WO2012088876A1 - 数据发送方法及装置 - Google Patents

数据发送方法及装置 Download PDF

Info

Publication number
WO2012088876A1
WO2012088876A1 PCT/CN2011/077460 CN2011077460W WO2012088876A1 WO 2012088876 A1 WO2012088876 A1 WO 2012088876A1 CN 2011077460 W CN2011077460 W CN 2011077460W WO 2012088876 A1 WO2012088876 A1 WO 2012088876A1
Authority
WO
WIPO (PCT)
Prior art keywords
srs
pucch
pusch
current subframe
data
Prior art date
Application number
PCT/CN2011/077460
Other languages
English (en)
French (fr)
Inventor
梁春丽
戴博
喻斌
杨维维
张禹强
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Priority to RU2013132662/07A priority Critical patent/RU2571096C2/ru
Priority to KR1020137015009A priority patent/KR101847671B1/ko
Priority to BR112013016964-8A priority patent/BR112013016964B1/pt
Priority to US13/977,907 priority patent/US9143297B2/en
Priority to EP11853200.1A priority patent/EP2660992B1/en
Priority to MX2013007728A priority patent/MX2013007728A/es
Priority to DK11853200.1T priority patent/DK2660992T3/da
Priority to JP2013546568A priority patent/JP5869588B2/ja
Priority to FIEP11853200.1T priority patent/FI2660992T3/fi
Publication of WO2012088876A1 publication Critical patent/WO2012088876A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals

Definitions

  • the present invention relates to the field of communications, and in particular to a data transmission method and apparatus.
  • the physical uplink channel of the Long Term Evolution (LTE) system includes a physical random access channel (Physical Random Access Channel, PRASH for short) and a physical uplink shared channel (PUSCH).
  • Physical uplink control channel (PUCCH for short) There are also two physical uplink signals, one is a demodulation reference signal for demodulating data/control signaling (Demodulation Reference Signal, for short DM RS ), the other is the Sounding Reference Signal (SRS) used to measure the uplink channel.
  • PUSCH/PUCCH has two different Cyclic Prefix (CP) lengths, which are common.
  • the Cyclic Prefix (Normal Cyclic Prefix) and the Extended Cyclic Prefix (Extended Cyclic Prefix) are used in the current LTE system.
  • the Uplink Control Information includes the correct/error response. Message, channel status letter (CSI: Channel State Information, which includes Channel Quality Indicator (CQI: Channel Quality Indicator), Precoding Matrix Indicator (PMI) and Rank Indicator (RI: Rank Indicator), Scheduling Request (SR) : Scheduling Request ), and the combinations they send at the same time.
  • CQI Channel Quality Indicator
  • PMI Precoding Matrix Indicator
  • RI Rank Indicator
  • Scheduling Request (SR) : Scheduling Request ), and the combinations they send at the same time.
  • LTE also stipulates that if there is no PUSCH to be transmitted in the current subframe, one or more of the foregoing UCIs (limited to the combination of the two UCIs) are transmitted on the PUCCH, and if the current subframe has a PUSCH to be transmitted at the same time, the foregoing One or more of the UCIs are sent with the data on the PUSCH.
  • LTE defines a variety of PUCCH formats, including PUCCH format 1/la/lb (the channel structure is shown in Figure 1) and format 2/2a/2b (the channel structure is shown in Figure 2).
  • the format 1 is used to send the scheduling request of the UE.
  • the formats la and lb are used to feed back the 1-bit ACK/NACK response message and the 2-bit ACK/NACK response message respectively.
  • the format 2 is used to send the downlink channel state information. To send CSI and 1-bit ACK/NACK response message, format 2b is used to send CSI information and 2-bit ACK/NACK response message.
  • LTE in order to be able to support the PUCCH format 1/la/lb to be transmitted simultaneously with the SRS, LTE also defines a shortened format of the PUCCH format 1/la/lb, that is, the PUCCH is not used in the last symbol of the subframe.
  • the PUCCH is transmitted, and the last symbol of the subframe is used to transmit the SRS.
  • the last symbol of the subframe used to transmit the PUCCH is called a normal PUCCH structure (normal format).
  • the SRS is a signal used by the UE to measure channel state information (CSI).
  • the UE performs parameters such as bandwidth indicated by the eNB, frequency domain location, sequence cyclic shift, period, and subframe offset. , periodically transmitting the uplink SRS on the last data symbol of the transmitting subframe.
  • the eNB determines the uplink CSI of the UE according to the received SRS, and performs operations such as frequency domain selection scheduling, closed loop power control, and the like according to the obtained CSI.
  • LTE only supports periodic SRS. Therefore, in the following description, the SRS refers to the periodic SRS unless otherwise specified.
  • LTE specifies that the SRS is transmitted on the last symbol in the subframe, and in order to maintain the single carrier of the uplink signal and avoid mutual interference between the SRS and the PUSCH/PUCCH between different users, LTE specifies: (1) when the UE is When a certain subframe needs to transmit the PUSCH and the SRS at the same time, the last symbol of the corresponding subframe does not send the PUSCH, and the SRS is sent on the last symbol of the subframe;
  • the resource allocation and the upper layer of the PUSCH are When there is overlap in the configured cell-specific SRS bandwidth configuration, the last symbol of the subframe does not transmit the PUSCH; otherwise, the last symbol of the subframe transmits the PUSCH.
  • the UE When the UE needs to simultaneously transmit the PUCCH and the SRS in a certain subframe, if the PUCCH is in the PUCCH format 2/2a/2b, the UE only transmits the PUCCH, and the SRS is destroyed.
  • ⁇ -Advanced International Mobile Telecommunications-Advanced
  • the peak rate of the IMT-Advanced system can reach lGbit/s.
  • the peak rate of the IMT-Advanced system can reach 100 Mbit/s.
  • LTE-A Long Term Evolution Advanced
  • CA Carrier Aggregation
  • the system includes at least one primary component carrier and a secondary component carrier, wherein the primary component carrier is always active.
  • the component carrier is equivalent to the cell.
  • the uplink bandwidth and the downlink bandwidth may include multiple component carriers.
  • the base station schedules a PDSCH for a certain UE on multiple downlink component carriers, and when the UE does not transmit a PUSCH in the current subframe, the terminal needs to feed back the ACK of the PDSCH transmission of the multiple downlink component carriers on the PUCCH. NACK response message.
  • NACK response message A current work assumes that these ACK/NACK response messages are sent over a UE-specific uplink component carrier; for SR information, the current one assumes that the UE transmits only one SR, and this SR information is passed through a UE-specific The uplink component carrier is transmitted.
  • the current one is that the CSI information is transmitted through a UE-specific uplink component carrier.
  • the current work is determined.
  • the UE is transmitted by using the PUCCH format 1.
  • the UE is sent by using the PUCCH format 2, and for the ACK/NACK response message, PUCCH format la and lb, multiplexed with channel selection already defined in LTE, LTE-A boosts a new DFT-s-OFDM based format for transmitting ACKs with larger loads
  • the /NACK response message has a channel structure diagram as shown in FIG. 3. For convenience of description, this structure is referred to as PUCCH Format 3.
  • LTE-A also introduces uplink multi-antennas and can use up to four antennas as uplink transmit antennas. Therefore, in order to obtain channel state information for each uplink transmit antenna, the UE needs to simultaneously transmit SRS on multiple antennas.
  • non-precoding (ie, antenna-specific) SRS should be used, and DMRS of PUSCH should be pre-coded.
  • the base station can estimate the original CSI of the uplink by receiving the non-precoded SRS, and the pre-coded DMRS cannot make the base station estimate the original CSI of the uplink.
  • the UE transmits the non-precoded SRS by using multiple antennas the SRS resources required by each UE are increased, which causes the number of UEs that can be simultaneously multiplexed in the system to decrease.
  • the UE may also configure the UE to transmit SRS aperiodic through downlink control information or higher layer signaling.
  • LTE-A in order to make full use of uplink resources, and considering that the channel quality is generally good in the application scenario of carrier aggregation, the requirement for single-carrier performance of the uplink signal is relaxed, and PUCCH and PUSCH are simultaneously transmitted. Whether the UE is allowed to transmit PUCCH and PUSCH at the same time can be configured through higher layer parameters.
  • the existing UE cannot implement simultaneous Send multiple physical uplink signals/channels.
  • the main purpose of the present invention is to provide a data transmission method and Device to solve the above problem.
  • a data transmitting method is provided.
  • the data transmitting method includes: determining, by a UE, whether to transmit PUCCH data and/or PUSCH data or SRS on a last symbol on a current subframe according to a predetermined rule; whether the UE can use the last symbol according to the current subframe Transmitting PUCCH data and/or PUSCH data, determining PUCCH data and/or PUSCH data transmitted in a current subframe; UE transmitting PUCCH data and/or PUSCH data on a current subframe and/or on a last symbol of a current subframe Send SRS.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data or PUSCH data or SRS (rule 1) on the last symbol on the current subframe includes: when the current subframe is a cell dedicated to the component carrier of the PUSCH where the PUSCH is located, When transmitting a subframe of the SRS, the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 2) on the last symbol on the current subframe includes: when the current subframe is a cell-specific configuration of a component carrier of the component carrier where the PUSCH is located When the subframe for transmitting the SRS is used and the resource allocation of the PUSCH overlaps with the cell-specific SRS bandwidth configuration of the component carrier higher layer configuration, the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 3) on the last symbol on the current subframe includes: when the current subframe is a component carrier where the PUSCH is located or a component carrier of the UE When a component other than the component carrier in which the PUSCH is located is a cell-specific subframe for transmitting the SRS, the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe (rule 4) includes: when the PUCCH is in the format l/la/lb/3, and the UE allows ACK/ The high-level configuration parameter of the simultaneous transmission of the NACK and the SRS is TRUE, and when the current subframe is a cell-specific subframe for transmitting the SRS configured by the upper component of the primary component carrier of the UE, the UE determines that the last symbol of the current subframe is not Send PUCCH.
  • Determining, according to whether the last symbol of the current subframe is used to send PUCCH data and/or PUSCH data determining, by the UE, that the PUCCH data and/or the PUSCH data sent in the current subframe include: when the last symbol of the current subframe cannot be used for sending In PUSCH, when the UE determines the number of time domain symbols occupied by the PUSCH transmission, it is set to 1; otherwise, it is set to 0, where is a variable indicating whether the current subframe is to transmit SRS; when the last symbol of the current subframe cannot For transmitting the PUCCH format l/la/lb/3, the PUCCH transmits the PUCCH data in the current subframe using the truncation structure, otherwise the PUCCH data is transmitted by the conventional structure.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 5) on the last symbol on the current subframe includes: when the UE simultaneously transmits SRSs of multiple uplink component carriers on the current subframe, And when the PUSCH data and/or the PUCCH data of the UE are not transmitted on the last symbol of the current subframe, the UE sends the SRS with the high priority on the last symbol of the current subframe according to a predetermined priority principle.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe (rule 5) includes: In the advanced long-term evolution LTE-A system, when the UE is on the current subframe When the SRSs of the multiple uplink component carriers are simultaneously transmitted, and the PUSCH data and/or the PUCCH data of the UE are not transmitted on the last symbol of the current subframe, the UE has a predetermined priority principle, and is on the last symbol of the current subframe. Send the highest priority SRS.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 5) on the last symbol on the current subframe includes: when the UE simultaneously transmits SRSs of multiple uplink component carriers on the current subframe, And when the PUSCH data and/or the PUCCH data of the UE are not sent on the last symbol of the current subframe, when the UE is configured by the higher layer signaling to allow the n SRSs to be simultaneously transmitted on the last symbol of the subframe, the UE a predetermined priority principle, sending high priority n SRSs in the last symbol of the current subframe, n being an integer greater than 1; or configuring the UE not to simultaneously transmit on the last symbol of the subframe when configured by higher layer signaling For n SRSs, the UE transmits the highest priority SRS in the last symbol of the current subframe according to the predetermined priority principle.
  • the high-level signaling is configured to allow the UE to simultaneously transmit n SRSs on the last symbol of the subframe, including one of the following:
  • the high-layer signaling is newly added high-level signaling of the LTE-A system, or the high-layer signaling is LTE-A system defined high-level signaling for indicating simultaneous transmission of PUSCH and PUCCH; indicating that the UE is allowed to be enabled by configuring high-level signaling for allowing simultaneous transmission of PUSCH and PUCCH to be true (TRUE) or ON (ON)
  • TRUE true
  • ON ON
  • the n SRSs are transmitted at the same time;
  • the high-level signaling configured to indicate that the PUSCH and the PUCCH are allowed to be simultaneously transmitted is ⁇ _(FALSE) or OFF (OFF) to indicate that the UE can only send one SRS.
  • the predetermined priority principle includes: setting the priority of the uplink component carrier to the priority of transmitting the SRS on the corresponding component carrier.
  • the predetermined priority principle includes at least one of the following: preferentially setting the priority of the aperiodic SRS to be higher than the priority of the periodic SRS; secondly, setting the priority of the SRS on the primary uplink component carrier is higher than other components Priority on the carrier; again set the priority of the SRS on the component carrier with the PUSCH transmission containing the UCI at the same time as the priority of the SRS of the component carrier transmitted with the PUSCH not including the UCI; The priority of the SRS on the component carrier is higher than the priority of the SRS of the component carrier without the PUSCH transmission; after the priority principle is applied, the priority of the SRS on the multiple component carriers is still the same, then the uplink component carrier is set.
  • the priority is the priority of the SRS on the corresponding plurality of component carriers.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe includes: when the UE simultaneously transmits PUCCH format 2/2a/2b and periodic SRS on the current subframe, The UE determines to transmit the PUCCH on the current subframe, and does not transmit the periodic SRS.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUCCH format containing the ACK/NACK response message on the current subframe 2/ In the case of 2a/2b and aperiodic SRS, the UE determines to transmit the PUCCH on the current subframe and does not transmit the aperiodic SRS.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe includes: when the UE simultaneously transmits the PUCCH format 2 and not containing the ACK/NACK response message on the current subframe In the case of aperiodic SRS, the UE determines that the PUCCH is not transmitted on the current subframe, and transmits an aperiodic SRS.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUSCH or PUCCH format l/la/lb/3 and the current subframe. SRS, and the last symbol of the current subframe is used to transmit the UE When the PUSCH data or PUCCH format is l/la/lb/3, the UE determines to transmit PUSCH data or PUCCH data on the current subframe, and the UE determines that the SRS is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUSCH or PUCCH format l/la/lb/3 and the current subframe. SRS, and when the last symbol of the current subframe is not used to transmit the PUSCH data of the UE or the format l/la/lb/3 of the PUCCH data, the UE determines to transmit the PUSCH data or the PUCCH data in the current subframe except the last symbol. The UE determines to transmit the SRS on the last symbol of the current subframe.
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe includes: when the UE simultaneously transmits PUCCH, PUSCH, and SRS on the current subframe, and is used to indicate that the PUSCH is allowed.
  • the UE When the high layer signaling transmitted simultaneously with the PUCCH is true (TRUE) or ON (ON), the UE first determines the transmission of the PUCCH and the SRS according to the processing method in which the PUCCH and the SRS are transmitted in the same subframe; The SRS is still to be transmitted on the last symbol of the frame, and the transmission of the PUSCH and the SRS is further determined according to the processing method in which the PUSCH and the SRS are transmitted on the same subframe.
  • Determining the transmission of the PUCCH and the SRS according to the processing method of the PUCCH and the SRS being transmitted on the same subframe includes: when the UE simultaneously transmits the PUCCH format 2/2a/2b and the periodic SRS on the current subframe, the UE determines that the current subframe is Transmitting the PUCCH, not transmitting the periodic SRS; when the UE simultaneously transmits the PUCCH format 2/2a/2b and the aperiodic SRS including the ACK/NACK response message on the current subframe, the UE determines to transmit the PUCCH on the current subframe, Transmitting a non-periodic SRS when the UE simultaneously transmits a PUCCH format 2 and an aperiodic SRS that do not include an ACK/NACK response message on the current subframe, the UE determines not to transmit the PUCCH in the current subframe, and sends the aperiodic SRS; The UE sends the PUCCH format l/la/lb/3 and SRS
  • Determining, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe includes: when the UE simultaneously transmits PUCCH, PUSCH, and SRS on the current subframe, and is used to indicate that the PUSCH is allowed.
  • the high layer signaling transmitted simultaneously with the PUCCH is When FALSE or OFF, the UE first transmits the UCI information carried by the PUCCH on the PUSCH placed on the PUSCH; and then determines the transmission of the PUSCH and the SRS according to the processing method in which the PUSCH and the SRS are transmitted in the same subframe.
  • Determining the transmission of the PUSCH and the SRS according to the processing method of the PUSCH and the SRS being transmitted on the same subframe includes: when the UE simultaneously transmits the PUSCH data and the SRS on the current subframe, and the last symbol of the current subframe is used to send the UE.
  • the UE determines to transmit the PUSCH data on the current subframe, and the UE determines that the SRS is not transmitted on the last symbol of the current subframe; when the UE simultaneously transmits the PUSCH data and the SRS on the current subframe, and the last of the current subframe
  • the UE determines to transmit PUSCH data on the last symbol except the current subframe, and the UE determines to transmit the SRS on the last symbol of the current subframe.
  • the data transmitting apparatus includes: a first determining module, configured to determine whether to transmit PUCCH data and/or PUSCH data or SRS on a last symbol on a current subframe according to a predetermined rule; a second determining module, configured to Determining, according to whether the last symbol of the current subframe is used for transmitting PUCCH data and/or PUSCH data, PUCCH data and/or PUSCH data sent in a current subframe; and sending, configured to send PUCCH data and the current subframe / or PUSCH data and / or send SRS on the last symbol of the current subframe.
  • FIG. 1 is a schematic structural diagram of a PUCCH format 1/la/lb according to the related art
  • FIG. 2 is a schematic structural diagram of a PUCCH format 2/2a/2b according to the related art
  • FIG. 3 is a PUCCH format according to the related art.
  • 3 is a schematic structural diagram of FIG. 4;
  • FIG. 4 is a flowchart of a data transmitting method according to an embodiment of the present invention;
  • 5 is a schematic diagram of time-frequency domain locations of PUCCH, PUSCH, and SRS according to an embodiment of the present invention;
  • FIG. 6 is a schematic diagram of multiplexing PUSCH and SRS on the same component carrier according to an embodiment of the present invention;
  • FIG. 12 is another schematic diagram of multiplexing PUCCH and SRS on the same component carrier according to an embodiment of the present invention;
  • 13 is a schematic diagram of multiplexing PUCCH and SRS on the same component carrier according to an embodiment of the present invention; FIG.
  • FIG. 14 is another schematic diagram of multiplexing PUCCH and SRS on different component carriers according to an embodiment of the present invention
  • Figure 15 is another schematic diagram of multiplexing PUCCH and SRS on different component carriers according to an embodiment of the present invention
  • Figure 16 is a diagram of simultaneous transmission of multiple SRSs on different component carriers according to an embodiment of the present invention
  • FIG. 17 is another schematic diagram of simultaneous transmission of multiple SRSs on different component carriers according to an embodiment of the present invention
  • FIG. FIG. 18 is another schematic diagram of a plurality of SRSs simultaneously transmitted on different component carriers according to an embodiment of the present invention
  • FIG. 19 is a block diagram showing the structure of a data transmitting apparatus according to an embodiment of the present invention.
  • FIG. 4 is a flowchart of a data sending method according to an embodiment of the present invention. As shown in FIG. 4, the following steps S402 to S406 are included. Step S402, the UE determines, according to a predetermined rule, whether to send physical uplink control channel PUCCH data and/or physical uplink shared channel PUSCH data or measurement reference signal SRS on the last symbol on the current subframe.
  • Step S404 the UE determines PUCCH data and/or PUSCH data transmitted in the current subframe according to whether the last symbol of the current subframe can be used to transmit PUCCH data and/or PUSCH data.
  • Step S406 the UE sends PUCCH data and/or PUSCH data on the current subframe and/or transmits the SRS on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data or PUSCH data or SRS (rule 1) on the last symbol on the current subframe, including: when the current subframe is a cell-specific configured by the component carrier of the PUSCH When the subframe for transmitting the SRS is used, the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 2) on the last symbol on the current subframe, including: when the current subframe is a cell configured by a component carrier of the PUSCH.
  • the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 3) on the last symbol on the current subframe, including: when the current subframe is a component carrier where the PUSCH is located or a component of the UE Other than the component carrier where the PUSCH is located in the carrier
  • the UE determines that the PUSCH is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 4) on the last symbol on the current subframe, including: when the PUCCH is in the format l/la/lb/3, and the UE
  • the high-level configuration parameter that allows ACK/NACK and SRS simultaneous transmission is TRUE, and when the current subframe is a cell-specific subframe for transmitting the SRS configured by the UE's primary component carrier, the UE determines the last one of the current subframe.
  • the PUCCH is not transmitted on the symbol.
  • the UE determines whether the PUCCH data and/or the PUSCH data sent in the current subframe is: according to whether the last symbol of the current subframe is used to send the PUCCH data and/or the PUSCH data: when the last symbol of the current subframe cannot When transmitting the PUSCH, the UE sets to 1 when determining the number of time domain symbols occupied by the PUSCH transmission; otherwise, sets N to 0, where N is a variable indicating whether the current subframe is to transmit SRS; when the current subframe When the last symbol cannot be used to transmit the PUCCH format l/la/lb/3, the PUCCH transmits the PUCCH data in the current subframe using the truncation structure, otherwise the PUCCH data is transmitted by the conventional structure.
  • the UE determines the number of time domain symbols occupied by the PUSCH transmission, and calculates according to the following formula;
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 5) on the last symbol on the current subframe, including: when the UE simultaneously transmits multiple uplink and downlink component carriers on the current subframe SRS, and when the PUSCH data and/or PUCCH data of the UE are not transmitted on the last symbol of the current subframe, the UE transmits the SRS with high priority on the last symbol of the current subframe according to a predetermined priority principle.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe (rule 5) includes: in the advanced long-term evolution LTE-A system, when the UE is currently The SRS of the multiple uplink component carriers is simultaneously transmitted on the subframe, and when the PUSCH data and/or the PUCCH data of the UE are not transmitted on the last symbol of the current subframe, the UE is at the end of the current subframe according to a predetermined priority principle. One SRS with the highest priority is sent on one symbol.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS (rule 5) on the last symbol on the current subframe, including: when the UE is in the current subframe When the SRSs of the multiple uplink component carriers are simultaneously transmitted, and the PUSCH data and/or the PUCCH data of the UE are not transmitted on the last symbol of the current subframe, when the UE is configured by the higher layer signaling, the last symbol of the subframe is allowed.
  • a predetermined rule whether to transmit PUCCH data and/or PUSCH data or SRS (rule 5) on the last symbol on the current subframe, including: when the UE is in the current subframe When the SRSs of the multiple uplink component carriers are simultaneously transmitted, and the PUSCH data and/or the PUCCH data of the UE are not transmitted on the last symbol of the current subframe, when the UE is configured by the higher layer signaling, the last symbol of the subframe is allowed.
  • n SRSs When n SRSs are simultaneously transmitted, the UE sends high-priority n SRSs in the last symbol of the current subframe according to a predetermined priority principle, where n is an integer greater than 1 or when the UE is configured through higher layer signaling.
  • n SRSs are allowed to be simultaneously transmitted on the last symbol of the subframe, the UE transmits the highest priority SRS in the last symbol of the current subframe according to a predetermined priority principle.
  • configuring the UE to transmit n SRSs on the last symbol of the subframe by using the high layer signaling includes one of the following: the high layer signaling is newly added high layer signaling of the LTE-A system, or the high layer signaling is LTE- A system has defined high-level signaling for indicating simultaneous transmission of PUSCH and PUCCH; indicating that the UE is allowed to transmit simultaneously by configuring high-level signaling for allowing simultaneous transmission of PUSCH and PUCCH to be true (TRUE) or ON (ON) n SRSs; indicating that the UE can only transmit one SRS by configuring high-level signaling for allowing simultaneous transmission of PUSCH and PUCCH to i (FALSE) or OFF (OFF).
  • the high layer signaling is newly added high layer signaling of the LTE-A system, or the high layer signaling is LTE- A system has defined high-level signaling for indicating simultaneous transmission of PUSCH and PUCCH; indicating that the UE is allowed to transmit simultaneously by configuring high-
  • the predetermined priority principle includes: setting a priority of the uplink component carrier to a priority of transmitting the SRS on the corresponding component carrier.
  • the predetermined priority principle includes at least one of the following: preferentially setting the priority of the aperiodic SRS to be higher than the priority of the periodic SRS; and secondly setting the priority of the SRS on the primary uplink component carrier Priority on other component carriers; again set the priority of the SRS on the component carrier that has the PUSCH transmission including the UCI at the same time as the priority of the SRS of the component carrier that does not include the UCI.
  • the priority of the SRS on the component carrier transmitted by the PUSCH is higher than the priority of the SRS of the component carrier without the PUSCH transmission; after the priority principle is applied, the priority of the SRS on the multiple component carriers remains the same, then the uplink is set.
  • the priority of the component carrier is the priority of the SRS on the corresponding plurality of component carriers.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUCCH format 2/2a/2b and the period on the current subframe.
  • the UE determines to transmit the PUCCH on the current subframe, and does not transmit the periodic SRS.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits on the current subframe
  • the UE determines to transmit the PUCCH on the current subframe and does not transmit the aperiodic SRS.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUCCH that does not include the ACK/NACK response message on the current subframe.
  • the UE determines that the PUCCH is not transmitted on the current subframe, and transmits the aperiodic SRS.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUSCH or PUCCH format l/la/lb on the current subframe. /3 and SRS, and when the last symbol of the current subframe is used to transmit the PUSCH data of the UE or the format l/la/lb/3 of the PUCCH, the UE determines to transmit PUSCH data or PUCCH data on the current subframe, and the UE determines The SRS is not transmitted on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe, including: when the UE simultaneously transmits the PUSCH or PUCCH format l/la/lb on the current subframe. /3 and SRS, and when the last symbol of the current subframe is not used to transmit the PUSCH data of the UE or the format l/la/lb/3 of the PUCCH data, the UE determines to transmit the PUSCH data in the current subframe except the last symbol or PUCCH data, the UE determines to transmit the SRS on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe comprises: when the UE simultaneously transmits PUCCH, PUSCH and SRS on the current subframe, and is used for When the high layer signaling indicating that the PUSCH and the PUCCH are simultaneously transmitted is true (TRUE) or ON (ON), the UE first determines the transmission of the PUCCH and the SRS according to the processing method in which the PUCCH and the SRS are transmitted in the same subframe; After the SRS is still transmitted on the last symbol of the subframe, the transmission of the PUSCH and the SRS is further determined according to the processing method in which the PUSCH and the SRS are transmitted in the same subframe.
  • the sending of the PUCCH and the SRS includes: when the UE simultaneously transmits the PUCCH format 2/2a/2b and the periodic SRS on the current subframe, the UE determines that the current The PUCCH is transmitted on the subframe, and the periodic SRS is not transmitted; when the UE simultaneously transmits the PUCCH format 2/2a/2b and the aperiodic SRS including the ACK/NACK response message on the current subframe, the UE determines to transmit on the current subframe.
  • the UE does not transmit an aperiodic SRS; when the UE simultaneously transmits a PUCCH format 2 that does not contain an ACK/NACK response message on the current subframe 2 And the aperiodic SRS, the UE determines that the PUCCH is not transmitted on the current subframe, and sends the aperiodic SRS; when the UE simultaneously transmits the PUCCH format 1/1 a/lb/3 and the SRS in the current subframe, and the current subframe
  • the UE determines to transmit PUCCH data on the current subframe, and the UE determines that the SRS is not transmitted on the last symbol of the current subframe;
  • the PUCCH format l/la/lb/3 and SRS are simultaneously transmitted on the current subframe, and the PUCCH format l/la/lb/3 of the UE is not used for transmitting the last symbol of the current subframe, the UE determines
  • the PUCCH data is transmitted on the last symbol, and the UE determines to transmit the SRS on the last symbol of the current subframe.
  • the UE determines, according to a predetermined rule, whether to transmit PUCCH data and/or PUSCH data or SRS on the last symbol on the current subframe comprises: when the UE simultaneously transmits PUCCH, PUSCH and SRS on the current subframe, and is used for When the high-level signaling indicating that the PUSCH and the PUCCH are simultaneously transmitted is ⁇ _(FALSE) or OFF (OFF), the UE first transmits the UCI information carried by the PUCCH on the PUSCH placed on the PUSCH; and then is in the same subframe according to the PUSCH and the SRS.
  • the processing method of the transmission determines the transmission of the PUSCH and the SRS.
  • determining, according to the processing method that the PUSCH and the SRS are sent in the same subframe, the sending of the PUSCH and the SRS includes: when the UE simultaneously transmits the PUSCH data and the SRS on the current subframe, and the last symbol of the current subframe is used for When transmitting the PUSCH data of the UE, the UE determines to transmit the PUSCH data in the current subframe, and the UE determines that the SRS is not sent on the last symbol of the current subframe; when the UE simultaneously transmits the PUSCH data and the SRS in the current subframe, and the current sub-sub When the last symbol of the frame is not used to transmit the PUSCH of the UE, the UE determines to transmit the PUSCH data on the last symbol except the last subframe, and the UE determines to transmit the SRS on the last symbol of the current subframe.
  • UL CC#2 is the primary uplink component carrier (UL PCC); where subframe #1/#1 ⁇ is a cell-specific subframe of the high-level configuration of UL CC#1 that can be used to transmit SRS, and subframe #i/#k/#l is UL CC#2
  • the high-level configured cell-specific subframes that can be used to transmit the SRS, and the subframe #i/#j/#l are the cell-specific subframes that can be used to transmit the SRS for the high-level configuration of the UL CC#3.
  • the SRS described below includes a periodic SRS and an aperiodic SRS, unless otherwise specified.
  • Embodiment 1 As shown in FIG. 6, it is assumed that the UE on subframe #i needs to simultaneously transmit PUSCH and SRS on UL CC#2, since subframe #i can transmit SRS, therefore, current subframe #1 must be UL CC# 2
  • Embodiment 2 Embodiment 2-1 As shown in FIG. 7, it is assumed that the UE on subframe #1 is to transmit a PUSCH on UL CC#2, and the UL CC#1 needs to transmit an SRS, and for UL CC#2, Frame #i is a cell-specific SRS subframe configured by the UL CC#2 upper layer, and it is assumed here that the resource allocation of the PUSCH on the current UL CC#2 overlaps with the cell-specific SRS bandwidth of the high-level configuration of the UL CC#2.
  • the UE will not transmit the PUSCH in the last symbol of the subframe ⁇ , and according to rule 8, since there is no PUSCH transmission on the last symbol of the subframe #1, the UE will be in the subframe.
  • the SRS of UL CC#1 is transmitted on the last symbol of #i.
  • Embodiment 2-2 As shown in FIG. 8, it is assumed that the UE on subframe #1 is to transmit a PUSCH on UL CC#2, and the SRS is required to be transmitted on UL CC#1.
  • subframe #i is UL CC#2 high-level configured cell-specific SRS subframe
  • the UE will send the PUSCH in the last symbol of the subframe ⁇
  • rule 7 since the last symbol of the subframe #1 has PUSCH transmission, the SRS of the UL CC#1 will be destroyed. send.
  • Embodiment 2-3 As shown in FIG. 9, it is assumed that the UE on the subframe #" is to transmit the PUSCH on the UL CC #2, and the SRS is required to be transmitted on the UL CC #3.
  • the UE Since the subframe #" is not UL CC#2 high-level configured cell-specific SRS subframe, therefore, according to rule 1, the UE will send on the last symbol of subframe #j PUSCH, according to rule 7, since the last symbol of subframe #" has PUSCH transmission, the SRS of UL CC#3 will be cancelled and not sent.
  • Embodiment 2-4 As shown in FIG. 10, it is assumed that the UE on the subframe #" is to transmit the PUSCH on the UL CC #2, and the SRS is required to be transmitted on the UL CC #3.
  • the subframe #j is not UL CC#2 high-level configured cell-specific SRS subframe, but is a cell-specific SRS subframe configured by UL CC#3, so according to rule 3, the UE will not be the last symbol of subframe #j
  • the PUSCH is transmitted upward, and according to rule 8, since there is no PUSCH transmission on the last symbol of the subframe #", the UE will transmit the SRS of the UL CC #3 on the last symbol of the subframe #".
  • Embodiment 3 3-1 As shown in FIG. 11, it is assumed that a PUCCH and an SRS are simultaneously transmitted on a UL CC #2 in a subframe, and it is assumed that the PUCCH is one of PUCCH formats l/la/lb/3. And, assuming that the high-level configuration parameter Simultaneous-AN-and-SRS is TRUE, according to rule 4, the UE will send the PUCCH in the truncation structure on the subframe # ⁇ , that is, the last one of the subframe #i There is no PUCCH transmission on the symbol, and according to rule 8, since there is no PUCCH transmission on the last symbol of subframe #i, the UE will transmit the SRS on the last symbol of subframe #i.
  • Simultaneous-AN-and-SRS is TRUE
  • Embodiment 3-2 As shown in FIG. 12, it is assumed that the UE on subframe #i is to simultaneously transmit PUCCH and SRS on UL CC#2, assuming that the PUCCH is one of PUCCH formats l/la/lb/3, and Assuming that the high-level configuration parameter Simultaneous-AN-and-SRS is FALSE, according to rule 4, the UE will send the PUCCH on the subframe #1 using the conventional structure, that is, the PUCCH is transmitted on the last symbol of the subframe #i. According to rule 7, since there is PUCCH transmission on the last symbol of subframe #1, the UE will cancel the SRS on UL CC#2 and not transmit.
  • Example 4 Example 4-1 As shown in FIG.
  • the UE on subframe #1 is to transmit a PUCCH on UL CC#2, and the SRS is to be transmitted on UL CC#1, assuming that the PUCCH is one of PUCCH formats l/la/lb/3.
  • the high-level configuration parameter Simultaneous-AN-and-SRS is TRUE, since the subframe #i is a cell-specific SRS subframe configured by the UL CC#2 upper layer, the UE will be in the subframe #1 according to rule 4.
  • the upper layer transmits the PUCCH on the UL CC#2 with the truncation structure, that is, there is no PUCCH transmission on the last symbol of the subframe #i, and then according to the rule 8, since there is no PUCCH transmission on the last symbol of the subframe #i Therefore, the UE will transmit the SRS of UL CC#1 on the last symbol of subframe #i.
  • Embodiment 4-2 As shown in FIG.
  • a UE on subframe #1 is to transmit a PUCCH on UL CC#2, and an SRS is to be transmitted on UL CC#1, assuming that the PUCCH is a PUCCH format l/la/lb/ One of the three, and assuming that the high-level configuration parameter Simultaneous-AN-and-SRS is FALSE, according to rule 4, the UE will transmit the PUCCH on the UL CC#2, that is, the subframe, on the subframe # ⁇ using the conventional structure. There is PUCCH transmission on the last symbol of #i, and according to rule 7, since there is PUCCH transmission on the last symbol of subframe #1, the UE will not send the SRS of UL CC#1.
  • Embodiment 4-3 As shown in FIG. 15, it is assumed that a UE on subframe #" is to transmit a PUCCH on UL CC#2, and an SRS is to be transmitted on UL CC#2, assuming that the PUCCH is in a PUCCH format l/la/lb/ In one of the three, since the subframe #j is not the cell-specific SRS subframe configured by the upper layer of the primary uplink component carrier UL CC#2, according to rule 4, the UE will transmit the UL on the subframe #1 using the conventional structure.
  • the PUCCH on CC#2 that is, the last symbol of subframe #j, has PUCCH transmission, and then according to rule 7, since the last symbol of subframe #" has PUCCH transmission, the UE will play UL.
  • the SRS of CC#3 is not sent.
  • Embodiment 5 5-1 As shown in FIG. 12, it is assumed that a PUCCH and a periodic SRS are simultaneously transmitted on a UL CC #2 in a subframe, and it is assumed that the PUCCH is one of PUCCH formats 2/2a/2b. According to rule 6, the UE will send the PUCCH on subframe #1, and then rule 7, because the last symbol of subframe #i has PUCCH transmission, therefore, the UE will cancel the SRS on UL CC#2. Do not send.
  • Embodiment 5-2 As shown in FIG.
  • Embodiment 5-3 As shown in FIG. 12, it is assumed that a PUCCH and an aperiodic SRS are simultaneously transmitted on a UL CC #2 in a subframe, and it is assumed that the PUCCH is a PUCCH format 2 that does not include ACK/NACK transmission, according to a rule. 6. Since the PUCCH does not include ACK/NACK transmission, the UE will not send the PUCCH on the subframe #i, and then the rule 8, since there is no PUCCH transmission on the last symbol of the subframe #1, therefore, the UE The SRS on UL CC#2 is transmitted on the last symbol on subframe #i.
  • Embodiment 6 Embodiment 6-1 As shown in FIG. 14, it is assumed that a subframe is to transmit a PUCCH on UL CC #2, and a periodic SRS is to be transmitted on UL CC #1, assuming that the PUCCH is PUCCH format 2 One of /2a/2b, according to rule 6, the UE will transmit the PUCCH of UL CC#2 on subframe # ⁇ , and according to rule 7, since PUCCH is transmitted on the last symbol of subframe #i, therefore, The UE will cancel the SRS on UL CC# 1 and not send it.
  • Embodiment 6-2 As shown in FIG. 14, it is assumed that a sub-frame ⁇ 1 is to transmit a PUCCH on UL CC#2, and
  • Aperiodic SRS is to be transmitted on UL CC#1, assuming that the PUCCH is PUCCH format 2a or 2b or PUCCH format 2 containing ACK/NACK transmission, according to rule 6, due to the PUCCH
  • the ACK/NACK transmission is included, so the UE will transmit the PUCCH of the UL CC#2 on the subframe #1, and according to the rule 7, since the PUCCH is transmitted on the last symbol of the subframe #i, the UE will cancel the UL.
  • the SRS on CC#1 is not sent.
  • Embodiment 6-3 As shown in FIG. 13, it is assumed that a subframe is to transmit a PUCCH on UL CC#2, and an aperiodic SRS is to be transmitted on UL CC#1, assuming that the PUCCH does not include ACK/NACK. Transmitted PUCCH format 2, according to rule 6, since the PUCCH does not include ACK/NACK transmission, the UE will not transmit the PUCCH of UL CC#2 on subframe #i, and according to rule 8, due to subframe #i There is no PUCCH transmission on the last symbol, therefore, the UE transmits the SRS on UL CC#1 on the last symbol on subframe #i.
  • Embodiment 7 7-1 When the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is TRUE, that is, the PUCCH and the PUSCH are simultaneously transmitted, the UE comprehensively uses the same processing as the specific embodiments 1, 3, and 5. The method is to determine the transmission of PUCCH, PUSCH and SRS.
  • Embodiment 7-2 When the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is FALSE, that is, the PUCCH and the PUSCH are not allowed to be simultaneously transmitted, the UCI carried by the PUCCH is sent on the PUSCH, that is, the current sub- Only PUSCH and PUSCH are transmitted simultaneously on the frame. At this time, the PUSCH and the SRS are simultaneously transmitted on the same component carrier, and therefore, the UE determines the transmission of the PUSCH and the SRS by using the same processing method as that of the specific embodiment 1.
  • Embodiment 8 Embodiment 8-1 when the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is TRUE, that is, the PUCCH and the PUSCH are simultaneously transmitted, if the PUCCH and the PUSCH to be transmitted in the current subframe are on the same component carrier,
  • the SRS is on another component carrier, or the PUCCH, the PUSCH, and the SRS are all on different component carriers, and the UE comprehensively uses the same processing manner as the specific embodiments 2, 4, and 6 to determine the PUCCH, PUSCH, and SRS transmission. .
  • Embodiment 8-2 When the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is TRUE, that is, the PUCCH and the PUSCH are simultaneously transmitted, if the PUCCH and the SRS to be transmitted in the current subframe are on the same component carrier, and the PUSCH is in another On a component carrier, the UE integrates the same processing manners as in the specific embodiments 2, 3, and 5 to determine the transmission of PUCCH, PUSCH, and SRS.
  • Embodiment 8-3 When the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is TRUE, that is, the PUCCH and the PUSCH are simultaneously transmitted, if the PUSCH and the SRS to be transmitted in the current subframe are on the same component carrier, and the PUCCH is in another On a component carrier, the UE integrates the same processing manners as in the specific embodiments 1, 4, and 6 to determine the transmission of PUCCH, PUSCH, and SRS.
  • Embodiment 8-4 When the UE high-level configuration parameter Simultaneous-PUCCH-and-PUSCH is FALSE, that is, the PUCCH and the PUSCH are not allowed to be simultaneously transmitted, the UCI carried by the PUCCH will be sent on the PUSCH, if the current subframe is to be sent.
  • the PUSCH and the SRS are on different component carriers, and the UE will use the same processing manner as in Embodiment 2 to determine the transmission of the PUSCH and the SRS. If the PUSCH and the SRS to be transmitted in the current subframe are in the same subframe (for the scenario where the original PUSCH and the PUCCH are not on the same component carrier), the UE will use the same processing method as that of the specific embodiment 1. , to determine the transmission of PUSCH and SRS.
  • Embodiment 9 Embodiment 9-1 When the UE is configured by the higher layer signaling to allow multiple SRSs to be simultaneously transmitted, the UE transmits the SRS of the multiple component carriers on the last symbol of the subframe.
  • Embodiment 9-2 When the UE is configured by high layer signaling to not allow multiple SRSs to be simultaneously transmitted, the UE transmits on the last symbol of the subframe according to a predefined priority principle. The SRS of the highest priority component carrier.
  • Embodiment 9-2-1 It is assumed that the priority principle 1 of the above-mentioned priority is adopted when the UE uses the SRS selection, and the priority of the UL CC# 1/2/3 is: UL CC#2>UL CC# 1>UL CC#3. As shown in FIG. 16, the UE needs to transmit UL CC#1 and UL on the last symbol of subframe #i.
  • the SRS of CC#2 but the signaling of the high-layer configuration of the UE does not allow multiple SRSs to be transmitted at the same time. Therefore, the UE is based on the priority principle 1.
  • the UL CC#2 has the highest priority. Therefore, the UE will transmit the SRS of UL CC#2 on the last symbol of subframe #i, and The SRS on the UL CC#1 is not transmitted, regardless of whether the SRS on the UL CC#1 is a periodic SRS or an aperiodic SRS.
  • Embodiment 9-2-2 The priority principle 2 described above is used when the UE is used for SRS selection. As shown in FIG.
  • the UE needs to transmit the periodic SRS of the UL CC #1 and the periodic SRS of the UL CC #2 on the last symbol of the subframe #i, but the signaling of the high layer configuration of the UE does not allow multiple SRSs simultaneously. Transmit, therefore, the UE is based on the priority principle 2, since the SRS on the UL CC #1 is an aperiodic SRS, the UE will transmit the aperiodic SRS of the UL CC #1 on the last symbol on the subframe #1. The SRS on the UL CC#2 is not sent.
  • Embodiment 9-2-3 It is assumed that the priority principle 2 described above is used when the UE uses the SRS selection. As shown in FIG. 17, it is assumed that the UE needs to transmit UL CC#1 and the last symbol of subframe #i.
  • the same type of SRS of UL CC#3 (same as periodic SRS or the same as aperiodic SRS), but the signaling of the high-level configuration of the UE does not allow multiple SRSs to be transmitted simultaneously. Therefore, the UE is based on the priority principle 2, because UL CC# 1 and the SRS type on UL CC#2 are the same, but there is a PUSCH to be transmitted on UL CC#3, and no PUSCH is to be transmitted on UL CC#1, therefore, the UE will be on the last symbol on subframe #1.
  • the SRS of UL CC#3 is transmitted and the SRS on UL CC#1 is not sent.
  • Embodiment 9-2-4 The priority principle 2 described above is used when the UE is used for SRS selection. As shown in FIG. 18, it is assumed that the UE needs to transmit the same type of SRS of UL CC#1 and UL CC#3 on the last symbol of subframe #i (same as periodic SRS or the same as non-periodic SRS), but the UE is high-level. The configured signaling does not allow multiple SRSs to be transmitted simultaneously. Therefore, according to the priority principle 2, the UE has the same SRS type on UL CC#1 and UL CC#2, and neither UL CC#1 nor UL CC#3 is the primary.
  • the uplink component carrier also has a PUSCH to be transmitted.
  • the UE needs to select a higher priority SRS to transmit on the UL CC #1 and the UL CC #3 according to the priority principle 1 described above, because the component carrier The priority is UL CC#1>UL CC#3. Therefore, the UE will transmit the SRS of UL CC#1 on the last symbol on subframe #i and the SRS on UL CC#3 will not be sent.
  • Embodiment 9-2-5 It is assumed that the priority principle 2 described above is used when the UE uses the SRS selection. As shown in FIG.
  • the UE needs to transmit the same type of SRS of UL CC#1 and UL CC#3 on the last symbol of subframe #i (same as periodic SRS or the same as non-periodic SRS), but the UE is high-level.
  • the configured signaling does not allow multiple SRSs to be transmitted simultaneously. Therefore, according to the priority principle 2, the UE has the same SRS type on UL CC#1 and UL CC#2, and neither UL CC#1 nor UL CC#3 is the primary.
  • Upstream also has a PUSCH to transmit, but assumes that the PUSCH on the UC CC#1 carries the UCI.
  • FIG. 19 is a structural block diagram of a data transmitting apparatus according to an embodiment of the present invention. As shown in FIG.
  • the first determining module 192 is configured to determine, according to a predetermined rule, whether to send PUCCH data and/or PUSCH data and/or SRS on the last symbol on the current subframe; and the second determining module 194 is configured to Whether the last symbol of the frame can be used to transmit PUCCH data and/or PUSCH data, determine PUCCH data and/or PUSCH data transmitted in the current subframe; and send module 196 is configured to transmit PUCCH data and/or on the current subframe.
  • the PUSCH data and/or the SRS is transmitted on the last symbol of the current subframe.
  • the data sending apparatus described in the device embodiment corresponds to the foregoing method embodiment, and the specific implementation process has been described in detail in the method embodiment, and is not described herein.
  • a data transmitting method and apparatus are provided.
  • the present invention can transmit PUCCH data and/or PUSCH data and/or SRS according to different predetermined rules, and can simultaneously transmit multiple physical uplink signals/channels.
  • the above modules or steps of the present invention can be implemented by a general-purpose computing device, which can be concentrated on a single computing device or distributed over a network composed of multiple computing devices.
  • the invention is not limited to any specific combination of hardware and software.
  • the above is only the preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes can be made to the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the scope of the present invention are intended to be included within the scope of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明公开了一种数据发送方法及装置,该方法包括:UE根据预定规则,确定在当前子帧上的最后一个符号上是否发送PUCCH数据和/或PUSCH数据或SRS;UE根据当前子帧的最后一个符号能否用于发送PUCCH数据和/或PUSCH数据,确定在当前子帧发送的PUCCH数据和/或PUSCH数据;UE在当前子帧上发送PUCCH数据和/或PUSCH数据和/或在当前子帧的最后一个符号上发送SRS。本发明可以实现同时发送多种物理上行信号/信道。

Description

数据发送方法^置 技术领域 本发明涉及通信领域, 具体而言, 涉及一种数据发送方法及装置。 背景技术 长期演进(Long Term Evolution, 简称为 LTE ) ***的物理上行信道包含 物理随机接入信道 (Physical Random Access Channel, 简称为 PRACH )、 物理 上行共享信道 (Physical uplink shared channel, 简称为 PUSCH )、 物理上行控 制信道 ( Physical uplink control channel, 简称为 PUCCH )„ 另外还有两种物理 上行信号, 一种是用于对数据 /控制信令进行解调的解调参考信号 ( Demodulation Reference Signal , 简称为 DM RS ), 另一种是用于测量上行信 道的测量参考信号( Sounding Reference Signal, 简称为 SRS )。 PUSCH/PUCCH 有两种不同的循环前缀( Cyclic Prefix , 简称为 CP ) 长度, 分别是普通循环前 缀( Normal Cyclic Prefix, 简称为 Normal CP )和扩展循环前缀( Extended Cyclic Prefix, 简称为 Extended CP )„ 当前 LTE***中,物理上行控制信令( Uplink Control Information,简称 UCI ) 包括正确 /错误应答消息, 信道状态信息 (CSI: Channel State Information, 其 中包括了信道质量指示符 (CQI: Channel Quality Indicator ), 预编码矩阵指示 符 ( PMI: Precoding Matrix Indicator ) 和秩指示符 ( RI: Rank Indicator ) ), 调 度请求 (SR: Scheduling Request ), 以及它们同时发送的组合。 LTE同时还规 定, 如果当前子帧没有 PUSCH要发送, 则上述的 UCI的一种或多种 (仅限于 2种 UCI的组合) 在 PUCCH上发送, 如果当前子帧同时有 PUSCH要发送, 则上述的 UCI的一种或多种在 PUSCH上与数据一起发送。
LTE定义了多种 PUCCH 格式( format ), 包括 PUCCH format 1/la/lb (其 信道结构示意图如图 1所示)和 format 2/2a/2b(其信道结构示意图如图 2所示), 其中 format 1用来发送 UE的调度请求, format la和 lb分别用来反馈 1比特 的 ACK/NACK应答消息和 2比特的 ACK/NACK应答消息, format 2用来发送 下行的信道状态信息, format 2a用来发送 CSI和 1比特的 ACK/NACK应答消 息, format 2b用来发送 CSI信息和 2比特的 ACK/NACK应答消息。 另外, 为了能够支持 PUCCH格式 1/la/lb能够与 SRS同时发送, LTE还 定义了 PUCCH格式 1/la/lb的截短结构 (shortened format ), 也就是 PUCCH 在子帧的最后一个符号不用于发送 PUCCH, 子帧的最后一个符号用于发送 SRS。 相对于截短结构而言, 子帧的最后一个符号用于发送 PUCCH的称为常 规 PUCCH结构 ( normal format )。
SRS是 UE用来测量无线信道信息( Channel State Information,简称为 CSI ) 的信号, 在长期演进***中, UE按照 eNB指示的带宽、 频域位置、 序列循环 移位、 周期和子帧偏置等参数, 周期性的在发送子帧的最后一个数据符号上发 送上行 SRS。 eNB根据接收到的 SRS判断 UE上行的 CSI, 并根据得到的 CSI 进行频域选择调度、 闭环功率控制等操作。 LTE只支持周期的 SRS。 因此, 在 后面的叙述当中, 如果没特殊说明, SRS都指周期 SRS。
LTE规定 SRS在子帧内的最后一个符号上传输,同时为了保持上行信号的 单载波性以及避免不同用户之间的 SRS和 PUSCH/PUCCH之间相互千扰, LTE 规定: ( 1 )当 UE在某一子帧需要同时发送 PUSCH和 SRS时,相应子帧的最后 一个符号不发送 PUSCH, SRS在子帧的最后一个符号上发送;
( 2 ) 当 UE在某一子帧上只需要发送 PUSCH时, 如果所述子帧为高层配 置小区专有的 ( Cell-specific )可用于发送 SRS的子帧, 则当 PUSCH的资源分 配与高层配置的小区专有的 SRS带宽配置( bandwidth configuration )有重叠时, 所述子帧的最后一个符号不发送 PUSCH; 否则, 所述子帧的最后一个符号发 送 PUSCH。
( 3 ) 当 UE在某一子帧上需要同时发送 PUCCH和 SRS时, 如果所述的 PUCCH 为 PUCCH 格 式 1/la/lb 时 , 则 当 高 层 配 置 的 参 数 Simultaneous-AN-and-SRS为 TRUE时, PUCCH釆用截短结构发送, SRS在子 帧的最后一个符号上发送, 否则, PUCCH釆用常规结构发送, 同时 SRS将被 打掉 (也就是当前子帧 UE不发送 SRS )。
( 4 ) 当 UE在某一子帧上需要同时发送 PUCCH和 SRS时, 如果所述的 PUCCH为 PUCCH格式 2/2a/2b时,则 UE只发送 PUCCH, 同时 SRS被打掉。 在高级国际移动通信 ( International Mobile Telecommunications-Advanced , 简称为 ΙΜΤ- Advanced ) ***中, 能够实现数据的高速传输, 并具有较大的系 统容量, 在低速移动、 热点覆盖的情况下, IMT-Advanced ***的峰值速率可 以达到 lGbit/s, 在高速移动、 广域覆盖的情况下, IMT-Advanced ***的峰值 速率可以达到 100Mbit/s。 为 了 满 足 高 级 国 际 电 信联盟 ( International Telecommunication Union-Advanced, 简称为 ITU- Advanced ) 的要求, 作为 LTE的演进标准的高 级长期演进(Long Term Evolution Advanced, 简称为 LTE-A ) ***需要支持更 大的***带宽 (最高可达 100MHz ), 并需要后向兼容 LTE现有的标准。 在现 有的 LTE***的基础上, 可以将 LTE***的带宽进行合并来获得更大的带宽, 这种技术称为载波聚合 (Carrier Aggregation, 简称为 CA ) 技术, 该技术能够 提高 IMT- Advance***的频谱利用率、 緩解频谱资源紧缺, 进而优化频谱资源 的利用。 在引入了载波聚合的***中, 进行聚合的载波称为分量载波 ( Component Carrier, 简称为 CC ), 也称为一个小区 ( Cell )。 同时, 还提出了主分量载波 / 小区 ( Primary Component Carrier/Cell, 简称为 PCC/PCell )和 i 分量载波 /小区 ( Secondary Component Carrier/Cell, 简称为 SCC/SCell ) 的概念, 在进行了载 波聚合的***中, 至少包含一个主分量载波和辅分量载波, 其中主分量载波一 直处于激活状态。 在后面的叙述当中, 分量载波与小区是等价的。
? I入载波聚合后, 当前关于下行分量载波与 PDSCH传输块以及 HARQ进 程关系的讨论中, 一个基本工作假定是当没有釆用空分复用时, 一个下行分量 载波对应一个 PDSCH传输块以及一个 HARQ进程, 也就是说, UE需要为每 个分量载波的一个 PDSCH传输块反馈 1 比特的 ACK/NACK应答信息。 而当 釆用空分复用时, LTE- A当前规定, 最多支持 2个传输块。 因此, 当釆用空分 复用时, UE 需要为每个下行分量载波的 2 个 PDSCH传输块反馈 2 比特的 ACK/NACK应答消息。 在釆用了频谱聚合技术后的 LTE-A***中,上行带宽和下行带宽就可以包 括多个分量载波。 当基站在多个下行分量载波上都有调度给某 UE 的 PDSCH 时, 且当 UE在当前子帧没有 PUSCH要发送时, 终端需要在 PUCCH上反馈 这多个下行分量载波的 PDSCH传输的 ACK/NACK应答消息。 当前的一个工 作假定是这些 ACK/NACK应答消息是通过一个 UE-specific的上行分量载波发 送; 对于 SR信息, 当前的一个工作假定是 UE只发送一个 SR, 且这个 SR信 息是通过一个 UE-specific的上行分量载波发送,对于 CSI信息, 当前的一个工 作^ _定是 CSI信息是通过一个 UE-specific的上行分量载波发送。 在 LTE-A***中,当前的工作^ _定,对于 SR信息, UE釆用 PUCCH format 1来发送, 对于 CSI, UE釆用 PUCCH format 2来发送, 对于 ACK/NACK应 答消息, 除了可以使用在 LTE中已经定义的 PUCCH format la和 lb, 信道选 择 ( multiplexing with channel selection ) 夕卜, LTE-A 增力口了一种新的基于 DFT-s-OFDM的格式, 用于发送更大负载的 ACK/NACK应答消息, 其信道结 构示意图如图 3所示, 为了便于描述, 将这种结构称为 PUCCH Format 3。 对 于最多能够支持 4比特 ACK/NACK反馈的 UE来说,其 ACK/NACK反馈将釆 用 PUCCH格式 lb联合信道选择的方式来反馈, 而对于能够支持 4比特以上 ACK/NACK反馈的高端 UE来说, 需要通过高层信令配置的方式来指示 UE釆 用哪种方式来反馈 ACK/NACK。 除了载波聚合技术外, LTE-A还引进了上行多天线, 并且最多可以使用 4 根天线作为上行发射天线。 因此, 为了能够得到每根上行发射天线的信道状态 信息, UE需要在多根天线上同时发送 SRS。 在现有的 LTE-A的研究中提出: 在上行通信中, 应该使用非预编码(即天 线专有)的 SRS , 而对 PUSCH的 DMRS则进行预编码。 基站通过接收非预编 码的 SRS , 可估计出上行的原始 CSI , 而经过了预编码 DMRS则不能使基站估 计出上行原始的 CSI。 此时, 当 UE使用多天线发送非预编码的 SRS时, 每个 UE所需要的 SRS资源都会增加, 也就造成了***内可以同时复用的 UE数量 下降。 此外, 除了保留 LTE原有的周期 (periodic ) 发送 SRS , 为了改善 SRS 资源的利用率, 提高资源调度的灵活性, 还可以通过下行控制信息或者高层信 令配置 UE非周期 ( aperiodic )发送 SRS。 在 LTE-A中, 为了更加充分的利用上行资源, 且考虑到在载波聚合的应用 场景中, 信道质量通常较好, 因此放宽了对上行信号单载波性的要求, 允许 PUCCH和 PUSCH同时发送。 是否允许 UE同时发送 PUCCH和 PUSCH, 可 通过高层参数来配置。 因此, 在 LTE-A***中, 当面对各种新技术的引入, 如载波聚合、 上行多 天线、 PUCCH格式 3、 非周期 SRS、 PUCCH和 PUSCH同时传输等时, 现有 的 UE无法实现同时发送多种物理上行信号 /信道。 发明内容 针对面对各种新技术引入时, 现有的 UE无法实现同时发送多种物理上行 信号 /信道的问题而提出本发明, 为此, 本发明的主要目的在于提供一种数据发 送方法及装置, 以解决上述问题。 为了实现上述目的, 根据本发明的一个方面, 提供了一种数据发送方法。 根据本发明的数据发送方法包括: UE 根据预定规则, 确定在当前子帧上 的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS; UE根据 当前子帧的最后一个符号能否用于发送 PUCCH数据和 /或 PUSCH数据, 确定 在当前子帧发送的 PUCCH 数据和 /或 PUSCH 数据; UE 在当前子帧上发送 PUCCH数据和 /或 PUSCH数据和 /或在当前子帧的最后一个符号上发送 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据或 PUSCH数据或 SRS (规则 1 )包括: 当当前子帧为 PUSCH所在的分量 载波高层配置的小区专有的用于发送 SRS的子帧时, UE确定在当前子帧的最 后一个符号上不发送 PUSCH。 UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 2 ) 包括: 当当前子帧为 PUSCH所在的 分量载波高层配置的小区专有的用于发送 SRS的子帧且 PUSCH的资源分配与 分量载波高层配置的小区专有的 SRS带宽配置重叠时, UE确定在当前子帧的 最后一个符号上不发送 PUSCH。 UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 3 ) 包括: 当当前子帧为 PUSCH所在的 分量载波或者 UE的分量载波中除 PUSCH所在的分量载波之外其它的分量载 波高层配置的小区专有的用于发送 SRS的子帧时, UE确定在当前子帧的最后 一个符号上不发送 PUSCH。 UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 4 ) 包括: 当 PUCCH为格式 l/la/lb/3 , 且 UE允许 ACK/NACK和 SRS同时传输的高层配置参数为 TRUE, 且当前子 帧为 UE的主分量载波高层配置的小区专有的用于发送 SRS的子帧时, UE确 定在当前子帧的最后一个符号上不发送 PUCCH。 UE根据当前子帧的最后一个符号能否用于发送 PUCCH数据和 /或 PUSCH 数据, 确定在当前子帧发送的 PUCCH数据和 /或 PUSCH数据包括: 当当前子 帧的最后一个符号不能用于发送 PUSCH时, UE在确定 PUSCH传输所占的时 域符号数时, 设置 为 1 ; 否则, 设置 为 0, 其中 为表示当前子帧是 否要发送 SRS的一个变量; 当当前子帧的最后一个符号不能用于发送 PUCCH 格式 l/la/lb/3时, PUCCH在当前子帧釆用截短结构发送 PUCCH数据, 否则 釆用常规结构发送 PUCCH数据。
UE 确定 PUSCH 传输所占的时域符号数釆用如下公式进行计算; N™ H-imtial = (2 · (N b - l)- NSRS ), 其中 imtial为 PUSCH传输所占的时域符号 数, N b为一个时隙内能发送的符号个数。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 5 ) 包括: 当 UE在当前子帧上同时发送 多个上行分量载波的 SRS , 且在当前子帧的最后一个符号上不发送 UE 的 PUSCH数据和 /或 PUCCH数据时, UE根据预定的优先级原则, 在当前子帧的 最后一个符号上发送具有高优先级的 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 5 )包括: 在高级长期演进 LTE-A***中, 当 UE在当前子帧上同时发送多个上行分量载波的 SRS , 且在当前子帧的最后 一个符号上不发送 UE的 PUSCH数据和 /或 PUCCH数据时, UE 居预定的优 先级原则, 在当前子帧的最后一个符号上发送优先级最高的一个 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS (规则 5 ) 包括: 当 UE在当前子帧上同时发送 多个上行分量载波的 SRS , 且在当前子帧的最后一个符号上不发送 UE 的 PUSCH数据和 /或 PUCCH数据时, 当通过高层信令配置 UE允许在子帧的最 后一个符号上同时发送 n个 SRS时, UE才艮据预定的优先级原则, 在当前子帧 的最后一个符号发送高优先级的 n个 SRS , n为大于 1的整数; 或者当通过高 层信令配置 UE不允许在子帧的最后一个符号上同时发送 n个 SRS时, UE才艮 据预定的优先级原则, 在当前子帧的最后一个符号发送优先级最高的一个 SRS。 通过高层信令配置 UE允许在子帧的最后一个符号上同时发送 n个 SRS包 括以下之一: 高层信令为 LTE-A ***新增加的高层信令, 或者高层信令为 LTE-A***已定义的用于指示允许 PUSCH和 PUCCH同时传输的高层信令; 通过配置用于指示允许 PUSCH和 PUCCH同时传输的高层信令为真 ( TRUE ) 或开(ON )来指示允许 UE同时发送 n个 SRS;通过配置用于指示允许 PUSCH 和 PUCCH同时传输的高层信令为^ _ ( FALSE ) 或者关 (OFF ) 来指示 UE只 能发送一个 SRS。 预定的优先级原则 (优先级原则 1 ) 包括: 设置上行分量载波的优先级为 相应的分量载波上发送 SRS的优先级。 预定的优先级原则 (优先级原则 2 ) 包括以下至少之一: 优先设置非周期 的 SRS的优先级高于周期 SRS的优先级; 其次设置主上行分量载波上的 SRS 的优先级高于其他分量载波上的优先级; 再次设置同时有包含 UCI的 PUSCH 发送的分量载波上的 SRS的优先级高于同时有不包含 UCI的 PUSCH发送的分 量载波的 SRS 的优先级; 再次设置同时有 PUSCH发送的分量载波上的 SRS 的优先级高于同时没有 PUSCH发送的分量载波的 SRS的优先级; 对于应用上 述优先级原则后, 多个分量载波上的 SRS的优先级仍然相同, 则设置上行分量 载波的优先级为相应多个分量载波上的 SRS的优先级。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH格 式 2/2a/2b和周期 SRS时, UE确定在当前子帧上发送 PUCCH, 不发送周期的 SRS。 UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH 数据或 SRS 包括: 当 UE 在当前子帧上同时发送包含有 ACK/NACK应答消息的 PUCCH格式 2/2a/2b和非周期 SRS时, UE确定在当 前子帧上发送 PUCCH, 不发送非周期的 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH 数据或 SRS 包括: 当 UE 在当前子帧上同时发送不含有 ACK/NACK应答消息的 PUCCH格式 2和非周期 SRS时, UE确定在当前子帧 上不发送 PUCCH, 发送非周期的 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUSCH或 PUCCH格式 l/la/lb/3和 SRS , 且当前子帧的最后一个符号上用于发送 UE的 PUSCH数据或 PUCCH的格式 l/la/lb/3时,UE确定在当前子帧上发送 PUSCH 数据或 PUCCH数据, UE确定在当前子帧的最后一个符号上不发送 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUSCH或 PUCCH格式 l/la/lb/3和 SRS , 且当前子帧的最后一个符号上不用于发送 UE 的 PUSCH数据或 PUCCH数据的格式 l/la/lb/3时, UE确定在当前子帧除最 后一个符号上发送 PUSCH数据或 PUCCH数据, UE确定在当前子帧的最后一 个符号上发送 SRS。
UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH、 PUSCH以及 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的高层信令为 真 ( TRUE ) 或开 ( ON ) 时, UE先按照 PUCCH和 SRS在相同子帧上发送的 处理方法, 确定 PUCCH和 SRS的发送; 如果按照上述处理后, 子帧的最后一 个符号上仍要发送 SRS , 则进一步的按照 PUSCH和 SRS在相同子帧上发送的 处理方法, 确定 PUSCH和 SRS的发送。 按照 PUCCH和 SRS在相同子帧上发送的处理方法, 确定 PUCCH和 SRS 的发送包括: 当 UE在当前子帧上同时发送 PUCCH格式 2/2a/2b和周期 SRS 时, UE确定在当前子帧上发送 PUCCH, 不发送周期的 SRS; 当 UE在当前子 帧上同时发送包含有 ACK/NACK应答消息的 PUCCH格式 2/2a/2b和非周期 SRS时时, UE确定在当前子帧上发送 PUCCH, 不发送非周期的 SRS; 当 UE 在当前子帧上同时发送不含有 ACK/NACK应答消息的 PUCCH格式 2和非周 期 SRS时, UE确定在当前子帧上不发送 PUCCH, 发送非周期的 SRS; 当 UE 在当前子帧上同时发送 PUCCH格式 l/la/lb/3和 SRS ,且当前子帧的最后一个 符号上用于发送 UE的 PUCCH的格式 l/la/lb/3时, UE确定在当前子帧上发 送 PUCCH数据, UE确定在当前子帧的最后一个符号上不发送 SRS; 当 UE在 当前子帧上同时发送 PUCCH格式 l/la/lb/3和 SRS ,且当前子帧的最后一个符 号上不用于发送 UE的 PUCCH格式 l/la/lb/3时, UE确定在当前子帧除最后 一个符号上发送 PUCCH 数据, UE 确定在当前子帧的最后一个符号上发送 SRS。 UE按照预定规则,确定在当前子帧上的最后一个符号上是否发送 PUCCH 数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH、 PUSCH以及 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的高层信令为 假( FALSE )或关( OFF )时, UE先将 PUCCH携带的 UCI信息将放在的 PUSCH 上发送; 然后按照 PUSCH和 SRS在相同子帧上发送的处理方法,确定 PUSCH 和 SRS的发送。 按照 PUSCH和 SRS在相同子帧上发送的处理方法, 确定 PUSCH和 SRS 的发送包括: 当 UE在当前子帧上同时发送 PUSCH数据和 SRS , 且当前子帧 的最后一个符号上用于发送 UE的 PUSCH数据时, UE确定在当前子帧上发送 PUSCH数据, UE确定在当前子帧的最后一个符号上不发送 SRS; 当 UE在当 前子帧上同时发送 PUSCH数据和 SRS , 且当前子帧的最后一个符号上不用于 发送 UE的 PUSCH时, UE确定在当前子帧除最后一个符号上发送 PUSCH数 据, UE确定在当前子帧的最后一个符号上发送 SRS。 为了实现上述目的,根据本发明的另一个方面,提供了一种数据发送装置。 根据本发明的数据发送装置包括: 第一确定模块, 设置为根据预定规则, 确定在当前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据 或 SRS; 第二确定模块, 设置为根据当前子帧的最后一个符号能否用于发送 PUCCH数据和 /或 PUSCH数据, 确定在当前子帧发送的 PUCCH数据和 /或 PUSCH数据; 发送模块, 设置为在当前子帧上发送 PUCCH数据和 /或 PUSCH 数据和 /或在当前子帧的最后一个符号上发送 SRS。 本发明按照不同的预定规则, 发送 PUCCH数据和 /或 PUSCH数据和 /或 SRS , 可以实现同时发送多种物理上行信号 /信道。 附图说明 此处所说明的附图用来提供对本发明的进一步理解, 构成本申请的一部 分, 本发明的示意性实施例及其说明用于解释本发明, 并不构成对本发明的不 当限定。 在附图中: 图 1是根据相关技术的 PUCCH格式 1/la/lb的结构示意图; 图 2是根据相关技术的 PUCCH格式 2/2a/2b的结构示意图; 图 3是根据相关技术的 PUCCH格式 3的结构示意图; 图 4是才艮据本发明实施例的数据发送方法的流程图; 图 5是根据本发明实施例的 PUCCH, PUSCH以及 SRS的时频域位置示意 图; 图 6是才艮据本发明实施例的 PUSCH和 SRS在相同分量载波上复用的一个 示意图; 图 7是才艮据本发明实施例的 PUSCH和 SRS在不同分量载波上复用的一个 示意图; 图 8是才艮据本发明实施例的 PUSCH和 SRS在不同分量载波上复用的另一 个示意图; 图 9是才艮据本发明实施例的 PUSCH和 SRS在不同分量载波上复用的另一 个示意图; 图 10是才艮据本发明实施例的 PUSCH和 SRS在不同分量载波上复用的另 一个示意图; 图 11是才艮据本发明实施例的 PUCCH和 SRS在相同分量载波上复用的一 个示意图; 图 12是才艮据本发明实施例的 PUCCH和 SRS在相同分量载波上复用的另 一个示意图; 图 13是才艮据本发明实施例的 PUCCH和 SRS在相同分量载波上复用的一 个示意图; 图 14是才艮据本发明实施例的 PUCCH和 SRS在不同分量载波上复用的另 一个示意图; 图 15是才艮据本发明实施例的 PUCCH和 SRS在不同分量载波上复用的另 一个示意图; 图 16是才艮据本发明实施例的多个 SRS在不同分量载波上同时发送的一个 示意图; 图 17是才艮据本发明实施例的多个 SRS在不同分量载波上同时发送的另一 个示意图; 图 18是才艮据本发明实施例的多个 SRS在不同分量载波上同时发送的另一 个示意图; 图 19是根据本发明实施例的数据发送装置的结构框图。 具体实施方式 需要说明的是, 在不冲突的情况下, 本申请中的实施例及实施例中的特征 可以相互组合。 下面将参考附图并结合实施例来详细说明本发明。 本发明提供了一种数据发送方法。 图 4是根据本发明实施例的数据发送方 法的流程图, 如图 4所示, 包括如下的步骤 S402至步骤 S406。 步骤 S402, UE根据预定规则, 确定在当前子帧上的最后一个符号上是否 发送物理上行控制信道 PUCCH数据和 /或物理上行共享信道 PUSCH数据或测 量参考信号 SRS。 步骤 S404, UE根据当前子帧的最后一个符号能否用于发送 PUCCH数据 和 /或 PUSCH数据, 确定在当前子帧发送的 PUCCH数据和 /或 PUSCH数据。 步骤 S406, UE在当前子帧上发送 PUCCH数据和 /或 PUSCH数据和 /或在 当前子帧的最后一个符号上发送 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据或 PUSCH数据或 SRS (规则 1 ) 包括: 当当前子帧为 PUSCH 所在的分量载波高层配置的小区专有的用于发送 SRS的子帧时, UE确定在当 前子帧的最后一个符号上不发送 PUSCH。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS(规则 2 )包括:当当前子帧为 PUSCH 所在的分量载波高层配置的小区专有的用于发送 SRS的子帧且 PUSCH的资源 分配与分量载波高层配置的小区专有的 SRS带宽配置重叠时, UE确定在当前 子帧的最后一个符号上不发送 PUSCH。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS(规则 3 )包括:当当前子帧为 PUSCH 所在的分量载波或者 UE的分量载波中除 PUSCH所在的分量载波之外其它的 分量载波高层配置的小区专有的用于发送 SRS的子帧时, UE确定在当前子帧 的最后一个符号上不发送 PUSCH。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS (规则 4 ) 包括: 当 PUCCH为格式 l/la/lb/3 , 且 UE允许 ACK/NACK和 SRS同时传输的高层配置参数为 TRUE, 且当前子帧为 UE 的主分量载波高层配置的小区专有的用于发送 SRS 的子帧 时, UE确定在当前子帧的最后一个符号上不发送 PUCCH。 优选地, UE根据当前子帧的最后一个符号能否用于发送 PUCCH数据和 / 或 PUSCH数据, 确定在当前子帧发送的 PUCCH数据和 /或 PUSCH数据包括: 当当前子帧的最后一个符号不能用于发送 PUSCH时, UE在确定 PUSCH传输 所占的时域符号数时, 设置 为 1 ; 否则, 设置 N 为 0, 其中 N 为表示当 前子帧是否要发送 SRS的一个变量; 当当前子帧的最后一个符号不能用于发送 PUCCH格式 l/la/lb/3时, PUCCH在当前子帧釆用截短结构发送 PUCCH数据, 否则釆用常规结构发送 PUCCH数据。 优选地, UE确定 PUSCH传输所占的时域符号数釆用如下公式进行计算;
N™ H-imtial = (2 · (N b - l)- NSRS ), 其中 imtial为 PUSCH传输所占的时域符号 数, N b为一个时隙内能发送的符号个数。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS (规则 5 ) 包括: 当 UE在当前子帧 上同时发送多上下行分量载波的 SRS , 且在当前子帧的最后一个符号上不发送 UE的 PUSCH数据和 /或 PUCCH数据时, UE根据预定的优先级原则, 在当前 子帧的最后一个符号上发送具有高优先级的 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS(规则 5 )包括:在高级长期演进 LTE-A ***中, 当 UE在当前子帧上同时发送多个上行分量载波的 SRS , 且在当前子 帧的最后一个符号上不发送 UE的 PUSCH数据和 /或 PUCCH数据时, UE根据 预定的优先级原则, 在当前子帧的最后一个符号上发送优先级最高的一个 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS (规则 5 ) 包括: 当 UE在当前子帧 上同时发送多个上行分量载波的 SRS , 且在当前子帧的最后一个符号上不发送 UE的 PUSCH数据和 /或 PUCCH数据时,当通过高层信令配置 UE允许在子帧 的最后一个符号上同时发送 n个 SRS时, UE才艮据预定的优先级原则, 在当前 子帧的最后一个符号发送高优先级的 n个 SRS , n为大于 1的整数; 或者当通 过高层信令配置 UE不允许在子帧的最后一个符号上同时发送 n个 SRS时,UE 根据预定的优先级原则, 在当前子帧的最后一个符号发送优先级最高的一个 SRS。 优选地, 通过高层信令配置 UE允许在子帧的最后一个符号上同时发送 n 个 SRS 包括以下之一: 高层信令为 LTE-A***新增加的高层信令, 或者高层 信令为 LTE-A***已定义的用于指示允许 PUSCH和 PUCCH同时传输的高层 信令; 通过配置用于指示允许 PUSCH 和 PUCCH 同时传输的高层信令为真 ( TRUE )或开 ( ON ) 来指示允许 UE同时发送 n个 SRS; 通过配置用于指示 允许 PUSCH和 PUCCH同时传输的高层信令为 i ( FALSE ) 或者关 (OFF ) 来指示 UE只能发送一个 SRS。 优选地, 预定的优先级原则 (优先级原则 1 ) 包括: 设置上行分量载波的 优先级为相应的分量载波上发送 SRS的优先级。 优选地, 预定的优先级原则 (优先级原则 2 ) 包括以下至少之一: 优先设 置非周期的 SRS的优先级高于周期 SRS的优先级; 其次设置主上行分量载波 上的 SRS 的优先级高于其他分量载波上的优先级; 再次设置同时有包含 UCI 的 PUSCH发送的分量载波上的 SRS的优先级高于同时有不包含 UCI的 PUSCH 发送的分量载波的 SRS的优先级; 再次设置同时有 PUSCH发送的分量载波上 的 SRS的优先级高于同时没有 PUSCH发送的分量载波的 SRS的优先级;对于 应用上述优先级原则后, 多个分量载波上的 SRS的优先级仍然相同, 则设置上 行分量载波的优先级为相应多个分量载波上的 SRS的优先级。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH格式 2/2a/2b和周期 SRS时, UE确定在当前子帧上发送 PUCCH, 不 发送周期的 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 包含有 ACK/NACK应答消息的 PUCCH格式 2/2a/2b和非周期 SRS时, UE确 定在当前子帧上发送 PUCCH, 不发送非周期的 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 不含有 ACK/NACK应答消息的 PUCCH格式 2和非周期 SRS时, UE确定在 当前子帧上不发送 PUCCH, 发送非周期的 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUSCH或 PUCCH格式 l/la/lb/3和 SRS , 且当前子帧的最后一个符号上用于 发送 UE的 PUSCH数据或 PUCCH的格式 l/la/lb/3时,UE确定在当前子帧上 发送 PUSCH数据或 PUCCH数据, UE确定在当前子帧的最后一个符号上不发 送 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUSCH或 PUCCH格式 l/la/lb/3和 SRS , 且当前子帧的最后一个符号上不用 于发送 UE的 PUSCH数据或 PUCCH数据的格式 l/la/lb/3时, UE确定在当前 子帧除最后一个符号上发送 PUSCH数据或 PUCCH数据, UE确定在当前子帧 的最后一个符号上发送 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH, PUSCH以及 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的 高层信令为真 ( TRUE ) 或开 ( ON ) 时, UE先按照 PUCCH和 SRS在相同子 帧上发送的处理方法, 确定 PUCCH和 SRS的发送; 如果按照上述处理后, 子 帧的最后一个符号上仍要发送 SRS , 则进一步的按照 PUSCH和 SRS在相同子 帧上发送的处理方法, 确定 PUSCH和 SRS的发送。 优选地,按照 PUCCH和 SRS在相同子帧上发送的处理方法,确定 PUCCH 和 SRS的发送包括: 当 UE在当前子帧上同时发送 PUCCH格式 2/2a/2b和周 期 SRS 时, UE确定在当前子帧上发送 PUCCH, 不发送周期的 SRS; 当 UE 在当前子帧上同时发送包含有 ACK/NACK应答消息的 PUCCH格式 2/2a/2b和 非周期 SRS时时, UE确定在当前子帧上发送 PUCCH, 不发送非周期的 SRS; 当 UE在当前子帧上同时发送不含有 ACK/NACK应答消息的 PUCCH格式 2 和非周期 SRS时, UE确定在当前子帧上不发送 PUCCH, 发送非周期的 SRS; 当 UE在当前子帧上同时发送 PUCCH格式 1/1 a/ lb/3和 SRS , 且当前子帧的最 后一个符号上用于发送 UE的 PUCCH的格式 l/la/lb/3时, UE确定在当前子 帧上发送 PUCCH数据, UE确定在当前子帧的最后一个符号上不发送 SRS; 当 UE在当前子帧上同时发送 PUCCH格式 l/la/lb/3和 SRS , 且当前子帧的最 后一个符号上不用于发送 UE的 PUCCH格式 l/la/lb/3时, UE确定在当前子 帧除最后一个符号上发送 PUCCH数据, UE确定在当前子帧的最后一个符号 上发送 SRS。 优选地, UE 按照预定规则, 确定在当前子帧上的最后一个符号上是否发 送 PUCCH数据和 /或 PUSCH数据或 SRS包括: 当 UE在当前子帧上同时发送 PUCCH, PUSCH以及 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的 高层信令为^ _ ( FALSE ) 或关 ( OFF ) 时, UE先将 PUCCH携带的 UCI信息 将放在的 PUSCH上发送; 然后按照 PUSCH和 SRS在相同子帧上发送的处理 方法, 确定 PUSCH和 SRS的发送。 优选地,按照 PUSCH和 SRS在相同子帧上发送的处理方法,确定 PUSCH 和 SRS的发送包括: 当 UE在当前子帧上同时发送 PUSCH数据和 SRS , 且当 前子帧的最后一个符号上用于发送 UE的 PUSCH数据时, UE确定在当前子帧 上发送 PUSCH数据, UE确定在当前子帧的最后一个符号上不发送 SRS; 当 UE在当前子帧上同时发送 PUSCH数据和 SRS ,且当前子帧的最后一个符号上 不用于发送 UE 的 PUSCH 时, UE 确定在当前子帧除最后一个符号上发送 PUSCH数据, UE确定在当前子帧的最后一个符号上发送 SRS。 下面将结合实例对本发明实施例的实现过程进行详细描述。 为了便于理解本发明的规则在实际中如何应用, 下面结合具体的实施例进 行详细说明。 为了便于说明, 如图 5所示, 假定通过高层信令给 UE配置了多个上行分 量载波 UL CC#1 , UL CC#2以及 UL CC#3, 其中 UL CC#2为主上行分量载波 ( UL PCC ); 其中子帧#1/#1^为 UL CC#1的高层配置的小区专有的可用于发送 SRS的子帧,子帧 #i/#k/#l为 UL CC#2的高层配置的小区专有的可用于发送 SRS 的子帧, 子帧 #i/#j/#l为 UL CC#3的高层配置的小区专有的可用于发送 SRS的 子帧。 另外, 为了叙述简便, 如无特殊说明, 下述的 SRS均包括周期 SRS和 非周期 SRS。 实施例 1 如图 6所示,假设子帧 #i上 UE在 UL CC#2上需要同时发送 PUSCH和 SRS , 由于子帧 #i可以发送 SRS , 因此, 当前子帧#1一定为 UL CC#2高层配置的小 区专有的 SRS子帧,根据规则 1 , UE将不在子帧 #i的最后一个符号发送 PUSCH, 再根据规则 8, 由于子帧 #i的最后一个符号上没有 PUSCH发送, 因此, UE将 在子帧 #i的最后一个符号上发送所述 SRS。 实施例 2 实施例 2-1 : 如图 7所示,假设子帧#1上 UE在 UL CC#2上要发送 PUSCH,而 UL CC#1 上需要发送 SRS , 对于 UL CC#2, 由于子帧 #i为 UL CC#2高层配置的小区专 有的 SRS子帧,且这里假定当前 UL CC#2上的 PUSCH的资源分配与 UL CC#2 的高层配置的小区专有的 SRS带宽有重叠的部分, 因此, 才艮据规则 2, UE将 不在子帧^的最后一个符号发送 PUSCH, 再根据规则 8, 由于子帧 #1的最后一 个符号上没有 PUSCH发送, 因此, UE将在子帧 #i的最后一个符号上发送 UL CC#1的 SRS。
实施例 2-2 如图 8所示,假设子帧#1上 UE在 UL CC#2上要发送 PUSCH,而 UL CC#1 上需要发送 SRS , 对于 UL CC#2, 由于子帧 #i为 UL CC#2高层配置的小区专 有的 SRS子帧,且这里假定当前 UL CC#2上的 PUSCH的资源分配与 UL CC#2 的高层配置的小区专有的 SRS 带宽没有重叠的部分, 因此, 居规则 2, UE 将在子帧^的最后一个符号发送 PUSCH, 再根据规则 7, 由于子帧 #1的最后一 个符号上有 PUSCH发送, 因此, UL CC#1的 SRS将被打掉不发送。
实施例 2-3 如图 9所示,假设子帧#」上 UE在 UL CC#2上要发送 PUSCH,而 UL CC#3 上需要发送 SRS , 对于 UL CC#2, 由于子帧#」不是 UL CC#2高层配置的小区 专有的 SRS子帧, 因此, 才艮据规则 1 , UE将在子帧 #j的最后一个符号上发送 PUSCH, 再才艮据规则 7 , 由于子帧#」的最后一个符号上有 PUSCH发送, 因此, UL CC#3的 SRS将被打掉不发送。
实施例 2-4 如图 10所示,假设子帧#」上 UE在 UL CC#2上要发送 PUSCH,而 UL CC#3 上需要发送 SRS , 对于 UL CC#2, 虽然子帧 #j不是 UL CC#2高层配置的小区 专有的 SRS子帧, 但是是 UL CC#3高层配置的小区专有的 SRS子帧, 因此才艮 据规则 3 , UE将不在子帧 #j的最后一个符号上发送 PUSCH, 再根据规则 8 , 由于子帧#」的最后一个符号上没有 PUSCH发送, 因此, UE将在子帧#」的最后 一个符号上发送 UL CC#3的 SRS。 实施例 3 实施例 3-1 如图 11所示,假设子帧 ^上1^在 UL CC#2上要同时发送 PUCCH 和 SRS , 假设该 PUCCH 为 PUCCH 格式 l/la/lb/3 中的一种, 且假定高层配置参数 Simultaneous- AN-and-SRS为 TRUE, 才艮据规则 4 , UE将在子帧#丄上釆用截短 结构发送所述 PUCCH, 也就是子帧 #i的最后一个符号上没有 PUCCH发送, 再才艮据规则 8, 由于子帧 #i的最后一个符号上没有 PUCCH发送, 因此, UE将 在子帧 #i的最后一个符号上发送所述 SRS。 实施例 3-2 如图 12所示,假设子帧 #i上 UE在 UL CC#2上要同时发送 PUCCH 和 SRS , 假设该 PUCCH 为 PUCCH 格式 l/la/lb/3 中的一种, 且假定高层配置参数 Simultaneous-AN-and-SRS为 FALSE, 根据规则 4, UE将在子帧#1上釆用常规 结构发送所述 PUCCH, 也就是子帧 #i的最后一个符号上有 PUCCH发送, 再 才艮据规则 7 , 由于子帧#1的最后一个符号上有 PUCCH发送, 因此, UE将打掉 UL CC#2上的 SRS不发送。 实施例 4 实施例 4-1 如图 13所示,假设子帧#1上 UE在 UL CC#2上要发送 PUCCH,在 UL CC#1 上要发送 SRS , 假设该 PUCCH为 PUCCH格式 l/la/lb/3中的一种, 且假定高 层配置参数 Simultaneous- AN-and-SRS为 TRUE , 由于子帧 #i是 UL CC#2高层 配置的小区专有的 SRS子帧, 才艮据规则 4, UE将在子帧#1上釆用截短结构发 送 UL CC#2上的 PUCCH,也就是子帧 #i的最后一个符号上没有 PUCCH发送, 再才艮据规则 8, 由于子帧 #i的最后一个符号上没有 PUCCH发送, 因此, UE将 在子帧 #i的最后一个符号上发送 UL CC#1的 SRS。 实施例 4-2 如图 14所示,假设子帧#1上 UE在 UL CC#2上要发送 PUCCH,在 UL CC#1 上要发送 SRS , 假设该 PUCCH为 PUCCH格式 l/la/lb/3中的一种, 且假定高 层配置参数 Simultaneous- AN-and-SRS为 FALSE, 根据规则 4, UE将在子帧#丄 上釆用常规结构发送 UL CC#2上的 PUCCH, 也就是子帧 #i的最后一个符号上 有 PUCCH发送, 再根据规则 7, 由于子帧#1的最后一个符号上有 PUCCH发 送, 因此, UE将打掉 UL CC#1的 SRS不发送。 实施例 4-3 如图 15所示,假设子帧#」上 UE在 UL CC#2上要发送 PUCCH,在 UL CC#2 上要发送 SRS , 假设该 PUCCH为 PUCCH格式 l/la/lb/3中的一种, 由于子帧 #j不是主上行分量载波 UL CC#2的高层配置的小区专有的 SRS子帧, 根据规 则 4, UE将在子帧#1上釆用常规结构发送 UL CC#2上的 PUCCH,也就是子帧 #j的最后一个符号上有 PUCCH发送, 再才艮据规则 7, 由于子帧#」的最后一个 符号上有 PUCCH发送, 因此, UE将打掉 UL CC#3的 SRS不发送。
实施例 5 实施例 5-1 如图 12所示, 假设子帧 ^上1^在 UL CC#2上要同时发送 PUCCH 和周 期 SRS , 假设该 PUCCH为 PUCCH格式 2/2a/2b中的一种, 根据规则 6, UE 将在子帧#1上发送所述 PUCCH, 再 居规则 7, 由于子帧 #i的最后一个符号 上有 PUCCH发送, 因此, UE将打掉 UL CC#2上的 SRS不发送。 实施例 5-2 如图 12所示, 假设子帧 ^上1^在 UL CC#2上要同时发送 PUCCH 和非 周期 SRS , 假设该 PUCCH为 PUCCH格式 2a或 2b或包含了 ACK/NACK传 输的 PUCCH格式 2, 根据规则 6, 由于所述的 PUCCH均包含了 ACK/NACK 传输, 因此 UE将在子帧#1上发送所述 PUCCH, 再根据规则 8, 由于子帧#1 的最后一个符号上有 PUCCH发送, 因此, UE将打掉 UL CC#2上的 SRS不发 送。
实施例 5-3 如图 12所示, 假设子帧 ^上1^在 UL CC#2上要同时发送 PUCCH 和非 周期 SRS , 假设该 PUCCH为不包含 ACK/NACK传输的 PUCCH格式 2, 根据 规则 6, 由于所述的 PUCCH不包含 ACK/NACK传输, 因此 UE将不在子帧 #i 上发送所述 PUCCH,再 居规则 8,由于子帧#1的最后一个符号上没有 PUCCH 发送, 因此, UE在子帧 #i上的最后一个符号上发送 UL CC#2上的 SRS。
实施例 6 实施例 6-1 如图 14所示, 假设子帧 ^上1^在 UL CC#2上要发送 PUCCH , 同时在 UL CC#1上要发送周期 SRS , 假设该 PUCCH为 PUCCH格式 2/2a/2b中的一 种, 根据规则 6, UE将在子帧#丄上发送 UL CC#2的 PUCCH, 再根据规则 7, 由于子帧 #i的最后一个符号上有 PUCCH发送, 因此, UE将打掉 UL CC# 1上 的 SRS不发送。
实施例 6-2 如图 14所示, 假设子帧 ^上1^在 UL CC#2上要发送 PUCCH , 同时在
UL CC#1上要发送非周期 SRS , 假设该 PUCCH为 PUCCH格式 2a或 2b或包 含了 ACK/NACK传输的 PUCCH格式 2, 根据规则 6, 由于所述的 PUCCH均 包含了 ACK/NACK传输, 因此 UE将在子帧#1上发送 UL CC#2的 PUCCH, 再根据规则 7 , 由于子帧 #i的最后一个符号上有 PUCCH发送, 因此, UE将打 掉 UL CC#1上的 SRS不发送。
实施例 6-3 如图 13所示, 假设子帧 ^上1^在 UL CC#2上要发送 PUCCH , 同时在 UL CC#1上要发送非周期 SRS , 假设该 PUCCH为不包含 ACK/NACK传输的 PUCCH格式 2, 根据规则 6, 由于所述的 PUCCH不包含 ACK/NACK传输, 因此 UE将不在子帧 #i上发送 UL CC#2的 PUCCH, 再根据规则 8, 由于子帧 #i的最后一个符号上没有 PUCCH发送, 因此, UE在子帧 #i上的最后一个符 号上发送 UL CC#1上的 SRS。
实施例 7 实施例 7-1 , 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 TRUE, 也就是允许 PUCCH和 PUSCH同时发送, 则 UE综合釆用与具体实施 例 1 , 3 , 5相同的处理方式, 来确定 PUCCH, PUSCH以及 SRS的发送。 实施例 7-2, 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 FALSE, 也就是不允许 PUCCH和 PUSCH同时发送, 因此, PUCCH所携带的 UCI将放在 PUSCH上发送,也就是说当前子帧上只有 PUSCH和 PUSCH同时 发送。 这时候, PUSCH与 SRS的在相同分量载波上同时发送, 因此, UE将釆 用与具体实施例 1相同的处理方式, 来确定 PUSCH, SRS的发送。
实施例 8 实施例 8-1 , 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 TRUE, 也就是允许 PUCCH和 PUSCH 同时发送, 如果当前子帧所要发送的 PUCCH 和 PUSCH 在相同分量载波上, 而 SRS 在另一分量载波上, 或者 PUCCH, PUSCH和 SRS均在不同的分量载波上, 则 UE综合釆用与具体实施 例 2, 4, 6相同的处理方式, 来确定 PUCCH, PUSCH以及 SRS的发送。 实施例 8-2, 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 TRUE, 也就是允许 PUCCH和 PUSCH 同时发送, 如果当前子帧所要发送的 PUCCH和 SRS在相同分量载波上, 而 PUSCH在另一分量载波上, 则 UE综 合釆用与具体实施例 2, 3 , 5相同的处理方式, 来确定 PUCCH, PUSCH以及 SRS的发送。 实施例 8-3 , 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 TRUE, 也就是允许 PUCCH和 PUSCH 同时发送, 如果当前子帧所要发送的 PUSCH和 SRS在相同分量载波上, 而 PUCCH在另一分量载波上, 则 UE综 合釆用与具体实施例 1 , 4, 6相同的处理方式, 来确定 PUCCH, PUSCH以及 SRS的发送。 实施例 8-4, 当 UE 高层配置参数 Simultaneous-PUCCH-and-PUSCH 为 FALSE, 也就是不允许 PUCCH和 PUSCH同时发送, 这时候 PUCCH携带的 UCI将在 PUSCH上发送, 如果当前子帧所要发送的 PUSCH和 SRS在不同的 分量载波上, 则 UE将釆用与具体实施例 2相同的处理方式, 来确定 PUSCH 以及 SRS的发送。 如果当前子帧所要发送的 PUSCH与 SRS在相同子帧上(对 于这种场景也就是原来的 PUSCH 与 PUCCH —定不在相同分量载波上), 则 UE将釆用与具体实施例 1相同的处理方式, 来确定 PUSCH和 SRS的发送。
实施例 9 实施例 9-1 : 当所述 UE通过高层信令配置为允许多个 SRS同时发送时, 所述 UE在所述子帧的最后一个符号上发送所述多个分量载波的 SRS。 实施例 9-2: 当所述 UE通过高层信令配置为不允许多个 SRS同时发送时, 所述 UE才艮据预定义的优先级原则, 在所述子帧的最后一个符号上发送具有最 高优先级的分量载波的 SRS。 实施例 9-2-1 : 假定 UE釆用进行 SRS选择时釆用上述的优先级原则 1 , 同 时 £定 UL CC# 1/2/3的优先级依次为: UL CC#2>UL CC#1>UL CC#3。 如图 16所示, UE在子帧 #i的最后一个符号上需要发送 UL CC#1和 UL
CC#2的 SRS , 但是 UE高层配置的信令不允许多个 SRS同时发送, 因此, UE 才艮据优先级原则 1 , 在需要发送 SRS的分量载波中, 由于 UL CC#2具有最高 优先级, 因此, UE将在子帧 #i的最后一个符号上发送 UL CC#2的 SRS , 而打 掉 UL CC#1上的 SRS不发送, 这时候不管 UL CC#1上的 SRS是周期 SRS还 是非周期 SRS。 实施例 9-2-2: ^_定 UE釆用进行 SRS选择时釆用上述的优先级原则 2。 如图 16所示, 假设 UE在子帧 #i的最后一个符号上需要发送 UL CC#1的 非周期 SRS和 UL CC#2的周期 SRS ,但是 UE高层配置的信令不允许多个 SRS 同时发送,因此,UE才艮据优先级原则 2,由于 UL CC#1上的 SRS为非周期 SRS , 因此,UE将在子帧#1上的最后一个符号上发送 UL CC#1的非周期 SRS而打掉 UL CC#2上的 SRS不发送。 实施例 9-2-3: 假定 UE釆用进行 SRS选择时釆用上述的优先级原则 2。 如图 17所示, 假设 UE在子帧 #i的最后一个符号上需要发送 UL CC#1和
UL CC#3的同类型的 SRS (同为周期 SRS或同为非周期 SRS ), 但是 UE高层 配置的信令不允许多个 SRS同时发送, 因此, UE根据优先级原则 2, 由于 UL CC#1和 UL CC#2上的 SRS类型相同, 但是 UL CC#3上同时有 PUSCH要发 送, 而 UL CC#1上没有 PUSCH要发送, 因此, UE将在子帧#1上的最后一个 符号上发送 UL CC#3的 SRS而打掉 UL CC#1上的 SRS不发送。 实施例 9-2-4: ^_定 UE釆用进行 SRS选择时釆用上述的优先级原则 2。 如图 18所示, 假设 UE在子帧 #i的最后一个符号上需要发送 UL CC#1和 UL CC#3的同类型的 SRS (同为周期 SRS或同为非周期 SRS ), 但是 UE高层 配置的信令不允许多个 SRS同时发送, 因此, UE根据优先级原则 2, 由于 UL CC#1和 UL CC#2上的 SRS类型相同, 且 UL CC#1和 UL CC#3都不是主上行 分量载波, 同时也都有 PUSCH要发送, 这时候, UE需要根据上述的优先级原 则 1 , 在 UL CC#1和 UL CC#3上选择一个优先级较高的 SRS来发送, 由于分 量载波优先级有 UL CC#1>UL CC#3 , 因此, UE将在子帧 #i上的最后一个符号 上发送 UL CC#1的 SRS而打掉 UL CC#3上的 SRS不发送。 实施例 9-2-5: 假定 UE釆用进行 SRS选择时釆用上述的优先级原则 2。 如图 18所示, 假设 UE在子帧 #i的最后一个符号上需要发送 UL CC#1和 UL CC#3的同类型的 SRS (同为周期 SRS或同为非周期 SRS ), 但是 UE高层 配置的信令不允许多个 SRS同时发送, 因此, UE根据优先级原则 2, 由于 UL CC#1和 UL CC#2上的 SRS类型相同, 且 UL CC#1和 UL CC#3都不是主上行 分量载波, 同时也都有 PUSCH要发送, 但是假定 UC CC#1上的 PUSCH携带 有 UCI, 这时候, UE将在子帧#1上的最后一个符号上发送 UL CC#1的 SRS而 打掉 UL CC#3上的 SRS不发送。 需要说明的是, 在附图的流程图示出的步骤可以在诸如一组计算机可执行 指令的计算机***中执行, 并且, 虽然在流程图中示出了逻辑顺序, 但是在某 些情况下, 可以以不同于此处的顺序执行所示出或描述的步 4聚。 本发明实施例提供了一种数据发送装置, 该数据发送装置可以用于实现上 述数据发送方法。 图 19 是才艮据本发明实施例的数据发送装置的结构框图, 如 图 19所示, 包括第一确定模块 192 , 第二确定模块 194和发送模块 196。 下面 对其结构进行详细描述。 第一确定模块 192 , 设置为根据预定规则, 确定在当前子帧上的最后一个 符号上是否发送 PUCCH数据和 /或 PUSCH数据和 /或 SRS;第二确定模块 194 , 设置为才艮据当前子帧的最后一个符号能否用于发送 PUCCH数据和 /或 PUSCH 数据, 确定在当前子帧发送的 PUCCH数据和 /或 PUSCH数据; 发送模块 196 , 设置为在当前子帧上发送 PUCCH数据和 /或 PUSCH数据和 /或在当前子帧的最 后一个符号上发送 SRS。 需要说明的是, 装置实施例中描述的数据发送装置对应于上述的方法实施 例, 其具体的实现过程在方法实施例中已经进行过详细说明, 在此不再赞述。 综上所述, 根据本发明的上述实施例, 提供了一种数据发送方法及装置。 本发明按照不同的预定规则, 发送 PUCCH数据和 /或 PUSCH数据和 /或 SRS , 可以实现同时发送多种物理上行信号 /信道。 显然, 本领域的技术人员应该明白, 上述的本发明的各模块或各步骤可以 用通用的计算装置来实现, 它们可以集中在单个的计算装置上, 或者分布在多 个计算装置所组成的网络上, 可选地, 它们可以用计算装置可执行的程序代码 来实现, 从而, 可以将它们存储在存储装置中由计算装置来执行, 或者将它们 分别制作成各个集成电路模块, 或者将它们中的多个模块或步骤制作成单个集 成电路模块来实现。 这样, 本发明不限制于任何特定的硬件和软件结合。 以上所述仅为本发明的优选实施例而已, 并不用于限制本发明, 对于本领 域的技术人员来说, 本发明可以有各种更改和变化。 凡在本发明的 ^"神和原则 之内, 所作的任何修改、 等同替换、 改进等, 均应包含在本发明的保护范围之 内。

Claims

权 利 要 求 书
1. 一种数据发送方法, 包括:
用户设备 UE根据预定规则, 确定在当前子帧上的最后一个符号上 是否发送物理上行控制信道 PUCCH 数据和 /或物理上行共享信道 PUSCH数据或测量参考信号 SRS; 所述 UE 居所述当前子帧的最后一个符号能否用于发送所述 PUCCH数据和 /或所述 PUSCH数据, 确定在所述当前子帧发送的所述 PUCCH数据和 /或所述 PUSCH数据;
所述 UE在所述当前子帧上发送所述 PUCCH数据和 /或所述 PUSCH 数据和 /或在所述当前子帧的最后一个符号上发送 SRS。
2. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据或 PUSCH数据或 SRS 包括:
当所述当前子帧为所述 PUSCH所在的分量载波高层配置的小区专 有的用于发送所述 SRS的子帧时, 所述 UE确定在所述当前子帧的最后 一个符号上不发送所述 PUSCH。
3. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述当前子帧为所述 PUSCH所在的分量载波高层配置的小区专 有的用于发送所述 SRS的子帧且所述 PUSCH的资源分配与所述分量载 波高层配置的小区专有的 SRS带宽配置重叠时, 所述 UE确定在所述当 前子帧的最后一个符号上不发送所述 PUSCH。
4. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述当前子帧为所述 PUSCH所在的分量载波或者所述 UE的分量 载波中除所述 PUSCH所在的分量载波之外其它的分量载波高层配置的 小区专有的用于发送 SRS的子帧时, 所述 UE确定在所述当前子帧的最 后一个符号上不发送所述 PUSCH。 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 PUCCH为格式 l/la/lb/3 , 且所述 UE允许 ACK/NACK和 SRS 同时传输的高层配置参数为 TRUE, 且所述当前子帧为所述 UE的 主分量载波高层配置的小区专有的用于发送 SRS的子帧时, 所述 UE确 定在所述当前子帧的最后一个符号上不发送所述 PUCCH。 根据权利要求 1所述的方法, 其中, 所述 UE根据所述当前子帧的最后 一个符号能否用于发送所述 PUCCH数据和 /或所述 PUSCH数据, 确定 在所述当前子帧发送的所述 PUCCH数据和 /或所述 PUSCH数据包括: 当所述当前子帧的最后一个符号不能用于发送所述 PUSCH 时, 所 述 UE在确定所述 PUSCH传输所占的时域符号数时, 设置 为 1; 否 则, 设置 为 0, 其中 为表示当前子帧是否要发送 SRS的一个变 量;
当所述当前子帧的最后一个符号不能用于发送所述 PUCCH 格式 l/la/lb/3 时, 所述 PUCCH 在所述当前子帧釆用截短结构发送所述 PUCCH数据, 否则釆用常规结构发送所述 PUCCH数据。 才艮据权利要求 6所述的方法, 其中, 所述 UE确定所述 PUSCH传输所占 的时域符号数釆用如下公式进行计算;
Figure imgf000027_0001
-l)- WSRS ) , 其 中 ^CfH_imtial为 PUSCH传输所占的时域符号数, N b为一个时隙内能发 送的符号个数。 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送多个上行分量载波的 SRS , 且在所述当前子帧的最后一个符号上不发送所述 UE的 PUSCH数据和 / 或 PUCCH数据时, 所述 UE根据预定的优先级原则, 在所述当前子帧 的最后一个符号上发送具有高优先级的所述 SRS。
. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
在高级长期演进 LTE-A***中, 当所述 UE在所述当前子帧上同时 发送多个上行分量载波的 SRS , 且在所述当前子帧的最后一个符号上不 发送所述 UE的 PUSCH数据和 /或 PUCCH数据时,所述 UE根据预定的 优先级原则, 在所述当前子帧的最后一个符号上发送优先级最高的一个 SRS。
10. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送多上下行分量载波的 SRS , 且在所述当前子帧的最后一个符号上不发送所述 UE的 PUSCH数据和 / 或 PUCCH数据时,
当通过高层信令配置所述 UE允许在子帧的最后一个符号上同时发 送 n个 SRS时, 所述 UE 居预定的优先级原则, 在所述当前子帧的最 后一个符号发送高优先级的 n个 SRS , n为大于 1的整数; 或者
当通过高层信令配置所述 UE不允许在子帧的最后一个符号上同时 发送 n个 SRS时, 所述 UE 居预定的优先级原则, 在所述当前子帧的 最后一个符号发送优先级最高的一个 SRS。
11. 根据权利要求 10所述的方法, 其中, 所述通过高层信令配置所述 UE允 许在子帧的最后一个符号上同时发送 n个 SRS包括以下之一:
所述高层信令为 LTE-A***新增加的高层信令, 或者所述高层信令 为 LTE-A***已定义的用于指示允许 PUSCH和 PUCCH同时传输的高 层信令;
通过配置用于指示允许 PUSCH和 PUCCH同时传输的高层信令为真 ( TRUE ) 或开 (ON ) 来指示允许所述 UE同时发送 n个 SRS;
通过配置用于指示允许 PUSCH和 PUCCH同时传输的高层信令为假 ( FALSE ) 或者关 (OFF ) 来指示所述 UE只能发送一个 SRS。
12. 根据权利要求 8至 11中任一项所述的方法, 其中, 所述预定的优先级原 则包括: 设置上行分量载波的优先级为相应的分量载波上发送 SRS的优 先级。
13. 根据权利要求 8至 11中任一项所述的方法, 其中, 所述预定的优先级原 则包括以下至少之一:
优先设置非周期的 SRS的优先级高于周期 SRS的优先级; 其次设置主上行分量载波上的 SRS的优先级高于其他分量载波上的 优先级;
再次设置同时有包含 UCI的 PUSCH发送的分量载波上的 SRS的优 先级高于同时有不包含 UCI的 PUSCH发送的分量载波的 SRS的优先级; 再次设置同时有 PUSCH发送的分量载波上的 SRS的优先级高于同 时没有 PUSCH发送的分量载波的 SRS的优先级;
对于应用上述优先级原则后, 所述多个分量载波上的 SRS的优先级 仍然相同, 则设置上行分量载波的优先级为所述相应多个分量载波上的 SRS的优先级。
14. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送 PUCCH格式 2/2a/2b和周期 SRS时, 所述 UE确定在所述当前子帧上发送所述 PUCCH, 不发送所述 周期的 SRS。
15. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送包含有 ACK/NACK应答消息 的 PUCCH格式 2/2a/2b和非周期 SRS时,所述 UE确定在所述当前子帧 上发送所述 PUCCH, 不发送所述非周期的 SRS。
16. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送不含有 ACK/NACK应答消息 的 PUCCH格式 2和非周期 SRS时, 所述 UE确定在所述当前子帧上不 发送所述 PUCCH, 发送所述非周期的 SRS。
17 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE 在所述当前子帧上同时发送 PUSCH 或 PUCCH 格式 l/la/lb/3 和 SRS , 且所述当前子帧的最后一个符号上用于发送所述 UE 的 PUSCH数据或 PUCCH的格式 l/la/lb/3时, 所述 UE确定在所述当 前子帧上发送所述 PUSCH数据或 PUCCH数据,所述 UE确定在所述当 前子帧的最后一个符号上不发送所述 SRS。
18. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE 在所述当前子帧上同时发送 PUSCH 或 PUCCH 格式 l/la/lb/3和 SRS ,且所述当前子帧的最后一个符号上不用于发送所述 UE 的 PUSCH数据或 PUCCH数据的格式 l/la/lb/3时, 所述 UE确定在所 述当前子帧除最后一个符号上发送所述 PUSCH数据或 PUCCH数据,所 述 UE确定在所述当前子帧的最后一个符号上发送所述 SRS。
19. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送所述 PUCCH, 所述 PUSCH 以及所述 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的高层信 令为真 (TRUE ) 或开 (ON ) 时,
所述 UE先按照 PUCCH和 SRS在相同子帧上发送的处理方法, 确 定所述 PUCCH和所述 SRS的发送; 如果按照上述处理后, 所述子帧的最后一个符号上仍要发送 SRS , 则进一步的按照 PUSCH和 SRS在相同子帧上发送的处理方法, 确定所 述 PUSCH和所述 SRS的发送。
20. 根据权利要求 19所述的方法, 其中, 所述的按照 PUCCH和 SRS在相 同子帧上发送的处理方法, 确定所述 PUCCH和所述 SRS的发送包括: 当所述 UE在所述当前子帧上同时发送 PUCCH格式 2/2a/2b和周期 SRS时, 所述 UE确定在所述当前子帧上发送所述 PUCCH, 不发送所述 周期的 SRS;
当所述 UE在所述当前子帧上同时发送包含有 ACK/NACK应答消息 的 PUCCH格式 2/2a/2b和非周期 SRS时时,所述 UE确定在所述当前子 帧上发送所述 PUCCH, 不发送所述非周期的 SRS;
当所述 UE在所述当前子帧上同时发送不含有 ACK/NACK应答消息 的 PUCCH格式 2和非周期 SRS时, 所述 UE确定在所述当前子帧上不 发送所述 PUCCH, 发送所述非周期的 SRS;
当所述 UE在所述当前子帧上同时发送 PUCCH格式 l/la/lb/3 和 SRS ,且所述当前子帧的最后一个符号上用于发送所述 UE的 PUCCH的 格式 l/la/lb/3时, 所述 UE确定在所述当前子帧上发送所述 PUCCH数 据, 所述 UE确定在所述当前子帧的最后一个符号上不发送所述 SRS; 当所述 UE在所述当前子帧上同时发送 PUCCH格式 l/la/lb/3 和 SRS , 且所述当前子帧的最后一个符号上不用于发送所述 UE的 PUCCH 格式 l/la/lb/3时, 所述 UE确定在所述当前子帧除最后一个符号上发送 所述 PUCCH数据, 所述 UE确定在所述当前子帧的最后一个符号上发 送所述 SRS。
21. 根据权利要求 1所述的方法, 其中, 所述 UE按照预定规则, 确定在当 前子帧上的最后一个符号上是否发送 PUCCH数据和 /或 PUSCH数据或 SRS包括:
当所述 UE在所述当前子帧上同时发送所述 PUCCH, 所述 PUSCH 以及所述 SRS , 且用于指示允许 PUSCH和 PUCCH同时传输的高层信 令为假 (FALSE ) 或关 (OFF ) 时,
所述 UE先将所述 PUCCH携带的 UCI信息将放在所述的 PUSCH 上发送; 然后按照 PUSCH和 SRS在相同子帧上发送的处理方法, 确定所述 PUSCH和所述 SRS的发送。
22. 根据权利要求 19或 21所述的方法, 其中, 所述的按照 PUSCH和 SRS 在相同子帧上发送的处理方法, 确定所述 PUSCH和所述 SRS的发送包 括:
当所述 UE在所述当前子帧上同时发送 PUSCH数据和 SRS , 且所 述当前子帧的最后一个符号上用于发送所述 UE的 PUSCH数据时,所述 UE确定在所述当前子帧上发送所述 PUSCH数据, 所述 UE确定在所述 当前子帧的最后一个符号上不发送所述 SRS;
当所述 UE在所述当前子帧上同时发送 PUSCH数据和 SRS , 且所 述当前子帧的最后一个符号上不用于发送所述 UE的 PUSCH时, 所述 UE确定在所述当前子帧除最后一个符号上发送所述 PUSCH数据 , 所述 UE确定在所述当前子帧的最后一个符号上发送所述 SRS。
23. 一种数据发送装置, 包括:
第一确定模块, 设置为根据预定规则, 确定在当前子帧上的最后一 个符号上是否发送物理上行控制信道 PUCCH数据和 /或物理上行共享信 道 PUSCH数据或测量参考信号 SRS;
第二确定模块, 设置为根据所述当前子帧的最后一个符号能否用于 发送所述 PUCCH数据和 /或所述 PUSCH数据, 确定在所述当前子帧发 送的所述 PUCCH数据和 /或所述 PUSCH数据;
发送模块, 设置为在所述当前子帧上发送所述 PUCCH数据和 /或所 述 PUSCH数据和 /或在所述当前子帧的最后一个符号上发送 SRS。
PCT/CN2011/077460 2010-12-30 2011-07-21 数据发送方法及装置 WO2012088876A1 (zh)

Priority Applications (9)

Application Number Priority Date Filing Date Title
RU2013132662/07A RU2571096C2 (ru) 2010-12-30 2011-07-21 Способ и устройство для передачи данных
KR1020137015009A KR101847671B1 (ko) 2010-12-30 2011-07-21 데이터 송신 방법 및 그 장치
BR112013016964-8A BR112013016964B1 (pt) 2010-12-30 2011-07-21 Método e dispositivo para transmissão de dados
US13/977,907 US9143297B2 (en) 2010-12-30 2011-07-21 Method and device for data transmission
EP11853200.1A EP2660992B1 (en) 2010-12-30 2011-07-21 Data transmitting method and device
MX2013007728A MX2013007728A (es) 2010-12-30 2011-07-21 Metodo y dispositivo de transmision de datos.
DK11853200.1T DK2660992T3 (da) 2010-12-30 2011-07-21 Fremgangsmåde og enhed til transmission af data
JP2013546568A JP5869588B2 (ja) 2010-12-30 2011-07-21 データの送信方法及び装置
FIEP11853200.1T FI2660992T3 (fi) 2010-12-30 2011-07-21 Tiedonsiirtomenetelmä ja -laite

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201010616294.2 2010-12-30
CN201010616294.2A CN102098086B (zh) 2010-12-30 2010-12-30 数据发送方法及装置

Publications (1)

Publication Number Publication Date
WO2012088876A1 true WO2012088876A1 (zh) 2012-07-05

Family

ID=44130973

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/077460 WO2012088876A1 (zh) 2010-12-30 2011-07-21 数据发送方法及装置

Country Status (11)

Country Link
US (1) US9143297B2 (zh)
EP (1) EP2660992B1 (zh)
JP (1) JP5869588B2 (zh)
KR (1) KR101847671B1 (zh)
CN (1) CN102098086B (zh)
BR (1) BR112013016964B1 (zh)
DK (1) DK2660992T3 (zh)
FI (1) FI2660992T3 (zh)
MX (1) MX2013007728A (zh)
RU (1) RU2571096C2 (zh)
WO (1) WO2012088876A1 (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014180601A1 (en) * 2013-05-09 2014-11-13 Nokia Solutions And Networks Oy Efficient sounding reference signal (srs) symbol usage for sounding and data
JP2015527834A (ja) * 2012-07-27 2015-09-17 ホアウェイ・テクノロジーズ・カンパニー・リミテッド システムおよびマルチポイント通信のための方法
JP2016502312A (ja) * 2012-10-31 2016-01-21 エルジー エレクトロニクス インコーポレイティド アップリンク信号送信方法及び装置
WO2020206601A1 (en) * 2019-04-09 2020-10-15 Qualcomm Incorporated Sounding reference signal resource determination for physical uplink shared channel with configured grant

Families Citing this family (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI481276B (zh) * 2009-10-02 2015-04-11 Interdigital Patent Holdings 在一以上分量載波中控制傳輸傳送功率方法及裝置
CN102098086B (zh) 2010-12-30 2016-03-02 中兴通讯股份有限公司 数据发送方法及装置
CN102892199B (zh) * 2011-07-20 2018-03-09 中兴通讯股份有限公司 一种实现信号发送的方法和***
US8395985B2 (en) 2011-07-25 2013-03-12 Ofinno Technologies, Llc Time alignment in multicarrier OFDM network
KR101758592B1 (ko) * 2011-07-29 2017-07-14 후지쯔 가부시끼가이샤 파워 제어 방법 및 단말 장치
CN107196743B (zh) * 2011-09-23 2020-11-06 Lg电子株式会社 在无线通信***中控制上行链路控制信息的方法和装置
CN103037529A (zh) * 2011-09-29 2013-04-10 华为技术有限公司 一种上行控制信息的发送方法以及相关装置
JP2013102398A (ja) * 2011-11-09 2013-05-23 Ntt Docomo Inc 無線通信システム、ユーザ端末及び無線通信方法
EP3432666B1 (en) 2011-12-22 2021-06-16 Interdigital Patent Holdings, Inc. Control signaling in lte carrier aggregation
US9237537B2 (en) 2012-01-25 2016-01-12 Ofinno Technologies, Llc Random access process in a multicarrier base station and wireless device
EP3937551A3 (en) 2012-01-25 2022-02-09 Comcast Cable Communications, LLC Random access channel in multicarrier wireless communications with timing advance groups
US20130259008A1 (en) 2012-04-01 2013-10-03 Esmael Hejazi Dinan Random Access Response Process in a Wireless Communications
US11943813B2 (en) 2012-04-01 2024-03-26 Comcast Cable Communications, Llc Cell grouping for wireless communications
US10419960B2 (en) * 2012-04-09 2019-09-17 Telefonaktiabolaget LM Ericsson Managing uncertain measurement occasions
US11582704B2 (en) 2012-04-16 2023-02-14 Comcast Cable Communications, Llc Signal transmission power adjustment in a wireless device
US11252679B2 (en) 2012-04-16 2022-02-15 Comcast Cable Communications, Llc Signal transmission power adjustment in a wireless device
US11825419B2 (en) 2012-04-16 2023-11-21 Comcast Cable Communications, Llc Cell timing in a wireless device and base station
US9107206B2 (en) 2012-06-18 2015-08-11 Ofinne Technologies, LLC Carrier grouping in multicarrier wireless networks
US11622372B2 (en) 2012-06-18 2023-04-04 Comcast Cable Communications, Llc Communication device
US11882560B2 (en) 2012-06-18 2024-01-23 Comcast Cable Communications, Llc Carrier grouping in multicarrier wireless networks
CN103580833B (zh) * 2012-07-25 2018-08-14 上海诺基亚贝尔股份有限公司 一种用于配置载波聚合的方法和设备
US9876621B2 (en) 2013-01-09 2018-01-23 Lg Electronics Inc. Method for transmitting signal and apparatus for same
US9949275B2 (en) 2013-10-01 2018-04-17 Qualcomm Incorporated Physical uplink control management in LTE/LTE-A systems with unlicensed spectrum
EP3136641B1 (en) * 2014-04-20 2019-07-24 LG Electronics Inc. Method and terminal for transmitting sounding reference signal in wireless communication system
US10425825B2 (en) * 2014-08-20 2019-09-24 Lg Electronics Inc. Method and apparatus for transmitting signal in wireless communication system
US10980045B2 (en) * 2014-10-02 2021-04-13 Qualcomm Incorporated Techniques for managing power on an uplink component carrier transmitted over a shared radio frequency spectrum band
CN105991216B (zh) * 2015-01-30 2019-07-12 上海诺基亚贝尔股份有限公司 用于基于lte帧结构类型2来配置上行链路帧结构的方法
CN114221742B (zh) * 2015-07-28 2024-03-08 松下电器(美国)知识产权公司 通信装置、通信方法及集成电路
CN108029023B (zh) * 2015-09-25 2021-11-30 松下电器(美国)知识产权公司 用户设备和无线通信方法
WO2017049582A1 (zh) 2015-09-25 2017-03-30 华为技术有限公司 数据传输方法、数据传输装置、基站及用户设备
JP2018538729A (ja) 2015-11-06 2018-12-27 ホアウェイ・テクノロジーズ・カンパニー・リミテッド データ伝送方法、ネットワーク装置、及び端末装置
WO2017082696A1 (ko) * 2015-11-13 2017-05-18 엘지전자 주식회사 무선 신호를 전송하는 방법 및 이를 위한 장치
WO2017138790A1 (ko) * 2016-02-12 2017-08-17 엘지전자 주식회사 무선 통신 시스템에서 상향링크 제어 채널을 송수신하는 방법 및 이를 지원하는 장치
WO2017197086A1 (en) * 2016-05-13 2017-11-16 Intel IP Corporation Enabling sounding reference signal component carrier-based switching in wireless communication
EP3447944B1 (en) 2016-05-13 2021-02-24 Huawei Technologies Co., Ltd. Method and apparatus for transmitting aperiodic srs
CN107547455B (zh) * 2016-06-29 2023-04-07 华为技术有限公司 一种子帧配置方法及相关设备
WO2018009044A1 (en) * 2016-07-07 2018-01-11 Lg Electronics Inc. Method and apparatus for transceiving a signal in a wireless communication system supporting zone-based communication
CN107809305A (zh) * 2016-09-09 2018-03-16 北京三星通信技术研究有限公司 一种上行信息和探测参考信号的传输方法和设备
US10469224B2 (en) * 2016-09-30 2019-11-05 Qualcomm Incorporated Joint transmission of precoded and unprecoded sounding reference signals in uplink
US11088783B2 (en) * 2016-11-04 2021-08-10 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Communication method, terminal and network device
EP3396887B1 (en) * 2016-11-04 2022-05-04 LG Electronics Inc. Method for transmitting and receiving physical uplink control channel between terminal and base station in wireless communication system and apparatus for supporting same
US20180132229A1 (en) * 2016-11-04 2018-05-10 Mediatek Inc. Method And Apparatus For Multiplexing Physical Uplink Control Channels In Mobile Communications
JP7082971B2 (ja) * 2017-03-23 2022-06-09 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 端末及び通信方法
CN109150424B (zh) * 2017-06-15 2021-09-07 华为技术有限公司 参考信号、消息的传输方法、传输资源确定方法和装置
CN110547023A (zh) * 2017-06-16 2019-12-06 Oppo广东移动通信有限公司 信道传输的方法、终端设备和网络设备
CN109151969B (zh) 2017-06-16 2022-04-05 中兴通讯股份有限公司 发送功率的确定方法及装置、终端
EP4138330A1 (en) * 2017-08-04 2023-02-22 Telefonaktiebolaget LM ERICSSON (PUBL) Handling sounding reference signaling
CN108111277B (zh) * 2017-08-11 2022-04-19 中兴通讯股份有限公司 上行信号发送的配置、上行信号的发送方法、装置及***
WO2019051765A1 (zh) * 2017-09-15 2019-03-21 Oppo广东移动通信有限公司 一种调度请求的配置方法、网络设备及终端设备
CN109560906B (zh) * 2017-09-27 2021-03-19 北京紫光展锐通信技术有限公司 上行控制信息的反馈方法、装置及用户设备
CN109995464B (zh) * 2017-12-29 2021-10-26 普天信息技术有限公司 检测处理的方法、装置、电子设备和存储介质
US10749637B2 (en) * 2018-01-18 2020-08-18 FG Innovation Company Limited Methods and devices for aperiodic uplink transmission
WO2019147000A1 (ko) * 2018-01-25 2019-08-01 엘지전자 주식회사 무선 통신 시스템에서 물리 상향 링크 제어 채널 상에서 다수의 상향 링크 제어 정보를 전송하는 방법 및 이를 위한 장치
CN110099446B (zh) * 2018-01-30 2023-05-30 大唐移动通信设备有限公司 上行传输方法及装置、通信***、计算机存储介质
CN110351007B (zh) 2018-04-04 2021-09-07 华为技术有限公司 一种上行控制信息发送和接收方法及装置
CN110474747B (zh) * 2018-05-11 2022-01-25 中兴通讯股份有限公司 一种信号传输方法和装置、及终端
CN111756661B (zh) * 2019-03-29 2021-10-22 华为技术有限公司 通信方法、装置、***和存储介质
CN112929137B (zh) * 2019-12-06 2022-12-02 大唐移动通信设备有限公司 一种上行信道传输方法、终端及基站
CN116584143A (zh) * 2021-11-18 2023-08-11 北京小米移动软件有限公司 一种定位用途参考信号传输方法、装置及存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286970A (zh) * 2008-05-16 2008-10-15 中兴通讯股份有限公司 在物理上行共享信道中秩指示信令的发送方法
CN101594683A (zh) * 2009-06-19 2009-12-02 中兴通讯股份有限公司 一种载波聚合时的信号传输方法及***
US20100165931A1 (en) * 2008-12-31 2010-07-01 Motorola, Inc. Apparatus and Method for Communicating Control Information Over a Data Channel in the Absence of User Data
CN102098086A (zh) * 2010-12-30 2011-06-15 中兴通讯股份有限公司 数据发送方法及装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4739207A (en) * 1987-02-20 1988-04-19 Westinghouse Electric Corp. Wedge locking device in a radially ventilated rotor
RU2166774C2 (ru) * 1999-06-01 2001-05-10 Тамбовский военный авиационный инженерный институт Способ и устройство формирования поляризационного портрета земной или морской поверхности в двухчастотной цифровой рса
JP5209308B2 (ja) * 2004-08-11 2013-06-12 インターデイジタル テクノロジー コーポレーション システム性能向上のためのチャネルサウンディング
CN101330325B (zh) * 2008-07-29 2012-09-05 中兴通讯股份有限公司 一种上行信道测量参考信号的传输方法
KR101327131B1 (ko) * 2010-02-12 2013-11-07 엘지전자 주식회사 무선 통신 시스템에서 데이터 전송 방법 및 장치
MX2013001971A (es) * 2010-08-20 2013-05-09 Ericsson Telefon Ab L M Disposicion y metodo para identificar recursos de formato 3 de canal de control de enlace ascendente fisico

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286970A (zh) * 2008-05-16 2008-10-15 中兴通讯股份有限公司 在物理上行共享信道中秩指示信令的发送方法
US20100165931A1 (en) * 2008-12-31 2010-07-01 Motorola, Inc. Apparatus and Method for Communicating Control Information Over a Data Channel in the Absence of User Data
CN101594683A (zh) * 2009-06-19 2009-12-02 中兴通讯股份有限公司 一种载波聚合时的信号传输方法及***
CN102098086A (zh) * 2010-12-30 2011-06-15 中兴通讯股份有限公司 数据发送方法及装置

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015527834A (ja) * 2012-07-27 2015-09-17 ホアウェイ・テクノロジーズ・カンパニー・リミテッド システムおよびマルチポイント通信のための方法
US9615360B2 (en) 2012-07-27 2017-04-04 Futurewei Technologies, Inc. System and method for multiple point communications
JP2017118561A (ja) * 2012-07-27 2017-06-29 ホアウェイ・テクノロジーズ・カンパニー・リミテッド システムおよびマルチポイント通信のための方法
US10356762B2 (en) 2012-07-27 2019-07-16 Futurewei Technologies, Inc. System and method for multiple point communications
JP2016502312A (ja) * 2012-10-31 2016-01-21 エルジー エレクトロニクス インコーポレイティド アップリンク信号送信方法及び装置
US9413503B2 (en) 2012-10-31 2016-08-09 Lg Electronics Inc. Method and apparatus for transmitting uplink signal
JP2016174432A (ja) * 2012-10-31 2016-09-29 エルジー エレクトロニクス インコーポレイティド アップリンク信号送信方法及び装置
US9742540B2 (en) 2012-10-31 2017-08-22 Lg Electronics Inc. Method and apparatus for transmitting uplink signal
US9887819B2 (en) 2012-10-31 2018-02-06 Lg Electronics Inc. Method and apparatus for transmitting uplink signal
WO2014180601A1 (en) * 2013-05-09 2014-11-13 Nokia Solutions And Networks Oy Efficient sounding reference signal (srs) symbol usage for sounding and data
US9270435B2 (en) 2013-05-09 2016-02-23 Nokia Solutions And Networks Oy Sounding reference signal (SRS) usage
WO2020206601A1 (en) * 2019-04-09 2020-10-15 Qualcomm Incorporated Sounding reference signal resource determination for physical uplink shared channel with configured grant

Also Published As

Publication number Publication date
KR20130141587A (ko) 2013-12-26
US9143297B2 (en) 2015-09-22
EP2660992A4 (en) 2014-08-27
EP2660992B1 (en) 2024-05-08
BR112013016964A2 (pt) 2016-10-25
EP2660992A1 (en) 2013-11-06
KR101847671B1 (ko) 2018-04-10
DK2660992T3 (da) 2024-07-01
MX2013007728A (es) 2013-09-26
JP2014504816A (ja) 2014-02-24
RU2013132662A (ru) 2015-02-10
CN102098086A (zh) 2011-06-15
RU2571096C2 (ru) 2015-12-20
FI2660992T3 (fi) 2024-07-02
JP5869588B2 (ja) 2016-02-24
CN102098086B (zh) 2016-03-02
BR112013016964B1 (pt) 2021-08-31
US20140010182A1 (en) 2014-01-09

Similar Documents

Publication Publication Date Title
US10893536B2 (en) Method for transmitting uplink control channel in wireless communication system and device therefor
WO2012088876A1 (zh) 数据发送方法及装置
US11929860B2 (en) Uplink sounding reference signals configuration and transmission
CN110352582B (zh) 无线通信***中的上行链路信号发送或接收方法及其设备
JP6940684B2 (ja) 無線通信システムにおいて信号を送受信する方法及び装置
US11050540B2 (en) Method for reporting channel state in wireless communication system and device therefor
US11206646B2 (en) Method and apparatus for transmitting or receiving uplink signal for terminal supporting short TTI in wireless communication system
CN109997327B (zh) 在无线通信***中发送上行链路信号的方法及其装置
US11395315B2 (en) Method for transmitting or receiving signal in wireless communication system and device therefor
US10306501B2 (en) Method for reporting channel status in wireless communication system and apparatus therefor
EP3057245B1 (en) Method and apparatus for transmitting srs in cellular mobile communication system
US9306721B2 (en) Method and apparatus for device-to-device communication
JP2022500959A (ja) Harq−ackの伝送方法、端末装置およびネットワーク装置
US10694511B2 (en) Method for receiving downlink channel or transmitting uplink channel in wireless communication system and device for same
CN111586844B (zh) 一种通信方法及装置
US10506626B2 (en) Method for receiving downlink control channel in wireless communication system and apparatus therefor
JP7284303B2 (ja) アップリンク伝送方法、装置、端末装置、アクセスネットワーク装置及びシステム
WO2022078285A1 (zh) 上行传输方法及装置
KR20230165821A (ko) Pusch 상에서 uci를 송수신하기 위한 방법, 단말 및 장치
JP2024514173A (ja) キャリア切り替えの伝送方法、装置、端末及びネットワーク側機器

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11853200

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2013546568

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20137015009

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: MX/A/2013/007728

Country of ref document: MX

WWE Wipo information: entry into national phase

Ref document number: 2011853200

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2013132662

Country of ref document: RU

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13977907

Country of ref document: US

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013016964

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013016964

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130701