US20140259923A1 - Apparatus, system, and method for processing materials - Google Patents

Apparatus, system, and method for processing materials Download PDF

Info

Publication number
US20140259923A1
US20140259923A1 US14/196,067 US201414196067A US2014259923A1 US 20140259923 A1 US20140259923 A1 US 20140259923A1 US 201414196067 A US201414196067 A US 201414196067A US 2014259923 A1 US2014259923 A1 US 2014259923A1
Authority
US
United States
Prior art keywords
feedstock
chamber
endothermic
processing
endothermic chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/196,067
Inventor
John E. Blair
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Clean Blue Technologies Inc
Original Assignee
Clean Blue Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clean Blue Technologies Inc filed Critical Clean Blue Technologies Inc
Priority to US14/196,067 priority Critical patent/US20140259923A1/en
Publication of US20140259923A1 publication Critical patent/US20140259923A1/en
Assigned to Clean Blue Technologies, Inc. reassignment Clean Blue Technologies, Inc. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BLAIR, JOHN E.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/72Other features
    • C10J3/721Multistage gasification, e.g. plural parallel or serial gasification stages
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10KPURIFYING OR MODIFYING THE CHEMICAL COMPOSITION OF COMBUSTIBLE GASES CONTAINING CARBON MONOXIDE
    • C10K3/00Modifying the chemical composition of combustible gases containing carbon monoxide to produce an improved fuel, e.g. one of different calorific value, which may be free from carbon monoxide
    • C10K3/02Modifying the chemical composition of combustible gases containing carbon monoxide to produce an improved fuel, e.g. one of different calorific value, which may be free from carbon monoxide by catalytic treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J7/00Apparatus for generating gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B5/00Operations not covered by a single other subclass or by a single other group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C1/00Reclamation of contaminated soil
    • B09C1/06Reclamation of contaminated soil thermally
    • B09C1/065Reclamation of contaminated soil thermally by pyrolysis
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B53/00Destructive distillation, specially adapted for particular solid raw materials or solid raw materials in special form
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B53/00Destructive distillation, specially adapted for particular solid raw materials or solid raw materials in special form
    • C10B53/07Destructive distillation, specially adapted for particular solid raw materials or solid raw materials in special form of solid raw materials consisting of synthetic polymeric materials, e.g. tyres
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G1/00Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal
    • C10G1/08Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal with moving catalysts
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G1/00Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal
    • C10G1/10Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal from rubber or rubber waste
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E50/00Technologies for the production of fuel of non-fossil origin
    • Y02E50/30Fuel from waste, e.g. synthetic alcohol or diesel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/141Feedstock
    • Y02P20/143Feedstock the feedstock being recycled material, e.g. plastics

Definitions

  • the present disclosure relates to an apparatus, system, and method for processing materials.
  • Disposal in a landfill creates a multiplicity of problems, such as, for example, selecting a site for disposal, transport of material to and from the site, potential pollutions problems in the nearby soil, groundwater, and air, and issues associated with the lack of recycling when materials are disposed of in a landfill.
  • Pyrolysis may be used to dispose of certain plastic wastes, however, conventional pyrolysis methods are not energy or cost efficient.
  • a refinery system includes a feedstock supply line, a first endothermic chamber that receives feedstock from the feedstock supply line and processes the feedstock under elevated heat during a first time period, a second endothermic chamber that receives feedstock from the feedstock supply line under elevated heat during a second time period, and a refining processor downstream and in communication with each of the first chamber and the second chamber.
  • the feedstock is one of mostly polymers, contaminated soil, and animal processing byproducts.
  • the system includes respective first and second catalyst chambers downstream from the first and second endothermic chambers but upstream from the refining processor.
  • a common line is downstream of the first and second endothermic chambers and in communication with the refining processor downstream.
  • syngas is formed in the respective first and second catalyst chambers, and further wherein, syngas formed in the first and second catalyst chambers is used to heat one of the first and second endothermic chambers.
  • the catalyst chambers include a catalyst selected from the group consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • a catalyst selected from the group consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • the first and second time periods do not substantially overlap.
  • the first time period is between about two hours and about fifteen hours.
  • the feedstock is processed until the oxygen level is below about 10%.
  • the feedstock is processed until the oxygen level is below about 5%.
  • the system includes a third endothermic chamber that receives feedstock from the feedstock supply under elevated during a third time period.
  • the first endothermic chamber and the second endothermic chamber are configured to supply a continuous amount of processed feedstock to the refining processor.
  • the refining processor includes a crude oil refining system that includes an oil and water separator and one or more condensers for separating syngas.
  • the refining processor includes a crude oil refining system that includes a catalyst chamber and a condenser for separating syngas and leaving a biodiesel source.
  • each of the first and second endothermic chambers are sealed after feedstock is provided therein.
  • one of the first endothermic chamber and the second endothermic chamber is at a preferred operating temperature (POT) at all times during processing.
  • POT preferred operating temperature
  • the feedstock is algae.
  • the feedstock includes a polymer
  • the feedstock includes animal byproducts.
  • the refining processor processes syncrude and syngas.
  • processed feedstock is removed from the first endothermic chamber while feedstock is loaded into the second endothermic chamber.
  • a method of generating a resource includes receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber during a first time period under heating, receiving a feedstock in a second endothermic chamber, processing the feedstock in the second endothermic chamber during a second time period under heating, and receiving, in a single downstream refining processor, the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about two hours and about 15 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about four hours and about 13 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about six hours and about 11 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about eight hours and about 9 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient temperature to about 900 degrees C. during the first time period.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient to about 50 degrees C.
  • the method includes processing the feedstock in a respective first and second catalyst chamber downstream from each of the first and second endothermic chambers and upstream of the single downstream refining processor.
  • processing the feedstock in a respective first and second catalyst chamber includes introducing a catalyst consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • a catalyst consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • the first time period and the second time period do not substantially overlap.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber comprises heating the feedstock until the oxygen levels are below about 10%.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the oxygen levels are below about 5%.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the feedstock is reduced to primarily a light weight gas, a heavy weight gas, and carbon char.
  • the carbon char is removed from each of the first endothermic chamber and the second endothermic chamber.
  • the light weight gas is syngas
  • the method further comprising isolating the syngas and using the syngas to heat either of the first and second endothermic chambers during a subsequent processing step.
  • the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing includes receiving a continuous supply that is alternated from the first endothermic chamber and the second endothermic chamber.
  • one of the first endothermic chamber and the second endothermic chamber is maintained at a preferred operating temperature (“POT”) at all processing times.
  • POT preferred operating temperature
  • a method of generating a resource includes at a first time, receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber under heating to an elevated processing temperature in which light weight heating gas is produced, and at a second time, receiving a feedstock in a second endothermic chamber, and processing the feedstock in the second endothermic chamber under heating to an elevated processing temperature in which light weight heating gas is produced.
  • One of the first and second endothermic chambers maintains the elevated processing temperature during a processing period of time, the processing period of time including at least one heating period for each of the first and second endothermic chambers.
  • a refinery system includes a feed stock supply line, a first endothermic chamber that receives feedstock from the feedstock supply and processes the feedstock under elevated heat during a first time period, a second endothermic chamber that receives feedstock from the feedstock supply under elevated heat during a second time period, a refining processor downstream and in communication with each of the first chamber and the second chamber, and a control module configured to direct a heating source to apply heat to the first endothermic chamber during the first time period, monitor the oxygen level in the first endothermic chamber to determine a desired oxygen level in the feedstock, upon determining a desired oxygen level in the feedstock of the first endothermic chamber, direct a heating source to apply heat to the second endothermic chambering during the second time period, monitor the oxygen level in the second endothermic chamber to determine a desired oxygen level in the feedstock, and upon determining a desired oxygen level in the feedstock of the second endothermic chamber, direct a heating source to apply heat to one of the first endothermic chamber
  • the first and second time periods are about the same.
  • a refinery system includes a feedstock supply line, a first endothermic chamber that receives feedstock from the feedstock supply and processes the feedstock under elevated heat during a first time period and a first catalyst chamber for interacting with syncrude from the first endothermic chamber, a second endothermic chamber that receives feedstock from the feedstock supply under elevated heat during a second time period and a second catalyst chamber for interacting with syncrude from the second endothermic chamber, and a refining processor downstream and in communication with each of the first chamber and the second chamber, the refining processor receiving a generally continuous supply of syncrude from one of the first catalyst chamber and the second catalyst chamber during a manufacturing process.
  • the refining processor processes syncrude and syngas.
  • a method of generating a resource includes at a first time, receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber under heating to an elevated processing temperature to produce a product for downstream processing, at a second time, receiving a feedstock in a second endothermic chamber, processing the feedstock in the second endothermic chamber under heating to an elevated processing temperature to produce a product for downstream processing, and providing a product for downstream processing in a generally continuous manner from one of the first endothermic chamber and the second endothermic chamber.
  • the method includes processing the product for downstream processing in a catalyst chamber.
  • a method of generating an oil byproduct includes providing a feedstock into a first endothermic chamber in communication with a first catalytic chamber, applying heat to the first endothermic chamber in order to process the feedstock into a processed syncrude, transporting the processed syncrude from the first endothermic chamber into the downstream processor, providing feedstock into the second endothermic chamber in communication with a second catalytic chamber, wherein each of the first and second endothermic chambers are in communication with a single downstream processor that processes the oil byproduct, applying heat to the second endothermic chamber from the second endothermic chamber in order to process the feedstock into a processed syncrude, and transporting the processed syncrude into the downstream processor.
  • FIG. 1 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 2 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 3 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 4 illustrates one or more methods of processing waste materials according to one or more embodiments disclosed herein.
  • FIG. 5 illustrates temperature versus time charts of respective first and second endothermic chambers according to one or more experiments according to the one or more methods disclosed herein.
  • FIG. 1 illustrates a portion of a system, where the portion is generally designated 10 A.
  • Portion of system 10 A works in conjunction with portion of system 10 B illustrated in FIG. 2 and portion of system 10 C illustrated in FIG. 3 to form an entire system that processes materials, such as, for example, plastics and the like.
  • System 10 A includes feedstock supplies 11 A and 11 B. While illustrated in the system diagram as being separate feedstocks, the feedstock supply may be one in the same for supplying feedstock to endothermic chambers 12 A and 12 B.
  • the feedstock supplies 11 A and 11 B may include any waste material.
  • the waste material may include waste plastics and other polymers from postindustrial manufacturing, municipal waste collections, or any other source of waste plastics.
  • the waste plastics may include plastics 1 through 7 and 9 .
  • the plastics may be bailed, bundled, shredded, or otherwise processed or unprocessed.
  • the waste material is transferred from storage using any appropriate material handler, such as a tractor, to a staging or loading area.
  • the waste material is then loaded onto a conveyor loader, hydraulic loader, or carried by hand, or other appropriate manner, and is then supplied to the endothermic chambers 12 A and 12 B. This is preferably done during alternating time periods, though may be done at the same time.
  • the endothermic chambers 12 A and 12 B are loaded with the feedstock material. Downstream from the endothermic chambers 12 A and 12 B are respective catalytic chambers 14 A and 14 B. Catalytic chambers 14 A and 14 B each have a catalyst compound loaded therein.
  • the catalyst compound used herein may include, but is not limited to, Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof.
  • the catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof.
  • the polymer feedstock may include, but is not limited to, #1 PET (Polyethylene terephthalate), #2 HDPE (High-density polyethylene); #3 PVC (Polyvinyl chloride); #4 LDPE (Low-density polyethylene); #5 PP (Polypropylene); #6 PS (Polystyrene); #7 Other; and #9 or ABS.
  • #1 PET Polyethylene terephthalate
  • #2 HDPE High-density polyethylene
  • #3 PVC Polyvinyl chloride
  • #4 LDPE Low-density polyethylene
  • #5 PP Polypropylene
  • #6 PS Polystyrene
  • #7 Other and #9 or ABS.
  • endothermic chamber 12 A is sealed after the feedstock is provided therein.
  • processing occurs of the feedstock in the endothermic chamber. This occurs by subjecting the feedstock to a heating process where the temperature of the feedstock is raised from ambient to about 50 degrees C. in a first heating step. The temperature of the feedstock is then raised from about 50 degrees C. to about 900 degrees C. over less than about a 12 hour period.
  • the elevated temperature may be higher or lower than about 900 degrees C.
  • the elevated final temperature may be between about 450 and 550 degrees C.
  • the oxygen level therein is reduced during the heating process until it is at a suitably low level.
  • the oxygen level may be about 10 percent. In one or more embodiments, the oxygen level may be about 5 percent. In one or more embodiments, the oxygen level is below about 5 percent after final processing within the endothermic chamber 12 A.
  • the endothermic chamber 12 A is in fluid communication with catalyst chamber 14 A.
  • the catalyst chamber 14 A includes a catalyst to aid in reacting with gases formed in the endothermic chamber 12 A.
  • the catalyst may include Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof.
  • the catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof.
  • Gases are formed in endothermic chamber 12 A when a chemical reaction of the feedstock occurs. Specifically, the chemical reaction may be cracking where long chain molecules in the feedstock are broken down into shorter chain molecules that generally form into a light weight gas, which may be syngas, a heavy gas, which may be syncrude, and a carbon char.
  • the gases are formed and they flow out of the endothermic chamber 12 A into the catalyst chamber 14 A.
  • the gases collectively the syngas and syncrude, may further react with a catalyst.
  • feedstock 11 A is loaded into endothermic chamber 12 B in the same manner as it is loaded into endothermic chamber 12 A.
  • feedstock in endothermic chamber 12 B is also being processed in the same manner.
  • This has the advantage of maintaining a continuous supply of syngas, Syncrude, and carbon char from processed feedstock to be used for downstream processing. In this manner, inefficiencies associated with starting and stopping a pyrolysis system as new processed feedstock becomes available are eliminated.
  • Endothermic chamber 12 A may be loaded by about between 10 and 90 percent by volume with feedstock.
  • Feedstock is then processed in endothermic chamber 12 B according to the same manner as that which is processed in endothermic chamber 12 A while endothermic chamber 12 A cools. During this cooling period, char is removed from the endothermic chamber 12 A, as well as any other contaminants or materials such as metal. These materials may then be further processed or sold for industrial use.
  • syngas travels into a flue 16 .
  • the syngas may then further go through a filtering process to remove any dust or other contaminants in a filter 44 or 46 .
  • a compressor 20 may then compress the syngas before it is stored in a storage tank 22 where it is later used for providing heat treatment to each of the endothermic chambers 12 A and 12 B. In this manner, the majority of the energy used in the portion 10 A is from syngas made from recycled materials.
  • Char removed from either of endothermic chambers 12 A and 12 B may be subject to further processing FP, which may include any suitable processing for those materials.
  • Syncrude may be pumped or otherwise transferred into a portion 10 B of the system for further processing.
  • a separator 24 separates oil and water in the crude oil.
  • the crude oil then travels through one or more condensers 34 , 36 in order to cool the crude oil down to less than about 350 degrees C.
  • Syngas is separated from crude oil during this process, and may be stored in tank 22 for further use.
  • a transition tank 42 may contain the processed crude oil which will later be processed in a further processing step.
  • a backpressure module 40 may be provided in communication with condensers 34 , 36 in order to reduce any backpressures in the system.
  • a buffer tank 30 and pressure module 26 may be provided for storing processed materials during any of the processes.
  • Portion 10 C of the system may be further provided for additional processing.
  • an oil flow pump 44 may be provided for pumping the crude oil to a thermochemical distillation chamber 46 .
  • the crude oil is heated for further processing.
  • the oil is then transferred to a catalyst chamber 50 for additional processing.
  • a syngas filter 52 filters out any syngas, which is then filtered in filter 54 and filter 56 .
  • Steam from this portion of the refining process is processed through the dust filter 54 and then passed through the hydro filter module 56 , capturing the remaining steam and contaminants.
  • the collection of contaminants is then processed through the chamber 12 A or 12 B to convert from a liquid into a solid.
  • a back pressure module 70 may be in communication therewith, with buffer tank 72 and negative pressure module 74 .
  • Oil from the diesel collection tank 62 is transferred to a diesel measurement tank 76 that is in communication with a distillates measurement tank 80 .
  • An oil flow pump 82 provides pumping forces to pump oil to an acidic wash tank 84 .
  • An oil flow pump 86 further provides pumping forces to pump oil to an alkali wash tank 90 where sulfur is cleaned from the fuel, completing the refining process and resulting in transportation grade ultra-low biodiesel fuel D2.
  • the biodiesel fuel is then transferred to a transition tank 92 where further testing may be completed before transport to a transfer fuel trailer or other storage tank.
  • portions 10 A, 10 B, and 10 C form a system 10 that is capable of converting plastic waste into a highly efficient recycling process producing syngas for heating during the processing step, biodiesel for use as a fuel source, and char for further processing as desired.
  • a control module 94 may be in communication with one or more or all of the elements described herein for monitoring one or more aspects of the refining process.
  • the endothermic chambers 12 A and 12 B may have one or more sensors in communication therewith that monitor, for example, temperature, pressure, oxygen levels, and any other desired characteristic.
  • the control module 94 may then be configured to monitor the one or more characteristics, and direct additional elements to carry out one or more portions of the process disclosed herein.
  • control module 94 detects a release in negative pressure from system 10 A, particularly the refining of oil of the first feedstock from the endothermic chamber 12 A, the control module directs the oil pump 44 to pump oil from endothermic chamber 12 B to thereby cause a continuous flow of oil in the refining process.
  • system uptime is maximized and the system 10 is almost always running at operating temperatures and pressures, thereby increasing efficiency in the recycling process by eliminating the inefficiencies associated with startup when temperatures and pressures are not at operating ranges.
  • the control module 94 is configured to monitor a decrease in gas flow into the catalyst chamber 14 A in order to direct heating of endothermic chamber 12 B.
  • the system 10 utilized the processes disclosed herein to produce syngas, biodiesel, and char.
  • each of the first endothermic chamber 12 A and the second endothermic chamber 12 B had about the same amount of feedstock having about the same characteristics applied therein.
  • the first endothermic chamber 12 A was sealed and heat was applied according to the following schedule shown in TABLE I.
  • the second endothermic chamber 12 B was loaded with feedstock and the heating process began. In this manner, at about 7:00, the feedstock in the second endothermic chamber 12 B starts a gasification flow. At about 7:00, heat is no longer applied to endothermic chamber 12 A and ambient air is introduced to decrease pressure and increase the cooling rate. At about 8:30, the endothermic chamber 12 A is rotated to increase the cooling rate. At about 9:30, a chamber door is opened on the endothermic chamber 12 A, thereby allowing an increased cooling rate. The heating process for the second endothermic chamber 12 B was carried out to have consistent time measurements as the heating process for the first endothermic chamber 12 A. At about 10:30, the char is removed from the endothermic chamber 12 A. Feedstock may then be loaded into chamber 12 A for heating and processing at a later date. Maximum pressure was found to be about 500 pounds per square inch.
  • the syngas, crude oil, and char material are then processed according to the one or more processes disclosed herein.
  • FIG. 5 illustrates graphs plotting temperature of each endothermic chamber 12 A, 12 B relative to processing time.
  • POT preferred operating temperature
  • feedstocks 11 A and 11 B may be petroleum contaminated soils from, but not limited to, fuel spills, fuel tank leakage, petroleum beach wash, refining spills, fuel line spills, petroleum laden spills, and sands residue from separation washing.
  • the petroleum contaminated soils are transferred into the endothermic chambers 12 A and 12 B for processing. After the soil has been processed in the endothermic chambers 12 A and 12 B, the separated syngas and oil is sent for further processing as described herein with reference to other materials, and the soil and char is removed from the endothermic chambers 12 A and 12 B.
  • a vacuum or similar apparatus may be used to remove the soils.
  • feedstocks 11 A and 11 B may be poultry, swine, bovine, fish, or other animal processing byproducts.
  • the animal processing byproducts are transferred into the endothermic chambers 12 A and 12 B for processing.
  • the processing byproducts are preferably dewatered or dried to a moisture content of less than about 50%.
  • the separated syngas and oil is sent for further processing as described herein with reference to other materials, and the char is removed from the endothermic chambers 12 A and 12 B.
  • a vacuum or similar apparatus may be used to remove the char and other materials. These materials have particular applicability as a fertilizer grade material.
  • the one or more methods may include a method of generating a resource.
  • the method may include receiving a feedstock ⁇ in a first endothermic chamber 110 , processing the feedstock in a first endothermic chamber during a first time period under heating 112 , receiving a feedstock in a second endothermic chamber 114 , processing the feedstock in a second endothermic chamber during a second time period under heating 116 , and receiving, in a single downstream refining processor, the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing 120 .
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about two hours and about 15 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about four hours and about 13 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about six hours and about 11 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about eight hours and about 9 hours.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient temperature to about 900 degrees C. during the first time period.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient to about 50 degrees C. in a first portion of the heating process.
  • the method includes processing the feedstock in a respective first and second catalyst chamber downstream from each of the first and second endothermic chambers and upstream of the single downstream refining processor.
  • processing the feedstock in a respective first and second catalyst chamber comprises introducing a catalyst comprising one of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof.
  • the catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof.
  • the first time period and the second time period do not substantially overlap. In this manner, only a portion of the first and second time period overlaps, yet the endothermic chambers continually provide processed feedstock for further downstream processing.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber comprises heating the feedstock until the oxygen levels are below about 10%.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the oxygen levels are below about 5%.
  • processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the feedstock is reduced to primarily a light weight gas, a heavy weight gas, and carbon char.
  • the carbon char is removed from each of the first endothermic chamber and the second endothermic chamber.
  • the light weight gas is syngas and the method further includes isolating the syngas and using the syngas to heat either of the first and second endothermic chambers during a subsequent processing step.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Wood Science & Technology (AREA)
  • Materials Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Soil Sciences (AREA)
  • Thermal Sciences (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Processing Of Solid Wastes (AREA)
  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)

Abstract

A refinery system is provided. The refinery system includes a feedstock supply line, a first endothermic chamber that receives feedstock from the feedstock supply and processes the feedstock under elevated heat during a first time period, a second endothermic chamber that receives feedstock from the feedstock supply under elevated heat during a second time period, and a refining processor downstream and in communication with each of the first chamber and the second chamber. A related method is also disclosed.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to U.S. Provisional Patent Application No. 61/785,220 filed on Mar. 14, 2013 and entitled APPARATUS AND METHODS OF PROCESSING MATERIALS, the contents of which are incorporated by reference in their entirety herein.
  • TECHNICAL FIELD
  • The present disclosure relates to an apparatus, system, and method for processing materials.
  • BACKGROUND
  • Disposal of residential, commercial, and industrial waste in an environmentally friendly and cost-efficient manner continues to be a problem for which current solutions have one or more disadvantages associated therewith.
  • Disposal in a landfill creates a multiplicity of problems, such as, for example, selecting a site for disposal, transport of material to and from the site, potential pollutions problems in the nearby soil, groundwater, and air, and issues associated with the lack of recycling when materials are disposed of in a landfill.
  • Other methods for waste disposal include recycling materials such as plastics, but the same logistics problems associated with transport to and from a landfill are present, and current methods of recycling are not energy or cost efficient. In addition, many commercial and industrial providers are charged a service or tonnage charge for materials that they recycle, which creates an incentive to avoid recycling.
  • Pyrolysis may be used to dispose of certain plastic wastes, however, conventional pyrolysis methods are not energy or cost efficient.
  • Accordingly, a method, good, or product that is configured to address these disadvantages is needed.
  • SUMMARY
  • This Summary is provided to introduce in a simplified form concepts that are further described in the following detailed descriptions. This summary is not intended to identify key features or essential features of the claimed subject matter, nor is it to be construed as limiting the scope of the claimed subject matter.
  • According to one or more embodiments, a refinery system is provided. The system includes a feedstock supply line, a first endothermic chamber that receives feedstock from the feedstock supply line and processes the feedstock under elevated heat during a first time period, a second endothermic chamber that receives feedstock from the feedstock supply line under elevated heat during a second time period, and a refining processor downstream and in communication with each of the first chamber and the second chamber.
  • According to one or more embodiments, the feedstock is one of mostly polymers, contaminated soil, and animal processing byproducts.
  • According to one or more embodiments, the system includes respective first and second catalyst chambers downstream from the first and second endothermic chambers but upstream from the refining processor.
  • According to one or more embodiments, a common line is downstream of the first and second endothermic chambers and in communication with the refining processor downstream.
  • According to one or more embodiments, syngas is formed in the respective first and second catalyst chambers, and further wherein, syngas formed in the first and second catalyst chambers is used to heat one of the first and second endothermic chambers.
  • According to one or more embodiments, the catalyst chambers include a catalyst selected from the group consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • According to one or more embodiments, the first and second time periods do not substantially overlap.
  • According to one or more embodiments, the first time period is between about two hours and about fifteen hours.
  • According to one or more embodiments, the feedstock is processed until the oxygen level is below about 10%.
  • According to one or more embodiments, the feedstock is processed until the oxygen level is below about 5%.
  • According to one or more embodiments, the system includes a third endothermic chamber that receives feedstock from the feedstock supply under elevated during a third time period.
  • According to one or more embodiments, the first endothermic chamber and the second endothermic chamber are configured to supply a continuous amount of processed feedstock to the refining processor.
  • According to one or more embodiments, the refining processor includes a crude oil refining system that includes an oil and water separator and one or more condensers for separating syngas.
  • According to one or more embodiments, the refining processor includes a crude oil refining system that includes a catalyst chamber and a condenser for separating syngas and leaving a biodiesel source.
  • According to one or more embodiments, each of the first and second endothermic chambers are sealed after feedstock is provided therein.
  • According to one or more embodiments, one of the first endothermic chamber and the second endothermic chamber is at a preferred operating temperature (POT) at all times during processing.
  • According to one or more embodiments, the feedstock is algae.
  • According to one or more embodiments, the feedstock includes a polymer.
  • According to one or more embodiments, the feedstock includes animal byproducts.
  • According to one or more embodiments, the refining processor processes syncrude and syngas.
  • According to one or more embodiments, processed feedstock is removed from the first endothermic chamber while feedstock is loaded into the second endothermic chamber.
  • According to one or more embodiments, a method of generating a resource is provided. The method includes receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber during a first time period under heating, receiving a feedstock in a second endothermic chamber, processing the feedstock in the second endothermic chamber during a second time period under heating, and receiving, in a single downstream refining processor, the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about two hours and about 15 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about four hours and about 13 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about six hours and about 11 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about eight hours and about 9 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient temperature to about 900 degrees C. during the first time period.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient to about 50 degrees C.
  • According to one or more embodiments, the method includes processing the feedstock in a respective first and second catalyst chamber downstream from each of the first and second endothermic chambers and upstream of the single downstream refining processor.
  • According to one or more embodiments, processing the feedstock in a respective first and second catalyst chamber includes introducing a catalyst consisting of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, ZnO, CaO, K2O, and combinations thereof.
  • According to one or more embodiments, the first time period and the second time period do not substantially overlap.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber comprises heating the feedstock until the oxygen levels are below about 10%.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the oxygen levels are below about 5%.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the feedstock is reduced to primarily a light weight gas, a heavy weight gas, and carbon char.
  • According to one or more embodiments, the carbon char is removed from each of the first endothermic chamber and the second endothermic chamber.
  • According to one or more embodiments, the light weight gas is syngas, the method further comprising isolating the syngas and using the syngas to heat either of the first and second endothermic chambers during a subsequent processing step.
  • According to one or more embodiments, during receiving, in a single downstream refining processor, the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing includes receiving a continuous supply that is alternated from the first endothermic chamber and the second endothermic chamber.
  • According to one or more embodiments, during the processing of feedstock, one of the first endothermic chamber and the second endothermic chamber is maintained at a preferred operating temperature (“POT”) at all processing times.
  • According to one or more embodiments, a method of generating a resource includes at a first time, receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber under heating to an elevated processing temperature in which light weight heating gas is produced, and at a second time, receiving a feedstock in a second endothermic chamber, and processing the feedstock in the second endothermic chamber under heating to an elevated processing temperature in which light weight heating gas is produced. One of the first and second endothermic chambers maintains the elevated processing temperature during a processing period of time, the processing period of time including at least one heating period for each of the first and second endothermic chambers.
  • According to one or more embodiments, a refinery system includes a feed stock supply line, a first endothermic chamber that receives feedstock from the feedstock supply and processes the feedstock under elevated heat during a first time period, a second endothermic chamber that receives feedstock from the feedstock supply under elevated heat during a second time period, a refining processor downstream and in communication with each of the first chamber and the second chamber, and a control module configured to direct a heating source to apply heat to the first endothermic chamber during the first time period, monitor the oxygen level in the first endothermic chamber to determine a desired oxygen level in the feedstock, upon determining a desired oxygen level in the feedstock of the first endothermic chamber, direct a heating source to apply heat to the second endothermic chambering during the second time period, monitor the oxygen level in the second endothermic chamber to determine a desired oxygen level in the feedstock, and upon determining a desired oxygen level in the feedstock of the second endothermic chamber, direct a heating source to apply heat to one of the first endothermic chamber or a third endothermic chamber.
  • According to one or more embodiments, the first and second time periods are about the same.
  • According to one or more embodiments, a refinery system includes a feedstock supply line, a first endothermic chamber that receives feedstock from the feedstock supply and processes the feedstock under elevated heat during a first time period and a first catalyst chamber for interacting with syncrude from the first endothermic chamber, a second endothermic chamber that receives feedstock from the feedstock supply under elevated heat during a second time period and a second catalyst chamber for interacting with syncrude from the second endothermic chamber, and a refining processor downstream and in communication with each of the first chamber and the second chamber, the refining processor receiving a generally continuous supply of syncrude from one of the first catalyst chamber and the second catalyst chamber during a manufacturing process.
  • According to one or more embodiments, the refining processor processes syncrude and syngas.
  • According to one or more embodiments, a method of generating a resource is provided. The method includes at a first time, receiving a feedstock in a first endothermic chamber, processing the feedstock in the first endothermic chamber under heating to an elevated processing temperature to produce a product for downstream processing, at a second time, receiving a feedstock in a second endothermic chamber, processing the feedstock in the second endothermic chamber under heating to an elevated processing temperature to produce a product for downstream processing, and providing a product for downstream processing in a generally continuous manner from one of the first endothermic chamber and the second endothermic chamber.
  • According to one or more embodiments, the method includes processing the product for downstream processing in a catalyst chamber.
  • According to one or more embodiments, a method of generating an oil byproduct is provided. The method includes providing a feedstock into a first endothermic chamber in communication with a first catalytic chamber, applying heat to the first endothermic chamber in order to process the feedstock into a processed syncrude, transporting the processed syncrude from the first endothermic chamber into the downstream processor, providing feedstock into the second endothermic chamber in communication with a second catalytic chamber, wherein each of the first and second endothermic chambers are in communication with a single downstream processor that processes the oil byproduct, applying heat to the second endothermic chamber from the second endothermic chamber in order to process the feedstock into a processed syncrude, and transporting the processed syncrude into the downstream processor.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The previous summary and the following detailed descriptions are to be read in view of the drawings, which illustrate particular exemplary embodiments and features as briefly described below. The summary and detailed descriptions, however, are not limited to only those embodiments and features explicitly illustrated.
  • FIG. 1 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 2 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 3 illustrates a system diagram of a portion of a processing system according to one or more embodiments disclosed herein;
  • FIG. 4 illustrates one or more methods of processing waste materials according to one or more embodiments disclosed herein; and
  • FIG. 5 illustrates temperature versus time charts of respective first and second endothermic chambers according to one or more experiments according to the one or more methods disclosed herein.
  • DETAILED DESCRIPTIONS
  • These descriptions are presented with sufficient details to provide an understanding of one or more particular embodiments of broader inventive subject matters. These descriptions expound upon and exemplify particular features of those particular embodiments without limiting the inventive subject matters to the explicitly described embodiments and features. Considerations in view of these descriptions will likely give rise to additional and similar embodiments and features without departing from the scope of the inventive subject matters.
  • Polymer as a Feedstock
  • FIG. 1 illustrates a portion of a system, where the portion is generally designated 10A. Portion of system 10A works in conjunction with portion of system 10B illustrated in FIG. 2 and portion of system 10C illustrated in FIG. 3 to form an entire system that processes materials, such as, for example, plastics and the like. System 10A includes feedstock supplies 11A and 11B. While illustrated in the system diagram as being separate feedstocks, the feedstock supply may be one in the same for supplying feedstock to endothermic chambers 12A and 12B. The feedstock supplies 11A and 11B may include any waste material. In one or more embodiments, the waste material may include waste plastics and other polymers from postindustrial manufacturing, municipal waste collections, or any other source of waste plastics. The waste plastics may include plastics 1 through 7 and 9. The plastics may be bailed, bundled, shredded, or otherwise processed or unprocessed.
  • The waste material is transferred from storage using any appropriate material handler, such as a tractor, to a staging or loading area. The waste material is then loaded onto a conveyor loader, hydraulic loader, or carried by hand, or other appropriate manner, and is then supplied to the endothermic chambers 12A and 12B. This is preferably done during alternating time periods, though may be done at the same time. The endothermic chambers 12A and 12B are loaded with the feedstock material. Downstream from the endothermic chambers 12A and 12B are respective catalytic chambers 14A and 14B. Catalytic chambers 14A and 14B each have a catalyst compound loaded therein.
  • The catalyst compound used herein may include, but is not limited to, Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof. The catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof.
  • The polymer feedstock may include, but is not limited to, #1 PET (Polyethylene terephthalate), #2 HDPE (High-density polyethylene); #3 PVC (Polyvinyl chloride); #4 LDPE (Low-density polyethylene); #5 PP (Polypropylene); #6 PS (Polystyrene); #7 Other; and #9 or ABS.
  • In one or more processes, endothermic chamber 12A is sealed after the feedstock is provided therein. Next, processing occurs of the feedstock in the endothermic chamber. This occurs by subjecting the feedstock to a heating process where the temperature of the feedstock is raised from ambient to about 50 degrees C. in a first heating step. The temperature of the feedstock is then raised from about 50 degrees C. to about 900 degrees C. over less than about a 12 hour period. In one or more embodiments, the elevated temperature may be higher or lower than about 900 degrees C. For example, in one or more embodiments, the elevated final temperature may be between about 450 and 550 degrees C. During the process of applying heat to the endothermic chamber 12A, the oxygen level therein is reduced during the heating process until it is at a suitably low level. In one or more embodiments, the oxygen level may be about 10 percent. In one or more embodiments, the oxygen level may be about 5 percent. In one or more embodiments, the oxygen level is below about 5 percent after final processing within the endothermic chamber 12A.
  • The endothermic chamber 12A is in fluid communication with catalyst chamber 14A. The catalyst chamber 14A includes a catalyst to aid in reacting with gases formed in the endothermic chamber 12A. The catalyst may include Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof. The catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof. Gases are formed in endothermic chamber 12A when a chemical reaction of the feedstock occurs. Specifically, the chemical reaction may be cracking where long chain molecules in the feedstock are broken down into shorter chain molecules that generally form into a light weight gas, which may be syngas, a heavy gas, which may be syncrude, and a carbon char.
  • During cracking, the gases are formed and they flow out of the endothermic chamber 12A into the catalyst chamber 14A. The gases, collectively the syngas and syncrude, may further react with a catalyst.
  • Towards the conclusion of processing of the feedstock in the endothermic chamber 12A, feedstock 11A is loaded into endothermic chamber 12B in the same manner as it is loaded into endothermic chamber 12A. In this manner, during the time period P1 in which endothermic chamber 12A is processing, feedstock in endothermic chamber 12B is also being processed in the same manner. This has the advantage of maintaining a continuous supply of syngas, Syncrude, and carbon char from processed feedstock to be used for downstream processing. In this manner, inefficiencies associated with starting and stopping a pyrolysis system as new processed feedstock becomes available are eliminated. This has the advantage of increasing production uptime and it has been determined to yield higher efficiency in recycling feedstocks, and additionally only requires single downstream processing equipment. Endothermic chamber 12A may be loaded by about between 10 and 90 percent by volume with feedstock.
  • Feedstock is then processed in endothermic chamber 12B according to the same manner as that which is processed in endothermic chamber 12A while endothermic chamber 12A cools. During this cooling period, char is removed from the endothermic chamber 12A, as well as any other contaminants or materials such as metal. These materials may then be further processed or sold for industrial use.
  • During processing of feedstock in either of the endothermic chambers 12A and 12B, syngas travels into a flue 16. The syngas may then further go through a filtering process to remove any dust or other contaminants in a filter 44 or 46. A compressor 20 may then compress the syngas before it is stored in a storage tank 22 where it is later used for providing heat treatment to each of the endothermic chambers 12A and 12B. In this manner, the majority of the energy used in the portion 10A is from syngas made from recycled materials.
  • Char removed from either of endothermic chambers 12A and 12B may be subject to further processing FP, which may include any suitable processing for those materials. Syncrude may be pumped or otherwise transferred into a portion 10B of the system for further processing. A separator 24 separates oil and water in the crude oil.
  • The crude oil then travels through one or more condensers 34, 36 in order to cool the crude oil down to less than about 350 degrees C. Syngas is separated from crude oil during this process, and may be stored in tank 22 for further use. A transition tank 42 may contain the processed crude oil which will later be processed in a further processing step. A backpressure module 40 may be provided in communication with condensers 34, 36 in order to reduce any backpressures in the system.
  • During the portion 10B, solids from air may be processed in filters 44 and 46. Steam from the refining process of 10A is processed through filter 44 and then into filter module 46 for capturing any remaining steam and contaminants. A buffer tank 30 and pressure module 26 may be provided for storing processed materials during any of the processes.
  • Portion 10C of the system may be further provided for additional processing. Specifically, an oil flow pump 44 may be provided for pumping the crude oil to a thermochemical distillation chamber 46. In this chamber, the crude oil is heated for further processing. The oil is then transferred to a catalyst chamber 50 for additional processing. A syngas filter 52 filters out any syngas, which is then filtered in filter 54 and filter 56. Steam from this portion of the refining process is processed through the dust filter 54 and then passed through the hydro filter module 56, capturing the remaining steam and contaminants. The collection of contaminants is then processed through the chamber 12A or 12B to convert from a liquid into a solid.
  • The remaining oil then goes through condenser 60 to form a diesel grade material that is collected within tank 62. Another condenser 64 condenses the remaining oil into a distillates collection tank 66. A back pressure module 70 may be in communication therewith, with buffer tank 72 and negative pressure module 74.
  • Oil from the diesel collection tank 62 is transferred to a diesel measurement tank 76 that is in communication with a distillates measurement tank 80. An oil flow pump 82 provides pumping forces to pump oil to an acidic wash tank 84. An oil flow pump 86 further provides pumping forces to pump oil to an alkali wash tank 90 where sulfur is cleaned from the fuel, completing the refining process and resulting in transportation grade ultra-low biodiesel fuel D2. The biodiesel fuel is then transferred to a transition tank 92 where further testing may be completed before transport to a transfer fuel trailer or other storage tank.
  • Collectively, portions 10A, 10B, and 10C form a system 10 that is capable of converting plastic waste into a highly efficient recycling process producing syngas for heating during the processing step, biodiesel for use as a fuel source, and char for further processing as desired. A control module 94 may be in communication with one or more or all of the elements described herein for monitoring one or more aspects of the refining process. For example, the endothermic chambers 12A and 12B may have one or more sensors in communication therewith that monitor, for example, temperature, pressure, oxygen levels, and any other desired characteristic. The control module 94 may then be configured to monitor the one or more characteristics, and direct additional elements to carry out one or more portions of the process disclosed herein. As the control module 94 detects a release in negative pressure from system 10A, particularly the refining of oil of the first feedstock from the endothermic chamber 12A, the control module directs the oil pump 44 to pump oil from endothermic chamber 12B to thereby cause a continuous flow of oil in the refining process. In this manner, system uptime is maximized and the system 10 is almost always running at operating temperatures and pressures, thereby increasing efficiency in the recycling process by eliminating the inefficiencies associated with startup when temperatures and pressures are not at operating ranges. The control module 94 is configured to monitor a decrease in gas flow into the catalyst chamber 14A in order to direct heating of endothermic chamber 12B.
  • Experimental Results for Processing of Polymer Materials
  • In one or more experiments, the system 10 utilized the processes disclosed herein to produce syngas, biodiesel, and char. In the one or more experiments, each of the first endothermic chamber 12A and the second endothermic chamber 12B had about the same amount of feedstock having about the same characteristics applied therein. The first endothermic chamber 12A was sealed and heat was applied according to the following schedule shown in TABLE I.
  • TABLE I
    OXYGEN
    TIME TEMP. LEVEL GASIFICATION
    0:00  21 C. 21% 0%
    0:30 150 C. 16% 0%
    1:00 250 C. 10% 0%
    1:30 350 C. 5% 40%
    2:00 450 C. 2% 76%
    2:30 450 C. 2% 76%
    3:00 500 C. 2% 69%
    3:30 500 C. 2% 69%
    4:00 520 C. 2% 60%
    4:30 520 C. 2% 60%
    5:00 550 C. 2% 47%
    5:30 520 C. 2% 60%
    6:00 500 C. 2% 69%
    6:30 350 C. 5% 40%
    7:00 250 C. 10% 0%
    7:30 150 C. 16% 0%
    8:00  32 C. 21% 0%
    8:30  21 C. 21% 0%
  • At about time 4:30 during the heating and processing of the first endothermic chambers 12A, the second endothermic chamber 12B was loaded with feedstock and the heating process began. In this manner, at about 7:00, the feedstock in the second endothermic chamber 12B starts a gasification flow. At about 7:00, heat is no longer applied to endothermic chamber 12A and ambient air is introduced to decrease pressure and increase the cooling rate. At about 8:30, the endothermic chamber 12A is rotated to increase the cooling rate. At about 9:30, a chamber door is opened on the endothermic chamber 12A, thereby allowing an increased cooling rate. The heating process for the second endothermic chamber 12B was carried out to have consistent time measurements as the heating process for the first endothermic chamber 12A. At about 10:30, the char is removed from the endothermic chamber 12A. Feedstock may then be loaded into chamber 12A for heating and processing at a later date. Maximum pressure was found to be about 500 pounds per square inch.
  • After the first endothermic chamber 12A has cooled, the syngas, crude oil, and char material are then processed according to the one or more processes disclosed herein.
  • FIG. 5 illustrates graphs plotting temperature of each endothermic chamber 12A, 12B relative to processing time. As illustrated, by having alternating endothermic chambers 12A, 12B provides for a continuous supply of processed feedstock at a preferred operating temperature (“POT”) of about at least 425 degrees C., which has been shown to create optimum processing conditions for increased efficiency and improved processed stock. In one or more embodiments,
  • Contaminated Soil as a Feedstock
  • In one or more embodiments, feedstocks 11A and 11B may be petroleum contaminated soils from, but not limited to, fuel spills, fuel tank leakage, petroleum beach wash, refining spills, fuel line spills, petroleum laden spills, and sands residue from separation washing.
  • The petroleum contaminated soils are transferred into the endothermic chambers 12A and 12B for processing. After the soil has been processed in the endothermic chambers 12A and 12B, the separated syngas and oil is sent for further processing as described herein with reference to other materials, and the soil and char is removed from the endothermic chambers 12A and 12B. A vacuum or similar apparatus may be used to remove the soils.
  • Poultry, Swine, Bovine, and Fish Processing Offal as a Feedstock
  • In one or more embodiments, feedstocks 11A and 11B may be poultry, swine, bovine, fish, or other animal processing byproducts. The animal processing byproducts are transferred into the endothermic chambers 12A and 12B for processing. Before being placed into endothermic chambers, the processing byproducts are preferably dewatered or dried to a moisture content of less than about 50%. After the byproducts have been processed in the endothermic chambers 12A and 12B, the separated syngas and oil is sent for further processing as described herein with reference to other materials, and the char is removed from the endothermic chambers 12A and 12B. A vacuum or similar apparatus may be used to remove the char and other materials. These materials have particular applicability as a fertilizer grade material.
  • One or more methods are illustrated in the flowchart of FIG. 4 and generally designated 100. The one or more methods may include a method of generating a resource. The method may include receiving a feedstock \ in a first endothermic chamber 110, processing the feedstock in a first endothermic chamber during a first time period under heating 112, receiving a feedstock in a second endothermic chamber 114, processing the feedstock in a second endothermic chamber during a second time period under heating 116, and receiving, in a single downstream refining processor, the processed feedstock from each of the first endothermic chamber and the second endothermic chamber for further processing 120.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about two hours and about 15 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about four hours and about 13 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about six hours and about 11 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock for a period of between about eight hours and about 9 hours.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient temperature to about 900 degrees C. during the first time period.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock from ambient to about 50 degrees C. in a first portion of the heating process.
  • According to one or more embodiments, the method includes processing the feedstock in a respective first and second catalyst chamber downstream from each of the first and second endothermic chambers and upstream of the single downstream refining processor.
  • According to one or more embodiments, processing the feedstock in a respective first and second catalyst chamber comprises introducing a catalyst comprising one of Acidic catalysts, Silica-Alumina, PZMSM-5 Zeolite, HZSM-5 zeolite, Hy Zeolite, Mordenite ZSM-5 x-Zeolite, Faujasite Zeolite (y-Zeolite), Clinoptilolite, MCM-41, and SBA-15, and combinations thereof. The catalysts may also be alkaline catalysts such as ZnO, CaO, K2O, and combinations thereof.
  • According to one or more embodiments, the first time period and the second time period do not substantially overlap. In this manner, only a portion of the first and second time period overlaps, yet the endothermic chambers continually provide processed feedstock for further downstream processing.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber comprises heating the feedstock until the oxygen levels are below about 10%.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the oxygen levels are below about 5%.
  • According to one or more embodiments, processing the feedstock in either of the first endothermic chamber or the second endothermic chamber includes heating the feedstock until the feedstock is reduced to primarily a light weight gas, a heavy weight gas, and carbon char.
  • According to one or more embodiments, the carbon char is removed from each of the first endothermic chamber and the second endothermic chamber.
  • According to one or more embodiments, the light weight gas is syngas and the method further includes isolating the syngas and using the syngas to heat either of the first and second endothermic chambers during a subsequent processing step.
  • Particular embodiments and features have been described with reference to the drawings. It is to be understood that these descriptions are not limited to any single embodiment or any particular set of features, and that similar embodiments and features may arise or modifications and additions may be made without departing from the scope of these descriptions and the spirit of the appended claims.

Claims (1)

What is claimed is:
1. A refinery system comprising:
a feedstock supply line;
a first endothermic chamber that receives feedstock from the feedstock supply line and processes the feedstock under elevated heat during a first time period;
a second endothermic chamber that receives feedstock from the feedstock supply line under elevated heat during a second time period; and
a refining processor downstream and in communication with each of the first chamber and the second chamber.
US14/196,067 2013-03-14 2014-03-04 Apparatus, system, and method for processing materials Abandoned US20140259923A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/196,067 US20140259923A1 (en) 2013-03-14 2014-03-04 Apparatus, system, and method for processing materials

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361785220P 2013-03-14 2013-03-14
US14/196,067 US20140259923A1 (en) 2013-03-14 2014-03-04 Apparatus, system, and method for processing materials

Publications (1)

Publication Number Publication Date
US20140259923A1 true US20140259923A1 (en) 2014-09-18

Family

ID=51520841

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/196,067 Abandoned US20140259923A1 (en) 2013-03-14 2014-03-04 Apparatus, system, and method for processing materials

Country Status (12)

Country Link
US (1) US20140259923A1 (en)
EP (1) EP2969274A4 (en)
JP (1) JP2016516567A (en)
KR (1) KR20160008512A (en)
CN (1) CN105163875A (en)
AU (1) AU2014241900A1 (en)
BR (1) BR112015023296A2 (en)
CA (1) CA2906354A1 (en)
MX (1) MX2015012740A (en)
RU (1) RU2015143290A (en)
WO (1) WO2014158779A1 (en)
ZA (1) ZA201506992B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111966063B (en) * 2020-07-31 2021-07-30 中国科学院深圳先进技术研究院 Automatic casting platform integrated system applied to synthetic biology and automatic biological synthesis method
CN112371710B (en) * 2020-10-20 2022-03-15 格林美(武汉)城市矿产循环产业园开发有限公司 Oil pumping equipment and oil pumping method for compressor
CN113732036B (en) * 2021-08-24 2023-10-20 中国环境科学研究院 Method for promoting heat treatment and restoration of heavy petroleum polluted soil

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4983549A (en) * 1988-09-22 1991-01-08 The Budd Company Method for recycling plastic composite materials
US5841011A (en) * 1995-06-07 1998-11-24 Kenji Hashimoto Process for producing light-weight oil from waste plastics containing phthalic polyester and/or polyvinyl chloride
US20070179326A1 (en) * 2004-03-14 2007-08-02 Garry Baker Process and plant for conversion of waste material to liquid fuel
US20120228113A1 (en) * 2009-09-16 2012-09-13 All Grade Holdings Limited Pyrolysis Apparatus and Methods Using Same

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6172275B1 (en) * 1991-12-20 2001-01-09 Kabushiki Kaisha Toshiba Method and apparatus for pyrolytically decomposing waste plastic
IT1283877B1 (en) * 1996-01-12 1998-05-07 Kinetics Technology ISOTHERMAL CATALYTIC REACTOR FOR HIGH TEMPERATURE ENDOTHERMIC REACTIONS
US7169197B2 (en) * 2000-07-10 2007-01-30 Advanced Fuel Research, Inc. Pyrolysis processing for solid waste resource recovery
US20050003247A1 (en) * 2003-07-01 2005-01-06 Ai-Quoc Pham Co-production of hydrogen and electricity using pyrolysis and fuel cells
CN1864030B (en) * 2003-08-21 2010-09-29 国际环保技术公司 Shaft seal for a pyrolytic waste treatment system
KR100787958B1 (en) * 2004-09-25 2007-12-31 구재완 Successive pyrolysis system of waste synthetic-highly polymerized compound
JP2007021451A (en) * 2005-07-21 2007-02-01 Nippon Steel Corp Thermal decomposition method for combustible waste
GB0604907D0 (en) * 2006-03-10 2006-04-19 Morgan Everett Ltd Pyrolysis apparatus and method
KR100675909B1 (en) * 2006-09-26 2007-02-02 주식회사 펄스에너지 Oil extraction device for pyrolysis of plastics waste material and extraction method thereof
US7834226B2 (en) * 2007-12-12 2010-11-16 Chevron U.S.A. Inc. System and method for producing transportation fuels from waste plastic and biomass
CN101560404A (en) * 2008-04-15 2009-10-21 上海鸿泽企业发展有限公司 Method for preparing biomass oil in microwave thermal decomposition way
JP5274943B2 (en) * 2008-09-04 2013-08-28 株式会社キムテック Oiling system
GB0916358D0 (en) * 2009-09-18 2009-10-28 Pyropure Ltd Waste treatment apparatus and method
US10131847B2 (en) * 2009-12-22 2018-11-20 Plastic Energy Limited Conversion of waste plastics material to fuel
CN102277188B (en) * 2011-07-25 2014-06-18 青岛福瑞斯生物能源科技开发有限公司 Biomass thermal cracking liquefying fuel oil technology
CN102604656A (en) * 2012-02-28 2012-07-25 北京神雾环境能源科技集团股份有限公司 Heat-storage type biomass pyrolysis method and system
CN102786986A (en) * 2012-08-27 2012-11-21 青岛科技大学 Refining technology of microalgae pyrolysis oil

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4983549A (en) * 1988-09-22 1991-01-08 The Budd Company Method for recycling plastic composite materials
US5841011A (en) * 1995-06-07 1998-11-24 Kenji Hashimoto Process for producing light-weight oil from waste plastics containing phthalic polyester and/or polyvinyl chloride
US20070179326A1 (en) * 2004-03-14 2007-08-02 Garry Baker Process and plant for conversion of waste material to liquid fuel
US20120228113A1 (en) * 2009-09-16 2012-09-13 All Grade Holdings Limited Pyrolysis Apparatus and Methods Using Same

Also Published As

Publication number Publication date
BR112015023296A2 (en) 2017-07-18
EP2969274A4 (en) 2016-12-21
ZA201506992B (en) 2017-03-29
KR20160008512A (en) 2016-01-22
AU2014241900A1 (en) 2015-10-22
JP2016516567A (en) 2016-06-09
EP2969274A1 (en) 2016-01-20
RU2015143290A (en) 2017-04-18
MX2015012740A (en) 2016-07-06
WO2014158779A1 (en) 2014-10-02
CN105163875A (en) 2015-12-16
CA2906354A1 (en) 2014-10-02

Similar Documents

Publication Publication Date Title
US8877992B2 (en) Methods and apparatus for converting waste materials into fuels and other useful products
EP1951618B1 (en) Process of conversion of shredder residue into useful products
CN101786776B (en) Advanced treatment process of sludge containing oil
CN103237869A (en) Low water biomass-derived pyrolysis oils and processes for producing the same
CN101318759A (en) Resource regeneration processing method and equipment for urban sewage sludge
HU204553B (en) Process and apparatus for producing utilizable gas from waste materials
US20140259923A1 (en) Apparatus, system, and method for processing materials
CN103756697B (en) Method and system for processing waste and sludge
CN103464448B (en) A kind of rubbish thermal cracking treatment process
CN103894393B (en) A kind of Kitchen waste hydrothermal processing method and device
CN103539325A (en) Processing method and system for sludge containing oil
CN202576344U (en) Equipment for extracting oil fuel from sandy oil sludge or/and organic waste
CN103672907A (en) Garbage treatment system and method
CN103880266A (en) Hydrothermal-process sludge dehydrating method and hydrothermal-process sludge dehydrating device
CN103402930B (en) The integrated approach of bio oil is prepared by the mud from effluent purifying device
CN102477307A (en) Microwave cracking device
CN201098698Y (en) Vehicle-carrying device for processing kitchen garbage
TWI728850B (en) System and method for thermolysing plastic waste
WO2014051415A1 (en) An oil recovering system from waste effluent
CN116064064A (en) Method and system for recycling waste plastics through pyrolysis
CN113072982A (en) Treatment system and method for sludge low-temperature pyrolysis coupling biomass catalytic gasification
Handa et al. Waste management and environment
Bandhavya et al. EXTRACTION OF CRUDE OIL FROM PLASTIC WASTE USING PYROLYSIS TREATMENT
CN102092867B (en) Recycling method and device of gas tower section wastewater of oil shale dry distillation system
CN112222144A (en) Kitchen waste treatment system and technology

Legal Events

Date Code Title Description
AS Assignment

Owner name: CLEAN BLUE TECHNOLOGIES, INC., NORTH CAROLINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BLAIR, JOHN E.;REEL/FRAME:038854/0269

Effective date: 20130529

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION