CN2525158Y - New lifting integrated scaffold - Google Patents

New lifting integrated scaffold Download PDF

Info

Publication number
CN2525158Y
CN2525158Y CN 01273195 CN01273195U CN2525158Y CN 2525158 Y CN2525158 Y CN 2525158Y CN 01273195 CN01273195 CN 01273195 CN 01273195 U CN01273195 U CN 01273195U CN 2525158 Y CN2525158 Y CN 2525158Y
Authority
CN
China
Prior art keywords
scaffold
hung
bearing support
set bolt
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01273195
Other languages
Chinese (zh)
Inventor
孙为民
张彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01273195 priority Critical patent/CN2525158Y/en
Application granted granted Critical
Publication of CN2525158Y publication Critical patent/CN2525158Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a lifting integrated scaffold. A bearing bracket (7) is connected with a fixed bolt (9) through an attached rod (8) and is hung by an electric block (15) which is hung on the bearing plank (17), the bearing plank is connected with a fixed bolt (18) through an attached pull rod (10), and the bearing bracket and the bearing plank are respectively fixed on the outer wall through bolts (22) and (23). With the advantages of good integrity, high security, convenient manipulation, high degree of automation and good economic returns, the scaffold can stably and integrally lift at a higher speed.

Description

Novel elevating formula integral-scaffold
The utility model belongs to exterior wall scaffold for building, especially external wall of high-rise building scaffold field.
In high-building construction, flying scaffold has obtained application more and more widely.In known technology, but most of liftable scaffold form by the unit combination of a plurality of independent-liftings, and wherein much by manually-operated control lifting, scaffold lacks enough globality and stability, operation is also inconvenient.Chinese patent " integral hoisting scaffold " (patent No. 88216513.5) provide a kind of can the whole scaffold that promotes, make the dismounting scaffold simplified control many, the sense of security when constructing, the constructor has also been arranged, but the employed lifting facility of this patent are Lift-slab machines, hoisting velocity is slow, the facility volume is big, weight is big, is not easy to dismounting and installation, and the control automaticity is also not enough.
The purpose of this utility model provides that a kind of globality is strong, the sense of security good, easy to operate, electric up-down integral-scaffold that automaticity is high.
The utility model is realized its purpose as follows: scaffold 2 is located on the bearing support 7 of many group elevating mechanisms, and each bearing support 7 links to each other with set bolt 9 through attached wall pull bar 8, and is hung by electric block 15; Each electric block is hung respectively on the support bracket 17 of its place group, and support bracket 17 is connected with set bolt 18 through attached wall pull bar 10; Bearing support 7 and support bracket 17 are fixed on the skin by set bolt 22,23 respectively.
Use electric up-down integral-scaffold of the present utility model, can promote or decline, give the constructor with the very big sense of security so that fast speeds is whole reposefully, and it is easy to operate, reliable operation, the economic benefit height is a kind of more satisfactory highrise building scaffold.
Embodiment further specifies the utility model below in conjunction with accompanying drawing:
Fig. 1 is the vertical profile schematic diagram of this electric up-down integral-scaffold.
Fig. 2 is the elevation of this scaffold.
Fig. 3 is the partial plan layout of this scaffold.
Truss principal 1 is arranged at the bottom of scaffold 2.Many group elevating mechanisms are more equably distributing along the scaffold cross section.Truss principal 1 part of scaffold is located on the bearing support 7 of respectively organizing elevating mechanism, and bearing support 7 is fixed on certain position of exterior wall by bolt 11, foot rest 12 and set bolt 22, and attached wall pull bar 8 and set bolt 9 give bearing support with supplemental support.Support bracket 17 is fixed on the exterior wall of building by set bolt 23; electric block 15 is hung thereon; protection steel cable 14 is hung between it and bearing support 7; support bracket is also fixedlyed connected with skin with set bolt 18 by attached wall pull bar 10, is slidingly connected by slide fastener spare 13 and conduit 16.Directive wheel 6 makes the scaffold can be along the exterior wall vertical lift of building.
This scaffold can overlap with common scaffolding such as steel pipe, shaped steel and fastener dop.Be easy construction, can set up four floor height, scaffold floor 3, railing 4, safety net 5 are arranged on the frame.Whole scaffold is set up around building 19, determines the group number of required elevating mechanism according to the building needs.Scaffold top should exceed as shown in Figure 1 constructs more than the building body wall first floor that finishes.After new floor 20 constructions were finished, scaffold should promote the 1-2 layer height.During lifting, unclamp earlier the set bolt 23,18 of respectively organizing elevating mechanism simultaneously, adopt small-sized hand-operated cucurbit that support bracket 17 is upwards promoted the 1-2 layer together with electric block 15 grades, utilizing giving on the exterior wall to box out retightens, allow electric block 15 tangle bearing support 7 then, unclamp set bolt 22,9 again, start the electric block 15 of respectively organizing elevating mechanism and promote bearing support 7, scaffold 2 promptly promotes thereupon, utilizes external wall to give after putting in place to box out to retighten bearing support 7.Unclamp set bolt 22,9 during decline earlier, restart electric block 15 and fall bearing support 7, scaffold 2 descends thereupon, again support bracket 17 and electric block 15 is fallen the 1-2 floor after bearing support is retightened, and treats to fall scaffold 2 next time and uses.The constructor can stand in operation on the operating desk 21 during operation.Electric block of each group elevating mechanism is carried out Program Synchronization control, make that respectively to organize the elevating mechanism lifting synchronous, whole scaffold lifting is steady, has strengthened constructor's the sense of security.Through the construction application in practice, adopt scaffold of the present utility model to carry out high-building construction, play very significant effect to realizing high-quality, high-speed, high benefit.

Claims (1)

1. an electric up-down integral-scaffold has scaffold (2), scaffold floor (3), railing (4), safety net (5), directive wheel (6), it is characterized in that:
1. scaffold (2) is located on the bearing support (7) of many group elevating mechanisms, and each bearing support (7) links to each other with set bolt (9) through attached wall pull bar (8), and is hung by electric block (15);
2. each electric block (15) is hung respectively on the support bracket (17) of its place group, and support bracket (17) is connected with set bolt (18) through attached wall pull bar (10);
(3) bearing support (7) and support bracket (17) are fixed on the skin by set bolt (22), (23) respectively.
CN 01273195 2001-12-30 2001-12-30 New lifting integrated scaffold Expired - Fee Related CN2525158Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01273195 CN2525158Y (en) 2001-12-30 2001-12-30 New lifting integrated scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01273195 CN2525158Y (en) 2001-12-30 2001-12-30 New lifting integrated scaffold

Publications (1)

Publication Number Publication Date
CN2525158Y true CN2525158Y (en) 2002-12-11

Family

ID=33678207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01273195 Expired - Fee Related CN2525158Y (en) 2001-12-30 2001-12-30 New lifting integrated scaffold

Country Status (1)

Country Link
CN (1) CN2525158Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100351482C (en) * 2005-12-14 2007-11-28 姚康华 Protective frame special for construction of building main body
CN100365236C (en) * 2004-07-19 2008-01-30 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN102383588A (en) * 2011-08-25 2012-03-21 深圳市特辰科技股份有限公司 Lifting platform for protecting safety of high-level construction
CN105102183A (en) * 2013-01-24 2015-11-25 康克斯科技公司 Plural-story, pipe-support frame system with modular, removably attachable, lateral-worker-support scaffolding

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365236C (en) * 2004-07-19 2008-01-30 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN100351482C (en) * 2005-12-14 2007-11-28 姚康华 Protective frame special for construction of building main body
CN102383588A (en) * 2011-08-25 2012-03-21 深圳市特辰科技股份有限公司 Lifting platform for protecting safety of high-level construction
CN105102183A (en) * 2013-01-24 2015-11-25 康克斯科技公司 Plural-story, pipe-support frame system with modular, removably attachable, lateral-worker-support scaffolding

Similar Documents

Publication Publication Date Title
CN211524016U (en) Double-working-surface guide frame climbing type working platform and system
CN1044841A (en) Building construction system
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN2187637Y (en) Electric lifting integral scaffolding
CN2525158Y (en) New lifting integrated scaffold
CN110185247A (en) Mobile outrigger platform
CN202441045U (en) Rail-type electric attached lifting scaffold
CN209568688U (en) A kind of elevating construction platform
CN209703967U (en) A kind of Multifunctional decoration construction bracket
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN2853976Y (en) Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction
CN214302804U (en) Double-layer hanging basket of riding horse type
CN214995818U (en) Climbing type construction operation platform outside building
CN204754150U (en) Dish -type node formula scaffold
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN201502168U (en) Hoisting device for wholly hoisting building outer bracket
CN2276046Y (en) Divided multistage automatic climbing external scaffold
CN208056658U (en) Aerial for industrialized building makes building machine
CN2578461Y (en) Liftable scaffold
CN210127618U (en) Adjustable movable steel pipe scaffold
CN106088564A (en) Track climbing type monolithic architecture construction scaffolding
CN2175805Y (en) Integrated lifting scaffold capable of being segmented
CN206466912U (en) A kind of three-dimensional module hanging apparatus
CN2204832Y (en) Automatic lifting scaffold
CN2241727Y (en) Outside scaffold capable of quick lifting for high-rise building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee