TW202117148A - A floor steel frame support device - Google Patents

A floor steel frame support device Download PDF

Info

Publication number
TW202117148A
TW202117148A TW108139236A TW108139236A TW202117148A TW 202117148 A TW202117148 A TW 202117148A TW 108139236 A TW108139236 A TW 108139236A TW 108139236 A TW108139236 A TW 108139236A TW 202117148 A TW202117148 A TW 202117148A
Authority
TW
Taiwan
Prior art keywords
steel
floor
steel beam
support device
beams
Prior art date
Application number
TW108139236A
Other languages
Chinese (zh)
Other versions
TWI765187B (en
Inventor
黃建德
Original Assignee
黃建德
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黃建德 filed Critical 黃建德
Priority to TW108139236A priority Critical patent/TWI765187B/en
Publication of TW202117148A publication Critical patent/TW202117148A/en
Application granted granted Critical
Publication of TWI765187B publication Critical patent/TWI765187B/en

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

A floor steel frame support device for supporting floor. The floor steel frame support device comprises a plurality of support frames, a plurality of first steel beams, and a plurality of second steel beams. The first steel beam is mounted on the support frames. The first steel beam is arranged along a first direction at a first predetermined distance. The second steel beam is disposed on the first steel beam. The second steel beam is arranged along a second direction at a second predetermined distance. Thereby, it can simplify the connection of steel beams, improve the load capacity of raised floors, and save costs.

Description

一種地板鋼架支撐裝置 Supporting device for floor steel frame

本發明涉及廠房建設之技術領域,尤其涉及一種地板鋼架支撐裝置。 The invention relates to the technical field of plant construction, in particular to a floor steel frame support device.

高架地板是通過利用架高的方式設置在地面或是樓地板上,以使得高架地板的面板與地面之間會存在一定的空間,這些空間可以被用來佈設電線或者送風。因此,高架地板在市場中變得越來越受歡迎。 The raised floor is set on the ground or floor by means of raising, so that there will be a certain space between the panel of the raised floor and the ground, and these spaces can be used for wiring or air supply. Therefore, raised floors are becoming more and more popular in the market.

但是傳統的高架地板在使用時,鋼樑為保證高架地板的承重強度,其銜接結構往往較為複雜,並且成本高。而且傳統的高架地板的承重強度也不高。 However, when the traditional raised floor is in use, in order to ensure the load-bearing strength of the raised floor, the connecting structure of the steel beam is often complicated and the cost is high. Moreover, the load-bearing strength of the traditional raised floor is not high.

因此,本發明的主要目的在於提供一種地板鋼架支撐裝置,以解決上述問題。 Therefore, the main purpose of the present invention is to provide a floor steel frame support device to solve the above-mentioned problems.

本發明之目的在於提供一種地板鋼架支撐裝置,藉由多層級鋼樑的設置,以使得高架地板可以簡化鋼樑銜接,提升高架地板的承重能力,並節約製造成本。 The object of the present invention is to provide a floor steel frame support device, which can simplify the connection of steel beams for the elevated floor through the arrangement of multi-level steel beams, improve the load-bearing capacity of the elevated floor, and save manufacturing costs.

為達所述優點至少其中之一或其他優點,本發明的一實施例提出一種地板鋼架支撐裝置,用於支撐複數個地板,地板鋼架支撐裝置包括複數個支撐架、複數個第一鋼樑以及複數個第二鋼樑。 In order to achieve at least one of the advantages or other advantages, an embodiment of the present invention provides a floor steel frame support device for supporting a plurality of floors. The floor steel frame support device includes a plurality of support frames and a plurality of first steel frames. Beams and a plurality of second steel beams.

其中,支撐架設置於樓地板上,第一鋼樑架設於支撐架上,且第一鋼樑是以一第一預設距離為間隔沿著一第一方向排列,第二鋼樑設置於第一鋼樑上,且第二鋼樑是以一第二預設距離為間隔沿著一第二方向排列。 Wherein the support frame is arranged on the floor, the first steel beam is erected on the support frame, and the first steel beams are arranged along a first direction at intervals of a first preset distance, and the second steel beam is arranged on the first On a steel beam, and the second steel beams are arranged along a second direction at intervals of a second predetermined distance.

在一些實施例中,第一方向垂直於第二方向。 In some embodiments, the first direction is perpendicular to the second direction.

在一些實施例中,地板鋼架支撐裝置還可包括複數個固定板,固定板是以螺絲鎖固的方式將相鄰二個第一鋼樑固定連接,固定板以螺絲鎖固之方式將相鄰二個第二鋼樑固定連接。 In some embodiments, the floor steel frame support device may further include a plurality of fixing plates. The fixing plates are fixedly connected to two adjacent first steel beams in a screw-locked manner, and the fixed plates are fixed to each other in a screw-locked manner. Two adjacent second steel beams are fixedly connected.

在一些實施例中,第一預設距離是第二預設距離之整數倍。 In some embodiments, the first predetermined distance is an integer multiple of the second predetermined distance.

在一些實施例中,第一鋼樑之截面高度小於第二鋼樑之截面高度,第一鋼樑之截面寬度大於第二鋼樑之截面寬度,第一鋼樑之厚度大於第二鋼樑之厚度。 In some embodiments, the cross-sectional height of the first steel beam is smaller than the cross-sectional height of the second steel beam, the cross-sectional width of the first steel beam is greater than the cross-sectional width of the second steel beam, and the thickness of the first steel beam is greater than that of the second steel beam. thickness.

在一些實施例中,支撐架還可包括支撐座,第一鋼樑是以螺絲鎖固的方式固定於支撐架頂端的支撐座上。 In some embodiments, the support frame may further include a support base, and the first steel beam is fixed to the support base at the top end of the support frame in a screw locking manner.

在一些實施例中,支撐架還可包括翼板、管體以及固定座,管體固定於固定座上,翼板設置於固 定座上並抵住管體。 In some embodiments, the support frame may further include a wing plate, a pipe body, and a fixing seat. The pipe body is fixed on the fixing seat, and the wing plate is arranged on the fixing seat. Set the seat and hold it against the tube body.

在一些實施例中,地板是以螺絲鎖固之方式固定於第二鋼樑上。 In some embodiments, the floor is fixed to the second steel beam by screw locking.

在一些實施例中,地板鋼架支撐裝置還可包括複數個固定件,間隔一個第二預設距離以黏貼的方式設置於第二鋼樑上,用以定位固定地板。 In some embodiments, the floor steel frame support device may further include a plurality of fixing members, which are arranged on the second steel beam in an adhesive manner with a second preset distance to position and fix the floor.

在一些實施例中,固定件包括凸出結構,凸出結構透過地板底部的四個角落以定位固定地板。 In some embodiments, the fixing member includes a protruding structure, and the protruding structure penetrates the four corners of the bottom of the floor to position and fix the floor.

因此,利用本發明所提供一種地板鋼架支撐裝置,藉由多層級鋼樑的設置,以使得高架地板可以簡化鋼樑銜接,提升高架地板的承重能力,進而節約製造成本,並可增加地板下方的空間,以放置較大之設備與較多之管線。 Therefore, using the floor steel frame support device provided by the present invention, through the arrangement of multi-level steel beams, the elevated floor can simplify the connection of steel beams, improve the load-bearing capacity of the elevated floor, thereby saving manufacturing costs, and increasing the amount of underfloor Space to place larger equipment and more pipelines.

上述說明僅是本發明技術方案的概述,為了能夠更清楚瞭解本發明的技術手段,而可依照說明書的內容予以實施,並且為了讓本發明的上述和其他目的、特徵和優點能夠更明顯易懂,以下特舉較佳實施例,並配合附圖,詳細說明如下。 The above description is only an overview of the technical solution of the present invention. In order to understand the technical means of the present invention more clearly, it can be implemented in accordance with the content of the specification, and in order to make the above and other objectives, features and advantages of the present invention more obvious and understandable. In the following, the preferred embodiments are cited in conjunction with the drawings, and the detailed description is as follows.

10‧‧‧高架地板 10‧‧‧Raised floor

12‧‧‧樓地板 12‧‧‧Floor Floor

14‧‧‧支撐架 14‧‧‧Support frame

16‧‧‧鋼樑 16‧‧‧Steel beam

18‧‧‧地板 18‧‧‧Floor

1402‧‧‧翼板 1402‧‧‧Wing plate

1404‧‧‧管體 1404‧‧‧Tube body

1406‧‧‧固定座 1406‧‧‧Fixed seat

1602‧‧‧第一鋼樑 1602‧‧‧The first steel beam

1604‧‧‧第二鋼樑 1604‧‧‧Second Steel Beam

20‧‧‧固定件 20‧‧‧Fixture

22‧‧‧固定孔 22‧‧‧Fixed hole

S1‧‧‧第一預設距離 S1‧‧‧First preset distance

S2‧‧‧第二預設距離 S2‧‧‧The second preset distance

A‧‧‧第一方向 A‧‧‧First direction

B‧‧‧第二方向 B‧‧‧Second direction

H1‧‧‧第一鋼樑的截面高度 H1‧‧‧Section height of the first steel beam

H2‧‧‧第二鋼樑的截面高度 H2‧‧‧Second steel beam section height

W1‧‧‧第一鋼樑的截面寬度 W1‧‧‧Section width of the first steel beam

W2‧‧‧第二鋼樑的截面寬度 W2‧‧‧Second steel beam section width

1601‧‧‧支撐座 1601‧‧‧Support seat

24‧‧‧固定板 24‧‧‧Fixed plate

2402‧‧‧螺絲 2402‧‧‧Screw

2002‧‧‧凸出結構 2002‧‧‧Protruding structure

40‧‧‧地板鋼架支撐裝置 40‧‧‧Floor steel frame support device

T1‧‧‧第一鋼樑的厚度 T1‧‧‧The thickness of the first steel beam

T2‧‧‧第二鋼樑的厚度 T2‧‧‧The thickness of the second steel beam

所包括的附圖用來提供對本申請實施例的進一步的理解,其構成了說明書的一部分,用於例示本申請的實施方式,並與文字描述一起來闡釋本申請的原理。顯而易見地,下面描述中的附圖僅僅是本申請的一些實施例,對於本領域普通技術人員來講,在不付出 創造性勞動性的前提下,還可以根據這些附圖獲得其他的附圖。在附圖中: The included drawings are used to provide a further understanding of the embodiments of the present application, which constitute a part of the specification, are used to illustrate the embodiments of the present application, and together with the text description, explain the principle of the present application. Obviously, the drawings in the following description are only some embodiments of the present application. For those of ordinary skill in the art, it is not necessary to pay Under the premise of creative labor, other drawings may be obtained based on these drawings. In the attached picture:

圖1是本發明高架地板的結構示意圖; Figure 1 is a schematic diagram of the structure of the raised floor of the present invention;

圖2是本發明高架地板的側面示意圖; Figure 2 is a schematic side view of the raised floor of the present invention;

圖3是本發明固定件一實施例的結構示意圖; Fig. 3 is a schematic structural view of an embodiment of the fixing member of the present invention;

圖4是本發明第一鋼樑與第二鋼樑的截面對比示意圖; Figure 4 is a schematic cross-sectional comparison of the first steel beam and the second steel beam of the present invention;

圖5是本發明高架地板安裝有固定板的側面示意圖; Figure 5 is a schematic side view of the fixed board installed on the raised floor of the present invention;

圖6是本發明固定件另一實施例的結構示意圖; Figure 6 is a schematic structural view of another embodiment of the fixing member of the present invention;

圖7是圖6的剖面示意圖; Figure 7 is a schematic cross-sectional view of Figure 6;

圖8是本發明高架地板另一實施例的示意圖;以及 Figure 8 is a schematic diagram of another embodiment of the raised floor of the present invention; and

圖9是本發明高架地板另一實施例的示意圖。 Fig. 9 is a schematic diagram of another embodiment of the raised floor of the present invention.

這裏所公開的具體結構和功能細節僅僅是代表性的,並且是用於描述本發明的示例性實施例的目的。但是本發明可以通過許多替換形式來具體實現,並且不應當被解釋成僅僅受限於這裏所闡述的實施例。 The specific structure and functional details disclosed herein are only representative, and are used for the purpose of describing exemplary embodiments of the present invention. However, the present invention can be embodied in many alternative forms, and should not be construed as being limited only to the embodiments set forth herein.

在本發明的描述中,需要理解的是,術語“中心”、“橫向”、“上”、“下”、“左”、“右”、“豎直”、“水準”、“頂”、“底”、“內”、“外”等指示的方位或位置關為基於附圖所示的方位或位置關係,僅是為了便於描述本發明和簡化描述,而不是指示或暗示所指的裝置或組件必須具有特定的方位、以特定的方位構造和操作,因此不能理解為對本發明的限制。此外,術語“第一”、“第二”僅用於描述目的,而不能理解為指示或暗示相 對重要性或者隱含指明所指示的技術特徵的數量。由此,限定有“第一”、“第二”的特徵可以明示或者隱含地包括一個或者更多個該特徵。在本發明的描述中,除非另有說明,“多個”的含義是兩個或兩個以上。另外,術語“包括”及其任何變形,意圖在於覆蓋不排他的包含。 In the description of the present invention, it should be understood that the terms "center", "lateral", "upper", "lower", "left", "right", "vertical", "horizontal", "top", The directions or positions indicated by "bottom", "inner", "outer", etc. are based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply the pointed device Or the component must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative The importance or implicit indication of the number of technical features indicated. Thus, the features defined with "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, unless otherwise specified, "plurality" means two or more. In addition, the term "including" and any variations thereof is intended to cover non-exclusive inclusion.

在本發明的描述中,需要說明的是,除非另有明確的規定和限定,術語“安裝”、“相連”、“連接”應做廣義理解,例如,可以是固定連接,也可以是可拆卸連接,或一體地連接;可以是機械連接,也可以是電連接;可以是直接相連,也可以通過中間媒介間接相連,可以是兩個組件內部的連通。對於本領域的普通技術人員而言,可以具體情況理解上述術語在本發明中的具體含義。 In the description of the present invention, it should be noted that the terms "installed", "connected", and "connected" should be understood in a broad sense unless otherwise clearly specified and limited. For example, they can be fixed or detachable. Connected or integrally connected; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication between two components. For those of ordinary skill in the art, the specific meanings of the above-mentioned terms in the present invention can be understood under specific circumstances.

這裏所使用的術語僅僅是為了描述具體實施例而不意圖限制示例性實施例。除非上下文明確地另有所指,否則這裏所使用的單數形式“一個”、“一項”還意圖包括複數。還應當理解的是,這裏所使用的術語“包括”和/或“包含”規定所陳述的特徵、整數、步驟、操作、單元和/或組件的存在,而不排除存在或添加一個或更多其他特徵、整數、步驟、操作、單元、組件和/或其組合。 The terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments. Unless the context clearly dictates otherwise, the singular forms "a" and "one" used herein are also intended to include the plural. It should also be understood that the terms "including" and/or "including" used herein specify the existence of the stated features, integers, steps, operations, units and/or components, and do not exclude the existence or addition of one or more Other features, integers, steps, operations, units, components, and/or combinations thereof.

請參閱圖1、圖2和圖3,圖1是本發明高架地板10的結構示意圖,圖2是本發明高架地板10的側面示意圖,圖3是本發明固定件20一實施例的結構示意圖。為達所述優點至少其中之一或其他優點,本發明的一實施 例提供一種高架地板10,用以架設於樓地板12。地板鋼架支撐裝置40用於高架地板10中,以支撐複數個地板18。 Please refer to FIGS. 1, 2 and 3. FIG. 1 is a schematic diagram of the structure of the raised floor 10 of the present invention, FIG. 2 is a schematic side view of the raised floor 10 of the present invention, and FIG. 3 is a schematic structural diagram of an embodiment of the fixing member 20 of the present invention. In order to achieve at least one of the advantages or other advantages, an implementation of the present invention For example, a raised floor 10 is provided for erecting on the floor 12 of the floor. The floor steel frame support device 40 is used in the raised floor 10 to support a plurality of floors 18.

結合圖2參閱圖1可見,地板鋼架支撐裝置40包括複數個支撐架14、複數個鋼樑16、複數個地板18以及複數個固定件20。進一步看,鋼樑16包括複數個第一鋼樑1602以及複數個第二鋼樑1604,支撐架14包括翼板1402、管體1404、固定座1406以及支撐座1601,每個固定件20具有多個固定孔22。 Referring to FIG. 1 in conjunction with FIG. 2, it can be seen that the floor steel frame support device 40 includes a plurality of support frames 14, a plurality of steel beams 16, a plurality of floors 18 and a plurality of fixing members 20. Looking further, the steel beam 16 includes a plurality of first steel beams 1602 and a plurality of second steel beams 1604. The support frame 14 includes a wing plate 1402, a tube body 1404, a fixing seat 1406, and a support seat 1601. Each fixing member 20 has a plurality of A fixed hole 22.

在本實施例中,四個支撐架14是設置於樓地板12上以起支撐作用,兩個第一鋼樑1602以一第一預設距離S1為間隔沿著一第一方向A架設於支撐架14的支撐座1601上,五個第二鋼樑1604以一第二預設距離S2為間隔沿著一第二方向B排列於第一鋼樑1602上。第一鋼樑1602使用螺絲2402以鎖固之方式固定於支撐座1601上,第二鋼樑1604使用螺絲2402以鎖固之方式固定於第一鋼樑1602上。固定件20以第二預設距離S2為間隔設置於第二鋼樑1604上,每個地板18之四個腳落位置固定於固定件20上,這些固定件20的設置位置是對應於地板18的角落位置。請同時參照圖3所示,各個固定件20具有多個固定孔22並以黏膠方式黏在第二鋼樑1604上,地板18可透過固定孔22以螺絲鎖固的方式固定於固定件20。藉由此種地板18通過固定件20固定於第二鋼樑1604上、第二鋼樑1604架設於第一鋼樑1602上、第一鋼樑1602架設於支撐架14上的設置方式,可以調整高架地板10的高度,簡化橫向鋼樑與縱向鋼樑間的連接結構,並可增強高架 地板10的整體承重能力。每個支撐架14的固定座1406上皆固定有四個翼板1402與管體1404,翼板1402抵住管體1404以加強支撐架14的支撐能力。 In this embodiment, the four support frames 14 are arranged on the floor 12 to support the floor, and the two first steel beams 1602 are erected on the support along a first direction A at an interval of a first preset distance S1. On the supporting seat 1601 of the frame 14, five second steel beams 1604 are arranged on the first steel beam 1602 along a second direction B with an interval of a second predetermined distance S2. The first steel beam 1602 is fixed to the support base 1601 with screws 2402 in a locking manner, and the second steel beam 1604 is fixed to the first steel beam 1602 in a locking manner with screws 2402. The fixing parts 20 are arranged on the second steel beam 1604 at intervals of a second preset distance S2. The four foot positions of each floor 18 are fixed on the fixing parts 20, and the fixing parts 20 are arranged in positions corresponding to the floor 18 Corner location. Please refer to FIG. 3 at the same time. Each fixing member 20 has a plurality of fixing holes 22 and is glued to the second steel beam 1604. The floor 18 can be fixed to the fixing member 20 by means of screws through the fixing holes 22. . The floor 18 is fixed to the second steel beam 1604 by the fixing member 20, the second steel beam 1604 is erected on the first steel beam 1602, and the first steel beam 1602 is erected on the support frame 14, which can be adjusted The height of the elevated floor 10 simplifies the connection structure between the horizontal steel beams and the longitudinal steel beams, and can enhance the elevated The overall load-bearing capacity of the floor 10. Four wing plates 1402 and a tube body 1404 are fixed on the fixing seat 1406 of each support frame 14, and the wing plates 1402 abut the tube body 1404 to strengthen the supporting capacity of the support frame 14.

進一步說明,在本實施例中,第一預設距離S1是240cm,第二預設距離S2是60cm,第二預設距離S2與地板18之寬度相同,第一預設距離S1是地板18寬度之四倍,第一預設距離S1大於第二預設距離S2並且第一預設距離S1是第二預設距離S2的四倍。 To further illustrate, in this embodiment, the first preset distance S1 is 240 cm, the second preset distance S2 is 60 cm, the second preset distance S2 is the same as the width of the floor 18, and the first preset distance S1 is the width of the floor 18 Four times, the first preset distance S1 is greater than the second preset distance S2 and the first preset distance S1 is four times the second preset distance S2.

進一步說明,在本實施例中,第一方向A是與第二方向B在水平面是相互垂直。不過本案亦不限於此,第一方向A與第二方向B可以是任意一方向,只要這兩個方向在同一個水平面即可。 To further illustrate, in this embodiment, the first direction A and the second direction B are perpendicular to each other in the horizontal plane. However, this case is not limited to this. The first direction A and the second direction B can be any direction, as long as the two directions are on the same horizontal plane.

進一步說明,在本實施例中,固定件20是以黏貼之方式固定於第二鋼樑1602上。不過本案亦不限於此,也可以是螺絲鎖固方式、焊接方式等。 To further illustrate, in this embodiment, the fixing member 20 is fixed to the second steel beam 1602 by pasting. However, this case is not limited to this, it can also be a screw locking method, a welding method, etc.

進一步說明,在本實施例中,因為第一預設距離S1大於第二預設距離S2,第一鋼樑1602的抗彎強度須大於第二鋼樑1604的抗彎強度,以便在壓彎第二鋼樑1604的時候,第一鋼樑1602仍可以起到有效的保護作用。不過本案亦不限於此,第二鋼樑1604的抗彎強度亦可以大於或等於第一鋼樑1602的抗彎強度。在一實施例中,可依據第一預設距離S1與第二預設距離S2選定具有適當抗彎強度的第一鋼樑1602與第二鋼樑1604,以維持整體結構強度。 To further explain, in this embodiment, because the first preset distance S1 is greater than the second preset distance S2, the bending strength of the first steel beam 1602 must be greater than the bending strength of the second steel beam 1604, so that the bending In the case of the second steel beam 1604, the first steel beam 1602 can still play an effective protective role. However, the present case is not limited to this. The bending strength of the second steel beam 1604 may also be greater than or equal to the bending strength of the first steel beam 1602. In one embodiment, the first steel beam 1602 and the second steel beam 1604 with appropriate bending strength can be selected according to the first preset distance S1 and the second preset distance S2 to maintain the overall structural strength.

請參閱圖4,圖4是本發明第一鋼樑1602 與第二鋼樑1604的截面對比示意圖。圖4示例中可見,第一鋼樑1602的截面高度H1小於第二鋼樑1604的截面高度H2,第一鋼樑1602的截面寬度W1大於第二鋼樑1604的截面寬度W2,第一鋼樑1602的厚度T1大於第二鋼樑1604的厚度T2。因第一鋼樑1602分佈的密度較第二鋼樑1604分佈的密度為小,第一鋼樑1602單位面積須承載較大之重量,故須較大之抗彎強度,所以第一鋼樑1602之截面寬度W1與厚度T1須較大。 Please refer to Figure 4, Figure 4 is the first steel beam 1602 of the present invention Schematic diagram of comparison with the cross-section of the second steel beam 1604. As can be seen in the example in Figure 4, the section height H1 of the first steel beam 1602 is smaller than the section height H2 of the second steel beam 1604, and the section width W1 of the first steel beam 1602 is greater than the section width W2 of the second steel beam 1604. The thickness T1 of 1602 is greater than the thickness T2 of the second steel beam 1604. Because the density of the first steel beam 1602 is smaller than the density of the second steel beam 1604, the first steel beam 1602 must carry a larger weight per unit area, so it must have a greater bending strength, so the first steel beam 1602 The cross-sectional width W1 and thickness T1 must be larger.

請參閱圖5,圖5是本發明高架地板10安裝有固定板24的側面示意圖。如圖5所示,使用一個固定板24用螺絲2402將相鄰二個的第一鋼樑1602固定連接,使用一個固定板24用螺絲2402將相鄰二個第二鋼樑1604固定連接,固定板24用於加強相鄰二個第一鋼樑1602的連接和相鄰二個第二鋼樑1604的連接,第一鋼樑1602使用螺絲2402以鎖固方式固定於支撐架14頂端之支撐座1601上,第二鋼樑1604使用螺絲2402以鎖固方式固定於第一鋼樑1602上,以提升高架地板10的整體穩定性。不過本案亦不限於此,固定板24亦可以分別使用焊接的方式將相鄰二個的第一鋼樑1602固定連接及相鄰二個的第二鋼樑1604固定連接。 Please refer to FIG. 5. FIG. 5 is a schematic side view of the fixed board 24 installed on the raised floor 10 of the present invention. As shown in Figure 5, a fixing plate 24 is used to fix two adjacent first steel beams 1602 with screws 2402, and a fixing plate 24 is used to fix two adjacent second steel beams 1604 with screws 2402. The plate 24 is used to strengthen the connection between two adjacent first steel beams 1602 and the connection between two adjacent second steel beams 1604. The first steel beam 1602 is fixed to the support base at the top of the support frame 14 in a locking manner using screws 2402. On 1601, the second steel beam 1604 is fixed to the first steel beam 1602 in a locking manner using screws 2402 to improve the overall stability of the raised floor 10. However, the present case is not limited to this. The fixing plate 24 can also be used to fix the two adjacent first steel beams 1602 and the two adjacent second steel beams 1604 by welding.

結合圖1和圖2請參閱圖6和圖7,圖6是本發明固定件20另一實施例的結構示意圖,圖7是圖6的剖面示意圖。結合圖7參閱圖6,可清楚地看到,在本實施例中,固定件20還包括複數個凸出結構2002,凸出結構2002是以榫卯連接的方式設置於固定件20中,每個凸出 結構2002內具有一固定孔22,地板18可透過固定孔22以螺絲鎖固的方式固定於固定件20上,凸出結構2002透過地板18底部之四個角落以定位固定地板18,且固定件20上可再使用墊片方式調整地板18之水平狀態,亦可避免地板18直接碰撞第二鋼樑1604,從而對第二鋼樑1604造成損傷。 Please refer to FIG. 6 and FIG. 7 in combination with FIG. 1 and FIG. 2. FIG. 6 is a schematic structural view of another embodiment of the fixing member 20 of the present invention, and FIG. 7 is a cross-sectional schematic view of FIG. 6. Referring to FIG. 6 in conjunction with FIG. 7, it can be clearly seen that, in this embodiment, the fixing member 20 further includes a plurality of protruding structures 2002. The protruding structures 2002 are arranged in the fixing member 20 in a tenon-and-mortise connection, each Bulge There is a fixing hole 22 in the structure 2002. The floor 18 can be fixed to the fixing member 20 by screw locking through the fixing hole 22. The protruding structure 2002 can locate and fix the floor 18 through the four corners of the bottom of the floor 18, and the fixing member The leveling of the floor 18 can be adjusted by using the gasket method on the 20, and the floor 18 can also be prevented from directly colliding with the second steel beam 1604, thereby causing damage to the second steel beam 1604.

進一步說明,支撐架14的高度是可以根據需要進行調整的。若是所需搭設的高架地板10高度過高,單純的提高支撐架14高度會降低高架地板10的承重能力,可通過在第二鋼樑1604上繼續疊加第三鋼樑16、第四鋼樑16等鋼樑16在保證高度的基礎上,保持高架地板10的承重能力。 To further illustrate, the height of the support frame 14 can be adjusted as required. If the height of the elevated floor 10 to be erected is too high, simply increasing the height of the support frame 14 will reduce the load-bearing capacity of the elevated floor 10. The third steel beam 16 and the fourth steel beam 16 can be superimposed on the second steel beam 1604. The equal steel beam 16 maintains the load-bearing capacity of the raised floor 10 on the basis of ensuring the height.

進一步說明,上述地板18與固定件20、兩個第二鋼樑1604間、兩個第一鋼樑1602間及第一鋼樑1602與支撐架14之間的連接方式皆為螺絲鎖固,不過亦不限於此,也可以是榫卯連接、焊接等,只要達到固定效果的連接方式都應在本發明的保護範圍之內。 To further illustrate, the connection between the floor 18 and the fixing member 20, the two second steel beams 1604, the two first steel beams 1602, and the first steel beam 1602 and the support frame 14 are all screw-locked. It is not limited to this, but can also be tenon-and-mortise connection, welding, etc., as long as the connection mode that achieves the fixing effect should be within the protection scope of the present invention.

請參閱圖8,圖8是本發明高架地板10另一實施例的示意圖。如圖8所示,高架地板10可鋪設32個地板18,以4×8的方式排列,相鄰二個第一鋼樑1602透過一個固定板24以螺絲鎖固的方式連接。固定件20焊接於第二鋼樑1604上,用以支撐地板18。第一鋼樑1602與第二鋼樑1604相互垂直。 Please refer to FIG. 8, which is a schematic diagram of another embodiment of the raised floor 10 of the present invention. As shown in FIG. 8, the raised floor 10 can be laid with 32 floors 18 arranged in a 4×8 manner, and two adjacent first steel beams 1602 are connected through a fixing plate 24 in a screw-locked manner. The fixing member 20 is welded to the second steel beam 1604 to support the floor 18. The first steel beam 1602 and the second steel beam 1604 are perpendicular to each other.

請參閱圖9,圖9是本發明高架地板10另一實施例的示意圖。如圖9所示,高架地板10可鋪設32個地 板18,以4×8的方式排列,三支第一鋼樑1602架設於支撐架14的支撐座1601上,十支第二鋼樑1604架設於這些第一鋼樑1602上。相鄰二個第二鋼樑1604透過一個固定板24以螺絲鎖固的方式連接。固定件20焊接於第二鋼樑1604上,用以支撐地板18。第一鋼樑1602與第二鋼樑1604相互垂直。 Please refer to FIG. 9, which is a schematic diagram of another embodiment of the raised floor 10 of the present invention. As shown in Figure 9, the raised floor 10 can be laid with 32 grounds. The plates 18 are arranged in a 4×8 manner. Three first steel beams 1602 are erected on the support base 1601 of the support frame 14, and ten second steel beams 1604 are erected on these first steel beams 1602. Two adjacent second steel beams 1604 are connected through a fixing plate 24 in a screw locking manner. The fixing member 20 is welded to the second steel beam 1604 to support the floor 18. The first steel beam 1602 and the second steel beam 1604 are perpendicular to each other.

綜上述,本發明所提供之地板鋼架支撐裝置40,用以支撐複數個地板18,藉由多層級鋼樑16的設置,以使得高架地板10可以簡化鋼樑16銜接,提升高架地板10的承重能力,並可增加地板18下方的空間,以放置較大之設備與較多之管線。 In summary, the floor steel frame support device 40 provided by the present invention is used to support a plurality of floors 18. With the arrangement of multi-level steel beams 16, the elevated floor 10 can simplify the connection of the steel beams 16 and improve the raised floor 10 Load-bearing capacity, and can increase the space under the floor 18 to place larger equipment and more pipelines.

上述僅為本案較佳之實施例而已,並不對本案進行任何限制。任何所屬技術領域的技術人員,在不脫離本案的技術手段的範圍內,對本案揭露的技術手段和技術內容做任何形式的等同替換或修改等變動,均屬未脫離本案的技術手段的內容,仍屬於本案的保護範圍之內。 The above are only preferred embodiments of this case, and do not impose any restriction on this case. Any person in the technical field who makes any form of equivalent substitution or modification to the technical means and technical content disclosed in this case within the scope of the technical means of this case is not deviated from the technical means of this case. It still falls within the scope of protection of this case.

10‧‧‧高架地板 10‧‧‧Raised floor

12‧‧‧樓地板 12‧‧‧Floor Floor

14‧‧‧支撐架 14‧‧‧Support frame

16‧‧‧鋼樑 16‧‧‧Steel beam

18‧‧‧地板 18‧‧‧Floor

1402‧‧‧翼板 1402‧‧‧Wing plate

1404‧‧‧管體 1404‧‧‧Tube body

1406‧‧‧固定座 1406‧‧‧Fixed seat

1602‧‧‧第一鋼樑 1602‧‧‧The first steel beam

1604‧‧‧第二鋼樑 1604‧‧‧Second Steel Beam

20‧‧‧固定件 20‧‧‧Fixture

22‧‧‧固定孔 22‧‧‧Fixed hole

S1‧‧‧第一預設距離 S1‧‧‧First preset distance

S2‧‧‧第二預設距離 S2‧‧‧The second preset distance

B‧‧‧第二方向 B‧‧‧Second direction

A‧‧‧第一方向 A‧‧‧First direction

1601‧‧‧支撐座 1601‧‧‧Support seat

40‧‧‧地板鋼架支撐裝置 40‧‧‧Floor steel frame support device

Claims (10)

一種地板鋼架支撐裝置,用於支撐複數地板,該地板鋼架支撐裝置包括: A floor steel frame support device for supporting multiple floors. The floor steel frame support device includes: 複數個支撐架; Multiple support frames; 複數個第一鋼樑,設置於該些支撐架上;以及 A plurality of first steel beams are arranged on the support frames; and 複數個第二鋼樑,該些第二鋼樑設置於該些第一鋼樑上,該些第一鋼樑是以一第一預設距離為間隔沿著一第一方向排列,該些第二鋼樑是以一第二預設距離為間隔沿著一第二方向排列。 A plurality of second steel beams, the second steel beams are arranged on the first steel beams, the first steel beams are arranged along a first direction at intervals of a first predetermined distance, and the second steel beams The two steel beams are arranged along a second direction at an interval of a second preset distance. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該第一方向垂直於該第二方向。 According to the floor steel frame supporting device described in item 1 of the scope of patent application, the first direction is perpendicular to the second direction. 如申請專利範圍第1項所述的地板鋼架支撐裝置,更包括複數個固定板,該固定板以螺絲鎖固之方式將相鄰二該第一鋼樑固定連接,該固定板以螺絲之方式將相鄰二該第二鋼樑固定連接。 For example, the floor steel frame support device described in item 1 of the scope of patent application further includes a plurality of fixing plates. The fixing plates are fixedly connected to the two adjacent first steel beams by screw locking, and the fixing plates are fixed by screws. The two adjacent second steel beams are fixedly connected. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該第一預設距離是該第二預設距離之整數倍。 According to the floor steel frame support device described in item 1 of the scope of patent application, the first predetermined distance is an integer multiple of the second predetermined distance. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該第一鋼樑之截面高度小於該第二鋼樑之截面高度,該第一鋼樑之截面寬度大於該第二鋼樑之截面寬度,該第一鋼樑之厚度大於該第二鋼樑之厚度。 The floor steel frame support device according to the first item of the scope of patent application, wherein the section height of the first steel beam is smaller than the section height of the second steel beam, and the section width of the first steel beam is larger than the second steel beam The thickness of the first steel beam is greater than the thickness of the second steel beam. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該支撐架包括一支撐座,該第一鋼樑以螺絲鎖固之方式固定於該支撐架頂端之支撐座上。 The floor steel frame support device according to the first item of the scope of patent application, wherein the support frame includes a support base, and the first steel beam is fixed to the support base at the top of the support frame by screw locking. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該支撐架更包括一翼板、一管體以及一固定座,該管體固定於該固定座,該翼板設置於該固定座並抵住該管體。 For the floor steel frame support device described in item 1 of the scope of patent application, the support frame further includes a wing plate, a pipe body and a fixing seat, the pipe body is fixed to the fixing seat, and the wing plate is arranged on the fixing seat. Seat and against the tube body. 如申請專利範圍第1項所述的地板鋼架支撐裝置,其中,該些地板是以螺絲鎖固之方式固定於該些第二鋼樑上。 According to the floor steel frame support device described in item 1 of the scope of patent application, the floors are fixed to the second steel beams by screw locking. 如申請專利範圍第8項所述的地板鋼架支撐裝置,更包括複數個固定件,該些固定件間隔該第二預設距離以黏貼之方式設置於該些第二鋼樑上,以定位固定該些地板。 For example, the floor steel frame support device described in item 8 of the scope of the patent application further includes a plurality of fixing members, and the fixing members are arranged on the second steel beams in a pasting manner at intervals of the second predetermined distance for positioning Fix these floors. 如申請專利範圍第9項所述的地板鋼架支撐裝置,其中,該固定件包括一凸出結構,該凸出結構透過該地板底部之角落以定位固定該地板。 According to the floor steel frame support device described in item 9 of the scope of patent application, the fixing member includes a protruding structure that penetrates the corner of the bottom of the floor to position and fix the floor.
TW108139236A 2019-10-30 2019-10-30 A floor steel frame support device TWI765187B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW108139236A TWI765187B (en) 2019-10-30 2019-10-30 A floor steel frame support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW108139236A TWI765187B (en) 2019-10-30 2019-10-30 A floor steel frame support device

Publications (2)

Publication Number Publication Date
TW202117148A true TW202117148A (en) 2021-05-01
TWI765187B TWI765187B (en) 2022-05-21

Family

ID=77020650

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108139236A TWI765187B (en) 2019-10-30 2019-10-30 A floor steel frame support device

Country Status (1)

Country Link
TW (1) TWI765187B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW478536U (en) * 2001-02-23 2002-03-01 Jian-De Huang Positioning structure for steel beam of raised floor
CN2470449Y (en) * 2001-02-28 2002-01-09 上海惠亚铝合金制品有限公司 Steel-beam combination structure of elevated floor-board
CN2509281Y (en) * 2001-09-26 2002-09-04 上海惠亚铝合金制品有限公司 Adjustable bearing structure for overhead floors
JP2010024649A (en) * 2008-07-16 2010-02-04 Oki Semiconductor Co Ltd Seismic strengthening structure and seismic strengthening method for double floor
TWM592891U (en) * 2019-10-30 2020-04-01 黃建德 A floor steel frame support device

Also Published As

Publication number Publication date
TWI765187B (en) 2022-05-21

Similar Documents

Publication Publication Date Title
TWM592891U (en) A floor steel frame support device
TWM566439U (en) Shape steel supporting stand
US7975443B2 (en) Precast prestress raised access floor construction
TW202117148A (en) A floor steel frame support device
CN218814399U (en) Cross column rigid bracket node structure
TWI807127B (en) A floor steel frame support device
TWM599334U (en) Floor steel frame support device
CN211511576U (en) Bathroom base and bathroom device
TWI785323B (en) Floor steel frame support device
TWI735363B (en) Floor steel frame support device
KR102140729B1 (en) Suppoting device of water tank
TWI748412B (en) Floor steel frame support device
CN210369739U (en) Anti-cracking floor heating solid wood composite floor
TWM609839U (en) Floor steel frame support device
TWI785280B (en) Elevated floor
CN217419937U (en) Structure is assembled to assembled concrete
JP4054729B2 (en) Living room unit with vibration control device and unit building with the living room unit
CN211007486U (en) Elevated floor supporting structure
TWI744770B (en) Supporting structure
JP3919196B2 (en) Plate assembly plate kit for supporting a solar power generation equipment gantry and a base for supporting a solar power generation equipment gantry constructed using the plate kit
CN214833876U (en) Steel construction building side fascia corner circular arc transition device
CN211421413U (en) Fixing base of steel structure stand column
CN212056125U (en) Water heating pipeline erection bracing frame for building
CN212104808U (en) Assembled building component foundation column
TWI718687B (en) Support structure of raised floor