US3319391A - Elevation markers - Google Patents

Elevation markers Download PDF

Info

Publication number
US3319391A
US3319391A US404096A US40409664A US3319391A US 3319391 A US3319391 A US 3319391A US 404096 A US404096 A US 404096A US 40409664 A US40409664 A US 40409664A US 3319391 A US3319391 A US 3319391A
Authority
US
United States
Prior art keywords
collar
projections
elevation
split
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US404096A
Inventor
Lutch Anthony
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US404096A priority Critical patent/US3319391A/en
Application granted granted Critical
Publication of US3319391A publication Critical patent/US3319391A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Definitions

  • an anchor bolt to receive a steel column or I beam is placed in the pier in an upright position.
  • a transit instrument sights an elevation point to the anchor bolt. This elevation point is where the bottom of the I beam is to rest. Generally the elevation point is marked on the anchor bolt.
  • an elevation rod is lowered until the correct elevation is read on the transit instrument.
  • a nail is driven into the pier and next to the anchor bolt. The rod rests on the nail which is driven into the concrete pier until the correct elevation is read onthe rod.
  • the height of the nail marks the elevation point to which grout is filled from the top of the pier.
  • a wood form is built around the pier to insure that the grout fill is level at the correct elevation.
  • the present invention eliminates these problems and also provides a rigid collar around the anchor bolt upon which the bearing plate may rest, if one is needed.
  • a correct elevation point using an elevation rod sighted by a transit instrument is easily achieved.
  • An elevation marker that cannot be removed without a wedge records in permanent fashion the elevation point on the anchor bolt.
  • Grout can then be poured flush to the top of the elevation marker in the absence of any wood form.
  • a bearing plate can be lowered on top of the soft grout in a level position without being further tapped around the edges to make it level thereby increasing the accuracy of setting an I beam on a concrete pier.
  • I provide an elevation marker for a foundation anchor bolt comprising a split resilient collar having projections at the split, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt, the inside surface of the collar having a plurality'of vertically spaced ribs for gripping the anchor bolt.
  • I provide an elevation marker for a foundation anchor bolt comprising a split resilient collar having projections at the split, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt, the inside surface of the collar having a plurality of knife edge projections extending horizontally around the collar for gripping the anchor bolt.
  • the projections at the split extend from the collar and have a top cam surface above the planar surface of the collar and that the projections 3 ,3 19,3 9 l Patented May 16, 1967 ice have aligned open ended transverse slots to receive a screed member having a. transverse slot thereby forming a blind halved .lap joint which closes the diameter of the collar under compression.
  • FIGURE 1 is a perspective view of the marker
  • FIGURE 2 is a perspective view of the marker
  • FIGURE 3 is a perspective view showing two anchor bolts in a concrete pier with twoelevation markers around the anchor bolts;
  • FIGURE 4 is a perspective view showing two anchor bolts in a concrete pier with two elevation markers around the anchor bolts and a pair of hands smoothing out the grout fill;
  • FIGURE 5 is a side sectional view taken at line V-V in FIGURE 4 showing bolted I beam resting on a bearing plate;
  • FIGURE 6 is a perspective view of the marker
  • FIGURE 7 is a side view'of the marker around the anchor bolt.
  • an anchor bolt elevation marker generally shown as 10 has a collar 12 and a screed 14.
  • the collar 12 has projections 16 and 18 extending from the split 20.
  • the collar 12 is made from steel which is resilient.
  • the top surfaces 22 and 24 of the projections 16 and 18 respectively are on the same plane as the top surface 26 of the collar 12.
  • Space 28 is formed between the projections 16 and 18.
  • the inside surface of the collar 12 has vertically spaced ribs 30.
  • Projections 16 and 18 have open ended transverse slots 32 and 34 which are designed to receive open ended transverse slot 36 in the screed 14.
  • the open ended transverse slots 32 and 34 are aligned to receive the open ended transverse slot 36 of the screed 14.
  • Projections 16 and 18 are pressed together closing the space 28 to enable the screed 14 to engage slots 32 and 34 and form a blind halved lap joint 38 shown in FIGURE-.2.
  • the opposing force of the projections 16 and 18 holds the screed 14 in a perfect horizontal position shown in FIGURE 2.
  • the force at the blind halved joint 38 is caused by the spring action at the projections 16 and '18.
  • a concrete pier 40 is poured and while it is still soft anchor bolts 42 are vertically inserted and spaced apart.
  • the anchor bolts 42 have threaded portions 44 and a smooth portion 46.
  • An elevation point must be sighted on the anchor bolt which will insure a proper elevation for an I beam designed to rest on the concrete pier 40 and bolted to anchor bolts 42.
  • This elevation marker 10 is used.
  • the normal inside diameter of collar 12 is smaller than the outside diameter of the foundation anchor bolt 42.
  • a screw driver or the end of the screed 14 used as a wedge can be inserted in the space 28 and twisted enlarging the space 28 and at the same time increasing the inside diameter of the collar 12 allowing it to be inserted over the foundation a'nchor bolt 42.
  • An elevation rod is some? times rested on top of the collar 12 until the correct elevation point is read on a transit instrument or the transit instrument can sight the top of. the collar 12 .directly.
  • the wedge such as the screw driver or the end of screed 14 is removed and the vertical ribs 30 grip the foundation anchor bolt 42 with a spring like action.
  • the ribs 30 work equally well on the threaded portion 44 of the anchor bolt 42 as on the smooth surface 46. The collar cannot be removed or jarred from its position without the insertion of a wedge in space 28.
  • Projections 16 and 18 are compressed tightly to enable the screed 14 to engage its transverse open ended slot 36 with the two aligned 'open ended transverse slots 32 and 34 forming a blind halved lap joint 38.
  • the inserted screeds 14 on the two anchor bolts 42 are horizontally positioned and kept in place by a force acting on the blind halved lap joint 38.
  • One of the purposes of the screeds 14 is to eliminate the need for a wooden form which is used to hold grout fill 48 between the top surfaces of the collar 12 land the top surface of the concrete pier 40.
  • screeds 14 eliminate the need for a wooden form and grout 48 is made flush with the top surface of the screed 14 and the collar 12 of the elevation marker 10.
  • a straight edge 50 easily insures a formed level grout 48 fill at the proper elevation.
  • a bearing plate 52 is sometimes lowered on top of screeds 14 and collar 12. Then an I beam 54 is lowered on top of the bearing plate 52 and bolted by anchor nuts 56.
  • the presence of the elevation marker comprising collar 12 having projections 16 and 18 and a screed 14 allows the I beam 54 to be bolted and lowered into place while the grout 48 is still soft.
  • the elevation marker shown generally as 58 is the same as the elevation marker in FIGURE 1 except the ribs are replaced by knife edges 60 and 62 to provide the gripping surface needed.
  • an anchor bolt 42 is shown with an elevation marker generally shown as 64 around the anchor bolt 42.
  • the elevation marker 64 has a collar 66 having the same characteristics as the collar in FIGURES 1 through 5.
  • a pair of projections 68 extend from the collar having a cam surface 70 which is raised above the top planar surface 72 of the collar 66.
  • the transit instrument always sights the elevation of the marker where the screed engages the open ended slots 76.
  • the cam surface 70 will always be higher than the top surface 72 of the collar 66. Therefore, after the correct elevation is sighted at point 78 at the top of the cam surface 70, there will be no surface higher than the cam surface.
  • An elevation marker for a foundation anchor bolt comprising .a split resilient collar having projections at the split extending from the collar, the projections having a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt.
  • An elevation marker for a foundation anchor bolt comprising:
  • a split resilient collar having projections at. the. split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having a plurality of ribs gripping the anchor bolt, the collar under tension urging the split to close;
  • a screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
  • An elevation marker for a foundation anchor bolt comprising:
  • a split resilient collar having projections at the split extending from the collar, the projections hav ing a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the: collar under tension urging the split to close;
  • a screed member having an open ended transverse slot engaging the slots in the extended projections forming .a blind halved lap joint which urges the projections together under compression.
  • An elevation marker for a foundation anchor bolt comprising:
  • a split resilient collar having spaced apart horizontal projections at the split extending from the collar, the projections having a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the inside surface of the collar having a plurality of ribs gripping the anchor bolt, the collar under tension urging the split to close;
  • a screed member having an open ended. transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression, the top of the screed member flush with the top of cam surface of the projections.
  • An elevation marker for a foundation anchor bolt comprising:
  • a split resilient collar having projections at the split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having a knife edge gripping the anchor bolt, the collar under tension urging the split to close;
  • a screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
  • An elevation marker for a foundation anchor bolt 2 comprising:
  • a split resilient collar having projections .at the split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having vertical ribs spaced apart and gripping the anchor bolt, the collar under tension urging the split to close;
  • a screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
  • elevation marker for a foundation anchor bolt comprising:
  • a split resilient collar having projections at the split extending from the collar, the projections having aligned open ended transverse slots, the collar under tension urging the split to close;
  • a screed member having .an open ended transverse slot engaging the slots in the extended. projections forming a blind halved lap joint which urges the projections together under compression.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

y 15, 1967 A. LUTCH ELEVATION MARKERS Filed Oct. 15, 1964 pagan H H M INVENTOR g Anthony Lutch flaw w United States Patent 3,319,391 ELEVATION MARKERS Anthony Lutch, 284 Glass Run Road, Pittsburgh, Pa. 15207 Filed Oct. 15, 1964, Ser. No. 404,096 7 Claims. (Cl. 52-371) This invention relates to elevation markers and particularly to an elevation marker for foundation anchor bolts.
After a concrete pier is formed, an anchor bolt to receive a steel column or I beam is placed in the pier in an upright position. After the pier hardens, a transit instrument sights an elevation point to the anchor bolt. This elevation point is where the bottom of the I beam is to rest. Generally the elevation point is marked on the anchor bolt. In sighting the elevation point, an elevation rod is lowered until the correct elevation is read on the transit instrument. A nail is driven into the pier and next to the anchor bolt. The rod rests on the nail which is driven into the concrete pier until the correct elevation is read onthe rod. The height of the nail marks the elevation point to which grout is filled from the top of the pier. A wood form is built around the pier to insure that the grout fill is level at the correct elevation. Sometimes a bearing plate is placed on top of the grout while it is still soft and is then tapped around the edges to make it level. Then an I beam is lowered and bolted to the anchor bolt. In most instances a chalk mark is placed on the anchor bolt marking the elevation point. There are a number of disadvantages to this technique. They are as follows:
(i) The nails are hard to drive in the concrete pier;
(ii) The nails may be knocked over;
(iii) The chalk mark on the bolt may wipe off; and
(iv) A wood form must be built between two elevation points to insure that the grout fill is level.
The present invention eliminates these problems and also provides a rigid collar around the anchor bolt upon which the bearing plate may rest, if one is needed.
In using the present invention a correct elevation point using an elevation rod sighted by a transit instrument is easily achieved. An elevation marker that cannot be removed without a wedge records in permanent fashion the elevation point on the anchor bolt. Grout can then be poured flush to the top of the elevation marker in the absence of any wood form. A bearing plate can be lowered on top of the soft grout in a level position without being further tapped around the edges to make it level thereby increasing the accuracy of setting an I beam on a concrete pier.
I provide an elevation marker for a foundation anchor bolt comprising a split resilient collar having projections at the split, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt, the inside surface of the collar having a plurality'of vertically spaced ribs for gripping the anchor bolt.
I provide an elevation marker for a foundation anchor bolt comprising a split resilient collar having projections at the split, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt, the inside surface of the collar having a plurality of knife edge projections extending horizontally around the collar for gripping the anchor bolt.
I prefer-ably provide that the projections at the split extend from the collar and have a top cam surface above the planar surface of the collar and that the projections 3 ,3 19,3 9 l Patented May 16, 1967 ice have aligned open ended transverse slots to receive a screed member having a. transverse slot thereby forming a blind halved .lap joint which closes the diameter of the collar under compression.
In the foregoing description I have set outcertain objects, purposes and advantages of my invention. Other objects, purposes and advantages will be apparent from a consideration of the following description of the drawings in which FIGURE 1 is a perspective view of the marker;
FIGURE 2 is a perspective view of the marker;
FIGURE 3 is a perspective view showing two anchor bolts in a concrete pier with twoelevation markers around the anchor bolts;
FIGURE 4 is a perspective view showing two anchor bolts in a concrete pier with two elevation markers around the anchor bolts and a pair of hands smoothing out the grout fill;
FIGURE 5 is a side sectional view taken at line V-V in FIGURE 4 showing bolted I beam resting on a bearing plate;
FIGURE 6 is a perspective view of the marker; and
FIGURE 7 is a side view'of the marker around the anchor bolt.
Referring to FIGURE 1 an anchor bolt elevation marker generally shown as 10 has a collar 12 and a screed 14. The collar 12 has projections 16 and 18 extending from the split 20. The collar 12 is made from steel which is resilient. The top surfaces 22 and 24 of the projections 16 and 18 respectively are on the same plane as the top surface 26 of the collar 12. Space 28 is formed between the projections 16 and 18. The inside surface of the collar 12 has vertically spaced ribs 30. Projections 16 and 18 have open ended transverse slots 32 and 34 which are designed to receive open ended transverse slot 36 in the screed 14. The open ended transverse slots 32 and 34 are aligned to receive the open ended transverse slot 36 of the screed 14. Projections 16 and 18 are pressed together closing the space 28 to enable the screed 14 to engage slots 32 and 34 and form a blind halved lap joint 38 shown in FIGURE-.2. The opposing force of the projections 16 and 18 holds the screed 14 in a perfect horizontal position shown in FIGURE 2. The force at the blind halved joint 38 is caused by the spring action at the projections 16 and '18. Whenever screed 14 is engaged with projections 16 and 18, the space in split 20 is narrowed and the space 28 between projections 16 and 18 is narrowed.
Refer-ring to FIGURE 3 a concrete pier 40 is poured and while it is still soft anchor bolts 42 are vertically inserted and spaced apart. The anchor bolts 42 have threaded portions 44 and a smooth portion 46. An elevation point must be sighted on the anchor bolt which will insure a proper elevation for an I beam designed to rest on the concrete pier 40 and bolted to anchor bolts 42. In order to do this elevation marker 10 is used. The normal inside diameter of collar 12 is smaller than the outside diameter of the foundation anchor bolt 42. In order to get the collar 12 on the bolt 42, a screw driver or the end of the screed 14 used as a wedge can be inserted in the space 28 and twisted enlarging the space 28 and at the same time increasing the inside diameter of the collar 12 allowing it to be inserted over the foundation a'nchor bolt 42. An elevation rod is some? times rested on top of the collar 12 until the correct elevation point is read on a transit instrument or the transit instrument can sight the top of. the collar 12 .directly. Whenever the correct elevation point is read in the transit instrument, the wedge such as the screw driver or the end of screed 14 is removed and the vertical ribs 30 grip the foundation anchor bolt 42 with a spring like action. The ribs 30 work equally well on the threaded portion 44 of the anchor bolt 42 as on the smooth surface 46. The collar cannot be removed or jarred from its position without the insertion of a wedge in space 28.
Projections 16 and 18 are compressed tightly to enable the screed 14 to engage its transverse open ended slot 36 with the two aligned 'open ended transverse slots 32 and 34 forming a blind halved lap joint 38. The inserted screeds 14 on the two anchor bolts 42 are horizontally positioned and kept in place by a force acting on the blind halved lap joint 38. One of the purposes of the screeds 14 is to eliminate the need for a wooden form which is used to hold grout fill 48 between the top surfaces of the collar 12 land the top surface of the concrete pier 40.
Referring to FIGURE 4 screeds 14 eliminate the need for a wooden form and grout 48 is made flush with the top surface of the screed 14 and the collar 12 of the elevation marker 10. A straight edge 50 easily insures a formed level grout 48 fill at the proper elevation.
, Referring to FIGURE while the grout 48 on top of concrete pier 40 is still soft a bearing plate 52 is sometimes lowered on top of screeds 14 and collar 12. Then an I beam 54 is lowered on top of the bearing plate 52 and bolted by anchor nuts 56. The presence of the elevation marker comprising collar 12 having projections 16 and 18 and a screed 14 allows the I beam 54 to be bolted and lowered into place while the grout 48 is still soft.
Referring to FIGURE 6 the elevation marker shown generally as 58 is the same as the elevation marker in FIGURE 1 except the ribs are replaced by knife edges 60 and 62 to provide the gripping surface needed.
Referring to FIGURE 7 an anchor bolt 42 is shown with an elevation marker generally shown as 64 around the anchor bolt 42. The elevation marker 64 has a collar 66 having the same characteristics as the collar in FIGURES 1 through 5. A pair of projections 68 extend from the collar having a cam surface 70 which is raised above the top planar surface 72 of the collar 66. Whenever the anchor bolt 42 is placed into a concrete pier, it is possible that the anchor bolt may tilt slightly off center at an angle 74. The transit instrument always sights the elevation of the marker where the screed engages the open ended slots 76. The cam surface 70 will always be higher than the top surface 72 of the collar 66. Therefore, after the correct elevation is sighted at point 78 at the top of the cam surface 70, there will be no surface higher than the cam surface. This eliminates the possibility of having the top surface 72 of the collars 66 extend higher and above the elevation line 80 and thereby giving an improper elevation when the concrete is laid and a bearing plate is placed on top of the elevation marker 64 by having it rest on the edge of the top surface 72.
While I have shown and described certain preferred methods and embodiments of my invention, it will be understood that this invention may be otherwise embodied within the scope of the following claims.
I claim:
1. An elevation marker for a foundation anchor bolt comprising .a split resilient collar having projections at the split extending from the collar, the projections having a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the collar having an inside normal diameter smaller than the outside diameter of the anchor bolt.
2. An elevation marker for a foundation anchor bolt comprising:
(a) A split resilient collar having projections at. the. split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having a plurality of ribs gripping the anchor bolt, the collar under tension urging the split to close; and
(b) A screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
3. An elevation marker for a foundation anchor bolt comprising:
(a) A split resilient collar having projections at the split extending from the collar, the projections hav ing a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the: collar under tension urging the split to close; and
(b) A screed member having an open ended transverse slot engaging the slots in the extended projections forming .a blind halved lap joint which urges the projections together under compression.
4. An elevation marker for a foundation anchor bolt comprising:
(a) A split resilient collar having spaced apart horizontal projections at the split extending from the collar, the projections having a top cam surface extending above the top planar surface of the collar and having aligned transverse slots open ended at the top of the cam surface, the inside surface of the collar having a plurality of ribs gripping the anchor bolt, the collar under tension urging the split to close; and
(b) A screed member having an open ended. transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression, the top of the screed member flush with the top of cam surface of the projections.
5. An elevation marker for a foundation anchor bolt comprising:
(a) A split resilient collar having projections at the split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having a knife edge gripping the anchor bolt, the collar under tension urging the split to close; and
(b) A screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
6. An elevation marker for a foundation anchor bolt 2 comprising:
(a) A split resilient collar having projections .at the split extending from the collar, the projections having aligned open ended transverse slots, the inside surface of the collar having vertical ribs spaced apart and gripping the anchor bolt, the collar under tension urging the split to close; and
(b) A screed member having an open ended transverse slot engaging the slots in the extended projections forming a blind halved lap joint which urges the projections together under compression.
7. elevation marker for a foundation anchor bolt comprising:
(a) A split resilient collar having projections at the split extending from the collar, the projections having aligned open ended transverse slots, the collar under tension urging the split to close; and
(b) A screed member having .an open ended transverse slot engaging the slots in the extended. projections forming a blind halved lap joint which urges the projections together under compression.
(References on following page) 5 6 References Cited by the Examiner 2,523,785 9/ 1950 Sereno 287-49 X HOItZCHdOI'fi 452,886 5/1891 Lloyd 1687.2
1,527,323 2/1925 Moore 5 FRANK ABBOTT, Primary Examm'er- 1,658,535 2/1928 Neilson 52-638 X A. C. PERHAM, Assistant Examiner.

Claims (1)

  1. 3. AN ELEVATION MARKER FOR A FOUNDATION ANCHOR BOLT COMPRISING: (A) A SPLIT RESILIENT COLLAR HAVING PROJECTIONS AT THE SPLIT EXTENDING FROM THE COLLAR, THE PROJECTIONS HAVING A TOP CAM SURFACE EXTENDING ABOVE THE TOP PLANAR SURFACE OF THE COLLAR AND HAVING ALIGNED TRANSVERSE SLOTS OPEN ENDED AT THE TOP OF THE CAM SURFACE, THE COLLAR UNDER TENSION URGING THE SPLIT TO CLOSE; AND (B) A SCREED MEMBER HAVING AN OPEN ENDED TRANSVERSE SLOT ENGAGING THE SLOTS IN THE EXTENDED PROJECTIONS FORMING A BLIND HALVED LAP JOINT WHICH URGES THE PROJECTIONS TOGETHER UNDER COMPRESSION.
US404096A 1964-10-15 1964-10-15 Elevation markers Expired - Lifetime US3319391A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US404096A US3319391A (en) 1964-10-15 1964-10-15 Elevation markers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US404096A US3319391A (en) 1964-10-15 1964-10-15 Elevation markers

Publications (1)

Publication Number Publication Date
US3319391A true US3319391A (en) 1967-05-16

Family

ID=23598145

Family Applications (1)

Application Number Title Priority Date Filing Date
US404096A Expired - Lifetime US3319391A (en) 1964-10-15 1964-10-15 Elevation markers

Country Status (1)

Country Link
US (1) US3319391A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3594965A (en) * 1968-10-01 1971-07-27 Kolbjorn Saether Precast building construction
US3681484A (en) * 1970-08-26 1972-08-01 Eugene T Mckie Method for surfacing poured material
US4561617A (en) * 1984-07-06 1985-12-31 Hafner William E Support device for displaying objects
US4574554A (en) * 1983-05-31 1986-03-11 Gentry Gary L Surfacing method and apparatus
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
US6760974B1 (en) 2003-04-29 2004-07-13 Maxxon Corporation Height determining instrument for poured floors, and method
US20060185320A1 (en) * 2005-02-10 2006-08-24 Ronald Dureiko Absorber tower metal hood to concrete shell attachment
US20070131840A1 (en) * 2005-12-13 2007-06-14 Jones Kurtis D Integral form panel for concrete form system
US20130055670A1 (en) * 2011-07-08 2013-03-07 Nucor Corporation Truss and rebar reinforced concrete structures
WO2016048171A3 (en) * 2014-09-26 2016-11-10 Mclindon Designs Limited Height clip
US20230183978A1 (en) * 2020-12-07 2023-06-15 Tim Veldman Rebar positioning apparatus

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US452886A (en) * 1891-05-26 Curtain-ring
US1527323A (en) * 1922-07-10 1925-02-24 Lee C Moore & Company Inc Metal derrick and the like
US1658535A (en) * 1926-12-11 1928-02-07 Sr James P Neilson Derrick
US2523785A (en) * 1946-08-20 1950-09-26 Sereno Paolo Resilient clamping device for framework elements
US3145961A (en) * 1962-09-04 1964-08-25 Holtzendorff Luciau Clive Branch attaching device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US452886A (en) * 1891-05-26 Curtain-ring
US1527323A (en) * 1922-07-10 1925-02-24 Lee C Moore & Company Inc Metal derrick and the like
US1658535A (en) * 1926-12-11 1928-02-07 Sr James P Neilson Derrick
US2523785A (en) * 1946-08-20 1950-09-26 Sereno Paolo Resilient clamping device for framework elements
US3145961A (en) * 1962-09-04 1964-08-25 Holtzendorff Luciau Clive Branch attaching device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3594965A (en) * 1968-10-01 1971-07-27 Kolbjorn Saether Precast building construction
US3681484A (en) * 1970-08-26 1972-08-01 Eugene T Mckie Method for surfacing poured material
US4574554A (en) * 1983-05-31 1986-03-11 Gentry Gary L Surfacing method and apparatus
US4561617A (en) * 1984-07-06 1985-12-31 Hafner William E Support device for displaying objects
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
US6760974B1 (en) 2003-04-29 2004-07-13 Maxxon Corporation Height determining instrument for poured floors, and method
US20060185320A1 (en) * 2005-02-10 2006-08-24 Ronald Dureiko Absorber tower metal hood to concrete shell attachment
US7707782B2 (en) * 2005-02-10 2010-05-04 The Babcock & Wilcox Power Generation Group, Inc. Absorber tower metal hood to concrete shell attachment
US20070131840A1 (en) * 2005-12-13 2007-06-14 Jones Kurtis D Integral form panel for concrete form system
WO2007070636A2 (en) * 2005-12-13 2007-06-21 Cactus Holdings, Llc Integral form panel for concrete form system
WO2007070636A3 (en) * 2005-12-13 2008-11-20 Cactus Holdings Llc Integral form panel for concrete form system
US20130055670A1 (en) * 2011-07-08 2013-03-07 Nucor Corporation Truss and rebar reinforced concrete structures
WO2016048171A3 (en) * 2014-09-26 2016-11-10 Mclindon Designs Limited Height clip
US20230183978A1 (en) * 2020-12-07 2023-06-15 Tim Veldman Rebar positioning apparatus
US11851881B2 (en) * 2020-12-07 2023-12-26 Tim Veldman Rebar positioning apparatus

Similar Documents

Publication Publication Date Title
US3319391A (en) Elevation markers
US3333380A (en) Adjustable leveling implement for finishing cast concrete layers
US4261544A (en) Element locator for concrete
US4533112A (en) Curb stake with integral support
US5419055A (en) Construction apparatus
US2331949A (en) Screed support
US2304333A (en) Building construction
US4924579A (en) Layout system for construction foundation placement
US3685237A (en) Property boundary marker
US1245632A (en) Screed-supporting device.
US3497172A (en) Concrete form and joint forming member therefor
US3429241A (en) Concrete form
US5228262A (en) Anchor assembly
US3017701A (en) Mason's multipurpose implement and anchoring means
US3130500A (en) Masonry guides
GB2089863A (en) Building Structure
US3871147A (en) Reusable ledger board with a nail-loosening means
US20120074293A1 (en) Assembly for leveling new concrete and sub-grade
GB511249A (en) Improvements in or relating to anchorages for posts and the like
US3397458A (en) Guide line supporting apparatus
US2383544A (en) Foundation block structure
GB2209044A (en) Patio slab laying aid
US8096060B1 (en) Assembly for leveling new concrete and sub-grade
US2138634A (en) Road rail stake pocket
US2534154A (en) Anchor lock form aligner