DC conversion unit 21 performs DC bus voltage control (insufficient power is replenished from the power system 14), and the PV DC / DC conversion unit 22 performs MPPT control. The fifth control content to be stopped by the / DC conversion unit 23 is selected, and the process is ended.
  • step S11 When the control unit 24 determines that the power generation state of the PV 15 is not generating power in step S11, the process proceeds to step S20. Then, in step S20, the control unit 24 determines whether the charge state of the battery 16 is not chargeable or not dischargeable.
  • step S20 when the control unit 24 determines that the charge state of the battery 16 is not chargeable, the process proceeds to step S21.
  • step S21 the control unit 24 controls the AC load 17 so that the battery DC / DC conversion unit 23 performs DC bus voltage control (load following discharge) and the AC / DC conversion unit 21 does not reverse flow to the power system 14. Output control for outputting power (maximum discharge when power is insufficient) is performed, and the sixth control content for stopping the PV DC / DC conversion unit 22 is selected, and the process is ended.
  • step S20 when control unit 24 determines that the charge state of battery 16 can not be discharged, the process proceeds to step S22, and control unit 24 needs to charge battery 16 or not. Determine if
  • step S22 when the control unit 24 determines that the battery 16 needs to be charged, the process proceeds to step S23.
  • step S23 in the control unit 24, the AC / DC conversion unit 21 performs DC bus voltage control, the PV DC / DC conversion unit 22 stops, and the battery DC / DC conversion unit 23 performs CPCV (constant power-constant Voltage: The seventh control content to be charged according to the Constant Power-Constant Voltage control is selected, and the process is terminated.
  • CPCV constant power-constant Voltage
  • step S22 when the control unit 24 determines that the battery 16 does not need to be charged, the process proceeds to step S24.
  • step S24 the control unit 24 selects to stop the operation of the AC / DC conversion unit 21, the PV DC / DC conversion unit 22, and the battery DC / DC conversion unit 23, and the process is ended.
  • step S31 the control unit 24 determines whether the power generation state of the PV 15 is generating or not. If it is determined that the power generation state is generating power, the process proceeds to step S32. Then, in step S32, the control unit 24 determines whether the charge state of the battery 16 is chargeable / dischargeable, chargeable or not dischargeable.
  • step S32 when the control unit 24 determines that the charge state of the battery 16 is chargeable / dischargeable, the process proceeds to step S33.
  • step S33 the control unit 24 causes the battery DC / DC conversion unit 23 to perform DC bus voltage control (surplus charging and insufficient discharge), and the AC / DC conversion unit 21 keeps the AC voltage of the self-supporting output constant.
  • the output control for outputting power is performed, the PV DC / DC conversion unit 22 selects the eighth control content for performing the MPPT control, and the process is ended.
  • step S32 determines in step S32 that the charge state of the battery 16 is not chargeable
  • the process proceeds to step S34, and the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount. Determine if there is.
  • step S34 determines in step S34 that the power consumption state of the AC load 17 is equal to or less than the power generation amount. If the control unit 24 determines in step S34 that the power consumption state of the AC load 17 is equal to or less than the power generation amount, the process proceeds to step S35.
  • step S35 the control unit 24 outputs power so that the PV DC / DC conversion unit 22 performs DC bus voltage control (output limitation) and the AC / DC conversion unit 21 keeps the AC voltage of the self-supporting output constant.
  • the output control is performed to select the ninth control content to be stopped by the battery DC / DC conversion unit 23, and the process is ended.
  • step S34 determines in step S34 that the power consumption state of the AC load 17 is not equal to or less than the power generation amount (larger than the power generation amount)
  • step S36 the control unit 24 outputs power so that the battery DC / DC conversion unit 23 performs DC bus voltage control (underdischarge) and the AC / DC conversion unit 21 keeps the AC voltage of the self-supporting output constant.
  • the output control is performed, the PV DC / DC conversion unit 22 selects the tenth control content for performing the MPPT control, and the process is ended.
  • step S32 when the control unit 24 determines that the charge state of the battery 16 can not be discharged, the process proceeds to step S37, and the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount. Determine if there is.
  • step S37 when the control unit 24 determines that the power consumption state of the AC load 17 is equal to or less than the power generation amount, the process proceeds to step S38.
  • step S38 the control unit 24 outputs power so that the battery DC / DC conversion unit 23 performs DC bus voltage control (surplus charge) and the AC / DC conversion unit 21 keeps the AC voltage of the self-supporting output constant.
  • the output control is performed, the PV DC / DC conversion unit 22 selects the eleventh control content for performing the MPPT control, and the process is ended.
  • step S37 when the control unit 24 determines that the power consumption state of the AC load 17 is not less than or equal to the power generation amount (greater than the power generation amount), the process proceeds to step S39.
  • step S39 the control unit 24 determines, for example, control for the AC / DC conversion unit 21, the PV DC / DC conversion unit 22, and the battery DC / DC conversion unit 23 according to a higher-order instruction. The content is selected and the process is terminated.
  • step S31 when the control unit 24 determines that the power generation state of the PV 15 is not generating power, the process proceeds to step S40. Then, in step S40, the control unit 24 determines whether the charge state of the battery 16 is not chargeable or not dischargeable.
  • step S40 when the control unit 24 determines that the charge state of the battery 16 is not chargeable, the process proceeds to step S41.
  • step S41 the control unit 24 performs power control so that the battery DC / DC conversion unit 23 performs DC bus voltage control (load following discharge) and the AC / DC conversion unit 21 keeps the AC voltage of the self-supporting output constant.
  • the thirteenth control content for performing output control to be output is selected, and the process is ended.
  • step S40 determines in step S40 that the charge state of battery 16 is not dischargeable
  • the process proceeds to step S42.
  • step S42 the control unit 24 selects to stop the operation of the AC / DC conversion unit 21, the PV DC / DC conversion unit 22, and the battery DC / DC conversion unit 23, and the process is ended.
  • control unit 24 performs DC bus voltage control by selecting the control contents by performing the classification according to the conditions as illustrated in FIGS. 4 and 5. A controlling entity has been decided.
  • the present disclosure has been made in view of such a situation, and enables control of a DC bus to be further simplified.
  • a power control apparatus includes a DC bus serving as a path for supplying DC power, an output of DC power to the DC bus connected to the DC bus, and DC power from the DC bus.
  • the plurality of power supply devices that perform at least one of the inputs, and the plurality of power supply devices are controlled based on the priority order of the power supply devices serving as control entities that control the voltage of the DC bus to be constant.
  • the power supply device to be the control subject is determined.
  • a power control method or program includes a direct current bus serving as a path for supplying direct current power, an output of direct current power connected to the direct current bus, and a direct current from the direct current bus.
  • a power control method of a power control device comprising a plurality of power supply devices for performing at least one of power input, or a program to be executed by a computer for controlling the power control device, the program being executed for each of the plurality of power devices.
  • the method further includes the step of determining the power supply device serving as the control subject based on the priority of the power supply device serving as a control subject that controls the voltage of the DC bus to be constant.
  • the power supply device serving as the control subject is determined based on the priority order of the power supply devices serving as the control subject that controls the voltage of the DC bus to be constant for each of the plurality of power supply devices. .
  • control of the DC bus can be further simplified.
  • FIG. 1 is a block diagram showing a configuration example of an embodiment of an energy management system to which the present technology is applied. It is a figure which shows the example of a simple structure of an energy management system. It is a figure explaining the relationship between a priority and a control subject.
  • FIG. 6 is a block diagram showing a configuration example of an embodiment of an energy management system to which the present technology is applied.
  • a power control device 32 is connected to a power system 34 via an ammeter 33, a PV 35, a battery 36, an EV (Electric Vehicle) 37, an AC load 38, and a DC load 39-. 1 and 39-2 are connected to the power control unit 32 and configured.
  • the power control device 32 is configured to connect the power supplied from the plurality of power sources (the power system 34, the PV 35, the battery 36, or the EV 37) connected to the power control device 32 to the power control device 32 Control is performed to supply the AC load 38 and DC loads 39-1 and 39-2.
  • the plurality of power sources the power system 34, the PV 35, the battery 36, or the EV 37
  • the ammeter 33 measures the power supplied from the power system 34 to the power control device 32 and the power supplied from the power control device 32 to the power system 34 (reverse power flow).
  • the power system 34 supplies AC power to the energy management system 31.
  • the PV 35 is connected to a plurality of solar cell modules and configured in a panel shape, generates electric power according to the amount of sunlight received, and supplies the generated electric power to the power control device 32.
  • the battery 36 stores electric power supplied from the power control device 32, and supplies the stored electric power to the power control device 32.
  • the EV 37 is appropriately connected to the power control device 32 in response to the user using the EV 37, and incorporates a battery that stores the power supplied from the power control device 32.
  • the AC load 38 is a device that consumes and drives AC power
  • the DC loads 39-1 and 39-2 are devices that consume and drive DC power.
  • two DC loads 39-1 and 39-2 are connected to the power control apparatus 32, but the number can be increased or decreased.
  • the power control device 32 includes an AC / DC converter 41, a PV DC / DC converter 42, a battery DC / DC converter 43, an EV DC / DC converter 44, and a load DC / DC converter 45-1. And 45-2, a distribution board 46, and a system control unit 47. Further, breakers 51-1 to 51-6, ammeters 52-1 to 52-4, and a DC bus 53 are accommodated in the distribution board 46.
  • the terminal on the AC side of the AC / DC conversion unit 41 is connected to the power line 40 connecting the power system 34 and the AC load 38, and the terminal on the DC side of the AC / DC conversion unit 41 is It is connected to a DC bus 53 serving as a path for supplying DC power through the breaker 51-1.
  • the PV DC / DC conversion unit 42 to which the PV 35 is connected is connected to the DC bus 53 via the breaker 51-2.
  • the battery DC / DC converter 43 to which the battery 36 is connected is connected to the DC bus 53 via the breaker 51-3
  • the EV DC / DC converter 44 to which the EV 37 is connected is the breaker 51-4. And is connected to the DC bus 53 via an ammeter 52-1.
  • the DC / DC conversion unit for load 45-1 to which the DC load 39-1 is connected is connected to the DC bus 53 via the breaker 51-5 and the ammeter 52-2, and the DC load 39-2 is connected.
  • the load DC / DC conversion unit 45-2 is connected to the DC bus 53 via the breaker 51-6 and the ammeter 52-3.
  • the AC load 38 is connected to the AC / DC conversion unit 41 via the breaker 51-7 and the ammeter 52-4.
  • the AC / DC conversion unit 41 outputs DC power obtained by AC / DC converting AC power supplied from the power system 34 to the DC bus 53. Further, the AC / DC conversion unit 41 performs DC / AC conversion of DC power supplied via the DC bus 53 and supplies it to the AC load 38 via the power line 40 or reversely flows to the power system 34. Do.
  • the PV DC / DC conversion unit 42 performs DC / DC conversion (boosting / boosting) so that the electric power generated by the PV 35 has a predetermined voltage, and outputs the electric power to the DC bus 53.
  • the PV DC / DC conversion unit 42 can perform MPPT control that tracks the maximum output point so as to extract the maximum power from the PV 35.
  • the battery DC / DC conversion unit 43 performs DC / DC conversion (boosting) on the power stored in the battery 36 and outputs the power to the DC bus 53 or DC / DC power supplied via the DC bus 53. DC conversion is performed to charge the battery 36 or the like.
  • the EV DC / DC conversion unit 44 DC / DC converts the power stored in the EV 37 and outputs it to the DC bus 53, or via the DC bus 53.
  • DC / DC converts the supplied power to charge the EV 37 or the like.
  • the DC / DC converting units 45-1 and 45-2 for load convert the power supplied via the DC bus 53 into voltages necessary for driving the DC loads 39-1 and 39-2 connected thereto. DC / DC conversion and supply to DC loads 39-1 and 39-2, respectively.
  • the system control unit 47 configures the power control device 32 based on, for example, the current measured by the ammeter 33 and the ammeters 52-1 to 52-4, the power generation state of the PV 35, the charge state of the battery 36, and the like. Control each block. Thus, the system control unit 47 controls the entire energy management system 31. Note that, in FIG. 6, illustration of wiring connecting the system control unit 47 and each block is omitted.
  • the priorities of the devices that are the control subjects that perform DC bus voltage control are set in advance so that the voltage of the DC bus 53 becomes constant. Then, in the energy management system 31, processing for determining a control subject that performs DC bus voltage control is performed individually for each device that can be a control subject.
  • the priority of the battery DC / DC conversion unit 43 is the highest.
  • the AC / DC conversion unit 41 has a second priority
  • the PV DC / DC conversion unit 42 has a third priority
  • the priority of the device that is the control subject that performs DC bus voltage control is set.
  • the priority order can be switched, for example, in accordance with an instruction from a higher-level device (not shown) besides being preset in the system control unit 47, for example.
  • the battery DC / DC conversion unit 43 with the highest priority performs DC bus voltage control. Then, when the battery DC / DC conversion unit 43 can not perform DC bus voltage control according to the state of the battery 36 or the upper instruction, as shown in A of FIG. 8, control to perform DC bus voltage control. The subject moves to the AC / DC conversion unit 41 having the second priority.
  • the control subject performing DC bus voltage control is the DC for PV having the third priority. It will move to the / DC conversion unit 42. If another device that can be a control subject that performs DC bus voltage control is connected, and the priority of the device is lower than the PV DC / DC conversion unit 42, the PV DC / DC conversion unit 42 is However, when the DC bus voltage control can not be performed, the control subject performing the DC bus voltage control shifts to the lower device.
  • the device that can be the control entity determines not to be the control entity when the device higher in priority than the device itself can perform DC bus voltage control.
  • a device higher in priority than the device itself can not perform DC bus voltage control, and the device itself can perform DC bus voltage control. Decide to become the control entity.
  • the priority of the control entity that performs DC bus voltage control is set, for example, such that the device that wants to use power as effectively as possible is lower in priority.
  • the power generated by the PV 35 is used to the maximum, and the AC / DC conversion unit 41 matches the power consumption of the AC load 38, the power generation state of the PV 35, the charge state of the battery 36, etc. It is desirable to use the battery 36 in a buffer role such as charging the surplus power and discharging the battery 36 when the power is insufficient. Therefore, the PV DC / DC conversion unit 42, the AC / DC conversion unit 41, and the battery DC / DC conversion unit 43 are in the order of effective utilization. From this, it is preferable that the priority of the control subject performing DC bus voltage control be the order of the battery DC / DC conversion unit 43, the AC / DC conversion unit 41, and the PV DC / DC conversion unit 42. .
  • the process for determining the control subject performing DC bus voltage control is not performed by the system control unit 47, but the AC / DC conversion unit 41, the PV DC / DC conversion unit 42, And the battery DC / DC converter 43 individually.
  • the priority of the device that is the control subject that performs DC bus voltage control is the highest priority of the battery DC / DC conversion unit 43, and the priority of the AC / DC conversion unit 41 is two. It is assumed that the priority of the PV DC / DC conversion unit 42 is set to the third.
  • FIG. 9 shows a flowchart of processing for determining a control subject that performs DC bus voltage control, which is executed by the battery DC / DC conversion unit 43.
  • step S51 the battery DC / DC conversion unit 43 determines whether the power state of the energy management system 11 is grid connection or stand-alone operation.
  • step S51 the battery DC / DC conversion unit 43 determines in step S51 that the power state of the energy management system 11 is grid connection. Then, in step S52, the battery DC / DC conversion unit 43 acquires the priority information in which the priority order of the device that is the control subject performing DC bus voltage control is set. For example, the priority information is stored in the memory of the system control unit 47, and the battery DC / DC conversion unit 43 communicates with the system control unit 47 to acquire the priority information from the memory.
  • step S53 the battery DC / DC conversion unit 43 performs control subject determination processing to determine whether the battery DC / DC conversion unit 43 itself becomes a control subject that performs DC bus voltage control.
  • the control subject determination process will be described later with reference to FIG.
  • step S54 the battery DC / DC conversion unit 43 determines whether or not to perform DC bus voltage control based on the process result of the control subject determination process of step S53.
  • step S54 If the battery DC / DC conversion unit 43 determines in step S54 that the battery DC / DC conversion unit 43 itself performs DC bus voltage control, the process proceeds to step S55.
  • step S55 the battery DC / DC conversion unit 43 starts DC bus voltage control to perform control such that the voltage of the DC bus 53 becomes constant, and the process of determining the control subject is ended.
  • step S54 when the battery DC / DC conversion unit 43 determines in step S54 that the battery DC / DC conversion unit 43 itself does not perform DC bus voltage control, the process proceeds to step S56.
  • step S56 the battery DC / DC conversion unit 43 selects the stop of the operation or the start of charging of the battery 36 according to the CPCV control according to the upper instruction, and the process of determining the control subject is ended. .
  • step S51 when the battery DC / DC conversion unit 43 determines that the power state of the energy management system 11 is in the stand-alone operation mode, the process proceeds to step S57. Then, in step S57, the battery DC / DC conversion unit 43 acquires priority information as in step S52.
  • step S58 the control subject determination process is performed as in step S53, and in step S59, the battery DC / DC conversion unit 43 itself is the DC bus voltage based on the process result of the control subject determination process in step S58. It is determined whether to perform control.
  • step S59 If the battery DC / DC conversion unit 43 determines in step S59 that the battery DC / DC conversion unit 43 itself performs DC bus voltage control, the process proceeds to step S60.
  • step S60 the battery DC / DC conversion unit 43 starts DC bus voltage control, performs control so that the voltage of the DC bus 53 becomes constant, and the process of determining the control subject is ended.
  • step S59 when the battery DC / DC conversion unit 43 determines in step S59 that the battery DC / DC conversion unit 43 itself does not perform DC bus voltage control, the process proceeds to step S61, and the battery DC / DC conversion unit 43 stops operation. The process of determining the control entity is ended.
  • FIG. 10 is a flow chart for explaining control subject determination processing performed in steps S53 and S58 of FIG.
  • step S71 the battery DC / DC conversion unit 43 determines whether the battery DC / DC conversion unit 43 itself has the highest priority based on the priority information acquired in step S52 or S57 of FIG. Determine if
  • step S71 when the battery DC / DC conversion unit 43 determines that the battery DC / DC conversion unit 43 itself has the highest priority, the process proceeds to step S72, and the battery DC / DC conversion unit It is determined whether 43 itself can perform DC bus voltage control. For example, the battery DC / DC conversion unit 43 determines whether or not DC bus voltage control can be performed based on the charging state of the battery 36, an instruction from the upper level, or the like.
  • DC bus voltage control can not be performed.
  • the battery DC / DC conversion unit 43 has to control the voltage of the DC bus 53 originally to 370 V, for example, whereas the voltage of the DC bus 53 rises to 380 V Conversely, if the voltage is lowered to 360 V, it is determined that the DC bus voltage control can not be performed because the voltage of the DC bus 53 is in an uncontrollable state.
  • step S72 if the battery DC / DC conversion unit 43 determines that the DC bus voltage control can be performed, the process proceeds to step S73, and the battery DC / DC conversion unit 43 determines in the control subject determination process. As a determination result, it is determined that DC bus voltage control is to be performed. Then, in step S74, the battery DC / DC conversion unit 43 sets control availability information indicating that DC bus voltage control can be performed to a lower priority device (in this case, the AC / DC conversion unit 41 and PV). Supply to the DC / DC conversion unit 42), and the control subject determination process is terminated.
  • a lower priority device in this case, the AC / DC conversion unit 41 and PV.
  • step S72 determines in step S72 that DC bus voltage control is not to be performed
  • the process proceeds to step S75, and the battery DC / DC conversion unit 43 determines the control subject As a result of determination in processing, it is determined that DC bus voltage control is not performed.
  • step S76 the battery DC / DC conversion unit 43 supplies control availability information indicating that DC bus voltage control can not be performed to the lower priority device, and the control subject determination process is ended. Ru.
  • step S77 the battery DC / DC conversion unit 43 acquires controllability information of a device having a higher priority than the battery DC / DC conversion unit 43. For example, also in the AC / DC conversion unit 41 and the PV DC / DC conversion unit 42, processing similar to that of the battery DC / DC conversion unit 43 is performed. When the AC / DC conversion unit 41 or the PV DC / DC conversion unit 42 has a higher priority than the battery DC / DC conversion unit 43, the process of step S74 or S76 described above is performed in those devices. The control availability information is transmitted by performing. In response to this, the battery DC / DC conversion unit 43 acquires the control availability information in step S77.
  • step S78 the battery DC / DC conversion unit 43 determines whether or not the device with a higher priority can perform DC bus voltage control, according to the control availability information acquired in step S77. If it is determined in step S78 that the device with higher priority can not perform DC bus voltage control, the process proceeds to step S72, and it is determined that the device with higher priority can perform DC bus voltage control. If it is determined, the process proceeds to step S75. Then, the processing described above is performed.
  • FIG. 11 shows a flowchart of processing for determining a control subject that performs DC bus voltage control that is executed by the AC / DC conversion unit 41.
  • step S81 the AC / DC conversion unit 41 determines whether the power state of the energy management system 11 is grid connection or stand-alone operation. When it is determined that the power state of the energy management system 11 is grid connection, the AC / DC conversion unit 41 acquires priority information in step S82, and then determines the control subject in step S83 (see FIG. Do 10).
  • step S84 the AC / DC conversion unit 41 determines whether or not it performs DC bus voltage control, and when it is determined that itself performs DC bus voltage control, the DC bus voltage is determined in step S85. The process is ended by starting control. On the other hand, when it is determined in step S84 that the control unit does not perform DC bus voltage control, the process proceeds to step S86, and the AC / DC conversion unit 41 outputs power following the power consumption of the AC load 38. Processing is terminated.
  • step S81 when it is determined in step S81 that the power state of the energy management system 11 is in the stand-alone operation, the process proceeds to step S87. Then, the AC / DC conversion unit 41 performs the same processing as steps S82 to S86 in steps S87 to S91.
  • FIG. 12 shows a flowchart of processing for determining a control subject that performs DC bus voltage control, which is executed by the PV DC / DC conversion unit 42.
  • step S101 the PV DC / DC conversion unit 42 determines whether the power state of the energy management system 11 is grid connection or stand-alone operation. When it is determined that the power state of the energy management system 11 is grid connection, the PV DC / DC conversion unit 42 acquires priority information in step S102, and then performs control subject determination processing in step S103. Perform ( Figure 10).
  • step S104 the PV DC / DC conversion unit 42 determines whether or not it performs DC bus voltage control, and when it determines that it performs DC bus voltage control, the DC in step S105. The process is ended by starting the bus voltage control. On the other hand, when it is determined in step S104 that the DC bus voltage control is not performed by itself, the process proceeds to step S106, the PV DC / DC conversion unit 42 starts the MPPT control, and the process is ended. Ru. When the PV 35 is not generating power, the PV DC / DC conversion unit 42 stops its operation in step S106.
  • step S101 when it is determined in step S101 that the power state of the energy management system 11 is in the stand-alone operation mode, the process proceeds to step S107. Then, the PV DC / DC conversion unit 42 performs the same processing as steps S102 to S106 in steps S107 to S111.
  • the AC / DC converter 41, the PV DC / DC converter 42, and the battery DC / DC converter 43 individually control DC bus voltage, and It can be determined whether or not
  • the control program can be constructed more easily than the process in which the system control unit 47 determines a device to be a control subject that performs DC bus voltage control.
  • the conventional control method divides the case based on each situation as described above to determine the operation of the device (the control subject that performs DC bus voltage control)
  • the priority order The control entity can be determined based on As a result, the operation of the other device that did not become the control subject naturally becomes limited in options, and there is no need to perform complicated case division, and the processing can be simplified.
  • the change can be easily coped with by executing the process of determining the control subject performing DC bus voltage control in each device. .
  • FIG. 13 shows a configuration example in which the EV 37 and the DC load 39 are connected to the energy management system 31 shown in FIG. 7.
  • an AC / DC conversion unit 41 a PV DC / DC conversion unit 42, a battery DC / DC conversion unit 43, and an EV DC / DC conversion unit 44 , And a load DC / DC converter 45 are connected.
  • the priority of the control entity that performs the DC bus voltage control is set so that the device that wants to use the power as much as possible and effectively is lower in priority.
  • the power generated by the PV 35 is utilized to the maximum, the DC load 39 is preferentially supplied with power, and the AC load 38 is preferentially supplied with power next to the DC load 39.
  • the surplus power charges the battery 36, and when the battery 36 is fully charged, the EV 37 is charged.
  • the power generated by the PV 35 can not cover the load, the power of the battery 36 is supplied, and when the battery 36 is insufficient, the electric power is supplied from the EV 37.
  • the PV DC / DC conversion unit 42 When it is desired to use electric power in this way, the PV DC / DC conversion unit 42, the load DC / DC conversion unit 45, the AC / DC conversion unit 41, the battery DC / DC conversion unit 43 And the order of the DC / DC conversion unit 44 for EV. From this, the priority of the control subject that performs DC bus voltage control is the DC / DC converter for EV 44, the DC / DC converter for battery 43, the AC / DC converter 41, the DC / DC converter for load 45, It is preferable that the order is the order of the DC / DC conversion unit 42 for PV and for PV.
  • the priority information set in such an order is stored in the memory of the system control unit 47. Then, when the process for determining the control subject performing DC bus voltage control is started, the AC / DC conversion unit 41, the PV DC / DC conversion unit 42, the battery DC / DC conversion unit 43, and the EV DC
  • the / DC converter 44 and the load DC / DC converter 45 obtain priority information from the system controller 47, and execute the processing as described with reference to the flowcharts of FIGS. 9 to 12 individually. Do.
  • the load DC / DC conversion unit 45 When it is determined that the DC / DC conversion unit 45 for load does not perform DC bus voltage control, the load DC / DC conversion unit 45 outputs power following the power consumption of the DC load 39 as in the AC / DC conversion unit 41. Take control. Further, when the DC / DC converter for EV 44 determines that the DC bus voltage control is not performed by itself, the operation is stopped or charging / discharging is performed according to the instruction of the higher rank, similarly to the AC / DC converter 41. Do.
  • the number of devices connected to the DC bus 53 increases by executing processing for determining a control subject that performs DC bus voltage control in each device. Can be easily coped with.
  • the AC / DC converter 41, the PV DC / DC converter 42, and the battery DC / DC converter 43 perform communication to perform DC bus voltage control.
  • Controllability information indicating that it can be performed is transmitted from the device with higher priority to the device below.
  • can devices be connected by electrical contacts and DC bus voltage control can be performed from a device with a higher priority to a device with a lower priority depending on the level of the voltage input to the contacts? Whether or not it may be notified.
  • FIG. 14 shows a configuration example of a contact for notifying whether or not DC bus voltage control can be performed.
  • the configuration of the AC / DC conversion unit 41 is described as an example, but the same configuration is also applied to other devices.
  • the AC / DC conversion unit 41 includes a control circuit 61, an input terminal 62, a rectifying element 63, a rectifying element 64, and an output terminal 65.
  • Each contact of the input terminal unit 62 is connected to the output terminal unit 65 of a device (for example, battery DC / DC conversion unit 43) higher in priority than the AC / DC conversion unit 41, and each contact is It is connected to the control circuit 61 via the corresponding rectifying element 63.
  • the control circuit 61 is connected to the output terminal unit 65 via the rectifying element 64, and each contact of the output terminal unit 65 is a device (for example, for PV) lower in priority than the AC / DC conversion unit 41. It is connected to the input terminal 62 of the DC / DC converter 42).
  • the control circuit 61 sets the potential of the signal output from the output terminal unit 65 to a low level (for example, 0 V) to control the DC bus voltage. If it can be performed, the potential of the signal output from the output terminal unit 65 is set to a high level (for example, 5 V).
  • a high level signal is input to the input terminal unit 62 of the AC / DC conversion unit 41. If any one of the signals input to the input terminal unit 62 is at high level, the control circuit 61 of the AC / DC conversion unit 41 determines that the AC / DC conversion unit 41 does not perform DC bus voltage control. .
  • a current smaller than a load about half of the no-load or ripple current is output by outputting a current smaller than the current continuous mode in which power is supplied to the load.
  • the current discontinuous mode which is Since the control method of the output voltage is different for each of these two modes, the DC / DC converter needs a predetermined switching time to switch the mode, so that it takes time to stabilize the control. Become.
  • the transition from the stopped state to the operating state in which the DC / DC conversion unit feeds the load starts from the stopped state to the current discontinuous mode, and then to the current continuous mode.
  • the DC / DC conversion unit needs to have a soft start function that requires a predetermined time before starting from the stopped state and supplying the load with the normal operation state.
  • the DC / DC conversion unit when the DC / DC conversion unit has the soft start function, the voltage of the DC bus becomes unstable depending on the state of each device connected to the DC bus. Also, it takes a predetermined time for the DC load to obtain the desired power. That is, in a state where power is not supplied to the DC bus, if the DC load starts to draw current from the DC bus, the DC / DC conversion unit raises the current from 0 A because it has a soft start function. It will take time to Nevertheless, if the DC load forcibly sinks power, the DC / DC conversion unit can not supply power, and the voltage of the DC bus will drop.
  • the system control unit 47 maintains a state in which at least one device among the plurality of devices connected to the DC bus 53 constantly supplies power to the DC bus 53. Take control.
  • control by the system control unit 47 is performed so that the state in which power is always supplied to the DC bus 53 is maintained. That is, at least one of the AC / DC converter 41, the PV DC / DC converter 42, the battery DC / DC converter 43, and the EV DC / DC 44 connected to the DC bus 53 is a DC bus. Power is constantly supplied to the power supply 53, and at least one of the battery 36, the EV 37, the DC loads 39-1 and 39-2, and the AC / DC conversion unit 41 supplies power via the DC bus 53. Is maintained.
  • At least one of the AC / DC converter 41, the PV DC / DC converter 42, the battery DC / DC converter 43, and the EV DC / DC 44 connected to the DC bus 53 is a current It will operate in continuous mode. Therefore, for example, at least one of the AC / DC conversion unit 41, the PV DC / DC conversion unit 42, the battery DC / DC conversion unit 43, and the EV DC / DC 44 outputs a current as little as possible. It is in a state of As a result, for example, the DC load 39-1 or 39-2 can be easily activated to cope with a rapid load fluctuation when trying to sink current from the DC bus, and the voltage of the DC bus 53 becomes unstable. It can be avoided.
  • Priority is set. For example, power supply to a DC load 39 (for example, a router or a telephone) that always requires power is given top priority, charging to the battery 36 or EV 37 is given next priority, and power to the power system 34 is given. The reverse flow is made the next priority. Then, power is supplied via the DC bus 53 in the order of high priority.
  • a DC load 39 for example, a router or a telephone
  • the system control unit 47 determines the presence or absence of power supply to the DC load 39-1 based on the output of the ammeter 52-2, and based on the output of the ammeter 52-3 to the DC load 39-2. Determine the presence or absence of power supply.
  • the system control unit 47 directly communicates with the AC / DC conversion unit 41, the PV DC / DC conversion unit 42, the battery DC / DC conversion unit 43, and the EV DC / DC 44 to thereby It is determined whether power is supplied to the grid 34, the PV 35, the battery 36, and the EV 37.
  • step S121 the system control unit 47 determines whether there is a device that supplies power to the DC bus 53.
  • the system control unit 47 communicates with the AC / DC conversion unit 41, the PV DC / DC 42, the battery DC / DC conversion unit 43, and the EV DC / DC 44 to ensure that power supply is not performed. If confirmed, it is determined that there is no device supplying power to the DC bus 53.
  • the system control unit 47 performs the AC / DC conversion unit 41, the PV DC / DC 42, the battery DC / DC conversion unit 43, and the like.
  • communication with the EV DC / DC 44 is performed to confirm that at least one of the DC bus 53 is supplying power to the DC bus 53, it is determined that there is a device that supplies power to the DC bus 53.
  • step S121 If the system control unit 47 determines in step S121 that there is no device supplying power to the DC bus 53, the process proceeds to step S122.
  • step S122 the system control unit 47 performs AC / DC conversion of the power supplied from the power system 34 to the AC / DC conversion unit 41 and outputs it to the DC bus 53, that is, the AC / DC conversion unit Control 41 to operate in the purchase direction.
  • step S122 After the process of step S122, or when it is determined in step S121 that there is a device supplying power to the DC bus 53, the process proceeds to step S123.
  • step S123 the system control unit 47 determines whether power is supplied from the DC bus 53 to the DC load 39-1 or 39-2. For example, when neither of the ammeters 52-2 and 52-3 detects a current, the system control unit 47 does not supply power from the DC bus 53 to the DC load 39-1 or 39-2. judge. On the other hand, when either of the ammeters 52-2 and 52-3 detects a current, the system control unit 47 supplies power from the DC bus 53 to the DC load 39-1 or 39-2. It is determined that
  • step S123 If the system control unit 47 determines in step S123 that power is not supplied from the DC bus 53 to the DC load 39-1 or 39-2, the process proceeds to step S124. That is, in this case, the DC loads 39-1 and 39-2 do not request power supply.
  • step S124 system control unit 47 communicates with battery DC / DC conversion unit 43 and EV DC / DC 44, and the remaining amount of SOC of at least one of battery 36 and EV 37 (the battery thereof) can be charged. Determine if there is. If it is determined in step S124 that at least one SOC of battery 36 and EV 37 is the chargeable remaining amount, the process proceeds to step S125, and system control unit 47 instructs battery DC / DC conversion unit 43. Control is performed to charge the battery 36 or to charge the EV DC / DC 44 to the EV 37.
  • step S124 when it is determined in step S124 that the SOC of the battery 36 is not the chargeable remaining amount and the SOC of the EV 37 is not the chargeable remaining amount, the process proceeds to step S126. That is, in this case, the SOCs of the battery 36 and the EV 37 are dischargeable remaining amounts.
  • step S126 the system control unit 47 DC / AC converts the power supplied via the DC bus 53 to the AC / DC conversion unit 41 and reversely flows the power system 34, ie, AC. It controls so that / DC conversion part 41 operates in the direction of power sale. Then, in step S127, system control unit 47 controls battery DC / DC conversion unit 43 to be discharged from battery 36 or EV DC / DC 44 to be discharged from EV 37. .
  • step S123 If it is determined in step S123 that power is supplied from DC bus 53 to DC load 39-1 or 39-2, processing proceeds to step S128 after processing in step S125 or after processing in step S127. .
  • the energy management system 31 can maintain the state where power is constantly supplied to the DC bus 53, and can prevent the voltage of the DC bus 53 from becoming unstable. And, the DC load 39 can obtain the desired power quickly.
  • FIG. 17 is a block diagram showing a first modified example of the energy management system.
  • the blocks common to the energy management system 31 in FIG. 15 are assigned the same reference numerals and detailed explanations thereof will be omitted.
  • the power control unit 32A corresponds to the two battery DC / DC conversion units. It has 43-1 and 43-2. Furthermore, the power control device 32A includes a DC / DC conversion unit 71 and an AC / DC conversion unit 72. Then, one terminal of the DC / DC conversion unit 71 is connected to the DC bus 53, and the other terminal of the DC / DC conversion unit 71 and the terminal on the DC side of the AC / DC conversion unit 72 both are system control units. Connected to 47. The terminal on the AC side of the AC / DC conversion unit 72 is connected to the power line 40 connecting the AC / DC conversion unit 41 and the power system 34.
  • any one or more of the batteries 36-1 and 36-2, the EV 37, the DC load 39, and the AC / DC conversion unit 41 must always supply power via the DC bus 53. And any one or more of the batteries 36-1 and 36-2, the PV 35, the EV 37, and the AC / DC converter 41 always output power to the DC bus 53. The state is continued.
  • the PV 35 to the DC / DC conversion unit for PV 42 The power output to the DC bus 53 is supplied to the DC load 39 via
  • power is supplied to each other between batteries 36-1 and 36-2 and EV 37.
  • the energy management system 31A by having the two batteries 36-1 and 36-2, charge and discharge can be performed between the batteries 36-1 and 36-2, and power is supplied to the DC bus 53.
  • the maintenance of the constantly supplied state can be realized.
  • the power charged / discharged between batteries 36-1 and 36-2 is minimized, and battery 36-1 is used when there is no other device requiring power.
  • the batteries 36-1 and 36-2 are controlled so as not to be fully charged at the same time. When one of the batteries is fully charged, discharge is performed from one of them and the other is charged.
  • the voltage of the DC bus 53 can be stabilized by maintaining the state where power is always supplied to the DC bus 53. Then, by setting the state where even a small amount of current is output to the DC bus 53 from the battery DC / DC conversion unit 43-1 or 43-2, a sudden such as when the DC load 39 starts to request power It can respond to fluctuations in power.
  • the system control unit 47 can obtain power from both the DC bus 53 and the power line 40 by providing the DC / DC conversion unit 71 and the AC / DC conversion unit 72.
  • the voltage that the AC / DC conversion unit 72 outputs to the system control unit 47 is slightly higher (for example, 0. several V) than the voltage that the DC / DC conversion unit 71 outputs to the system control unit 47 side. Make it As a result, during normal times, power is supplied from the power system 34 to the system control unit 47, and when there is a power failure, power is supplied from the DC bus 53 to the system control unit 47.
  • the battery DC / DC conversion unit 43-1 or 43-2 is activated to start the DC bus 53 when a power failure occurs.
  • the power is supplied to the system control unit 47.
  • the power supply to the system control unit 47 is quickly performed. be able to.
  • the DC load 39 for example, a device requiring a 24-hour power supply such as a router, a telephone, an emergency lighting, a power supply for fire alarm etc. is there.
  • a device requiring a 24-hour power supply such as a router, a telephone, an emergency lighting, a power supply for fire alarm etc.
  • power is supplied to DC bus 53 by mutually supplying power between batteries 36-1 and 36-2 and EV 37. Can be maintained at all times.
  • the energy management system 31A can prevent the voltage of the DC bus 53 from becoming unstable by maintaining the state where power is always supplied to the DC bus 53. And, the DC load 39 can obtain the desired power quickly.
  • FIG. 18 is a block diagram showing a second modification of the energy management system.
  • the blocks common to the energy management system 31A in FIG. 17 are assigned the same reference numerals and detailed explanations thereof will be omitted.
  • the energy management system 31B is different from the battery 36-2 and the battery DC / DC conversion unit 43-2 in FIG. 17 in that the dedicated DC load 81 and the DC / DC conversion unit 73 are provided. And are configured differently.
  • any one or more of the battery 36-1, the dedicated DC load 81, the EV 37, the DC load 39, and the AC / DC conversion unit 41 always via the DC bus 53. Power is supplied, and at least one of battery 36-1, PV 35, EV 37, and AC / DC conversion unit 41 always outputs power to DC bus 53. Be done.
  • the energy management system 31B for example, when the PV 35, the EV 37, the AC load 38, and the DC load 39 do not receive or transmit power, charging is performed from the AC / DC conversion unit 41 to the battery 36 if the battery 36 is not fully charged. It will be. Further, in this case, if the battery 36 is fully charged, power is supplied from the battery 36 to the dedicated DC load 81.
  • the energy management system 31B can maintain the state where power is constantly supplied to the DC bus 53, and can prevent the voltage of the DC bus 53 from becoming unstable. . And, the DC load 39 can obtain the desired power quickly.
  • the above-described series of processes may be performed by hardware or software.
  • the various functions are executed by installing a computer in which a program constituting the software is incorporated in dedicated hardware or various programs. Can be installed from a program storage medium, for example, on a general-purpose computer.
  • a program stored in a ROM Read Only Memory
  • a program stored in a storage unit such as a hard disk or a non-volatile memory, etc. is loaded into a RAM (Random Access Memory), Processing Unit).
  • RAM Random Access Memory
  • those programs are stored in advance in the storage unit, and via a communication unit including a network interface or the like, or a magnetic disk (including a flexible disk), an optical disk (CD-ROM (Compact Disc-Read Only) It can be installed in a computer via a drive for driving removable media such as Memory), DVD (Digital Versatile Disc), magneto-optical disc, or semiconductor memory.
  • a communication unit including a network interface or the like, or a magnetic disk (including a flexible disk), an optical disk (CD-ROM (Compact Disc-Read Only) It can be installed in a computer via a drive for driving removable media such as Memory), DVD (Digital Versatile Disc), magneto-optical disc, or semiconductor memory.
  • the program executed by the computer may be a program that performs processing in chronological order according to the order described in this specification, in parallel, or when necessary, such as when a call is made. It may be a program to be processed.
  • the program may be processed by one CPU or may be distributed and processed by a plurality of CPUs.
  • the system represents the entire apparatus configured by a plurality of apparatuses.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Secondary Cells (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 本開示は、直流バスに対する制御をより簡易化することができるようにする電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステムに関する。 電力制御装置は、直流電力を供給する経路となる直流バスと、直流バスに接続され、直流バスに直流電力を入力、出力、または入出力する複数の電源機器とを備える。そして、複数の電源機器ごとに、直流バスの電圧が一定になるように制御する制御主体となる電源機器の優先順位に基づいて、各自が制御主体となるか否かの判断が行われ、制御主体となる電源機器が決定される。本技術は、例えば、直流バスに複数の電源機器が接続された電力制御装置に適用できる。

Description

電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム
 本開示は、電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステムに関し、特に、直流バスに対する制御をより簡易化することができるようにした電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステムに関する。
 従来、商用電力を供給する電力系統からの電力だけでなく、太陽光発電により発電された電力やバッテリに蓄積されている電力など、複数の電力源から供給される電力を効率良く使用するために、最適な電力管理を行うエネルギーマネジメントシステムの開発が行われている。
 例えば、特許文献1には、停電発生時にも、電力を安定して使用することができるシステムが開示されている。
 また今後、エネルギーマネジメントシステムにおいて、変換効率の高効率化や、システムの小型化、低コスト化などが推進されることを考慮すると、将来的には、バッテリやPV(Photovoltaics)などの複数の機器が、直流電力を供給する経路となるDC(Direct Current)バスに接続された構成になることが想定される。
 図1には、エネルギーマネジメントシステムの一構成例が示されている。
 図1に示すように、エネルギーマネジメントシステム11は、電力制御装置12が電流計13を介して電力系統14に接続され、電力制御装置12に、PV15、バッテリ16、およびAC(Alternating Current)負荷17が接続されて構成されている。
 電力制御装置12は、AC/DC変換部21、PV用DC/DC変換部22、バッテリ用DC/DC変換部23、および制御部24を有して構成される。AC/DC変換部21のAC側の端子は、電力系統14およびAC負荷17に接続される。一方、AC/DC変換部21のDC側の端子は、PV用DC/DC変換部22を介してPV15に接続されるとともに、バッテリ用DC/DC変換部23を介してバッテリ16に接続される。ここで、AC/DC変換部21のDC側の端子に接続され、PV用DC/DC変換部22およびバッテリ用DC/DC変換部23との間で直流電力の供給が行われる配線を、以下適宜、DCバス25と称する。
 制御部24は、エネルギーマネジメントシステム11の状況に応じて、AC/DC変換部21、PV用DC/DC変換部22、およびバッテリ用DC/DC変換部23に対する制御を行う。例えば、エネルギーマネジメントシステム11の運転モードには、電力系統14から供給される電力にできるだけ依存せずに電力管理を行う自給自足運転モードなどがあり、制御部24は、その運転モードに応じた制御を行う。また、制御部24は、自給自足運転モードにおいて、エネルギーマネジメントシステム11の電力状態(例えば、電力系統14からエネルギーマネジメントシステム11に電力供給を行うことができる状態である系統連系、または、停電が発生することによって電力系統14からエネルギーマネジメントシステム11に電力供給を行うことができない状態である自立運転)に応じて制御を行う。
 図2を参照して、自給自足運転モードにおける電力供給経路について説明する。なお、図2では、制御部24の図示は省略されている。
 自給自足運転モードの通常時(系統連系時かつ非満充電時)では、図2のAに示すように、PV15により発電された電力は、PV用DC/DC変換部22によりDC/DC変換されてDCバス25を介してAC/DC変換部21およびバッテリ用DC/DC変換部23に供給される。そして、AC/DC変換部21によりAC/DC変換された電力がAC負荷17に供給され、バッテリ用DC/DC変換部23によりDC/DC変換された電力がバッテリ16に充電される。
 このとき、制御部24は、AC負荷17の消費電力に追従して電力を出力するようにAC/DC変換部21に対する制御を行う。また、制御部24は、最大電力となる出力電圧でPV15から電力を取り出すMPPT(Maximum. Power Point Tracker)制御に従って電力を出力するようにPV用DC/DC変換部22に対する制御を行う。そして、制御部24は、DCバス25の電圧が一定になるような充電制御(即ち、DCバス25の電圧が高ければ充電し、DCバス25の電圧が低ければ放電する制御)を行うようにバッテリ用DC/DC変換部23に対する制御を行う。従って、例えば、PV15が4kWの発電を行っているときに、AC負荷17の消費電力が1kWである場合、バッテリ16には3kWの電力が充電される。
 また、系統連系時の自給自足運転モードにおいてバッテリ16が満充電(SOC(state of charge)=100%)になると、バッテリ用DC/DC変換部23は、バッテリ16に充電することができなくなる。この場合、図2のBに示すように、PV15により発電された電力は、PV用DC/DC変換部22によりDC/DC変換されてDCバス25を介してAC/DC変換部21に供給され、AC/DC変換部21によりAC/DC変換されてAC負荷17に供給されるとともに、余った電力は電力系統14に逆潮流される。
 このとき、制御部24は、MPPT制御に従って電力を出力するようにPV用DC/DC変換部22に対する制御を行う。また、制御部24は、DCバス25の電圧が一定になるような出力制御(即ち、余った電力は電力系統14に逆潮流する制御)を行うようにAC/DC変換部21に対する制御を行う。また、バッテリ用DC/DC変換部23は停止状態である。従って、例えば、PV15が4kWの発電を行っているときに、AC負荷17の消費電力が1kWである場合、電力系統14には3kWの電力が逆潮流される。
 さらに、バッテリ16が満充電(SOC=100%)であるときに停電が発生して自立運転時の自給自足運転モードになると、バッテリ16への充電および電力系統14への逆潮流を行うことができなくなる。この場合、図2のCに示すように、PV15により発電された電力は、PV用DC/DC変換部22によりDC/DC変換されてDCバス25を介してAC/DC変換部21に供給され、AC/DC変換部21によりAC/DC変換されてAC負荷17に供給される。
 このとき、制御部24は、DCバス25の電圧が一定になるような出力制御(即ち、AC負荷17に合わせてPV15の出力を利用する制御)を行うようにPV用DC/DC変換部22に対する制御を行う。また、AC/DC変換部21はAC負荷17の消費電力に追従して電力を出力し、バッテリ用DC/DC変換部23は停止状態である。従って、例えば、AC負荷17の消費電力が1kWである場合、PV15が1kWの発電を行うような制御が行われる。
 このように、制御部24は、エネルギーマネジメントシステム11の電力状態や、PV15の発電状態、バッテリ16の充電状態、AC負荷17の電力消費状態などに基づいて、AC/DC変換部21、PV用DC/DC変換部22、およびバッテリ用DC/DC変換部23に対する制御内容を選択する。その際、AC/DC変換部21、PV用DC/DC変換部22、バッテリ用DC/DC変換部23のいずれかが制御主体となって、DCバス25の電圧を一定にするような制御(以下、適宜、DCバス電圧制御)を行うように制御内容が設定されている。
 図3には、制御部24により選択される制御内容が示されている。
 例えば、エネルギーマネジメントシステム11の電力状態が系統連系時であり、PV15の発電状態が発電中であって、バッテリ16の充電状態が充放電可である場合、制御部24は、第1の制御内容を選択する。第1の制御内容では、バッテリ用DC/DC変換部23がDCバス電圧制御を行い、AC/DC変換部21は電力系統14に逆潮流しないようにAC負荷17に電力を出力する出力制御を行い、バッテリ用DC/DC変換部23がMPPT制御を行うように設定されている。
 また、例えば、エネルギーマネジメントシステム11の電力状態が系統連系時であり、PV15の発電状態が発電中であり、バッテリ16の充電状態が充電不可であって、AC負荷17の電力消費状態がPV15の発電量以下である場合、制御部24は、第2の制御内容を選択する。第2の制御内容では、AC/DC変換部21がDCバス電圧制御を行い、バッテリ用DC/DC変換部23がMPPT制御を行い、バッテリ用DC/DC変換部23が停止するように設定されている。
 以下、図3に示すように、制御部24は、自給自足運転モードにおいて、エネルギーマネジメントシステム11の電力状態、PV15の発電状態、バッテリ16の充電状態、およびAC負荷17の電力消費状態に従って、第3の制御内容から第13の制御内容を選択することができる。
 図4および図5には、制御部24が制御内容を選択する処理を実行するフローチャートが示されている。図4には、エネルギーマネジメントシステム11の電力状態が系統連系時である場合におけるフローチャートが示されており、図5には、エネルギーマネジメントシステム11の電力状態が自立運転時である場合におけるフローチャートが示されている。
 図4に示すように、エネルギーマネジメントシステム11の電力状態が系統連系時である場合、ステップS11において、制御部24は、PV15の発電状態が発電しているか否かを判定し、PV15の発電状態が発電していると判定した場合、処理はステップS12に進む。そして、ステップS12において、制御部24は、バッテリ16の充電状態が充放電可、充電不可、および放電不可のいずれであるかを判定する。
 ステップS12において、制御部24が、バッテリ16の充電状態が充放電可であると判定した場合、処理はステップS13に進む。ステップS13において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(余剰充電、不足放電)を行い、AC/DC変換部21が電力系統14に逆潮流しないようにAC負荷17に電力を出力する出力制御(電力が足りないときは最大放電)を行い、PV用DC/DC変換部22がMPPT制御を行う第1の制御内容を選択し、処理は終了される。
 一方、ステップS12において、制御部24が、バッテリ16の充電状態が充電不可であると判定した場合、処理はステップS14に進み、制御部24は、AC負荷17の電力消費状態が発電量以下であるか否かを判定する。
 ステップS14において、制御部24が、AC負荷17の電力消費状態が発電量以下であると判定した場合、処理はステップS15に進む。ステップS15において、制御部24は、AC/DC変換部21がDCバス電圧制御(余剰電力は電力系統14へ逆潮流)を行い、PV用DC/DC変換部22がMPPT制御を行い、バッテリ用DC/DC変換部23が停止する第2の制御内容を選択し、処理は終了される。
 一方、ステップS14において、制御部24が、AC負荷17の電力消費状態が発電量以下でない(発電量より大である)と判定した場合、処理はステップS16に進む。ステップS16において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(不足放電)を行い、AC/DC変換部21は電力系統14に逆潮流しないようにAC負荷17に電力を出力する出力制御を行い、PV用DC/DC変換部22がMPPT制御を行う第3の制御内容を選択し、処理は終了される。
 さらに、ステップS12において、制御部24が、バッテリ16の充電状態が放電不可であると判定した場合、処理はステップS17に進み、制御部24は、AC負荷17の電力消費状態が発電量以下であるか否かを判定する。
 ステップS17において、制御部24が、AC負荷17の電力消費状態が発電量以下であると判定した場合、処理はステップS18に進む。ステップS18において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(余剰充電)を行い、AC/DC変換部21は電力系統14に逆潮流しないようにAC負荷17に電力を出力する出力制御を行い、PV用DC/DC変換部22がMPPT制御を行う第4の制御内容を選択し、処理は終了される。
 一方、ステップS17において、制御部24が、AC負荷17の電力消費状態が発電量以下でない(発電量より大である)と判定した場合、処理はステップS19に進む。ステップS19において、制御部24は、AC/DC変換部21がDCバス電圧制御(不足電力は電力系統14から補充)を行い、PV用DC/DC変換部22がMPPT制御を行い、バッテリ用DC/DC変換部23が停止する第5の制御内容を選択し、処理は終了される。
 また、ステップS11において、制御部24が、PV15の発電状態が発電していないと判定した場合、処理はステップS20に進む。そして、ステップS20において、制御部24は、バッテリ16の充電状態が充電不可および放電不可のいずれであるかを判定する。
 ステップS20において、制御部24が、バッテリ16の充電状態が充電不可であると判定した場合、処理はステップS21に進む。ステップS21において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(負荷追従放電)を行い、AC/DC変換部21が電力系統14に逆潮流しないようにAC負荷17に電力を出力する出力制御(電力が足りないときは最大放電)を行い、PV用DC/DC変換部22が停止する第6の制御内容を選択し、処理は終了される。
 一方、ステップS20において、制御部24が、バッテリ16の充電状態が放電不可であると判定した場合、処理はステップS22に進み、制御部24は、バッテリ16を充電することが必要であるか否かを判定する。
 ステップS22において、制御部24が、バッテリ16を充電することが必要であると判定した場合、処理はステップS23に進む。ステップS23において、制御部24は、AC/DC変換部21がDCバス電圧制御を行い、PV用DC/DC変換部22が停止し、バッテリ用DC/DC変換部23がCPCV(定電力-定電圧:Constant Power - Constant Voltage)制御に従って充電を行う第7の制御内容を選択し、処理は終了される。
 一方、ステップS22において、制御部24が、バッテリ16を充電することが必要でないと判定した場合、処理はステップS24に進む。ステップS24において、制御部24は、AC/DC変換部21、PV用DC/DC変換部22、およびバッテリ用DC/DC変換部23の動作を停止させることを選択し、処理は終了される。
 また、エネルギーマネジメントシステム11の電力状態が自立運転時である場合、図5に示すように、ステップS31において、制御部24は、PV15の発電状態が発電しているか否かを判定し、PV15の発電状態が発電していると判定した場合、処理はステップS32に進む。そして、ステップS32において、制御部24は、バッテリ16の充電状態が充放電可、充電不可、および放電不可のいずれであるかを判定する。
 ステップS32において、制御部24が、バッテリ16の充電状態が充放電可であると判定した場合、処理はステップS33に進む。ステップS33において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(余剰充電、不足放電)を行い、AC/DC変換部21が自立出力のAC電圧が一定となるように電力を出力する出力制御を行い、PV用DC/DC変換部22がMPPT制御を行う第8の制御内容を選択し、処理は終了される。
 一方、ステップS32において、制御部24が、バッテリ16の充電状態が充電不可であると判定した場合、処理はステップS34に進み、制御部24は、AC負荷17の電力消費状態が発電量以下であるか否かを判定する。
 ステップS34において、制御部24が、AC負荷17の電力消費状態が発電量以下であると判定した場合、処理はステップS35に進む。ステップS35において、制御部24は、PV用DC/DC変換部22がDCバス電圧制御(出力制限)を行い、AC/DC変換部21が自立出力のAC電圧が一定となるように電力を出力する出力制御を行い、バッテリ用DC/DC変換部23が停止する第9の制御内容を選択し、処理は終了される。
 一方、ステップS34において、制御部24が、AC負荷17の電力消費状態が発電量以下でない(発電量より大である)と判定した場合、処理はステップS36に進む。ステップS36において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(不足放電)を行い、AC/DC変換部21が自立出力のAC電圧が一定となるように電力を出力する出力制御を行い、PV用DC/DC変換部22がMPPT制御を行う第10の制御内容を選択し、処理は終了される。
 さらに、ステップS32において、制御部24が、バッテリ16の充電状態が放電不可であると判定した場合、処理はステップS37に進み、制御部24は、AC負荷17の電力消費状態が発電量以下であるか否かを判定する。
 ステップS37において、制御部24が、AC負荷17の電力消費状態が発電量以下であると判定した場合、処理はステップS38に進む。ステップS38において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(余剰充電)を行い、AC/DC変換部21が自立出力のAC電圧が一定となるように電力を出力する出力制御を行い、PV用DC/DC変換部22がMPPT制御を行う第11の制御内容を選択し、処理は終了される。
 一方、ステップS37において、制御部24が、AC負荷17の電力消費状態が発電量以下でない(発電量より大である)と判定した場合、処理はステップS39に進む。ステップS39において、制御部24は、例えば、上位の指示に従って、AC/DC変換部21、PV用DC/DC変換部22、およびバッテリ用DC/DC変換部23に対する制御を決定する第12の制御内容を選択し、処理は終了される。
 また、ステップS31において、制御部24が、PV15の発電状態が発電していないと判定した場合、処理はステップS40に進む。そして、ステップS40において、制御部24は、バッテリ16の充電状態が充電不可および放電不可のいずれであるかを判定する。
 ステップS40において、制御部24が、バッテリ16の充電状態が充電不可であると判定した場合、処理はステップS41に進む。ステップS41において、制御部24は、バッテリ用DC/DC変換部23がDCバス電圧制御(負荷追従放電)を行い、AC/DC変換部21が自立出力のAC電圧が一定となるように電力を出力する出力制御を行う第13の制御内容を選択し、処理は終了される。
 一方、ステップS40において、制御部24が、バッテリ16の充電状態が放電不可であると判定した場合、処理はステップS42に進む。ステップS42において、制御部24は、AC/DC変換部21、PV用DC/DC変換部22、およびバッテリ用DC/DC変換部23の動作を停止させることを選択し、処理は終了される。
 このように、従来のエネルギーマネジメントシステム11では、制御部24が、図4および図5に示したような条件に従った場合分けを行って制御内容を選択することで、DCバス電圧制御を行う制御主体が決定されていた。
特開2011-135763号公報
 ところで、上述したように複数の電力源がDCバス25に接続された構成では、複数の制御主体によりDCバス25の電圧が制御されると、それらの制御が干渉することによってハンチングなどが発生する可能性があるため、基本的には、制御主体は1つにすることが望ましい。しかしながら、エネルギーマネジメントシステム11の状況に応じて、DCバス25の制御主体を変更する必要があるため、その結果、制御部24が制御内容を選択する処理は複雑になる。
 また、将来的には、DCバス25に接続される機器の種類および個数が増加していくことが想定される。その場合、制御部24が制御内容を選択する処理における場合分けが指数関数的に増加することになり、制御部24が制御内容を選択する処理が複雑化および煩雑化する恐れがある。
 さらに、上述したような場合分けの順番を変更したり、DCバス25に接続される機器の増加または削減したりすることが想定される。そのような変更に対応するために、制御部24が制御内容を選択する処理を変更(制御アルゴリズムを再度作成)することは困難であり、非常に労力を要することが想定される。
 本開示は、このような状況に鑑みてなされたものであり、直流バスに対する制御をより簡易化することができるようにするものである。
 本開示の一側面の電力制御装置は、直流電力を供給する経路となる直流バスと、前記直流バスに接続され、前記直流バスへの直流電力の出力、および、前記直流バスからの直流電力の入力の少なくとも一方を行う複数の電源機器とを備え、複数の前記電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定される。
 本開示の一側面の電力制御方法またはプログラムは、直流電力を供給する経路となる直流バスと、前記直流バスに接続され、前記直流バスへの直流電力の出力、および、前記直流バスからの直流電力の入力の少なくとも一方を行う複数の電源機器とを備える電力制御装置の電力制御方法、または、その電力制御装置を制御するコンピュータに実行させるプログラムであって、複数の前記電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定されるステップを含む。
 本開示の一側面においては、複数の電源機器ごとに、直流バスの電圧が一定になるように制御する制御主体となる電源機器の優先順位に基づいて、制御主体となる電源機器が決定される。
 本開示の一側面によれば、直流バスに対する制御をより簡易化することができる。
エネルギーマネジメントシステムの一構成例を示すブロック図である。 自立運転モードにおける電力供給経路を示す図である。 電力制御装置で選択される制御内容を示す図である。 系統連系時の場合に制御内容を選択する処理を実行するフローチャートである。 自立運転時の場合に制御内容を選択する処理を実行するフローチャートである。 本技術を適用したエネルギーマネジメントシステムの一実施の形態の構成例を示すブロック図である。 エネルギーマネジメントシステムの簡略的な構成例を示す図である。 優先順位と制御主体との関係を説明する図である。 バッテリ用DC/DC変換部が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートである。 制御主体判断処理を説明するフローチャートである。 AC/DC変換部が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートである。 PV用DC/DC変換部が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートである。 EVおよびDC負荷が接続されたエネルギーマネジメントシステムの簡略的な構成例を示す図である。 DCバス電圧制御を行うことができるか否かを通知するための接点の構成例を示す図である。 エネルギーマネジメントシステムの構成例を示すブロック図である。 DCバスに対して電力を常に供給している状態を維持する処理を説明するフローチャートである。 エネルギーマネジメントシステムの第1の変形例を示すブロック図である。 エネルギーマネジメントシステムの第2の変形例を示すブロック図である。
 以下、本技術を適用した具体的な実施の形態について、図面を参照しながら詳細に説明する。
 図6は、本技術を適用したエネルギーマネジメントシステムの一実施の形態の構成例を示すブロック図である。
 図6において、エネルギーマネジメントシステム31は、電力制御装置32が電流計33を介して電力系統34に接続され、PV35、バッテリ36、EV(Electric Vehicle)37、AC負荷38、並びに、DC負荷39-1および39-2が、電力制御装置32に接続されて構成されている。
 電力制御装置32は、電力制御装置32に接続される複数の電力源(電力系統34、PV35、バッテリ36、またはEV37)から供給される電力を、電力制御装置32に接続される複数の負荷(AC負荷38、並びに、DC負荷39-1および39-2)に供給する制御を行う。
 電流計33は、電力系統34から電力制御装置32に供給される電力、および、電力制御装置32から電力系統34に供給(逆潮流)される電力を計測する。電力系統34は、エネルギーマネジメントシステム31に対して交流電力を供給する。
 PV35は、例えば、複数の太陽電池モジュールが接続されてパネル状に構成され、受光する太陽光の光量に応じて発電し、その発電した電力を電力制御装置32に供給する。バッテリ36は、電力制御装置32から供給される電力を蓄電したり、蓄電している電力を電力制御装置32に供給したりする。EV37は、ユーザがEV37を使用するのに応じて電力制御装置32に適宜接続され、電力制御装置32から供給される電力を蓄電するバッテリを内蔵している。
 AC負荷38は、交流電力を消費して駆動する機器であり、DC負荷39-1および39-2は、直流電力を消費して駆動する機器である。なお、図6の構成例では、2台のDC負荷39-1および39-2が電力制御装置32に接続されているが、その台数を増減させることができる。
 電力制御装置32は、AC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、EV用DC/DC変換部44、負荷用DC/DC変換部45-1および45-2、分電盤46、並びにシステム制御部47を備えて構成される。また、分電盤46には、ブレーカ51-1乃至51-6、電流計52-1乃至52-4、およびDCバス53が収納される。
 電力制御装置32では、電力系統34とAC負荷38とを接続する電力線40に、AC/DC変換部41のAC側の端子が接続されており、AC/DC変換部41のDC側の端子はブレーカ51-1を介して、直流電力を供給する経路となるDCバス53に接続される。また、PV35が接続されるPV用DC/DC変換部42はブレーカ51-2を介してDCバス53に接続される。同様に、バッテリ36が接続されるバッテリ用DC/DC変換部43はブレーカ51-3を介してDCバス53に接続され、EV37が接続されるEV用DC/DC変換部44はブレーカ51-4および電流計52-1を介してDCバス53に接続される。
 また、DC負荷39-1が接続される負荷用DC/DC変換部45-1はブレーカ51-5および電流計52-2を介してDCバス53に接続され、DC負荷39-2が接続される負荷用DC/DC変換部45-2はブレーカ51-6および電流計52-3を介してDCバス53に接続される。また、AC負荷38は、ブレーカ51-7および電流計52-4を介して、AC/DC変換部41に接続される。
 AC/DC変換部41は、電力系統34から供給される交流電力をAC/DC変換した直流電力をDCバス53に出力する。また、AC/DC変換部41は、DCバス53を介して供給される直流電力をDC/AC変換し、電力線40を介して、AC負荷38に供給したり、電力系統34に逆潮流したりする。
 PV用DC/DC変換部42は、PV35において発電された電力を所定の電圧となるようにDC/DC変換(昇降圧)して、DCバス53に出力する。例えば、PV用DC/DC変換部42は、PV35から最大の電力を取り出すように最大出力点を追跡するMPPT制御を行うことができる。
 バッテリ用DC/DC変換部43は、バッテリ36に蓄積されている電力をDC/DC変換(昇降圧)してDCバス53に出力したり、DCバス53を介して供給される電力をDC/DC変換してバッテリ36を充電したりする。
 EV用DC/DC変換部44は、電力制御装置32にEV37が接続されているとき、EV37に蓄積されている電力をDC/DC変換してDCバス53に出力したり、DCバス53を介して供給される電力をDC/DC変換してEV37を充電したりする。
 負荷用DC/DC変換部45-1および45-2は、DCバス53を介して供給される電力を、それぞれに接続されているDC負荷39-1および39-2の駆動に必要な電圧にDC/DC変換して、DC負荷39-1および39-2にそれぞれ供給する。
 システム制御部47は、例えば、電流計33および電流計52-1乃至52-4により計測される電流や、PV35の発電状態、バッテリ36の充電状態などに基づいて、電力制御装置32を構成する各ブロックに対する制御を行う。これにより、システム制御部47は、エネルギーマネジメントシステム31全体を制御する。なお、図6では、システム制御部47と各ブロックを接続する配線の図示は、省略されている。
 また、システム制御部47には、エネルギーマネジメントシステム31において、DCバス53の電圧が一定になるようにDCバス電圧制御を行う制御主体となる機器の優先順位が予め設定されている。そして、エネルギーマネジメントシステム31では、制御主体となり得る機器ごとに個別に、DCバス電圧制御を行う制御主体を決定するための処理が行われる。
 ここで、説明を簡略化するために、図7に示すようなエネルギーマネジメントシステム31の構成例を用いて説明する。
 図7に示すように、電力制御装置32に、電力系統34、PV35、バッテリ36、およびAC負荷38が接続された構成において、例えば、バッテリ用DC/DC変換部43の優先順位を最上位とし、AC/DC変換部41の優先順位を2番目とし、PV用DC/DC変換部42の優先順位を3番目として、DCバス電圧制御を行う制御主体となる機器の優先順位が設定される。なお、この優先順位は、例えば、システム制御部47に予め設定されている他、例えば、図示しない上位の装置からの指示に従って、入れ替えることができる。
 このような優先順位を設定することで、基本的には、優先順位が最上位のバッテリ用DC/DC変換部43がDCバス電圧制御を行うことになる。そして、バッテリ36の状態や上位の指示によって、バッテリ用DC/DC変換部43がDCバス電圧制御を行うことができない場合には、図8のAに示すように、DCバス電圧制御を行う制御主体は、優先順位が2番目のAC/DC変換部41に移ることになる。
 さらに、AC/DC変換部41がDCバス電圧制御を行うことができない場合には、図8のBに示すように、DCバス電圧制御を行う制御主体は、優先順位が3番目のPV用DC/DC変換部42に移ることになる。なお、DCバス電圧制御を行う制御主体となり得る機器が他にも接続されており、その機器の優先順位がPV用DC/DC変換部42よりも下位の場合、PV用DC/DC変換部42がDCバス電圧制御を行うことができなくなると、DCバス電圧制御を行う制御主体は、その下位の機器に移ることになる。
 つまり、図8に示すように、制御主体となり得る機器は、その機器自身よりも優先順位が上位の機器がDCバス電圧制御を行うことができる場合には、制御主体にならないと決定する。一方、制御主体となり得る機器は、その機器自身よりも優先順位が上位の機器がDCバス電圧制御を行うことができず、かつ、その機器自身がDCバス電圧制御を行うことができる場合には、制御主体になると決定する。
 また、DCバス電圧制御を行う制御主体の優先順位は、例えば、電力を最大限、有効に利用したい機器ほど優先順位が低くなるように設定される。例えば、図7に示した構成では、PV35により発電される電力を最大限に利用し、AC/DC変換部41はAC負荷38の消費電力やPV35の発電状態、バッテリ36の充電状態などに合わせて電力を利用し、バッテリ36は、余剰電力を充電したり電力が不足したときに放電したりするというようにバッファ的な役割で利用することが望ましい。従って、有効利用度では、PV用DC/DC変換部42、AC/DC変換部41、およびバッテリ用DC/DC変換部43の順番となる。これより、DCバス電圧制御を行う制御主体の優先順位は、バッテリ用DC/DC変換部43、AC/DC変換部41、およびPV用DC/DC変換部42の順番となるのが好適である。
 そして、電力制御装置32では、DCバス電圧制御を行う制御主体を決定するための処理は、システム制御部47が行うのではなく、AC/DC変換部41、PV用DC/DC変換部42、およびバッテリ用DC/DC変換部43において個別に行われる。
 次に、図9乃至図12を参照して、AC/DC変換部41、PV用DC/DC変換部42、およびバッテリ用DC/DC変換部43において個別に行われるDCバス電圧制御を行う制御主体を決定する処理について説明する。
 例えば、エネルギーマネジメントシステム31では、DCバス電圧制御を行う制御主体の優先順位に変更があったとき、エネルギーマネジメントシステム31の電力状態が切り替えられたとき、または、DCバス電圧制御を行っている制御主体がDCバス電圧制御を行うことができなくなったときに、DCバス電圧制御を行う制御主体を決定する処理が開始される。また、以下の説明では、DCバス電圧制御を行う制御主体となる機器の優先順位が、バッテリ用DC/DC変換部43の優先順位を最上位とし、AC/DC変換部41の優先順位を2番目とし、PV用DC/DC変換部42の優先順位を3番目として設定されているものとする。
 図9には、バッテリ用DC/DC変換部43が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートが示されている。
 ステップS51において、バッテリ用DC/DC変換部43は、エネルギーマネジメントシステム11の電力状態が系統連系時および自立運転時のいずれであるかを判定する。
 ステップS51において、バッテリ用DC/DC変換部43が、エネルギーマネジメントシステム11の電力状態が系統連系時であると判定した場合、処理はステップS52に進む。そして、ステップS52において、バッテリ用DC/DC変換部43は、DCバス電圧制御を行う制御主体となる機器の優先順位が設定された優先順位情報を取得する。例えば、優先順位情報は、システム制御部47のメモリに記憶されており、バッテリ用DC/DC変換部43は、システム制御部47と通信を行うことにより、そのメモリから優先順位情報を取得する。
 ステップS53において、バッテリ用DC/DC変換部43は、バッテリ用DC/DC変換部43自身がDCバス電圧制御を行う制御主体となるかを判断する制御主体判断処理を行う。制御主体判断処理については、図10を参照して後述する。
 ステップS54において、バッテリ用DC/DC変換部43は、ステップS53の制御主体判断処理の処理結果に基づいて、自身がDCバス電圧制御を行うか否かを判定する。
 ステップS54において、バッテリ用DC/DC変換部43が、自身がDCバス電圧制御を行うと判定した場合、処理はステップS55に進む。ステップS55において、バッテリ用DC/DC変換部43は、DCバス電圧制御を開始して、DCバス53の電圧が一定になるように制御が行われ、制御主体を決定する処理は終了される。
 一方、ステップS54において、バッテリ用DC/DC変換部43が、自身がDCバス電圧制御を行わないと判定した場合、処理はステップS56に進む。ステップS56において、バッテリ用DC/DC変換部43は、上位の指示に従って、動作の停止、または、CPCV制御に従ったバッテリ36の充電の開始を選択し、制御主体を決定する処理は終了される。
 また、ステップS51において、バッテリ用DC/DC変換部43が、エネルギーマネジメントシステム11の電力状態が自立運転時であると判定した場合、処理はステップS57に進む。そして、ステップS57において、バッテリ用DC/DC変換部43は、ステップS52と同様に、優先順位情報を取得する。
 ステップS58では、ステップS53と同様に制御主体判断処理が行われ、ステップS59において、バッテリ用DC/DC変換部43は、ステップS58の制御主体判断処理の処理結果に基づいて、自身がDCバス電圧制御を行うか否かを判定する。
 ステップS59において、バッテリ用DC/DC変換部43が、自身がDCバス電圧制御を行うと判定した場合、処理はステップS60に進む。ステップS60において、バッテリ用DC/DC変換部43は、DCバス電圧制御を開始して、DCバス53の電圧が一定になるように制御が行われ、制御主体を決定する処理は終了される。
 一方、ステップS59において、バッテリ用DC/DC変換部43が、自身がDCバス電圧制御を行わないと判定した場合、処理はステップS61に進み、バッテリ用DC/DC変換部43は動作を停止し、制御主体を決定する処理は終了される。
 次に、図10は、図9のステップS53およびS58で行われる制御主体判断処理を説明するフローチャートである。
 ステップS71において、バッテリ用DC/DC変換部43は、図9のステップS52またはS57で取得した優先順位情報に基づいて、バッテリ用DC/DC変換部43自身の優先順位が最上位であるか否かを判定する。
 ステップS71において、バッテリ用DC/DC変換部43が、バッテリ用DC/DC変換部43自身の優先順位が最上位であると判定した場合、処理はステップS72に進み、バッテリ用DC/DC変換部43自身がDCバス電圧制御を行うことができるか否かを判定する。例えば、バッテリ用DC/DC変換部43は、バッテリ36の充電状態や上位の指示などに基づいて、DCバス電圧制御を行うことができるか否かを判定する。
 具体的には、バッテリ用DC/DC変換部43は、バッテリ36のSOCが100%となっていて充電することができない場合や、強制的に充電を行うように上位から指示された場合などにおいて、DCバス電圧制御を行うことができないと判定する。または、バッテリ用DC/DC変換部43は、DCバス電圧制御を試みた結果、例えば、DCバス53の電圧を本来370Vに制御しなければならないのに対し、DCバス53の電圧が380Vまで上昇し、逆に360Vまで低下している場合には、DCバス53の電圧が制御不可能な状態であるとして、DCバス電圧制御を行うことができないと判定する。
 ステップS72において、バッテリ用DC/DC変換部43が、DCバス電圧制御を行うことができると判定した場合、処理はステップS73に進み、バッテリ用DC/DC変換部43は、制御主体判断処理における判断結果として、DCバス電圧制御を行うと判断する。そして、ステップS74において、バッテリ用DC/DC変換部43は、DCバス電圧制御を行うことができることを示す制御可否情報を、優先順位が下位の機器(この場合、AC/DC変換部41およびPV用DC/DC変換部42)に供給し、制御主体判断処理は終了される。
 一方、ステップS72において、バッテリ用DC/DC変換部43が、DCバス電圧制御を行うことがでないと判定した場合、処理はステップS75に進み、バッテリ用DC/DC変換部43は、制御主体判断処理における判断結果として、DCバス電圧制御を行わないと判断する。そして、ステップS76において、バッテリ用DC/DC変換部43は、DCバス電圧制御を行うことができないことを示す制御可否情報を、優先順位が下位の機器に供給し、制御主体判断処理は終了される。
 また、ステップS71において、バッテリ用DC/DC変換部43が、バッテリ用DC/DC変換部43自身の優先順位が最上位でないと判定した場合、処理はステップS77に進む。ステップS77において、バッテリ用DC/DC変換部43は、バッテリ用DC/DC変換部43よりも優先順位が上位の機器の制御可否情報を取得する。例えば、AC/DC変換部41およびPV用DC/DC変換部42においても、バッテリ用DC/DC変換部43と同様の処理が行われる。そして、AC/DC変換部41またはPV用DC/DC変換部42がバッテリ用DC/DC変換部43よりも優先順位が上位である場合には、それらの機器において上述したステップS74またはS76の処理が行われることで制御可否情報が送信される。これに応じて、バッテリ用DC/DC変換部43は、その制御可否情報をステップS77で取得する。
 ステップS78において、バッテリ用DC/DC変換部43は、ステップS77で取得した制御可否情報に従って、優先順位が上位の機器がDCバス電圧制御を行うことができるか否かを判定する。ステップS78において、優先順位が上位の機器がDCバス電圧制御を行うことができないと判定された場合、処理はステップS72に進み、優先順位が上位の機器がDCバス電圧制御を行うことができると判定された場合、処理はステップS75に進む。そして、以下、上述した処理が行われる。
 次に、図11には、AC/DC変換部41が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートが示されている。
 ステップS81において、AC/DC変換部41は、エネルギーマネジメントシステム11の電力状態が系統連系時および自立運転時のいずれであるかを判定する。そして、エネルギーマネジメントシステム11の電力状態が系統連系時であると判定された場合、AC/DC変換部41は、ステップS82において優先順位情報を取得した後、ステップS83において制御主体判断処理(図10)を行う。
 そして、ステップS84において、AC/DC変換部41は、自身がDCバス電圧制御を行うか否かを判定して、自身がDCバス電圧制御を行うと判定した場合にはステップS85においてDCバス電圧制御を開始して、処理は終了される。一方、ステップS84において、自身がDCバス電圧制御を行わないと判定した場合には、処理はステップS86に進み、AC/DC変換部41は、AC負荷38の消費電力に追従して電力を出力する制御を開始して、処理は終了される。
 一方、ステップS81において、エネルギーマネジメントシステム11の電力状態が自立運転時であると判定された場合、処理はステップS87に進む。そして、AC/DC変換部41は、ステップS87乃至S91において、ステップS82乃至S86と同様の処理を行う。
 次に、図12には、PV用DC/DC変換部42が実行するDCバス電圧制御を行う制御主体を決定する処理のフローチャートが示されている。
 ステップS101において、PV用DC/DC変換部42は、エネルギーマネジメントシステム11の電力状態が系統連系時および自立運転時のいずれであるかを判定する。そして、エネルギーマネジメントシステム11の電力状態が系統連系時であると判定された場合、PV用DC/DC変換部42は、ステップS102において優先順位情報を取得した後、ステップS103において制御主体判断処理(図10)を行う。
 そして、ステップS104において、PV用DC/DC変換部42は、自身がDCバス電圧制御を行うか否かを判定して、自身がDCバス電圧制御を行うと判定した場合にはステップS105においてDCバス電圧制御を開始して、処理は終了される。一方、ステップS104において、自身がDCバス電圧制御を行わないと判定した場合には、処理はステップS106に進み、PV用DC/DC変換部42は、MPPT制御を開始して、処理は終了される。なお、PV35が非発電時には、ステップS106において、PV用DC/DC変換部42は動作を停止する。
 一方、ステップS101において、エネルギーマネジメントシステム11の電力状態が自立運転時であると判定された場合、処理はステップS107に進む。そして、PV用DC/DC変換部42は、ステップS107乃至S111において、ステップS102乃至S106と同様の処理を行う。
 以上のように、エネルギーマネジメントシステム31では、AC/DC変換部41、PV用DC/DC変換部42、およびバッテリ用DC/DC変換部43がそれぞれ個別に、DCバス電圧制御を行う制御主体となるか否かを判断することができる。これにより、例えば、システム制御部47が、DCバス電圧制御を行う制御主体となる機器を決定する処理よりも、より簡単に、制御プログラムを構築することができる。また、従来の制御方式が、上述したように各状況に基づいた場合分けを行って機器の動作(DCバス電圧制御を行う制御主体)を決定するのに対し、エネルギーマネジメントシステム31では、優先順位に基づいて制御主体を決定することができる。これにより、制御主体とならなかった他の機器の動作は自ずと選択肢が限定的となり、複雑な場合分けを行う必要がなく、処理を簡略化することができる。
 また、AC/DC変換部41、PV用DC/DC変換部42、およびバッテリ用DC/DC変換部43それぞれにおいて処理を分散するため、システム制御部47の負荷を軽減することができる。さらに、DCバス電圧制御を行う制御主体となる機器の優先順位の変更にも容易に対応することができる。
 また、DCバス53に接続する機器を拡張または縮小した場合にも、それぞれの機器においてDCバス電圧制御を行う制御主体を決定する処理を実行することで、その変更に容易に対応することができる。
 例えば、図13に示すような構成例のエネルギーマネジメントシステム31について説明する。
 図13には、図7に示したエネルギーマネジメントシステム31に、EV37およびDC負荷39が接続された構成例が示されている。
 即ち、図13に示すエネルギーマネジメントシステム31では、DCバス53に、AC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、EV用DC/DC変換部44、および負荷用DC/DC変換部45が接続されている。
 このとき、DCバス電圧制御を行う制御主体の優先順位は、上述したように、電力を最大限、有効に利用したい機器ほど優先順位が低くなるように設定される。例えば、PV35により発電される電力を最大限に利用し、DC負荷39に優先的に電力を供給し、AC負荷38にはDC負荷39の次に優先的に電力を供給する。また、余剰電力はバッテリ36に充電し、バッテリ36が満充電の場合にはEV37に充電する。そして、PV35により発電される電力で負荷を賄えない場合には、バッテリ36の電力を供給し、バッテリ36でも不足するときにはEV37から電力を供給する。
 このように電力を利用したい場合には、有効利用度では、PV用DC/DC変換部42、負荷用DC/DC変換部45、AC/DC変換部41、バッテリ用DC/DC変換部43、およびEV用DC/DC変換部44の順番になる。これより、DCバス電圧制御を行う制御主体の優先順位は、EV用DC/DC変換部44、バッテリ用DC/DC変換部43、AC/DC変換部41、負荷用DC/DC変換部45、およびPV用DC/DC変換部42の順番となるのが好適である。
 このような順番で設定された優先順位情報がシステム制御部47のメモリに記憶されている。そして、DCバス電圧制御を行う制御主体を決定するための処理が開始されると、AC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、EV用DC/DC変換部44、および負荷用DC/DC変換部45は、システム制御部47から優先順位情報を取得して、図9乃至図12のフローチャートを参照して説明したような処理を個別に実行する。
 なお、負荷用DC/DC変換部45は、自身がDCバス電圧制御を行わないと判定した場合、AC/DC変換部41と同様に、DC負荷39の消費電力に追従して電力を出力する制御を行う。また、EV用DC/DC変換部44は、自身がDCバス電圧制御を行わないと判定した場合、AC/DC変換部41と同様に、上位の指示に従って、動作の停止、または、充放電を行う。
 このように、エネルギーマネジメントシステム31では、DCバス53に接続される機器が増加した場合においても、それぞれの機器においてDCバス電圧制御を行う制御主体を決定する処理を実行することで、機器の増加に容易に対応することができる。
 また、上述した実施の形態では、例えば、AC/DC変換部41、PV用DC/DC変換部42、およびバッテリ用DC/DC変換部43が通信を行って、DCバス電圧制御を行うことができることを示す制御可否情報が、優先順位が上位の機器から下位の機器へ送信される。これに対し、例えば、機器同士を電気的な接点で接続し、その接点に入力される電圧のレベルによって、優先順位が上位の機器から下位の機器へ、DCバス電圧制御を行うことができるか否かが通知されるようにしてもよい。
 例えば、図14には、DCバス電圧制御を行うことができるか否かを通知するための接点の構成例が示されている。なお、図14では、AC/DC変換部41の構成を例に説明を行うが、他の機器においても同様の構成とされる。
 図14に示すように、AC/DC変換部41は、制御回路61、入力端子部62、整流素子63、整流素子64、および出力端子部65を備えて構成される。
 入力端子部62の各接点には、AC/DC変換部41よりも優先順位の上位の機器(例えば、バッテリ用DC/DC変換部43)の出力端子部65に接続され、それぞれの接点は、対応する整流素子63を介して制御回路61に接続される。また、制御回路61は、整流素子64を介して出力端子部65に接続され、出力端子部65の各接点には、AC/DC変換部41よりも優先順位の下位の機器(例えば、PV用DC/DC変換部42)の入力端子部62に接続される。
 このような構成において、制御回路61は、DCバス電圧制御を行うことができない場合には、出力端子部65から出力される信号の電位をローレベル(例えば、0V)にし、DCバス電圧制御を行うことができる場合には、出力端子部65から出力される信号の電位をハイレベル(例えば、5V)にする。
 従って、AC/DC変換部41よりも優先順位の上位の機器がDCバス電圧制御を行うことができる場合には、AC/DC変換部41の入力端子部62にハイレベルの信号が入力される。入力端子部62に入力される信号のいずれか1つでもハイレベルであれば、AC/DC変換部41の制御回路61は、AC/DC変換部41がDCバス電圧制御を行わないと判断する。
 このように、入力端子部62および出力端子部65の接点に入出力される信号のレベルに基づいて、機器同士で、優先順位の上位の機器がDCバス電圧制御を行うか否かの判定を行うことができる。また、図13に示したように、DCバス53に接続される機器が追加された場合にも、それぞれの入力端子部62および出力端子部65の結線を変更することにより、機器の増加に容易に対応することができる。また、DCバス電圧制御を行う制御主体の優先順位に変更があったときにも、結線を変更することで対応することができる。
 ところで、一般的に、DC/DC変換部の動作には、負荷に電力供給している状態である電流連続モードと、無負荷や、リップル電流の半分程度の負荷よりも小さい電流を出力している状態である電流不連続モードとの2つのモードがある。これらの2つのモードごとに出力電圧の制御方法が異なることより、DC/DC変換部は、モードの切り替えを行うには所定の切り替え時間が必要となるため、制御の安定に時間を要することになる。
 従って、DC/DC変換部が、停止状態から負荷に給電する動作状態への遷移は、停止状態から起動して電流不連続モードとなり、その後、電流連続モードになる。このように、DC/DC変換部は、停止状態から起動して負荷に給電する通常の動作状態になるまでに所定の時間を要するソフトスタート機能を有する必要がある。
 このように、DC/DC変換部がソフトスタート機能を有することにより、DCバスに接続される各機器の状態によっては、DCバスの電圧が不安定になることなる。また、DC負荷が所望の電力を得るまでに所定の時間を要することになる。つまり、DCバスに電力が供給されていない状態において、DC負荷が起動してDCバスから電流を吸い込もうとすると、DC/DC変換部は、ソフトスタート機能を有するために、0Aから電流を上昇させるのには時間を要することになる。それにも拘わらず、DC負荷が無理に電力を吸い込むと、DC/DC変換部が電力を供給することができず、DCバスの電圧が低下することになる。
 そこで、エネルギーマネジメントシステム31では、DCバス53に接続される複数の機器のうち、少なくとも1つの機器がDCバス53に対して電力を常に供給している状態を維持するようにシステム制御部47が制御を行う。
 例えば、図15に示すような構成例のエネルギーマネジメントシステム31を参照して説明を行う。
 エネルギーマネジメントシステム31では、DCバス53に対して電力が常に供給される状態が維持されるようにシステム制御部47による制御が行われる。即ち、DCバス53に接続されるAC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、およびEV用DC/DC44のうちの少なくとも1つは、DCバス53に対して電力を常に供給し、かつ、バッテリ36、EV37、DC負荷39-1および39-2、並びに、AC/DC変換部41のうちの少なくとも1つは、DCバス53を介して電力が供給されている状態が維持される。
 これにより、DCバス53に接続されるAC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、およびEV用DC/DC44のうちの少なくとも1つは、電流連続モードで動作することになる。従って、例えば、AC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、およびEV用DC/DC44のうちの少なくとも1つは、少しでも電流を出力している状態となっている。これにより、例えば、DC負荷39-1または39-2が起動してDCバスから電流を吸い込もうとしたときの急激な負荷変動に対応し易くなり、DCバス53の電圧が不安定になることを回避することができる。
 また、DCバス53に対して電力を常に供給する際に、意味のない負荷に電力を供給することは無駄な電力消費であることより、電力を無駄に消費することにならないように供給先に優先順位が設定される。例えば、電力を常に必要とするDC負荷39(例えば、ルータや電話機など)への電力供給を最上位の優先順位とし、バッテリ36またはEV37への充電を次の優先順位とし、電力系統34への逆潮流を次の優先順位とする。そして、優先順位の高い順にDCバス53を介した電力の供給が行われる。
 また、システム制御部47は、電流計52-2の出力に基づいてDC負荷39-1への電力供給の有無を判定し、電流計52-3の出力に基づいてDC負荷39-2への電力供給の有無を判定する。また、システム制御部47は、AC/DC変換部41、PV用DC/DC変換部42、バッテリ用DC/DC変換部43、およびEV用DC/DC44と直接的に通信を行うことによって、電力系統34、PV35、バッテリ36、およびEV37との電力供給の有無を判定する。
 図16のフローチャートを参照して、DCバス53に対して電力を常に供給している状態を維持する処理について説明する。
 ステップS121において、システム制御部47は、DCバス53に電力を供給している機器があるか否かを判定する。例えば、システム制御部47は、AC/DC変換部41、PV用DC/DC42、バッテリ用DC/DC変換部43、およびEV用DC/DC44と通信を行って電力供給が行われていないことを確認した場合、DCバス53に電力を供給している機器がないと判定する。一方、システム制御部47は、電流計52-2または52-3により電流が検出されたとき、または、AC/DC変換部41、PV用DC/DC42、バッテリ用DC/DC変換部43、およびEV用DC/DC44と通信を行って少なくともいずれか1つがDCバス53に電力供給を行っていることを確認した場合、DCバス53に電力を供給している機器があると判定する。
 ステップS121において、システム制御部47がDCバス53に電力を供給している機器がないと判定した場合、処理はステップS122に進む。ステップS122において、システム制御部47は、AC/DC変換部41に対し、電力系統34から供給される電力をAC/DC変換してDCバス53に出力するように、即ち、AC/DC変換部41を買電の方向に動作するように制御する。
 ステップS122の処理後、または、ステップS121でDCバス53に電力を供給している機器があると判定された場合、処理はステップS123に進む。
 ステップS123において、システム制御部47は、DCバス53からDC負荷39-1または39-2へ電力供給されているか否かを判定する。例えば、システム制御部47は、電流計52-2および52-3のどちらも電流を検出していない場合には、DCバス53からDC負荷39-1または39-2へ電力供給されていないと判定する。一方、システム制御部47は、電流計52-2および52-3のどちらかが電流を検出している場合には、DCバス53からDC負荷39-1または39-2へ電力供給されていると判定する。
 ステップS123において、システム制御部47が、DCバス53からDC負荷39-1または39-2へ電力供給されていないと判定した場合、処理はステップS124に進む。即ち、この場合、DC負荷39-1および39-2は電力供給を要求していないことになる。
 ステップS124において、システム制御部47は、バッテリ用DC/DC変換部43およびEV用DC/DC44と通信を行って、バッテリ36およびEV37(のバッテリ)の少なくとも一方のSOCが充電可能な残量であるか否かを判定する。ステップS124において、バッテリ36およびEV37の少なくとも一方のSOCが充電可能な残量であると判定された場合、処理はステップS125に進み、システム制御部47は、バッテリ用DC/DC変換部43に対してバッテリ36へ充電するように、または、EV用DC/DC44に対してEV37へ充電するように制御を行う。
 一方、ステップS124において、バッテリ36のSOCが充電可能な残量でない、かつ、EV37のSOCが充電可能な残量でないと判定された場合、処理はステップS126に進む。即ち、この場合、バッテリ36およびEV37のSOCは、放電可能な残量である。
 ステップS126において、システム制御部47は、AC/DC変換部41に対して、DCバス53を介して供給される電力をDC/AC変換して電力系統34に逆潮流するように、即ち、AC/DC変換部41を売電の方向に動作するように制御する。そして、ステップS127において、システム制御部47は、バッテリ用DC/DC変換部43に対してバッテリ36から放電するように、または、EV用DC/DC44に対してEV37から放電するように制御を行う。
 また、ステップS123において、DCバス53からDC負荷39-1または39-2へ電力供給されていると判定された場合、ステップS125の処理後、またはステップS127の処理後、処理はステップS128に進む。ステップS128において、システム制御部47は、AC/DC変換部41、バッテリ用DC/DC変換部43、およびEV用DC/DC44に対して通常の運転を実行するように制御して、処理はステップS121に戻り、以下、同様の処理が繰り返される。
 以上のように、エネルギーマネジメントシステム31では、DCバス53に対して電力を常に供給している状態を維持することができ、DCバス53の電圧が不安定になることを回避することができる。そして、DC負荷39は所望の電力を迅速に得ることができる。
 次に、図17は、エネルギーマネジメントシステムの第1の変形例を示すブロック図である。なお、図17に示すエネルギーマネジメントシステム31Aにおいて、図15のエネルギーマネジメントシステム31と共通するブロックについては同一の符号を付し、その詳細な説明は省略する。
 即ち、エネルギーマネジメントシステム31Aでは、2つのバッテリ36-1および36-2が電力制御装置32Aに接続されており、それらに対応して、電力制御装置32Aが、2つのバッテリ用DC/DC変換部43-1および43-2を備えている。さらに、電力制御装置32Aは、DC/DC変換部71およびAC/DC変換部72を備えている。そして、DC/DC変換部71の一方の端子がDCバス53に接続され、DC/DC変換部71の他方の端子、および、AC/DC変換部72のDC側の端子が共に、システム制御部47に接続されている。また、AC/DC変換部72のAC側の端子は、AC/DC変換部41および電力系統34を接続する電力線40に接続されている。
 そして、エネルギーマネジメントシステム31Aにおいては、バッテリ36-1および36-2、EV37、DC負荷39、並びに、AC/DC変換部41のうちの、いずれか1つ以上は必ずDCバス53を介して電力が供給されており、かつ、バッテリ36-1および36-2、PV35、EV37、並びに、AC/DC変換部41のうちの、いずれか1つ以上は必ずDCバス53に電力を出力している状態が継続される。
 例えば、バッテリ36-1または36-2からの放電があり、AC/DC変換部41からの放電がAC負荷38の消費電力より大である場合には、PV35からPV用DC/DC変換部42を介してDCバス53に出力される電力がDC負荷39に供給される。一方、これ以外の場合には、バッテリ36-1および36-2、並びにEV37の間で互いに電力が供給される。
 即ち、エネルギーマネジメントシステム31Aでは、2つのバッテリ36-1および36-2を有することにより、バッテリ36-1および36-2の間で充放電を行うことができ、DCバス53に対して電力を常に供給している状態の維持を実現することができる。このとき、電力の無駄を抑制するために、バッテリ36-1および36-2の間で充放電する電力は最小限とし、かつ、他に電力を必要とする機器がない場合にバッテリ36-1および36-2の間で充放電を行うこととする。なお、バッテリ36-1および36-2が同時に満充電とならないように制御され、一方が満充電の場合には、その一方からの放電を行うとともに他方への充電を行う。
 また、例えば、EV37が使用中でDCバス53に接続されていないときや、AC負荷38およびDC負荷39が電力を消費しないとき、夜間などでPV35が発電しないとき、バッテリ36-1および36-2の電力を電力系統34に逆潮流させないときなどにおいても、2つのバッテリ36-1および36-2を有することにより、DCバス53に対して電力を常に供給している状態を維持することができる。
 このように、DCバス53に対して電力を常に供給している状態の維持することで、DCバス53の電圧を安定させることができる。そして、バッテリ用DC/DC変換部43-1または43-2から少しでも電流をDCバス53に出力している状態とすることによって、DC負荷39が電力を要求し始めたときなどの急激な電力の変動に対応することができる。
 また、エネルギーマネジメントシステム31Aでは、DC/DC変換部71およびAC/DC変換部72を備えることにより、システム制御部47が、DCバス53および電力線40の両方から電力を取得することができる。このとき、DC/DC変換部71がシステム制御部47側に出力する電圧よりも、AC/DC変換部72がシステム制御部47側に出力する電圧を若干(例えば、0.数V)高電圧にする。これにより、通常時には、電力系統34から電力がシステム制御部47に電力が供給され、停電時には、DCバス53からシステム制御部47に電力が供給される。
 そして、エネルギーマネジメントシステム31Aでは、DCバス53に対して電力を常に供給している状態とされているので、停電が発生したときに、システム制御部47に迅速に電力供給を行うことができる。
 つまり、DCバス53に対して電力を常に供給している状態とされない場合には、停電が発生したときに、バッテリ用DC/DC変換部43-1または43-2が起動してDCバス53に電力の出力を開始し、DC/DC変換部71が起動した後に、システム制御部47へ電力が供給されることになる。このように、従来、システム制御部47への電力供給までに2ステップが必要で迅速な電力供給が行えなかったのに対し、エネルギーマネジメントシステム31Aでは、システム制御部47に迅速に電力供給を行うことができる。
 また、エネルギーマネジメントシステム31Aでは、DC負荷39として、例えば、ルーターや、電話機、非常用照明、火災報知器用の電源などのように、24時間の電力供給を必要とする機器を用いることが好適である。これにより、DCバス53に対して電力を常に供給している状態を維持していても、電力を無駄に消費することを回避することができる。また、このような電力を常に必要とする機器をメンテナンスなどで交換する際には、バッテリ36-1および36-2、並びにEV37の間で互いに電力を行うことで、DCバス53に対して電力を常に供給している状態を維持することができる。
 以上のように、エネルギーマネジメントシステム31Aでは、DCバス53に対して電力を常に供給している状態を維持することにより、DCバス53の電圧が不安定になることを回避することができる。そして、DC負荷39は所望の電力を迅速に得ることができる。
 次に、図18は、エネルギーマネジメントシステムの第2の変形例を示すブロック図である。なお、図18に示すエネルギーマネジメントシステム31Bにおいて、図17のエネルギーマネジメントシステム31Aと共通するブロックについては同一の符号を付し、その詳細な説明は省略する。
 即ち、エネルギーマネジメントシステム31Bは、図17のバッテリ36-2およびバッテリ用DC/DC変換部43-2に替えて、専用DC負荷81およびDC/DC変換部73を備える点で、エネルギーマネジメントシステム31Aと異なる構成とされている。
 そして、エネルギーマネジメントシステム31Bにおいては、バッテリ36-1、専用DC負荷81、EV37、DC負荷39、並びに、AC/DC変換部41のうちの、いずれか1つ以上は必ずDCバス53を介して電力が供給されており、かつ、バッテリ36-1、PV35、EV37、並びに、AC/DC変換部41のうちの、いずれか1つ以上は必ずDCバス53に電力を出力している状態が継続される。
 また、エネルギーマネジメントシステム31Bでは、例えば、PV35、EV37、AC負荷38、およびDC負荷39の電力授受がない場合、バッテリ36が満充電でなければAC/DC変換部41からバッテリ36へ充電が行われる。また、この場合、バッテリ36が満充電であればバッテリ36から専用DC負荷81へ電力が供給される。
 このような構成により、エネルギーマネジメントシステム31Bでは、DCバス53に対して電力を常に供給している状態を維持することができ、DCバス53の電圧が不安定になることを回避することができる。そして、DC負荷39は所望の電力を迅速に得ることができる。
 なお、上述した一連の処理は、ハードウエアにより実行することもできるし、ソフトウエアにより実行することもできる。一連の処理をソフトウエアにより実行する場合には、そのソフトウエアを構成するプログラムが、専用のハードウエアに組み込まれているコンピュータ、または、各種のプログラムをインストールすることで、各種の機能を実行することが可能な、例えば汎用のコンピュータなどに、プログラム記録媒体からインストールされる。
 コンピュータでは、ROM(Read Only Memory)に記憶されているプログラムや、ハードディスクや不揮発性のメモリなどよりなる記憶部に記憶されているプログラムなどが、RAM(Random Access Memory)にロードされ、CPU(Central Processing Unit)により実行される。それにより、上述した一連の処理が行われる。
 また、それらのプログラムは、あらかじめ記憶部に記憶させておく他、ネットワークインタフェースなどよりなる通信部を介して、あるいは、磁気ディスク(フレキシブルディスクを含む)、光ディスク(CD-ROM(Compact Disc-Read Only Memory),DVD(Digital Versatile Disc)等)、光磁気ディスク、または半導体メモリなどのリムーバブルメディアを駆動するドライブを介して、コンピュータにインストールすることができる。
 なお、コンピュータが実行するプログラムは、本明細書で説明する順序に沿って時系列に処理が行われるプログラムであっても良いし、並列に、あるいは呼び出しが行われたとき等の必要なタイミングで処理が行われるプログラムであっても良い。また、プログラムは、1つのCPUにより処理されるものであっても良いし、複数のCPUによって分散処理されるものであっても良い。なお、本明細書において、システムとは、複数の装置により構成される装置全体を表すものである。
 なお、本実施の形態は、上述した実施の形態に限定されるものではなく、本開示の要旨を逸脱しない範囲において種々の変更が可能である。
 31 エネルギーマネジメントシステム, 32 電力制御装置, 33 電流計, 34 電力系統, 35 PV, 36 バッテリ, 37 EV, 38 AC負荷, 39 DC負荷, 40 電力線, 41 AC/DC変換部, 42 PV用DC/DC変換部, 43 バッテリ用DC/DC変換部, 44 EV用DC/DC変換部, 45 負荷用DC/DC変換部, 46 分電盤, 47 システム制御部, 51 ブレーカ, 52 電流計, 53 DCバス

Claims (14)

  1.  直流電力を供給する経路となる直流バスと、
     前記直流バスに接続され、前記直流バスへの直流電力の出力、および、前記直流バスからの直流電力の入力の少なくとも一方を行う複数の電源機器と
     を備え、
     複数の前記電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定される
     電力制御装置。
  2.  複数の前記電源機器は、
      それぞれ自身より前記優先順位が高い他の前記電源機器から供給される、各自が前記直流バスの電圧が一定になるように制御することができるか否かを示す制御可否情報に基づいて、各自が前記制御主体となるか否かの判断を行い、
      それぞれ自身より前記優先順位が低い他の前記電源機器に、前記制御可否情報を供給する
     請求項1に記載の電力制御装置。
  3.  複数の前記電源機器のうちの、電力を有効に利用したい前記電源機器ほど前記優先順位が低く設定される
     請求項1に記載の電力制御装置。
  4.  複数の前記電源機器は、前記優先順位が設定された優先順位情報を記憶する記憶部から前記優先順位情報を取得して、各自が前記制御主体となるか否かの判断を行う
     請求項1に記載の電力制御装置。
  5.  複数の前記電源機器は、
      それぞれ各自より前記優先順位が上位の他の前記電源機器と電気的な接点により接続されるとともに、それぞれ各自より前記優先順位が下位の他の前記電源機器と電気的な接点により接続されており、
      前記優先順位が上位の他の前記電源機器において前記制御主体となると判断された場合には、前記優先順位が上位の他の前記電源機器との電気的な接点に対して所定レベルの信号が供給され、
      自身が前記制御主体となると判断した場合には、前記優先順位が下位の他の前記電源機器との電気的な接点に対して所定レベルの信号を供給する
     請求項1に記載の電力制御装置。
  6.  複数の前記電源機器のうちの少なくとも1つが、前記直流バスに対して電力を常に供給する
     請求項1に記載の電力制御装置。
  7.  複数の前記電源機器として、
      自然エネルギーを利用して発電を行う発電部からの直流電力の電圧を昇降圧して前記直流バスに電力を供給する第1の電源機器、
      電力を蓄電する蓄電部からの直流電力の電圧を昇降圧して前記直流バスに電力を供給する第2の電源機器、
      交流電力を供給する電力系統からの交流電力を直流電力に変換して前記直流バスに電力を供給する第3の電源機器
     が少なくとも用いられる
     請求項6に記載の電力制御装置。
  8.  前記直流バスを介して供給される電力を常に消費する直流負荷が前記直流バスに接続されることにより、前記直流バスに対して電力が常に供給される
     請求項6に記載の電力制御装置。
  9.  前記直流バスを介して供給される電力を前記電力系統に対して逆潮流させることにより、前記直流バスに対して電力が常に供給される
     請求項6に記載の電力制御装置。
  10.  前記直流バスを介して供給される電力を使用する複数の電力使用部が前記直流バスに接続されており、複数の前記電力使用部のうちの、電力を使用する優先順位の高い順に前記直流バスを介した電力の供給が行われる
     請求項6に記載の電力制御装置。
  11.  電力を蓄電する複数の蓄電部が、それぞれ対応する前記蓄電部からの直流電力の電圧を昇降圧して前記直流バスに電力を供給する複数の前記電源機器を介して前記直流バスに接続されており、それぞれの前記蓄電部の間で充放電を行うことにより、前記直流バスに対して電力が常に供給される
     請求項6に記載の電力制御装置。
  12.  直流電力を供給する経路となる直流バスと、
     前記直流バスに接続され、前記直流バスへの直流電力の出力、および、前記直流バスからの直流電力の入力の少なくとも一方を行う複数の電源機器と
     を備える電力制御装置の電力制御方法であって、
     複数の前記電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定される
     ステップを含む電力制御方法。
  13.  直流電力を供給する経路となる直流バスと、
     前記直流バスに接続され、前記直流バスへの直流電力の出力、および、前記直流バスからの直流電力の入力の少なくとも一方を行う複数の電源機器と
     を備える電力制御装置を制御するコンピュータに実行させるプログラムであって、
     複数の前記電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定される
     ステップを含む処理をコンピュータに実行させるプログラム。
  14.  太陽光を受光した光量に応じて発電する太陽光発電部と、
     電力を蓄電する蓄電部と、
     直流電力を供給する経路となる直流バスと、
     前記直流バスに接続され、前記太陽光発電部により発電された電力を前記直流バスに出力する第1の電源機器と、
     前記直流バスに接続され、前記蓄電部の電力を前記直流バスに出力、および、前記直流バスから入力される電力の前記蓄電部への蓄電の少なくとも一方を行う第2の電源機器と、
     前記直流バスに接続され、交流電力を供給する電力系統からの交流電力を直流電力に変換して前記直流バスに出力、および、前記直流バスから入力される直流電力を交流電力へ変換の少なくとも一方を行う第3の電源機器と
     を備え、
     前記第1乃至第3の電源機器ごとに、前記直流バスの電圧が一定になるように制御する制御主体となる前記電源機器の優先順位に基づいて、前記制御主体となる前記電源機器が決定される
     エネルギーマネジメントシステム。
PCT/JP2013/056410 2012-12-28 2013-03-08 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム WO2014103351A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-287937 2012-12-28
JP2012287937A JP6198034B2 (ja) 2012-12-28 2012-12-28 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム

Publications (1)

Publication Number Publication Date
WO2014103351A1 true WO2014103351A1 (ja) 2014-07-03

Family

ID=51020461

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/056410 WO2014103351A1 (ja) 2012-12-28 2013-03-08 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム

Country Status (2)

Country Link
JP (1) JP6198034B2 (ja)
WO (1) WO2014103351A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016158434A (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力変換装置及び電力管理システム
JP2016158436A (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力管理システム、電力変換装置及び電力管理方法
US10418821B2 (en) 2015-02-25 2019-09-17 Kyocera Corporation Power converting apparatus and power converting method
WO2022097413A1 (ja) * 2020-11-05 2022-05-12 株式会社日立製作所 Dcグリッドシステム、制御装置、制御方法

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101984484B1 (ko) * 2014-03-06 2019-05-31 로베르트 보쉬 게엠베하 Dc 마이크로그리드용 dc 전력 서버
JP6419394B1 (ja) 2017-12-25 2018-11-07 三菱電機株式会社 電力変換装置
JP6441520B1 (ja) * 2018-03-14 2018-12-19 株式会社日立パワーソリューションズ 電力需給システム、制御装置及び電力需給方法
JP7089960B2 (ja) * 2018-06-25 2022-06-23 ニチコン株式会社 パワーコンディショナおよび蓄電システム
EP3691071B8 (de) * 2019-02-04 2021-04-28 Olmatic GmbH Verfahren zum betrieb einer mobilen stromversorgungseinrichtung
JP7290991B2 (ja) * 2019-05-13 2023-06-14 ニチコン株式会社 V2hスタンドおよび当該v2hスタンドを搭載した蓄電システム
JP7484253B2 (ja) 2020-03-13 2024-05-16 オムロン株式会社 電力制御装置及び電力制御システム
JP7473898B2 (ja) 2021-05-27 2024-04-24 株式会社Tmeic 給電装置およびそれを備える給電システム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006129585A (ja) * 2004-10-27 2006-05-18 Hitachi Ltd 直流配電システムの制御装置及び変換器制御装置
JP2012095418A (ja) * 2010-10-26 2012-05-17 Sharp Corp 直流給電システム
JP2013090560A (ja) * 2011-10-19 2013-05-13 Ishikawa Kogaku Zokei Kenkyusho:Kk 直流給電システム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4641507B2 (ja) * 2006-03-17 2011-03-02 シャープ株式会社 給電システム
JP5050718B2 (ja) * 2007-08-06 2012-10-17 富士電機株式会社 電力変換装置及び電力変換制御方法
JP2009213288A (ja) * 2008-03-05 2009-09-17 Toyota Motor Corp 電源システムおよびそれを備えた車両、ならびに電源システムの制御方法
JP5407752B2 (ja) * 2009-10-28 2014-02-05 トヨタ自動車株式会社 車両の電源システムおよびそれを搭載する車両
JP5522378B2 (ja) * 2010-02-25 2014-06-18 日本電気株式会社 電源装置
JP2012249450A (ja) * 2011-05-30 2012-12-13 Fuji Electric Co Ltd 充電装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006129585A (ja) * 2004-10-27 2006-05-18 Hitachi Ltd 直流配電システムの制御装置及び変換器制御装置
JP2012095418A (ja) * 2010-10-26 2012-05-17 Sharp Corp 直流給電システム
JP2013090560A (ja) * 2011-10-19 2013-05-13 Ishikawa Kogaku Zokei Kenkyusho:Kk 直流給電システム

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016158434A (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力変換装置及び電力管理システム
JP2016158436A (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力管理システム、電力変換装置及び電力管理方法
US10418821B2 (en) 2015-02-25 2019-09-17 Kyocera Corporation Power converting apparatus and power converting method
WO2022097413A1 (ja) * 2020-11-05 2022-05-12 株式会社日立製作所 Dcグリッドシステム、制御装置、制御方法
JP7510850B2 (ja) 2020-11-05 2024-07-04 株式会社日立製作所 Dcグリッドシステム、制御装置、制御方法

Also Published As

Publication number Publication date
JP2014131413A (ja) 2014-07-10
JP6198034B2 (ja) 2017-09-20

Similar Documents

Publication Publication Date Title
WO2014103351A1 (ja) 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム
JP6024973B2 (ja) 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム
JP6085544B2 (ja) 電気自動車用急速充電設備、充電設備のエネルギーマネジメント方法および充電設備システム
KR101818168B1 (ko) 배터리 관리 장치 및 배터리 에너지 저장 시스템
JP6061135B2 (ja) 電力制御装置、電力制御方法、プログラム、およびエネルギーマネジメントシステム
US8410750B2 (en) Method for solar power energy management with intelligent selection of operating modes
JP6026713B1 (ja) 電力管理システム
KR20150011301A (ko) 선박용 전력관리장치
WO2013145658A1 (ja) 充放電制御装置、蓄電システム、および充放電制御方法
JP6522901B2 (ja) 直流配電システム
JP2014050199A (ja) 電力制御装置、接続箱、電力調整器、発電システムおよび電力制御方法
US11121554B2 (en) Electrical power control apparatus, electrical power control method and electrical power control system
KR101849664B1 (ko) 태양광 발전 장치 연계형 전력공급장치 및 그 동작방법
JP6225672B2 (ja) 給電設備及びその運転方法
KR20150135843A (ko) 하이브리드 에너지 저장 시스템 및 그 제어 방법
JP2017139834A (ja) 電力変換装置、およびパワーコンディショナシステム
KR101737461B1 (ko) 태양전지에서 생성된 전력으로 제어 구동전원을 얻는 태양광 발전 시스템 및 그 방법
KR20190062812A (ko) 에너지 저장 시스템
JP2017169446A (ja) 電力制御装置、電力制御システム、電力制御方法、および蓄電池
JP2000069675A (ja) 電力貯蔵電源システム、電力供給方法及び電力給電方法
KR101215396B1 (ko) 방전전류제어를 이용한 하이브리드 스마트그리드 무정전전원장치
JP6677186B2 (ja) 直流給電システム
EP1513240A2 (en) Apparatus for supplying standby power
CN111095717A (zh) 储能***
JP6479516B2 (ja) 入力制御蓄電システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13866538

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13866538

Country of ref document: EP

Kind code of ref document: A1