US11822417B2 - Factory power management and control system and method based on edge-cloud coordination - Google Patents

Factory power management and control system and method based on edge-cloud coordination Download PDF

Info

Publication number
US11822417B2
US11822417B2 US17/261,875 US202017261875A US11822417B2 US 11822417 B2 US11822417 B2 US 11822417B2 US 202017261875 A US202017261875 A US 202017261875A US 11822417 B2 US11822417 B2 US 11822417B2
Authority
US
United States
Prior art keywords
power
factory
computing
edge
cloud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US17/261,875
Other versions
US20220187894A1 (en
Inventor
Ping Wang
Xu Yang
Min Wei
Caiqin LI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Post and Telecommunications
Original Assignee
Chongqing University of Post and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Post and Telecommunications filed Critical Chongqing University of Post and Telecommunications
Publication of US20220187894A1 publication Critical patent/US20220187894A1/en
Application granted granted Critical
Publication of US11822417B2 publication Critical patent/US11822417B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/329Power saving characterised by the action undertaken by task scheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/28Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/3296Power saving characterised by the action undertaken by lowering the supply or operating voltage
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/505Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5061Partitioning or combining of resources
    • G06F9/5072Grid computing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5083Techniques for rebalancing the load in a distributed system
    • G06F9/5088Techniques for rebalancing the load in a distributed system involving task migration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention belongs to the field of factory power management and control, and relates to a factory power management and control system and method based on edge-cloud coordination.
  • Edge computing refers to using a distributed open platform that integrates core capabilities of network, computing, storage and application to provide nearest edge intelligent services at a network edge side close to an object or data source, so as to meet key demands of industry digitization in agile connection, real-time service, data optimization, application intelligence, security and privacy protection, and other aspects.
  • Edge computing can serve as a bridge connecting the physical and digital worlds, enabling intelligent assets, intelligent gateways, intelligent systems and smart services. Because the edge side needs to support multiple network interfaces, protocols and topologies, real-time service processing and deterministic delay, data processing and analysis, distributed intelligence and security and privacy protection, while it is difficult for the cloud to meet the above requirements, edge computing and cloud computing are required to collaborate in the aspects of network, service, application, and intelligence.
  • Edge-cloud coordination may magnify values of edge computing and cloud computing.
  • Edge computing and cloud computing have respective advantages: cloud computing is good at global, non-real-time, long-term big data processing and analysis, and can make the most of the advantage in long-term maintenance, service decision support and other fields; edge computing is more suitable for processing and analysis of local, real-time, and short-term data, and can better support real-time intelligent decision-making and execution of local services.
  • edge computing and cloud computing are not a substitute relationship, but a complementary coordination relationship.
  • Edge computing and cloud computing need to be closely coordinated to better meet the matching of various demand scenarios, thereby magnifying application values of edge computing and cloud computing.
  • Edge computing is not only close to an execution unit, but is also a collection and preliminary processing unit of high-value data required by the cloud, which can better support cloud applications; conversely, service rules or models output by cloud computing through big data analysis and optimization may be issued to the edge side, and edge computing runs based on new service rules or models.
  • Edge-cloud coordination involves resource coordination, data coordination, intelligence coordination, application management coordination, service management coordination, service coordination and other aspects.
  • the present invention is no longer limited to cloud computing, further studies edge computing and integrates same into factory power management and control, uses edge-cloud coordination computing to improve the flexibility, security, and timeliness of the factory power management and control system, and reduces factory power costs by simultaneously reducing power consumption costs and power supply costs; and provides a factory power management and control system and method based on edge-cloud coordination.
  • the present invention provides the following technical solution:
  • the present invention provides a factory power management and control system based on edge-cloud coordination, including a cloud power management layer, an edge computing layer, a device layer and a power supply side,
  • the present invention provides factory power management and control method based on edge-cloud coordination, comprising following steps:
  • step S1 specifically comprises:
  • the algorithm complexities are divided into 4 ranks and the algorithm complexities progressively decrease in order, rank 1 indicates that the algorithm complexity is extremely high, and rank 4 indicates that the algorithm complexity is low.
  • rank 1 indicates that the algorithm complexity is extremely high
  • rank 4 indicates that the algorithm complexity is low.
  • computation time thereof are different
  • storage spaces occupied when computation is executed are different.
  • Complexity attributes corresponding to complexity ranks are shown in Table 1.
  • step S2 specifically comprises: collecting from the production device, by the field node, data frame information tables ⁇ Task_number, T i , protocol, ID, data_source, Task_type ⁇ respectively representing task number, task execution time, industrial protocol, network ID, data source address, and task type; marking, by the field node, data frames with different timeliness ranks according to the task type Task_type in the data frame information tables in an MAC layer, so the marked frame information tables become ⁇ Task_number, T i , protocol, ID, data_source, Task_type, TIME_priority ⁇ , where TIME_priority ⁇ [1-4]; TIME_priority represents data timeliness ranks, and data attributes represented by values thereby are shown in Table 2.
  • TIME_priority corresponds to 4 timeliness ranks, rank 1 to rank 4 in sequence, priority ranks progressively increase in order, 1 indicates that the requirement for timeliness is not high, 4 indicates that the requirement for timeliness is extremely high.
  • Timeliness attributes corresponding to timeliness ranks are shown in Table 2.
  • step S14 inputs of the demand response algorithm are the electricity demand E d , the power generation model M g , the power storage model M s , and the power price model M p ; and outputs are the power consumption scheme Scheme i , and the power supply scheme Scheme p ;
  • E d ⁇ i ⁇ T i ⁇ E i ;
  • Edge-cloud coordination computing improves timeliness: in this solution, the edge nodes locally process the production task data from the device layer, and form a real-time feedback control loop with a field device, so the management and control efficiency is effectively improved, the instruction transmission time is shortened, and power supply and power consumption schemes are generated in real time, and are provided to the production device and various power stations of the power supply side for execution.
  • the power data of a power plant and the generated schemes can be stored in the cloud, and then the subsequent scheme generation time can be shortened.
  • algorithm complexities and data timeliness are ranked, and comprehensive ranks are obtained.
  • Joint scheduling of power supply-power consumption increases flexibility: in this solution, a power consumption side and a power supply side are jointly scheduled, so not only “peak-load shifting” is achieved, that is, when the power price is low, not only high-power device is turned on at the device layer, but also a charging function of the power storage system is enabled at the power supply side.
  • a low-power device is turned on at the device layer, and a discharging function of the power storage system is enabled systematically at the power supply side.
  • the cost reduction of the power consumption side is mainly achieved by adding production tasks when the power price is low, and the cost reduction of the power supply side is achieved by charging the power storage station when the power price is low, and discharging the power storage station when the power price is high.
  • simultaneous scheduling of power supply and power consumption can significantly improve the performance of the power management and control system.
  • Edge-cloud coordination distributed computing improves security: in this solution, the main computing tasks are completed by the edge nodes, since the edge nodes are distributed dispersedly, even if the security of several edge nodes is threatened, the tasks are then executed by other edge nodes, having little impact on the entire power management and control system. Compared with centralized scheduling, in case of breakdown of a centralized scheduling center, the entire production system may suffer from a fatal blow. Therefore, the edge-cloud coordination technology can improve the security of the power management and control system.
  • FIG. 1 is a structural schematic diagram of the factory power management and control system based on edge-cloud coordination of the present invention
  • FIG. 2 is a flow chart of the factory power management and control method based on edge-cloud coordination of the present invention.
  • FIG. 3 is a flow diagram of the demand response algorithm of the present invention.
  • the present invention provides a factory power management and control system based on edge-cloud coordination, as shown in FIG. 1 , including a cloud power management layer, an edge computing layer, a device layer and a power supply side,
  • the edge computing layer includes a plurality of edge nodes, wherein the edge nodes are used to: ⁇ circle around (1) ⁇ compute an electricity demand E d required for production task; ⁇ circle around (2) ⁇ compute an electricity demand required to complete established production tasks according to the STN task model information issued by the cloud power management center and real-time task information sent by a factory device layer; ⁇ circle around (3) ⁇ receive power supply information data from the power supply side, including a real-time power price model, a power storage model and a power generation model; ⁇ circle around (4) ⁇ judge algorithm complexity ranks O, judge data timeliness ranks TIME_priority, and compute comprehensive ranks R; ⁇ circle around (5) ⁇ send a part of computing tasks to the cloud power management center according to the comprehensive ranks R, accept computing results of this part, and perform computing of a remaining part of tasks at the edge node; ⁇ circle around (6) ⁇ comprehensively obtain a power consumption scheme Scheme i and a power supply scheme Scheme p according to computing results; ⁇ circle around (7) ⁇
  • the present invention provides a factory power management and control method based on edge-cloud coordination.
  • the design of the factory power management and control method based on edge-cloud coordination will be described in detail below in combination with examples. Aiming at the situation where there is a need to quickly generate a power supply scheme and a power consumption scheme at an edge node in an industrial field, the present invention provides specific embodiments of the patent.
  • Step 1 collecting from the production device, by the field node, data frame information tables ⁇ Task_number, T i , protocol, ID, data_source, Task_type, TIME_priority ⁇ respectively representing task number, task execution time, industrial protocol, network ID, data source address, task type, and timeliness rank.
  • data frame information tables ⁇ Task_number, T i , protocol, ID, data_source, Task_type, TIME_priority ⁇ respectively representing task number, task execution time, industrial protocol, network ID, data source address, task type, and timeliness rank.
  • Step 2 parsing, by the field node, production task information data I p and sending same to the edge node.
  • Step 4 sending, by the power supply proxy of the power supply side, the power generation model M g , the power storage model M s and the power price model M p to the edge node.
  • Step 5 computing, by the edge node, an electricity demand E d required to complete these production tasks according to the production task information data I p and the STN task model M t .
  • Step 6 searching, by the edge node, an algorithm head to obtain values of O.
  • Step 8 computing, by the edge node, values of comprehensive ranks R through values of algorithm complexity ranks O and values of the data timeliness ranks TIME_priority according to Table 3.
  • Step 9 storing, by the edge node, computations of which the values of comprehensive ranks R are 5, 6, 7, 8 locally.
  • Step S10 sending, by the edge node, computations of which the values of comprehensive ranks R are 2, 3, 4 to the cloud power management center.
  • Step S11 executing, by the edge node, the computations of which the values of comprehensive ranks R are 5, 6, 7, 8, and saving computing results locally; executing, by the cloud power management center, the computations of which the values of comprehensive ranks are 2, 3, 4 sent by the edge node.
  • Step 12 returning, by the cloud power management center, the computing results to the edge node.
  • Step 13 executing, by the edge node, a demand response algorithm.
  • inputs of the demand response (DR) algorithm are the electricity demand E d , the power generation model M g , the power storage model M s , and the power price model M p ; and outputs are the power consumption scheme Scheme i , and the power supply scheme Scheme i .
  • E d ⁇ i ⁇ T i ⁇ E i .
  • the power generation model is computed from the price of power generation materials consumed by the generator per unit time, and it is assumed that the cost of power generation per unit time of one generator is P g . It is assumed that the number of generators that need to run in the factory is x g . In this part, the costs of starting and shutting down an engine are ignored.
  • the charging power of one power storage machine is E s
  • the discharging power E sp is the current device power
  • charging is performed only when the power supply station outside factory supplies power.
  • S s represents a state of the power storage machine
  • T s represents time the power storage machine is in the charging/discharging state
  • the power price model depends on the situation of an external power supply unit, including a Day-ahead power price model, a real-time power price model and a segmented power price model in general.
  • P represents the price of power supplied to the factory.
  • the edge node may generate Scheme i .
  • the edge node may generate Scheme p .
  • Scheme p ⁇ x g , T g , S s , T s , P, S p , T p _01, T p _10 ⁇ .
  • a power consumption scheme Schemes and a power supply scheme Scheme p are generated.
  • the scheme is a task execution scheme or a power supply scheme to complete 6 production processes within 24 hours a day.
  • the 6 production processes refer that task 1 is executed for 6 h, task 2 is executed for 12 h, task 3 is executed for 18 h, and task 4 is executed for 24 h without interruption.
  • Step 14 sending, by the edge node, the power consumption scheme Scheme i to the field node, and sending, by the edge node, the power supply scheme Scheme p to the power supply proxy.
  • Step 15 further sending, by the field node, Scheme; to the production device to execute production tasks; controlling, by the power supply proxy, the power generation station in factory, the power storage station in factory, and the power supply station outside factory to execute corresponding schemes.
  • Step 16 storing, by the edge node, the schemes in the cloud power management center simultaneously to be used as a reference for future operation schemes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Automation & Control Theory (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a factory power management and control method based on edge-cloud coordination, including: 1) forming an industrial field network by a field node, a routing node and a device executing production tasks; 2) parsing production task information data and sending; 3) issuing an STN model in production field to an edge node; 4) sending to the edge node; 5) computing, required to complete the production tasks; 6) computing values of comprehensive ranks; 7) executing, by the edge node, the higher rank, and executing, by the cloud power management center, the lower rank; 8) executing, by the edge node, a demand response algorithm; 9) executing, by the production device, the production tasks based on computing results; and executing, by a power generation station in factory, a power storage station in factory and a power supply station outside factory, corresponding schemes based on the results.

Description

TECHNICAL FIELD
The present invention belongs to the field of factory power management and control, and relates to a factory power management and control system and method based on edge-cloud coordination.
BACKGROUND
Edge computing refers to using a distributed open platform that integrates core capabilities of network, computing, storage and application to provide nearest edge intelligent services at a network edge side close to an object or data source, so as to meet key demands of industry digitization in agile connection, real-time service, data optimization, application intelligence, security and privacy protection, and other aspects. Edge computing can serve as a bridge connecting the physical and digital worlds, enabling intelligent assets, intelligent gateways, intelligent systems and smart services. Because the edge side needs to support multiple network interfaces, protocols and topologies, real-time service processing and deterministic delay, data processing and analysis, distributed intelligence and security and privacy protection, while it is difficult for the cloud to meet the above requirements, edge computing and cloud computing are required to collaborate in the aspects of network, service, application, and intelligence.
Edge-cloud coordination may magnify values of edge computing and cloud computing. Edge computing and cloud computing have respective advantages: cloud computing is good at global, non-real-time, long-term big data processing and analysis, and can make the most of the advantage in long-term maintenance, service decision support and other fields; edge computing is more suitable for processing and analysis of local, real-time, and short-term data, and can better support real-time intelligent decision-making and execution of local services.
Therefore, the relationship between edge computing and cloud computing is not a substitute relationship, but a complementary coordination relationship. Edge computing and cloud computing need to be closely coordinated to better meet the matching of various demand scenarios, thereby magnifying application values of edge computing and cloud computing. Edge computing is not only close to an execution unit, but is also a collection and preliminary processing unit of high-value data required by the cloud, which can better support cloud applications; conversely, service rules or models output by cloud computing through big data analysis and optimization may be issued to the edge side, and edge computing runs based on new service rules or models. Edge-cloud coordination involves resource coordination, data coordination, intelligence coordination, application management coordination, service management coordination, service coordination and other aspects.
In the aspect of factory power management and control, researches at home and abroad mainly focus on centralized management and control of factory power, to solve the problems of limited traditional power management and control methods and high factory power costs. Centralized management and control methods have several major limitations:
    • {circle around (1)} timeliness is insufficient: the amount of power data information in factory field is huge, so moving all power data to the cloud for centralized computation may cause delay in transmission of control instructions and increase in power consumption costs.
    • {circle around (2)} power supply-power consumption cannot be jointly managed and controlled: a factory electricity consumption layer and a factory power supply layer cannot achieve joint management and control, resulting in insufficient or surplus power supply, thus resulting in increase in power consumption costs.
    • {circle around (3)} security is insufficient: as a centralized computing center, factory cloud plays a role in centralized scheduling of the entire factory power management and control system, so once it faces a security threat, consequences are extremely serious.
SUMMARY
In view of this, the present invention is no longer limited to cloud computing, further studies edge computing and integrates same into factory power management and control, uses edge-cloud coordination computing to improve the flexibility, security, and timeliness of the factory power management and control system, and reduces factory power costs by simultaneously reducing power consumption costs and power supply costs; and provides a factory power management and control system and method based on edge-cloud coordination.
To achieve the above purpose, the present invention provides the following technical solution:
On the one hand, the present invention provides a factory power management and control system based on edge-cloud coordination, including a cloud power management layer, an edge computing layer, a device layer and a power supply side,
    • wherein the cloud power management layer includes a cloud power management center and an industrial cloud server, wherein the cloud power management center is used to execute a part of computing tasks and return computing results to an edge node, and is also used to store an STN task model in production field and issue same to the edge node; and the industrial cloud server is used to store power supply and power consumption schemes generated by the edge node, to use same as a reference in scheme generation process in the future;
    • the edge computing layer includes a plurality of edge nodes, wherein the edge nodes are used to: {circle around (1)} compute an electricity demand Ed required for production tasks; {circle around (2)} compute an electricity demand required to complete established production task according to STN task model information issued by the cloud power management center and real-time task information sent by a factory device layer; {circle around (3)} receive power supply information data from the power supply side, including a real-time power price model, a power storage model and a power generation model; {circle around (4)} judge algorithm complexity ranks O, judge data timeliness ranks TIME_priority, and compute comprehensive ranks R; {circle around (5)} send a part of computing tasks to the cloud power management center according to the comprehensive ranks R, accept computing results of this part, and perform computing of a remaining part of tasks at the edge node; {circle around (6)} comprehensively obtain a power consumption scheme Schemei and a power supply scheme Schemep according to the computing results; {circle around (7)} send the power consumption scheme Schemep to the factory device layer to execute production tasks, and send the power supply scheme to the power supply side to execute power supply tasks;
    • the device layer includes a field node, a routing node and production device, wherein production information about the production device is collected by an industrial field network formed by the field node, and is sent to the edge node by the routing node; the power consumption scheme from the edge node is received by the routing node, and the device layer is controlled to execute production tasks according to the scheme; the production device, that is, a device that executes a plan in industrial field, is used to execute production tasks in the power consumption scheme;
    • the power supply side includes a power supply proxy, a power station outside factory, a power generation station in factory and a power storage station in factory, wherein the power supply proxy is used to store a power price model of the power station outside factory, a power generation model of the power generation station in factory, and a power storage model of the power storage station in factory, and if any model is updated, send same to the edge node; the power station outside factory is used to connect a power grid of the factory, to supply power to the factory; the power generation station in factory, as a self-built power generation station of the factory, is used to supply power to the factory; the power storage station in factory is used to store power when power price is low, and supplies power to the factory when power price is high.
On the other hand, the present invention provides factory power management and control method based on edge-cloud coordination, comprising following steps:
    • S1: storing an STN task model Mt in production field at the cloud power management center, storing a power generation model Mg, a power storage model Ms, and a power price model Mp of the power supply side in the power supply proxy, and specifying algorithm complexity ranks;
    • S2. forming an industrial field network by a field node, a routing node and a device executing production tasks of the device layer;
    • S3. parsing, by the field node, production task information data Ip and sending same to the edge node;
    • S4: issuing, by the cloud power management center, an STN model in production field to the edge node;
    • S5: sending, by the power supply proxy of the power supply side, the power generation model Mg, the power storage model M and the power price model Mp to the edge node;
    • S6: computing, by the edge node, an electricity demand Ed required to complete these production tasks according to the production task information data Ip and the STN task model Mt;
    • S7: judging, by the edge node, algorithm complexity ranks according to values of algorithm head O and Table 1;
    • S8: judging, by the edge node, data timeliness ranks through values of TIME_priority in data frames according to Table 2;
    • S9: computing, by the edge node, values of comprehensive ranks R through values of algorithm complexity ranks O and values of data timeliness ranks TIME_priority according to Table 3;
TABLE 3
Edge-cloud coordination computing
Serial Timeliness Algorithm Comprehensive Edge-cloud
number Computing category rank complexity rank coordination
1 Low timeliness, 1 1 2 Cloud
extremely high computing
complexity
2 Moderate timeliness, 2 1 3 Cloud
extremely high computing
complexity
3 Low timeliness, high 1 2 3 Cloud
complexity computing
4 Moderate timeliness, 2 2 4 Cloud
high complexity computing
5 Low timeliness, 1 3 4 Cloud
moderate complexity computing
6 Low timeliness, 3 1 4 Cloud
extremely high computing
complexity
7 Low timeliness, low 1 4 5 Edge
complexity computing
8 Low timeliness, 4 1 5 Edge
extremely high computing
complexity
9 Moderate timeliness, 2 3 5 Edge
moderate complexity computing
10 Low timeliness, high 3 2 5 Edge
complexity computing
11 Moderate timeliness, 2 4 6 Edge
low complexity computing
12 Extremely high 4 2 6 Edge
timeliness, high computing
complexity
13 Low timeliness, 3 3 6 Edge
moderate complexity computing
14 High timeliness, low 3 4 7 Edge
complexity computing
15 Extremely high 4 3 7 Edge
timeliness, moderate computing
complexity
16 Extremely high 4 4 8 Edge
timeliness, low computing
complexity
    • S10: storing, by the edge node, computations of which the values or comprehensive ranks R are 5, 6, 7, 8 locally;
    • S11: sending, by the edge node, computations of which the values of comprehensive ranks R are 2, 3, 4 to the cloud power management center,
    • S12: executing, by the edge node, the computations of which the values of comprehensive ranks R are 5, 6, 7, 8, and saving computing results locally; executing, by the cloud power management center, the computations of which the values of comprehensive ranks are 2, 3, 4 sent by the edge node;
    • S13: returning, by the cloud power management center, the computing results to the edge node;
    • S14: executing, by the edge node, a demand response algorithm;
    • S15: sending, by the edge node, the power consumption scheme Schemei to the field node, and sending the power supply scheme Schemep to the power supply proxy;
    • S16: sending, by the field node, the Schemei to the production device to execute production tasks; controlling, by the power supply proxy, the power generation station in factory, the power storage station in factory and the power supply station outside factory to execute corresponding schemes;
    • Step 17: storing, by the edge node, the schemes in the cloud power management center simultaneously to be used as a reference for future operation schemes.
Further, step S1 specifically comprises:
    • (1) Storing, by a factory power system manager, the STN task model Mt in production field in the cloud power management center in advance, Mt={Task number−i, Electricityi=Ei}, where Ei represents electricity consumption required to run a task I in unit time.
    • (2) Storing the power generation model Mg, the power storage model Ms, and the power price model Mp of the power supply side in the power supply proxy in advance.
    • (3) Computing algorithm complexities: testing, by the factory power system manager, all algorithms that need to be executed on a computer on the edge node, analyzing algorithm complexity attributes as {extremely high complexity, high complexity, moderate complexity, low complexity} in the case of comprehensive consideration of space complexity and time complexity; grading the algorithms according to the algorithm complexity attributes, denoted by O; algorithm complexity ranks corresponding to Table 1, O∈[1-4], and marking values of O at algorithm heads.
The algorithm complexities are divided into 4 ranks and the algorithm complexities progressively decrease in order, rank 1 indicates that the algorithm complexity is extremely high, and rank 4 indicates that the algorithm complexity is low. For different algorithm complexities, computation time thereof are different, and storage spaces occupied when computation is executed are different. Complexity attributes corresponding to complexity ranks are shown in Table 1.
TABLE 1
Algorithm complexity rank
Algorithm complexity Algorithm complexity
rank attribute
O = 1 Extremely high
complexity
O = 2 High complexity
O = 3 Moderate complexity
O = 4 Low complexity
Further, step S2 specifically comprises: collecting from the production device, by the field node, data frame information tables {Task_number, Ti, protocol, ID, data_source, Task_type} respectively representing task number, task execution time, industrial protocol, network ID, data source address, and task type; marking, by the field node, data frames with different timeliness ranks according to the task type Task_type in the data frame information tables in an MAC layer, so the marked frame information tables become {Task_number, Ti, protocol, ID, data_source, Task_type, TIME_priority}, where TIME_priority∈[1-4]; TIME_priority represents data timeliness ranks, and data attributes represented by values thereby are shown in Table 2. Values of TIME_priority correspond to 4 timeliness ranks, rank 1 to rank 4 in sequence, priority ranks progressively increase in order, 1 indicates that the requirement for timeliness is not high, 4 indicates that the requirement for timeliness is extremely high. Timeliness attributes corresponding to timeliness ranks are shown in Table 2.
TABLE 2
Data Timeliness Ranks
Timeliness rank Timeliness attribute
TIME_priority = 1 Low
TIME_priority = 2 Moderate
TIME_priority = 3 High
TIME_priority = 4 Extremely high
Further, in step S3, Ip may be parsed from the frame information tables, Ip={Task_number−i, i∈N*, Ti, Ti∈R+}, where i represents task number, and Ti represents task execution time.
Further, in step S14, inputs of the demand response algorithm are the electricity demand Ed, the power generation model Mg, the power storage model Ms, and the power price model Mp; and outputs are the power consumption scheme Schemei, and the power supply scheme Schemep;
    • 1) in combination with the production task information data Ip and the STN task model Mt, the electricity demand Ed is computed:
E d = i T i E i ;
    • 2) the power generation model is Ms={Es,Esp,Ss,Ts,Ps}, where Pg represents power generation cost in unit time of one generator, xg represents number of generators that need to run in the factory, Eg represents power supply amount in unit time of the power generation station in factory, and Tg represents power generation time of each generator;
    • 3) the power storage model is Ms={Es, Esp, Ss, Ts, Ps}, where it is assumed that charging power of a power storage machine is Es, discharging power Esp is the current device power, and charging is performed only when the power supply station outside the factory supplies power, Ss represents state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state, Ts represents time the power storage machine is in the charging/discharging state, and Ps represents power price when the power storage machine is charged;
    • 4) the power price model is Mp−{P, Ep}, where P represents price of power supplied to the factory, and Ep represents power supply amount per unit time of the power station outside the factory;
    • 5) after computing all results, the edge node generates a power consumption scheme Schemei, Schemei={Task_number=i, i∈N*; T_exe; Period; T_exe, Period∈R+}, where Task_number represents task number, T_exe represents task execution time, and Period represents task execution duration;
    • 6) after computing all results, the edge node generates a power supply scheme Schemep, Schemep={xg, Tg, Ss, Ts, P, Sp, Tp_01, Tp_10}, where
    • xg represents number of generators that need to run in the power station in factory;
    • Tg represents power generation time of each generator;
    • Ss represents a state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state;
    • Ts represents time the power storage machine is in the charging/discharging state;
    • P represents current power price;
    • Sp represents a power supply state of the power station outside factory, Sp=00 represents that the power station is in a sleep state, Sp=01 represents that the power station only supplies power to the production device, Sp=10 represents that the power station only supplies power to the power storage station, and Sp=11 represents that the power station supplies power to both the device layer and the power storage station;
    • Tp_Sp represents power supply time in the Sp state, Tp_01 represents time to supply power to the production device only, and Tp_10 represents time to supply power to the power storage station only;
    • 7) computing according to following formulae
      E d =E sp *T s +T p_01*E p +E g *T g
      C=T p10*P s +T p01*P+x g *P g *T g
    • in the case where an electricity demand Ed of a power consumption side is satisfied, if it is computed that the above two formulae are satisfied, a parameter combination with small C is selected as a final scheme;
    • 8) generating schemes: after the above computation, a power consumption scheme Schemei and a power supply scheme Schemep are generated.
The present invention has the following beneficial effects:
Edge-cloud coordination computing improves timeliness: in this solution, the edge nodes locally process the production task data from the device layer, and form a real-time feedback control loop with a field device, so the management and control efficiency is effectively improved, the instruction transmission time is shortened, and power supply and power consumption schemes are generated in real time, and are provided to the production device and various power stations of the power supply side for execution. According to the method, the power data of a power plant and the generated schemes can be stored in the cloud, and then the subsequent scheme generation time can be shortened. According to the method, by using the advantages of edge computing and cloud computing, algorithm complexities and data timeliness are ranked, and comprehensive ranks are obtained. Computations of which the comprehensive ranks are 2, 3, 4 are uploaded to the cloud for execution, and computations of which the comprehensive ranks are 5, 6, 7, 8 are placed at the edge for localization execution. On the premise of increasing the timeliness of the entire power management and control system, schemes are updated in real time, and scheme generation time and instruction transmission time are shortened, thereby reducing power consumption costs. Compared with a centralized scheduling mechanism, timeliness may greatly improve the performance of the power management and control system.
Joint scheduling of power supply-power consumption increases flexibility: in this solution, a power consumption side and a power supply side are jointly scheduled, so not only “peak-load shifting” is achieved, that is, when the power price is low, not only high-power device is turned on at the device layer, but also a charging function of the power storage system is enabled at the power supply side. When the power price is high, a low-power device is turned on at the device layer, and a discharging function of the power storage system is enabled systematically at the power supply side. The cost reduction of the power consumption side is mainly achieved by adding production tasks when the power price is low, and the cost reduction of the power supply side is achieved by charging the power storage station when the power price is low, and discharging the power storage station when the power price is high. Compared with the centralized scheduling mechanism, simultaneous scheduling of power supply and power consumption can significantly improve the performance of the power management and control system.
Edge-cloud coordination distributed computing improves security: in this solution, the main computing tasks are completed by the edge nodes, since the edge nodes are distributed dispersedly, even if the security of several edge nodes is threatened, the tasks are then executed by other edge nodes, having little impact on the entire power management and control system. Compared with centralized scheduling, in case of breakdown of a centralized scheduling center, the entire production system may suffer from a fatal blow. Therefore, the edge-cloud coordination technology can improve the security of the power management and control system.
Other advantages, objectives and features of the present invention will be illustrated in the following description to some extent, and will be apparent to those skilled in the art based on the following investigation and research to some extent, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description.
DESCRIPTION OF DRAWINGS
To enable the purpose, the technical solution and the advantages of the present invention to be more clear, the present invention will be preferably described in detail below in combination with the drawings, wherein:
FIG. 1 is a structural schematic diagram of the factory power management and control system based on edge-cloud coordination of the present invention;
FIG. 2 is a flow chart of the factory power management and control method based on edge-cloud coordination of the present invention; and
FIG. 3 is a flow diagram of the demand response algorithm of the present invention.
DETAILED DESCRIPTION
Embodiments of the present invention are described below through specific embodiments. Those skilled in the art can understand other advantages and effects of the present invention easily through the disclosure of the description. The present invention can also be implemented or applied through additional different specific embodiments. All details in the description can be modified or changed based on different perspectives and applications without departing from the spirit of the present invention. It should be noted that the figures provided in the following embodiments only exemplarily explain the basic conception of the present invention, and if there is no conflict, the following embodiments and the features in the embodiments can be mutually combined.
Wherein the drawings are only used for exemplary description, are only schematic diagrams rather than physical diagrams, and shall not be understood as a limitation to the present invention. In order to better illustrate the embodiments of the present invention, some components in the drawings may be omitted, scaled up or scaled down, and do not reflect actual product sizes. It should be understandable for those skilled in the art that some well-known structures and description thereof in the drawings may be omitted.
Same or similar reference signs in the drawings of the embodiments of the present invention refer to same or similar components. It should be understood in the description of the present invention that terms such as “upper”, “lower”, “left”, “right”, “front” and “back” indicate direction or position relationships shown based on the drawings, and are only intended to facilitate the description of the present invention and the simplification of the description rather than to indicate or imply that the indicated device or element must have a specific direction or constructed and operated in a specific direction, and therefore, the terms describing position relationships in the drawings are only used for exemplary description and shall not be understood as a limitation to the present invention; for those ordinary skilled in the art, the meanings of the above terms may be understood according to specific conditions.
On the one hand, the present invention provides a factory power management and control system based on edge-cloud coordination, as shown in FIG. 1 , including a cloud power management layer, an edge computing layer, a device layer and a power supply side,
    • wherein the cloud power management layer includes a cloud power management center and an industrial cloud server, wherein the cloud power management center is used to execute a part of computing tasks and return computing results to an edge node, and is also used to store an STN task model in production field and issue same to the edge node; and the industrial cloud server is used to store power supply and power consumption schemes generated by the edge node, to use same as a reference in scheme generation process in the future;
The edge computing layer includes a plurality of edge nodes, wherein the edge nodes are used to: {circle around (1)} compute an electricity demand Ed required for production task; {circle around (2)} compute an electricity demand required to complete established production tasks according to the STN task model information issued by the cloud power management center and real-time task information sent by a factory device layer; {circle around (3)} receive power supply information data from the power supply side, including a real-time power price model, a power storage model and a power generation model; {circle around (4)} judge algorithm complexity ranks O, judge data timeliness ranks TIME_priority, and compute comprehensive ranks R; {circle around (5)} send a part of computing tasks to the cloud power management center according to the comprehensive ranks R, accept computing results of this part, and perform computing of a remaining part of tasks at the edge node; {circle around (6)} comprehensively obtain a power consumption scheme Schemei and a power supply scheme Schemep according to computing results; {circle around (7)} send the power consumption scheme Schemep to the factory device layer to execute production tasks, and send the power supply scheme to the power supply side to execute power supply tasks;
    • the device layer includes a field node, a routing node and production device, wherein production information about the production device is collected by an industrial field network formed by the field node, and is sent to the edge node by the routing node; the power consumption scheme from the edge node is received by the routing node, and the device layer is controlled to execute production tasks according to the scheme; the production device, that is, a device that executes a plan in industrial field, is used to execute production tasks in the power consumption scheme;
    • the power supply side includes a power supply proxy, a power station outside factory, a power generation station in factory and a power storage station in factory, wherein the power supply proxy is used to store a power price model of the power station outside factory, a power generation model of the power generation station in factory, and a power storage model of the power storage station in factory, and if any model is updated, send same to the edge node; the power station outside factory is used to connect a power grid of the factory, and supply power to the factory; the power generation station in factory, as a self-built power generation station of the factory, is used to supply power to the factory; the power storage station in factory is used to store power when power price is low, and supplies power to the factory when power price is high.
On the other hand, as shown in FIG. 2 , the present invention provides a factory power management and control method based on edge-cloud coordination. The design of the factory power management and control method based on edge-cloud coordination will be described in detail below in combination with examples. Aiming at the situation where there is a need to quickly generate a power supply scheme and a power consumption scheme at an edge node in an industrial field, the present invention provides specific embodiments of the patent.
Preparations are made first:
    • (1) storing, by a factory power system manager, the STN task model Mt in production field in the cloud power management center in advance, Mt={Task_number=i, Electricityi=Ei}, where i represents task number, and electricity consumption per hour may be computed in KWH, so the electricity consumption of each task can be directly expressed by power. Four tasks Task_number={1, 2, 3, 4} are required to be completed in the production flow, where task 4 is required to run all the while. Let E1=5 KW, E2=10 KW, E3=30 KW, E4=50 KW.
    • (2) Storing the power generation model={Pg=1.0 Yuan/KWH, xg, Eg, Tg} of the power supply side; the power storage model Ms={Es=6.25 KW, Esp, Ss, Ts, Ps}, with the charging power is 6.25 KW, and the maximum capacity of the power storage station is 50 KWH, that is, the power storage station can be fully charged in 8 h; and the power price model Mp (as shown in Table 4), with the discharging probability Esp is the power of the current power consumption device, in the power supply proxy in advance.
TABLE 4
Power price model
Time period Power price (Yuan/KWH)
 8:00-11:30  Ppeak = 1.5
18:30-23:00
7:00-8:00 Pflat = 0.8
11:30-18:30
23:00-7:00  Pvalley = 0.5
    • (3) Computing algorithm complexities: testing, by the factory power system manager, all algorithms that need to be executed on a computer on the edge node, and marking values of the algorithm complexity O at algorithm heads.
Step 1: collecting from the production device, by the field node, data frame information tables {Task_number, Ti, protocol, ID, data_source, Task_type, TIME_priority} respectively representing task number, task execution time, industrial protocol, network ID, data source address, task type, and timeliness rank. After the field node parses collected data frames, following task information may be obtained.
TABLE 5
Task model
Task_number Ti protocol ID data_source Task_type TIME_priority
1 1 h WIA-PA R1 Manipulator Ingredient 1
arm 1 mixing
2 2 h WIA-PA R2 Manipulator Grasp 2
arm 2
3 3 h WIA-PA R3 Manipulator Assembly 3
arm 3
4 4 h WIA-PA R4 Manipulator Plastic 4
arm 4 package
Step 2, parsing, by the field node, production task information data Ip and sending same to the edge node. Ip may be parsed from the frame information tables, Ip={(Task_numnber=1, Ti=1); (Task_number=2, Ti=2); (Task_number=3, Ti=3); (Task_number=4, Ti=4)}, where i represents task number, and Ti represents task execution time. Four tasks Task_number={1, 2, 3, 4} are required to be completed in the production flow, where task 4 is required to run all the while.
Step 3: issuing, by the cloud power management center, an STN model Mt={(1.5 KW); (2.10 KW); (3.30 KW); (1.50 KW);} in production field to the edge node.
Step 4: sending, by the power supply proxy of the power supply side, the power generation model Mg, the power storage model Ms and the power price model Mp to the edge node.
Step 5: computing, by the edge node, an electricity demand Ed required to complete these production tasks according to the production task information data Ip and the STN task model Mt.
E d=1*5 KW+2*10 KW+3*30 KW+4*50 KW=315 KWH
Step 6: searching, by the edge node, an algorithm head to obtain values of O.
Step 7: judging, by the edge node, data timeliness ranks through values of TIME_priority in data frames according to Table 1 to obtain TIME_priority(1)=1; TIME_priority(2)=2; TIME_priority(3)=3; TIME_priority(4)=4.
Step 8: computing, by the edge node, values of comprehensive ranks R through values of algorithm complexity ranks O and values of the data timeliness ranks TIME_priority according to Table 3.
Step 9: storing, by the edge node, computations of which the values of comprehensive ranks R are 5, 6, 7, 8 locally.
Step S10: sending, by the edge node, computations of which the values of comprehensive ranks R are 2, 3, 4 to the cloud power management center.
Step S11: executing, by the edge node, the computations of which the values of comprehensive ranks R are 5, 6, 7, 8, and saving computing results locally; executing, by the cloud power management center, the computations of which the values of comprehensive ranks are 2, 3, 4 sent by the edge node.
Step 12: returning, by the cloud power management center, the computing results to the edge node.
Step 13: executing, by the edge node, a demand response algorithm.
As shown in FIG. 3 , inputs of the demand response (DR) algorithm are the electricity demand Ed, the power generation model Mg, the power storage model Ms, and the power price model Mp; and outputs are the power consumption scheme Schemei, and the power supply scheme Schemei.
(1) Electricity Demand Ed
In combination with the production task information data Ip and the STN task model Mt, the electricity demand Ed may be computed. 1, may be parsed from the frame information tables, Ip={Task_number=i, i∈N*, Ti, Ti∈R+}, where i represents task number, and Ti represents task execution time; Mt={Task_number=i, Electricityi=Ei}, where Ei represents electricity consumption required to run a task i in unit time.
Electricity demand
E d = i T i E i .
(2) Power Generation Model Mg
Here, it is assumed that the power generation system is powered by diesel oil and natural gas, the power generation model is computed from the price of power generation materials consumed by the generator per unit time, and it is assumed that the cost of power generation per unit time of one generator is Pg. It is assumed that the number of generators that need to run in the factory is xg. In this part, the costs of starting and shutting down an engine are ignored. Eg represents the power supply amount per unit time of the power generation station in the factory, and Tg represents the power generation time of each generator. Therefore, the power generation model is
Mg={Pg,xg,Eg,Tg}
(3) Power Storage Model Ms
It is assumed that the charging power of one power storage machine is Es, the discharging power Esp is the current device power, and charging is performed only when the power supply station outside factory supplies power. Ss represents a state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state. Ts represents time the power storage machine is in the charging/discharging state, and Ps represents power price when the power storage machine is charged. Therefore, the power storage model is
Ms={Es,Esp,Ss,Ts,Ps}
(4) Power Price Model Mp
The power price model depends on the situation of an external power supply unit, including a Day-ahead power price model, a real-time power price model and a segmented power price model in general. P represents the price of power supplied to the factory. Ep represents power supply amount per unit time of the power station outside factory. Therefore, the power price model is
M p ={P,E p}
(5) Power Consumption Scheme Schemer
After computing all results, the edge node may generate Schemei. Schemei={Task_number=i, i∈N*; T_exe; Period; T_exe, Period∈R+}, where Task_number represents task number, T_exe represents task execution time, and Period represents task execution duration.
(6) Power supply scheme Schemep
After computing all results, the edge node may generate Schemep. Schemep={xg, Tg, Ss, Ts, P, Sp, Tp_01, Tp_10}.
    • xg represents number of generators that need to run in the power station in factory;
    • Tg represents power generation time of each generator;
    • Ss represents a state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state;
    • Ts represents time the power storage machine is in the charging/discharging state;
    • P represents current power price;
    • Sp represents a power supply state of the power station outside factory, Sp=00 represents that the power station is in a sleep state, Sp=01 represents that the power station only supplies power to the production device, Sp=10 represents that the power station only supplies power to the power storage station, and Sp=11 represents that the power station supplies power to both the device layer and the power storage station. Tp_Sp represents the power supply time in the Sp state, Tp_01 represents the time to supply power to the production device only, and Tp_10 represents the time to supply power to the power storage station only.
(7) Computing According to Following Formulae:
E d =E sp *T s +T p_01*E p +E g *T g
C=T p10*P s +T p01*P+x g *P g *T g
in the case where an electricity demand Ed of the power consumption side is satisfied, it is computed that when the above two formulae are satisfied, a parameter combination with small C is selected as a final scheme.
(8) Generating Schemes:
after the above computation, a power consumption scheme Schemei and a power supply scheme Schemep are generated.
In this embodiment:
    • 1) electricity demand Ed=315 KWH
    • 2) power generation model Mg={Pg=1.0 Yuan/KWH, xg, Eg, Ti}
    • 3) power storage model Ms={Es=6.25 KW, Esp, Ss, Ts, Ps}
    • 4) Power price model Mp={P, Ep}
According to formulae
E d =E sp *T s +T p_01*E p +E g *T g
C=T p_10*P s +T p_01*P+x g *P g T g
in the case where an electricity demand of the power consumption side is satisfied, it is computed that when the above two formulae are satisfied, a parameter combination with small C is selected as a final scheme.
(5) Generating Schemes:
after the above computation, a power consumption scheme Schemes and a power supply scheme Schemep are generated. There are multiple specific schemes, one of which is listed in Table 6. The scheme is a task execution scheme or a power supply scheme to complete 6 production processes within 24 hours a day. The 6 production processes refer that task 1 is executed for 6 h, task 2 is executed for 12 h, task 3 is executed for 18 h, and task 4 is executed for 24 h without interruption.
TABLE 6
Power consumption scheme and power supply scheme
7:00-8:00 8:00-11:30 11:30-18:30 18:30-23:00 23:00-7:00
Task_number T_exe Period T_exe Period T_exe Period T_exe Period T_exe Period
Power 1 Sleep 0 H Sleep 0 H Sleep 0 H Sleep 0 H 23:00 6 H
consumption 2 Sleep 0 H Sleep 0 H 11:30 4 H Sleep 0 H 23:00 8 H
scheme 3 Operation 1 H Operation 0 H 11:30 7 H 21:00 2 H 23:00 8 H
4 Operation 1 H Operation 3.5 H   Operation 7 H Operation 4.5 H   Operation 8 H
Power Power xg 0 5 0 5 0
supply generation Tg 0 3.5 H   0 4.5 H   0
scheme station
Power Ss 1 (charging) 0 (discharging) 1 (charging) 0 (discharging) 1 (charging)
storage Ts 1 H   1 H[1] 7 H   1 H[1] 8 H
station
Power P Pflat = 0.8 Ppeak = 1.5 Pflat = 0.8 Ppeak = 1.5 Pvalley = 0.5
station Yuan/KWH Yuan/KWH Yuan/KWH Yuan/KWH Yuan/KWH
outside Sp 11  01  11  01  11 
factory Tp 01 1 H 2.5 H   7 H 3.5 H   8 H
Tp 10 1 H 0 H 7 H 0 H 8 H
Note 1:
When and only when the power storage station is fully charged, it can supply power for task 4 for 1 h.
Step 14: sending, by the edge node, the power consumption scheme Schemei to the field node, and sending, by the edge node, the power supply scheme Schemep to the power supply proxy.
Step 15: further sending, by the field node, Scheme; to the production device to execute production tasks; controlling, by the power supply proxy, the power generation station in factory, the power storage station in factory, and the power supply station outside factory to execute corresponding schemes.
Step 16, storing, by the edge node, the schemes in the cloud power management center simultaneously to be used as a reference for future operation schemes.
Finally, it should be noted that the above embodiments are only used for describing, rather than limiting the technical solution of the present invention. Although the present invention is described in detail with reference to the preferred embodiments, those ordinary skilled in the art shall understand that the technical solution of the present invention can be amended or equivalently replaced without departing from the purpose and the scope of the technical solution. The amendment or equivalent replacement shall be covered within the scope of the claims of the present invention.

Claims (6)

What is claimed is:
1. A factory power management and control system based on edge-cloud coordination, comprising a cloud power management layer, an edge computing layer, a device layer and a power supply side,
wherein the cloud power management layer includes a cloud power management center and an industrial cloud server, wherein the cloud power management center is used to execute a part of computing tasks and return computing results to an edge node, and is also used to store an STN task model in production field and issue same to the edge node; and the industrial cloud server is used to store power supply and power consumption schemes generated by the edge node, to use same as a reference in scheme generation process in the future;
the edge computing layer includes a plurality of edge nodes, wherein the edge nodes are used to: {circle around (1)} compute an electricity demand Ed required for production tasks; {circle around (2)} compute an electricity demand required to complete established production tasks according to STN task model information issued by the cloud power management center and real-time task information sent by a factory device layer; {circle around (3)} receive power supply information data from the power supply side, including a real-time power price model, a power storage model and a power generation model; {circle around (4)} judge algorithm complexity ranks O, judge data timeliness ranks TIME_priority, and compute comprehensive ranks R; {circle around (5)} send a part of computing tasks to the cloud power management center according to the comprehensive ranks R, accept computing results of this part, and perform computing of a remaining part of tasks at the edge node; {circle around (6)} comprehensively obtain a power consumption scheme Schemei and a power supply scheme Schemep according to computing results; {circle around (7)} send the power consumption scheme Schemep to the factory device layer to execute production tasks, and send the power supply scheme to the power supply side to execute power supply tasks;
the device layer includes a field node, a routing node and a production device, wherein production information about the production device is collected by an industrial field network formed by the field node, and is sent to the edge node by the routing node; the power consumption scheme from the edge node is received by the routing node, and the device layer is controlled to execute production tasks according to the scheme; the production device, that is, a device that executes a plan in industrial field, is used to execute production tasks in the power consumption scheme;
the power supply side includes a power supply proxy, a power station outside factory, a power generation station in factory and a power storage station in factory, wherein the power supply proxy is used to store a power price model of the power station outside factory, a power generation model of the power generation station in factory, and a power storage model of the power storage station in factory, and if any model is updated, send same to the edge node; the power station outside factory is used to connect a power grid of the factory, to supply power to the factory; the power generation station in factory, as a self-built power generation station of the factory, is used to supply power to the factory; the power storage station in factory is used to store power when power price is low, and supply power to the factory when power price is high.
2. A factory power management and control method based on edge-cloud coordination, comprising following steps:
S1: storing an STN task model Mt in production field in the cloud power management center, storing a power generation model Mg, a power storage model Ms, and a power price model Mp of the power supply side in the power supply proxy, and specifying algorithm complexity ranks;
S2. forming an industrial field network by a field node, a routing node and a device executing production tasks of the device layer,
S3. parsing, by the field node, production task information data Ip and sending same to an edge node;
S4: issuing, by the cloud power management center, an STN model in production field to the edge node;
S5: sending, by the power supply proxy of the power supply side, the power generation model M b, the power storage model Ms and the power price model Mp to the edge node;
S6: computing, by the edge node, an electricity demand Ed required to complete these production tasks according to the production task information data Ip and the STN task model Mt;
S7: judging, by the edge node, algorithm complexity ranks according to values of algorithm head O;
S8: judging, by the edge node, data timeliness ranks through attribute values of data frames;
S9: computing, by the edge node, values of comprehensive ranks R according to values of algorithm complexity ranks O and values of the data timeliness ranks TIME_priority;
Serial Timeliness Algorithm Comprehensive Edge-cloud number Computing category rank complexity rank coordination 1 Low timeliness, 1 1 2 Cloud extremely high computing complexity 2 Moderate timeliness, 2 1 3 Cloud extremely high computing complexity 3 Low timeliness, high 1 2 3 Cloud complexity computing 4 Moderate timeliness, 2 2 4 Cloud high complexity computing 5 Low timeliness, 1 3 4 Cloud moderate complexity computing 6 Low timeliness, 3 1 4 Cloud extremely high computing complexity 7 Low timeliness, low 1 4 5 Edge complexity computing 8 Low timeliness, 4 1 5 Edge extremely high computing complexity 9 Moderate timeliness, 2 3 5 Edge moderate complexity computing 10 Low timeliness, high 3 2 5 Edge complexity computing 11 Moderate timeliness, 2 4 6 Edge low complexity computing 12 Extremely high 4 2 6 Edge timeliness, high computing complexity 13 Low timeliness, 3 3 6 Edge moderate complexity computing 14 High timeliness, low 3 4 7 Edge complexity computing 15 Extremely high 4 3 7 Edge timeliness, moderate computing complexity 16 Extremely high 4 4 8 Edge timeliness, low computing complexity
S10: storing, by the edge node, computations of which values of comprehensive ranks R are 5, 6, 7, 8 locally;
S11: sending, by the edge node, computations of which the values of comprehensive ranks R are 2, 3, 4 to the cloud power management center;
S12: executing, by the edge node, the computations of which the values of comprehensive ranks R are 5, 6, 7, 8, and saving computing results locally; executing, by the cloud power management center, the computations of which the values of comprehensive ranks are 2, 3, 4 sent by the edge node;
S13: returning, by the cloud power management center, the computing results to the edge node;
S14: executing, by the edge node, a demand response algorithm;
S15: sending, by the edge node, a power consumption scheme Schemei to the field node, and sending a power supply scheme Schemep to the power supply proxy;
S16: sending, by the field node, the Schemei to the production device to execute production tasks; controlling, by the power supply proxy, the power generation station in factory, the power storage station in factory, and the power supply station outside factory to execute corresponding schemes;
Step 17, storing, by the edge node, the schemes in the cloud power management center simultaneously to be used as a reference for future operation schemes.
3. The factory power management and control method based on edge-cloud coordination according to claim 2, characterized in that step S1 specifically comprises:
storing the STN task model Mg in production field in the cloud power management center, Mt={Task_number=i, Electricityi-Ei}, where Ei represents electricity consumption required to run a task i in unit time;
storing the power generation model Mg, the power storage model Ms and the power price model Mp of the power supply side in the power supply proxy;
computing algorithm complexities: testing all algorithms that need to be executed on a computer on the edge node, analyzing algorithm complexity attributes as (extremely high complexity, high complexity, moderate complexity, low complexity) in the case of comprehensive consideration of space complexity and time complexity, grading the algorithms according to the algorithm complexity attributes, denoted by O, algorithm complexity ranks corresponding to Table 1, O∈[1-4], and marking values of O at algorithm heads, wherein the algorithm complexities are divided into 4 ranks and the algorithm complexities progressively decrease in order, rank 1 indicates that the algorithm complexity is extremely high, and rank 4 indicates that the algorithm complexity is low.
4. The factory power management and control method based on edge-cloud coordination according to claim 3, characterized in that step S2 specifically comprises: collecting from the production device, by the field node, data frame information tables {Task_number, Ti, protocol, ID, data_source, Task_type} respectively representing task number, task execution time, industrial protocol, network ID, data source address, and task type;
marking, by the field node, data frames with different timeliness ranks according to the task type Task_type in the data frame information tables in an MAC layer, so the marked frame information tables become {Task_number, Ti, protocol, ID, data_source, Task_type, TIME_priority}, where TIME_priority∈[1-4];
TIME_priority represents data timeliness ranks, and values thereof correspond to 4 timeliness ranks, rank 1 to rank 4 in sequence, priority ranks progressively increase in order, 1 indicates that the requirement for timeliness is not high, 4 indicates that the requirement for timeliness is extremely high.
5. The factory power management and control method based on edge-cloud coordination according to claim 4, characterized in that in step S3, Ip is parsed from the frame information tables, Ip={Task_number=i, i∈N*, Ti, Ti∈R+}, where i represents task number, and Ti represents task execution time.
6. The factory power management and control method based on edge-cloud coordination according to claim 5, characterized in that in step S14, inputs of the demand response algorithm are the electricity demand Ed, the power generation model Mg, the power storage model Ms, and the power price model Mp; and outputs are the power consumption scheme Schemei, and the power supply scheme Schemep;
a) in combination with the production task information data Ip and the STN task model Mt, the electricity demand Ed is computed:
E d = i T i E i ;
b) the power generation model is Mg={Pg, xg, Eg, Tg}, where Pg represents power generation cost in unit time of one generator, xg represents number of generators that need to run in the factory, Eg represents power supply amount in unit time of the power generation station in factory, and Tg represents power generation time of each generator;
c) the power storage model is Ms={Es, Esp, Ss, Ts, Ps}, where it is assumed that charging power of a power storage machine is Es, discharging power Esp is current device power, and charging is performed only when the power supply station outside factory supplies power, Ss represents a state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state, Ts represents time the power storage machine is in the charging/discharging state, and Ps represents power price when the power storage machine is charged;
d) the power price model is Mp{P, Ep}, where P represents price of power supplied to the factory, and Ep represents power supply amount per unit time of the power station outside factory;
e) after computing all results, the edge node generates a power consumption scheme Schemei, Schemei={Task_number=i, i∈N*; T_exe; Period; T_exe, Period∈R+}, where Task_number represents task number, T_exe represents task execution time, and Period represents task execution duration;
f) after computing all results, the edge node generates a power supply scheme Schemep, Schemep={xg, Tg, Ss, Ts, P, Sp, Tp_01, Tp_10}, where
xg represents number of generators that need to run in the power station in factory;
Tg represents power generation time of each generator;
Ss represents a state of the power storage machine, Ss=0 represents that the power storage machine is in a discharging state, Ss=1 represents that the power storage machine is in a charging state;
Ts represents time the power storage machine is in the charging/discharging state;
P represents current power price;
Sp represents a power supply state of the power station outside factory, Sp=00 represents that the power station is in a sleep state, Sp=01 represents that the power station only supplies power to the production device, Sp=10 represents that the power station only supplies power to the power storage station, and Sp=11 represents that the power station supplies power to both the device layer and the power storage station;
Tp_Sp represents power supply time in the Sp state, Tp_01 represents time to supply power to the production device only, and Tp_10 represents time to supply power to the power storage station only;
g) computing according to following formulae:

E d =E sp *T s +T p_01*E p +E g *T g

C=T p_10*P s +T p_01*P+x g *P g *T g
in the case where an electricity demand Ed of a power consumption side is satisfied, if it is computed that the above two formulae are satisfied, a parameter combination with small C is selected as a final scheme;
h) generating schemes: after the above computation, a power consumption scheme Schemei and a power supply scheme Schemep are generated.
US17/261,875 2019-12-11 2020-07-15 Factory power management and control system and method based on edge-cloud coordination Active 2041-08-22 US11822417B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201911270941.6 2019-12-11
CN201911270941.6A CN111144715B (en) 2019-12-11 2019-12-11 Factory electric energy management and control system and method based on edge cloud cooperation
PCT/CN2020/102200 WO2021114661A1 (en) 2019-12-11 2020-07-15 Plant electric energy management and control system and method based on edge-cloud cooperation

Publications (2)

Publication Number Publication Date
US20220187894A1 US20220187894A1 (en) 2022-06-16
US11822417B2 true US11822417B2 (en) 2023-11-21

Family

ID=70518086

Family Applications (1)

Application Number Title Priority Date Filing Date
US17/261,875 Active 2041-08-22 US11822417B2 (en) 2019-12-11 2020-07-15 Factory power management and control system and method based on edge-cloud coordination

Country Status (4)

Country Link
US (1) US11822417B2 (en)
KR (1) KR20220007644A (en)
CN (1) CN111144715B (en)
WO (1) WO2021114661A1 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111144715B (en) * 2019-12-11 2023-06-23 重庆邮电大学 Factory electric energy management and control system and method based on edge cloud cooperation
CN111928334A (en) * 2020-07-30 2020-11-13 瑞纳智能设备股份有限公司 Heat supply control method and system based on edge cloud cooperative framework and computer equipment
CN113315172B (en) * 2021-05-21 2022-09-20 华中科技大学 Distributed source load data scheduling system of electric heating comprehensive energy
CN113590368B (en) * 2021-06-25 2024-05-28 中国电力科学研究院有限公司 Abnormal equipment diagnosis method and system based on edge-to-edge coordination
CN113537011A (en) * 2021-07-06 2021-10-22 广西电网有限责任公司 Cloud edge fusion-based method for monitoring state of power transmission line of power tower
CN113534832B (en) * 2021-08-03 2024-03-15 国网江苏省电力有限公司泰州供电分公司 Unmanned aerial vehicle routing inspection tracking distribution network line flight method based on edge calculation
CN113934536B (en) * 2021-10-11 2022-08-16 中用科技有限公司 Data acquisition method facing edge calculation
CN114154777B (en) * 2021-10-18 2022-08-19 中标慧安信息技术股份有限公司 Industrial big data monitoring method and system based on edge calculation
CN114390055B (en) * 2021-12-08 2023-12-05 广东电网有限责任公司 Cloud edge cooperative data acquisition method and system suitable for power industry
CN114357743B (en) * 2021-12-22 2022-08-26 天津大学 Edge cloud collaborative optimization method and device for regional energy Internet
CN114285855B (en) * 2022-03-07 2022-05-24 济南英华自动化技术有限公司 Cloud edge cooperation method based on intelligent edge Internet of things
CN117040139B (en) * 2023-10-09 2023-12-22 江苏鼎豪电力工程有限公司 Electric energy management and control system and method based on big data analysis
CN117445735B (en) * 2023-12-25 2024-03-19 国网天津市电力公司武清供电分公司 Cloud-edge cooperative charging early warning method, equipment and medium
CN117590823B (en) * 2024-01-19 2024-03-26 江苏聚由新材料科技有限公司 Control system and control method based on safe production
CN118118526A (en) * 2024-04-23 2024-05-31 浙江大学 Cloud edge cooperative data acquisition and control method for new energy power station

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120029720A1 (en) * 2010-07-29 2012-02-02 Spirae, Inc. Dynamic distributed power grid control system
US20140277806A1 (en) * 2013-03-15 2014-09-18 Rockwell Automation Technologies, Inc. Extensible energy management architecture
US20190041960A1 (en) * 2018-06-19 2019-02-07 Francesc Guim Bernat Multi-tenant edge cloud system power management
US20220114010A1 (en) * 2021-12-22 2022-04-14 Francesc Guim Bernat Cooperative management of dynamic edge execution
US20220187894A1 (en) * 2019-12-11 2022-06-16 Chongqing University Of Posts And Telecommunications Factory power management and control system and method based on edge-cloud coordination
US20220197773A1 (en) * 2019-06-27 2022-06-23 Intel Corporation Automated resource management for distributed computing
US20220256320A1 (en) * 2019-04-17 2022-08-11 Sony Group Corporation Power management of movable edge computing servers
US20230156976A1 (en) * 2021-11-15 2023-05-18 Korea Electronics Technology Institute Adaptive temperature control method based on log analysis of chassis manager in edge server
US20230189058A1 (en) * 2020-07-02 2023-06-15 Intel Corporation Ran-aware traffic distribution rules and ran measurements for enhanced access traffic steering switching and splitting
US11679494B2 (en) * 2018-03-14 2023-06-20 Fedex Corporate Services, Inc. Modular multiple mobility base assembly apparatus for transporting an item being shipped

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104218683B (en) * 2014-10-11 2016-03-23 重庆邮电大学 A kind of closed loop self study demand response system and method
US10484913B2 (en) * 2015-06-29 2019-11-19 Ntt Docomo, Inc. Communication control method, communication control device, and communication system for causing readiness for movement of a communication terminal
JP7052218B2 (en) * 2017-05-19 2022-04-12 コニカミノルタ株式会社 Edge computing system, communication control method and communication control program
EP3416126A1 (en) * 2017-06-15 2018-12-19 Flex, Ltd. System and method for hybrid cloud-edge computing method for automated decision making and probabilistic occurrence
US20190079898A1 (en) * 2017-09-12 2019-03-14 Actiontec Electronics, Inc. Distributed machine learning platform using fog computing
CN109995546B (en) * 2017-12-29 2021-02-05 中国科学院沈阳自动化研究所 Intelligent factory automation system with edge computing and cloud computing cooperating
US10990068B2 (en) * 2018-05-29 2021-04-27 Abb Schweiz Ag Technologies for providing cloud-based management of an electrical grid
CN109557862A (en) * 2018-12-28 2019-04-02 苏州易助能源管理有限公司 A kind of photovoltaic plant power monitor device and method based on edge calculations
CN110111214B (en) * 2019-04-24 2021-09-10 北京邮电大学 User energy management method and system based on priority
CN110162018B (en) * 2019-05-31 2020-11-24 天津开发区精诺瀚海数据科技有限公司 Incremental equipment fault diagnosis method based on knowledge distillation and hidden layer sharing
CN110071579A (en) * 2019-06-05 2019-07-30 国网北京市电力公司 Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system
CN110336703A (en) * 2019-07-12 2019-10-15 河海大学常州校区 Industrial big data based on edge calculations monitors system
CN110430266B (en) * 2019-08-06 2021-07-13 腾讯科技(深圳)有限公司 Edge cloud cooperative data transmission method, device, equipment and storage medium

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120029720A1 (en) * 2010-07-29 2012-02-02 Spirae, Inc. Dynamic distributed power grid control system
US20140277806A1 (en) * 2013-03-15 2014-09-18 Rockwell Automation Technologies, Inc. Extensible energy management architecture
US11679494B2 (en) * 2018-03-14 2023-06-20 Fedex Corporate Services, Inc. Modular multiple mobility base assembly apparatus for transporting an item being shipped
US20190041960A1 (en) * 2018-06-19 2019-02-07 Francesc Guim Bernat Multi-tenant edge cloud system power management
US20220256320A1 (en) * 2019-04-17 2022-08-11 Sony Group Corporation Power management of movable edge computing servers
US20220197773A1 (en) * 2019-06-27 2022-06-23 Intel Corporation Automated resource management for distributed computing
US20220187894A1 (en) * 2019-12-11 2022-06-16 Chongqing University Of Posts And Telecommunications Factory power management and control system and method based on edge-cloud coordination
US20230189058A1 (en) * 2020-07-02 2023-06-15 Intel Corporation Ran-aware traffic distribution rules and ran measurements for enhanced access traffic steering switching and splitting
US20230156976A1 (en) * 2021-11-15 2023-05-18 Korea Electronics Technology Institute Adaptive temperature control method based on log analysis of chassis manager in edge server
US20220114010A1 (en) * 2021-12-22 2022-04-14 Francesc Guim Bernat Cooperative management of dynamic edge execution

Also Published As

Publication number Publication date
US20220187894A1 (en) 2022-06-16
CN111144715A (en) 2020-05-12
WO2021114661A1 (en) 2021-06-17
CN111144715B (en) 2023-06-23
KR20220007644A (en) 2022-01-18

Similar Documents

Publication Publication Date Title
US11822417B2 (en) Factory power management and control system and method based on edge-cloud coordination
CN107256443B (en) Line loss real-time computing technique based on business and data integration
Zhang et al. Optimal charging schemes for electric vehicles in smart grid: A contract theoretic approach
WO2023246568A1 (en) Digital twin architecture, model evaluation system, and model running method
Zhang et al. Task-driven manufacturing cloud service proactive discovery and optimal configuration method
CN104238466A (en) Smart power and energy using system platform based on Cloud of Things
Al-Agtash Electricity agents in smart grid markets
WO2018139043A1 (en) Distribution control system, distribution control method, power-system distribution control system, and power resource control method
Yan et al. Dynamic repair scheduling for transmission systems based on look-ahead strategy approximation
CN115934856A (en) Method and system for constructing comprehensive energy data assets
Ordouei et al. Optimization of energy consumption in smart city using reinforcement learning algorithm
Zhang et al. Meta-energy: When integrated energy Internet meets metaverse
Burgio et al. An IoT approach for smart energy districts
CN105631549A (en) Virtual power plant distributed model prediction control method under active power distribution network environment
CN109961376A (en) A kind of distributed energy storage apparatus management/control system and method
Chang et al. Research on key energy-saving technologies in green data centers
Sang et al. RALaaS: Resource-aware learning-as-a-service in edge-cloud collaborative smart connected communities
Xie et al. Research on comprehensive energy efficiency control and optimization technology for the internet of things for three-dimensional “common intelligence” visualization
CN105117486A (en) Power distribution network data processing method and device
Hu et al. A heuristic method for two-sided assembly line reconfiguration in IoT environment
Hu Research on real-time information exchange strategy of large data volume based on Internet of Things
Wang et al. Social networking and consumer preference based power peak reduction for safe smart grid
Wang et al. IoT and Big Data Technologies for Health Care: Second EAI International Conference, IoTCare 2021, Virtual Event, October 18-19, 2021, Proceedings, Part I
Chen et al. Learning Enabled Data Center Operation Scheme for Participating in Power Market
Tian et al. Integrated Demand Response Software for Multi-Energy Coordination

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT RECEIVED

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE