TWI506190B - A?high-rise safety construction lifting platform - Google Patents

A?high-rise safety construction lifting platform Download PDF

Info

Publication number
TWI506190B
TWI506190B TW101130920A TW101130920A TWI506190B TW I506190 B TWI506190 B TW I506190B TW 101130920 A TW101130920 A TW 101130920A TW 101130920 A TW101130920 A TW 101130920A TW I506190 B TWI506190 B TW I506190B
Authority
TW
Taiwan
Prior art keywords
safety protection
scaffolding
construction safety
rise construction
fixed
Prior art date
Application number
TW101130920A
Other languages
Chinese (zh)
Other versions
TW201311983A (en
Inventor
Haiyan Shen
Jianen Han
Xinpeng Wang
Original Assignee
Shenzhen Techen Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techen Technology Co Ltd filed Critical Shenzhen Techen Technology Co Ltd
Publication of TW201311983A publication Critical patent/TW201311983A/en
Application granted granted Critical
Publication of TWI506190B publication Critical patent/TWI506190B/en

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Emergency Lowering Means (AREA)
  • Jib Cranes (AREA)

Description

一種高層施工安全防護升降平臺 High-rise construction safety protection lifting platform

本發明涉及高層建築施工用安全防護裝置,更具體地說,涉及一種高層施工安全防護升降平臺。 The invention relates to a safety protection device for high-rise building construction, and more particularly to a high-rise construction safety protection lifting platform.

在很多地區,建築安全事故成為僅次於交通事故的第二大殺手,而所有建築安全死亡事故中,高空墜落和物體打擊又占到建築施工事故總數的57.01%,而這些又直接與建築施工中的外腳手架相關聯。 In many areas, construction safety accidents have become the second biggest killer after traffic accidents. In all construction safety fatal accidents, high-altitude falls and object strikes accounted for 57.01% of the total number of construction accidents, which are directly related to building construction. The outer scaffolding is associated.

目前,高層施工外腳手架主要有以下幾種形式:落地式腳手架、懸挑式腳手架、升降式腳手架、折疊式升降腳手架等,其中:前述3種腳手架,都是在現場進行人工搭設和拆除,這項工作屬高空臨邊高危作業,且勞動強度大、十分零散、難以管理,由於其受人為因素影響很大,又處於每天的很大的動態變化中,因此其高空墜落和物體打擊隱患較多,事故頻發;折疊式升降腳手架,根據方案設計由工廠分單元製作好折疊後,運輸到施工現場,在地面打開和拼裝後,直接由塔吊將各組吊裝就位,組和組之間連接好並安裝好控制系統後,即可進行升降作業供使用和起到很好的安全防護作用,但是,由於其成本很高,目前僅有極少數特別高端的用戶使用,普及速度較慢。 At present, the high-rise construction scaffolding mainly has the following forms: floor-standing scaffolding, cantilever scaffolding, lifting scaffolding, folding lifting scaffolding, etc., among which: the above three kinds of scaffolding are manually erected and demolished on site. The work is a high-risk operation at high altitude, and it is labor intensive, very fragmented, and difficult to manage. Because it is greatly affected by human factors and is in a big dynamic change every day, its high-altitude fall and object hitting more hidden dangers. Frequent accidents; folding lift scaffolding, according to the design of the project, the factory is divided into units and then transported to the construction site. After the ground is opened and assembled, the groups are directly hoisted by the tower crane, and the groups and groups are connected. After the control system is installed and installed, the lifting operation can be used for safe operation and protection. However, due to its high cost, only a few very high-end users are currently used, and the popularity is slow.

本發明的目的,就是克服上述腳手架的不足,設計一種即能滿足高層施工要求,又能具備很好防護功能的可大幅度消除高空墜落和物體打擊安全事故,並且成本大幅下降,綜合性能更優,能夠儘快普及的高層施工安全防護升降平臺。 The object of the present invention is to overcome the deficiencies of the above-mentioned scaffolding, and to design a type that can meet the requirements of high-rise construction, and can have a good protection function, can greatly eliminate high-altitude falling and object hitting safety accidents, and the cost is greatly reduced, and the comprehensive performance is better. A high-rise construction safety protection lifting platform that can be popularized as soon as possible.

本發明提供了一種可升降的高層施工安全防護平臺,解決了現有技術中由鋼管組、部件搭接構造的固定式腳手架或升降腳手架在組裝、拆除、使用過程中存在效率低、需要大量人工、存在安全隱患的問題,解決了折疊式升降腳手架成本過高的問題。 The invention provides a high-rise construction safety protection platform capable of lifting and lowering, and solves the problems of low efficiency and large amount of labor in the process of assembly, disassembly and use of the fixed scaffold or the lifting scaffold constructed by the steel pipe group and the component overlapping structure in the prior art. The problem of safety hazards solves the problem of excessive cost of folding lift scaffolding.

本發明解決其技術問題所採用的技術方案是:構造一種高層施工安全防護升降平臺,包括:附著式升降腳手架機位元系統,所述附著式升降腳手架機位元系統包括承力導向座、以及與所述承力導向座滑動連接的豎向構件,所述承力導向座固定在建築物的週邊,所述豎向構件的上端固定有上吊點構件,所述豎向構件的下端固定有下吊點桁架,所述下吊點桁架的下端固定有下吊點構件,所述下吊點桁架上還固定有倒掛電動葫蘆;多個連接在一起的高層施工安全防護平臺單元,每個所述高層施工安全防護平臺單元包括外立網、設置在外立網上的腳手板組件;支承元件,所述支承組件一端固定在所述豎向構件上,另一端固定在所述外立網上。 The technical solution adopted by the present invention to solve the technical problem is: constructing a high-rise construction safety protection lifting platform, comprising: an attached lifting scaffolding machine bit system, the attached lifting scaffolding machine bit system comprising a bearing guiding seat, and a vertical member slidably coupled to the bearing guide seat, the bearing guide seat is fixed to a periphery of the building, and an upper hanging point member is fixed at an upper end of the vertical member, and a lower end of the vertical member is fixed a lifting point truss, a lower hanging point member is fixed at a lower end of the lower hanging point truss, and an inverted electric hoist is fixed on the lower hanging point truss; a plurality of high-rise construction safety protection platform units connected together, each of the The high-rise construction safety protection platform unit comprises an external net, a scaffolding assembly disposed on the external net, and a supporting member, one end of which is fixed on the vertical member and the other end is fixed on the external net.

在本發明所述的高層施工安全防護升降平臺中,所述附著式升降腳手架機位元系統位於兩個高層施工安全防護平臺單元的對接處。 In the high-rise construction safety protection lifting platform of the present invention, the attached lifting scaffolding machine position system is located at the docking point of two high-rise construction safety protection platform units.

在本發明所述的高層施工安全防護升降平臺中,所述支承元件包括圍成直角三角形的斜杆、水準杆、以及豎杆,所述豎杆的上下兩端分別固定在所述豎向構件上,所述水準杆和所述斜杆的交接處設有連接板,所述連接板固定在所述外立網上。 In the high-rise construction safety protection lifting platform of the present invention, the supporting element comprises a diagonal rod, a leveling rod, and a vertical rod enclosing a right-angled triangle, and upper and lower ends of the vertical rod are respectively fixed to the vertical member The connection between the leveling rod and the diagonal rod is provided with a connecting plate, and the connecting plate is fixed on the external net.

在本發明所述的高層施工安全防護升降平臺中,所述附著式升降腳手架機位元系統位於其中一個高層施工安全防護平臺單元的中間位置。 In the high-rise construction safety protection lifting platform of the present invention, the attached lifting scaffolding machine position system is located at an intermediate position of one of the high-rise construction safety protection platform units.

在本發明所述的高層施工安全防護升降平臺中,所述支承元件包括兩個關於所述豎向構件對稱的斜連接杆,所述斜連接杆一端固定在所述豎向構件上,另一端固定在所述外立網上。 In the high-rise construction safety protection lifting platform of the present invention, the supporting element comprises two oblique connecting rods symmetric about the vertical member, the inclined connecting rod is fixed at one end to the vertical member, and the other end is Fixed on the external network.

在本發明所述的高層施工安全防護升降平臺中,所述豎向構件與所述腳手板元件通過第一連接件連接,所述第一連接件包括固定在所述豎向構件上的豎向部分、以及與所述豎向部分垂直的橫向部分,所述橫向部分固定在所述腳手板元件上。 In the high-rise construction safety protection lifting platform of the present invention, the vertical member and the scaffolding element are connected by a first connecting member, and the first connecting member includes a vertical direction fixed on the vertical member And a lateral portion perpendicular to the vertical portion, the lateral portion being fixed to the scaffolding element.

在本發明所述的高層施工安全防護升降平臺中,所述下吊點桁架的下端和與所述下吊點桁架的下端所對應的腳手板元件通過第二連接件連接,所述第二連接件包括與所述腳手板元件連接的上豎直部分、與所述下吊點桁架連接的下豎直部分、以及連接所述上豎直部分和下豎直部分的斜向部分,所述下豎直部分和斜向部分之間設有加強肋板。 In the high-rise construction safety protection lifting platform of the present invention, the lower end of the lower hanging point truss and the scaffolding element corresponding to the lower end of the lower hanging point truss are connected by a second connecting piece, the second connection The piece includes an upper vertical portion coupled to the scaffolding element, a lower vertical portion coupled to the lower hanging point truss, and an oblique portion connecting the upper vertical portion and the lower vertical portion, the lower portion A reinforcing rib is provided between the vertical portion and the oblique portion.

在本發明所述的高層施工安全防護升降平臺中,所述外立網包括多個連接在一起的外立網單元,每個所述外立網單元包括兩個立柱、位於兩立柱之間的防護網支承骨架、以及附著在防護網支承骨架上的防護網片。 In the high-rise construction safety protection lifting platform of the present invention, the external network includes a plurality of external network units connected together, and each of the external network units includes two columns and is located between the two columns. The protective mesh supports the skeleton and the protective mesh attached to the support mesh of the protective net.

在本發明所述的高層施工安全防護升降平臺中,所述腳手板元件 包括腳手板、延伸翻板和斜撐杆;所述腳手板與所述外立網鉸鏈式連接,所述斜撐杆一端固定在所述外立網上,另一端固定在所述腳手板上,以支承所述腳手板懸挑於外立網上;所述延伸翻板與所述腳手板通過合頁鉸鏈連接。 In the high-rise construction safety protection lifting platform of the present invention, the scaffolding component The utility model includes a scaffolding board, an extension flap and a diagonal strut; the scaffolding board is hingedly connected to the external net, the diagonal strut is fixed at one end on the external net, and the other end is fixed on the scaffold To support the scaffolding overhanging on the external net; the extended flap and the scaffold are connected by a hinge hinge.

在本發明所述的高層施工安全防護升降平臺中,相鄰的高層施工安全防護平臺單元之間設有左右連接件,所述左右連接件包括中間段,以及位於中間段兩端的連接片,兩個所述連接片分別與相鄰的高層施工安全防護平臺單元的腳手板元件相連。 In the high-rise construction safety protection lifting platform of the present invention, adjacent high-rise construction safety protection platform units are provided with left and right connecting members, and the left and right connecting members include an intermediate portion and connecting pieces at both ends of the intermediate portion, two The connecting pieces are respectively connected to the scaffolding elements of the adjacent high-rise construction safety protection platform unit.

實施本發明的高層施工安全防護升降平臺,具有以下有益效果:本發明的高層施工安全防護升降平臺在使用時只需將各個高層施工安全防護平臺單元相互連接在一起,無需要搭接鋼管組、部件結構,提高了搭設腳手架的效率,降低了所需的人工數量和操作人員的勞動強度,具有結構簡單、拆裝快捷、使用安全的、節約成本的特點。 The high-rise construction safety protection lifting platform embodying the invention has the following beneficial effects: the high-rise construction safety protection lifting platform of the invention only needs to connect the high-rise construction safety protection platform units to each other, and there is no need to lap the steel pipe group, The structure of the component improves the efficiency of erecting the scaffold, reduces the required labor quantity and the labor intensity of the operator, and has the characteristics of simple structure, quick disassembly and assembly, safe use and cost saving.

1‧‧‧附著式升降腳手架機位元系統 1‧‧‧ Attached Lifting Scaffolding Positioning System

11‧‧‧承力導向座 11‧‧‧ Bearing guide seat

12‧‧‧豎向構件 12‧‧‧Vertical components

13‧‧‧上吊點構件 13‧‧‧Upper lifting point components

15‧‧‧下吊點桁架 15‧‧‧ hanging point truss

14‧‧‧下吊點構件 14‧‧‧Hanging point components

16‧‧‧倒掛電動葫蘆 16‧‧‧Upside down electric hoist

3‧‧‧外立網 3‧‧‧External Network

4‧‧‧腳手板組件 4‧‧‧Shoulder assembly

2‧‧‧支承組件 2‧‧‧Support components

31‧‧‧立柱 31‧‧‧ column

32‧‧‧支承骨架 32‧‧‧Support skeleton

33‧‧‧防護網片 33‧‧‧Protective mesh

10‧‧‧上下連接件 10‧‧‧Upper and lower connectors

8‧‧‧左右連接件 8‧‧‧connections

80‧‧‧中間段 80‧‧‧ middle section

81‧‧‧連接片 81‧‧‧Connecting piece

41‧‧‧腳手板 41‧‧‧Shoulder board

42‧‧‧延伸翻板 42‧‧‧Extended flap

43‧‧‧斜撐杆 43‧‧‧ diagonal strut

21‧‧‧斜杆 21‧‧‧ slanting rod

22‧‧‧水準杆 22‧‧‧ leveling pole

23‧‧‧豎杆 23‧‧‧ Vertical rod

24‧‧‧連接板 24‧‧‧Connecting plate

15‧‧‧下吊點桁架 15‧‧‧ hanging point truss

5‧‧‧第二連接件 5‧‧‧Second connector

51‧‧‧上豎直部分 51‧‧‧Upper vertical section

52‧‧‧下豎直部分 52‧‧‧Lower vertical section

53‧‧‧斜向部分 53‧‧‧ oblique part

54‧‧‧加強肋板 54‧‧‧Reinforced ribs

6‧‧‧斜連接杆 6‧‧‧ oblique connecting rod

7‧‧‧第一連接件 7‧‧‧First connector

71‧‧‧豎向部分 71‧‧‧ vertical part

72‧‧‧橫向部分 72‧‧‧ lateral part

圖1是本發明的高層施工安全防護升降平臺的第一實施例的示意圖;圖2是本發明的高層施工安全防護升降平臺的第一實施例的側面視圖;圖3a是本發明的高層施工安全防護升降平臺的第一實施例中的一種支承元件的示意圖;圖3b是本發明的高層施工安全防護升降平臺的第一實施例中的一種斜撐杆的示意圖;圖4a是本發明的高層施工安全防護升降平臺的第一實施例中的另 一種支承元件的示意圖;圖4b是本發明的高層施工安全防護升降平臺的第一實施例中的另一種斜撐杆的示意圖;圖5是本發明的高層施工安全防護升降平臺的第一實施例中左右連接件的示意圖;圖6是本發明的高層施工安全防護升降平臺的第一實施例中第二連接件的示意圖;圖7a是本發明的高層施工安全防護升降平臺的第一實施例中附著式升降腳手架機位元系統的示意圖;圖7b是圖7a中A部放大圖;圖7c是圖7b中B部放大圖;圖7d是圖7c中C部放大圖;圖8a是本發明的高層施工安全防護升降平臺的第二實施例的示意圖;圖8b是圖8a中D部放大圖;圖9是本發明的高層施工安全防護升降平臺的第二實施例中第一連接件的示意圖;圖10a是本發明的高層施工安全防護升降平臺的第二實施例的側面視圖;圖10b是本發明的高層施工安全防護升降平臺的第二實施例中斜連接杆的示意圖;圖11是本發明的高層施工安全防護升降平臺中外立網單元上下連接的示意圖;圖12是本發明的高層施工安全防護升降平臺中外立網左右連接的示意圖; 圖13a-13b是本發明的高層施工安全防護升降平臺升降的示意圖。 1 is a schematic view of a first embodiment of a high-rise construction safety protection lifting platform of the present invention; FIG. 2 is a side view of a first embodiment of a high-rise construction safety protection lifting platform of the present invention; and FIG. 3a is a high-rise construction safety of the present invention. FIG. 3b is a schematic view of a diagonal strut in the first embodiment of the high-rise construction safety protection lifting platform of the present invention; FIG. 4a is a high-rise construction of the present invention; Another in the first embodiment of the safety protection lifting platform FIG. 4b is a schematic view of another diagonal strut in the first embodiment of the high-rise construction safety protection lifting platform of the present invention; FIG. 5 is a first embodiment of the high-rise construction safety protection lifting platform of the present invention; FIG. 6 is a schematic view of a second connecting member in the first embodiment of the high-rise construction safety protection lifting platform of the present invention; FIG. 7a is a first embodiment of the high-rise construction safety protection lifting platform of the present invention. Figure 7b is an enlarged view of a portion A of Figure 7a; Figure 7c is an enlarged view of a portion B of Figure 7b; Figure 7d is an enlarged view of a portion C of Figure 7c; Figure 8a is an enlarged view of a portion C of Figure 7c; A schematic view of a second embodiment of a high-rise construction safety protection lifting platform; FIG. 8b is an enlarged view of a portion D of FIG. 8a; FIG. 9 is a schematic view of a first connecting member of a second embodiment of the high-rise construction safety protection lifting platform of the present invention; Figure 10a is a side elevational view of a second embodiment of the high-rise construction safety protection lifting platform of the present invention; Figure 10b is a perspective view of the second embodiment of the high-rise construction safety protection lifting platform of the present invention It is intended; FIG. 11 is a schematic top down connection construction security FOREIGN vertical lift platform network unit of the invention; FIG. 12 is a schematic top connected to the left and right lift platform construction safety legislation foreign network of the invention; 13a-13b are schematic views of the lifting of the high-rise construction safety protection lifting platform of the present invention.

為了對本發明的技術特徵、目的和效果有更加清楚的理解,現對照附圖詳細說明本發明的具體實施方式。 For a better understanding of the technical features, objects and effects of the present invention, the embodiments of the present invention are described in detail with reference to the accompanying drawings.

如圖1和圖2所示,為本發明的高層施工安全防護升降平臺的第一實施例的示意圖,該高層施工安全防護升降平臺包括附著式升降腳手架機位元系統1,參看圖7a-7d,該附著式升降腳手架機位元系統1包括承力導向座11、以及與所述承力導向座11滑動連接的豎向構件12。其中,承力導向座11固定在建築物的週邊,在一個附著式升降腳手架機位元系統中,包括多個承力導向座11,這些承力導向座11沿豎向排成一列,承力導向座11設有導向裝置和防墜裝置,對豎向構件12起到導向的作用,同時還可以防止豎向構件12發生墜落,承力導向座11的導向裝置和防墜裝置為常規適用的導向裝置和防墜裝置。豎向構件12的上端固定有上吊點構件13,豎向構件12的下端固定有下吊點桁架15,所述下吊點桁架15的下端固定有下吊點構件14,下吊點桁架15上還固定有倒掛電動葫蘆16,倒掛電動葫蘆16、上吊點構件13、下吊點構件14、以及環鏈(未示出)等構成提升系統,其原理可以參看專利號為ZL201020148501.1的中國專利“一體化倒掛葫蘆”,提升系統還包括重力感測器、智慧控制系統,智慧控制系統包括電腦和智慧分機,通過計算機智能控制軟體發出信號到各個機位元系統智慧分機控制電動葫蘆工作。 1 and 2 are schematic views of a first embodiment of a high-rise construction safety protection lifting platform of the present invention, the high-rise construction safety protection lifting platform comprising an attached lifting scaffolding machine bit system 1, see FIGS. 7a-7d The attached lift scaffolding machine position system 1 includes a bearing guide seat 11 and a vertical member 12 slidably coupled to the bearing guide seat 11. Wherein, the bearing guiding seat 11 is fixed at the periphery of the building, and in an attached lifting scaffolding machine bit system, a plurality of bearing guiding seats 11 are arranged, and the bearing guiding seats 11 are arranged in a row in a vertical direction. The guiding seat 11 is provided with a guiding device and a fall arresting device to guide the vertical member 12, and also prevents the vertical member 12 from falling. The guiding device and the fall arresting device of the bearing guiding seat 11 are conventionally applicable. Guide and fall arrester. The upper end of the vertical member 12 is fixed with an upper hanging point member 13, and the lower end of the vertical member 12 is fixed with a lower hanging point truss 15, and the lower hanging end of the lower hanging point truss 15 is fixed with a lower hanging point member 14, and the lower hanging point truss 15 is attached. Also, an inverted electric hoist 16, an upside down electric hoist 16, an upper hanging point member 13, a lower hanging point member 14, and a chain chain (not shown) are fixed to constitute a lifting system, and the principle can be referred to the Chinese patent of the patent number ZL201020148501.1. "Integrated upside down hoist", the lifting system also includes gravity sensor, intelligent control system, intelligent control system including computer and smart extension, through the computer intelligent control software to send signals to each unit of the meta-system intelligent branch control electric hoist work.

高層施工安全防護升降平臺還包括多個連接在一起的高層施工安 全防護平臺單元,每個高層施工安全防護平臺單元包括外立網3、設置在外立網3上的腳手板組件4;高層施工安全防護升降平臺還包括支承組件2,所述支承組件2一端固定在豎向構件12上,另一端固定在所述外立網3上。 The high-rise construction safety protection lifting platform also includes a plurality of high-rise constructions connected together. The full protection platform unit, each high-rise construction safety protection platform unit comprises an external net 3, a scaffolding assembly 4 disposed on the external net 3; the high-rise construction safety protection lifting platform further comprises a support assembly 2, the support assembly 2 being fixed at one end On the vertical member 12, the other end is fixed to the outer net 3.

在本實施例中,高層施工安全防護升降平臺的附著式升降腳手架機位元系統1位於兩個高層施工安全防護平臺單元的對接處,也稱之為標準機位。參看圖11和圖12,在本實施例中,外立網3由多個外立網單元連接而成,每個所述外立網單元包括兩個立柱31、位於兩立柱31之間的防護網支承骨架32、以及附著在防護網支承骨架32上的防護網片33。外立網單元的兩根立柱31的材料可以為C形鋼,防護網支承骨架32由型鋼焊接組合,其與立網立柱31之間進行焊接固定或通過螺栓、連接板進行固定;防護網片33為鋼制網,每個立網單元之間可以通過螺栓、連接件進行上下左右連接固定也可以焊接固定。在本實施例中,外立網單元上下之間的連接是通過外立網上下連接件10連接的,外立網上下連接件10與上下兩個外立網單元的立柱31連接固定。外立網3的左右連接,也可以通過螺栓將相鄰的外立網3的立柱31固定在一起。參看圖1、圖5和圖11,進一步,可以在相鄰的高層施工安全防護平臺單元之間設置左右連接件8,該左右連接件8包括中間段80,以及位於中間段8兩端的連接片81,兩連接片81分別與相鄰的高層施工安全防護平臺單元的腳手板組件4相連。 In the present embodiment, the attached lifting scaffolding machine position system 1 of the high-rise construction safety protection lifting platform is located at the docking point of two high-rise construction safety protection platform units, which is also called a standard position. Referring to FIG. 11 and FIG. 12, in the present embodiment, the external net 3 is connected by a plurality of external net units, and each of the external net units includes two columns 31 and protection between the two columns 31. The mesh supports the skeleton 32 and the protective mesh 33 attached to the protective mesh support frame 32. The material of the two uprights 31 of the external net unit may be C-shaped steel, and the protective net support frame 32 is welded by a profiled steel, which is fixed by welding with the vertical net upright 31 or fixed by bolts and connecting plates; 33 is a steel mesh, and each of the riser units can be connected to each other by bolts and connectors, and can be welded and fixed. In this embodiment, the connection between the upper and lower parts of the external net unit is connected through the lower connecting member 10 of the external net, and the lower connecting member 10 of the standing net is connected and fixed to the uprights 31 of the upper and lower external net units. The left and right connections of the riser net 3 can also be used to fix the uprights 31 of the adjacent upright nets 3 by bolts. Referring to Figures 1, 5 and 11, further, left and right connecting members 8 may be disposed between adjacent high-rise construction safety protection platform units, the left and right connecting members 8 including intermediate portions 80, and connecting pieces at both ends of the intermediate portion 8. 81. The two connecting pieces 81 are respectively connected to the scaffolding assembly 4 of the adjacent high-rise construction safety protection platform unit.

在本實施例中,腳手板組件4包括腳手板41、延伸翻板42和斜撐杆43;其中腳手板41與外立網3鉸鏈式連接,斜撐杆43一端固定在外立網3上,另一端固定在腳手板41上,以支承腳手板41懸挑於外立網3上;延伸翻板42與腳手板41通過合頁鉸鏈連接。具體 的,腳手板41與外立網3的立柱31通螺栓或銷軸形成鉸鏈式連接,腳手板41可以折疊到外立網3的兩根立柱31內;延伸翻板42與腳手板41通過合頁鉸鏈連接,其可以與腳手板41成折疊或展開狀態;斜撐杆43其一端固定在外立網立柱31上,另一端固定在腳手板41上,其支撐腳板懸挑在外立網3的立柱31上。圖3b和圖4b,分別示出了兩種不同規格的斜撐杆43,圖4b中的斜撐杆43用在最下端的腳手板組件4中,圖3b中的斜撐杆43用在靠上的腳手板組件中。 In this embodiment, the scaffolding assembly 4 includes a scaffolding board 41, an extending flap 42 and a diagonal strut 43; wherein the scaffolding board 41 is hingedly connected to the external net 3, and one end of the diagonal strut 43 is fixed on the external net 3, The other end is fixed to the scaffolding board 41 to support the scaffolding board 41 overhanging the external net 3; the extending flap 42 and the scaffolding board 41 are connected by a hinge hinge. specific The scaffolding plate 41 and the uprights 31 of the external net 3 are hingedly connected by bolts or pins, and the scaffolding plates 41 can be folded into the two uprights 31 of the external net 3; the extended flaps 42 and the scaffolding plates 41 are combined. a page hinge connection, which can be folded or unfolded with the scaffolding 41; the diagonal strut 43 has one end fixed to the outer net upright 31 and the other end fixed to the scaffolding 41, and the supporting leg is cantilevered on the upright net 3 31. Figures 3b and 4b show two different sizes of diagonal strut 43 respectively, the diagonal strut 43 of Figure 4b being used in the lowermost scaffolding assembly 4, and the diagonal strut 43 of Figure 3b for On the scaffolding board assembly.

參看圖3a和圖4a,在本實施例中,支承組件2包括圍成直角三角形的斜杆21、水準杆22、以及豎杆23,其中豎杆23的上下兩端分別固定在豎向構件12上,水準杆22和所述斜杆21的交接處設有連接板24,所述連接板24固定在所述外立網3上。支承組件2呈直角三角形,其結構更為穩固,可以可靠的將高層施工安全防護平臺單元連接在附著式升降腳手架機位元系統1的豎向構件12上。圖3a和圖4a,分別示出了兩種不同規格的支承組件2,圖4b中的支承元件2用在高層施工安全防護升降平臺的最下端,圖3b中的支承組件2用在高層施工安全防護升降平臺的靠上的位置。 Referring to Figures 3a and 4a, in the present embodiment, the support assembly 2 includes a slanted rod 21 enclosing a right-angled triangle, a leveling rod 22, and a vertical rod 23, wherein the upper and lower ends of the vertical rod 23 are respectively fixed to the vertical member 12 Upper, the junction of the leveling rod 22 and the slanting rod 21 is provided with a connecting plate 24, and the connecting plate 24 is fixed on the external net 3. The support assembly 2 has a right-angled triangle shape and is more stable in structure, and can reliably connect the high-rise construction safety protection platform unit to the vertical member 12 of the attached lifting scaffolding machine position system 1. Figures 3a and 4a show two different sizes of support assembly 2, the support element 2 of Figure 4b is used at the lowermost end of the high-rise construction safety protection lifting platform, and the support assembly 2 of Figure 3b is used for high-rise construction safety. The upper position of the protection lifting platform.

參看圖2和圖6,在本實施例中,下吊點桁架15的下端和與該下吊點桁架15的下端所對應的腳手板組件4通過第二連接件5連接,第二連接件5包括與腳手板元件4連接的上豎直部分51、與下吊點桁架15連接的下豎直部分52、以及連接上豎直部分51和下豎直部分52的斜向部分53,下豎直部分52和斜向部分53之間設有加強肋板54,這樣可以保證最下端的腳手板組件4和下吊點桁架15形成可靠連接。 Referring to Figures 2 and 6, in the present embodiment, the lower end of the lower lifting point truss 15 and the scaffolding assembly 4 corresponding to the lower end of the lower hanging point truss 15 are connected by a second connecting member 5, the second connecting member 5 An upper vertical portion 51 connected to the scaffolding element 4, a lower vertical portion 52 connected to the lower hanging point truss 15, and an oblique portion 53 connecting the upper vertical portion 51 and the lower vertical portion 52, vertically vertical A reinforcing rib 54 is provided between the portion 52 and the oblique portion 53, so that the lowermost scaffolding assembly 4 and the lower hanging truss 15 are reliably connected.

如圖8a所示,為本發明的高層施工安全防護升降平臺的第二實施例的示意圖,該實施例與第一實施例不同之處在於,在本實施例 中,附著式升降腳手架機位元系統1位於其中一個高層施工安全防護平臺單元的中間位置,稱之為中間機位。參看圖10a和圖10b,在本實施例中,由於附著式升降腳手架機位元系統1的位置不同,導致支承組件2的結構也有所不同,在本實施例中,支承組件2包括兩個關於豎向構件12對稱的斜連接杆6,其中斜連接杆6一端固定在豎向構件12上,另一端固定在外立網3的立柱31上。參看圖8b和圖9,在本實施例中,為了保證豎向構件與高層施工安全防護平臺單元之間的可靠連接,豎向構件12與腳手板組件4通過第一連接件7連接,其中第一連接件7包括固定在豎向構件12上的豎向部分71、以及與豎向部分71垂直的橫向部分72,所述橫向部分72固定在腳手板組件4上。本實施例的高層施工安全防護升降平平台的其他結構和第一實施例的高層施工安全防護升降平臺的結構相同,不再贅述。 As shown in FIG. 8a, it is a schematic diagram of a second embodiment of a high-rise construction safety protection lifting platform of the present invention, which is different from the first embodiment in the present embodiment. In the middle, the attached lifting scaffolding machine position system 1 is located in the middle position of one of the high-rise construction safety protection platform units, which is called an intermediate position. Referring to Figures 10a and 10b, in the present embodiment, the structure of the support assembly 2 is also different due to the different positions of the attached lift scaffolding machine position system 1. In the present embodiment, the support assembly 2 includes two The vertical member 12 is a symmetrical oblique connecting rod 6, wherein one end of the oblique connecting rod 6 is fixed to the vertical member 12, and the other end is fixed to the upright 31 of the external net 3. Referring to Figures 8b and 9, in the present embodiment, in order to ensure a reliable connection between the vertical member and the high-rise construction safety protection platform unit, the vertical member 12 and the scaffold assembly 4 are connected by the first connecting member 7, wherein A connector 7 includes a vertical portion 71 secured to the vertical member 12 and a lateral portion 72 that is perpendicular to the vertical portion 71, the lateral portion 72 being secured to the scaffold assembly 4. The other structures of the high-rise construction safety protection lifting platform of the present embodiment are the same as those of the high-rise construction safety protection lifting platform of the first embodiment, and will not be described again.

圖13a和圖13b示出了本發明的高層施工安全防護升降平臺升降的示意圖。 Figures 13a and 13b show schematic views of the lifting of the high-rise construction safety protection lifting platform of the present invention.

本發明的高層施工安全防護升降平臺在使用時只需將各個高層施工安全防護平臺單元相互連接在一起,無需要搭接鋼管組、部件結構,提高了搭設腳手架的效率,降低了所需的人工數量和操作人員的勞動強度,具有結構簡單、拆裝快捷、使用安全的、節約成本的特點。 The high-rise construction safety protection lifting platform of the invention only needs to connect the high-rise construction safety protection platform units to each other in use, without the need to lap the steel pipe group and the component structure, thereby improving the efficiency of erecting the scaffolding and reducing the required labor. The quantity and the labor intensity of the operator have the characteristics of simple structure, quick disassembly and assembly, safe use and cost saving.

上面結合附圖對本發明的實施例進行了描述,但是本發明並不局限於上述的具體實施方式,上述的具體實施方式僅僅是示意性的,而不是限制性的,本領域的普通技術人員在本發明的啟示下,在不脫離本發明宗旨和權利要求所保護的範圍情況下,還可做出很多形式,這些均屬於本發明的保護之內。 The embodiments of the present invention have been described above with reference to the drawings, but the present invention is not limited to the specific embodiments described above, and the specific embodiments described above are merely illustrative and not restrictive, and those skilled in the art In the light of the present invention, many forms may be made without departing from the spirit and scope of the invention as claimed.

1‧‧‧附著式升降腳手架機位元系統 1‧‧‧ Attached Lifting Scaffolding Positioning System

3‧‧‧外立網 3‧‧‧External Network

4‧‧‧腳手板組件 4‧‧‧Shoulder assembly

41‧‧‧腳手板 41‧‧‧Shoulder board

42‧‧‧延伸翻板 42‧‧‧Extended flap

8‧‧‧左右連接件 8‧‧‧connections

Claims (10)

一種高層施工安全防護升降平臺,包括:附著式升降腳手架機位元系統(1),所述附著式升降腳手架機位元系統(1)包括承力導向座(11)、以及與所述承力導向座(11)滑動連接的豎向構件(12),所述承力導向座(11)固定在建築物的週邊,所述豎向構件(12)的上端固定有上吊點構件(13),所述豎向構件(12)的下端固定有下吊點桁架(15),所述下吊點桁架(15)的下端固定有下吊點構件(14),所述下吊點桁架(15)上還固定有倒掛電動葫蘆(16);多個連接在一起的高層施工安全防護平臺單元,相鄰的高層施工安全防護平臺之間通過左右連接件(8)進行連接;每個所述高層施工安全防護平臺單元包括外立網(3)、設置在外立網(3)上的腳手板組件(4);支承組件(2),所述支承組件(2)一端固定在所述豎向構件(12)上,另一端固定在所述外立網(3)上;所述外立網(3)包括多個連接在一起的外立網單元,外立網單元上下之間通過外立網上下連接件(10)連接;每個所述外立網單元包括兩個立柱(31);所述腳手板組件(4)包括腳手板(41)、以及延伸翻板(42),所述腳手板41與所述外立網3的形成鉸鏈式連接,所述腳手板(41)可以折疊到外立網(3)的兩根立柱(31)內。 A high-rise construction safety protection lifting platform comprises: an attached lifting scaffolding machine bit system (1), the attached lifting and scaffolding machine position system (1) comprises a bearing guiding seat (11), and the bearing force a guiding member (11) is slidably connected to a vertical member (12), the bearing guiding seat (11) is fixed at a periphery of the building, and an upper hanging member (13) is fixed at an upper end of the vertical member (12). A lower hanging point truss (15) is fixed to a lower end of the vertical member (12), and a lower hanging point member (14) is fixed at a lower end of the lower hanging point truss (15), and the lower hanging point truss (15) There is also an inverted electric hoist (16); a plurality of high-rise construction safety protection platform units connected together, and adjacent high-rise construction safety protection platforms are connected by left and right connecting members (8); each of the high-rise constructions The safety protection platform unit comprises an external net (3), a scaffold assembly (4) disposed on the external net (3), a support assembly (2), and one end of the support assembly (2) is fixed to the vertical member ( 12) upper, the other end is fixed on the external net (3); the external net (3) includes a plurality of external nets connected together The upper and lower net unit are connected by upper and lower net connection members (10); each of the outer net units includes two uprights (31); the scaffolding assembly (4) includes a scaffolding board (41) And extending the flap (42), the scaffolding plate 41 is hingedly connected to the outer net 3, and the scaffolding plate (41) can be folded to the two uprights of the outer net (3) (31) )Inside. 根據請求項1所述的高層施工安全防護升降平臺,其特徵在於,所述附著式升降腳手架機位元系統(1)位於兩個高層施工安全 防護平臺單元的對接處。 The high-rise construction safety protection lifting platform according to claim 1, characterized in that the attached lifting scaffolding machine position system (1) is located in two high-rise construction safety The docking of the protection platform unit. 根據請求項2所述的高層施工安全防護升降平臺,其特徵在於,所述支承組件(2)包括圍成直角三角形的斜杆(21)、水準杆(22)、以及豎杆(23),所述豎杆(23)的上下兩端分別固定在所述豎向構件(12)上,所述水準杆(22)和所述斜杆(21)的交接處設有連接板(24),所述連接板(24)固定在所述外立網(3)上。 The high-rise construction safety protection lifting platform according to claim 2, characterized in that the support assembly (2) comprises a diagonal rod (21), a leveling rod (22), and a vertical rod (23) enclosing a right-angled triangle. The upper and lower ends of the vertical rod (23) are respectively fixed on the vertical member (12), and a connection plate (24) is arranged at the intersection of the level rod (22) and the inclined rod (21). The connecting plate (24) is fixed to the external net (3). 根據請求項1所述的高層施工安全防護升降平臺,其特徵在於,所述附著式升降腳手架機位元系統(1)位於其中一個高層施工安全防護平臺單元的中間位置。 The high-rise construction safety protection lifting platform according to claim 1, characterized in that the attached lifting scaffolding machine position system (1) is located at an intermediate position of one of the high-rise construction safety protection platform units. 根據請求項4所述的高層施工安全防護升降平臺,其特徵在於,所述支承組件(2)包括兩個關於所述豎向構件(12)對稱的斜連接杆(6),所述斜連接杆(6)一端固定在所述豎向構件(12)上,另一端固定在所述外立網(3)上。 A high-rise construction safety protection lifting platform according to claim 4, characterized in that the support assembly (2) comprises two oblique connecting rods (6) symmetric about the vertical member (12), the oblique connection The rod (6) is fixed at one end to the vertical member (12) and at the other end to the external net (3). 根據請求項4所述的高層施工安全防護升降平臺,其特徵在於,所述豎向構件(12)與所述腳手板組件(4)通過第一連接件(7)連接,所述第一連接件(7)包括固定在所述豎向構件(12)上的豎向部分(71)、以及與所述豎向部分(71)垂直的橫向部分(72),所述橫向部分(72)固定在所述腳手板組件(4)上。 The high-rise construction safety protection lifting platform according to claim 4, characterized in that the vertical member (12) and the scaffolding assembly (4) are connected by a first connecting member (7), the first connection The member (7) includes a vertical portion (71) fixed to the vertical member (12), and a lateral portion (72) perpendicular to the vertical portion (71), the lateral portion (72) being fixed On the scaffolding assembly (4). 根據請求項2或4所述的高層施工安全防護升降平臺,其特徵在於,所述下吊點桁架(15)的下端和與所述下吊點桁架(15)的下端所對應的腳手板組件(4)通過第二連接件(5)連接,所述第二連接件(5)包括與所述腳手板組件(4)連接的上豎直部分(51)、與所述下吊點桁架(15)連接的下豎直部分(52)、以及 連接所述上豎直部分(51)和下豎直部分(52)的斜向部分(53),所述下豎直部分(52)和斜向部分(53)之間設有加強肋板(54)。 The high-rise construction safety protection lifting platform according to claim 2 or 4, characterized in that the lower end of the lower hanging point truss (15) and the scaffolding component corresponding to the lower end of the lower hanging point truss (15) (4) connected by a second connecting member (5) including an upper vertical portion (51) connected to the scaffolding assembly (4), and the lower hanging point truss ( 15) the lower vertical portion of the connection (52), and An oblique portion (53) connecting the upper vertical portion (51) and the lower vertical portion (52), and a reinforcing rib (not provided) between the lower vertical portion (52) and the oblique portion (53) 54). 根據請求項1至6任一項所述的高層施工安全防護升降平臺,其特徵在於,每個所述外立網單元包括位於兩立柱(31)之間的防護網支承骨架(32)、以及附著在防護網支承骨架(32)上的防護網片(33)。 The high-rise construction safety protection lifting platform according to any one of claims 1 to 6, characterized in that each of the external net units comprises a protective net support skeleton (32) between the two columns (31), and A protective mesh (33) attached to the protective mesh support frame (32). 根據請求項1至6任一項所述的高層施工安全防護升降平臺,其特徵在於,所述腳手板組件(4)包括斜撐杆(43);所述斜撐杆(43)一端固定在所述外立網(3)上,另一端固定在所述腳手板(41)上,以支承所述腳手板(41)懸挑於外立網(3)上;所述延伸翻板(42)與所述腳手板(41)通過合頁鉸鏈連接。 The high-rise construction safety protection lifting platform according to any one of claims 1 to 6, characterized in that the scaffolding assembly (4) comprises a diagonal strut (43); the diagonal strut (43) is fixed at one end The other end of the external net (3) is fixed on the scaffolding board (41) to support the scaffolding board (41) overhanging on the external net (3); the extended flap (42) ) is connected to the scaffolding board (41) by a hinge hinge. 根據請求項1至6任一項所述的高層施工安全防護升降平臺,其特徵在於,相鄰的高層施工安全防護平臺單元之間設有左右連接件(8),所述左右連接件(8)包括中間段(80),以及位於中間段(8)兩端的連接片(81),兩個所述連接片(81)分別與相鄰的高層施工安全防護平臺單元的腳手板組件(4)相連。 The high-rise construction safety protection lifting platform according to any one of claims 1 to 6, wherein the adjacent high-rise construction safety protection platform units are provided with left and right connecting members (8), and the left and right connecting members (8) ) comprising an intermediate section (80), and a connecting piece (81) at both ends of the intermediate section (8), the two connecting pieces (81) and the adjacent high-rise construction safety protection platform unit scaffolding assembly (4) Connected.
TW101130920A 2011-08-25 2012-08-24 A?high-rise safety construction lifting platform TWI506190B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110245531 CN102383588B (en) 2011-08-25 2011-08-25 Lifting platform for protecting safety of high-level construction

Publications (2)

Publication Number Publication Date
TW201311983A TW201311983A (en) 2013-03-16
TWI506190B true TWI506190B (en) 2015-11-01

Family

ID=45823388

Family Applications (1)

Application Number Title Priority Date Filing Date
TW101130920A TWI506190B (en) 2011-08-25 2012-08-24 A?high-rise safety construction lifting platform

Country Status (2)

Country Link
CN (1) CN102383588B (en)
TW (1) TWI506190B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI635998B (en) * 2013-10-09 2018-09-21 美商Bd史丹佛有限責任公司 Apparatus for providing safety netting on manlifts

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635227B (en) * 2012-04-28 2015-11-18 深圳市特辰科技股份有限公司 Aluminium alloys lifting false work
CN102704665A (en) * 2012-06-07 2012-10-03 中国建筑第八工程局有限公司 Foldable horizontal protector between external climbing frame and building and foldable horizontal protection method
WO2014000034A1 (en) * 2012-06-26 2014-01-03 Form 700 Pty Ltd Improved frame for climbing screen
CN104420641B (en) * 2013-09-03 2016-08-24 中铁建工集团有限公司 A kind of telescopic elevating construction platform
CN103821340B (en) * 2014-03-10 2016-02-10 成都嘉泽正达科技有限公司 The mounting method of adhering lifting multilayer operation platform
CN105089263A (en) * 2014-05-22 2015-11-25 深圳市特辰科技股份有限公司 Porous hinge assembly and construction platform
CN105089262A (en) * 2014-05-22 2015-11-25 马永洪 All steel-structure implementary scaffold
CN106320724B (en) * 2015-07-03 2019-01-18 深圳市特辰科技股份有限公司 Auto Deformation construction protection Platform Machinery people and its method for building upper movement and deformation in curved shape
CN105421797A (en) * 2015-11-05 2016-03-23 黄汉雄 Simple building construction protective net
CN105442828B (en) * 2015-11-06 2017-08-15 深圳市中升建科科技发展有限公司 One kind is conveniently detached security protection screen
CN105484485A (en) * 2016-01-14 2016-04-13 中亿丰建设集团股份有限公司 Attached lifting scaffold
CN105804383A (en) * 2016-03-11 2016-07-27 上海建工集团股份有限公司 Length-adjustable double-guide-frame multistage synchronous lifting working platform and construction method thereof
CN105781091A (en) * 2016-03-11 2016-07-20 上海建工集团股份有限公司 Adjustable-length single-guide-frame multilevel synchronous lifting working platform and construction method thereof
CN105715031A (en) * 2016-03-11 2016-06-29 上海建工集团股份有限公司 Double-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for double-guide-frame multi-stage lifting working platform
CN105715030A (en) * 2016-03-11 2016-06-29 上海建工集团股份有限公司 Single-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for single-guide-frame multi-stage lifting working platform
CN105804384B (en) * 2016-03-15 2018-05-29 深圳前海特辰科技有限公司 A kind of light construction protection robot
CN105756333B (en) * 2016-04-29 2018-04-03 深圳市特辰科技股份有限公司 Collapsible construction robot platform unit and construction robot platform
CN106836242B (en) * 2017-03-31 2022-09-02 湖南省第六工程有限公司 Deep foundation pit anchor cable tensioning assembly type operation platform
CN108166767A (en) * 2018-01-18 2018-06-15 北京崇建工程有限公司 A kind of construction method and outer climbing frame protective device
CN109025236B (en) * 2018-09-12 2020-10-16 重庆玖和惠鼎建筑劳务有限公司 All-steel lifting high-rise building construction safety protection platform
CN109322249A (en) * 2018-11-22 2019-02-12 中国建筑第七工程局有限公司 A kind of sliding protective net
CN110409790A (en) * 2019-07-31 2019-11-05 中国五冶集团有限公司 A kind of production of attachment type raise scaffold ultra-wide protective plate, application method
CN110271998B (en) * 2019-08-07 2024-03-12 油特机械工具(大连)有限公司 Automatic combined lifting device for processing cylinders with various specifications
CN111075182A (en) * 2020-01-02 2020-04-28 河北盛卓建筑设备制造有限公司 Attached lifting scaffold hangs hoist system upside down
CN111424951A (en) * 2020-04-16 2020-07-17 中国建筑第四工程局有限公司 Steel structure high-altitude welding enclosure cage type closed environment operation platform and use method thereof
CN111591932B (en) * 2020-06-12 2023-07-25 国网湖南省电力有限公司 System and method for carrying people along anti-falling track on power transmission line
CN114458034A (en) * 2021-12-20 2022-05-10 上海建工一建集团有限公司 Foldable lifting shielding wall and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239529A (en) * 2002-02-14 2003-08-27 Kunimoto Co Ltd Scaffold board support device for veranda handrail
CN201614731U (en) * 2009-09-25 2010-10-27 北京星河人施工技术有限责任公司 Novel electric lifting scaffold
CN201835512U (en) * 2010-10-29 2011-05-18 北京韬盛科技发展有限公司 Turning folding scaffold unit

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH078173B2 (en) * 1988-11-11 1995-02-01 株式会社クボタ Spare seedling supply device
JP3927804B2 (en) * 2001-12-21 2007-06-13 ジャパン スチールス インターナショナル株式会社 Climbing work unit
CN2525158Y (en) * 2001-12-30 2002-12-11 孙为民 New lifting integrated scaffold
JP4078173B2 (en) * 2002-10-09 2008-04-23 ジャパン スチールス インターナショナル株式会社 Work unit
DE102006019622A1 (en) * 2006-04-25 2007-11-15 Hek Manufacturing B.V. Mast platform and method for height adjustment
CN101440660B (en) * 2007-11-22 2010-09-01 唐继忠 Guiding-rail attached lifting scaffold
KR100944463B1 (en) * 2009-07-02 2010-03-05 송재근 Composite cage for construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239529A (en) * 2002-02-14 2003-08-27 Kunimoto Co Ltd Scaffold board support device for veranda handrail
CN201614731U (en) * 2009-09-25 2010-10-27 北京星河人施工技术有限责任公司 Novel electric lifting scaffold
CN201835512U (en) * 2010-10-29 2011-05-18 北京韬盛科技发展有限公司 Turning folding scaffold unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI635998B (en) * 2013-10-09 2018-09-21 美商Bd史丹佛有限責任公司 Apparatus for providing safety netting on manlifts

Also Published As

Publication number Publication date
TW201311983A (en) 2013-03-16
CN102383588A (en) 2012-03-21
CN102383588B (en) 2013-11-06

Similar Documents

Publication Publication Date Title
TWI506190B (en) A?high-rise safety construction lifting platform
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN102839812B (en) Intelligent construction platform for construction of super high-rise building
CN202324340U (en) Combined type large steel-pipe truss
CN202055497U (en) Movable combination scaffold for construction works
CN207048345U (en) Construction discharge platform device
CN201129027Y (en) Two-hinge-turning-plate guard rail for widening scaffold
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN201665992U (en) Whole lifting platform of large steel net frame
CN202125061U (en) Scaffold of large-space concrete structure
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN212246007U (en) Be used for tower crane bracket welded portable platform
CN212866793U (en) Assembled construction elevator stops layer platform
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN210483094U (en) Inverted triangular pipe truss lifting device
CN212897502U (en) Assembled lifting scaffold
CN213204913U (en) Modular prefabricated staircase operation platform
CN207348447U (en) A kind of scaffold lifting is early to tear system open
CN203878563U (en) Suspended single-row scaffold
CN207277870U (en) A kind of elevator protective device with shaped
CN206693066U (en) One kind, which builds a bridge, safeguards scaffold
CN207526141U (en) A kind of small bore tower steel structure assembling formula operating platform
CN203225074U (en) Advertising board of net rack structure
CN205558447U (en) Found pole appurtenance
CN207131062U (en) A kind of job platform

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees