US20130125797A1 - Vertical Heat Treating Furnace - Google Patents

Vertical Heat Treating Furnace Download PDF

Info

Publication number
US20130125797A1
US20130125797A1 US13/396,079 US201213396079A US2013125797A1 US 20130125797 A1 US20130125797 A1 US 20130125797A1 US 201213396079 A US201213396079 A US 201213396079A US 2013125797 A1 US2013125797 A1 US 2013125797A1
Authority
US
United States
Prior art keywords
gas
heat treating
vertical heat
treating furnace
reaction chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/396,079
Inventor
Ying-Shih HSIAO
Toshiaki Yoshimura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kern Energy Enterprise Co Ltd
Original Assignee
Kern Energy Enterprise Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kern Energy Enterprise Co Ltd filed Critical Kern Energy Enterprise Co Ltd
Assigned to YOSHIMURA, TOSHIAKI, KERN ENERGY ENTERPRISE CO., LTD. reassignment YOSHIMURA, TOSHIAKI ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Hsiao, Ying-Shih, YOSHIMURA, TOSHIAKI
Publication of US20130125797A1 publication Critical patent/US20130125797A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B17/00Furnaces of a kind not covered by any preceding group
    • F27B17/0016Chamber type furnaces
    • F27B17/0025Especially adapted for treating semiconductor wafers
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/58After-treatment
    • C23C14/5846Reactive treatment
    • C23C14/5866Treatment with sulfur, selenium or tellurium
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/67005Apparatus not specifically provided for elsewhere
    • H01L21/67011Apparatus for manufacture or treatment
    • H01L21/67098Apparatus for thermal treatment
    • H01L21/67109Apparatus for thermal treatment mainly by convection

Definitions

  • This invention relates to a heat treating furnace, and more particularly to a vertical heat treating furnace capable of performing heat treatments under high pressure.
  • the vertical heat treating furnace provides a double-chamber structure including a gas circulation chamber and a reaction chamber.
  • the reaction gases inside the reaction chamber of the vertical heat treating furnace can be mixed uniformly and the reaction could be facilitated under high pressure. Hence the quality of the formed thin film and the operational safety are improved.
  • the thin film fabrication equipments for developing the thin film or the thin film precursor on substrates have been used in generating more and more products.
  • the present methods of developing the thin film include spattering and co-evaporation.
  • spattering is the most commonly used technique in developing the thin film precursor prior to the chemical reaction process for forming the thin film.
  • providing chemical compound vapor is the most suitable method for mass production. It is an advantageous way of providing chemical compound vapor to supply the required elements for forming the thin film precursor, such that the concentration and the diffusion of ingredients for forming the thin film precursor can be accurately controlled. As a result, the development of techniques and equipments of performing chemical reactions for forming thin films which employ the heat treating furnace grows vigorously.
  • the spattering deposition technique is used for forming multiple-layer precursors containing alloys or monomers of copper (Cu), gallium (Ga) and indium (In) on a soda lime glass substrate to constitute the structure of CIGS solar cell. Then the layered structure for producing CIGS solar cell is transferred into a selenization furnace (i.e. heat treating furnace), and the gaseous hydrogen selenide (H 2 Se) is introduced into the selenization furnace and is heated to the temperature of 400° C. or a higher tempareture to start the reaction between the gaseous hydrogen selenide and the multiple-layer precursors.
  • a selenization furnace i.e. heat treating furnace
  • H 2 Se gaseous hydrogen selenide
  • the selenization process of CIGS solar cell fabrication heating the solar cell structure with multiple-layer thin films is required for reacting with gaseous hydrogen selenide to produce the high-quality CIGS films.
  • a copper-gallium (Cu—Ga) alloy layer, a copper-indium (Cu—In) alloy layer and an indium layer are deposited to form the three-layer CuGa/CuIn/In precursor film of uniform thickness.
  • the three-layer CuGa/CuIn/In precursor film is transferred into a selenization furnace immediately after the deposition. Then the gaseous hydrogen selenide is introduced and the three-layer CuGa/CuIn/In precursor film is heated to the temperature of 400° C.
  • the compound CIGS layer is then heated to 550° C. at the heating rate of 15° C./min to provide the optimal crystal structure, followed by a step of cooling, and the compound CIGS layer is formed.
  • FIGS. 1 a and 1 b show schematically a prior art the embodiment of U.S. Pat. No. 7,871,502.
  • the selenization furnace includes only one closed reaction chamber provided for the selenization process of compound CIGS, and the pressure inside the chamber is kept lower than 1 atm throughout the whole selenization process.
  • FIG. 1 b shows the temperature profile diagram of selenization process.
  • FIG. 1 c shows the temperature and the pressure profile of the selenization process inside the selenization furnace shown in FIG. 1 a .
  • reaction chamber of the conventional selenization furnace After closing the selenization furnaces, repeatedly pumping out the air inside the selenization furnace and pumping gaseous nitrogen into the reaction chamber is required to ensure that the reaction chamber is full of gaseous nitrogen.
  • the operational pressure of reaction chamber of the conventional selenization furnace is kept at low pressure (i.e. lower than 1 atm) concerning the safety.
  • the pressure in the reaction camber is controlled within a range of 0.8 to 0.9 atm throughout the whole reaction process.
  • the gaseous pressure inside the reaction chamber increases as the selenization furnace is heated to the temperature of 590° C., thus, the gas is eliminated repeatedly for the purpose of reducing the pressure to maintain the pressure inside the reaction chamber at a set point.
  • energy and excessive gas are wasted.
  • the reaction gases are introduced simultaneously into the reaction chamber.
  • hydrogen selenide (10%) and gaseous nitrogen (90%) which is the carrier gas are used for reaction.
  • the reaction time of selenization is less than 100 minutes, but apparently the gas flows in the reaction chamber cannot be convected and the temperature cannot be uniformed in such short reaction time. Therefore, the uniformity of selenization is deteriorated which causes the variant thickness and quality of the compound CIGS layer on the substrates.
  • the selenization furnace needs to be cooled down to transfer the CIGS solar cell substrate out of the selenization furnace.
  • the reaction chamber of the inner body is a closed space, the only way to cool down the selenization furnace is pumping the gaseous nitrogen into inner body of the furnace and pumping out the gas at the same time which is a time consuming cooling process for reducing the temperature inside the selenide surface to the room temperature.
  • this cooling process generally takes 5 to 8 hours, but when it comes to a larger substrate, it takes even more than 10 hours.
  • tremendous manpower and resources are required, resulting in retarding the fabrication.
  • an objective of this invention is to design a vertical heat treating furnace provided with a gas circulation chamber between an inner body and outer body to maintain a pressure difference therein.
  • the density of gas molecules or the gaseous pressure inside the inner body can be increased to facilitate the chemical reaction rate of the thin film and improve the uniformity of the thin film.
  • Another objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for simultaneously introducing the cooling gaseous nitrogen into a reaction chamber inside the inner body and the gas circulation chamber between the inner body and the outer body, and therefore facilitating the flow rate of gaseous nitrogen and effectively accelerating cooling rate.
  • a further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for simultaneously introducing the cooling gaseous nitrogen into a reaction chamber inside the inner body and the gas circulation chamber between the inner body and the outer body, and therefore preventing the formation of temperature gradient in the wall of inner body, and effectively protecting the wall of inner body from chapping or peeling.
  • a further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for filling the gaseous nitrogen to keep a first pressure (P 1 ) in the gas circulation chamber greater than a second pressure (P 2 ) in the reaction chamber of the inner body.
  • a safety gate door is provided to effectively protect the operator from the danger of pressure imbalance inside the vertical heat treating furnace.
  • a further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace which improves the operational safety, for raising the operational pressure without the limitation of low pressure (i.e. ⁇ 1 atm) so that the operation can be performed at a higher pressure (i.e. >1 atm). In this way, the reaction rate and uniformity are improved and the waste of reaction gas is further reduced.
  • a further objective of this invention is to provide a vertical heat treating furnace provided with a sensor for real-time monitoring the pressure in the reaction chamber inside the inner body and the gas circulation chamber during the process of forming the thin film. It enables the effective control of the gas inflow to improve the safety and efficiency of the thin film formation.
  • a further objective of this invention is to provide a vertical heat treating furnace which a controlling method is chosen from monitoring the pressure or gas density in the reaction chamber by a pressure gauge or a gas density analyzer, and the signal is transmitted to a controlling device for the following regulation so as to increase the production profit and reduce the waste of excessive gas.
  • the present invention provides a vertical heat treating furnace including an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to the first side, the first side being provided with an opening of the first receiving space, the second side is a sealed side.
  • the vertical heat treating furnace further includes an inner body spaced and fixed in the first receiving space of the outer body, having an outer wall and an inner wall, thereby forming a second receiving space.
  • the inner body further has a third side and a fourth side corresponding to the third side, and a part of the third side being connected with the first side by a lower sealed side thereby forming an opening of the second receiving space, and the fourth side is a sealed side, wherein a gas circulation chamber is formed between the outer wall of the inner body and the interior wall of the outer body, a reaction chamber being formed inside the inner wall of the inner body.
  • the vertical heat treating furnace further includes a gate door which has an outer surface and an inner surface, being contacted with the opening of the second receiving space of the third side by the inner surface, thereby either of the gas circulation chamber and the reaction chamber being an independent chamber.
  • the present invention further provide a vertical heat treating furnace including an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to the first side, the first side being provided with an opening of the first receiving space, the second side is a sealed side.
  • the vertical heat treating furnace further includes an inner body spaced and fixed in the first receiving space of the outer body, having an outer wall and an inner wall, thereby forming a second receiving space.
  • the inner body further has a third side and a fourth side corresponding to the third side, and a part of the third side being connected with the first side by a lower sealed side thereby forming an opening of the second receiving space, and the fourth side is a sealed side, wherein a gas circulation chamber is formed between the outer wall of the inner body and the interior wall of the outer body, a reaction chamber being formed inside the inner wall of the inner body.
  • the vertical heat treating furnace further includes a heating mechanism being fixed and contacted with the outer wall of the inner body.
  • the vertical heat treating furnace further includes a gate door which has an outer surface and an inner surface, being contacted with the opening of the second receiving space of the third side by the inner surface, thereby either of the gas circulation chamber and the reaction chamber being an independent chamber.
  • the vertical heat treating furnace further includes a gas supplying mechanism constituted by a plurality of gas pipes which pass through the outer surface and the inner surface of the gate door, thereby introducing gases into the gas circulation chamber and the reaction chamber via the opening of the second receiving space and the lower sealed side.
  • the vertical heat treating furnace further includes a controller set outside the outer body for controlling the gas supplying mechanism, thereby controlling the supply amount of a first gas and a second gas into the gas circulation chamber and the reaction chamber. Thereby the gases form a first pressure (P 1 ) in the gas circulation chamber, and forming a second (P 2 ) in the reaction chamber.
  • the present invention provides the vertical heat treating furnace with the design of gas circulation chamber, enabling effective protection of operators, saving manpower and resources, and providing the reaction environment for high-pressure gases, those which are advantageous for forming various thin films.
  • FIG. 1 a is a schematic diagram illustrating the prior art
  • FIG. 1 b is a schematic diagram illustrating the prior art
  • FIG. 1 c is a schematic diagram of the temperature and pressure profile in the prior art
  • FIG. 2 a is a schematic diagram representing an embodiment of the vertical heat treating furnace in the present invention.
  • FIG. 2 b is a schematic diagram representing an embodiment of the closed vertical heat treating furnace in the present invention.
  • FIG. 3 is a schematic diagram representing the cross-sectional view of an embodiment of the vertical heat treating furnace in the present invention.
  • FIG. 4 is a schematic diagram representing the controlling profile of pressure and temperature of the vertical heat treating furnace in the present invention.
  • FIG. 5 is a schematic diagram representing the controlling profile of gas density and temperature of the vertical heat treating furnace in the present invention.
  • the present invention discloses the structure and function of a heat treating furnace.
  • a heat treating furnace producing CIGS solar cells is described for illustration, wherein the structure and function of a heat treating furnace producing CIGS solar cells are well known by persons skilled in the art and the description emphasizes the features of the heat treating furnace of the present invention, and thus is not described in detail hereunder.
  • the drawings below, with which the description presented hereunder is illustrated, are intended to depict schematically the structures related to the features of the present invention and are not, and need not being, drawn to scale.
  • FIG. 2 a schematically represents an embodiment of the vertical heat treating furnace in the present invention.
  • the structures of the vertical heat treating furnace include an outer body 10 which has an exterior wall 11 and an interior wall 12 for forming a first receiving space.
  • the vertical heat treating furnace has a first side 101 and a second side 102 corresponding to the first side 101 .
  • An opening of the first receiving is provided in the first side 101
  • the second side 102 is an upper sealed side 13 , such as an sealed side having arcs.
  • the vertical heat treating furnace includes an inner body 20 which is spaced and fixed in the first receiving space of the outer body 10 , and has a second receiving space formed by an outer wall 21 and an inner wall 22 .
  • the inner body 20 has a third side 201 and a fourth side 202 corresponding to the third side 201 , wherein a part of the third side 201 is connected with the first side 101 by a lower sealed side 14 thereby forming an opening of the second receiving space, and the fourth side 202 is also a sealed side, wherein a gas circulation chamber 204 is formed between the outer wall 21 of the inner body 20 and the interior wall 12 of the outer body 10 ; a reaction chamber 205 is formed inside the inner wall 22 of the inner body 20 .
  • the vertical heat treating furnace further includes a gate door 1001 which has which has an outer surface 1005 and an inner surface 1003 .
  • the gas-tight structure (not shown) provided in the gate door 1001 is hermetically sealed with the opening of the second receiving space of the third side 201 , thereby making either of the gas circulation chamber 204 and the reaction chamber 205 to be an independent gas-tight chamber without any communication with the thin film solar cell substrate 3 being located in the reaction chamber 205 as shown in FIG. 2 b.
  • the vertical heat treating furnace includes a heating mechanism 30 fixed and contacted with the outer wall 21 of the inner body 20 ; a gas supplying mechanism 40 constituted by a plurality of gas pipes 41 which pass through the outer surface 1005 and the inner surface 1001 of the gate door, thereby introducing gases into the gas circulation chamber 204 and the reaction chamber 205 via the opening of the second receiving space and the lower sealed side 14 .
  • the gas supplying mechanism 40 provides at least one first gas (such as nitrogen N 2 and argon Ar) into the gas circulation chamber 204 ; and provide at least one second gas (such as hydrogen H 2 , nitrogen N 2 , hydrogen selenide H 2 Se, hydrogen sulfide H 2 S and argon Ar) into the reaction chamber 205 .
  • the vertical heat treating furnace further includes a controller 50 set outside the outer body 10 for controlling the gas supplying mechanism 40 , thereby controlling the supply amount of a first gas and a second gas into the gas circulation chamber 204 and the reaction chamber 205 .
  • the gases form a first pressure (P 1 ) in the gas circulation chamber 204 , and forming a second (P 2 ) in the reaction chamber 205 .
  • FIG. 2 b schematically represents an embodiment of the closed vertical heat treating furnace in the present invention.
  • the gas-tight structure (not shown) provided in the gate door 1001 is hermetically sealed with the opening of the second receiving space of the third side 201 , thereby making either of the gas circulation chamber 204 and the reaction chamber 205 to be an independent gas-tight chamber without any communication with the thin film solar cell substrate 3 being located in the reaction chamber 205 .
  • the thin film solar cell substrate 3 is located in the vertical heat treating furnace 1 for forming compound CIGS layers, and during this process, introducing the gaseous hydrogen selenide (H 2 Se) into the reaction chamber 205 of the inner body 20 is required, and the fabrication under high temperature and high pressure is required to form the fairly uniform compound CIGS layers on the thin film solar cell substrate 3 . Furthermore, due to the gaseous hydrogen selenide (H 2 Se) introduce into the reaction chamber 205 reacts with air and generates selenium dioxide (SeO 2 ) dust which contaminate the compound CIGS layer and the inner wall 22 of the inner body 20 , those which are hazardous to operators.
  • H 2 Se gaseous hydrogen selenide
  • the outer body 10 is made of steel or stainless steel such as SUS304 and SUS316 which enables the outer body 10 is resistant to a pressure of 20 atm.
  • the material used to make the outer body 10 is not limited in the present invention.
  • the thermal insulating material can be further provided on the inner wall 12 of the outer body 10 to disrupt the transmission of heat to the outer wall 11 of the outer body 10 during the heating process.
  • the thermal insulating material can be any heat-resistant material such as quartz bricks or mica brick.
  • the inner wall 22 of the inner body 20 may be made of quartz or silicon dioxide (SiO 2 ), and a SiO 2 layer can be similarly formed on the lateral side of the inner surface 1003 of the first gate door 1001 , which is contacted hermetically with the gas-tight structure of the third side 201 , to protect the first gate door 1001 .
  • the gas circulation chamber 204 is provided with at least one first sensor 103 and each of the first sensor 103 is connected with a controller 50 .
  • the reaction chamber 205 is also provided with at least one second sensor 203 and each of the second sensor 203 is connected with a controller 50 .
  • both the first sensor 103 and the second sensor 203 are pressure gauges, the pressure measured in the gas circulation chamber 204 (P 1 ) and the pressure measured in the reaction chamber 205 (P 2 ) are transmitted to the controller 50 and then the pressure difference (P 1 ⁇ P 2 ) is calculated by the controller 50 and is accordingly controlled.
  • the purpose of calculating the pressure difference (P 1 ⁇ P 2 ) basing on the measurement of the first sensor 103 in the gas circulation chamber 204 and the second sensor 203 in the reaction chamber 205 of present invention is to control the pressure difference (P 1 ⁇ P 2 ) precisely and practically; especially to control the outer pressure of the gas circulation chamber 204 slightly greater than the inner pressure of the reaction chamber 205 .
  • the original pressure difference is set at 1 Kg/cm 2 , and once the value of pressure difference is greater than 1 Kg/cm 2 , the controller 50 immediately adjusts and increases the amount of gas input in the reaction chamber 205 and reduces the amount of gas input in the gas circulation chamber 204 , thereby maintaining the pressure difference within a predetermined range.
  • the outer pressure of the gas circulation chamber 204 is greater than 1 atm.
  • the first sensor 103 and the second sensor 203 can be gas density analyzers.
  • the first sensor 103 is a pressure gauge while the second sensor is a gas density analyzer to control the vertical heat treating furnace 1 , such that users may choose to control the pressure or control the density depending on the practical case itself, which is not limited in the present invention.
  • the gas supplying mechanism 40 is set outside the outer body 10 , being constituted by a plurality of gas pipes 41 passing through the inner surface 1003 of the gate door 1001 , and is contacted with the lower side of the outer body and with the outer wall of the inner body 20 .
  • a plurality of gas pipes 41 of the gas supplying mechanism 40 is connected to the controller 50 to provide and control the supply of at least one first gas (such as nitrogen N 2 and argon Ar) into the gas circulation chamber 204 ; and provide and control the supply of at least one second gas (such as hydrogen H 2 , nitrogen N 2 , hydrogen selenide H 2 Se, hydrogen sulfide H 2 S and argon Ar) into the reaction chamber 205 for proceeding reaction.
  • at least one first gas such as nitrogen N 2 and argon Ar
  • second gas such as hydrogen H 2 , nitrogen N 2 , hydrogen selenide H 2 Se, hydrogen sulfide H 2 S and argon Ar
  • the controller 50 of the vertical heat treating furnace 1 in this invention keeps the first pressure (P 1 ) in the gas circulation chamber 204 being greater than the second pressure (P 2 ) in the reaction chamber 205 all the time when the vertical heat treating furnace is operated to perform a gas reaction. Or the controller 50 keeps the first density in the gas circulation chamber 204 being greater than the second density in the reaction chamber 205 all the time during the reaction. In an embodiment of the present invention, the first pressure (P 1 ) is kept within the range of 0.5 to 9.8 atm. Furthermore, other than controlling the amount of gas inflow, the controller 50 of the present invention also monitors and controls the pressure, temperature, density, and toxicity, time, and gas types, etc. In other words, all the settings related to vertical heat treating furnace 1 are controlled and measured via the pressure sensor, density sensor, thermal sensor and toxicity sensor, and the signals are transmitted by the signal transmission circuit to the controller 50 for further processing.
  • a safety gate door 70 is further set between the gas circulation chamber 204 and the circulation chamber 205 .
  • the safety gate door 70 is set between the outer wall 21 and inner wall 22 of the inner body 20 , wherein the span of the outer wall 21 and inner wall 22 o is 6 to 25 mm.
  • the pressure in the gas circulation chamber 204 (P 1 ) is slightly greater than the pressure in the reaction chamber 205 (P 2 ), the flowing hydrogen selenide in the gas circulation chamber 204 is directed to the reaction chamber 205 instead of leaking outside the furnace. Furthermore, the safety gate door 70 prevents the vertical heat treating furnace 1 from being over pressured to damage the wall of quartz furnace. In the embodiment of the present invention, the working pressure in the reaction chamber 205 is generally maintained at 5 atm, far lower than the pressure resistance threshold of 20 atm. Thus, the vertical heat treating furnace ensures the operational safety.
  • the closing of the vertical heat treating furnace in the present invention depends on the upward or downward movement of the furnace body constituted by the outer body 10 and inner body 20 , thereby the gas circulation chamber 204 formed by third side 201 is hermetically sealed with the gas-tight structure in the gate door 1001 .
  • the furnace body can be moved upward to expose the compound thin film solar cell substrate 3 , and then the compound thin film solar cell substrate 3 can be transferred out.
  • the gate door 1001 of the vertical heat treating furnace 1 of the embodiment of the present invention is fixed, thus ensuring that the gas pipes 41 passing through the gate door 1001 will not leak gases.
  • the heating mechanism 30 of the vertical heat treating furnace 1 in the present invention is constituted by multiple of heaters arranged in the outer wall 21 of the inner body 20 , next to the outer wall 21 of the inner body 20 , wherein the heating mechanism 30 can be selected from a carbon heater or a halogen lamp heater, which heats the inner wall of the furnace to a set temperature.
  • the carbon heater may provide electrical-resistance heating and the halogen lamp heater may provide infrared heating both of which heat the inner body 20 uniformly.
  • the temperature reaches the range of 520° C.
  • FIG. 2 b illustrating the location of the gas circulation chamber 204 , the reaction chamber 205 and a substrate 3 ; apparently the compound thin film solar cell substrate 3 was introduced longitudinally in the reaction chamber 205 in coordination to the direction of gas flows inside, improve the uniformity of the reaction of thin film formation.
  • An embodiment is described here as an example to illustrate the safety design of the vertical heat treating furnace 1 of the present invention.
  • Under an atmosphere pressure at 1 atm when a pressure at 3 atm is measured by the first sensor 103 in the gas circulation chamber 204 ; a pressure at 2 atm is measured by the second sensor 203 in the reaction chamber 205 . That is to say, the pressure in the gas circulation chamber 204 is greater than both the pressure in the reaction chamber 205 and atmosphere pressure.
  • the vertical heat treating furnace 1 of the present invention can be operated under normal, low and high pressures, wherein the preferred range of working pressure is 0.5 to 9.8 atm.
  • the operational pressure in the gas circulation chamber 204 and the operational pressure in the reaction chamber 205 are both less than 1 atm, for example, it is feasible to operate the vertical heat treating furnace 1 of the present invention when the pressure in the gas circulation chamber 204 is 1 atm and the pressure in the reaction chamber 205 is 0.98 atm.
  • both the first sensor 103 and the second sensor 203 are gas density analyzers
  • the reaction can be controlled by measuring the gas density.
  • P a is the pressure
  • V a is the volume and T a is the temperature at point a
  • P b is the pressure
  • V b is the volume
  • T b is the temperature at point b.
  • the detail of the way of controlling will be described according to FIG. 4 and FIG. 5 .
  • FIG. 4 schematically representing the controlling profile of pressure and temperature of the vertical heat treating furnace in the present invention.
  • the gas supplying mechanism 40 is controlled by the controller 50 to repeatedly pump out the air and pumps in the gas such as gaseous nitrogen inside the gas circulation chamber 204 and the reaction chamber 205 , to ensure that no residual mist or water vapor.
  • the vertical heat treating furnace 1 is heated and the reaction gases are introduced into the reaction chamber 205 .
  • hydrogen selenide (10%) and gaseous nitrogen (90%) which is the carrier gas are used for reaction.
  • the pressure in the reaction chamber 205 is increased fast. For example, as the temperature reaches 590° C., the pressure in the reaction chamber 205 reaches around 5 atm, and then the reaction gases are reacting at 590° C. under, thus the reaction are performed in this state. Obviously, at this time the controller 50 keeps the pressure in the gas circulation chamber 204 at 5.1 atm. As shown in FIG. 4 , only the reaction time of 20 minutes is required for completing the reaction. Immediately after the reaction, the fast cooling process is performed, meanwhile the controller 50 pumps out the residual non-reacting gas and then introduces the cooling gaseous nitrogen into the gas circulation chamber 204 and the reaction chamber 205 for cooling.
  • the two walls of the inner body 20 in this embodiment of the present invention are cooled down simultaneously, which increases the cooling rate by two folds and reduces the concerns of chapping or peeling, thereby the input rate, amount of gas inflow, the cooling rate are accelerated to shorten the cooling time.
  • the vertical heat treating furnace 1 needs only 120 minutes to reduce the temperature of 590° C. in the reaction chamber 205 to a range of 50 to 60° C., and allows to open the first gate door 1001 to take out the compound solar cell substrate 3 with selenized compound CIGS layers.
  • measuring the pressure is a way of the present invention for controlling, the pressure in the gas circulation chamber 204 measured by the first sensor 103 and the pressure in the reaction chamber 205 measured by the second sensor 203 are transformed into signals and transmitted to the controller 50 and then the pressure difference (P 1 ⁇ P 2 ) is controlled by the controller 50 , which means the pressure in the gas circulation chamber 204 is kept being slightly greater than the pressure in the reaction chamber 205 .
  • the reaction in the reaction chamber 205 is carried on smoothly.
  • the fast heating process of the vertical heat treating furnace 1 of the present invention no depressurization is needed for fast heating, and the selenization can be performed under high pressure, for example, the reaction time is 20 minutes in this embodiment.
  • Another advantage of the present invention is the fast cooling process, only a cooling time of 120 minutes is needed for reducing the temperature to the range of 50 to 60° C.
  • the cooling time is greatly reduced the vertical heat treating furnace 1 of the present invention, therefore the usage rate of the vertical heat treating furnace 1 is greatly raised to reduce the production cost.
  • the operation condition of the embodiment is described as following: the diameter of the inner body 20 is 1.1 m, depth is 2 m, the gas volume in the reaction chamber 205 of the inner body 20 is 1235 L.
  • the Y axis in FIG. 5 represents the density, and after the first gate door 1001 being closed and nitrogen is introduced, the initial density is low due to the low density of nitrogen is lower than that of the air. A process of repeatedly pumping out the air and pumping in the nitrogen is completed to ensure no residual mist or water vapors inside, then the reaction gas, hydrogen selenide (10%) and gaseous nitrogen (90%, carrier gas) are introduced and following is the heating process.
  • the controlling profile of pressure and temperature of the vertical heat treating furnace is similar to those in FIG. 4 , during the heating process, after 50 minutes of reaction time, the temperature reaches a turning point (e.g. heating to 300° C.), no more reaction gas is introduced into the reaction chamber 205 . At the same time the amount of the reaction gas is constant in the reaction chamber 205 .
  • the settings are shown as below: the temperature is at 590° C. and the pressure is at 5 atm.
  • the related gas densities in the vertical heat treating furnace are: the mean gas density is 2.35 kg/m 3 , the nitrogen density is 1.78 kg/m 3 , and the hydrogen selenide density is 0.57 kg/m 3 .
  • the controller 50 keeps the pressure in the gas circulation chamber 204 greater than 2.35 kg/m 3 for the operation.
  • the reaction rate is faster than conventional heat treating furnace, as shown in FIG. 5 , the selenization in the reaction chamber 205 takes around 20 minutes.
  • the cooling nitrogen is introduced into the reaction chamber 205 inside the inner body 20 and the gas circulation chamber 204 outside the exterior wall of the furnace body, and there is no concern of the temperature gradient occurring in the wall of the inner body 20 , which amplified the amount of gas inflow.
  • the cooling process is completed. Once the gate door is opened, the temperature will be 25° C. due to the air inflow in the reaction chamber 205 , and the general air density is 1.184 kg/m 3 .
  • the gas density in the gas circulation chamber 204 and the reaction chamber 205 measured by the first sensor 103 and the second sensor 203 are transformed into signals and transmitted via the signal transmission circuit to the controller 50 and then the gas density difference is controlled by the controller 50 , which means the gas density in the gas circulation chamber 204 is kept being slightly greater than the gas density in the reaction chamber 205 .
  • the reaction in the reaction chamber 205 is carried on smoothly. In this way, during the fast heating process of the vertical heat treating furnace 1 of the present invention, no depressurization is needed for fast heating, and the selenization can be performed under high gas density (e.g. 2.35 kg/m 3 ), accelerating the reaction.
  • the reaction time is 20 minutes in this embodiment.
  • the other advantage of the present invention is the fast cooling process, only a cooling time of 120 minutes is needed for reducing the temperature to the range of 50 to 60° C.
  • the cooling time is greatly reduced the vertical heat treating furnace 1 of the present invention, therefore the usage rate of the vertical heat treating furnace 1 is greatly raised to reduce the production cost.
  • the first sensor 103 of the gas circulation chamber 204 can be a pressure gauge and the second sensor 203 of the reaction chamber 205 can be a gas density analyzer illustrated in FIG. 2 a , and the signals measured by the pressure gauge or gas density analyzer can be transmitted to the controller 50 by the signal transmission circuit, to control and adjust the amount of gas inflows in the gas circulation chamber 204 and the reaction chamber 205 . Therefore the vertical heat treating furnace of the present invention can be controlled according to the pressure or the density depending on the practical case.
  • the vertical heat treating furnace of the present invention can also be applied in other kinds of fabrication.
  • the hydrogen selenide gas is also used for the reaction with copper, zinc and tin in the vertical heat treating furnace of the present invention to produce the CZTS thin film solar cells.

Abstract

The vertical heat treating furnace for the gas reaction includes an outer body, an inner body, a heating mechanism, gas supplying mechanism, and a controller. Using the controller to control the amount of gas supply effectively keeps the first pressure (P1) in the gas circulation chamber outside the inner body greater than the second pressure (P2) in the reaction chamber inside the inner body all the time. In this way, the flow rate of gas inlet, reaction rate, cooling rate can be facilitated, and the uniformity of the thin film and the operational safety can be improved.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • This invention relates to a heat treating furnace, and more particularly to a vertical heat treating furnace capable of performing heat treatments under high pressure. The vertical heat treating furnace provides a double-chamber structure including a gas circulation chamber and a reaction chamber. By controlling the relative gas density and pressure of the chambers, the reaction gases inside the reaction chamber of the vertical heat treating furnace can be mixed uniformly and the reaction could be facilitated under high pressure. Hence the quality of the formed thin film and the operational safety are improved.
  • 2. Description of the Prior Art
  • With the development of compound thin film solar cell technologies, the thin film fabrication equipments for developing the thin film or the thin film precursor on substrates have been used in generating more and more products. However, the present methods of developing the thin film include spattering and co-evaporation. Especially for fabricating the products which are mass produced successfully in thin-film photovoltaic industry, spattering is the most commonly used technique in developing the thin film precursor prior to the chemical reaction process for forming the thin film.
  • Furthermore, among the techniques of performing chemical reaction processes on the thin film precursor for forming thin films, providing chemical compound vapor is the most suitable method for mass production. It is an advantageous way of providing chemical compound vapor to supply the required elements for forming the thin film precursor, such that the concentration and the diffusion of ingredients for forming the thin film precursor can be accurately controlled. As a result, the development of techniques and equipments of performing chemical reactions for forming thin films which employ the heat treating furnace grows vigorously. Taking the selenization process of Copper Indium Gallium Diselenide (CIGS) solar cell as an example, the spattering deposition technique is used for forming multiple-layer precursors containing alloys or monomers of copper (Cu), gallium (Ga) and indium (In) on a soda lime glass substrate to constitute the structure of CIGS solar cell. Then the layered structure for producing CIGS solar cell is transferred into a selenization furnace (i.e. heat treating furnace), and the gaseous hydrogen selenide (H2Se) is introduced into the selenization furnace and is heated to the temperature of 400° C. or a higher tempareture to start the reaction between the gaseous hydrogen selenide and the multiple-layer precursors. However, the selenization process of CIGS solar cell fabrication, heating the solar cell structure with multiple-layer thin films is required for reacting with gaseous hydrogen selenide to produce the high-quality CIGS films. For example, a copper-gallium (Cu—Ga) alloy layer, a copper-indium (Cu—In) alloy layer and an indium layer are deposited to form the three-layer CuGa/CuIn/In precursor film of uniform thickness. The three-layer CuGa/CuIn/In precursor film is transferred into a selenization furnace immediately after the deposition. Then the gaseous hydrogen selenide is introduced and the three-layer CuGa/CuIn/In precursor film is heated to the temperature of 400° C. at the heating rate of 40° C./min, and the three-layer CuGa/CuIn/In precursor film is reacted with selenide to form a compound CIGS layer. The compound CIGS layer is then heated to 550° C. at the heating rate of 15° C./min to provide the optimal crystal structure, followed by a step of cooling, and the compound CIGS layer is formed.
  • Due to that the selenization process is performed at the temperature range of 520 to 590° C., a large thick quartz tubes is utilized to be the inner body in the conventional heat treating furnace, and the outer side is tightly contacted to the thermal insulating materials, as a result, inside the heat treating furnace is in a closed status. In addition, the effects of thermal expansion and contraction makes the reaction gas with higher temperature flowing upward and the reaction gas with lower temperature flowing downward, which result in poor gas mixing in the selenization process, thus further result in variant quality and the thickness of the compound CIGS layer on the glass substrate. Furthermore, the reaction gases such as hydrogen selenide used in the selenization process are toxic; therefore the pressure inside the selenization furnace needs to be controlled at low pressure (i.e. lower than 1 atm) throughout the whole selenization process for the safety considerations and avoids the leakage of reaction gases otherwise causes industrial safety concerns. In this situation, the selenization process under low pressure evokes insufficient total gas molecules and results in the deterioration of the temperature gradient inside the selenization furnace, and also deteriorates the gas mixing uniformity. Those events result in a vicious circle that slow down the reaction rate and simultaneously worsen the uniformity of thin film. Apparently, the low pressure and the non-uniform temperature of present selenization furnaces generally result in the problems of selenium gas heterogeneity and ineffective thin film formation, thus the ultimate difficulty of promoting the photovoltaic conversion efficiency.
  • Please refer to the FIGS. 1 a and 1 b. FIG. 1 a and 1 b show schematically a prior art the embodiment of U.S. Pat. No. 7,871,502. Referring to FIG. 1 a, the selenization furnace includes only one closed reaction chamber provided for the selenization process of compound CIGS, and the pressure inside the chamber is kept lower than 1 atm throughout the whole selenization process. FIG. 1 b shows the temperature profile diagram of selenization process. FIG. 1 c shows the temperature and the pressure profile of the selenization process inside the selenization furnace shown in FIG. 1 a. After closing the selenization furnaces, repeatedly pumping out the air inside the selenization furnace and pumping gaseous nitrogen into the reaction chamber is required to ensure that the reaction chamber is full of gaseous nitrogen. The operational pressure of reaction chamber of the conventional selenization furnace is kept at low pressure (i.e. lower than 1 atm) concerning the safety. The pressure in the reaction camber is controlled within a range of 0.8 to 0.9 atm throughout the whole reaction process. The gaseous pressure inside the reaction chamber increases as the selenization furnace is heated to the temperature of 590° C., thus, the gas is eliminated repeatedly for the purpose of reducing the pressure to maintain the pressure inside the reaction chamber at a set point. However, during the process of gas elimination, energy and excessive gas are wasted. When the temperature reaches the set point for reaction, the reaction gases are introduced simultaneously into the reaction chamber. Generally, hydrogen selenide (10%) and gaseous nitrogen (90%) which is the carrier gas are used for reaction. As shown in FIG. 1 c, the reaction time of selenization is less than 100 minutes, but apparently the gas flows in the reaction chamber cannot be convected and the temperature cannot be uniformed in such short reaction time. Therefore, the uniformity of selenization is deteriorated which causes the variant thickness and quality of the compound CIGS layer on the substrates.
  • Following the reaction of forming the compound CIGS layer, the selenization furnace needs to be cooled down to transfer the CIGS solar cell substrate out of the selenization furnace. However, the reaction chamber of the inner body is a closed space, the only way to cool down the selenization furnace is pumping the gaseous nitrogen into inner body of the furnace and pumping out the gas at the same time which is a time consuming cooling process for reducing the temperature inside the selenide surface to the room temperature. As shown in FIG. 1 c, this cooling process generally takes 5 to 8 hours, but when it comes to a larger substrate, it takes even more than 10 hours. Thus, tremendous manpower and resources are required, resulting in retarding the fabrication.
  • SUMMARY OF THE INVENTION
  • To solve the above mentioned drawbacks, an objective of this invention is to design a vertical heat treating furnace provided with a gas circulation chamber between an inner body and outer body to maintain a pressure difference therein. Thus the density of gas molecules or the gaseous pressure inside the inner body can be increased to facilitate the chemical reaction rate of the thin film and improve the uniformity of the thin film.
  • Another objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for simultaneously introducing the cooling gaseous nitrogen into a reaction chamber inside the inner body and the gas circulation chamber between the inner body and the outer body, and therefore facilitating the flow rate of gaseous nitrogen and effectively accelerating cooling rate.
  • A further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for simultaneously introducing the cooling gaseous nitrogen into a reaction chamber inside the inner body and the gas circulation chamber between the inner body and the outer body, and therefore preventing the formation of temperature gradient in the wall of inner body, and effectively protecting the wall of inner body from chapping or peeling.
  • A further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace for filling the gaseous nitrogen to keep a first pressure (P1) in the gas circulation chamber greater than a second pressure (P2) in the reaction chamber of the inner body. A safety gate door is provided to effectively protect the operator from the danger of pressure imbalance inside the vertical heat treating furnace.
  • A further objective of this invention is to provide a gas circulation chamber in the vertical heat treating furnace which improves the operational safety, for raising the operational pressure without the limitation of low pressure (i.e. <1 atm) so that the operation can be performed at a higher pressure (i.e. >1 atm). In this way, the reaction rate and uniformity are improved and the waste of reaction gas is further reduced.
  • A further objective of this invention is to provide a vertical heat treating furnace provided with a sensor for real-time monitoring the pressure in the reaction chamber inside the inner body and the gas circulation chamber during the process of forming the thin film. It enables the effective control of the gas inflow to improve the safety and efficiency of the thin film formation.
  • A further objective of this invention is to provide a vertical heat treating furnace which a controlling method is chosen from monitoring the pressure or gas density in the reaction chamber by a pressure gauge or a gas density analyzer, and the signal is transmitted to a controlling device for the following regulation so as to increase the production profit and reduce the waste of excessive gas.
  • According to the aforementioned objectives, the present invention provides a vertical heat treating furnace including an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to the first side, the first side being provided with an opening of the first receiving space, the second side is a sealed side. The vertical heat treating furnace further includes an inner body spaced and fixed in the first receiving space of the outer body, having an outer wall and an inner wall, thereby forming a second receiving space. The inner body further has a third side and a fourth side corresponding to the third side, and a part of the third side being connected with the first side by a lower sealed side thereby forming an opening of the second receiving space, and the fourth side is a sealed side, wherein a gas circulation chamber is formed between the outer wall of the inner body and the interior wall of the outer body, a reaction chamber being formed inside the inner wall of the inner body. The vertical heat treating furnace further includes a gate door which has an outer surface and an inner surface, being contacted with the opening of the second receiving space of the third side by the inner surface, thereby either of the gas circulation chamber and the reaction chamber being an independent chamber.
  • The present invention further provide a vertical heat treating furnace including an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to the first side, the first side being provided with an opening of the first receiving space, the second side is a sealed side. The vertical heat treating furnace further includes an inner body spaced and fixed in the first receiving space of the outer body, having an outer wall and an inner wall, thereby forming a second receiving space. The inner body further has a third side and a fourth side corresponding to the third side, and a part of the third side being connected with the first side by a lower sealed side thereby forming an opening of the second receiving space, and the fourth side is a sealed side, wherein a gas circulation chamber is formed between the outer wall of the inner body and the interior wall of the outer body, a reaction chamber being formed inside the inner wall of the inner body. The vertical heat treating furnace further includes a heating mechanism being fixed and contacted with the outer wall of the inner body. The vertical heat treating furnace further includes a gate door which has an outer surface and an inner surface, being contacted with the opening of the second receiving space of the third side by the inner surface, thereby either of the gas circulation chamber and the reaction chamber being an independent chamber. The vertical heat treating furnace further includes a gas supplying mechanism constituted by a plurality of gas pipes which pass through the outer surface and the inner surface of the gate door, thereby introducing gases into the gas circulation chamber and the reaction chamber via the opening of the second receiving space and the lower sealed side. The vertical heat treating furnace further includes a controller set outside the outer body for controlling the gas supplying mechanism, thereby controlling the supply amount of a first gas and a second gas into the gas circulation chamber and the reaction chamber. Thereby the gases form a first pressure (P1) in the gas circulation chamber, and forming a second (P2) in the reaction chamber.
  • The present invention provides the vertical heat treating furnace with the design of gas circulation chamber, enabling effective protection of operators, saving manpower and resources, and providing the reaction environment for high-pressure gases, those which are advantageous for forming various thin films.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 a is a schematic diagram illustrating the prior art;
  • FIG. 1 b is a schematic diagram illustrating the prior art;
  • FIG. 1 c is a schematic diagram of the temperature and pressure profile in the prior art;
  • FIG. 2 a is a schematic diagram representing an embodiment of the vertical heat treating furnace in the present invention;
  • FIG. 2 b is a schematic diagram representing an embodiment of the closed vertical heat treating furnace in the present invention;
  • FIG. 3 is a schematic diagram representing the cross-sectional view of an embodiment of the vertical heat treating furnace in the present invention;
  • FIG. 4 is a schematic diagram representing the controlling profile of pressure and temperature of the vertical heat treating furnace in the present invention;
  • FIG. 5 is a schematic diagram representing the controlling profile of gas density and temperature of the vertical heat treating furnace in the present invention.
  • DESCRIPTION OF THE PREFERRED EMBODIMENT
  • The present invention discloses the structure and function of a heat treating furnace. For the convenience of description, an example of a heat treating furnace producing CIGS solar cells is described for illustration, wherein the structure and function of a heat treating furnace producing CIGS solar cells are well known by persons skilled in the art and the description emphasizes the features of the heat treating furnace of the present invention, and thus is not described in detail hereunder. The drawings below, with which the description presented hereunder is illustrated, are intended to depict schematically the structures related to the features of the present invention and are not, and need not being, drawn to scale.
  • First, refer to FIG. 2 a schematically represents an embodiment of the vertical heat treating furnace in the present invention. As shown in FIG. 2, the structures of the vertical heat treating furnace include an outer body 10 which has an exterior wall 11 and an interior wall 12 for forming a first receiving space. The vertical heat treating furnace has a first side 101 and a second side 102 corresponding to the first side 101. An opening of the first receiving is provided in the first side 101, and the second side 102 is an upper sealed side 13, such as an sealed side having arcs. The vertical heat treating furnace includes an inner body 20 which is spaced and fixed in the first receiving space of the outer body 10, and has a second receiving space formed by an outer wall 21 and an inner wall 22. The inner body 20 has a third side 201 and a fourth side 202 corresponding to the third side 201, wherein a part of the third side 201 is connected with the first side 101 by a lower sealed side 14 thereby forming an opening of the second receiving space, and the fourth side 202 is also a sealed side, wherein a gas circulation chamber 204 is formed between the outer wall 21 of the inner body 20 and the interior wall 12 of the outer body 10; a reaction chamber 205 is formed inside the inner wall 22 of the inner body 20. The vertical heat treating furnace further includes a gate door 1001 which has which has an outer surface 1005 and an inner surface 1003. When the thin film solar cell substrate 3 is disposed on the inner surface 1003 and the gate door is closed, the gas-tight structure (not shown) provided in the gate door 1001 is hermetically sealed with the opening of the second receiving space of the third side 201, thereby making either of the gas circulation chamber 204 and the reaction chamber 205 to be an independent gas-tight chamber without any communication with the thin film solar cell substrate 3 being located in the reaction chamber 205 as shown in FIG. 2 b.
  • The vertical heat treating furnace includes a heating mechanism 30 fixed and contacted with the outer wall 21 of the inner body 20; a gas supplying mechanism 40 constituted by a plurality of gas pipes 41 which pass through the outer surface 1005 and the inner surface 1001 of the gate door, thereby introducing gases into the gas circulation chamber 204 and the reaction chamber 205 via the opening of the second receiving space and the lower sealed side 14. The gas supplying mechanism 40 provides at least one first gas (such as nitrogen N2 and argon Ar) into the gas circulation chamber 204; and provide at least one second gas (such as hydrogen H2, nitrogen N2, hydrogen selenide H2Se, hydrogen sulfide H2S and argon Ar) into the reaction chamber 205. The vertical heat treating furnace further includes a controller 50 set outside the outer body 10 for controlling the gas supplying mechanism 40, thereby controlling the supply amount of a first gas and a second gas into the gas circulation chamber 204 and the reaction chamber 205. Thereby the gases form a first pressure (P1) in the gas circulation chamber 204, and forming a second (P2) in the reaction chamber 205.
  • Refer to FIG. 2 b schematically represents an embodiment of the closed vertical heat treating furnace in the present invention. As shown in FIG. 2, when the gate door 1001 is closed, the gas-tight structure (not shown) provided in the gate door 1001 is hermetically sealed with the opening of the second receiving space of the third side 201, thereby making either of the gas circulation chamber 204 and the reaction chamber 205 to be an independent gas-tight chamber without any communication with the thin film solar cell substrate 3 being located in the reaction chamber 205. Then, the thin film solar cell substrate 3 is located in the vertical heat treating furnace 1 for forming compound CIGS layers, and during this process, introducing the gaseous hydrogen selenide (H2Se) into the reaction chamber 205 of the inner body 20 is required, and the fabrication under high temperature and high pressure is required to form the fairly uniform compound CIGS layers on the thin film solar cell substrate 3. Furthermore, due to the gaseous hydrogen selenide (H2Se) introduce into the reaction chamber 205 reacts with air and generates selenium dioxide (SeO2) dust which contaminate the compound CIGS layer and the inner wall 22 of the inner body 20, those which are hazardous to operators. Therefore, during the process of reaction, either the gas circulation chamber 204 between the outer body 10 and the inner body 20 or the reaction chamber 205 between the inner wall 22 of the inner body 20 is required to be independent and gas-tight sealed chamber. Based on the requirement, the outer body 10 is made of steel or stainless steel such as SUS304 and SUS316 which enables the outer body 10 is resistant to a pressure of 20 atm. However, the material used to make the outer body 10 is not limited in the present invention. Moreover, the thermal insulating material can be further provided on the inner wall 12 of the outer body 10 to disrupt the transmission of heat to the outer wall 11 of the outer body 10 during the heating process. And the thermal insulating material can be any heat-resistant material such as quartz bricks or mica brick. Furthermore, for the reasons that the inner body 20 is operated under high pressure and temperature, and the reaction gases may be corrosive, the inner wall 22 of the inner body 20 may be made of quartz or silicon dioxide (SiO2), and a SiO2 layer can be similarly formed on the lateral side of the inner surface 1003 of the first gate door 1001, which is contacted hermetically with the gas-tight structure of the third side 201, to protect the first gate door 1001.
  • Refer to FIG. 2 b again, the gas circulation chamber 204 is provided with at least one first sensor 103 and each of the first sensor 103 is connected with a controller 50. Meanwhile, the reaction chamber 205 is also provided with at least one second sensor 203 and each of the second sensor 203 is connected with a controller 50. When both the first sensor 103 and the second sensor 203 are pressure gauges, the pressure measured in the gas circulation chamber 204 (P1) and the pressure measured in the reaction chamber 205 (P2) are transmitted to the controller 50 and then the pressure difference (P1−P2) is calculated by the controller 50 and is accordingly controlled. It should be especially emphasized that the purpose of calculating the pressure difference (P1−P2) basing on the measurement of the first sensor 103 in the gas circulation chamber 204 and the second sensor 203 in the reaction chamber 205 of present invention is to control the pressure difference (P1−P2) precisely and practically; especially to control the outer pressure of the gas circulation chamber 204 slightly greater than the inner pressure of the reaction chamber 205. For example, in an embodiment of the present invention, the original pressure difference is set at 1 Kg/cm2, and once the value of pressure difference is greater than 1 Kg/cm2, the controller 50 immediately adjusts and increases the amount of gas input in the reaction chamber 205 and reduces the amount of gas input in the gas circulation chamber 204, thereby maintaining the pressure difference within a predetermined range. And in the preferred embodiment of the present invention, the outer pressure of the gas circulation chamber 204 is greater than 1 atm. With the safety consideration, obviously, the control of the pressure difference is executed by simultaneously controlling the gas input in both chambers (i.e. the gas circulation chamber and the circulation chamber). Additionally, when controlling the gas density is employed in this embodiment, the first sensor 103 and the second sensor 203 can be gas density analyzers. Moreover, the first sensor 103 is a pressure gauge while the second sensor is a gas density analyzer to control the vertical heat treating furnace 1, such that users may choose to control the pressure or control the density depending on the practical case itself, which is not limited in the present invention.
  • Accordingly, the gas supplying mechanism 40 is set outside the outer body 10, being constituted by a plurality of gas pipes 41 passing through the inner surface 1003 of the gate door 1001, and is contacted with the lower side of the outer body and with the outer wall of the inner body 20. A plurality of gas pipes 41 of the gas supplying mechanism 40 is connected to the controller 50 to provide and control the supply of at least one first gas (such as nitrogen N2 and argon Ar) into the gas circulation chamber 204; and provide and control the supply of at least one second gas (such as hydrogen H2, nitrogen N2, hydrogen selenide H2Se, hydrogen sulfide H2S and argon Ar) into the reaction chamber 205 for proceeding reaction. It should be emphasized that, the controller 50 of the vertical heat treating furnace 1 in this invention keeps the first pressure (P1) in the gas circulation chamber 204 being greater than the second pressure (P2) in the reaction chamber 205 all the time when the vertical heat treating furnace is operated to perform a gas reaction. Or the controller 50 keeps the first density in the gas circulation chamber 204 being greater than the second density in the reaction chamber 205 all the time during the reaction. In an embodiment of the present invention, the first pressure (P1) is kept within the range of 0.5 to 9.8 atm. Furthermore, other than controlling the amount of gas inflow, the controller 50 of the present invention also monitors and controls the pressure, temperature, density, and toxicity, time, and gas types, etc. In other words, all the settings related to vertical heat treating furnace 1 are controlled and measured via the pressure sensor, density sensor, thermal sensor and toxicity sensor, and the signals are transmitted by the signal transmission circuit to the controller 50 for further processing.
  • Referring to FIG. 2 b again, showing that a safety gate door 70 is further set between the gas circulation chamber 204 and the circulation chamber 205. For example, the safety gate door 70 is set between the outer wall 21 and inner wall 22 of the inner body 20, wherein the span of the outer wall 21 and inner wall 22 o is 6 to 25 mm. Once the pressure in the reaction chamber 205 (P2) becomes greater than the set pressure in the gas circulation chamber 204 (P1), the safety gate door 70 ruptures, allowing the gases in the gas circulation chamber 204 and the reaction chamber 205 to communicate. Because the pressure in the gas circulation chamber 204 (P1) is slightly greater than the pressure in the reaction chamber 205 (P2), the flowing hydrogen selenide in the gas circulation chamber 204 is directed to the reaction chamber 205 instead of leaking outside the furnace. Furthermore, the safety gate door 70 prevents the vertical heat treating furnace 1 from being over pressured to damage the wall of quartz furnace. In the embodiment of the present invention, the working pressure in the reaction chamber 205 is generally maintained at 5 atm, far lower than the pressure resistance threshold of 20 atm. Thus, the vertical heat treating furnace ensures the operational safety.
  • Refer to both FIG. 2 a and FIG. 2 b, the closing of the vertical heat treating furnace in the present invention depends on the upward or downward movement of the furnace body constituted by the outer body 10 and inner body 20, thereby the gas circulation chamber 204 formed by third side 201 is hermetically sealed with the gas-tight structure in the gate door 1001. The furnace body can be moved upward to expose the compound thin film solar cell substrate 3, and then the compound thin film solar cell substrate 3 can be transferred out. Apparently, the gate door 1001 of the vertical heat treating furnace 1 of the embodiment of the present invention is fixed, thus ensuring that the gas pipes 41 passing through the gate door 1001 will not leak gases.
  • Refer to FIG. 3 schematically representing the cross-sectional view of an embodiment of the vertical heat treating furnace 1 in the present invention. As show in FIG. 3, the heating mechanism 30 of the vertical heat treating furnace 1 in the present invention is constituted by multiple of heaters arranged in the outer wall 21 of the inner body 20, next to the outer wall 21 of the inner body 20, wherein the heating mechanism 30 can be selected from a carbon heater or a halogen lamp heater, which heats the inner wall of the furnace to a set temperature. The carbon heater may provide electrical-resistance heating and the halogen lamp heater may provide infrared heating both of which heat the inner body 20 uniformly. In a preferred embodiment of the invention when the reaction gas is hydrogen selenide, the temperature reaches the range of 520° C. to 590° C. for performing the reaction. Referring to FIG. 2 b, illustrating the location of the gas circulation chamber 204, the reaction chamber 205 and a substrate 3; apparently the compound thin film solar cell substrate 3 was introduced longitudinally in the reaction chamber 205 in coordination to the direction of gas flows inside, improve the uniformity of the reaction of thin film formation.
  • An embodiment is described here as an example to illustrate the safety design of the vertical heat treating furnace 1 of the present invention. Under an atmosphere pressure at 1 atm, when a pressure at 3 atm is measured by the first sensor 103 in the gas circulation chamber 204; a pressure at 2 atm is measured by the second sensor 203 in the reaction chamber 205. That is to say, the pressure in the gas circulation chamber 204 is greater than both the pressure in the reaction chamber 205 and atmosphere pressure. Under this circumstance and given the pressure difference provided by the vertical heat treating furnace 1 of the present invention, once the gas leaks, only the gas in the gas circulation chamber 204 such as nitrogen leaks outside, and at the same time, the reduction of the pressure in the gas circulation chamber 204 thereby causes the controller to reduce the pressure in the reaction chamber 205 to maintain the pressure difference. Therefore, there is no safety concern for the operators. For the improvement of safety, the vertical heat treating furnace 1 of the present invention can be operated under normal, low and high pressures, wherein the preferred range of working pressure is 0.5 to 9.8 atm. However, if the operational pressure in the gas circulation chamber 204 and the operational pressure in the reaction chamber 205 are both less than 1 atm, for example, it is feasible to operate the vertical heat treating furnace 1 of the present invention when the pressure in the gas circulation chamber 204 is 1 atm and the pressure in the reaction chamber 205 is 0.98 atm.
  • In addition, when both the first sensor 103 and the second sensor 203 are gas density analyzers, the reaction can be controlled by measuring the gas density. The way of controlling is based on the Boyle's law and the equation below: PaVa/Ta=PbVb/Tb where Pa is the pressure, Va is the volume and Ta is the temperature at point a; Pb is the pressure, Vb is the volume and Tb is the temperature at point b. The detail of the way of controlling will be described according to FIG. 4 and FIG. 5.
  • Refer to the FIG. 4, schematically representing the controlling profile of pressure and temperature of the vertical heat treating furnace in the present invention. As shown in FIG. 4, after the first gate door 1001 and the second gate door 1002 being closed, the gas supplying mechanism 40 is controlled by the controller 50 to repeatedly pump out the air and pumps in the gas such as gaseous nitrogen inside the gas circulation chamber 204 and the reaction chamber 205, to ensure that no residual mist or water vapor. Meanwhile, the vertical heat treating furnace 1 is heated and the reaction gases are introduced into the reaction chamber 205. In this embodiment, hydrogen selenide (10%) and gaseous nitrogen (90%) which is the carrier gas are used for reaction. As shown in FIG. 4, during the heating process, after 50 minutes of reaction time, the temperature reaches a turning point (e.g. heating to 300° C.), no more reaction gas is introduced and only the heating is continued. This operation is based on the Boyle's law and the equation below: PaVa/Ta=PbVb/Tb where Pa is the pressure, Va is the volume and Ta is the temperature at point a; Pb is the pressure, Vb is the volume and Tb is the temperature at point b. And the amount of reaction gas required in the reaction chamber 205 is determined prior to the operation, so that the introduction of the reaction gases is stopped one the amount of the reaction gases reaches to the setting value, and only the temperature is kept raising.
  • As the temperature being raised, the pressure in the reaction chamber 205 is increased fast. For example, as the temperature reaches 590° C., the pressure in the reaction chamber 205 reaches around 5 atm, and then the reaction gases are reacting at 590° C. under, thus the reaction are performed in this state. Obviously, at this time the controller 50 keeps the pressure in the gas circulation chamber 204 at 5.1 atm. As shown in FIG. 4, only the reaction time of 20 minutes is required for completing the reaction. Immediately after the reaction, the fast cooling process is performed, meanwhile the controller 50 pumps out the residual non-reacting gas and then introduces the cooling gaseous nitrogen into the gas circulation chamber 204 and the reaction chamber 205 for cooling. The two walls of the inner body 20 in this embodiment of the present invention are cooled down simultaneously, which increases the cooling rate by two folds and reduces the concerns of chapping or peeling, thereby the input rate, amount of gas inflow, the cooling rate are accelerated to shorten the cooling time. Referring to FIG. 4 again, the vertical heat treating furnace 1 needs only 120 minutes to reduce the temperature of 590° C. in the reaction chamber 205 to a range of 50 to 60° C., and allows to open the first gate door 1001 to take out the compound solar cell substrate 3 with selenized compound CIGS layers.
  • As the process described previously, measuring the pressure is a way of the present invention for controlling, the pressure in the gas circulation chamber 204 measured by the first sensor 103 and the pressure in the reaction chamber 205 measured by the second sensor 203 are transformed into signals and transmitted to the controller 50 and then the pressure difference (P1−P2) is controlled by the controller 50, which means the pressure in the gas circulation chamber 204 is kept being slightly greater than the pressure in the reaction chamber 205. Thus the reaction in the reaction chamber 205 is carried on smoothly. In this way, in the fast heating process of the vertical heat treating furnace 1 of the present invention, no depressurization is needed for fast heating, and the selenization can be performed under high pressure, for example, the reaction time is 20 minutes in this embodiment. Another advantage of the present invention is the fast cooling process, only a cooling time of 120 minutes is needed for reducing the temperature to the range of 50 to 60° C. Apparently, according to FIG. 4, not only the selenization time but the cooling time is greatly reduced the vertical heat treating furnace 1 of the present invention, therefore the usage rate of the vertical heat treating furnace 1 is greatly raised to reduce the production cost.
  • Refer to FIG. 5 schematically representing the controlling profile of the gas density and temperature of the vertical heat treating furnace in the present invention, the operation condition of the embodiment is described as following: the diameter of the inner body 20 is 1.1 m, depth is 2 m, the gas volume in the reaction chamber 205 of the inner body 20 is 1235 L. The Y axis in FIG. 5 represents the density, and after the first gate door 1001 being closed and nitrogen is introduced, the initial density is low due to the low density of nitrogen is lower than that of the air. A process of repeatedly pumping out the air and pumping in the nitrogen is completed to ensure no residual mist or water vapors inside, then the reaction gas, hydrogen selenide (10%) and gaseous nitrogen (90%, carrier gas) are introduced and following is the heating process. The controlling profile of pressure and temperature of the vertical heat treating furnace is similar to those in FIG. 4, during the heating process, after 50 minutes of reaction time, the temperature reaches a turning point (e.g. heating to 300° C.), no more reaction gas is introduced into the reaction chamber 205. At the same time the amount of the reaction gas is constant in the reaction chamber 205. Corresponding to FIG. 4, the settings are shown as below: the temperature is at 590° C. and the pressure is at 5 atm. In this embodiment, the related gas densities in the vertical heat treating furnace are: the mean gas density is 2.35 kg/m3, the nitrogen density is 1.78 kg/m3, and the hydrogen selenide density is 0.57 kg/m3.
  • Referring FIG. 5 again, the reaction is performed under the mean gas density of 2.35 kg/m3, the controller 50 keeps the pressure in the gas circulation chamber 204 greater than 2.35 kg/m3 for the operation. Under the high gas density, the reaction rate is faster than conventional heat treating furnace, as shown in FIG. 5, the selenization in the reaction chamber 205 takes around 20 minutes. Likewise, the cooling nitrogen is introduced into the reaction chamber 205 inside the inner body 20 and the gas circulation chamber 204 outside the exterior wall of the furnace body, and there is no concern of the temperature gradient occurring in the wall of the inner body 20, which amplified the amount of gas inflow. Within less than 2 hours, the cooling process is completed. Once the gate door is opened, the temperature will be 25° C. due to the air inflow in the reaction chamber 205, and the general air density is 1.184 kg/m3.
  • Due to that measuring the gas density is a way of the present invention for controlling, the gas density in the gas circulation chamber 204 and the reaction chamber 205 measured by the first sensor 103 and the second sensor 203 are transformed into signals and transmitted via the signal transmission circuit to the controller 50 and then the gas density difference is controlled by the controller 50, which means the gas density in the gas circulation chamber 204 is kept being slightly greater than the gas density in the reaction chamber 205. Thus the reaction in the reaction chamber 205 is carried on smoothly. In this way, during the fast heating process of the vertical heat treating furnace 1 of the present invention, no depressurization is needed for fast heating, and the selenization can be performed under high gas density (e.g. 2.35 kg/m3), accelerating the reaction. For example, the reaction time is 20 minutes in this embodiment. The other advantage of the present invention is the fast cooling process, only a cooling time of 120 minutes is needed for reducing the temperature to the range of 50 to 60° C. Apparently, according to FIG. 5, not only the selenization time but the cooling time is greatly reduced the vertical heat treating furnace 1 of the present invention, therefore the usage rate of the vertical heat treating furnace 1 is greatly raised to reduce the production cost.
  • Similarly, the first sensor 103 of the gas circulation chamber 204 can be a pressure gauge and the second sensor 203 of the reaction chamber 205 can be a gas density analyzer illustrated in FIG. 2 a, and the signals measured by the pressure gauge or gas density analyzer can be transmitted to the controller 50 by the signal transmission circuit, to control and adjust the amount of gas inflows in the gas circulation chamber 204 and the reaction chamber 205. Therefore the vertical heat treating furnace of the present invention can be controlled according to the pressure or the density depending on the practical case.
  • All the above descriptions are based on the example of CIGS thin film solar cell substrate 3. However, the vertical heat treating furnace of the present invention can also be applied in other kinds of fabrication. Taking the Copper Zinc Tin Sulfide (CZTS) thin film solar cell for another example, the hydrogen selenide gas is also used for the reaction with copper, zinc and tin in the vertical heat treating furnace of the present invention to produce the CZTS thin film solar cells.
  • The present invention is disclosed above by preferred embodiments. However, persons skilled in the art should understand that the preferred embodiments are illustrative of the present invention only, but should not be interpreted as restrictive of the scope of the present invention. Persons skilled in the art are able to understand and implement the above disclosure of the present invention. Hence, all equivalent changes or modifications made to the aforesaid embodiments without departing from the spirit embodied in the present invention should fall within the scope of the present invention.

Claims (21)

What is claimed is:
1. A vertical heat treating furnace comprising:
an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to said first side, said first side being provided with an opening of said first receiving space, said second side is a sealed side;
an inner body being spaced and fixed in said first receiving space of said outer body, having an outer wall and an inner wall, thereby forming a second receiving space, having a third side and a fourth side corresponding to said third side, a part of said third side being connected with said first side by a lower sealed side thereby forming an opening of said second receiving space, said fourth side is a sealed side, wherein a gas circulation chamber being formed between said outer wall of said inner body and said interior wall of said outer body, a reaction chamber being formed inside said inner wall of said inner body; and
a gate door having an outer surface and an inner surface, being contacted with said opening of said second receiving space of said third side by said inner surface, thereby either of said gas circulation chamber and said reaction chamber being an independent chamber.
2. The vertical heat treating furnace of claim 1, wherein said outer body is made of steel or stainless steel such as SUS304 and SUS316.
3. The vertical heat treating furnace of claim 1, wherein said inner body is made of quartz or silicon dioxide (SiO2).
4. The vertical heat treating furnace of claim 1, wherein said gas circulation chamber is provided with at least one first sensor.
5. The vertical heat treating furnace of claim 1, wherein said reaction chamber is provided with at least one second sensor.
6. The vertical heat treating furnace of claim 4, wherein said first sensor is a pressure gauge.
7. The vertical heat treating furnace of claim 5, wherein said second sensor is a pressure gauge.
8. The vertical heat treating furnace of claim 4, wherein said first sensor is a gas density analyzer.
9. The vertical heat treating furnace of claim 5, wherein said second sensor is a gas density analyzer.
10. The vertical heat treating furnace of claim 1, further comprising a heating mechanism being fixed and contacted with said outer wall of said inner body.
11. The vertical heat treating furnace of claim 10, wherein said heating mechanism is a carbon heater or a halogen lamp heater.
12. The vertical heat treating furnace of claim 1, further comprising a gas supplying mechanism constituted by a plurality of gas pipes, said gas pipes passing through said outer surface and said inner surface of said gate door, thereby introducing gases into said gas circulation chamber and said reaction chamber via said opening of said second receiving space and said lower sealed side.
13. The vertical heat treating furnace of claim 1, further comprising a gas supplying mechanism which is constituted by a plurality of gas pipes, said gas pipes passing through said outer surface and said inner surface of said gate door, thereby introducing gases into said gas circulation chamber and said reaction chamber via said opening of said second receiving space and said lower sealed side
14. The vertical heat treating furnace of claim 13, further comprising a controller being set outside said outer body for controlling a gas supplying mechanism, thereby controlling the supply amount of a first gas and a second gas into said gas circulation chamber and said reaction chamber, thereby forming a first pressure (P1) in said gas circulation chamber, and forming a second (P2) in said reaction chamber.
15. The vertical heat treating furnace of claim 14, wherein said first pressure (P1) and said second pressure (P2) is greater than 1 atm.
16. A vertical heat treating furnace comprising:
an outer body having an exterior wall and an interior wall, thereby forming a first receiving space, and having a first side and a second side corresponding to said first side, said first side being provided with an opening of said first receiving space, said second side is a sealed side;
an inner body being spaced and fixed in said first receiving space of said outer body, having an outer wall and an inner wall, thereby forming a second receiving space, having a third side and a fourth side corresponding to said third side, a part of said third side being connected with said first side by a lower sealed side thereby forming an opening of said second receiving space, said fourth side is a sealed side, wherein a gas circulation chamber being formed between said outer wall of said inner body and said interior wall of said outer body, a reaction chamber being formed inside said inner wall of said inner body;
a heating mechanism being fixed and contacted with said outer wall of said inner body;
a gate door having an outer surface and an inner surface, being contacted with said opening of said second receiving space of said third side by said inner surface, thereby either of said gas circulation chamber and said reaction chamber being an independent chamber;
a gas supplying mechanism constituted by a plurality of gas pipes, said gas pipes passing through said outer surface and said inner surface of said gate door, thereby introducing gases into said gas circulation chamber and said reaction chamber via said opening of said second receiving space and said lower sealed side; and
a controller set outside said outer body for controlling said gas supplying mechanism, thereby controlling the supply amount of a first gas and a second gas into said gas circulation chamber and said reaction chamber, thereby forming a first pressure (P1) in said gas circulation chamber, and forming a second (P2) in said reaction chamber.
17. The vertical heat treating furnace of claim 16, wherein said gas circulation chamber is provided with at least one first sensor and each of said first sensor is connected with the controller.
18. The vertical heat treating furnace of claim 16, wherein said reaction chamber is provided with at least one second sensor and each of said second sensor is connected with the controller.
19. The vertical heat treating furnace of claim 16, wherein said first pressure (P1) and said second pressure (P2) is greater than 1 atm.
20. The vertical heat treating furnace of claim 16, wherein said outer body is made of steel or stainless steel such as SUS304 and SUS316.
21. The vertical heat treating furnace of claim 16, wherein said inner body is made of quartz or silicon dioxide (SiO2).
US13/396,079 2011-11-17 2012-02-14 Vertical Heat Treating Furnace Abandoned US20130125797A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
TW100142148 2011-11-17
TW100142148A TWI442012B (en) 2011-11-17 2011-11-17 Vertical furnace structure

Publications (1)

Publication Number Publication Date
US20130125797A1 true US20130125797A1 (en) 2013-05-23

Family

ID=45936852

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/396,079 Abandoned US20130125797A1 (en) 2011-11-17 2012-02-14 Vertical Heat Treating Furnace

Country Status (4)

Country Link
US (1) US20130125797A1 (en)
EP (1) EP2594882B1 (en)
CN (1) CN103122448B (en)
TW (1) TWI442012B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150017757A1 (en) * 2013-07-10 2015-01-15 Tsmc Solar Ltd. Apparatus and methods for forming thin film solar cell materials
CN104976892A (en) * 2014-04-11 2015-10-14 上海宝钢化工有限公司 High-temperature lifting furnace
US20220026939A1 (en) * 2020-07-27 2022-01-27 Shao-Chi Liu Material processing apparatus and operating method thereof
EP4174919A1 (en) * 2021-11-02 2023-05-03 ASM IP Holding B.V. Substrate processing apparatus

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276353B (en) * 2013-06-07 2019-02-05 广东世创金属科技股份有限公司 A kind of door body structure of vacuum coating equipment
CN103757605B (en) * 2014-01-27 2016-06-29 张福昌 A kind of chemical vapor depsotition equipment
CN112071775A (en) * 2020-08-14 2020-12-11 深圳第三代半导体研究院 Sintering equipment for packaging power device
CN114076522B (en) * 2022-01-19 2022-03-29 中电科风华信息装备股份有限公司 Full-automatic pressure curing equipment for semiconductor packaging

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4018184A (en) * 1975-07-28 1977-04-19 Mitsubishi Denki Kabushiki Kaisha Apparatus for treatment of semiconductor wafer
US4606195A (en) * 1985-03-14 1986-08-19 Winkler Richard C Hyperbaric container
JPH05299411A (en) * 1992-04-20 1993-11-12 Nec Kyushu Ltd Normal pressure vapor growth device
US6586330B1 (en) * 2002-05-07 2003-07-01 Tokyo Electron Limited Method for depositing conformal nitrified tantalum silicide films by thermal CVD
US20060276037A1 (en) * 2001-08-06 2006-12-07 Lee Chun S Plasma enhanced atomic layer deposition (PEALD) equipment and method of forming a conducting thin film using the same thereof
US20070187386A1 (en) * 2006-02-10 2007-08-16 Poongsan Microtec Corporation Methods and apparatuses for high pressure gas annealing
US20090223448A1 (en) * 2008-01-31 2009-09-10 Hitachi Kokusai Electric Inc. Substrate processing apparatus and method for manufacturing semiconductor device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW430866B (en) * 1998-11-26 2001-04-21 Tokyo Electron Ltd Thermal treatment apparatus
JP3554847B2 (en) * 2001-07-30 2004-08-18 東京エレクトロン株式会社 Heat treatment equipment
EP1746662B1 (en) * 2004-05-11 2017-01-25 Honda Motor Co., Ltd. Method for manufacturing chalcopyrite thin-film solar cell
US20090095422A1 (en) * 2007-09-06 2009-04-16 Hitachi Kokusai Electric Inc. Semiconductor manufacturing apparatus and substrate processing method
JP5564311B2 (en) * 2009-05-19 2014-07-30 株式会社日立国際電気 Semiconductor device manufacturing method, substrate processing apparatus, and substrate manufacturing method
TW201128792A (en) * 2010-02-12 2011-08-16 sheng-chang Zhang Method and equipment for heat treatment of CIGS solar photoelectric semiconductor thin film

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4018184A (en) * 1975-07-28 1977-04-19 Mitsubishi Denki Kabushiki Kaisha Apparatus for treatment of semiconductor wafer
US4606195A (en) * 1985-03-14 1986-08-19 Winkler Richard C Hyperbaric container
JPH05299411A (en) * 1992-04-20 1993-11-12 Nec Kyushu Ltd Normal pressure vapor growth device
US20060276037A1 (en) * 2001-08-06 2006-12-07 Lee Chun S Plasma enhanced atomic layer deposition (PEALD) equipment and method of forming a conducting thin film using the same thereof
US6586330B1 (en) * 2002-05-07 2003-07-01 Tokyo Electron Limited Method for depositing conformal nitrified tantalum silicide films by thermal CVD
US20070187386A1 (en) * 2006-02-10 2007-08-16 Poongsan Microtec Corporation Methods and apparatuses for high pressure gas annealing
US20090223448A1 (en) * 2008-01-31 2009-09-10 Hitachi Kokusai Electric Inc. Substrate processing apparatus and method for manufacturing semiconductor device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150017757A1 (en) * 2013-07-10 2015-01-15 Tsmc Solar Ltd. Apparatus and methods for forming thin film solar cell materials
US9385260B2 (en) * 2013-07-10 2016-07-05 Tsmc Solar Ltd. Apparatus and methods for forming thin film solar cell materials
TWI560897B (en) * 2013-07-10 2016-12-01 Taiwan Semiconductor Mfg Co Ltd Apparatus and method of forming thin film solar cell materials
CN104976892A (en) * 2014-04-11 2015-10-14 上海宝钢化工有限公司 High-temperature lifting furnace
US20220026939A1 (en) * 2020-07-27 2022-01-27 Shao-Chi Liu Material processing apparatus and operating method thereof
EP4174919A1 (en) * 2021-11-02 2023-05-03 ASM IP Holding B.V. Substrate processing apparatus

Also Published As

Publication number Publication date
EP2594882A1 (en) 2013-05-22
TW201321698A (en) 2013-06-01
CN103122448A (en) 2013-05-29
CN103122448B (en) 2016-01-20
TWI442012B (en) 2014-06-21
EP2594882B1 (en) 2015-12-09

Similar Documents

Publication Publication Date Title
EP2594882B1 (en) Vertical Heat Treating Furnace
TWI413269B (en) Method and apparatus for converting precursor layers into photovoltaic absorbers
EP2578977B1 (en) Heat treating furnace
KR101645950B1 (en) Process device for processing in particular stacked processed goods
JP2022515207A (en) Vacuum degreasing sintering furnace and its usage
EP2355936A1 (en) Reactor to form solar cell absorbers
CN101978091A (en) Reel-to-reel reaction of a precursor film to form solar cell absorber
KR20110121443A (en) Apparatus for forming a cigs layer
WO2019114237A1 (en) Cooling member and vacuum coating device
KR100979104B1 (en) Method for processing substrate and semiconductor manufacturing apparatus
WO2018135518A1 (en) Method and device for manufacturing black plated steel sheet
JP6257616B2 (en) Process box, apparatus and method for processing a coated substrate
US20180127875A1 (en) Apparatus for performing selenization and sulfurization process on glass substrate
CN102738261A (en) Substrate processing apparatus, method for manufacturing solar battery, and method for manufacturing substrate
KR101284704B1 (en) Thermal Processing Apparatus and Method for Manufacturing Solar Cell and Method for Manufacturing Solar Cell using the same
US20130098453A1 (en) Method and device for refilling an evaporator chamber
CN103046023B (en) Treatment furnace structure
WO2013099894A1 (en) Substrate processing device and substrate processing method using same
JP2009091632A (en) Heat-treatment apparatus and heat-treatment method
JP2013105910A (en) Treatment furnace
JP2013004589A (en) Selenide furnace, manufacturing method of compound semiconductor thin film, and manufacturing method of compound thin film solar cell
JP2018093128A (en) Facility used for steps of selenization and sulfurization of glass substrate
CN105206704B (en) Na dosage control methods
KR101442219B1 (en) Thermal treatment system and Method of performing thermal treatment and Method of manufacturing CIGS solar cell using the same

Legal Events

Date Code Title Description
AS Assignment

Owner name: KERN ENERGY ENTERPRISE CO., LTD., TAIWAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HSIAO, YING-SHIH;YOSHIMURA, TOSHIAKI;REEL/FRAME:027702/0133

Effective date: 20111205

Owner name: YOSHIMURA, TOSHIAKI, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HSIAO, YING-SHIH;YOSHIMURA, TOSHIAKI;REEL/FRAME:027702/0133

Effective date: 20111205

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION