TWM542646U - Modular crane device applied to building roof floor - Google Patents

Modular crane device applied to building roof floor Download PDF

Info

Publication number
TWM542646U
TWM542646U TW106202063U TW106202063U TWM542646U TW M542646 U TWM542646 U TW M542646U TW 106202063 U TW106202063 U TW 106202063U TW 106202063 U TW106202063 U TW 106202063U TW M542646 U TWM542646 U TW M542646U
Authority
TW
Taiwan
Prior art keywords
building
roof
control box
device applied
hanging device
Prior art date
Application number
TW106202063U
Other languages
Chinese (zh)
Inventor
Chien-Wen Kao
Original Assignee
Chien-Wen Kao
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chien-Wen Kao filed Critical Chien-Wen Kao
Priority to TW106202063U priority Critical patent/TWM542646U/en
Publication of TWM542646U publication Critical patent/TWM542646U/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

應用於建築物樓頂地面的模組式吊掛裝置 Modular hanging device applied to the roof of a building

本新型涉及於一般建築物樓頂所安裝的吊掛器械,特別有關一種應用於建築物樓頂地面的模組式吊掛裝置。 The present invention relates to a hanging device installed on the roof of a general building, and more particularly to a modular hanging device applied to the roof of a building.

目前建築物外牆的清洗、修繕等維護作業,多半利用建築物樓頂所安裝的吊掛裝置,以纜繩懸吊維修平台或洗牆機等垂直升降於各樓層的外牆間。其中,維修平台可供洗牆工人或維修人員站立,以便於實施外牆的清洗或修繕的工作;而洗牆機則可藉其附設之自動刷輪對牆面進行滾洗作業。此外,又例如建築物各樓層之間,亦可利用上述安裝於樓頂的吊掛裝置垂降纜繩至地面,而後吊掛重物至所需樓層的窗孔,以利重物之搬運。 At present, the maintenance work of cleaning and repairing the external wall of the building is mostly carried out by using the hanging device installed on the roof of the building, and lifting it vertically between the outer walls of each floor with a cable suspension maintenance platform or a wall washer. Among them, the maintenance platform can be used by the wall washer or maintenance personnel to facilitate the cleaning or repair work of the external wall; and the wall washer can perform the roller washing operation on the wall by the attached automatic brush wheel. In addition, for example, between the floors of the building, the above-mentioned hanging device mounted on the roof can be used to hang the cable to the ground, and then the heavy object is hung to the window of the desired floor to facilitate the handling of the heavy objects.

此外,基於防盜保全上的考量,一般建築物頂樓地面都盡量不固定安裝上述附有升降覽線的吊掛裝置,而是於需求對外牆進行清洗或修繕前,才將附有升降覽線的吊掛裝置搬運至建築物的樓頂進行安裝;於安裝時,一般會依靠樓頂地面所延伸的女兒牆作撐持,而且可在樓頂地面上水平移動,以利於變換被吊掛物(例如維修平台、洗牆機或其它重物等)於外牆的水平位置,因此吊掛裝置一般都製成可推移型式;但是,以目前已見公開的吊掛裝置技術而言,其雖可推移,但卻不利於展收安裝,乃至於包括在車載搬運上,以及利用建築物有限的電梯空間載運至樓頂的過程中,皆百般艱辛,且窒礙難行。 In addition, based on the consideration of anti-theft security, the top floor of the general building is not fixed to the above-mentioned hanging device with the lifting line as much as possible, but the cleaning line is attached before the external wall is cleaned or repaired. The hanging device is transported to the roof of the building for installation; during installation, it is generally supported by the parapet wall extended by the roof floor, and can be horizontally moved on the floor of the building to facilitate the change of the suspended object (for example, maintenance) The platform, the wall washer or other heavy objects are placed in a horizontal position on the outer wall, so the hanging device is generally made into a slidable type; however, in view of the currently disclosed hanging device technology, although it can be moved, However, it is not conducive to the installation and installation, and even in the process of carrying on the vehicle, and using the limited elevator space to carry to the roof of the building, it is all hard and difficult.

習見的吊掛裝置,有例如台灣專利公告第 M444373案及第M507929案,分別揭露出呈現L型架體的吊掛結構,且概略上皆是由一可移動式載台上設置垂立支架,並由該垂立支架上架設可展縮長度的水平支架組構而成。這些吊掛結構的L型架體均屬利用螺絲等鎖固的型式,體積大,且結構複雜,並不利於模組安裝及拆卸;特別是該垂直支架、水平支架可展縮的作用,僅限於控制纜繩、水管及電線展伸至女兒牆外的距離,對於縮減吊掛結構於上述車載搬運及梯間搬運時的體積,並無助意,因此更不利於搬運。 I saw the hanging device, for example, the Taiwan Patent Notice In the M444373 case and the M507929 case, the hanging structure showing the L-shaped frame body is respectively exposed, and the hanging frame is arranged on a movable stage, and the length of the vertical stand is stretched from the vertical stand. The horizontal brackets are constructed. The L-shaped frame of these hanging structures are all locked by screws, etc., which are large in size and complicated in structure, which is not conducive to module installation and disassembly; in particular, the vertical bracket and the horizontal bracket can be expanded and contracted only It is limited to controlling the distance from the cable, water pipe and electric wire to the outside of the parapet wall. It is not helpful for reducing the volume of the hanging structure during the above-mentioned vehicle handling and stair transportation, so it is more unfavorable for handling.

有鑑於此,本新型之目的,旨在改善傳統吊掛裝置或結構欠缺模組化的展收及裝卸機能,乃至於不利車載搬運及梯間搬運的問題。 In view of this, the purpose of the present invention is to improve the conventional lifting and loading and unloading functions of the conventional hanging device or the structure, and it is also disadvantageous for the problem of vehicle handling and stair transportation.

為了實現上述目的並解決問題,本新型特別採用了模組化的載重箱並結合展縮式吊臂的創意,來改善吊掛裝置不利於車載搬運及梯間搬運的問題。 In order to achieve the above object and solve the problem, the present invention particularly adopts a modular load box and combines the idea of a telescopic boom to improve the problem that the hanging device is disadvantageous for vehicle handling and stair transportation.

為此,本新型之一較佳實施例,係提供一種應用於建築物樓頂地面的模組式吊掛裝置,其技術特徵包括:一吊臂,呈可雙軸向伸展及縮回的倒L形體;一載重箱,由多個各自獨立且能移動擺放於樓頂地面的控制箱相互併列模組而成,且所述多個控制箱的一側端牆分別模組所述吊臂挺立;其中,所述多個控制箱內分別配置有一繞線轉盤,且各該繞線轉盤所綑附之管線能經由各該控制箱所模組固定之吊臂的導引而延伸至建築物樓頂之一側女兒牆外進行升降。其中,該繞線轉盤可以是附具動力的捲揚機。 To this end, a preferred embodiment of the present invention provides a modular hanging device applied to the roof of a building. The technical features include: a boom that is biaxially stretchable and retractable. L-shaped body; a load box, which is formed by a plurality of control boxes which are independent and can be moved and placed on the floor of the building, and the side walls of the plurality of control boxes respectively form the boom Standing uprightly; wherein each of the plurality of control boxes is respectively provided with a winding turntable, and the pipelines bundled by the winding turntables can be extended to the building through the guiding of the fixed arms of the control box One side of the roof is lifted outside the side of the daughter's wall. Wherein, the winding turntable can be a powered winch.

在進一步實施上,所述多支吊臂分別由一垂框和一橫框相互一體連接而成,各該吊臂經由垂框而模組固定於各該控制箱的端牆,且所述垂框和橫框分別由多節可調伸縮長度的架桿組成。其中:所述垂框上配置有至少一水平伸縮式的止擋件 接觸女兒牆的牆面。所述垂框、橫框上配置有多個導引繞線轉盤所綑附之管線的自由滑輪。所述多個控制箱包含一纜線控制箱、一水管控制箱及一電線控制箱。 In a further implementation, the plurality of booms are respectively integrally formed by a vertical frame and a horizontal frame, and each of the booms is fixed to the end wall of each control box via a vertical frame, and the hanging body The frame and the horizontal frame are respectively composed of a plurality of adjustable telescopic length rods. Wherein: the horizontal frame is provided with at least one horizontal telescopic stop Touch the wall of the daughter's wall. A plurality of free pulleys guiding the pipelines to which the turntables are attached are disposed on the vertical frame and the horizontal frame. The plurality of control boxes include a cable control box, a water tube control box, and a wire control box.

更進一步的還包括:上述纜線控制箱的橫框一端延伸形成一遠離纜線控制箱的垂支架,該垂支架的近底部還樞設一水平向的滾筒,該纜線控制箱內之繞線轉盤所綑附的纜線依序經由所述自由滑輪及滾筒的導引而於女兒牆外進行升降。其中,該垂支架與垂框相互平行。 Furthermore, the one end of the horizontal frame of the cable control box extends to form a hanging bracket away from the cable control box, and a horizontal roller is pivoted near the bottom of the hanging bracket, and the cable is controlled in the box. The cable bundled by the turntable is sequentially lifted and lowered outside the parapet through the guide of the free pulley and the drum. Wherein, the vertical bracket and the vertical frame are parallel to each other.

另一實施上,所述多個控制箱的雙側面分別設有一扣耳及一扣環,所述多個控制箱經由扣耳及扣環的相互扣組而相互併列模組成該載重箱。此外,所述控制箱的端側設有一用於掛附配重塊的掛耳。 In another implementation, the two sides of the plurality of control boxes are respectively provided with a buckle and a buckle, and the plurality of control boxes are mutually juxtaposed to form the load box via the interlocking groups of the buckles and the buckles. Furthermore, the end side of the control box is provided with a mounting lug for attaching the counterweight.

依據上述實施內容,本新型的技術效果在於:吊掛裝置的載重箱是由多個內載繞線轉盤的控制箱模組而成,具有利於快速拆解搬運及模組安裝的方便性,且各個控制箱上所模組的展收式吊臂,除了具有展伸及收合之機能外,也利於縮減各個附掛有吊臂的控制箱的體積,因此特別合適於梯間搬運及車載搬運。 According to the above implementation, the technical effect of the present invention is that the load box of the hanging device is formed by a plurality of control box modules of the inner winding turntable, which has the convenience of quick disassembly handling and module installation, and In addition to the functions of stretching and folding, the lifting booms of the modules on each control box also help to reduce the volume of each control box with the boom attached, so it is especially suitable for inter-trailer handling and vehicle handling. .

除此之外,有關本新型可供據以實施的相關技術細節,將在後續的實施方式及圖式中加以闡述。 In addition, the relevant technical details that can be implemented by the present invention will be explained in the following embodiments and drawings.

10‧‧‧控制箱 10‧‧‧Control box

10a‧‧‧纜線控制箱 10a‧‧‧ Cable control box

10b‧‧‧水管控制箱 10b‧‧‧Water pipe control box

10c‧‧‧電線控制箱 10c‧‧‧Wire control box

11‧‧‧腳輪 11‧‧‧ casters

12‧‧‧繞線轉盤 12‧‧‧Wind turntable

13‧‧‧管線 13‧‧‧ pipeline

13a‧‧‧纜線 13a‧‧‧ Cable

13b‧‧‧水管 13b‧‧‧ water pipes

13c‧‧‧電線 13c‧‧‧Wire

14‧‧‧自由滑輪 14‧‧‧Free pulley

14a‧‧‧副滑輪 14a‧‧‧Secondary pulley

15a‧‧‧扣耳 15a‧‧‧ 耳耳

15b‧‧‧扣環 15b‧‧‧ buckle

16‧‧‧掛耳 16‧‧‧hanging ears

20‧‧‧吊臂 20‧‧‧Boom

21‧‧‧垂框 21‧‧‧ hanging frame

21a、21b‧‧‧架桿 21a, 21b‧‧‧ pole

22‧‧‧橫框 22‧‧‧ transverse frame

22a、22b‧‧‧架桿 22a, 22b‧‧‧ pole

23‧‧‧垂支架 23‧‧‧ vertical bracket

24‧‧‧滾筒 24‧‧‧Roller

30‧‧‧載重箱 30‧‧‧Loading box

40‧‧‧樓頂地面 40‧‧‧Floor floor

41‧‧‧女兒牆 41‧‧‧Daughter Wall

42‧‧‧止擋件 42‧‧‧stops

50‧‧‧配重塊 50‧‧‧weights

W‧‧‧重物 W‧‧‧ Heavy objects

h1、h2‧‧‧距離 H1, h2‧‧‧ distance

圖1是本新型控制箱附掛吊臂的立體配置示意圖;圖2是本新型由多個附掛吊臂之控制箱模組而成的立體配置示意圖;圖3是圖2的側面示意圖;圖4是圖2中吊臂的附加實施例的立體示意圖;圖5是圖4的側視解說圖。 1 is a perspective view showing a three-dimensional arrangement of a control box attached to a control arm; FIG. 2 is a perspective view showing a three-dimensional arrangement of a control box module with a plurality of attached booms; FIG. 3 is a side view of FIG. 4 is a perspective view of an additional embodiment of the boom of FIG. 2; and FIG. 5 is a side view of FIG.

首先,請合併參閱圖1至圖3,揭露本新型所提供之一種展收式吊掛裝置的較佳實施形態。其中,圖1揭露出該吊掛裝置包括有一個呈現中空矩形的控制箱10,且控制箱10的一側端牆上模組有一吊臂20呈挺立狀。圖2揭露出由多個模組有吊臂20之控制箱10相互併列模組成一載重箱30的形式。圖3揭露該吊臂20具備雙軸向伸展及縮回的機能,且於展伸時能伸探至女兒牆41外進行重物W的吊掛作業。 First, please refer to FIG. 1 to FIG. 3 together to disclose a preferred embodiment of a spread type hanging device provided by the present invention. 1 shows that the hanging device includes a control box 10 that presents a hollow rectangle, and one side end wall module of the control box 10 has a boom 20 that is standing upright. 2 shows a form in which a plurality of modular control boxes 10 having booms 20 are mutually juxtaposed to form a load box 30. FIG. 3 discloses that the boom 20 has a biaxially extending and retracting function, and can be extended to the outside of the parapet 41 during the stretching to carry out the lifting operation of the weight W.

由圖1及圖3可以見悉該吊臂20係製成呈可雙軸向伸展及縮回的倒L形體;更詳細的說,該吊臂20是由一垂框21和一橫框22相互一體連接而成,使該垂框21一體固定於各該控制箱10的端牆,且所述垂框21和橫框22可以分別由多節可調伸縮長度的架桿21a、21b、22a、22b組套而成;其中,垂框21的架桿21a、21b之間設有可對位的栓孔21c,且橫框22的架桿22a、22b之間也設有可對位的栓孔22c,該等栓孔21c、22c乃有利於架桿21a、21b及架桿22a、22b之間調整展伸後的對位長度,並於調整好所需長度之後於既定的栓孔21c、22c內穿套栓件加以定位,使得所述垂框21和橫框22具備可展伸及縮回的機能。 It can be seen from FIGS. 1 and 3 that the boom 20 is formed as an inverted L-shaped body that can be biaxially stretched and retracted; in more detail, the boom 20 is composed of a vertical frame 21 and a horizontal frame 22 The vertical frame 21 is integrally connected to the end wall of each of the control boxes 10, and the vertical frame 21 and the horizontal frame 22 can be respectively provided by a plurality of adjustable telescopic length rods 21a, 21b, 22a. The 22b is formed by a sleeve; wherein the rods 21a and 21b of the vertical frame 21 are provided with a alignable bolt hole 21c, and the erecting bolts are also arranged between the rods 22a and 22b of the horizontal frame 22. The hole 22c, the pin holes 21c, 22c facilitate the adjustment of the alignment length after the extension between the masts 21a, 21b and the masts 22a, 22b, and after the required length is adjusted, the predetermined bolt holes 21c, The sleeve 22 is positioned in the 22c so that the vertical frame 21 and the horizontal frame 22 have the function of being stretchable and retractable.

圖1還可見悉所述控制箱10底部皆設有多個腳輪11,使所述控制箱10能自由的在建築物的梯間或樓頂地面40移動,且所述控制箱10內皆載置有一繞線轉盤12,該繞線轉盤12綑附有管線13。在圖2中進一步揭露該等繞線轉盤12所綑附的管線13可以是纜線13a、水管13b或電線13c,所述管線13皆能經由繞線轉盤12的捲繞而控制其荷重下的出線量;其中,所述多個控制箱10內的繞線轉盤12可以全部或選擇其一的實施成是附具馬達動力的捲揚機,或者是實施成是內載有彈簧或阻尼器來控制出線量的繞線轉盤。圖2中還可以進一步見悉所述管線13能經由吊臂20的導引而垂降至建築物樓頂地面40之女兒牆41外,並且經由繞線轉盤 12控制管線13在荷重下的升降長度。更細微的說,構成該吊臂20之所述垂框21和橫框22間配置有多個導引繞線轉盤所綑附之管線13的自由滑輪14;所述管線13是經由吊臂20上自由滑輪14的導引而垂降至建築物樓頂地面40之女兒牆41外(如圖3或圖4所示)。 FIG. 1 also shows that a plurality of casters 11 are disposed at the bottom of the control box 10, so that the control box 10 can be freely moved in the ladder or the roof floor 40 of the building, and the control box 10 is loaded. A winding turntable 12 is disposed, and the winding turntable 12 is bundled with a line 13. It is further disclosed in FIG. 2 that the pipeline 13 to which the winding turntable 12 is attached may be a cable 13a, a water pipe 13b or a wire 13c, and the pipeline 13 can be controlled under the load via the winding of the winding turntable 12. The amount of wire exiting; wherein the winding turntables 12 in the plurality of control boxes 10 can be implemented in one or all of them to be a motorized hoist, or can be controlled by a spring or a damper. Wire winding turntable. It can further be seen in Figure 2 that the line 13 can be lowered by the guiding of the boom 20 to the outside of the parapet 41 of the building roof 40 and via the winding turntable. 12 controls the length of the rise and fall of the line 13 under load. More specifically, between the vertical frame 21 and the horizontal frame 22 constituting the boom 20, a plurality of free pulleys 14 for guiding the pipeline 13 to which the winding turntable is attached are disposed; the pipeline 13 is via the boom 20 The guide of the upper free pulley 14 descends to the outside of the parapet wall 41 of the floor 40 of the building (as shown in FIG. 3 or FIG. 4).

在上述實施中,當吊掛裝置所欲吊掛的物件為自動洗牆機時,如圖2所示,所述多個控制箱10包含有一纜線控制箱10a、一水管控制箱10b及一電線控制箱10c;其中,該纜線控制箱10a內之繞線轉盤12所綑附的管線為纜線13a,水管控制箱10b內之繞線轉盤12所綑附的管線為水管13b,且電線控制箱10c內之繞線轉盤12所綑附的管線為電線13c。 In the above implementation, when the object to be hung by the hanging device is an automatic wall washer, as shown in FIG. 2, the plurality of control boxes 10 include a cable control box 10a, a water tube control box 10b, and a a wire control box 10c; wherein the line to which the winding turntable 12 in the cable control box 10a is attached is a cable 13a, and the line to which the winding turntable 12 in the water pipe control box 10b is attached is a water pipe 13b, and the electric wire The line to which the winding turntable 12 in the control box 10c is attached is the electric wire 13c.

此外,圖2中所示纜線控制箱10a、水管控制箱10b及電線控制箱10c拼組成載重箱30的模組方式,可以憑藉如圖1所示中,於各個控制箱10的雙側面分別設有一扣耳15a及一扣環15b,使纜線控制箱10a、水管控制箱10b及電線控制箱10c之間經由扣耳15a及扣環15b的相互扣組而相互併列模組成該載重箱30。由於,吊掛洗牆機時需仰賴纜線控制箱10a內繞線轉盤12所綑附的纜線13a來進行吊掛,因此纜線13a所必須承受的洗牆機荷重遠大於水管13b及電線13c,基於維持載重箱30載重後之穩定性及平均荷重的需求,使於拼組載重箱30時,該纜線控制箱10a最好是併列於水管控制箱10b與電線控制箱10c之間。 In addition, the cable control box 10a, the water tube control box 10b, and the electric wire control box 10c shown in FIG. 2 are assembled into a modular manner of the load box 30, which can be respectively disposed on both sides of each control box 10 as shown in FIG. A buckle 15a and a buckle 15b are provided, so that the cable control box 10a, the water tube control box 10b and the wire control box 10c are mutually juxtaposed by the interlocking group of the buckle 15a and the buckle 15b to form the load box. 30. Since the hanging wall washer is attached to the cable 13a bundled by the winding turntable 12 in the cable control box 10a for hanging, the load of the wall washer that the cable 13a must bear is much larger than that of the water pipe 13b and the electric wire. 13c, based on the need to maintain the stability of the load box 30 after the load and the average load, the cable control box 10a is preferably juxtaposed between the water tube control box 10b and the electric wire control box 10c when the load box 30 is assembled.

另外,當於建築物樓頂地面40拼組完成載重箱30時(如圖2),該載重箱30是鄰近於女兒牆41,使得各垂框21能平行貼靠或盡量平行貼近於女兒牆41;由於,垂立於地表的女兒牆41的表面輪廓並非特定,因此,在一附加實施上,可於所述垂框21上配置至少一水平伸縮式的止擋件42,該止擋件42能由一螺栓桿的端部結合有橡膠墊製成,使該止擋件 42經由螺栓桿旋鎖於垂框21上調整適當水平長度,而令止擋件42的橡膠墊能推抵接觸女兒牆41的內側牆面(如圖3),以便吊掛裝置於荷重吊掛的操作過程中能具備良好的支撐強度。 In addition, when the load box 30 is assembled on the floor 40 of the building (as shown in FIG. 2), the load box 30 is adjacent to the parapet wall 41, so that the vertical frames 21 can be placed in parallel or as close as possible to the parapet wall. 41. Since the surface contour of the parapet wall 41 standing on the ground surface is not specific, in an additional implementation, at least one horizontal telescopic stopper 42 can be disposed on the vertical frame 21, the stopper 42 can be made of a rubber rod with the end of a bolt rod, so that the stopper 42 adjust the appropriate horizontal length by screwing the bolt to the vertical frame 21, so that the rubber pad of the stopper 42 can push against the inner wall surface of the parapet wall 41 (as shown in FIG. 3), so that the hanging device can be hung on the load. It has good support strength during the operation.

再者,由圖2可見悉所述任一或全部控制箱10的端側可設有一用於掛附配重塊50的掛耳16,在圖2所示實施中,舉例揭示於該纜線控制箱10a的端側來設置掛耳16用以掛附配重塊50,該配重塊50可以是法碼、沙包或水箱等。 Furthermore, it can be seen from FIG. 2 that the end side of any or all of the control boxes 10 can be provided with a mounting lug 16 for attaching the weight 50. In the embodiment shown in FIG. 2, the cable is disclosed by way of example. The end side of the control box 10a is provided with a mounting ear 16 for attaching the weight 50, which may be a code, a sandbag or a water tank or the like.

續請參閱圖4及圖5,揭露該纜線控制箱10a之橫框22的最外端延伸形成有一遠離纜線控制箱10a的垂支架23,使得該垂支架23也相對遠離女兒牆41的外側牆面,該垂支架23並與垂框21相互平行;此外,該垂支架23的近底部樞設有一水平向的滾筒24,以便於纜線控制箱10a內之繞線轉盤12所綑附的纜線13a依序經由垂框21、橫框22上的自由滑輪14以及垂支架23上的滾筒24的導引,而於女兒牆41外進行升降。更進一步的說,請參閱圖5,說明該滾筒24具有導正垂直升降之纜線13a的作用,以避免纜線13a朝女兒牆41(或大樓外牆)方向搖擺或晃動。 4 and FIG. 5, it is disclosed that the outermost end of the horizontal frame 22 of the cable control box 10a extends to form a hanging bracket 23 away from the cable control box 10a, so that the vertical bracket 23 is also relatively far from the parapet wall 41. The outer wall surface is parallel to the vertical frame 21; further, a horizontal roller 24 is pivotally disposed near the bottom of the vertical bracket 23 to facilitate the winding of the winding turntable 12 in the cable control box 10a. The cable 13a is sequentially lifted and lowered outside the parapet 41 by the guide frame 21, the free pulley 14 on the horizontal frame 22, and the roller 24 on the vertical bracket 23. Further, referring to Fig. 5, the drum 24 has a function of guiding the cable 13a that is vertically rising and falling to prevent the cable 13a from swinging or swaying toward the parapet 41 (or the exterior wall of the building).

綜上所陳,應當不難理解,由於所述多個內載有繞線轉盤的控制箱10之間可以相互併列扣組式的模組成一體化的載重箱30,且每一控制箱10上模組的吊臂20也便於伸展及收合,因此當要移動本新型之吊掛裝置至需求進行清洗或修繕的建築物頂樓時,特別是在車載搬運及大樓梯間搬運時,本新型之吊掛裝置提供了極為方便的快速拆解機能,因此在本新型所屬技術領域中,理當已對先前技術作出貢獻。 In summary, it should be understood that since the plurality of control boxes 10 carrying the winding turntables can be mutually juxtaposed with each other, the assembled load box 30 is integrated, and each control box 10 The boom 20 of the upper module is also easy to stretch and fold, so when moving the suspension device of the present type to the top floor of a building that needs to be cleaned or repaired, especially when transported by car and between large stairways, the present invention The suspension device provides an extremely convenient quick disassembly function, and thus it is reasonable to contribute to the prior art in the technical field of the present invention.

以上實施例僅為表達了本新型的較佳實施方式,但並不能因此而理解為對本新型專利範圍的限制。因此,本新型應以申請專利範圍中限定的請求項內容為準。 The above embodiments are merely illustrative of the preferred embodiments of the present invention, but are not to be construed as limiting the scope of the present invention. Therefore, the present invention is subject to the content of the claims defined in the scope of the patent application.

10a‧‧‧纜線控制箱 10a‧‧‧ Cable control box

10b‧‧‧水管控制箱 10b‧‧‧Water pipe control box

10c‧‧‧電線控制箱 10c‧‧‧Wire control box

11‧‧‧腳輪 11‧‧‧ casters

12‧‧‧繞線轉盤 12‧‧‧Wind turntable

13a‧‧‧纜線 13a‧‧‧ Cable

13b‧‧‧水管 13b‧‧‧ water pipes

13c‧‧‧電線 13c‧‧‧Wire

14‧‧‧自由滑輪 14‧‧‧Free pulley

15a‧‧‧扣耳 15a‧‧‧ 耳耳

15b‧‧‧扣環 15b‧‧‧ buckle

16‧‧‧掛耳 16‧‧‧hanging ears

21‧‧‧垂框 21‧‧‧ hanging frame

22‧‧‧橫框 22‧‧‧ transverse frame

30‧‧‧載重箱 30‧‧‧Loading box

40‧‧‧樓頂地面 40‧‧‧Floor floor

41‧‧‧女兒牆 41‧‧‧Daughter Wall

42‧‧‧止擋件 42‧‧‧stops

50‧‧‧配重塊 50‧‧‧weights

Claims (10)

一種應用於建築物樓頂地面的模組式吊掛裝置,包括:一吊臂,呈可雙軸向伸展及縮回的倒L形體;一載重箱,由多個各自獨立且能移動擺放於樓頂地面的控制箱相互併列模組而成,且所述多個控制箱的一側端牆分別模組所述吊臂挺立;其中,所述多個控制箱內分別配置有一繞線轉盤,且各該繞線轉盤所綑附之管線能經由各該控制箱所模組固定之吊臂的導引而延伸至建築物樓頂之一側女兒牆外進行升降。 A modular hanging device applied to the roof of a building, comprising: a boom, which is an inverted L-shaped body that can be extended and retracted in a biaxial direction; a load box, which is independently and movable The control boxes on the floor of the building are formed by juxtaposed modules, and one side end wall of the plurality of control boxes respectively modulates the booms; wherein the plurality of control boxes are respectively provided with a winding turntable And the pipelines bundled by the winding bobbins can be extended to the outside of the side of the building roof by the guiding of the booms fixed by the modules of the control box. 如申請專利範圍第1項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述多支吊臂分別由一垂框和一橫框相互一體連接而成,各該吊臂經由垂框而模組固定於各該控制箱的端牆,且所述垂框和橫框分別由多節可調伸縮長度的架桿組成。 The modular hanging device applied to the roof of a building as described in claim 1, wherein the plurality of booms are respectively integrally formed by a vertical frame and a horizontal frame, and each of the booms The module is fixed to the end wall of each of the control boxes via a vertical frame, and the vertical frame and the horizontal frame are respectively composed of a plurality of adjustable telescopic lengths. 如申請專利範圍第2項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述垂框上配置有至少一水平伸縮式的止擋件接觸女兒牆的牆面。 The modular hanging device applied to the roof of a building as described in claim 2, wherein the hanging frame is provided with at least one horizontally-retractable stopper contacting the wall of the parapet wall. 如申請專利範圍第2項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述垂框、橫框上配置有多個導引繞線轉盤所綑附之管線的自由滑輪。 The modular hanging device applied to the roof of a building as described in claim 2, wherein the hanging frame and the horizontal frame are provided with a plurality of free pulleys guiding the pipelines to which the winding turntable is attached . 如申請專利範圍第2項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述多個控制箱包含一纜線控制箱、一水管控制箱及一電線控制箱。 The modular hanging device applied to the roof of a building as described in claim 2, wherein the plurality of control boxes comprise a cable control box, a water pipe control box and a wire control box. 如申請專利範圍第5項所述應用於建築物樓頂地面的模組式吊掛裝置,其中該纜線控制箱的橫框一端延伸形成一遠離纜線控制箱的垂支架,該垂支架的近底部還樞設一水平向的滾筒,該纜線控制箱內之繞線轉盤所綑附的纜線依序經由所述自由滑輪及滾筒的導引而於女兒牆外進行升降。 The modular hanging device applied to the roof of a building as described in claim 5, wherein one end of the horizontal frame of the cable control box extends to form a hanging bracket away from the cable control box, the hanging bracket A horizontal roller is also pivoted near the bottom, and the cable bundled by the winding turntable in the cable control box is sequentially lifted and lowered outside the parapet through the guide of the free pulley and the roller. 如申請專利範圍第6項所述應用於建築物樓頂地面的模組式吊掛裝置,其中該垂支架與垂框相互平行。 The modular hanging device applied to the roof of a building as described in claim 6 of the patent application, wherein the hanging bracket and the vertical frame are parallel to each other. 如申請專利範圍第1項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述多個控制箱的雙側面分別設有一扣耳及一扣環,所述多個控制箱經由扣耳及扣環的相互扣組而相互併列模組成該載重箱。 The modular hanging device applied to the roof of a building as described in claim 1, wherein the plurality of control boxes are respectively provided with a buckle and a buckle on both sides, and the plurality of control boxes The load box is formed side by side by the interlocking of the buckle ears and the buckles. 如申請專利範圍第1項所述應用於建築物樓頂地面的模組式吊掛裝置,其中所述控制箱的端側設有一用於掛附配重塊的掛耳。 The modular hanging device applied to the roof of a building as described in claim 1, wherein the end side of the control box is provided with a hanging lug for attaching the weight. 如申請專利範圍第1項所述應用於建築物樓頂地面的模組式吊掛裝置,其中該繞線轉盤為附具動力的捲揚機。 The modular hanging device applied to the roof of a building as described in the first aspect of the patent application, wherein the winding turntable is a powered winch.
TW106202063U 2017-02-13 2017-02-13 Modular crane device applied to building roof floor TWM542646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW106202063U TWM542646U (en) 2017-02-13 2017-02-13 Modular crane device applied to building roof floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW106202063U TWM542646U (en) 2017-02-13 2017-02-13 Modular crane device applied to building roof floor

Publications (1)

Publication Number Publication Date
TWM542646U true TWM542646U (en) 2017-06-01

Family

ID=59688643

Family Applications (1)

Application Number Title Priority Date Filing Date
TW106202063U TWM542646U (en) 2017-02-13 2017-02-13 Modular crane device applied to building roof floor

Country Status (1)

Country Link
TW (1) TWM542646U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI610877B (en) * 2017-02-13 2018-01-11 Chien Wen Kao Modular hanging device applied to the roof of a building
CN108116998A (en) * 2018-02-02 2018-06-05 广西壮族自治区环境监测中心站 A kind of tributary sediment sampling stent

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI610877B (en) * 2017-02-13 2018-01-11 Chien Wen Kao Modular hanging device applied to the roof of a building
CN108116998A (en) * 2018-02-02 2018-06-05 广西壮族自治区环境监测中心站 A kind of tributary sediment sampling stent

Similar Documents

Publication Publication Date Title
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
TWM542646U (en) Modular crane device applied to building roof floor
JP4753932B2 (en) Gondola equipment
WO2018145226A1 (en) Modular suspension apparatus applied to ground of building roof
TWI610877B (en) Modular hanging device applied to the roof of a building
TWM537095U (en) Foldable hanging device allowing movable installation on building roof floor
JP5636556B2 (en) Multifunctional gondola device
CN206273770U (en) The removable telescopic type erecting by overhang for being installed in building roof ground
CN207581225U (en) The Improvement type support frame structure of telescopic type erecting by overhang
WO2019100180A1 (en) Improved support bracket structure for deploying-stowing type suspension apparatus
CN201258228Y (en) Single column support type rotary arm hoist
CN103556837B (en) A kind of method realizing steel column at annex place and install
JP2020002555A (en) Wall balustrade scaffold installation device
TWI600608B (en) Mobile retractable hanging device installed on the roof of building
CN210759347U (en) Mounting equipment
CN203624932U (en) Portable indoor material lifter
TWM558796U (en) Improved support rack structure for foldable hanging device
WO2018090158A1 (en) Extending/retracting suspension apparatus which may be movably mounted on floor of building roof
CN112374328A (en) Building site lift transportation platform
TWI656086B (en) Improved support frame structure for display-type hanging device
TWM574621U (en) Assembling and lifting device for telescopic sleeve and scaffolding
JP5673134B2 (en) Lifting device, shaking prevention jig and suspension jig
TW201725167A (en) Hanger for lifter capable of being quickly assembled on and disassembled from the stacker
CN220165711U (en) Elevator convenient to it is fixed
CN211444796U (en) Glass curtain wall mounting crane

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees