US3919957A - Floating structure and method of recovering anchors therefor - Google Patents

Floating structure and method of recovering anchors therefor Download PDF

Info

Publication number
US3919957A
US3919957A US460707A US46070774A US3919957A US 3919957 A US3919957 A US 3919957A US 460707 A US460707 A US 460707A US 46070774 A US46070774 A US 46070774A US 3919957 A US3919957 A US 3919957A
Authority
US
United States
Prior art keywords
anchors
anchor
legs
platform
floating structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US460707A
Inventor
Donald R Ray
James D Bozeman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SONAT OFFSHORE DRILLING Inc
Original Assignee
Offshore Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Co filed Critical Offshore Co
Priority to US460707A priority Critical patent/US3919957A/en
Priority to ZA00752011A priority patent/ZA752011B/en
Priority to GB1366575A priority patent/GB1459706A/en
Priority to AU79820/75A priority patent/AU490117B2/en
Priority to CA223,898A priority patent/CA1045472A/en
Priority to NO751300A priority patent/NO751300L/no
Priority to BR2876/75A priority patent/BR7502260A/en
Priority to JP50045104A priority patent/JPS50146093A/ja
Priority to DK160075A priority patent/DK160075A/en
Application granted granted Critical
Publication of US3919957A publication Critical patent/US3919957A/en
Assigned to SONAT OFFSHORE DRILLING INC. reassignment SONAT OFFSHORE DRILLING INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: OFFSHORE COMPANY, THE
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H25/00Steering; Slowing-down otherwise than by use of propulsive elements; Dynamic anchoring, i.e. positioning vessels by means of main or auxiliary propulsive elements
    • B63H25/42Steering or dynamic anchoring by propulsive elements; Steering or dynamic anchoring by propellers used therefor only; Steering or dynamic anchoring by rudders carrying propellers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/107Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/502Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/12Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly
    • B63B2001/128Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly comprising underwater connectors between the hulls

Definitions

  • ABSTRACT An improved floating structure suitable for use as a floating drilling platform having a tension mooring system of a plurality of anchors each with a depending skirt on its lower side, control passageways through the anchor to the area defined by the skirt, ballasting and deballasting means, and a plurality of cables connecting each anchor to the floating platform, tension monitoring and control devices associated with each cable to assure substantial equalization of tension in the cables, the anchor locking system to secure the anchors to the floating platform, the anchors having a total buoyancy to support the entire weight of the structure so that in transit a minimum structure is below the water, and a plurality of thrusters controlled to assist in accurate station keeping of the floating platform and in movements of the floating structure from and to moored location.
  • the method of recovering the anchors which are connected to the floating platform having at least three legs by cables or chains which includes the steps of ballasting the floating platform to lower it in the water, tightening all of the cables or chains to a uniform tension, deballasting one of the legs of the platform to increase the tension in the connections to one of the anchors and thereby pull the anchor free of the bottom, similarly deballasting the platform to pull the other anchors free of the bottom, and lifting the anchors into engagement with the lower end of its platform leg.
  • the present invention relates to an improved tension mooring system for a floating structure and includes a plurality of anchors having sufficient buoyancy when deballasted to support substantially all of the weight of the floating platform, the improved auxiliary thrusters for propulsion and station keeping, the chains connecting the anchors to the platform, the ballasting and deballasting system for the anchors, the anchor deballasting probe, the control of flow through the anchors to increase the holding force of the anchors, the cable tension monitoring and control system and the other details of improved structure and the improved method of recovering the anchors.
  • An object of the present invention is to provide an improved floating structure having a plurality of anchors in a tension mooring system wherein the structure has a minimum of drag resistance to movement through water while in transit to or from a mooring site.
  • Another object is to provide an improved tension moored floating structure having short term holding force greater than the anchor weight and wherein the anchors can be easily and quickly recovered from anchored position.
  • a further object is to provide a tension moored floating structure with a plurality of anchors connected to the floating platform with cables and wherein the tension in each of the cables is maintained in a substantially equalized tension condition.
  • Still another object is to provide an improved ballasting and deballasting system for a plurality of anchors connected by cables or chains to a floating platform in a tension mooring system for a floating structure.
  • a still further object is to provide an improved tension mooring system for a floating structure having capabilities of remaining moored by tension in wave conditions approaching 60 feet and which may readily be converted to a slack mooring system to withstand more severe sea conditions.
  • FIG. 1 is a perspective view of the improved floating structure of the present invention in moving position and showing the water level on the lower portion of such floating structure.
  • FIG. 2 is a sectional view taken along line 22 in FIG. l and illustrating a typical thruster used with the improved floating structure.
  • FIG. 3 is another perspective view of the floating structure tension moored at a drilling site and showing the drilling at the bottom.
  • FIG. 4 is a partial perspective view of the bottom portion of a leg and the anchor therebelow.
  • FIG. 5 is a partial sectional view of the improved anchor of the present invention.
  • FIG. 6 is a partial sectional view of the anchor taken along line 6-6 in FIG. 5.
  • FIG. 7 is another partial sectional view of an anchor segment takm along line 7-7 in FIG. 5.
  • FIG. 8 is a partial sectional view taken along line 88 in FIG. 5 to illustrate the structure of the vertical bulkheads in the anchor.
  • FIG. 9 is a partial sectional view taken along line 99 in FIG. 5 to illustrate the structure of the horizontal bulkheads in the anchor.
  • FIG. 10 is a partial sectional view of the lower portion of a leg and its anchor to schematically illustrate the structure for locking, ballasting and deballasting of the anchor.
  • FIG. 11 is a schematic view illustrating the anchor ballasting and deballasting system.
  • FIG. 12 is a detailed sectional view illustrating the locking mechanism for securing the anchor to the lower end of its leg.
  • FIG. 13 is a plan view of the winching or recovery means for handling the means connecting the anchors to the floating structure.
  • FIG. 14 is an elevation view of one of the connecting means winches to illustrate the tension mooring and equalizing system.
  • FIG. 15 is a series of schematic views to illustrate the steps in setting of the anchors of the improved floating structure of the present invention.
  • FIG. 16 is a series of schematic views to illustrate the steps in releasing and recovering the anchors of the improved floating structure.
  • the floating structure 10 of the present invention includes the deck 12 which is of a generally triangular shape and supports the derrick 14, the winches 16, the pipe racks l8 and the housing 20.
  • the legs 22 depend below the comers of the deck 12 and are connected near their lower ends by the horizontal members 24.
  • This assembly of components is hereinafter referred to as the floating platform 28.
  • the floating structure 10 also includes the anchors 30 which in the transit or moving position are secured to the lower end of the legs 22 as hereinafter more fully explained.
  • Each of the horizontal members 24 is adapted to have one or more thrusters 32 depending therefrom with a pair of thrusters 32 being shown in FIG. 2.
  • the thrusters 32 are provided to serve a station-keeping function to thereby assist the mooring system with maintaining the floating platform 28 over the drilling site and also to provide sufficient thrust for short moves of the floating structure 10 and a source of auxiliary thrust to assist towing vessels in moving the structure 10 over long distances.
  • the thrusters 32 include the motor 34 which drives the shaft rotating the propeller 36 and the motor 38 is connected to rotate the propeller housing 40 to thereby control the direction of thrust. Both motors 34 and 38 are housed within the interior of a sealed compartment 42 within horizontal member 24 together with suitable gearing, bearings and other mechanisms for the operation of the thrusters 32. With the thrusters 32 as shown, they may be controlled individually or in concert from a suitable control location (not shown) on the deck 12.
  • the anchors 30 are of sufficient size so that they develop enough buoyancy to support the floating platform 28 and possibly have a small amount of freeboard so that a minimum amount of structure (only the three anchors 30 which are cylindrical and therefore have a minimum drag) is in the water during moving of the floating structure 10.
  • the connecting means 44 between the anchors 30 and the floating platform 28 are all maintained in tension to provide the tension mooring of the floating platform 28 as hereinafter explained.
  • Such connecting means 44 preferably includes at least 3 lengths of chain or other suitable connecting means connected to the upper end of the anchors 30 extending through the guides 46 and winches 16 and having their free ends stored in a chain compartment (not shown) within legs 22.
  • the anchors 30 are generally cylindrical and have a central frustoconical projection 48 on the central portion of their upper surface which is adapted to be received within the recess 50 within the lower end of legs 22.
  • the skirts 52 depend from the lower side of anchor 30 to engage within the soil on the bottom when the anchors are set to provide a degree of additional vertical and lateral holding power for the anchors.
  • Each anchor is composed of a plurality of segments 54 such as shown in FIG. 7.
  • Each f the segments 54 is complete within itself and is water tight so that the possible damage to an anchor 30 normally only damages one of the segments and not the whole anchor. This is particularly important so that the buoyancy of the anchor is not totally lost when the damage to the anchor is localized.
  • the segmental configuration of the anchors 30 assures minimum damage by localizing the effect of damage.
  • Each one of the segments 54 includes a plurality of structural members 56 as reinforcing and particularly to reinforce at the location to which the connecting means 44 connect to the anchors.
  • the vents 58 communicate completely through each anchor 30 to each section defined by the skirts 52.
  • Each of the vents 58 is provided with the flow restriction 60 which control the flow into and from the skirted sections.
  • vents 58 allow the water trapped by the skirts 52 to pass through the anchors 30 and thereby allow the anchors to move into complete engagement with the bottom wherein the skirts 52 are set into the bottom. Also, once the anchors 30 are set then upward forces on the anchors 30 greater than their weight will be resisted by the suction created in trying to move the anchors away from the bottom.
  • the restrictions 60 are sized to limit flow through the vents 58 so that during the maximum period of waves expected to be encountered the suction forces are not released sufficiently to allow the anchors 30 to commence lifting from the bottom.
  • This structure provides the anchors with a short-term holding force greater than the anchor weight and also reduces such short-term holding force to the anchor weight after a relatively short period of time which is preferred to be in the range from to minutes.
  • the restrictions 60 allow a flow to fill the skirt volume within such longer period. This longer period allows recovery of the anchors in a reasonable period of time such as for example 2 to 3 hours.
  • the interior of the anchors 30 is a honeycomb structure including a plurality of horizontal and vertical pan- 4 els 62 and 64 respectively.
  • Each of the panels is provided with an aperture through its central portion as shown in FIGS. 8 and 9 so that all parts of each segment 54 are in communication with each other for the ready ballasting and deballasting of each segment 54.
  • Ballasting of the anchor segments 54 is accomplished by causing the anchors 30 to be lowered into the water until their upper surface is awash. Thereafter water floods through the line 66 which has the check valves set in the branches 72 and 74. One of these check valves is set to allow water to flow inwardly during ballasting and the other is set to allow water to flow outwardly during deballasting. The lower end of line 66 extends downwardly into the lower portion of its anchor segment 54. Air within the anchor segment 54 discharges through the deballasting system hereinafter described.
  • the deballasting of anchors 30 is accomplishe through the nozzle 76 which is adapted to engage within the central opening 78 in anchor 30 and to discharge air therein.
  • the air flowing into such central opening 78 flows upwardly as shown by the arrows and into the water-tight segments 54 through the ports 80.
  • the pressure of the air forces the water out through lines 66 and the check valves until substantially all of the water is forced out of the anchor segments 54.
  • the nozzle 76 as best shown in FIG. 11 is extendible and retractable responsive to the double acting actuators 82.
  • the nozzle 76 includes the flexible section 84 which allows for slight misalignment with the recess 78.
  • the pump 86 supplies air to pressurize the seals 88 and 90 to assure that the nozzle 76 is sealed within its recess in leg 22 and within the recess 78 in anchors 30.
  • the scrubber seals 92 are provided to scrape the exterior of the nozzle 76 and assure that the sea water does not rise higher within the leg 22.
  • the compressor 94 is connected into nozzle 76 by line 95 which is under the control of valve 96.
  • the valve 98 is positioned within the line communicating with the interior of nozzle 76 from above and valve 100 is positioned within line 102 which communicates from the interior of nozzle 76 above valve 98 to the ballast tank (not shown) in leg 22.
  • valve 98 When valve 98 is open and valve 100 is closed, the nozzle 76 and the anchor 30 are vented to atmosphere.
  • the output of compressor 94 also communicates with line 104 which is under control of valve 106 and may be connected to any other device in the system which is to utilize the compressed air output from compressor 94 such as the actuators 82.
  • the supervisor control unit 109 controls the operation of valves 96, 98, 100 and 106 and compressor 94 to thereby control the initial ballasting and the deballasting operations as hereinafter described and such other operations as may be desired.
  • valves 98 and 100 are opened so that water may flow through line 102 and downwardly through nozzle 76 into the interior of anchors 30.
  • sufficient water has been delivered to cause the anchor to be lowered so that the upper end of line 66 is submerged then flows into the upper end of line 66 continues until each of the segments 54 are fully ballasted.
  • the deballasting proceeds as soon as the anchors 30 are raised up into engagement with the lower end of the legs 22.
  • the nozzle 76 is then extended into the recess 78 and the seals 88 and 90 are set.
  • valves 98, 100 and 106 closed and compressor 94 operating air under pressure is delivered through nozzle 76 and flows in the direction of the arrows in FIG.
  • the locking means 110 which is illustrated in FIGS. and 12.
  • the sides of projections 48 define the locking recesses 112.
  • the arm 114 is pivotally mounted within leg 22 as shown and has a slot 116 therein which receives a pin 118. Pin 118 is secured to the locking piston 120.
  • the locking means 110 is actuated by the actuator 122 which is connected to pivot the arm 114 from the unlocked vertical position shown in dashed lines to the angled locked position shown in solid lines in FIG. 12 and to return the arm to the unlocked position. As shown in FIG. 10 a plurality of such locking means 110 are used to assure uniform locking of the anchors 30 to the legs 22.
  • a suitable control means is provided to control the movement of the anchors 30 with respect to the floating platform 28, such as the winches 16. Since the strain on each of the chains of the connecting means 44 is desired to be equalized at all times a pivotal mounting of each of the winches 16 is provided as best shown in FIG. 14 and an actuator 124. Actuating fluid is supplied to actuators 124 from the pressure accumulator 126 which is maintained with a supply of actuating fluid from the compressor 128. Each of the winches 16 are pivotally mounted to the leg 130 with the actuator 124 positioned under the winch 16 at a point substantially displaced from leg 130. The load cell 132 is positioned under the actuator 124 to provide an indication of the tension in the connecting means 44. Since each of the actuators 124 is connected to the accumulator 126, the forces on the winches 16 are equalized. Also, the readings provided by the load cells 132 can be used to read directly as the load supported on each of the chains.
  • each anchor 30 is connected with three connecting means, mooring lines, or chains 44 and a winch 16 or other suitable retrieving means is provided for each of the anchor connecting means 44.
  • the three chains are connected so that they are equally spaced around and from the anchor center of gravity.
  • the use of three of such chains 44 with two of them positioned on the outside of each leg and one on the inside of each leg as shown assures that the loading of the connecting means is always shared by at least two of the chains and thus preventing the whole of the anchor loading from being exerted on a single chain. While this three chain system is shown as the preferred form other systems may be used. In using the three chains, the monotoring and load equalization between the chains to each anchor are minimized and a minimum number of mechanical systems are used in anchor deployment and recovery thereby providing a more reliable system than would be available with a greater number of connecting means.
  • the sequence of operations in setting the mooring system of the present invention is shown in the schematic views of FIG. and the sequence of operations in recovering the anchors preparatory to moving the floating structure 10 are shown in the schematic views of FIG. 16.
  • the floating structure 10 is supported for movement with the anchors 30 supporting the floating platform 28 above the surface 134 of the water to minimize the force necessary for movement.
  • the anchors 30 are ballasted to cause the floating structure 10 to move to the second position with the horizontal members 24 below the surface 134. In this position the upper surface of each of anchors 30 is below surface 134 and the remainder of the ballasting of the anchors 30 is accomplished automatically through the line 66 as hereinbefore explained.
  • the connecting means 44 to each of the anchors 30 are paid out to lower the anchors on to the bottom 136. After the anchors 30 have reached the bottom 136 they are allowed to complete their settling of the skirts 52 into the bottom 136. This is possible since the water trapped by the skirts flows through the vents 58.
  • the connecting means 44 are then adjusted by the winches 16 or by adjusting the ballast in legs 22 or both so that all of the elements of the connecting means to each of the anchors 30 are under substantially the same preselected tension. The amount of tension is preselected to retain the floating platform 28 in a position within a distance of approximately 5 percent of the depth of the water from the position directly over the drilling site.
  • the thrusters 32 are also used for station-keeping, i.e., maintaining the floating platform 28 within a very short distance of its desired position over the drilling site.
  • the tension selection is determined by considering the maximum wave, current and wind conditions expected to be encountered at the moored site. It should be noted that if such conditions are going to be exceeded, as by an especially severe storm, the drilling operation may be interrupted, the usual blowout preventors set and then the connecting means 44 paid out to allow the floating platform 28 to be slack moored and thereby increase the holding power of the mooring system and assure that the wellhead equipment is not damaged and the location of the anchors 30 on the bottom 136 is preserved.
  • the anchors 30 When it is desired to move the floating structure to a new location, the anchors 30 must be recovered from the bottom 136. This is accomplished by first ballasting the floating platform 28 to a lower position in the water as shown in the first view of FIG. 16. When this is accomplished the connecting means are winched up to take care of the different position of the floating platform 28 and to set the desired tension therein. Then the leg 22 of the first anchor 30 to be pulled off the bottom is deballasted until sufficient force is exerted on the connecting means 44 to pull the anchor 30 free of the bottom 136 responsive to the flow of water through the vents 58. Such force is exerted on the anchor 30 over a period of time to allow the suction caused by the skirts 52 to be relieved by flow through the vents 58.
  • the restriction is sized so that such flow takes place during a period longer than half the longest wave period expected.
  • This deballasting of the legs 22 is continued in rotation until all of the anchors 30 are raised above the bottom 136. With all of the anchors 30 released from the bottom the winches 16 raise them into engagement with the lower end of the legs 22, the locking means 10 is set and then each of the anchors 30 is deballasted by use of its deballasting nozzle 76 as previously explained.
  • the platform 28 is preferred to have a net reserve buoyancy in the range from .being equal to the total anchor and connecting means weight to three times such weight.
  • the improved floating structure of the present invention includes a plurality of anchors in a tension mooring system with such anchors having sufficient buoyancy so that the floating structure has minimum drag when moved through the water, the anchors have a greater holding power during short periods of time than their combined weight, the structure includes a means for maintaining the connections to the anchors in approximately equalized tension, and the structure is capable of both tension mooring and slack mooring when exposed to conditions of current and wind dictating each type of mooring system.
  • a floating structure comprising a platform having a deck and at least three vertical hollow legs depending below said deck and horizontal members extending between the lower ends of said legs,
  • each anchor being adapted to be positioned under one of said legs
  • said anchors when deballasted exerting sufficient buoyancy force to support substantially all of said platform above water with only the anchors creating drag resisting movement of the structure in the water,
  • said platform having sufficient buoyancy to exert a tension on the anchor connecting means for each anchor at least equal to the weight of said anchor
  • said anchors being movable downward from said legs for engagement with the bottom and having said connecting means extending from said anchors to said legs as a plurality of parallel tension lines without any non-parallel lines,
  • said anchor deballasting means being associated with said legs and operative only when said anchor is in close spaced relationship to the lower end of its leg.
  • a floating structure according to claim 1 including means associated with said anchors for increasing the short term holding force to a force greater'than the anchor weight and reducing 'said short term holding force to the anchor weight in a relatively short period of time.
  • a floating structure according to claim 1 including a skirt depending below the bottom of each anchor,
  • each anchor and a restricted flow passageway through each anchor to provide controlled relief of the vacuum created under each anchor and within said skirt by continued lifting on the anchors.
  • a floating structure according to claim 4 wherein said restricted flow passageway is sized to allow substantially complete relief of the vacuum created under each anchor and within said skirt by continuous exertion of a force exceeding the anchor weight in a period of less than 30 minutes.
  • a floating structure according to claim 1, wherein said anchor connecting means for each anchor includes three mooring lines extending from said platform to said anchor,
  • said mooring lines being positioned parallel to said legs and spaced substantially equally around said legs with one of said mooring lines on each anchor being on the side of the leg facing the remainder of the structure,
  • said lines all being connected to said anchor at points equally spaced around and equidistant from the center of gravity of said anchor.
  • a floating structure according to claim 6 includa glurality of winches mounted on said platform,
  • winches being connected to and adapted to pay out and retrieve said mooring lines with each winch connected to only one line and each line having a winch connected thereto, and
  • said tension equalizing means includes each of said winches being movably mounted,
  • a floating structure according to claim 8 including means associated with said winches for sensing the tension in its mooring lines.
  • a floating structure according to claim 1 includmeans for. releasably locking said anchors to the lower ends of said legs.
  • said locking means includes a plurality of axially movable locking pins positioned in each leg at an angle to the axis of said leg,
  • said anchor defining a plurality of recesses in alignment with each of said pins
  • a floating structure according to claim 1 includes a plurality of thrusters mounted on said platform and adapted to extend into the water with the structure floating on said anchors.
  • a floating structure according to claim 12 in-
  • a floating structure according to claim 1 including a nozzle positioned within each of said legs,
  • each of said anchors defining a deballasting chamber which when said anchors are held against the lower end of said legs is in alignment with said nozzle and so 9 .that said nozzle communicates with the interior of said anchor, means for moving 'said nozzles into communication with its respective deballasting chamber, and means for supplying air to said nozzles to deballast said anchors.
  • said nozzle includes a flexible section allowing said nozzle to connect with said deballasting chamber even when slightly misaligned therewith.
  • a floating structure according to claim 15 including means for communicating from said nozzle to atmosphere and to ballast in said leg, and means controlling flow through said communication means whereby water may be directed into said anchor, said anchor may be in communication with said atmosphere and both said communications may be closed.
  • a floating structure comprising a platform having a deck and three vertical hollow legs depending below said deck, three cylindrical anchors, one for each leg, three mooring lines for each leg,
  • each of said legs being connected to its anchor by said mooring lines, said mooring lines being positioned parallel to said legs and spaced equally around said legs with one of said mooring lines being on the side of said legs facing the remainder of the structure, means for releasably securing said anchors to the lower end of said legs, means for ballasting and deballasting each of said legs, means for ballasting and deballasting each of said anchors, means for paying out and retrieving each of said mooring lines and for applying a preselected tension to said mooring lines, and means for equalizing the tension in said mooring lines.
  • the method of recovering anchors in a vertical mooring system in which three anchors are ballasted and resting on the bottom of the body of water and connected by mooring lines to a floating platform on the surface of the water wherein the floating platform has a ballastable leg associated with each anchor including the steps of ballasting the floating platform to lower it in the water, tightening all of the mooring lines connecting the anchors to the floating platform to a uniform preselected tension, deballasting a portion of the platform to increase the tension in the connections to one of the anchors to thereby pull the anchor free of the bottom, deballasting other portions of the platform to pull the other anchors free of the bottom individually, and lifting the anchors upwardly through the water into engagement with the lower end of their respective platform legs.

Landscapes

  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Revetment (AREA)
  • Earth Drilling (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Foundations (AREA)

Abstract

An improved floating structure suitable for use as a floating drilling platform having a tension mooring system of a plurality of anchors each with a depending skirt on its lower side, control passageways through the anchor to the area defined by the skirt, ballasting and deballasting means, and a plurality of cables connecting each anchor to the floating platform, tension monitoring and control devices associated with each cable to assure substantial equalization of tension in the cables, the anchor locking system to secure the anchors to the floating platform, the anchors having a total buoyancy to support the entire weight of the structure so that in transit a minimum structure is below the water, and a plurality of thrusters controlled to assist in accurate station keeping of the floating platform and in movements of the floating structure from and to moored location. The method of recovering the anchors which are connected to the floating platform having at least three legs by cables or chains which includes the steps of ballasting the floating platform to lower it in the water, tightening all of the cables or chains to a uniform tension, deballasting one of the legs of the platform to increase the tension in the connections to one of the anchors and thereby pull the anchor free of the bottom, similarly deballasting the platform to pull the other anchors free of the bottom, and lifting the anchors into engagement with the lower end of its platform leg.

Description

United States Patent [191 Ray et al.
[ 1 Nov. 18, 1975' 1 1 FLOATING STRUCTURE AND METHOD OF RECOVERING ANCHORS THEREFOR [75] Inventors: Donald R. Ray; James D. Bozeman,
both of Houston, Tex.
[73] Assignee: The Offshore Company, Houston,
Tex.
22 Filed: Apr. 15,1974
211 Appl. No.: 460,707
[52] US. Cl. 114/.5 D; 61/465 [51] Int. Cl. B63B 35/44 [58] Field of Search 9/8 P; 114/.5 D, .5 R,
[56] References Cited UNITED STATES PATENTS 2,248,051 7/1941 Armstrong 61/465 2,399,656 5/1946 Armstrong 114/.5 D 2,972,973 2/1961 Thearle 114/125 X 3,154,039 10/1964 Knapp 61/465 X 3,540,396 11/1970 Horton 114/.5 D 3,771,481 11/1973 Goren et a1 114/.5 D
Primary ExaminerGeorge E. A. Halvosa Attorney, Agent, or Firnz\ inson, Elkins, Searls, Connally & Smith [57] ABSTRACT An improved floating structure suitable for use as a floating drilling platform having a tension mooring system of a plurality of anchors each with a depending skirt on its lower side, control passageways through the anchor to the area defined by the skirt, ballasting and deballasting means, and a plurality of cables connecting each anchor to the floating platform, tension monitoring and control devices associated with each cable to assure substantial equalization of tension in the cables, the anchor locking system to secure the anchors to the floating platform, the anchors having a total buoyancy to support the entire weight of the structure so that in transit a minimum structure is below the water, and a plurality of thrusters controlled to assist in accurate station keeping of the floating platform and in movements of the floating structure from and to moored location. The method of recovering the anchors which are connected to the floating platform having at least three legs by cables or chains which includes the steps of ballasting the floating platform to lower it in the water, tightening all of the cables or chains to a uniform tension, deballasting one of the legs of the platform to increase the tension in the connections to one of the anchors and thereby pull the anchor free of the bottom, similarly deballasting the platform to pull the other anchors free of the bottom, and lifting the anchors into engagement with the lower end of its platform leg.
21 Claims, 16 Drawing Figures US. Patent Nov. 18, 1975 Sheet 1 of7 US. Patent Nov. 18, 1975 Sheet 2 of7 3,919,957
US. Patent Nov. 18, 1975 Sheet4of7 3,919,957
U.S. Patent Nov. 18, 1975 Sheet60f7 3,919,957
US. Patent Nov. 18, 1975 Sheet7 0f7 3,919,957
FLOATING STRUCTURE AND METHOD OF RECOVERING ANCHORS THEREFOR BACKGROUND OF THE PRESENT INVENTION In the past a mooring system for a floating platform which relies on the tension in a plurality of connections from the floating platform to an anchor on the bottom has been suggested by the R. P. Knapp US. Pat. No. 3,154,039, the K. A. Blenkam US. Pat. No. 3,648,638 and E. E. Horton US. Pat. No. 3,780,685.
SUMMARY The present invention relates to an improved tension mooring system for a floating structure and includes a plurality of anchors having sufficient buoyancy when deballasted to support substantially all of the weight of the floating platform, the improved auxiliary thrusters for propulsion and station keeping, the chains connecting the anchors to the platform, the ballasting and deballasting system for the anchors, the anchor deballasting probe, the control of flow through the anchors to increase the holding force of the anchors, the cable tension monitoring and control system and the other details of improved structure and the improved method of recovering the anchors.
An object of the present invention is to provide an improved floating structure having a plurality of anchors in a tension mooring system wherein the structure has a minimum of drag resistance to movement through water while in transit to or from a mooring site.
Another object is to provide an improved tension moored floating structure having short term holding force greater than the anchor weight and wherein the anchors can be easily and quickly recovered from anchored position.
A further object is to provide a tension moored floating structure with a plurality of anchors connected to the floating platform with cables and wherein the tension in each of the cables is maintained in a substantially equalized tension condition.
Still another object is to provide an improved ballasting and deballasting system for a plurality of anchors connected by cables or chains to a floating platform in a tension mooring system for a floating structure.
A still further object is to provide an improved tension mooring system for a floating structure having capabilities of remaining moored by tension in wave conditions approaching 60 feet and which may readily be converted to a slack mooring system to withstand more severe sea conditions.
BRIEF DESCRIPTION OF THE DRAWINGS These and other objects and advantages of the present invention are hereinafter more fully set forth and explained with respect to the drawings wherein:
FIG. 1 is a perspective view of the improved floating structure of the present invention in moving position and showing the water level on the lower portion of such floating structure.
FIG. 2 is a sectional view taken along line 22 in FIG. l and illustrating a typical thruster used with the improved floating structure.
FIG. 3 is another perspective view of the floating structure tension moored at a drilling site and showing the drilling at the bottom.
FIG. 4 is a partial perspective view of the bottom portion of a leg and the anchor therebelow.
2 FIG. 5 is a partial sectional view of the improved anchor of the present invention.
FIG. 6 is a partial sectional view of the anchor taken along line 6-6 in FIG. 5.
FIG. 7 is another partial sectional view of an anchor segment takm along line 7-7 in FIG. 5.
FIG. 8 is a partial sectional view taken along line 88 in FIG. 5 to illustrate the structure of the vertical bulkheads in the anchor.
FIG. 9 is a partial sectional view taken along line 99 in FIG. 5 to illustrate the structure of the horizontal bulkheads in the anchor.
FIG. 10 is a partial sectional view of the lower portion of a leg and its anchor to schematically illustrate the structure for locking, ballasting and deballasting of the anchor.
FIG. 11 is a schematic view illustrating the anchor ballasting and deballasting system.
FIG. 12 is a detailed sectional view illustrating the locking mechanism for securing the anchor to the lower end of its leg.
FIG. 13 is a plan view of the winching or recovery means for handling the means connecting the anchors to the floating structure.
FIG. 14 is an elevation view of one of the connecting means winches to illustrate the tension mooring and equalizing system.
FIG. 15 is a series of schematic views to illustrate the steps in setting of the anchors of the improved floating structure of the present invention.
FIG. 16 is a series of schematic views to illustrate the steps in releasing and recovering the anchors of the improved floating structure.
DESCRIPTION OF THE PREFERRED EMBODIMENTS As can be seen from FIG. 1 the floating structure 10 of the present invention includes the deck 12 which is of a generally triangular shape and supports the derrick 14, the winches 16, the pipe racks l8 and the housing 20. The legs 22 depend below the comers of the deck 12 and are connected near their lower ends by the horizontal members 24. This assembly of components is hereinafter referred to as the floating platform 28. In addition to the floating platform 28 the floating structure 10 also includes the anchors 30 which in the transit or moving position are secured to the lower end of the legs 22 as hereinafter more fully explained.
Each of the horizontal members 24 is adapted to have one or more thrusters 32 depending therefrom with a pair of thrusters 32 being shown in FIG. 2. The thrusters 32 are provided to serve a station-keeping function to thereby assist the mooring system with maintaining the floating platform 28 over the drilling site and also to provide sufficient thrust for short moves of the floating structure 10 and a source of auxiliary thrust to assist towing vessels in moving the structure 10 over long distances. The thrusters 32 include the motor 34 which drives the shaft rotating the propeller 36 and the motor 38 is connected to rotate the propeller housing 40 to thereby control the direction of thrust. Both motors 34 and 38 are housed within the interior of a sealed compartment 42 within horizontal member 24 together with suitable gearing, bearings and other mechanisms for the operation of the thrusters 32. With the thrusters 32 as shown, they may be controlled individually or in concert from a suitable control location (not shown) on the deck 12.
As shown in FIG. 1 the anchors 30 are of sufficient size so that they develop enough buoyancy to support the floating platform 28 and possibly have a small amount of freeboard so that a minimum amount of structure (only the three anchors 30 which are cylindrical and therefore have a minimum drag) is in the water during moving of the floating structure 10. When the anchors 30 are on the bottom as shown in FIG. 3 the connecting means 44 between the anchors 30 and the floating platform 28 are all maintained in tension to provide the tension mooring of the floating platform 28 as hereinafter explained. Such connecting means 44 preferably includes at least 3 lengths of chain or other suitable connecting means connected to the upper end of the anchors 30 extending through the guides 46 and winches 16 and having their free ends stored in a chain compartment (not shown) within legs 22. The anchors 30 are generally cylindrical and have a central frustoconical projection 48 on the central portion of their upper surface which is adapted to be received within the recess 50 within the lower end of legs 22. The skirts 52 depend from the lower side of anchor 30 to engage within the soil on the bottom when the anchors are set to provide a degree of additional vertical and lateral holding power for the anchors.
The details of construction of the anchors 30 are shown in FIGS. through 9. Each anchor is composed of a plurality of segments 54 such as shown in FIG. 7. Each f the segments 54 is complete within itself and is water tight so that the possible damage to an anchor 30 normally only damages one of the segments and not the whole anchor. This is particularly important so that the buoyancy of the anchor is not totally lost when the damage to the anchor is localized. The segmental configuration of the anchors 30 assures minimum damage by localizing the effect of damage. Each one of the segments 54 includes a plurality of structural members 56 as reinforcing and particularly to reinforce at the location to which the connecting means 44 connect to the anchors. As shown in both FIGS. 5 and 7 the vents 58 communicate completely through each anchor 30 to each section defined by the skirts 52. Each of the vents 58 is provided with the flow restriction 60 which control the flow into and from the skirted sections.
In the ec'tting of the anchors on the bottom the vents 58 allow the water trapped by the skirts 52 to pass through the anchors 30 and thereby allow the anchors to move into complete engagement with the bottom wherein the skirts 52 are set into the bottom. Also, once the anchors 30 are set then upward forces on the anchors 30 greater than their weight will be resisted by the suction created in trying to move the anchors away from the bottom. The restrictions 60 are sized to limit flow through the vents 58 so that during the maximum period of waves expected to be encountered the suction forces are not released sufficiently to allow the anchors 30 to commence lifting from the bottom. This structure provides the anchors with a short-term holding force greater than the anchor weight and also reduces such short-term holding force to the anchor weight after a relatively short period of time which is preferred to be in the range from to minutes. Thus, the restrictions 60 allow a flow to fill the skirt volume within such longer period. This longer period allows recovery of the anchors in a reasonable period of time such as for example 2 to 3 hours.
The interior of the anchors 30 is a honeycomb structure including a plurality of horizontal and vertical pan- 4 els 62 and 64 respectively. Each of the panels is provided with an aperture through its central portion as shown in FIGS. 8 and 9 so that all parts of each segment 54 are in communication with each other for the ready ballasting and deballasting of each segment 54.
Ballasting of the anchor segments 54 is accomplished by causing the anchors 30 to be lowered into the water until their upper surface is awash. Thereafter water floods through the line 66 which has the check valves set in the branches 72 and 74. One of these check valves is set to allow water to flow inwardly during ballasting and the other is set to allow water to flow outwardly during deballasting. The lower end of line 66 extends downwardly into the lower portion of its anchor segment 54. Air within the anchor segment 54 discharges through the deballasting system hereinafter described.
The deballasting of anchors 30 is accomplishe through the nozzle 76 which is adapted to engage within the central opening 78 in anchor 30 and to discharge air therein. The air flowing into such central opening 78 flows upwardly as shown by the arrows and into the water-tight segments 54 through the ports 80. The pressure of the air forces the water out through lines 66 and the check valves until substantially all of the water is forced out of the anchor segments 54. The nozzle 76 as best shown in FIG. 11 is extendible and retractable responsive to the double acting actuators 82. The nozzle 76 includes the flexible section 84 which allows for slight misalignment with the recess 78. The pump 86 supplies air to pressurize the seals 88 and 90 to assure that the nozzle 76 is sealed within its recess in leg 22 and within the recess 78 in anchors 30. The scrubber seals 92 are provided to scrape the exterior of the nozzle 76 and assure that the sea water does not rise higher within the leg 22. The compressor 94 is connected into nozzle 76 by line 95 which is under the control of valve 96. The valve 98 is positioned within the line communicating with the interior of nozzle 76 from above and valve 100 is positioned within line 102 which communicates from the interior of nozzle 76 above valve 98 to the ballast tank (not shown) in leg 22. When valve 98 is open and valve 100 is closed, the nozzle 76 and the anchor 30 are vented to atmosphere. The output of compressor 94 also communicates with line 104 which is under control of valve 106 and may be connected to any other device in the system which is to utilize the compressed air output from compressor 94 such as the actuators 82. The supervisor control unit 109 controls the operation of valves 96, 98, 100 and 106 and compressor 94 to thereby control the initial ballasting and the deballasting operations as hereinafter described and such other operations as may be desired.
When ballasting is to be commenced valves 98 and 100 are opened so that water may flow through line 102 and downwardly through nozzle 76 into the interior of anchors 30. When sufficient water has been delivered to cause the anchor to be lowered so that the upper end of line 66 is submerged then flows into the upper end of line 66 continues until each of the segments 54 are fully ballasted. The deballasting proceeds as soon as the anchors 30 are raised up into engagement with the lower end of the legs 22. The nozzle 76 is then extended into the recess 78 and the seals 88 and 90 are set. With valves 98, 100 and 106 closed and compressor 94 operating, air under pressure is delivered through nozzle 76 and flows in the direction of the arrows in FIG. 11 downwardly in recess 78, upwardly around the annulus 108 and into each segment 54 through the ports 80. The air collects in the upper portion of the segments 54 and forces the water to flow through line 66 and to be discharged from segment 54. The flow of air through nozzle 76 is continued until the desired deballasting of anchor 30 has been completed.
When it is desired that the anchors 30 be retained against the lower end of their leg 22 they are held in such position by the locking means 110 which is illustrated in FIGS. and 12. The sides of projections 48 define the locking recesses 112. The arm 114 is pivotally mounted within leg 22 as shown and has a slot 116 therein which receives a pin 118. Pin 118 is secured to the locking piston 120. The locking means 110 is actuated by the actuator 122 which is connected to pivot the arm 114 from the unlocked vertical position shown in dashed lines to the angled locked position shown in solid lines in FIG. 12 and to return the arm to the unlocked position. As shown in FIG. 10 a plurality of such locking means 110 are used to assure uniform locking of the anchors 30 to the legs 22.
Besides ballasting and deballasting, a suitable control means is provided to control the movement of the anchors 30 with respect to the floating platform 28, such as the winches 16. Since the strain on each of the chains of the connecting means 44 is desired to be equalized at all times a pivotal mounting of each of the winches 16 is provided as best shown in FIG. 14 and an actuator 124. Actuating fluid is supplied to actuators 124 from the pressure accumulator 126 which is maintained with a supply of actuating fluid from the compressor 128. Each of the winches 16 are pivotally mounted to the leg 130 with the actuator 124 positioned under the winch 16 at a point substantially displaced from leg 130. The load cell 132 is positioned under the actuator 124 to provide an indication of the tension in the connecting means 44. Since each of the actuators 124 is connected to the accumulator 126, the forces on the winches 16 are equalized. Also, the readings provided by the load cells 132 can be used to read directly as the load supported on each of the chains.
As shown in the drawings each anchor 30 is connected with three connecting means, mooring lines, or chains 44 and a winch 16 or other suitable retrieving means is provided for each of the anchor connecting means 44. The three chains are connected so that they are equally spaced around and from the anchor center of gravity. The use of three of such chains 44 with two of them positioned on the outside of each leg and one on the inside of each leg as shown assures that the loading of the connecting means is always shared by at least two of the chains and thus preventing the whole of the anchor loading from being exerted on a single chain. While this three chain system is shown as the preferred form other systems may be used. In using the three chains, the monotoring and load equalization between the chains to each anchor are minimized and a minimum number of mechanical systems are used in anchor deployment and recovery thereby providing a more reliable system than would be available with a greater number of connecting means.
The sequence of operations in setting the mooring system of the present invention is shown in the schematic views of FIG. and the sequence of operations in recovering the anchors preparatory to moving the floating structure 10 are shown in the schematic views of FIG. 16. As previously mentioned the floating structure 10 is supported for movement with the anchors 30 supporting the floating platform 28 above the surface 134 of the water to minimize the force necessary for movement. When the floating structure 10 is in its desired location, such as a drilling site, the anchors 30 are ballasted to cause the floating structure 10 to move to the second position with the horizontal members 24 below the surface 134. In this position the upper surface of each of anchors 30 is below surface 134 and the remainder of the ballasting of the anchors 30 is accomplished automatically through the line 66 as hereinbefore explained. With the anchors 30 ballasted, the connecting means 44 to each of the anchors 30 are paid out to lower the anchors on to the bottom 136. After the anchors 30 have reached the bottom 136 they are allowed to complete their settling of the skirts 52 into the bottom 136. This is possible since the water trapped by the skirts flows through the vents 58. The connecting means 44 are then adjusted by the winches 16 or by adjusting the ballast in legs 22 or both so that all of the elements of the connecting means to each of the anchors 30 are under substantially the same preselected tension. The amount of tension is preselected to retain the floating platform 28 in a position within a distance of approximately 5 percent of the depth of the water from the position directly over the drilling site. The thrusters 32 are also used for station-keeping, i.e., maintaining the floating platform 28 within a very short distance of its desired position over the drilling site. The tension selection is determined by considering the maximum wave, current and wind conditions expected to be encountered at the moored site. It should be noted that if such conditions are going to be exceeded, as by an especially severe storm, the drilling operation may be interrupted, the usual blowout preventors set and then the connecting means 44 paid out to allow the floating platform 28 to be slack moored and thereby increase the holding power of the mooring system and assure that the wellhead equipment is not damaged and the location of the anchors 30 on the bottom 136 is preserved.
When it is desired to move the floating structure to a new location, the anchors 30 must be recovered from the bottom 136. This is accomplished by first ballasting the floating platform 28 to a lower position in the water as shown in the first view of FIG. 16. When this is accomplished the connecting means are winched up to take care of the different position of the floating platform 28 and to set the desired tension therein. Then the leg 22 of the first anchor 30 to be pulled off the bottom is deballasted until sufficient force is exerted on the connecting means 44 to pull the anchor 30 free of the bottom 136 responsive to the flow of water through the vents 58. Such force is exerted on the anchor 30 over a period of time to allow the suction caused by the skirts 52 to be relieved by flow through the vents 58. The restriction is sized so that such flow takes place during a period longer than half the longest wave period expected. This deballasting of the legs 22 is continued in rotation until all of the anchors 30 are raised above the bottom 136. With all of the anchors 30 released from the bottom the winches 16 raise them into engagement with the lower end of the legs 22, the locking means 10 is set and then each of the anchors 30 is deballasted by use of its deballasting nozzle 76 as previously explained.
In the preferred form of the present invention, the platform 28 is preferred to have a net reserve buoyancy in the range from .being equal to the total anchor and connecting means weight to three times such weight.
With such reserve buoyancy the anchor recovery is readily accomplished as hereinbefore described.
From the foregoing it can be seen that the improved floating structure of the present invention includes a plurality of anchors in a tension mooring system with such anchors having sufficient buoyancy so that the floating structure has minimum drag when moved through the water, the anchors have a greater holding power during short periods of time than their combined weight, the structure includes a means for maintaining the connections to the anchors in approximately equalized tension, and the structure is capable of both tension mooring and slack mooring when exposed to conditions of current and wind dictating each type of mooring system.
What is claimed is:
1. A floating structure comprising a platform having a deck and at least three vertical hollow legs depending below said deck and horizontal members extending between the lower ends of said legs,
at least three anchors, each anchor being adapted to be positioned under one of said legs,
means for ballasting and deballasting each of said legs,
means for connecting said anchors to said platform,
means for ballasting and deballasting each of said anchors, and
said anchors when deballasted exerting sufficient buoyancy force to support substantially all of said platform above water with only the anchors creating drag resisting movement of the structure in the water,
said platform having sufficient buoyancy to exert a tension on the anchor connecting means for each anchor at least equal to the weight of said anchor,
said anchors being movable downward from said legs for engagement with the bottom and having said connecting means extending from said anchors to said legs as a plurality of parallel tension lines without any non-parallel lines,
said anchor deballasting means being associated with said legs and operative only when said anchor is in close spaced relationship to the lower end of its leg.
2. A floating structure according to claim 1 wherein said anchors each include a plurality of watertight segments.
3. A floating structure according to claim 1 including means associated with said anchors for increasing the short term holding force to a force greater'than the anchor weight and reducing 'said short term holding force to the anchor weight in a relatively short period of time.
4. A floating structure according to claim 1 including a skirt depending below the bottom of each anchor,
and a restricted flow passageway through each anchor to provide controlled relief of the vacuum created under each anchor and within said skirt by continued lifting on the anchors.
5. A floating structure according to claim 4 wherein said restricted flow passageway is sized to allow substantially complete relief of the vacuum created under each anchor and within said skirt by continuous exertion of a force exceeding the anchor weight in a period of less than 30 minutes.
6. A floating structure according to claim 1, wherein said anchor connecting means for each anchor includes three mooring lines extending from said platform to said anchor,
said mooring lines being positioned parallel to said legs and spaced substantially equally around said legs with one of said mooring lines on each anchor being on the side of the leg facing the remainder of the structure,
said lines all being connected to said anchor at points equally spaced around and equidistant from the center of gravity of said anchor.
' 7. A floating structure according to claim 6, includa glurality of winches mounted on said platform,
said winches being connected to and adapted to pay out and retrieve said mooring lines with each winch connected to only one line and each line having a winch connected thereto, and
means for equalizing the tension in each of the mooring lines of each leg. 8. A floating structure according to claim 7 wherein said tension equalizing means includes each of said winches being movably mounted,
an actuator connected to each of said winches, and
means supplying actuating fluid to each of said actuators to exert a preselected force on said winches whereby the preselected tension is developed in each of said mooring lines. 9. A floating structure according to claim 8 including means associated with said winches for sensing the tension in its mooring lines. 10. A floating structure according to claim 1 includmeans for. releasably locking said anchors to the lower ends of said legs. 11. A floating structure according to claim 10 wherein said locking means includes a plurality of axially movable locking pins positioned in each leg at an angle to the axis of said leg,
said anchor defining a plurality of recesses in alignment with each of said pins, and
means for moving said pins into said recesses and retaining said pins within said recesses to secure each of said anchors to its respective leg. 12. A floating structure according to claim 1, includa plurality of thrusters mounted on said platform and adapted to extend into the water with the structure floating on said anchors. 13. A floating structure according to claim 12, in-
cluding means for orienting each of said thrusters to direct their thrust individually whereby said thrusters assist in the towing of said structure and in station keeping when said structure is moored. 14. A floating structure according to claim 1 wherein said anchors include a plurality of compartments, and
a line extending vertically through each of said compartments being open at its lower end to the interior of the compartment and extending through the upper surface of the anchor and being open thereabove at its upper end. 15. A floating structure according to claim 1 including a nozzle positioned within each of said legs,
each of said anchors defining a deballasting chamber which when said anchors are held against the lower end of said legs is in alignment with said nozzle and so 9 .that said nozzle communicates with the interior of said anchor, means for moving 'said nozzles into communication with its respective deballasting chamber, and means for supplying air to said nozzles to deballast said anchors. 16. A floating structure according to claim wherein said nozzle includes a flexible section allowing said nozzle to connect with said deballasting chamber even when slightly misaligned therewith. 17. A floating structure according to claim 15, including means for communicating from said nozzle to atmosphere and to ballast in said leg, and means controlling flow through said communication means whereby water may be directed into said anchor, said anchor may be in communication with said atmosphere and both said communications may be closed. 18. A floating structure according to claim 15, wherein said air supply means is an air compressor connected to said nozzle. 19. A floating structure according to claim 15 wherein said nozzle moving means includes at least one double acting actuator to extend and retract said nozzle. 20. A floating structure comprising a platform having a deck and three vertical hollow legs depending below said deck, three cylindrical anchors, one for each leg, three mooring lines for each leg,
10 each of said legs being connected to its anchor by said mooring lines, said mooring lines being positioned parallel to said legs and spaced equally around said legs with one of said mooring lines being on the side of said legs facing the remainder of the structure, means for releasably securing said anchors to the lower end of said legs, means for ballasting and deballasting each of said legs, means for ballasting and deballasting each of said anchors, means for paying out and retrieving each of said mooring lines and for applying a preselected tension to said mooring lines, and means for equalizing the tension in said mooring lines. 21. The method of recovering anchors in a vertical mooring system in which three anchors are ballasted and resting on the bottom of the body of water and connected by mooring lines to a floating platform on the surface of the water wherein the floating platform has a ballastable leg associated with each anchor including the steps of ballasting the floating platform to lower it in the water, tightening all of the mooring lines connecting the anchors to the floating platform to a uniform preselected tension, deballasting a portion of the platform to increase the tension in the connections to one of the anchors to thereby pull the anchor free of the bottom, deballasting other portions of the platform to pull the other anchors free of the bottom individually, and lifting the anchors upwardly through the water into engagement with the lower end of their respective platform legs.

Claims (21)

1. A floating structure comprising a platform having a deck and at least three vertical hollow legs depeNding below said deck and horizontal members extending between the lower ends of said legs, at least three anchors, each anchor being adapted to be positioned under one of said legs, means for ballasting and deballasting each of said legs, means for connecting said anchors to said platform, means for ballasting and deballasting each of said anchors, and said anchors when deballasted exerting sufficient buoyancy force to support substantially all of said platform above water with only the anchors creating drag resisting movement of the structure in the water, said platform having sufficient buoyancy to exert a tension on the anchor connecting means for each anchor at least equal to the weight of said anchor, said anchors being movable downward from said legs for engagement with the bottom and having said connecting means extending from said anchors to said legs as a plurality of parallel tension lines without any non-parallel lines, said anchor deballasting means being associated with said legs and operative only when said anchor is in close spaced relationship to the lower end of its leg.
2. A floating structure according to claim 1 wherein said anchors each include a plurality of watertight segments.
3. A floating structure according to claim 1 including means associated with said anchors for increasing the short term holding force to a force greater than the anchor weight and reducing said short term holding force to the anchor weight in a relatively short period of time.
4. A floating structure according to claim 1 including a skirt depending below the bottom of each anchor, and a restricted flow passageway through each anchor to provide controlled relief of the vacuum created under each anchor and within said skirt by continued lifting on the anchors.
5. A floating structure according to claim 4 wherein said restricted flow passageway is sized to allow substantially complete relief of the vacuum created under each anchor and within said skirt by continuous exertion of a force exceeding the anchor weight in a period of less than 30 minutes.
6. A floating structure according to claim 1, wherein said anchor connecting means for each anchor includes three mooring lines extending from said platform to said anchor, said mooring lines being positioned parallel to said legs and spaced substantially equally around said legs with one of said mooring lines on each anchor being on the side of the leg facing the remainder of the structure, said lines all being connected to said anchor at points equally spaced around and equidistant from the center of gravity of said anchor.
7. A floating structure according to claim 6, including a plurality of winches mounted on said platform, said winches being connected to and adapted to pay out and retrieve said mooring lines with each winch connected to only one line and each line having a winch connected thereto, and means for equalizing the tension in each of the mooring lines of each leg.
8. A floating structure according to claim 7 wherein said tension equalizing means includes each of said winches being movably mounted, an actuator connected to each of said winches, and means supplying actuating fluid to each of said actuators to exert a preselected force on said winches whereby the preselected tension is developed in each of said mooring lines.
9. A floating structure according to claim 8 including means associated with said winches for sensing the tension in its mooring lines.
10. A floating structure according to claim 1 including means for releasably locking said anchors to the lower ends of said legs.
11. A floating structure according to claim 10 wherein said locking means includes a plurality of axially movable locking pins positioned in each leg at an angle to the axis of said leg, said anchor defining a plurality of recesses in alignment with each of said pins, and means for mOving said pins into said recesses and retaining said pins within said recesses to secure each of said anchors to its respective leg.
12. A floating structure according to claim 1, including a plurality of thrusters mounted on said platform and adapted to extend into the water with the structure floating on said anchors.
13. A floating structure according to claim 12, including means for orienting each of said thrusters to direct their thrust individually whereby said thrusters assist in the towing of said structure and in station keeping when said structure is moored.
14. A floating structure according to claim 1 wherein said anchors include a plurality of compartments, and a line extending vertically through each of said compartments being open at its lower end to the interior of the compartment and extending through the upper surface of the anchor and being open thereabove at its upper end.
15. A floating structure according to claim 1 including a nozzle positioned within each of said legs, each of said anchors defining a deballasting chamber which when said anchors are held against the lower end of said legs is in alignment with said nozzle and so that said nozzle communicates with the interior of said anchor, means for moving said nozzles into communication with its respective deballasting chamber, and means for supplying air to said nozzles to deballast said anchors.
16. A floating structure according to claim 15 wherein said nozzle includes a flexible section allowing said nozzle to connect with said deballasting chamber even when slightly misaligned therewith.
17. A floating structure according to claim 15, including means for communicating from said nozzle to atmosphere and to ballast in said leg, and means controlling flow through said communication means whereby water may be directed into said anchor, said anchor may be in communication with said atmosphere and both said communications may be closed.
18. A floating structure according to claim 15, wherein said air supply means is an air compressor connected to said nozzle.
19. A floating structure according to claim 15 wherein said nozzle moving means includes at least one double acting actuator to extend and retract said nozzle.
20. A floating structure comprising a platform having a deck and three vertical hollow legs depending below said deck, three cylindrical anchors, one for each leg, three mooring lines for each leg, each of said legs being connected to its anchor by said mooring lines, said mooring lines being positioned parallel to said legs and spaced equally around said legs with one of said mooring lines being on the side of said legs facing the remainder of the structure, means for releasably securing said anchors to the lower end of said legs, means for ballasting and deballasting each of said legs, means for ballasting and deballasting each of said anchors, means for paying out and retrieving each of said mooring lines and for applying a preselected tension to said mooring lines, and means for equalizing the tension in said mooring lines.
21. The method of recovering anchors in a vertical mooring system in which three anchors are ballasted and resting on the bottom of the body of water and connected by mooring lines to a floating platform on the surface of the water wherein the floating platform has a ballastable leg associated with each anchor including the steps of ballasting the floating platform to lower it in the water, tightening all of the mooring lines connecting the anchors to the floating platform to a uniform preselected tension, deballasting a portion of the platform to increase the tension in the connections to one of the anchors to thereby pull the anchor free of the bottom, deballasting other portions of the platform to pull the other anchors free of the bottom individually, and lifting the anchors upwardly thrOugh the water into engagement with the lower end of their respective platform legs.
US460707A 1974-04-15 1974-04-15 Floating structure and method of recovering anchors therefor Expired - Lifetime US3919957A (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
US460707A US3919957A (en) 1974-04-15 1974-04-15 Floating structure and method of recovering anchors therefor
ZA00752011A ZA752011B (en) 1974-04-15 1975-04-01 Floating structure and method of recovering anchors therefor
GB1366575A GB1459706A (en) 1974-04-15 1975-04-03 Floating structures
AU79820/75A AU490117B2 (en) 1974-04-15 1975-04-04 Floating structure and method of recovering anchors therefor
CA223,898A CA1045472A (en) 1974-04-15 1975-04-07 Floating structure and method of recovering anchors therefor
NO751300A NO751300L (en) 1974-04-15 1975-04-14
BR2876/75A BR7502260A (en) 1974-04-15 1975-04-14 FLOATING STRUCTURE IMPROVEMENT AND ANCHOR RECOVERY PROCESS IN A TENSION ANCHORAGE SYSTEM
JP50045104A JPS50146093A (en) 1974-04-15 1975-04-14
DK160075A DK160075A (en) 1974-04-15 1975-04-14 FLOOD CONSTRUCTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US460707A US3919957A (en) 1974-04-15 1974-04-15 Floating structure and method of recovering anchors therefor

Publications (1)

Publication Number Publication Date
US3919957A true US3919957A (en) 1975-11-18

Family

ID=23829763

Family Applications (1)

Application Number Title Priority Date Filing Date
US460707A Expired - Lifetime US3919957A (en) 1974-04-15 1974-04-15 Floating structure and method of recovering anchors therefor

Country Status (8)

Country Link
US (1) US3919957A (en)
JP (1) JPS50146093A (en)
BR (1) BR7502260A (en)
CA (1) CA1045472A (en)
DK (1) DK160075A (en)
GB (1) GB1459706A (en)
NO (1) NO751300L (en)
ZA (1) ZA752011B (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4062313A (en) * 1975-09-25 1977-12-13 Standard Oil Company (Indiana) Installation of vertically moored platforms
EP0045651A2 (en) * 1980-08-04 1982-02-10 Conoco Phillips Company Apparatus and method for supporting a tubular riser
US4344721A (en) * 1980-08-04 1982-08-17 Conoco Inc. Multiple anchors for a tension leg platform
US4352599A (en) * 1980-08-04 1982-10-05 Conoco Inc. Permanent mooring of tension leg platforms
US4354446A (en) * 1980-08-22 1982-10-19 Conoco Inc. Temporary mooring of tension leg platforms
WO1982004233A1 (en) * 1981-06-05 1982-12-09 Valantin Alfred Sea platform,particularly derrick platform and method for the assembly thereof
US4456403A (en) * 1980-09-04 1984-06-26 Rsv-Gusto Engineering B.V. Device for absorbing horizontally directed impacts on the support legs of an artificial island during lowering and lifting of the legs respectively
US4540314A (en) * 1982-03-25 1985-09-10 Fluor Subsea Services, Inc. Tension leg means and method of installing same for a marine platform
FR2572049A1 (en) * 1984-10-22 1986-04-25 Canadian Patents Dev SEMI-SUBMERSIBLE INSTALLATION, IN PARTICULAR FOR DRILLING PLATFORM
US4611952A (en) * 1983-11-14 1986-09-16 Institut Francais Du Petrole Method of fabricating the lines of a taut-line platform and of prepositioning them prior to final fixing
US4733993A (en) * 1984-11-09 1988-03-29 J & W Offshore Ab Subsea foundation element and applications thereof
US4789271A (en) * 1986-07-29 1988-12-06 Halliburton Company Remote fluid transfer system and method for sub-sea baseplates and templates
US4848968A (en) * 1987-02-12 1989-07-18 Heerema Engineering Services BV Stabilization system
WO1997042393A1 (en) 1996-05-03 1997-11-13 Transocean Offshore Inc. Multi-activity offshore exploration and/or development drilling method and apparatus
WO1999057011A1 (en) * 1998-05-01 1999-11-11 Friede & Goldman, Ltd. Dynamically positioned semi-submersible drilling vessel
US6012873A (en) * 1997-09-30 2000-01-11 Copple; Robert W. Buoyant leg platform with retractable gravity base and method of anchoring and relocating the same
US6015245A (en) * 1997-09-08 2000-01-18 Frimm; Fernando C. Semisubmersible offshore vessel
FR2797843A1 (en) * 1999-09-01 2001-03-02 Dumez Gtm TENSILE LEFT MOBILE BARGE FOR NAUTICAL WORK WITH MEDIUM DEPTHS
EP1094193A2 (en) 1999-10-06 2001-04-25 Transocean Sedco Forex Inc. Dual riser assembly
US6273193B1 (en) 1997-12-16 2001-08-14 Transocean Sedco Forex, Inc. Dynamically positioned, concentric riser, drilling method and apparatus
US6447208B1 (en) * 1999-07-08 2002-09-10 Abb Lummus Global, Inc. Extended base tension leg substructures and method for supporting offshore platforms
US6503023B2 (en) * 2000-05-12 2003-01-07 Abb Lummus Global, Inc. Temporary floatation stabilization device and method
US6701861B2 (en) 2002-05-03 2004-03-09 Friede & Goldman, Ltd. Semi-submersible floating production facility
US20050058513A1 (en) * 2003-06-04 2005-03-17 Nils Martensson Semi-submersible offshore vessel
US20090279958A1 (en) * 2008-05-08 2009-11-12 Seahorse Equipment Corporation Pontoonless tension leg platform
US20110142545A1 (en) * 2004-04-06 2011-06-16 Leverette Steven J Ultra-deepwater floating platform
US20120141205A1 (en) * 2010-12-03 2012-06-07 Intelligent Organics Limited Mobile marine barrier system
CN105857533A (en) * 2016-05-10 2016-08-17 中国海洋石油总公司 Three-stand-column floating platform
US9631334B2 (en) 2011-07-04 2017-04-25 Intelligent Organics Limited Mobile marine barrier
US20180065713A1 (en) * 2015-03-19 2018-03-08 Samsung Heavy Ind. Co., Ltd. Semi-submersible maritime structure
US20190031291A1 (en) * 2015-12-24 2019-01-31 Keppel Offshore & Marine Technology Centre Pte Ltd Low motion semi-submersible
US10295007B2 (en) * 2014-08-22 2019-05-21 Subsea 7 Limited Subsea dynamic load absorber

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4425056A (en) * 1981-08-17 1984-01-10 Conoco Inc. Tension control system for controlling the tension in platform supporting tension legs.
JPS6045495A (en) * 1984-02-20 1985-03-11 Mitsubishi Heavy Ind Ltd Mooring gear for tension leg type marine structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2248051A (en) * 1938-12-28 1941-07-08 Sun Oil Co Offshore drilling rig
US2399656A (en) * 1944-12-07 1946-05-07 Edward R Armstrong Float
US2972973A (en) * 1958-05-06 1961-02-28 Ernest L Thearle Offshore platform
US3154039A (en) * 1962-07-25 1964-10-27 Jersey Prod Res Co Stable floating foundation
US3540396A (en) * 1968-06-07 1970-11-17 Deep Oil Technology Inc Offshore well apparatus and system
US3771481A (en) * 1971-05-03 1973-11-13 Santa Fe Int Corp Single column semisubmersible drilling vessel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2248051A (en) * 1938-12-28 1941-07-08 Sun Oil Co Offshore drilling rig
US2399656A (en) * 1944-12-07 1946-05-07 Edward R Armstrong Float
US2972973A (en) * 1958-05-06 1961-02-28 Ernest L Thearle Offshore platform
US3154039A (en) * 1962-07-25 1964-10-27 Jersey Prod Res Co Stable floating foundation
US3540396A (en) * 1968-06-07 1970-11-17 Deep Oil Technology Inc Offshore well apparatus and system
US3771481A (en) * 1971-05-03 1973-11-13 Santa Fe Int Corp Single column semisubmersible drilling vessel

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4062313A (en) * 1975-09-25 1977-12-13 Standard Oil Company (Indiana) Installation of vertically moored platforms
EP0045651A2 (en) * 1980-08-04 1982-02-10 Conoco Phillips Company Apparatus and method for supporting a tubular riser
US4344721A (en) * 1980-08-04 1982-08-17 Conoco Inc. Multiple anchors for a tension leg platform
US4352599A (en) * 1980-08-04 1982-10-05 Conoco Inc. Permanent mooring of tension leg platforms
US4359095A (en) * 1980-08-04 1982-11-16 Conoco Inc. Well support system
EP0045651B1 (en) * 1980-08-04 1986-03-26 Conoco Phillips Company Apparatus and method for supporting a tubular riser
US4354446A (en) * 1980-08-22 1982-10-19 Conoco Inc. Temporary mooring of tension leg platforms
US4456403A (en) * 1980-09-04 1984-06-26 Rsv-Gusto Engineering B.V. Device for absorbing horizontally directed impacts on the support legs of an artificial island during lowering and lifting of the legs respectively
WO1982004233A1 (en) * 1981-06-05 1982-12-09 Valantin Alfred Sea platform,particularly derrick platform and method for the assembly thereof
FR2507146A1 (en) * 1981-06-05 1982-12-10 Tim Tech Ind Minieres MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD
US4540314A (en) * 1982-03-25 1985-09-10 Fluor Subsea Services, Inc. Tension leg means and method of installing same for a marine platform
US4611952A (en) * 1983-11-14 1986-09-16 Institut Francais Du Petrole Method of fabricating the lines of a taut-line platform and of prepositioning them prior to final fixing
FR2572049A1 (en) * 1984-10-22 1986-04-25 Canadian Patents Dev SEMI-SUBMERSIBLE INSTALLATION, IN PARTICULAR FOR DRILLING PLATFORM
US4733993A (en) * 1984-11-09 1988-03-29 J & W Offshore Ab Subsea foundation element and applications thereof
US4789271A (en) * 1986-07-29 1988-12-06 Halliburton Company Remote fluid transfer system and method for sub-sea baseplates and templates
US4848968A (en) * 1987-02-12 1989-07-18 Heerema Engineering Services BV Stabilization system
WO1997042393A1 (en) 1996-05-03 1997-11-13 Transocean Offshore Inc. Multi-activity offshore exploration and/or development drilling method and apparatus
EP2332822A2 (en) 1996-05-03 2011-06-15 Transocean Offshore Deepwater Drilling Inc. Drillship or semi-submersible and multi-activity drilling assembly
US6015245A (en) * 1997-09-08 2000-01-18 Frimm; Fernando C. Semisubmersible offshore vessel
US6012873A (en) * 1997-09-30 2000-01-11 Copple; Robert W. Buoyant leg platform with retractable gravity base and method of anchoring and relocating the same
US6273193B1 (en) 1997-12-16 2001-08-14 Transocean Sedco Forex, Inc. Dynamically positioned, concentric riser, drilling method and apparatus
WO1999057011A1 (en) * 1998-05-01 1999-11-11 Friede & Goldman, Ltd. Dynamically positioned semi-submersible drilling vessel
US6447208B1 (en) * 1999-07-08 2002-09-10 Abb Lummus Global, Inc. Extended base tension leg substructures and method for supporting offshore platforms
FR2797843A1 (en) * 1999-09-01 2001-03-02 Dumez Gtm TENSILE LEFT MOBILE BARGE FOR NAUTICAL WORK WITH MEDIUM DEPTHS
WO2001015969A1 (en) * 1999-09-01 2001-03-08 Vinci Construction Grands Projets Mobile barge with tensioned struts for nautical works at medium depths
EP1094193A2 (en) 1999-10-06 2001-04-25 Transocean Sedco Forex Inc. Dual riser assembly
US7033115B2 (en) * 2000-05-12 2006-04-25 Deepwater Marine Technology L.L.C. Temporary floatation stabilization device and method
US20040208707A1 (en) * 2000-05-12 2004-10-21 Edward Huang Temporary floatation stabilization device and method
US6503023B2 (en) * 2000-05-12 2003-01-07 Abb Lummus Global, Inc. Temporary floatation stabilization device and method
US20030113170A1 (en) * 2000-05-12 2003-06-19 Edward Huang Temporary floatation stabilization device and method
US6701861B2 (en) 2002-05-03 2004-03-09 Friede & Goldman, Ltd. Semi-submersible floating production facility
US7011472B2 (en) * 2003-06-04 2006-03-14 Gva Consultants Ab Semi-submersible offshore vessel
US20050058513A1 (en) * 2003-06-04 2005-03-17 Nils Martensson Semi-submersible offshore vessel
US20110142545A1 (en) * 2004-04-06 2011-06-16 Leverette Steven J Ultra-deepwater floating platform
US20090279958A1 (en) * 2008-05-08 2009-11-12 Seahorse Equipment Corporation Pontoonless tension leg platform
US7854570B2 (en) * 2008-05-08 2010-12-21 Seahorse Equipment Corporation Pontoonless tension leg platform
US20120141205A1 (en) * 2010-12-03 2012-06-07 Intelligent Organics Limited Mobile marine barrier system
US9631334B2 (en) 2011-07-04 2017-04-25 Intelligent Organics Limited Mobile marine barrier
US10295007B2 (en) * 2014-08-22 2019-05-21 Subsea 7 Limited Subsea dynamic load absorber
US20180065713A1 (en) * 2015-03-19 2018-03-08 Samsung Heavy Ind. Co., Ltd. Semi-submersible maritime structure
US10618605B2 (en) * 2015-03-19 2020-04-14 Samsung Heavy Ind. Co., Ltd. Semi-submersible maritime structure
US20190031291A1 (en) * 2015-12-24 2019-01-31 Keppel Offshore & Marine Technology Centre Pte Ltd Low motion semi-submersible
US10549818B2 (en) * 2015-12-24 2020-02-04 Keppel Offshore & Marine Technology Centre Pte Ltd Low motion semi-submersible
CN105857533A (en) * 2016-05-10 2016-08-17 中国海洋石油总公司 Three-stand-column floating platform

Also Published As

Publication number Publication date
NO751300L (en) 1975-10-16
GB1459706A (en) 1976-12-31
CA1045472A (en) 1979-01-02
BR7502260A (en) 1976-02-17
DK160075A (en) 1975-10-16
ZA752011B (en) 1976-02-25
AU7982075A (en) 1976-10-07
JPS50146093A (en) 1975-11-22

Similar Documents

Publication Publication Date Title
US3919957A (en) Floating structure and method of recovering anchors therefor
US3540396A (en) Offshore well apparatus and system
US3572041A (en) Spar-type floating production facility
KR101348574B1 (en) Support including a reel having a docking buoy for detachable bottom/surface linking duct
US4683832A (en) Device and method to set and salvage structures
US2771747A (en) Offshore drilling barge
US2937006A (en) Underwater drilling rig
US6113314A (en) Disconnectable tension leg platform for offshore oil production facility
US4906139A (en) Offshore well test platform system
US4545437A (en) Drilling riser locking apparatus and method
US4065934A (en) Rig transport method
US3525388A (en) Subsea drilling apparatus
WO1987005876A1 (en) Subsurface buoy mooring and transfer system for offshore oil and gas production
US20090162144A1 (en) Tidal Flow Power Generation
US4224005A (en) Truss rig
BRPI0919568A2 (en) method and apparatus for subsea installations
KR20120083410A (en) Method, apparatus and system for attaching an anchor member to a floor of a body of water
US4458631A (en) Stop assembly for securing a buoy line connecting a mooring anchor to the associated buoy
US4041711A (en) Method and apparatus for quickly erecting off-shore platforms
US3782317A (en) Submersible salvage unit
US2921442A (en) Submergible barge
US4329088A (en) Tilt-up/jack-up off-shore drilling apparatus and method
US2941369A (en) Drilling structures
US3289419A (en) Sea raft
US4604001A (en) Jackdown tension leg platform

Legal Events

Date Code Title Description
AS Assignment

Owner name: SONAT OFFSHORE DRILLING INC.

Free format text: CHANGE OF NAME;ASSIGNOR:OFFSHORE COMPANY, THE;REEL/FRAME:004048/0943

Effective date: 19820105