TW591463B - Project engineering control system and method thereof - Google Patents

Project engineering control system and method thereof Download PDF

Info

Publication number
TW591463B
TW591463B TW91120398A TW91120398A TW591463B TW 591463 B TW591463 B TW 591463B TW 91120398 A TW91120398 A TW 91120398A TW 91120398 A TW91120398 A TW 91120398A TW 591463 B TW591463 B TW 591463B
Authority
TW
Taiwan
Prior art keywords
project
item
scope
data
patent application
Prior art date
Application number
TW91120398A
Other languages
Chinese (zh)
Inventor
Gau-Ching Jau
Original Assignee
Topco Scient Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Topco Scient Co Ltd filed Critical Topco Scient Co Ltd
Priority to TW91120398A priority Critical patent/TW591463B/en
Application granted granted Critical
Publication of TW591463B publication Critical patent/TW591463B/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a project engineering control system and method thereof, which comprise a central server device, a control end, a mission end and a decision end. When the mission end connects to the central server device through the network to transmit the working daily record to the central server device, the central server device will update the document management record in the database, and connects to the central server device through the network based on the plan data. The control end pre-establishes or issues a checking rule immediately on the central server device, so as to check the abnormal condition of the document management record, and assign an abnormal label to it. When the central server device finds the abnormal label, it informs the decision end to issue a processing opinion, and then inform the control end to require the mission end to eliminate the abnormal condition according to the processing opinion.

Description

591463 五、發明說明(1) 【發明背景】 目前習知專案工程施工控管方法,以中華民國專利公 告編號4 6 4 7 2 4之無塵室施工方法為例,其施工控管 方法包含步驟如下: (a ) 先進行建物移交工程,再進行移交之建物的檢查 確認工作; (b ) 若檢查確認品質未達移交要求,則重回到建物移 交工程,若確認已達移交要求,則進行工安衛措 施工程,再進工安衛措施之檢查確認工作;591463 V. Description of the invention (1) [Background of the invention] At present, the construction control method of the conventional project, taking the clean room construction method of the Republic of China Patent Publication No. 4 6 4 7 2 4 as an example, the construction control method includes steps. It is as follows: (a) first carry out the building transfer project, and then carry out the inspection and confirmation of the transferred building; (b) if the check confirms that the quality does not meet the transfer requirements, return to the building transfer project, and if it confirms that the transfer requirements have been met, proceed Work safety and security measures project, and then enter the inspection and confirmation of work safety and security measures;

(c ) 若確認未完成工安衛措施,則重回到工安衛措施 工程,若確認已完成工安衛措施,則進行假設工 程,而後進行塗裝工程,再進行塗裝之檢查確認 工作; (d ) 若確認未完成塗裝則重回到塗裝工程,若確認已 完成塗裝則進行地板保護工程,再進行地板保護 之檢查確認工作;(c) If it is confirmed that the work safety and security measures have not been completed, return to the work safety and security measures works; if it is confirmed that the work safety and security measures have been completed, perform hypothetical works, then carry out painting works, and then carry out painting inspection and confirmation work; (d) ) If it is confirmed that the painting is not completed, return to the painting project, if it is confirmed that the painting is completed, perform the floor protection project, and then check and confirm the floor protection;

(e ) 若確認未完成地板保護則重回到地板保護工程, 若確認已完成地板保護則進行貓道按裝工程,再 進行貓道之檢查確認工作; (f ) 若確認未完成貓道工程則重回到貓道工程,若確 認已完成貓道工程則可進行R · C基座工程、空 調箱組裝工程、風管工程、放樣工程、消防撒水 管路工程、冰熱水管路工程及電力工程,且在該 等工程之後均需進檢查確認工作;(e) If it is confirmed that the floor protection is not completed, return to the floor protection project; if it is confirmed that the floor protection is completed, perform the cat lane installation project, and then perform the inspection and confirmation of the cat lane; (f) If it is confirmed that the cat lane project is not completed Then return to the catwalk project. If you confirm that the catwalk project has been completed, you can carry out R · C base project, air-conditioning box assembly project, air duct project, stake out project, fire sprinkler project, ice and hot water pipeline project, and electricity. Works, and inspection and confirmation work are required after such works;

第4頁 591463 五、發明說明(2) (g ) 若確認未 成則依序 而後進行 上述之施工控 之步驟未經檢查確 工之進行。由上述 工程之各項要求, 度,就實際工程進 的。 有鑑於此,吾 法,藉由一中央伺 之控管方法,以滿 能達到同時控管及 【發明目的及概述 本發明之目的 法,藉由一中央伺 )及一控管端設立 完成則重回到 進行系統測試 移交工程。 該項工程,若確 工程及無塵室消】 管方法係採一循序步驟,一旦 定之步驟則明確 到同時控管功效。 認,則後項規 之控管方式看 然而,為確保 行而言,各項 人遂提出此— 服裝置及一資 足實際專案工 察覺各項進行 ] 一,係揭露一 服裝置、一資 ,滿足專案工 來,似乎能一— 達成業主所要求 工程往往是需要 專案工程控管系 料庫,並配合吾 程之同時進行需 中專案工程之異 專案工程控管系 料庫、一任務端 程於同時進行時 認均已完試工程, 前項規定 限定其施 確保各項 之施工進 同時進行 統及其方 人所揭露 要,且亦 常狀況。 統及其方 工地端 亦能達 法,藉由一中央 端設立,各項工程 各項進行工程中異 本發明之目的 法,藉由一中央伺 的二,係揭露一 伺服裝置、—資 於同時進行時 常狀況。 專案工程控管系統及其方 料庫、一控管端及一決策 ’亦能達即時回報及處理 係揭露 服裝置 資 專案工程控管系 料庫、一任務端 統及其方 、一控管 第5頁 591463Page 4 591463 V. Description of the invention (2) (g) If it is confirmed that it has not been completed, then proceed to the above-mentioned construction control steps without inspection and confirmation. Based on the requirements of the above projects, the progress is made on the actual project. In view of this, our method uses a central control method to achieve simultaneous control and [inventive purposes and outline the purpose of the invention, a central control) and a control end. Go back to the system test handover project. For this project, if the engineering and clean room management methods are adopted, follow the sequential steps. Once the steps are determined, the effectiveness of the simultaneous control will be clear. However, in order to ensure the line of practice, each person then proposed this — the service device and a fully-funded actual project worker perceive the progress of each item]. One is to expose the one service device, one asset, and meet the requirements. The project workers seem to be able to achieve one—to achieve the project required by the owner is often a project project management and control warehouse, and cooperate with us to carry out a different project project control and management warehouse and a task-end process. At the same time, it was recognized that the trial project had been completed. The provisions of the preceding paragraph limit its implementation to ensure that the construction of each item is carried out at the same time as disclosed by the system and its side, and it is also often in a condition. The system and its construction site end can also reach the law. With the establishment of a central end, various projects and projects are carried out differently from the purpose of the present invention. By a central server, the two are to expose a servo device. Carry out a constant condition. Project engineering control system and its library, a control terminal and a decision 'also can achieve immediate reporting and processing system to expose service device project management system library, a task terminal system and its methods, a control management Chapter 5

端及一機制設立,可有效掌控任 本發明之目的四,係揭露一 法,藉由一中央伺服裝置、一資 可提供相關人員查 限機制設立, 本發明之 法,藉由一控管端、一決 監造端 之介面 綜上所述 務端之員 專案工程 料庫、各 詢最即時 專案工程 一任務端 本發明上 指之專案 、一任務 裝置至少 錄x —文 工活動 控管系 式資料 之資訊 控管系 '一業 述之目 工程控 端、一 包含一 件管理 數量資 及一即 合之網 紀錄至 庫中之 線或兩 控管端 ,藉此 號。另 錄出現 路連接 接續通 之排除 狀態。 統及其方 報表及權 〇 統及其方 主端、一 的。 管系統係 決策端、 資料庫記 紀錄、' 料、材料 時比對功 路連接至 中央伺服 文件管理 者結合之 在中央伺 檢查文件 外,當中 異常標號 至中央伺 知控管端 ,其中, 目的五,係揭露一 策端、 效達成 發明所 控管端 央伺服 曰報紀 料、一 料、— 、有線 機傳送 設立,可有 之目的,本 包含一中央伺服裝置、一 一業主端及一^監造端。中 錄一計劃書資料、一施工 施工圖槽資 採購資 送審資 能。當 中央伺 裝置時 紀錄, 網路連 服裝置 管理紀 央伺服 日守’遂 服裝置 要求任 料、一 料、一進度報表資 任務端經由一無線 服裝置 ,中央 另依其 接至中 上預先 錄之一 裝置經 經由一 ,通知 務端依 ,定期或隨 伺服襄置會 計劃書資料 央伺服裝置 建立或立即 異常狀況, 由該資料庫 無線、有線 決策端下達 該處理意見 估驗計價 請款資料 或兩者結 施工日報 立即更新該資料 經由一無線、有 ’定期或隨機由 下達一檢查規則 並予以一異常標 發現文件管理記 或兩者結合之網 一處理意見後, 進行其異常狀況The establishment of a terminal and a mechanism can effectively control the purpose of the present invention. The fourth is to disclose a method, which is established by a central servo device and a mechanism that can provide relevant personnel to check and limit. The method of the invention is controlled by a controlling terminal. 1. The interface of the supervising and supervising end. In summary, the project database of the project staff, the most timely project project, the task end, the project referred to in the present invention, and a task device are recorded at least x — the control system of cultural activities. The information control system of the type data is the project control terminal of one industry description, one that contains a piece of management data and a combination of network records to the line in the library or two control management terminals. In addition, the exclusion status of the road connection and connection is displayed. System and its statements and rights 〇 System and its principal, one. The management system is the decision-making end, the database record, and the comparison of materials and materials. The circuit is connected to the central servo document manager, and the exception is the central servo inspection file. Fifth, it is to expose a policy end, and to achieve the control of the central server controlled by the invention. The central servo system reports the report, the data, and the cable transmission. The purpose is to include a central servo device, a client, and a server. ^ Supervision. Recorded one plan document, one construction plan, slotted capital, purchased capital, and submitted for review. Records when the central server is connected to the device. The management of the network-connected server is controlled by the central server. The server then requests any materials, materials, and progress reports. The task terminal passes a wireless server. After recording a device, the server will be notified, and the server will be established periodically or with the servo plan information or the server will be established immediately or abnormally. The wireless and wired decision-making terminal of the database will issue the processing opinion, estimate the price, and request the payment. The data or both will be immediately updated in the construction daily report. The information is processed abnormally after a wireless, regular or random issue of an inspection rule is issued, an abnormal bid is found, the document management record, or a combination of the two is processed.

第6頁 五、發明說明(4) 異常狀況排除、結果則經 錄至中央伺服驻里丈 務知疋期所傳送之施工曰報紀 叫服裝置而可即時得知。 乂之叶劃書資料鹿包合一 紀錄應包含直安 w 一專案工程規格。施工曰報 寻案工程之每日杯孜一 係包含-辦應該專案工程規袼匕執行狀況。文件_錄 工曰報紀錄。 知工紀錄,記錄最新之施 料,用S供該=:料二厂進度報表資料以及一請款資 包含一採購進^ ^監造端查詢及確認。採購資料, 以供任務端、控管端、決策端二;採購價金參考資料’用 造端及任務端杏、.,^ 一珣,施工圖檔貧料,供監 務^查询。估驗計價數 錄、一計價附件資料及一工藉旅^貝枓,包3有一计彳貝紀 詢。即時比對功能,可供控^包資肖,用以供控管端查 計劃書資料、施工曰報紀!;、文侔t務端、決策端查詢其 時,同時出現其比對吻人之件官理紀錄以及採購資料 考。 口 寻案工程資料記錄,以供參 另外,控管端包含提供一撫心 ^ 行動電話或一個人數位助理(2 ^猎由配置該員工一 話或該個人數位助理之業者, 並格配該行動電 態,如員工之所在位置。 Λ有效軍控任務端之員工狀 吾人根據上述所揭露之專垒 由一任務端傳送一施工日 置之一資料庫。 專案工程控管方法,其方法如;,程控官系統,另衍伸一 a 中央伺服裝Page 6 V. Description of the invention (4) The abnormal condition is eliminated, and the result is recorded to the central servo station during the construction period, and the construction period is reported to the server.乂 之 叶 writing data deer package unification record should contain the project specifications of Zhi'an w project. Construction Daily Report The daily cup of the case-finding project includes the implementation status of the project project regulations. File_record Know the labor records, record the latest materials, use S for the =: Material No. 2 factory progress report data and a request for funds, including a purchase progress ^ ^ supervision and confirmation of the manufacturing end. Purchasing data for task, control and decision-making; reference price of purchase price ’is used for construction and task, and the construction drawings are poor materials for supervision ^ query. Estimated price records, a price attachment information and a work trip ^ Beibei, including 3 Jibei inquiries. Real-time comparison function, which can be used to control the package, which can be used by the management to check the plan information, report the construction period! Examination of official records and procurement information. Oral search project data records for reference. In addition, the control end includes providing a carefree mobile phone or a digital assistant (2 ^ hunting by the operator who configures the employee or the personal digital assistant, and assigns the action Electrical status, such as the location of the employee. ΛEmployees from the effective arms control mission end transmit a database of a construction day from a mission end according to the above-disclosed barriers. Project engineering control methods, such as ;, Program controller system, another extension of a central servo device

五 、發明說明(5) b 中央伺服裝置’經由接受該施工日報紀錄至資料 庫t後,更新資料庫中之對應文件管理紀錄,並 依其計劃書資料,由一控管端預先建立或立即下 達一檢查規則,藉此檢查此文件管理紀錄之異常 狀況,並予一異常標號。 、/' c 待中央伺服裝置發現資料庫t之文件管理圮錚出 現異常標號時,即通知一決策端下達牛:處里理己= d 後,接續通知控管端要求任務端依此處理意見進 行其異常狀況之排除。 中央飼服裝置另可經由任務端定期所傳送之施工 如-日報紀錄得知其異常狀況之排除結果。 工程=1 ΐ述系統所述,上述之計劃書資料係包含一專案 執行肤柘貝料。施工日報紀錄係包含專案工程之每曰任務 之綠况。文件管理紀錄則應包含一對應該專案工程規袼 Γ己錄丄記錄最新之施工日報紀錄。 —仕故外,貧料庫更包含一採購資料、/施工圖檔資料、 及—ΪΪ價數量資料、一材料送審資料〆進度報表資料 表資即時比對功能。材料送審資料、進度報 採購資imr供業主端及監造端查詢及確認。 參考資料,供任務端材構進度、-採購明細及:採購價金 料,供龄造端及任Ϊ、控管端及決策端袭詢。訑工圖檔資 #1 ^ ϋ壬務端杳绝。/士於#細粉I資料,則 591463 五、發明說明(6) 端查詢其計劃書資料、施工日報紀錄、文件管理紀錄及採 購資料時,同時出現其比對吻合之一專案工程資料記錄, 以供參考。 再者,控管端更可包含提供一機制,如藉由配置該員 工一行動電話或一個人數位助理(P D A ),並搭配該行 動電話或該個人數位助理之業者,來有效掌控任務端之員 工狀態,如員工之所在位置。V. Description of the invention (5) b After accepting the construction daily report record to the database t, the central servo device updates the corresponding document management record in the database, and according to its plan information, it is established in advance by a control terminal or immediately A check rule is issued to check the abnormal status of this document management record and give an abnormal number. , / 'C When the central servo device finds that the file management of the database t has an abnormal label, it will notify a decision-making party to issue the bull: after handling it = d, then continue to notify the controlling end to request the task end to process the opinion accordingly. Exclude their abnormal conditions. The central feeding device can also know the exclusion result of its abnormal condition through the construction such as the daily report recorded by the mission. Project = 1: As stated in the description system, the above-mentioned plan information includes a project execution skin material. The construction daily record contains the green status of each task of the project. The document management record shall contain the latest construction daily record of a pair of project engineering regulations. —In addition to official sources, the poor material warehouse also includes a purchase data, / construction drawing file data, and—price data, a material submission review data, progress report data, and real-time comparison. The materials submitted for review and progress report The purchase capital imr is for the owner's and supervisor's inquiry and confirmation. Reference materials for the task end material structure progress,-purchase details and: purchase price gold materials, for age creation and appointment, control and decision making.訑 工 图档 资 资 # 1 ^ This is not the case. / 士 于 # Fine powder I data, then 591463 V. Invention description (6) When querying its plan information, construction daily records, document management records, and procurement information, it also appears that its comparison matches one of the project data records, for reference. Furthermore, the control terminal may further include providing a mechanism, such as by configuring the employee with a mobile phone or a digital assistant (PDA), and using the mobile phone or the personal digital assistant to effectively control the employees on the task side. Status, such as where the employee is.

第9頁 591463 圖式簡單說明 [ 圖式 簡 單 說 明 ] 為 讓 本 發 明 之上 述 目 的 特 徵 和 優 點 能 更 明 顯 易 懂 9 下 文特 舉 兩 較 佳 實施 例 並 配 合 所 附 圖 式 , 作 詳 細 說 明 如 下 • 第 一 圖 係 描 述 本發 明 之 主 要 架 構 示 意 圖 第 二 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 一 第 三 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 二 第 四 圖 係 描 述 本發 明 之 專 案 工 程 部 分 資 料 格 式 示 意 圖 第 五 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 —^— 9 第 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 四 9 第 七 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 五 ; 第 八 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 六 ; 第 九 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 七 第 十 圖 係 描 述 本發 明 之 _ 一 視 窗 介 面 示 意 圖 第 十一 圖 係 描 述 本發 明 之 專 案 工 程 資 料 控 管 示 意 圖 八 1 以 及 第 十二 -圖 係 描 述 本發 明 之 專 案 工 程 控 管 方 法 流 程 圖 〇 【標號說明】 10 0: 專案工程控管系統; 10 1: 中央伺服裝置; 10 2: 資料庫; 10 3: 計劃書資料; 10 4: 施工日報紀錄; 10 5: 文件管理紀錄;591463 Brief description of the drawings [Simplified description of the drawings] In order to make the above-mentioned features and advantages of the present invention more comprehensible and easy to understand 9 the following two specific embodiments are described in detail in conjunction with the attached drawings, as detailed below: The first diagram is a schematic diagram illustrating the main structure of the present invention. The second diagram is a schematic diagram of the control of the project engineering data of the present invention. The third diagram is a schematic diagram of the control of the project engineering data of the present invention. The fourth diagram is a project of the present invention. Schematic diagram of the data format of the engineering part The fifth diagram is a schematic diagram of the engineering data control of the project of the present invention — ^ — 9 The diagram is a schematic diagram of the engineering data control of the project of the present invention 4-9 The seventh diagram is the engineering data control of the project of the present invention Schematic diagram 5 of management; Schematic diagram 8 depicts the management of the project engineering data of the present invention The ninth diagram is a schematic diagram describing the control of the project engineering data of the present invention. The tenth diagram is a schematic diagram describing the window of the present invention. The eleventh diagram is a schematic diagram of the control of the project engineering data of the present invention. 8 and 12 -The drawing is a flow chart describing the project engineering control method of the present invention. 0 [label description] 10 0: project engineering control system; 10 1: central servo device; 10 2: database; 10 3: plan data; 10 4 : Construction daily record; 10 5: Document management record;

第10頁 591463 圖式簡單說明 10 6 10 7 10 8 10 9 01230123451212124567 11112222220000000000 IX IX IX IX IX IX IX 1± IX IX 0^- 0〇 0<0 44 4^ ^4 ^4 ^4 4^ 採購資料; 施工圖槽貢料, 估驗計價數量資料; 材料送審貢料, 進度報表資料; 請款資料; 即時比對功能; 異常狀況檢查功能; 控管端; 任務端; 決策端; 業主端; 監造端; 網路; 施工日報紀錄; 檢查規則紀錄; 異常標號; 處理意見; 施工紀錄; 每日任務執行狀況; 採購進度; 採購明細; 採購價金參考資料; 計價紀錄;Page 10 591463 Simple explanation of drawings 10 6 10 7 10 8 10 9 01230123451212124567 11112222220000000000 IX IX IX IX IX IX 1 ± IX IX 0 ^-0〇0 < 0 44 4 ^ ^ 4 ^ 4 ^ 4 4 ^ ; Construction drawings, tribute materials, estimated pricing data; materials submitted for review, progress report data; payment information; real-time comparison function; abnormal status check function; control side; task side; decision side; owner side; Origination; network; construction daily record records; inspection rule records; abnormal labeling; processing opinions; construction records; daily task execution status; procurement progress; procurement details; purchase price reference materials; valuation records;

591463 圖式簡單說明 4 0 8: 計價附件資料; 4 0 9: 工程發包資料; 501 、502、601 、602 及 603 ··視窗介面; 1 0 0 1 :專案工程資料記錄; 1 1 0 1 ··行動電話; 1 1 0 2 :個人數位助理; 1 1 0 3 :業者;以及 1 2 0 1至1 2 0 4 :流程步驟。 【實施例詳細說明】591463 Brief description of the drawings 4 0 8: Valuation attachment data; 4 0 9: Project contracting data; 501, 502, 601, 602, and 603 ·· Windows interface; 1 0 0 1: Project engineering data record; 1 1 0 1 · Mobile phones; 1 102: personal digital assistants; 1 103: operators; and 1 2 01 to 12 0 4: process steps. [Detailed description of the embodiment]

請參第一圖所示,本圖係描述本發明所指之專案工程 控管系統1 0 0之架構圖;圖中係包含一中央伺服裝置1 01、 一控管端120、一任務端121、一決策端12 2、 一業主端1 2 3及一監造端1 2 4。中央伺服裝置1 0 1至少包含一資料庫1 0 2記錄一計劃書資料1 0 3 、Please refer to the first figure, which is a structural diagram describing the project engineering control system 100 according to the present invention. The figure includes a central servo device 101, a control terminal 120, and a task terminal 121. 1. A decision-making end 12 2. A client 1 2 3 and a supervisor 1 2 4. The central servo device 1 0 1 contains at least a database 1 2 2 records a plan data 1 0 3,

一施工日報紀錄1 〇 4、一文件管理紀錄1 0 5、一採購 資料1 0 6、一施工圖檔資料1 0 7、一估驗計價數量資 料1 0 8、一材料送審資料1 0 9、一進度報表資料1 1 0、一請款資料1 1 1 、一即時比對功能1 1 2及一異常 狀況檢查功能1 1 3。為更加清楚說明第一圖,請參見第 二圖,當任務端1 2 1經由一無線、有線或兩者結合之網 路1 2 5連接至中央伺服裝置1 0 1 ,且定期或隨機傳送 施工曰報紀錄2 0 1至中央伺服裝置1 0 1時,中央伺服 裝置1 0 1會立即儲存於資料庫1 0 2中之施工日報紀錄 1 0 4當中,並更新資料庫1 0 2中之文件管理紀錄1 0A construction daily record 1 0 4 a file management record 1 0 5 a purchase information 1 0 6 a construction drawing file 1 0 7 an estimate price information 1 0 8 a material submission information 1 0 9 A progress report data 1 1 0, a request data 1 1 1, an instant comparison function 1 1 2 and an abnormal condition check function 1 1 3. In order to explain the first picture more clearly, please refer to the second picture. When the task end 1 2 1 is connected to the central servo device 1 0 1 via a wireless, wired or a combination of the network 1 2 5, and the construction is transmitted regularly or randomly When the daily report record 2 01 to the central servo device 101 is received, the central servo device 101 will be immediately stored in the construction daily report record 104 in the database 102 and the documents in the database 102 will be updated. Management records 1 0

第12頁 591463 圖式簡單說明 5 。另由控管 路1 〇 5連接 料1 〇 3,在 0 2中之異常 紀錄1 0 4中 料是否相符, 10 1 此檢查 紀錄1 料不符 請 料庫1 時,中 之網路 3 0 2 處理意 排除結 紀錄2 參 工程規 務執行 專案工 錄4 0 第 予一檢 文件管 0 4中 ’並予 接續參 0 2發 央伺服 12 5 後,接 見3 〇 果則經 0 1至 見第四 格。施 狀況4 程規格 2。 五圖係 端1 2 0經 至中央伺服 中央伺服裝 狀況功能檢 之描述所裝 或經由網路 查規則紀錄 理紀錄1 〇 之描述所裝 一異常標號 見第三圖, 現文件管理 裝置1 0 1 連接至,通 續通知控管 2進行其異 由任務端1 中央伺服裝 圖,上述之 工曰報紀錄 〇 2。文件 之施工紀錄 由^一無 裝置1 置1 0 查1 1 設之工 12 5 2 0 2 5之一 設之工 當中央 記錄1 遂經由 知決策 端1 2 常狀況 2 1定 置1 0 計劃書 10 4 管理紀 4 0 1 線、有線或兩者結合之網 0 1 ,並依據其計劃書資 1上預先建立於資料庫1 3,例如:檢查施工日報 程設備型號與其計劃書資 立即下達至中央伺服裝置 於資料庫102中,藉由 異常狀況,例如施工日報 程設備型號與其計劃書資 伺服裝置1 0 1 0 5出現異常標 一無線、有線或 端1 2 2下達一 0要求任務端1 之排除,其中, 期或隨機傳送之 1而可即時得知 資料1 0 3應包 應包含專案工程 錄1 0 5係包含 ,記錄最新之施 經由該資 號3 0 1 兩者結合 處理意見 2 1依該 異常狀況 施工曰報 〇 含—專案 之每曰任 一對應該 工曰報紀 描述本系統所提供之查詢功能,圖中,材料Page 12 591463 Schematic description 5. In addition, the pipeline 1 〇5 is connected to the material 1 〇3, and the abnormal record in 0 2 is whether the material in the 4 matches, 10 1 This check record 1 If the material does not match, please use the warehouse 1 in the network 3 0 2 The processing intention excludes the record 2 Participating in the project management project execution record 4 0 The first inspection document management tube 0 4 'and continuing to participate in the 0 2 after the central servo 12 5 after receiving 3 0 0 Four grids. Implementation Condition 4 Process Specification 2. The five pictures are end 1 2 0 installed by the description of the central servo central servo installation status function inspection or by the network to check the rule record records 1 0 description installed an abnormal number see the third figure, the current file management device 1 0 1 Connect to, and continuously notify the control 2 to perform the different tasks. The central server installs the map. The above-mentioned work report record 02. The construction record of the document is set by ^ No device 1 0 1 Check 1 1 One of the set 12 5 2 0 2 5 One of the set central records 1 Then passed the decision-making end 1 2 Normal status 2 1 Set 1 1 Plan 10 4 Management discipline 4 0 1 Line 0, wired or a combination of both networks 0 1, and pre-built in the database 1 3 according to their plan materials 1, for example: check the equipment type and schedule materials of construction schedules immediately The central servo device is in the database 102. Based on abnormal conditions, for example, the schedule equipment model and its schedule of the construction date, the servo device 1 0 1 0 5 is abnormal. A wireless, wired or terminal 1 2 2 sends a 0 request to the task terminal 1 Excluded, among which, 1 or 3 can be transmitted at random and can know the data immediately. 1 0 3 should include the project project record 1 0 5 is included, the latest application is recorded through the asset number 3 0 1 The combination of the two processing opinions 2 1Construction report according to the abnormal condition. 0 Include—Each project corresponding to the project report describes the query function provided by this system.

EH 第13頁 591463 圖式簡單說明 送審資料1 0 9、一進度報表資料1 1 0及請款資料1 1 1 ,可供業主端1 2 3及監造端1 2 4依其權限以一視窗 介面5 0 1及5 0 2查詢及確認。採購資料1 0 6包含一 採購進度4 0 4、一採購明細4 0 5及一採購價金參考資 料4 0 6 ,如第四圖所述,用以供任務端1 2 1 、控管端 120及決策端122依其權限以一視窗介面601、6 02及603查詢,如第六圖所述。續參見第七圖,其施 工圖檔資料1 0 7,則供監造端1 2 4及任務端1 2 1依 其權限以其視窗介面5 0 2及6 0 1查詢。估驗計價數量 資料1 0 8,包含一計價紀錄4 0 7、一計價附件資料4 0 8及一工程發包資料4 0 9 ,如第四圖所述,用以供控 管端1 20查詢,如第八圖所述。參見第九圖,本系統之 資料庫1 0 2所指之即時比對功能1 1 2,可供控管端1 20、任務端1 2 1及決策端1 22依其權限以其視窗介 面6 0 2、6 0 1及6 0 3查詢其計劃書資料1 0 3、施 工曰報紀錄1 0 4、文件管理紀錄1 0 5及採購資料1 0 6時,同時出現如同第十圖所述之晝面,其比對吻合之一 專案工程資料記錄1 0 〇 1 ,以供控管端1 2 0、任務端 1 2 1及決策端1 2 2依其權限參考。 另外,控管端1 2 0包含提供一機制,如藉由配置該 員工一行動電話1101或一個人數位助理(PDA)1 1 0 2,並搭配該行動電話或該個人數位助理之業者1 1 0 3 ,來有效掌控任務端1 2 1之員工狀態,如員工之所 在位置,如第十一圖所示。EH Page 13 591463 The diagram briefly explains the submission information 1 0 9, a progress report data 1 1 0 and request information 1 1 1, which can be used by the owner 1 2 3 and the supervisor 1 2 4 in a window according to their authority. Interfaces 501 and 502 for query and confirmation. Purchasing information 1 0 6 includes a purchasing progress 4 0 4, a purchasing detail 4 0 5 and a purchasing price reference material 4 0 6, as shown in the fourth figure, for the task side 1 2 1 and the control side 120 And the decision-making end 122 uses a window interface 601, 602, and 603 to query according to its authority, as shown in the sixth figure. Continuing to refer to the seventh diagram, the construction drawing file information 107 is for the supervisory end 1 2 4 and the task end 1 2 1 to inquire through its window interfaces 5 0 2 and 6 0 1 according to their authority. The estimated pricing information data 108 includes a pricing record 407, a pricing attachment data 408, and a project contracting data 409, as shown in the fourth figure, which is used by the control and management end 1 20 to query, As shown in Figure 8. Referring to the ninth figure, the real-time comparison function 1 1 2 referred to in the database 1 0 2 of this system can be used for the management terminal 1 20, the task terminal 1 2 1 and the decision terminal 1 22 according to their permissions. 0 2, 6 0 1 and 6 0 3 query their plan information 1 0 3, construction report record 1 0 4, document management record 1 0 5 and procurement information 1 06, at the same time as shown in the tenth figure On the day and the day, the comparison matches one of the project data records 1001 for reference by the management end 120, task end 121 and decision end 1222 according to their authority. In addition, the control terminal 1 2 0 includes a mechanism for providing the employee with a mobile phone 1101 or a personal digital assistant (PDA) 1 1 2 and a mobile phone or the personal digital assistant 1 1 0 3 to effectively control the status of employees at task end 1 2 1, such as the location of employees, as shown in Figure 11.

第14頁 591463 圖式簡單說明 請參見第十二圖,根據上述所揭露之專案工程控管系 統,另衍伸一專案工程控管方法,其方法如下: 步驟1 2 0 1,由任務端1 2 1傳送施工日報紀錄2 0 1至中央伺服裝置1 0 1之資料庫1 0 2。 步驟1 2 0 2,中央伺服裝置1 0 1續經由接受施工 曰報紀錄2 0 1至資料庫1 0 2後,更新資料庫1 0 2中 之對應文件管理紀錄1 0 5,並依其計劃書資料1 0 3 , 由一控管端1 2 0預先建立抑或立即下達一檢查規則2 0 2,藉此檢查此文件管理紀錄之異常狀況,並予一異常標Page 591463 For a brief description of the diagram, please refer to the twelfth figure. According to the project engineering control system disclosed above, another project engineering control method is developed. The method is as follows: Step 1 2 0 1 by the task side 1 2 1Transfer the construction daily report record 2 01 to the database 1 0 2 of the central servo device 101. Step 1 2 0 2 The central servo device 10 1 continues to accept the construction report record 2 01 to the database 10 2 and then updates the corresponding file management record 1 0 5 in the database 10 2 according to its plan. Book information 103, established by a control end 1 2 0 in advance or immediately issued a check rule 2 0 2 to check the abnormal status of this document management record and give an abnormal bid

號 3 0 1。 步驟1 2 0 3,待中央伺服裝置1 0 1發現資料庫1 0 2中之文件管理記錄1 0 5出現異常標號3 0 1 ,即通 知決策端1 2 2下達一處理意見3 0 2後,接續通知控管 端1 2 0要求任務端1 2 1依此處理意見3 0 2進行其異 常狀況之排除。 步驟1 2 0 4,中央伺服裝置1 0 1另可經由任務端 1 2 1定期或隨機傳送之施工日報紀錄2 0 1得知其異常 狀況之排除結果。No. 3 0 1. Step 1 2 0 3, after the central servo device 1 0 1 finds that the file management record 1 0 5 in the database 1 0 5 shows an abnormal label 3 0 1, that is, the decision-making terminal 1 2 2 is notified to issue a processing opinion 3 0 2. Continue to notify the control end 1 2 0 and ask the task end 1 2 1 to handle the opinion 3 2 2 accordingly to eliminate its abnormal situation. In step 1 2 0 4, the central servo device 1 0 1 can also periodically or randomly send the construction daily report record 2 1 1 through the task side 1 2 1 to know the result of its abnormal condition.

如同上述系統所述,上述之計劃書資料係包含專案工 程規格4 0 1。施工日報紀錄1 0 4係包含專案工程之每 曰任務執行狀況4 0 2。文件管理紀錄1 0 5則應包含對 應該專案工程規格之施工紀錄4 0 1 ,記錄最新之施工曰 報紀錄4 0 2。 另外,資料庫更包含有採購資料1 〇 6、施工圖檔資As described in the above system, the above plan information includes the project engineering specifications 401. The construction daily record 104 refers to the task execution status of the project. The document management record 105 shall include the construction record 401 corresponding to the project engineering specifications and the latest construction report record 402. In addition, the database contains procurement information 106. Construction drawing files

第15頁 591463 圖式簡單說明 料1 0 7 9、進度 功能1 1 及請款資 查詢及確 購明細4 1、控管 0 7,則 數量資料 0 8及工 即時比對 決策端1 0 4、文 現其比對 再者 該員工一 110 2 10 3, 置。 '估驗計價數量 表資料1 1 0 2 °材料送審資 料1 1 1 ,用以 認。採購資料1 〇 5及採購價金 端1 2 0及決策 供監造端1 2 4 1 0 8亦包含計 程發包資料4 0 功能1 1 2則供 2 2查詢其計劃 件管理紀錄1 〇 吻合之一專案工 ,控管端1 2 0 行動電話1 1 0 ,並搭配該行動 來有效掌控任務 資料1 0 、請款資 料1 0 9 供業主端 0 6亦包 參考資料 端1 2 2 及任務端 價紀錄4 9 ,用以 控管端1 書資料1 5及採購 程資料記 亦包含提 1或一個 電話或該 端之員工 8、材料送審資料1 料1 1 1以及即時比 、進度報表資料1 1 123及監造端12 含採購進度404、 4 0 6,供任務端1 查詢。施工圖檔資料 1 2 1查詢。估驗計 0 7、計價附件資料 供控管端1 2 0查詢 2 〇、任務端1 2 1 〇 3、施工日報紀錄 資料1 0 6時,同時 錄1001以供參考 供一機制,如藉由配 人數位助理(PDa 個人數位助理之章者 狀態,如員工之所在 0 對0 4 採21 價 4 出 〇 置 )1 位 、‘、上所述,雖然本創作已以一較佳實施例揭露如 然其並非用以限定本創作,任何熟習此技藝者,^ ° ’ 本創作之精神和範圍内,當可作各種之更動與潤,=離 本創作之保護範園當視後附之申請專利範圍其所界定2 =Page 15 591463 The diagram simply explains the material 1 0 7 9. Progress function 1 1 and the inquiry and purchase details 4 1. Control and management 0 7, the quantity data 0 8 and the real-time comparison decision-making end 1 0 4 The text is now compared with the employee 110 2 10 3. 'Assessed and quantified quantity Table 1 1 0 2 ° Materials submitted for review 1 1 1 for confirmation. Purchasing information 1 005 and purchase price gold end 1 2 0 and decision-making supervision end 1 2 4 1 0 8 also includes metering and contracting information 4 0 function 1 1 2 for 2 2 querying its management records of plan 1 1 One of the project workers, the control side 1 2 0 mobile phone 1 1 0, and use this action to effectively control the task data 1 0, the request information 1 0 9 for the owner 0 6 also includes the reference side 1 2 2 and tasks The price record 4 9 is used to control the data of the book 1 of the terminal 15 and the data record of the purchase process. It also contains the mention 1 or a phone or the staff of the terminal 8, the material submission information 1 material 1 1 1 and the real-time comparison and progress report data. 1 1 123 and Supervisor 12 include purchase progress 404, 4 0 6 for task 1 query. Construction drawings and documents 1 2 1 query. Evaluation meter 0 7. Valuation attachment information is provided to the control side 1 2 0 to query 2 〇, task side 1 2 1 〇3, construction daily report record data 1 06, at the same time recorded 1001 for reference for a mechanism, such as by Number of assistants (the status of PDa personal digital assistants, such as where the employees are 0 to 0 4 price 21 price 4 price 0) 1 person, ', as described above, although this creation has been disclosed in a preferred embodiment If it is not used to limit the creation, anyone who is familiar with this skill, ^ ° 'can make various changes and improvements within the spirit and scope of the creation, = the application attached to the protection of the creation of the creation should be attached The scope of the patent is defined 2 =

Claims (1)

591463 >T. I ____T'fel热貝 ——年 Μ a 六 、申請專利範圍 種專 中央、 一控管 一任務 一決策 其 該中央 資料庫 由該控 料 案工程控 伺服裝置 施工日報 端; 端;以及 jLlll · 中,當該 伺服裝置 中之該文 管端在該 管糸統,包含 至少包含一資 紀錄及一文件 料庫 管理 記錄一計劃書資 紀錄; Μ 達一檢查規則 4 狀況, 資料庫 通知該 端要求 除。 如專利 其中該 施工日 如專利 其中該 如專利 其中該 執行狀 並予一異 任務端 時,該 件管理 中央伺 藉此檢 常標號 發現該文件管理 決策端下達一處 該任務端依該處 定期傳 中央伺 紀錄, 服裝置 查該文,當該 記錄出 理意見 理意見 送該 服裝 另依 上預 件管 中央 現該 後, 進行 施工日報 置會立即 該計劃書 先建立或 理紀錄之 伺服裝置 異常標號 接續通知 該異常狀 紀錄至 更新該 資料, 立即下 一異常 經由該 時,遂 該控管 況之排 申請範圍第1項所述之專案 中央伺服裝置經由該任務端 報紀錄得知該異常狀況之排 申請範圍第1項所述之專案 計劃書資料係包含一專案工 申請範圍第3項所述之專案 施工曰報紀錄係包含該專案 況。 工程控管系統’ 定期所傳送之該 除結果。 工程控管系統’ 程規格。 工程控管系統’ 工程之每日任務 in ΙΗβ^ 第17頁 591463 >•、申請專利範圍 "5 •如專利 其中該 之施工 0 .如專利 7 8 10 2 如專利 其中該 資料及 球認。 如專利 其中該 端、決 如專利 其中該 及該任 如專利 其中該 端查詢 如專利 其中該 該監造 如專利 ,其中 如專利 申請範圍第3項所述之專案工程控管系統, 文件管理紀錄係包含一對應該專案工程規格 紀錄,記錄最新之該施工日報紀錄。 申請範圍第1項所述之專案工程控管系統, 系統更包含一業主端及一監造端。 申請範圍第6項所述之專案工程控管系統, 貧料庫更包含一材料送審資料、一進度報表 一睛款貧料,供該業主端及該監造端查詢及 申請範 資料庫 策端查 申請範 資料庫 務端查 申請範 資料庫 〇 申請範 控管端 端經由 中請範 該網路 申請範 圍第1項所述之專案工程控管 更包含一採購資料,供任務端 詢。 圍第6項所述之專案工程控管 更包含一施工圖檔資料,供該 詢。 項所述之專案工程控管 包含一估驗計價數量資料, 圍項所述之專案工程控管 、該任務蠕、該決策端、該羋 一網路遽始r m 涊系 圍第1 Ί接該中央伺服裝置 為益绩項所述之專案工程控 、有線或兩者結合。 項所述之專案工程控管 系統, 、控管系統, 監造端系統, 供控管 糸統, 主端及 〇 管系統 系統,591463 > T. I ____ T'fel Rebei——year M a 6. The patent application scope is dedicated to the central, one control, one task, one decision, the central database is controlled by the material control project, the servo control device, the construction daily report; In jLlll, when the document management terminal in the servo device is in the management system, it includes at least one asset record and one document repository management record and one plan document record; Μ up to check rule 4 status, The database notifies the end of the request for removal. Such as the patent, the construction day, the patent, the patent, the execution status, and a different task end, the management center will use this check mark to find that the document management decision side has issued one of the task end according to the regular Pass the central service record, the service device checks the article, and when the record gives the opinion and opinion, send the clothing according to the pre-conditions, and then the central government will perform the construction day report. The plan will immediately establish or manage the recorded servo device. The anomaly label continues to notify the anomaly record to update the data, and immediately after the next anomaly passes, the project central servo device described in item 1 of the application scope of the control condition learns the anomaly through the task report report. The project plan information described in item 1 of the application scope of the status includes a project construction report described in item 3 of the application scope of the project worker, which includes the project status. The engineering control system ’periodically transmits the division result. Engineering control system ’process specifications. Engineering control system 'Daily tasks of engineering in ΙΗβ ^ Page 17 591463 > •, scope of patent application " 5 • construction where the patent is 0. such as the patent 7 8 10 2 such information and identification in the patent . Such as the patent, the terminal, the patent, the and the patent, the terminal, the query, the patent, the supervision, such as the patent, the project engineering control system as described in the patent application scope item 3, and the document management record. The system contains a pair of project specifications records and records the latest construction daily records. The project engineering control system described in item 1 of the scope of application, the system further includes a client and a supervisor. The project engineering control system described in item 6 of the scope of application, the poor material warehouse also contains a material submission review data, a progress report and a glance at the poor materials for the owner and the supervisor to query and apply for the database database policy side. Check the application database. Check the application database. The application management control terminal passes the project engineering control described in item 1 of the online application scope. It also contains a procurement data for the task terminal to inquire. The project engineering control described in item 6 further includes a construction drawing file for the inquiry. The project engineering control described in this item includes an estimate of pricing data. The project engineering management described in the item, the task creep, the decision-making terminal, the network start rm, and the first network connection are connected to the item. The central servo device is the project engineering control, wired or a combination of the two mentioned in the performance item. The project project management and management system described in item 1, control and management system, supervision system, supply and control system, main and management system, ίΗ 第18頁 591463 申請專利範圍 其中該控管端包含提供一機制掌控任務端之 員工狀態。 夕一 如專利申請範圍第i 3項所述之專案工程控 ,其中該機制藉由配置該員工一行動電話或_ ^, 數位助理(PDA),並搭配該行動電話或該 數位助理之業者,得知該員工之所在位置。 人 如專利申請範圍第8項所述之專 其中該資料庫包含提供—役e糸统, 能可供該控管端、該任務:時比對:力能’該比對功 書資料、該施工日報紀錄、該決朿端查詢該計劃 購資料時,同時出現該比對;=件管理紀錄及該採 記錄,以供參考。 搿吻合之一專案工程資料 如專利申請範圍第8項所、+.—宙# 其中該採購資料至少包含士 J =程控管系統, 及一採購價金參考資料。採購進度、一採購明細 如專利申請範圍第Ί 〇 ,其中該估驗計價數述之專案工程控管系統 -計價附件資料及::料至少包含-計價紀錄、 一種專水程控管方法,勺人: 傳送一施工日報紀錄由 匕各· 之一資料庫,該資料任務端至一中央伺服裝置 資料、該施工曰報含-資料庫記錄-計劃書 接受該施工曰報文件管理紀錄; 庫中之該文件管理纪錚遠賢料庫中後,更新該資料 、、、己錄,並依該計劃書資料,由一 4 15 16 η —r ΧΠ 7 8ίΗ Page 18 591463 Scope of patent application The control terminal includes a mechanism for controlling the status of employees at the task terminal. The project engineering control as described in item i 3 of the scope of patent application, wherein the mechanism is configured by configuring the employee with a mobile phone or a digital assistant (PDA) and matching the mobile phone or the operator of the digital assistant, Know where the employee is. As described in item 8 of the scope of patent application, the database contains the provision-service e system, which can be used by the control end, the task: time comparison: force energy, the comparison workbook data, the The construction daily report records and the decision-making party query the plan purchase information at the same time; the comparison appears at the same time; = management records and the procurement records for reference.搿 One of the project engineering data, such as the patent application scope No. 8 institute, + .— zhou #, where the procurement information includes at least J = program control management system, and a purchase price reference information. The purchase progress and purchase details are as described in the scope of patent application No. 〇, among which the project engineering control system for evaluation and valuation-pricing attachments and information: at least include-pricing records, a special water program control method : Send a construction daily report to a database, and the data task is sent to a central server device. The construction report contains-database record-plan. Accept the construction report file management record. After the document is managed in the Jixuan Yuanxian database, the data, ,, and records are updated, and according to the plan data, a 4 15 16 η —r ΧΠ 7 8 591463591463 六、申請專利範圍 控管端在該中^伺服裝置上預先建立抑或立即下達 檢查規則’藉此檢查該文件管理紀錄之一異常狀 況,並予一異常標號; 經由該中央伺服裝置經由發現該資料庫發中該文件 ‘理兄錄之該異常標號,通知一決策端下達一處理 意見後,接續通知該控管端要求該任務端依該處理 意見進行該異常狀況之排除。 19 如專利申請範圍第18項所述之專案工程控管方法 ’其中該中央伺服裝置經由該任務端定期所傳送之 該施工日報紀錄得知該異常狀況之排除結果。 2 0 2 1 I :2 2 丨Ά Ιι23 2 4 如專利申請範圍第18項所述之專案工程控管方法 ’其中該計劃書資料係包含一專案工程規格。 如專利申請範圍第2 〇項所述之專案工程控管方法 ,其中該施工曰報紀錄係包含該專案工程之每曰任 務執行狀況。 •如專利申請範圍第2 〇項所述之專案工程控管方法 ,其中該文件管理紀錄係包含一對應該專案工程規 格之施工紀錄,記錄最新之該施工日報紀錄。 •如專利申請範圍第1 8項所述之專案工程控管方法 ,其中更包含一業主端及一監造端。 •如專利申請範圍第2 3項所述之專案工程控管方法 ’其中該資料庫更包含一材料送審資料、一進度報 表資料及一請款資料,供該業主端及該監造端杳 及確認。 w6. The patent application scope control and management end establishes in advance or immediately issues inspection rules on the server device, thereby checking one of the document management records for an abnormal condition, and assigning an abnormal number; through the central servo device, the data is found through The abnormal label of the file 'Library Record' in the library is issued. After notifying a decision-making party to issue a processing opinion, the management terminal is subsequently notified to request the task end to eliminate the abnormal situation according to the processing opinion. 19 The project engineering control method as described in item 18 of the scope of patent application ′, wherein the central servo device learns the exclusion result of the abnormal condition through the construction daily report periodically transmitted by the task end. 2 0 2 1 I: 2 2 丨 Ά Ιι23 2 4 The project engineering control method described in item 18 of the scope of patent application ′, wherein the plan information includes a project engineering specification. The project engineering control method as described in item 20 of the scope of patent application, wherein the construction report includes the execution status of each task of the project. • The project engineering control method as described in Item 20 of the patent application scope, wherein the document management record contains a pair of construction records that should meet the project project specifications, and records the latest construction daily report records. • The project engineering control method described in item 18 of the scope of patent application, which further includes a client and a supervisor. • The project engineering control method as described in item 23 of the scope of patent applications, where the database further includes a material submission review data, a progress report data and a payment information for the owner and the supervisory end; and confirm. w 591463 六、申請專利範圍 2 5 ·如專利申請範圍第1 8項所述之專案工程控管方法 ,其中該資料庫更包含一採購資料,供任務端、控 管端、決策端查詢。 2 6 ·如專利申請範圍第2 3項所述之專案工程控管方法 ,其中該資料庫更包含一施工圖檔資料,供該監造 端及該任務端查詢。 2 7 .如專利申請範圍第1 8項所述之專案工程控管方法 ,其中該資料庫更包含一估驗計價數量資料,供控 管端查詢。 f 1 2 8 ·如專利申請範圍第2 3項所述之專案工程控管方法 ί ,其中該控管端、該任務端、該決策端、該業主端 及該監造端經由一網路連接至該中央伺服裝置。 2 9 ·如專利申請範圍第2 8項所述之專案工程控管方法 ;〇 L ,其中該網路為無線、有線或兩者結合。 0 •如專利申請範圍第1 8項所述之專案工程控管方法 々 ,其中該控管端包含提供一機制掌控任務端之至少 一員工狀態。 〜:3 1 •如專利申請範圍第3 0項所述之專案工程控管方法 ,其中該機制藉由配置該員工一行動電話或一個人 數位助理(PDA),並搭配該行動電話或該個人 數位助理之業者,得知該員工之所在位置。 3 2 ·如專利申請範圍第2 5項所述之專案工程控管方法 ,其中該資料庫包含提供一即時比對功能,該比對 功能可供該控管端、該任務端、該決策端查詢該計591463 VI. Scope of patent application 2 5 · The project engineering control method as described in item 18 of the patent application scope, wherein the database also contains a procurement data for query by the task side, control side and decision side. 26 • The project engineering control method as described in item 23 of the scope of patent application, wherein the database further includes a construction drawing file data for the supervisory end and the task end to query. 27. The project engineering control method as described in item 18 of the scope of patent application, wherein the database further includes a quantity of estimated valuation data for the control side to query. f 1 2 8 · The project engineering control method as described in Item 23 of the scope of patent application, wherein the control terminal, the task terminal, the decision terminal, the owner terminal and the supervisory terminal are connected via a network To the central servo. 2 9 · Project engineering control method as described in item 28 of the scope of patent application; 0 L, where the network is wireless, wired or a combination of both. 0 • The project engineering control method 所述 described in item 18 of the patent application scope, wherein the control terminal includes a mechanism for controlling the status of at least one employee of the task terminal. ~: 3 1 • The project engineering control method as described in item 30 of the scope of patent applications, wherein the mechanism is configured by configuring the employee with a mobile phone or a personal digital assistant (PDA) and matching the mobile phone or the personal digital The assistant operator knows where the employee is. 3 2 · The project engineering control method as described in item 25 of the scope of patent application, wherein the database includes a real-time comparison function which can be used by the control end, the task end, and the decision end Query the plan 第21頁 591463 X ;:92. 12.; 2 6 六、申請專利範圍 劃書資料、該施工日報紀錄、該文件管理紀錄及該 採購資料時,同時出現該比對吻合之一專案工程資 料記錄,以供參考。 3 3 ·如專利申請範圍第2 5項所述之專案工程控管方法 ,其中該採購資料至少包含一採購進度、一採購明 細及一採購價金參考資料。 3 4 .如專利申請範圍第2 7項所述之專案工程控管方法 ,其中該估驗計價數量資料至少包含一計價紀錄、 一計價附件資料及一工程發包資料。 销Page 21 591463 X;: 92. 12 .; 2 6 VI. When applying for patent scope, the filing information, the construction daily record, the document management record and the procurement information, the project data records of the comparison match ,for reference. 3 3 · The project engineering control method as described in item 25 of the scope of patent application, wherein the procurement information includes at least a procurement progress, a procurement detail and a reference price of the procurement price. 34. The project engineering control method as described in item 27 of the scope of patent application, wherein the estimated pricing data includes at least a pricing record, a pricing attachment data, and a project contracting data. pin 第22頁Page 22
TW91120398A 2002-09-09 2002-09-09 Project engineering control system and method thereof TW591463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW91120398A TW591463B (en) 2002-09-09 2002-09-09 Project engineering control system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW91120398A TW591463B (en) 2002-09-09 2002-09-09 Project engineering control system and method thereof

Publications (1)

Publication Number Publication Date
TW591463B true TW591463B (en) 2004-06-11

Family

ID=34057845

Family Applications (1)

Application Number Title Priority Date Filing Date
TW91120398A TW591463B (en) 2002-09-09 2002-09-09 Project engineering control system and method thereof

Country Status (1)

Country Link
TW (1) TW591463B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7756883B2 (en) 2005-12-12 2010-07-13 Industrial Technology Research Institute Control method for modifying engineering information from a remote work site and a system of the same
CN1908969B (en) * 2005-08-01 2010-07-14 财团法人工业技术研究院 Method and system for remote operation in-site engineering data alteration control and management
TWI482105B (en) * 2008-12-23 2015-04-21 Ind Tech Res Inst Method and system for constructing project knowledge template
TWI549089B (en) * 2015-08-11 2016-09-11 國立屏東科技大學 Construction coordinated operation method
TWI576777B (en) * 2016-04-01 2017-04-01 zhi-da Luo Engineering management system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1908969B (en) * 2005-08-01 2010-07-14 财团法人工业技术研究院 Method and system for remote operation in-site engineering data alteration control and management
US7756883B2 (en) 2005-12-12 2010-07-13 Industrial Technology Research Institute Control method for modifying engineering information from a remote work site and a system of the same
US7949645B2 (en) 2005-12-12 2011-05-24 Industrial Technology Research Institute Control method for modifying engineering information from a remote work site and a system of the same
TWI482105B (en) * 2008-12-23 2015-04-21 Ind Tech Res Inst Method and system for constructing project knowledge template
TWI549089B (en) * 2015-08-11 2016-09-11 國立屏東科技大學 Construction coordinated operation method
TWI576777B (en) * 2016-04-01 2017-04-01 zhi-da Luo Engineering management system

Similar Documents

Publication Publication Date Title
KR101370775B1 (en) Intelligence system for managing a safety in company oriented and drive method of the same
KR102247941B1 (en) Smart Risk Assessment System and the method using it
KR102131656B1 (en) Cloud service platform system to manage for fire-fighting facilities
KR102438757B1 (en) Smart Safety Platform
US20200160464A1 (en) System for collaborative infrastructure management and incident response
TW591463B (en) Project engineering control system and method thereof
JP5135556B2 (en) Personnel introduction management system
KR102204091B1 (en) Apparatus and method for intergrating management of safety in the workplace
KR20150126276A (en) Apparatus and method for safety diagnosis report
CN113837533A (en) Multi-dimensional examination and evaluation system for real estate engineering project management
KR20210111006A (en) An managing platform for original application company, contractor and employee
JP5709128B2 (en) Exit management system
JP3936129B2 (en) Construction information management method and management system
KR101166920B1 (en) Building management service providing method using smart device
JP2008262345A (en) Remote management network system for building management work
TWI618006B (en) Engineering conference management system and operation method thereof
JP2007188116A (en) Operation progress management system
KR102356330B1 (en) Construction process automatic management system using qr code
JP4449256B2 (en) Work information management method and work information management system
TWI230881B (en) Real-time dynamic monitoring system and method for executing a construction project
KR102284691B1 (en) safety management method that can check two or more workers on site
CN111080197A (en) Material fulfillment system and method
CN113673910A (en) Property information management method and system based on multi-terminal management
KR102533361B1 (en) A method of operating messenger linked to HR information
KR102676097B1 (en) Building construction management systems and methods

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees