CN2525158Y - New lifting integrated scaffold - Google Patents
New lifting integrated scaffold Download PDFInfo
- Publication number
- CN2525158Y CN2525158Y CN 01273195 CN01273195U CN2525158Y CN 2525158 Y CN2525158 Y CN 2525158Y CN 01273195 CN01273195 CN 01273195 CN 01273195 U CN01273195 U CN 01273195U CN 2525158 Y CN2525158 Y CN 2525158Y
- Authority
- CN
- China
- Prior art keywords
- scaffold
- hung
- bearing support
- set bolt
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a lifting integrated scaffold. A bearing bracket (7) is connected with a fixed bolt (9) through an attached rod (8) and is hung by an electric block (15) which is hung on the bearing plank (17), the bearing plank is connected with a fixed bolt (18) through an attached pull rod (10), and the bearing bracket and the bearing plank are respectively fixed on the outer wall through bolts (22) and (23). With the advantages of good integrity, high security, convenient manipulation, high degree of automation and good economic returns, the scaffold can stably and integrally lift at a higher speed.
Description
The utility model belongs to exterior wall scaffold for building, especially external wall of high-rise building scaffold field.
In high-building construction, flying scaffold has obtained application more and more widely.In known technology, but most of liftable scaffold form by the unit combination of a plurality of independent-liftings, and wherein much by manually-operated control lifting, scaffold lacks enough globality and stability, operation is also inconvenient.Chinese patent " integral hoisting scaffold " (patent No. 88216513.5) provide a kind of can the whole scaffold that promotes, make the dismounting scaffold simplified control many, the sense of security when constructing, the constructor has also been arranged, but the employed lifting facility of this patent are Lift-slab machines, hoisting velocity is slow, the facility volume is big, weight is big, is not easy to dismounting and installation, and the control automaticity is also not enough.
The purpose of this utility model provides that a kind of globality is strong, the sense of security good, easy to operate, electric up-down integral-scaffold that automaticity is high.
The utility model is realized its purpose as follows: scaffold 2 is located on the bearing support 7 of many group elevating mechanisms, and each bearing support 7 links to each other with set bolt 9 through attached wall pull bar 8, and is hung by electric block 15; Each electric block is hung respectively on the support bracket 17 of its place group, and support bracket 17 is connected with set bolt 18 through attached wall pull bar 10; Bearing support 7 and support bracket 17 are fixed on the skin by set bolt 22,23 respectively.
Use electric up-down integral-scaffold of the present utility model, can promote or decline, give the constructor with the very big sense of security so that fast speeds is whole reposefully, and it is easy to operate, reliable operation, the economic benefit height is a kind of more satisfactory highrise building scaffold.
Embodiment further specifies the utility model below in conjunction with accompanying drawing:
Fig. 1 is the vertical profile schematic diagram of this electric up-down integral-scaffold.
Fig. 2 is the elevation of this scaffold.
Fig. 3 is the partial plan layout of this scaffold.
Truss principal 1 is arranged at the bottom of scaffold 2.Many group elevating mechanisms are more equably distributing along the scaffold cross section.Truss principal 1 part of scaffold is located on the bearing support 7 of respectively organizing elevating mechanism, and bearing support 7 is fixed on certain position of exterior wall by bolt 11, foot rest 12 and set bolt 22, and attached wall pull bar 8 and set bolt 9 give bearing support with supplemental support.Support bracket 17 is fixed on the exterior wall of building by set bolt 23; electric block 15 is hung thereon; protection steel cable 14 is hung between it and bearing support 7; support bracket is also fixedlyed connected with skin with set bolt 18 by attached wall pull bar 10, is slidingly connected by slide fastener spare 13 and conduit 16.Directive wheel 6 makes the scaffold can be along the exterior wall vertical lift of building.
This scaffold can overlap with common scaffolding such as steel pipe, shaped steel and fastener dop.Be easy construction, can set up four floor height, scaffold floor 3, railing 4, safety net 5 are arranged on the frame.Whole scaffold is set up around building 19, determines the group number of required elevating mechanism according to the building needs.Scaffold top should exceed as shown in Figure 1 constructs more than the building body wall first floor that finishes.After new floor 20 constructions were finished, scaffold should promote the 1-2 layer height.During lifting, unclamp earlier the set bolt 23,18 of respectively organizing elevating mechanism simultaneously, adopt small-sized hand-operated cucurbit that support bracket 17 is upwards promoted the 1-2 layer together with electric block 15 grades, utilizing giving on the exterior wall to box out retightens, allow electric block 15 tangle bearing support 7 then, unclamp set bolt 22,9 again, start the electric block 15 of respectively organizing elevating mechanism and promote bearing support 7, scaffold 2 promptly promotes thereupon, utilizes external wall to give after putting in place to box out to retighten bearing support 7.Unclamp set bolt 22,9 during decline earlier, restart electric block 15 and fall bearing support 7, scaffold 2 descends thereupon, again support bracket 17 and electric block 15 is fallen the 1-2 floor after bearing support is retightened, and treats to fall scaffold 2 next time and uses.The constructor can stand in operation on the operating desk 21 during operation.Electric block of each group elevating mechanism is carried out Program Synchronization control, make that respectively to organize the elevating mechanism lifting synchronous, whole scaffold lifting is steady, has strengthened constructor's the sense of security.Through the construction application in practice, adopt scaffold of the present utility model to carry out high-building construction, play very significant effect to realizing high-quality, high-speed, high benefit.
Claims (1)
1. an electric up-down integral-scaffold has scaffold (2), scaffold floor (3), railing (4), safety net (5), directive wheel (6), it is characterized in that:
1. scaffold (2) is located on the bearing support (7) of many group elevating mechanisms, and each bearing support (7) links to each other with set bolt (9) through attached wall pull bar (8), and is hung by electric block (15);
2. each electric block (15) is hung respectively on the support bracket (17) of its place group, and support bracket (17) is connected with set bolt (18) through attached wall pull bar (10);
(3) bearing support (7) and support bracket (17) are fixed on the skin by set bolt (22), (23) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01273195 CN2525158Y (en) | 2001-12-30 | 2001-12-30 | New lifting integrated scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01273195 CN2525158Y (en) | 2001-12-30 | 2001-12-30 | New lifting integrated scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2525158Y true CN2525158Y (en) | 2002-12-11 |
Family
ID=33678207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01273195 Expired - Fee Related CN2525158Y (en) | 2001-12-30 | 2001-12-30 | New lifting integrated scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2525158Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100351482C (en) * | 2005-12-14 | 2007-11-28 | 姚康华 | Protective frame special for construction of building main body |
CN100365236C (en) * | 2004-07-19 | 2008-01-30 | 深圳市特辰升降架工程有限公司 | Circulating mechanical arm type lifting scaffold |
CN102383588A (en) * | 2011-08-25 | 2012-03-21 | 深圳市特辰科技股份有限公司 | Lifting platform for protecting safety of high-level construction |
CN105102183A (en) * | 2013-01-24 | 2015-11-25 | 康克斯科技公司 | Plural-story, pipe-support frame system with modular, removably attachable, lateral-worker-support scaffolding |
-
2001
- 2001-12-30 CN CN 01273195 patent/CN2525158Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100365236C (en) * | 2004-07-19 | 2008-01-30 | 深圳市特辰升降架工程有限公司 | Circulating mechanical arm type lifting scaffold |
CN100351482C (en) * | 2005-12-14 | 2007-11-28 | 姚康华 | Protective frame special for construction of building main body |
CN102383588A (en) * | 2011-08-25 | 2012-03-21 | 深圳市特辰科技股份有限公司 | Lifting platform for protecting safety of high-level construction |
CN105102183A (en) * | 2013-01-24 | 2015-11-25 | 康克斯科技公司 | Plural-story, pipe-support frame system with modular, removably attachable, lateral-worker-support scaffolding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211524016U (en) | Double-working-surface guide frame climbing type working platform and system | |
CN1044841A (en) | Building construction system | |
CN106400691B (en) | Anti-collision wall mould bases integrated construction technique | |
CN2187637Y (en) | Electric lifting integral scaffolding | |
CN2525158Y (en) | New lifting integrated scaffold | |
CN110185247A (en) | Mobile outrigger platform | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN209568688U (en) | A kind of elevating construction platform | |
CN209703967U (en) | A kind of Multifunctional decoration construction bracket | |
CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
CN2853976Y (en) | Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction | |
CN214302804U (en) | Double-layer hanging basket of riding horse type | |
CN214995818U (en) | Climbing type construction operation platform outside building | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN115043343A (en) | Light partition board installation construction device and construction method thereof | |
CN201502168U (en) | Hoisting device for wholly hoisting building outer bracket | |
CN2276046Y (en) | Divided multistage automatic climbing external scaffold | |
CN208056658U (en) | Aerial for industrialized building makes building machine | |
CN2578461Y (en) | Liftable scaffold | |
CN210127618U (en) | Adjustable movable steel pipe scaffold | |
CN106088564A (en) | Track climbing type monolithic architecture construction scaffolding | |
CN2175805Y (en) | Integrated lifting scaffold capable of being segmented | |
CN206466912U (en) | A kind of three-dimensional module hanging apparatus | |
CN2204832Y (en) | Automatic lifting scaffold | |
CN2241727Y (en) | Outside scaffold capable of quick lifting for high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |