TW201926091A - Maintenance planning system and maintenance planning method - Google Patents

Maintenance planning system and maintenance planning method Download PDF

Info

Publication number
TW201926091A
TW201926091A TW107110694A TW107110694A TW201926091A TW 201926091 A TW201926091 A TW 201926091A TW 107110694 A TW107110694 A TW 107110694A TW 107110694 A TW107110694 A TW 107110694A TW 201926091 A TW201926091 A TW 201926091A
Authority
TW
Taiwan
Prior art keywords
maintenance
aforementioned
date
risk
value
Prior art date
Application number
TW107110694A
Other languages
Chinese (zh)
Inventor
福井孝太郎
谷口貴耶
Original Assignee
日商三菱電機股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日商三菱電機股份有限公司 filed Critical 日商三菱電機股份有限公司
Publication of TW201926091A publication Critical patent/TW201926091A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A management terminal (300) of the present invention displays an adjustment screen that includes a risk graph which represents a risk value time sequence, a tolerance mark which represents a tolerance value, an expiration mark which represents an expiry date for when the risk value reaches the tolerance value, and a modification interface for modifying the tolerance value. The management terminal receives a designated tolerance value designated with the modification interface. A maintenance planning device (200) calculates a new expiry date on the basis of the designated tolerance value and the risk value time sequence, and determines a maintenance work day on the basis of the new expiry date.

Description

保養計劃系統及保養計劃方法 Maintenance planning system and method

本發明係關於一種用以對於伴隨著遠端監視的機械製品訂定保養計劃的系統者。 The present invention relates to a system for scheduling maintenance of mechanical products with remote monitoring.

在基於風險的維修(Risk Based Maintenance,RBM)中,係依工廠(plant)等之設備的各部位求出異常發生時的風險及其發生機率,且根據經由該相乘而算出的風險,訂定出最佳的保養計劃方案。 In Risk Based Maintenance (RBM), the risk at the time of abnormality and the probability of its occurrence are obtained from various parts of the plant and other equipment, and the risk is calculated based on the multiplication. Determine the best maintenance plan.

在專利文獻1中,已提出一種在基於風險的維修中,預測機器的損壞或機器之性能降低的時期,且將該預測結果作為成本進行處置,以決定適當的保養時期的方法。 In Patent Document 1, a method has been proposed in which risk-based maintenance predicts a period of equipment damage or a decrease in performance of the equipment, and disposes the prediction result as a cost to determine an appropriate maintenance period.

在電梯(elevator)等之一部分的機械設備中,係根據機體內之感測器(sensor)等的資訊而實施偵測異常發生的遠端監視。 Elevator and other parts of machinery and equipment are remotely monitored to detect anomalies based on information from sensors in the machine.

在專利文獻2中,已提出一種在遠端監視中匯集從各種感測器所收集的資訊,而根據馬哈蘭(Mahalanobis)距離的變化量來算出異常發生時期的技術。 In Patent Document 2, a technique has been proposed in which information collected from various sensors is collected during remote monitoring, and the abnormality occurrence time is calculated from the amount of change in Mahalanobis distance.

[先前技術文獻] [Prior technical literature] [專利文獻] [Patent Literature]

專利文獻1:日本特開2003-303243號公報 Patent Document 1: Japanese Patent Application Laid-Open No. 2003-303243

專利文獻2:日本特開2013-113775號公報 Patent Document 2: Japanese Patent Application Publication No. 2013-113775

在要對於裝置的所有者提供保養服務之際,適用停機時間(down time)基準。具體而言,係於提供如升降機即使未獲得充分的保養品質亦少有動作會停止之裝置的保養服務時,會有適用停機時間基準的情形。 When maintenance service is to be provided to the owner of the device, a down time criterion is applied. Specifically, when a maintenance service is provided for a device that rarely stops even if the elevator does not obtain sufficient maintenance quality, a downtime basis may be applied.

然而,由於停機時間基準並不會適當反映出所有者的期望,因此難以在維持顧客滿足度的狀態下使保養計劃效率化。 However, because the downtime benchmark does not properly reflect the owner's expectations, it is difficult to make maintenance plans more efficient while maintaining customer satisfaction.

本發明之目的為可依據管理者(包含所有者)所指定的容許風險而訂定保養計劃。 The purpose of the present invention is to make a maintenance plan according to the allowable risks specified by the manager (including the owner).

本發明之保養計劃系統係包括:顯示部,係顯示調整畫面,該調整畫面包含:表示風險值時間序列的風險曲線圖(risk graph);表示容許值的容許標記(mark);表示風險值到達前述容許值之期限日的期限標記;及用以變更前述容許值的變更介面;接受部,係接受經由前述變更介面所指定的指定容許值;調整部,係根據前述指定容許值與前述風險值時間序列而算出新期限日;及計劃部,係根據前述新期限日而決定保養作業日。 The maintenance planning system of the present invention includes: a display unit that displays an adjustment screen including: a risk graph showing a time series of risk values; a mark indicating an allowable value; and a risk value arrival The deadline mark of the date of the aforementioned allowable value; and the change interface for changing the aforementioned allowable value; the acceptance section accepts the specified allowable value designated through the aforementioned change interface; the adjustment section is based on the aforementioned allowable value and the aforementioned risk value The new deadline is calculated in time series; and the planning department determines the maintenance work day based on the new deadline.

依據本發明,可依據管理者(包含所有者)所指定的容許風險而訂定保養計劃。 According to the present invention, a maintenance plan can be made in accordance with the allowable risk designated by the manager (including the owner).

100‧‧‧保養計劃系統 100‧‧‧Maintenance planning system

101‧‧‧網路 101‧‧‧Internet

110‧‧‧監視對象 110‧‧‧Monitored

111‧‧‧感測器 111‧‧‧Sensor

120‧‧‧保養計劃資料 120‧‧‧ Maintenance Plan Information

130‧‧‧調整畫面 130‧‧‧ Adjust screen

131‧‧‧風險曲線圖 131‧‧‧ risk curve

132‧‧‧容許標記 132‧‧‧Allowable mark

133‧‧‧期限標記 133‧‧‧Term mark

134‧‧‧變更介面 134‧‧‧ Change interface

140‧‧‧限制畫面 140‧‧‧Restricted screen

141‧‧‧限制介面 141‧‧‧ restricted interface

200‧‧‧保養計劃裝置 200‧‧‧ Maintenance plan device

201‧‧‧處理器 201‧‧‧ processor

202‧‧‧記憶體 202‧‧‧Memory

203‧‧‧輔助記憶裝置 203‧‧‧ auxiliary memory device

204‧‧‧通訊裝置 204‧‧‧Communication device

209‧‧‧處理電路 209‧‧‧Processing circuit

211‧‧‧畫面部 211‧‧‧Screen Department

212‧‧‧調整部 212‧‧‧Adjustment Department

213‧‧‧計劃部 213‧‧‧Planning Department

214‧‧‧限制部 214‧‧‧Restricted Department

215‧‧‧預測部 215‧‧‧Forecasting Department

216‧‧‧推薦部 216‧‧‧Recommendation Department

217‧‧‧事件部 217‧‧‧Event Department

291‧‧‧記憶部 291‧‧‧Memory Department

292‧‧‧通訊部 292‧‧‧Ministry of Communications

300‧‧‧管理終端 300‧‧‧ management terminal

301‧‧‧處理器 301‧‧‧ processor

302‧‧‧記憶體 302‧‧‧Memory

303‧‧‧輔助記憶裝置 303‧‧‧ auxiliary memory device

304‧‧‧通訊裝置 304‧‧‧Communication device

305‧‧‧輸出入介面 305‧‧‧I / O interface

309‧‧‧處理電路 309‧‧‧Processing Circuit

311‧‧‧控制部 311‧‧‧Control Department

391‧‧‧記憶部 391‧‧‧Memory Department

392‧‧‧通訊部 392‧‧‧ Ministry of Communications

393‧‧‧顯示部 393‧‧‧Display

394‧‧‧接受部 394‧‧‧Receiving Department

第1圖係實施形態1中之保養計劃系統100的構成圖。 FIG. 1 is a configuration diagram of the maintenance planning system 100 in the first embodiment.

第2圖係實施形態1中之保養計劃裝置200的構成圖。 FIG. 2 is a configuration diagram of the maintenance planning device 200 in the first embodiment.

第3圖係實施形態1中之管理終端300的構成圖。 FIG. 3 is a configuration diagram of the management terminal 300 in the first embodiment.

第4圖係實施形態1中之保養計劃資料120的說明圖。 FIG. 4 is an explanatory diagram of the maintenance plan data 120 in the first embodiment.

第5圖係實施形態1中之保養計劃方法的流程圖。 Fig. 5 is a flowchart of a maintenance planning method in the first embodiment.

第6圖係顯示實施形態1中之調整畫面130的圖。 Fig. 6 is a diagram showing an adjustment screen 130 in the first embodiment.

第7圖係顯示實施形態1中之調整畫面130之動作的圖。 Fig. 7 is a diagram showing the operation of the adjustment screen 130 in the first embodiment.

第8圖係實施形態1中之保養作業日的說明圖。 Fig. 8 is an explanatory diagram of a maintenance work day in the first embodiment.

第9圖係實施形態1中之保養作業日的說明圖。 Fig. 9 is an explanatory diagram of a maintenance work day in the first embodiment.

第10圖係實施形態1中之保養作業日的說明圖。 Fig. 10 is an explanatory diagram of a maintenance work day in the first embodiment.

第11圖係實施形態2中之保養計劃裝置200的構成圖。 Fig. 11 is a configuration diagram of the maintenance planning device 200 in the second embodiment.

第12圖係實施形態2中之保養計劃方法的流程圖。 Fig. 12 is a flowchart of a maintenance planning method in the second embodiment.

第13圖係實施形態2中之保養計劃方法的流程圖。 Fig. 13 is a flowchart of a maintenance planning method in the second embodiment.

第14圖係顯示實施形態2中之限制畫面140的圖。 Fig. 14 is a diagram showing a restriction screen 140 in the second embodiment.

第15圖係實施形態2中之保養作業日的說明圖。 Fig. 15 is an explanatory diagram of a maintenance work day in the second embodiment.

第16圖係實施形態2中之保養作業日的說明圖。 Fig. 16 is an explanatory diagram of a maintenance work day in the second embodiment.

第17圖係實施形態3中之保養計劃裝置200的構成圖。 Fig. 17 is a configuration diagram of the maintenance planning device 200 in the third embodiment.

第18圖係實施形態4中之保養計劃裝置200的構成圖。 Fig. 18 is a configuration diagram of a maintenance planning device 200 in the fourth embodiment.

第19圖係實施形態4中之事件對應方法的流程圖。 Fig. 19 is a flowchart of an event correspondence method in the fourth embodiment.

第20圖係實施形態中之保養計劃裝置200的硬體構成圖。 FIG. 20 is a hardware configuration diagram of the maintenance planning device 200 in the embodiment.

第21圖係實施形態中之管理終端300的硬體構成圖。 FIG. 21 is a hardware configuration diagram of the management terminal 300 in the embodiment.

在實施形態及圖式中,對於相同的要素及對應的要素係附上相同的符號。附有相同符號之要素的說明,係適當省略或簡化。圖中的箭頭符號係以資料的流向或處理的流向為主進行顯示。 In the embodiments and drawings, the same elements and corresponding elements are denoted by the same symbols. Descriptions of elements with the same symbols are appropriately omitted or simplified. The arrow symbol in the figure mainly displays the flow of data or the flow of processing.

實施形態1 Embodiment 1

茲根據第1圖至第10圖來說明保養計劃系統100。 The maintenance planning system 100 will be described with reference to FIGS. 1 to 10.

***構成的說明*** *** Explanation of composition ***

茲根據第1圖來說明保養計劃系統100的構成。 The configuration of the maintenance planning system 100 will be described with reference to FIG. 1.

保養計劃系統100係用以訂定對於監視對象110之保養計劃的系統。 The maintenance planning system 100 is a system for setting a maintenance plan for the monitoring target 110.

保養計劃系統100係包括監視對象110、保養計劃裝置200、及管理終端300。 The maintenance planning system 100 includes a monitoring target 110, a maintenance planning device 200, and a management terminal 300.

監視對象110、保養計劃裝置200、與管理終端300係透過網路(network)101而彼此進行通訊。 The monitoring target 110, the maintenance planning device 200, and the management terminal 300 communicate with each other through a network 101.

監視對象110係在遠端被監視的裝置,具備各種感測器111。例如,監視對象110係電梯或手扶梯(escalator)。 The monitoring target 110 is a device to be monitored at a remote end, and includes various sensors 111. For example, the monitoring target 110 is an elevator or an escalator.

保養計劃裝置200係進行對於監視對象110之保養計劃的方案制定。 The maintenance planning device 200 formulates a maintenance plan for the monitoring target 110.

管理終端300係被用來管理保養計劃。 The management terminal 300 is used to manage a maintenance plan.

茲根據第2圖來說明保養計劃裝置200的構成。 The configuration of the maintenance planning device 200 will be described with reference to FIG. 2.

保養計劃裝置200係包括有處理器(processor)201、記憶體(memory)202、輔助記憶裝置203、與通訊裝置204之類的硬體(hardware)的電腦。此等硬體係透過信號線而彼此連接。 The maintenance planning device 200 is a computer including hardware such as a processor 201, a memory 202, an auxiliary memory device 203, and a communication device 204. These hard systems are connected to each other through signal lines.

處理器201係進行運算處理的IC(Integrated Circuit,積體電路),用以控制其他硬體。例如,處理器201係CPU(Central Processing Unit,中央處理單元)、DSP(Digital Signal Processor,數位信號處理器)、或GPU(Graphics Processing Unit,圖形處理單元)。 The processor 201 is an integrated circuit (Integrated Circuit) for performing arithmetic processing to control other hardware. For example, the processor 201 is a central processing unit (CPU), a digital signal processor (DSP), or a graphics processing unit (GPU).

記憶體202係揮發性的記憶裝置。記憶體202亦被稱為主記憶裝置或主記憶體(main memory)。例如,記憶體202係RAM(Random Access Memory,隨機存取記憶體)。被記憶於記憶體202的資料係視需要而保存於輔助記憶裝置203。 The memory 202 is a volatile memory device. The memory 202 is also referred to as a main memory device or a main memory. For example, the memory 202 is a RAM (Random Access Memory). The data stored in the memory 202 are stored in the auxiliary memory device 203 as needed.

輔助記憶裝置203係非揮發性的記憶裝置。例如,輔助記憶裝置203係ROM(Read Only Memory,唯讀記憶體)、HDD(Hard Disk Drive,硬碟驅動器)、或快閃記憶體(flash memory)。被記憶於輔助記憶裝置203的資料係視需要而被載入於記憶體202。 The auxiliary memory device 203 is a non-volatile memory device. For example, the auxiliary memory device 203 is a ROM (Read Only Memory), a HDD (Hard Disk Drive), or a flash memory. The data stored in the auxiliary memory device 203 is loaded into the memory 202 as needed.

通訊裝置204係接收器(receiver)及發送器(transmitter)。例如,通訊裝置204係通訊晶片(chip)或NIC(Network Interface Card,網路介面卡)。 The communication device 204 is a receiver and a transmitter. For example, the communication device 204 is a communication chip or a NIC (Network Interface Card).

保養計劃裝置200係包括畫面部211、調整部212、計劃部213之類的要素。此等要素係藉由軟體(software)來實現。 The maintenance planning device 200 includes elements such as a screen section 211, an adjustment section 212, and a planning section 213. These elements are implemented by software.

在輔助記憶裝置203中,係記憶有用以使電腦(computer)發揮作為畫面部211、調整部212、計劃部213、記憶部291、及通訊部292之功能的保養計劃程式。保養計劃程式係被載入於記憶體202,且藉由處理器201而執行。 The auxiliary storage device 203 stores a maintenance plan program for causing a computer to function as the screen section 211, the adjustment section 212, the planning section 213, the storage section 291, and the communication section 292. The maintenance plan program is loaded into the memory 202 and executed by the processor 201.

再者,在輔助記憶裝置203中係記憶有OS(Operating System,操作系統)。OS的至少一部分係被載入於記憶體202,且藉由處理器201而執行。 Furthermore, an OS (Operating System) is stored in the auxiliary memory device 203. At least a part of the OS is loaded into the memory 202 and executed by the processor 201.

換言之,處理器201係一邊執行OS,一邊執行保養計劃程式。 In other words, the processor 201 executes the maintenance plan program while executing the OS.

執行保養計劃程式所獲得的資料,係被記憶於記憶體202、輔助記憶裝置203、處理器201內的暫存器(register)或處理器201內的快取記憶體(cache memory)之類的記憶裝置。 The data obtained by running the maintenance plan program are memorized in the memory 202, the auxiliary memory device 203, the register in the processor 201, or the cache memory in the processor 201. Memory device.

記憶體202係發揮作為記憶部291的功能。惟,亦可由其他記憶裝置取代記憶體202,或與記憶體202一同發揮作為記憶部291的功能。 The memory 202 functions as a memory unit 291. However, the memory 202 may be replaced by another memory device, or may function as the memory unit 291 together with the memory 202.

通訊裝置204係發揮作為通訊部292的功能。 The communication device 204 functions as a communication unit 292.

保養計劃裝置200亦可包括替代處理器201的複數個處理器。複數個處理器係分擔處理器201的作用。 The maintenance planning device 200 may also include a plurality of processors instead of the processor 201. The plurality of processors share the role of the processor 201.

保養計劃程式係以可由電腦讀取之方式記錄(儲存)於光碟或快閃記憶體等之非揮發性的記錄媒體。 The maintenance plan program is recorded (stored) on a non-volatile recording medium such as a disc or flash memory in a manner that can be read by a computer.

茲根據第3圖來說明管理終端300的構成。 The configuration of the management terminal 300 will be described with reference to FIG. 3.

管理終端300係包括有處理器301、記憶體302、輔助記憶裝置303、通訊裝置304、及輸出入介面305之類的硬體的電腦。此等硬體係透過信號線而彼此連接。 The management terminal 300 is a computer including hardware such as a processor 301, a memory 302, an auxiliary memory device 303, a communication device 304, and an input / output interface 305. These hard systems are connected to each other through signal lines.

處理器301係進行運算處理的IC,用以控制其他硬體。例如,處理器301係CPU、DSP或GPU。 The processor 301 is an IC that performs arithmetic processing to control other hardware. For example, the processor 301 is a CPU, a DSP, or a GPU.

記憶體302係揮發性的記憶裝置。記憶體302亦被稱為主 記憶裝置或主記憶體。例如,記憶體302係RAM。被記憶於記憶體302的資料係視需要而被保存於輔助記憶裝置303。 The memory 302 is a volatile memory device. Memory 302 is also known as the main Memory device or main memory. For example, the memory 302 is a RAM. The data stored in the memory 302 are stored in the auxiliary memory device 303 as necessary.

輔助記憶裝置303係非揮發性的記憶裝置。例如,輔助記憶裝置303係ROM、HDD或快閃記憶體。被記憶於輔助記憶裝置303的資料係視需要而被載入於記憶體302。 The auxiliary memory device 303 is a non-volatile memory device. For example, the auxiliary memory device 303 is a ROM, HDD, or flash memory. The data stored in the auxiliary storage device 303 is loaded into the memory 302 as needed.

通訊裝置304係接收器及發送器。例如,通訊裝置304係通訊晶片或NIC。 The communication device 304 is a receiver and a transmitter. For example, the communication device 304 is a communication chip or a NIC.

輸出入介面305係供輸入裝置及輸出裝置連接的端口(port)。例如,輸出入介面305係USB端子,輸入裝置係鍵盤(keyboard)及滑鼠(mouse),輸出裝置係顯示器(display)。USB係Universal Serial Bus(通用序列匯流排)的簡稱。 The input / output interface 305 is a port to which an input device and an output device are connected. For example, the input / output interface 305 is a USB terminal, the input device is a keyboard and a mouse, and the output device is a display. USB is an abbreviation for Universal Serial Bus.

管理終端300係包括控制部311,該控制部311係控制記憶部391、通訊部392、顯示部393、及接受部394。控制部311係藉由軟體而實現。 The management terminal 300 includes a control unit 311 which controls the memory unit 391, the communication unit 392, the display unit 393, and the receiving unit 394. The control unit 311 is implemented by software.

在輔助記憶裝置303中,係記憶有用以使電腦發揮作為控制部311、記憶部391、通訊部392、顯示部393、及接受部394之功能的管理程式。管理程式係被載入於記憶體302,且藉由處理器301而執行。 The auxiliary storage device 303 stores a management program for causing a computer to function as the control section 311, the storage section 391, the communication section 392, the display section 393, and the receiving section 394. The management program is loaded into the memory 302 and executed by the processor 301.

再者,在輔助記憶裝置303中係記憶有OS。OS的至少一部分係被載入於記憶體302,且藉由處理器301而執行。 The auxiliary memory device 303 stores an OS. At least a part of the OS is loaded into the memory 302 and executed by the processor 301.

換言之,處理器301係一邊執行OS,一邊執行管理程式。 In other words, the processor 301 executes an OS while executing a management program.

執行管理程式所獲得的資料,係被記憶於記憶體302、輔助記憶裝置303、處理器301內的暫存器或處理器301內的快取記憶體之類的記憶裝置 The data obtained by running the management program are stored in a memory device such as the memory 302, the auxiliary memory device 303, the register in the processor 301, or the cache memory in the processor 301

記憶體302係發揮作為記憶部391的功能。惟,亦可由其他記憶裝置取代記憶體302,或與記憶體302一同發揮作為記憶部391的功能。 The memory 302 functions as a memory unit 391. However, the memory 302 may be replaced by another memory device, or may function as the memory unit 391 together with the memory 302.

通訊裝置304係發揮作為通訊部392的功能。 The communication device 304 functions as a communication unit 392.

輸出入介面305係發揮作為顯示部393及接受部394的功能。 The input / output interface 305 functions as a display section 393 and a receiving section 394.

管理終端300亦可包括替代處理器301的複數個處理器。複數個處理器係分擔處理器301的作用。 The management terminal 300 may also include a plurality of processors instead of the processor 301. The plurality of processors share the role of the processor 301.

管理程式係以可由電腦讀取之方式記錄(儲存)於光碟或快閃記憶體等之非揮發性的記錄媒體。 The management program is a non-volatile recording medium that is recorded (stored) on a disc or flash memory in a manner that can be read by a computer.

茲根據第4圖來說明保養計劃資料120。 The maintenance plan information 120 is described with reference to FIG. 4.

保養計劃資料120係顯示對於監視對象110的保養計劃。 The maintenance plan data 120 displays a maintenance plan for the monitoring target 110.

具體而言,保養計劃資料120係顯示造訪日程與保養作業日程。 Specifically, the maintenance plan data 120 displays a visit schedule and a maintenance operation schedule.

造訪日程係造訪日的日程。 The visit schedule is the schedule of the visit day.

造訪日係作業員造訪對象設施之日。 The date when the Japanese operator visited the target facility.

對象設施係具有監視對象110的設施。 The target facility is a facility having the monitoring target 110.

虛線的三角形係顯示定期的造訪日。 Dotted triangles show regular visit days.

保養作業日程係保養作業日的日程。 The maintenance schedule is the schedule of the maintenance schedule.

保養作業日係作業員進行對於監視對象110之保養作業之日。 The maintenance work day is the day when the operator performs maintenance work on the monitoring target 110.

實線的三角形係顯示保養作業日。 The solid triangle indicates the maintenance work day.

保養作業日係根據監視對象110的風險值時間序列而決定。 The maintenance work day is determined based on the time series of risk values of the monitoring target 110.

具體而言,係較風險值(合計)到達容許值之日更之前的造訪日被決定為保養作業日。 Specifically, the visit day before the day when the risk value (total) reaches the allowable value is determined as the maintenance work day.

容許值係被決定作為所容許之最大風險值的值. The allowable value is determined as the value of the maximum allowable risk value.

風險值(合計)係各個風險值的合計。例如,風險值(合計)係風險值A與風險值B的合計。 Value at risk (total) is the total of each risk value. For example, the value at risk (total) is the total of the value at risk A and the value at risk B.

風險值A係故障風險A的風險值。 The risk value A is the risk value of the failure risk A.

風險值B係故障風險B的風險值。 The risk value B is the risk value of the failure risk B.

風險值係表示故障風險之程度的值。風險值愈大,故障風險愈高。故障風險係隨時間的經過而變高。 The risk value is a value indicating the degree of risk of failure. The greater the risk value, the higher the risk of failure. The risk of failure increases with time.

各風險值時間序列及初始的保養計劃資料120,係藉由基於風險的維修(RBM)中的習知方法而獲得。 The time series of each risk value and the initial maintenance plan data 120 are obtained through a conventional method in risk-based maintenance (RBM).

例如,各風險值的時間序列及初始的保養計劃資料120係藉由專利文獻1所揭示的方法而獲得。 For example, the time series of each risk value and the initial maintenance plan data 120 are obtained by the method disclosed in Patent Document 1.

***動作的說明*** *** Explanation of operation ***

保養計劃系統100的動作(尤其保養計劃裝置200的動作)係相當於保養計劃方法。此外,保養計劃方法的程序係相當於保養計劃程式的程序。 The operation of the maintenance planning system 100 (especially the operation of the maintenance planning device 200) corresponds to a maintenance planning method. The procedure of the maintenance planning method is equivalent to the procedure of the maintenance planning procedure.

茲根據第5圖來說明保養計劃方法。 The maintenance planning method is described with reference to FIG. 5.

在保養計劃方法的說明中,風險值係意味風險值(合計)。 In the description of the maintenance planning method, the risk value means the risk value (total).

初始的保養計劃資料120係記憶於保養計劃裝置200的記憶部291。再者,風險值時間序列及初始容許值,係記憶於保養計劃裝置200的記憶部291。 The initial maintenance plan data 120 is stored in the storage unit 291 of the maintenance plan device 200. The risk value time series and the initial allowable value are stored in the storage unit 291 of the maintenance planning device 200.

在步驟S110中,顯示部393係顯示調整畫面130於顯示器。 In step S110, the display unit 393 displays the adjustment screen 130 on the display.

茲根據第6圖來說明調整畫面130。 The adjustment screen 130 will be described with reference to FIG. 6.

調整畫面130係具有風險曲線圖131、容許標記132、期限標記133、及變更介面134。 The adjustment screen 130 includes a risk graph 131, an allowable mark 132, a time limit mark 133, and a change interface 134.

風險曲線圖131係表示監視對象110的風險值時間序列。 The risk graph 131 shows a time series of risk values of the monitoring target 110.

具體而言,風險曲線圖131係表示風險值時間序列的線曲線圖。縱軸係顯示風險值,橫軸係顯示時刻。 Specifically, the risk graph 131 is a line graph showing a time series of risk values. The vertical axis shows the risk value, and the horizontal axis shows the time.

風險曲線圖131的實線部分係表示實績值時間序列。實績值係過去的風險值。 The solid line portion of the risk graph 131 represents the time series of actual performance values. Actual value is the past risk value.

風險曲線圖131的虛線部分係表示預測值時間序列。預測值係未來的風險值。 The dashed portion of the risk graph 131 represents a time series of predicted values. The forecast value is the future risk value.

容許標記132係表示容許值。具體而言,容許標記132係直線。 The allowable mark 132 indicates an allowable value. Specifically, the allowable mark 132 is a straight line.

期限標記133係表示期限日。期限日係風險值到達容許值之日。換言之,期限日係對應與容許值相同值的風險值之日。具體而言,期限標記133係指示期限日的箭頭符號。 The deadline mark 133 indicates a deadline date. The maturity date is the day when the risk value reaches the allowable value. In other words, the maturity date is the date corresponding to the risk value of the same value as the allowable value. Specifically, the deadline mark 133 is an arrow symbol indicating a deadline date.

變更介面134係用以變更容許值的介面。 The change interface 134 is an interface for changing an allowable value.

具體而言,變更介面134係上升按鍵及下降按鍵。上升按鍵係按下以提高容許值,下降按鍵係按下以降低容許值。 Specifically, the change interface 134 is an up button and a down button. The up button is pressed to increase the allowable value, and the down button is pressed to decrease the allowable value.

返回第5圖來說明步驟S110的程序。 Returning to FIG. 5, the procedure of step S110 will be described.

首先,畫面部211係產生調整畫面130的資料。 First, the screen section 211 generates data for adjusting the screen 130.

接著,通訊部292係將調整畫面130的資料傳送至管理終端300。 Next, the communication unit 292 transmits the data of the adjustment screen 130 to the management terminal 300.

接著,通訊部392係從保養計劃裝置200接收調整畫面130 的資料。 Next, the communication unit 392 receives the adjustment screen 130 from the maintenance planning device 200. data of.

再者,顯示部393係使用調整畫面130的資料而將調整畫面130顯示於顯示器。 The display unit 393 displays the adjustment screen 130 on the display using the data of the adjustment screen 130.

茲說明產生調整畫面130之資料的程序。 The procedure for generating the data of the adjustment screen 130 is described below.

首先,畫面部211係根據風險值時間序列與初始容許值而算出初始期限日。初始期限日係對應與初始容許值相同之值的風險值之日。 First, the screen unit 211 calculates the initial deadline date based on the time series of the risk value and the initial allowable value. The initial maturity date is the date corresponding to the risk value of the same value as the initial allowable value.

接著,畫面部211係根據風險值時間序列而產生風險曲線圖131,且根據初始容許值而產生容許標記132,及根據初始期限日而產生期限標記133。 Next, the screen section 211 generates a risk graph 131 based on the time series of the risk value, generates an allowable mark 132 based on the initial allowable value, and generates a deadline mark 133 based on the initial deadline date.

再者,畫面部211係產生調整畫面130的資料。 The screen unit 211 generates data for adjusting the screen 130.

在步驟S120中,接受部394係接受指定容許值。 In step S120, the acceptance unit 394 accepts the specified allowable value.

指定容許值係被調整畫面130之變更介面134所指定的容許值。 The specified allowable value is an allowable value designated by the change interface 134 of the adjustment screen 130.

茲說明步驟S120的程序。 The procedure of step S120 will be described.

首先,管理者係藉由操作管理終端300的輸入裝置,利用變更介面134而指定容許值。具體而言,管理者係藉由操作滑鼠,而按下上升按鍵或下降按鍵。 First, the manager specifies an allowable value by operating the input device of the management terminal 300 and using the change interface 134. Specifically, the manager presses the up button or the down button by operating the mouse.

再者,接受部394係接受指定容許值。 The receiving unit 394 accepts a specified allowable value.

在步驟S130中,調整部212係算出新期限日。 In step S130, the adjustment unit 212 calculates a new deadline date.

新期限日係對應指定容許值的期限日。 The new deadline date corresponds to the deadline date of the specified allowable value.

茲說明步驟S130的程序。 The procedure of step S130 will be described.

首先,通訊部392係將指定容許值傳送至保養計劃裝置200。 First, the communication unit 392 transmits the specified allowable value to the maintenance planning device 200.

接著,通訊部292係從管理終端300接收指定容許值。此外,記憶部291係將所記憶的容許值更新為指定容許值。 Next, the communication unit 292 receives the specified allowable value from the management terminal 300. In addition, the storage unit 291 updates the stored allowable value to the specified allowable value.

再者,調整部212係根據風險值時間序列與指定容許值而算出新期限日。新期限日係風險值到達指定容許值之日。換言之,新期限日係對應與指定容許值相同之值的風險值之日。此外,記憶部291係將所記憶的期限日更新為新期限日。 In addition, the adjustment unit 212 calculates a new deadline based on the time series of the risk value and the specified allowable value. The new maturity date is the day when the risk value reaches the specified allowable value. In other words, the new maturity date is the date corresponding to the risk value of the specified allowable value. In addition, the storage unit 291 updates the stored deadline date to a new deadline date.

在步驟S140中,畫面部211係更新調整畫面130。 In step S140, the screen section 211 updates the adjustment screen 130.

具體而言,畫面部211係根據指定容許值而移動調整畫面130的容許標記132,且根據新期限日而移動調整畫面130的期限標記133。 Specifically, the screen section 211 moves the allowable mark 132 of the adjustment screen 130 according to the specified allowable value, and moves the time limit mark 133 of the adjustment screen 130 according to the new deadline date.

茲根據第7圖來說明調整畫面130的動作。 The operation of the adjustment screen 130 will be described with reference to FIG. 7.

當按下屬於變更介面134的上升按鍵時,容許標記132即朝上方移動,期限標記133則朝右方移動。 When the up button belonging to the change interface 134 is pressed, the allowable mark 132 moves upward, and the deadline mark 133 moves rightward.

此外,當按下屬於變更介面134的下降按鍵時,容許標記132即朝下方移動,期限標記133則朝左方移動。 In addition, when the down button belonging to the change interface 134 is pressed, the allowable mark 132 moves downward, and the deadline mark 133 moves leftward.

返回第5圖來說明步驟S140的程序。 Returning to FIG. 5, the procedure of step S140 will be described.

首先,畫面部211係根據風險值時間序列而產生風險曲線圖131,且根據指定容許值而產生容許標記132,及根據新期限日而產生期限標記133。 First, the screen section 211 generates a risk graph 131 based on a time series of risk values, generates an allowable mark 132 based on a specified allowable value, and generates a limit mark 133 based on a new deadline date.

接著,畫面部211係產生調整畫面130之更新後的資料。 Next, the screen section 211 generates updated data of the adjustment screen 130.

接著,通訊部292係將調整畫面130之更新後的資料傳送至管理終端300。 Next, the communication unit 292 transmits the updated data of the adjustment screen 130 to the management terminal 300.

接著,通訊部392係從保養計劃裝置200接收調整畫面130之更新後的資料。 Next, the communication unit 392 receives the updated data of the adjustment screen 130 from the maintenance planning device 200.

再者,顯示部393係使用調整畫面130之更新後的資料而將調整畫面130顯示於顯示器。 The display unit 393 displays the adjustment screen 130 on the display using the updated data of the adjustment screen 130.

在步驟S150中,計劃部213係根據新期限日而決定保養作業日。 In step S150, the planning unit 213 determines a maintenance work day based on the new deadline.

再者,計劃部213係將保養作業日登錄於保養計劃資料120。 In addition, the planning section 213 registers the maintenance work day in the maintenance plan data 120.

茲說明步驟S150的程序。 The procedure of step S150 is described below.

首先,計劃部213係從保養計劃資料120選擇下一次的造訪日。 First, the planning department 213 selects the next visit day from the maintenance plan data 120.

接著,計劃部213係將下一次的造訪日與新期限日進行比較。 Next, the planning department 213 compares the next visit date with the new deadline date.

當下一次的造訪日為較新期限日更之前之日時,計劃部213係將新期限日之前的造訪日決定為保養作業日。具體而言,計劃部213係從保養計劃資料120選擇緊接著新期限日之前的造訪日。所選擇的造訪日即成為保養作業日。再者,計劃部213係將保養作業日登錄於保養計劃資料120。 When the next visit date is a day before the new deadline date, the planning department 213 determines the visit date before the new deadline date as the maintenance operation day. Specifically, the planning department 213 selects a visit date immediately before the new deadline from the maintenance plan data 120. The selected visit day becomes the maintenance work day. In addition, the planning section 213 registers the maintenance work day in the maintenance plan data 120.

當下一次的造訪日為新期限日之後之日時,計劃部213即將較新期限日更之前之追加的造訪日決定為保養作業日。具體而言,計劃部213係選擇至新期限日為止前的任一日。所選擇之日即成為追加的造訪日及保養作業日。再者,計劃部213係將追加的造訪日登錄於保養計劃資料120。再者,計劃部213係將保養作業日登錄於保養計劃資料120。 When the next visit date is a day after the new deadline date, the planning department 213 decides that an additional visit date before the new deadline date is a maintenance work day. Specifically, the planning unit 213 selects any day before the new deadline. The selected day becomes the additional visit day and maintenance work day. In addition, the planning department 213 registers the additional visit day in the maintenance plan data 120. In addition, the planning section 213 registers the maintenance work day in the maintenance plan data 120.

茲根據第8圖及第10圖來說明保養作業日的決定。 The determination of the maintenance work day will be described with reference to FIGS. 8 and 10.

目前係較第2造訪日更之後之日,且為較第3造訪日更之前之日。換言之,下一次的造訪日係第3造訪日。 Currently, it is a date later than the second visit day, and it is a date before the third visit day. In other words, the next visit is the third visit.

在第8圖至第10圖中,係顯示3個容許值。第1容許值係最大的容許值,第2容許值係中間的容許值,第3容許值係最小的容許值。 In FIGS. 8 to 10, three allowable values are shown. The first allowable value is the maximum allowable value, the second allowable value is the intermediate allowable value, and the third allowable value is the smallest allowable value.

在第8圖中,設為由管理者指定了第1容許值。 In FIG. 8, it is assumed that the first allowable value is designated by the manager.

此時,下一次的造訪日(第3造訪日)為較期限日更之前之日,而緊接著期限日之前的造訪日為第4造訪日。因此,計劃部213係將第4造訪日決定為保養作業日。 At this time, the next visit day (the third visit day) is a day before the deadline date, and the visit day immediately before the deadline date is the fourth visit day. Therefore, the planning department 213 decides the fourth visit day as the maintenance work day.

在第9圖中,設為由管理者指定了第2容許值。 In FIG. 9, it is assumed that the second allowable value is designated by the manager.

此時,下一次的造訪日(第3造訪日)為較期限日更之前之日,而緊接著期限日之前的造訪日為第3造訪日。因此,計劃部213係將第3造訪日決定為保養作業日。 At this time, the next visit day (third visit day) is a day before the deadline date, and the visit day immediately before the deadline date is the third visit day. Therefore, the planning department 213 decides the third visit day as the maintenance work day.

在第10圖中,設為由管理者指定了第3容許值。 In FIG. 10, it is assumed that the third allowable value is designated by the manager.

此時,下一次的造訪日(第3造訪日)為較期限日更之後之日。因此,計劃部213係選擇較下一次之造訪日更之前之日作為追加的造訪日,且將追加的造訪日決定為保養作業日。 At this time, the next visit date (third visit date) is a date later than the deadline date. Therefore, the planning department 213 selects a day before the next visit day as the additional visit day, and determines the additional visit day as the maintenance operation day.

***實施形態1的補充*** *** Supplement to Embodiment 1 ***

監視對象110的具體例係機械設備。 A specific example of the monitored object 110 is a mechanical device.

機械設備係由多種零件所構成,各個零件的劣化係隨著使用次數或經歷年限而進行。因此,為使服務停止等的異常不會發生,乃定期地實施保養作業(檢修、調整及零件更換等)。 Mechanical equipment is composed of various parts, and the deterioration of each part progresses with the number of uses or the age. Therefore, in order to prevent abnormalities such as service suspension, maintenance operations (such as inspection, adjustment, and replacement of parts) are performed regularly.

機械設備的具體例係電梯。 A specific example of the mechanical equipment is an elevator.

茲實施對於電梯的遠端監視。在遠端監視中,經由機體內 之感測器111所獲得的感測器資訊被集中於中心設備(center)。當被遠端監視偵測到異常時,保養作業員即出動至現場進行修理。 Remote monitoring of the elevator is implemented. In remote surveillance, via the body The sensor information obtained by the sensor 111 is concentrated in a center. When an abnormality is detected by remote monitoring, the maintenance operator is dispatched to the site for repair.

監視對象110或具有監視對象110之設施的具體例,係工廠(plant)。 A specific example of the monitoring target 110 or a facility having the monitoring target 110 is a plant.

為了制定對於工廠之合理的保養計劃方案,係藉由每一異常項目的影響度與發生頻率的相乘而計算風險。再者,實施基於風險的維修(RBM)。在RBM中,係依據風險而決定保養周期及保養內容。影響度係表示異常發生時的影響。具體而言,影響度係依據對於人命的影響、金錢的損失或因應所需的時間等而求出。發生頻率係表示異常發生的可能性。在一般的RBM中,發生頻率係依據機種的故障發生實績或設計者的真知灼見等而求出。 In order to formulate a reasonable maintenance plan for the factory, the risk is calculated by multiplying the impact of each abnormal item with the frequency of occurrence. Furthermore, implement risk-based maintenance (RBM). In RBM, the maintenance cycle and maintenance content are determined based on risks. The degree of influence indicates the influence when an abnormality occurs. Specifically, the degree of influence is determined based on the effect on human life, loss of money, or time required. The frequency of occurrence indicates the possibility of abnormality. In general RBM, the frequency of occurrence is determined based on the actual failure occurrence of the model or the insights of the designer.

再者,已提出一種藉由解析技術及模擬技術的進步,而預測因為使用所導致之構件之劣化的技術方案。即使模擬困難,亦大多可藉由耐久實驗的實施而預測異常發生的使用次數或使用時間。 Furthermore, a technical solution has been proposed to predict the deterioration of components due to the use of advances in analysis technology and simulation technology. Even if the simulation is difficult, most of them can predict the number of times of use or the time of use of anomalies through the implementation of endurance experiments.

在此,故障的發生頻率係隨著成為故障原因之零件的劣化而增加。因此,當使用藉由劣化預測技術所獲得的推算結果時,可推算特定時序(timing)中之各故障的發生頻率。 Here, the frequency of failures increases with the deterioration of the parts that cause them. Therefore, when the estimation result obtained by the degradation prediction technique is used, the occurrence frequency of each fault in a specific timing can be estimated.

此外,由於當實施保養作業時會改善零件的狀態,因此關於接受保養作業實施之零件之異常的發生頻率會降低。 In addition, since the condition of the parts is improved when maintenance operations are performed, the frequency of occurrence of abnormalities regarding the parts subjected to maintenance operations is reduced.

各異常的影響度即使劣化狀況變化也不會改變。 因此,當進行發生頻率與影響度的相乘時,可計算出特定時序中的風險。 The degree of influence of each abnormality does not change even if the deterioration condition changes. Therefore, when the frequency of occurrence and the degree of influence are multiplied, the risk in a specific time series can be calculated.

在此,藉由將導致利用者之傷害之故障的影響度特意設為較通常的故障更高的值,重要零件的劣化將會更大地反映於風險。 Here, by intentionally setting the degree of influence of a failure that causes injury to a user to be higher than a normal failure, the deterioration of important parts will be more reflected in the risk.

保養計劃系統100係設為可供管理者(包含監視對象110的所有者)易於變更成為保養作業之實施基準的容許值。監視對象110的風險值係利用RBM而計算。 The maintenance planning system 100 is an allowable value that can be easily changed by a manager (including the owner of the monitoring target 110) to be a reference for implementing maintenance work. The risk value of the monitored object 110 is calculated using RBM.

首先,在設置監視對象110時,決定初始的容許值(容許位準(level)的初始值)。然後,使用加速實驗的結果或過去的故障實績資料等而進行劣化預測,且根據預測結果而計算風險值時間序列,及根據風險值時間序列而產生初始的保養計劃資料120。 First, when the monitoring target 110 is set, an initial allowable value (an initial value of an allowable level) is determined. Then, the deterioration prediction is performed using the results of the accelerated experiment or past failure performance data, etc., and the risk value time series is calculated based on the prediction results, and the initial maintenance plan data 120 is generated based on the risk value time series.

當作業員以一定周期造訪現場時,保養作業將會在風險值剛要超過容許值之前的定期造訪時實施。除此之外,為使風險值不會超過容許值,而且使作業量最小化,乃訂定定期保養計劃(初始保養計劃)。此時,要考慮保養作業之實施據點中之人員計劃及複數個作業之依存關係等的條件。 When the operator visits the site at a certain period, the maintenance work will be performed at regular visits just before the risk value exceeds the allowable value. In addition, in order to prevent the risk value from exceeding the allowable value and minimize the amount of work, a regular maintenance plan (initial maintenance plan) is established. At this time, consideration must be given to the conditions such as the personnel plan in the maintenance base and the dependency relationship between multiple operations.

在開始監視對象110的運用之後,利用監視對象110所具備的感測器111而實施遠端監視。然後,掌握監視對象110之各零件的劣化狀況。 After the operation of the monitoring target 110 is started, remote monitoring is performed using the sensor 111 provided in the monitoring target 110. Then, the deterioration condition of each component of the monitoring target 110 is grasped.

在此,雖存在從劣化推算所獲得的資料與所觀測到的資料,但在所觀測到的資料中,存在有測量參差不齊。因此,藉由使用卡爾曼濾波法(Kalman filter)之類的手法來組合此2 種資料,可進行精確度更高的劣化推算。至於不進行遠端監視的部位,亦可使用造訪時的檢修結果來進行狀態推算。 Here, although the data obtained from the degradation estimation and the observed data exist, there is a measurement unevenness in the observed data. Therefore, by using a Kalman filter or the like to combine the 2 This kind of data can be used for more accurate estimation of degradation. As for the parts that are not monitored remotely, the status of the visit can be used to estimate the status.

當所有零件的劣化狀況與設置時所預測之劣化狀況的差異為一定範圍內時,不需要進行保養計劃的修正。因此,仍然可繼續運用。 When the difference between the deterioration condition of all parts and the deterioration condition predicted at the time of setting is within a certain range, it is not necessary to modify the maintenance plan. Therefore, it can still be used.

另一方面,當差異超過一定範圍時,保守計劃要進行修正。 On the other hand, when the difference exceeds a certain range, the conservative plan needs to be revised.

作為第1階段的修正,係調整定期保養實施的時序及內容。 As the first stage of revision, the timing and content of regular maintenance implementation were adjusted.

當狀態的劣化比事前預測更快時,變更保養計劃以因應1次前的定期造訪時。此外,當風險值因為劣化而於緊接著保養實施日之前超過了容許值時,亦可以數日單位來調整保養作業的日程。 When the deterioration of the condition is faster than predicted in advance, the maintenance plan is changed to correspond to the previous regular visit. In addition, when the risk value exceeds the allowable value immediately before the maintenance implementation date due to deterioration, the maintenance work schedule can also be adjusted in units of several days.

當狀態的劣化比事前預測更慢時,亦可變更保養計劃以因應1次後的定期造訪時。 When the deterioration of the condition is slower than predicted in advance, the maintenance plan can also be changed to cope with the regular visits after the first visit.

再者,亦可藉由根據與作成初始之保養計劃時相同的限制條件而將保養計劃最佳化,而決定最終之定期保養的實施內容。 Furthermore, the content of the final scheduled maintenance can be determined by optimizing the maintenance plan based on the same constraints as when creating the initial maintenance plan.

當無法藉由第1階段的修正而將風險值的上升控制於容許範圍內時,以實施非定期之保養之方式變更保養計劃。尤其當在風險值達到容許值為止前的時間無餘裕時,以實施緊急出動之方式變更保養計劃。在緊急出動中,作業員係緊急前往現場而進行對於對象部位的保養作業。另一方面,亦可當有時間上的餘裕時,於實施非定期保養之前,以為了實施非定期保養的造訪為前提而將對象機體整體的保養計劃予以最 佳化。藉此,即可隨同對於其他部位的保養作業一併進行對於對象部位的保養作業。 When the increase in risk value cannot be controlled within the allowable range through the correction in the first stage, the maintenance plan is changed by implementing non-scheduled maintenance. Especially when there is no time left before the risk value reaches the allowable value, the maintenance plan is changed by implementing emergency dispatch. During the emergency call, the operator rushed to the scene to perform maintenance work on the target site. On the other hand, when there is a margin of time, you can optimize the overall maintenance plan of the target body before performing the non-scheduled maintenance on the premise of a visit for the non-scheduled maintenance. Optimization. Thereby, the maintenance work for the target part can be performed together with the maintenance work for other parts.

另外,當已調整了下一次之後造訪時的作業內容時,保養計劃資料120即被更新,且根據更新後的資料而持續監視狀態變化。藉由在已明確得知無法以此保養計劃完全因應風險的時點修正保養計劃,即可一直遵照此保養計劃系統100而決定最佳的因應方針。 In addition, when the operation content at the time of the next visit has been adjusted, the maintenance plan data 120 is updated, and the status change is continuously monitored based on the updated data. By correcting the maintenance plan at a point when it is clearly known that this maintenance plan cannot fully respond to risks, the maintenance plan system 100 can be always followed to determine the best response policy.

此外,在運用此系統的期間,將會改善劣化預測的精確度。因此,亦可以長期的周期來重估初始的保養計劃本身,以使此改善的效果反映於初始的保養計劃。 In addition, the accuracy of the degradation prediction will be improved during the application of this system. Therefore, the initial maintenance plan itself can be re-evaluated over a long period of time, so that the effect of this improvement is reflected in the initial maintenance plan.

風險的容許值係以依據管理者的期望來設定為理想。 The allowable value of risk is ideally set in accordance with managers' expectations.

例如,在高級旅館(hotel)中,係要求噪音及振動要維持在極低的水準。此外,在醫療機構中,則要求要極短的停機時間。 For example, in high-end hotels, noise and vibration are required to be maintained at extremely low levels. In addition, in medical facilities, extremely short downtime is required.

在此種情形下,藉由將容許值設為較通常更低,即可制定出反映出期望之最佳的保養計劃方案。惟,即使以此方式調整容許值時,也不可能容許對於會發生對利用者人體造成影響之故障之類的水準的調整。 In this case, by setting the allowable value lower than usual, an optimal maintenance plan that reflects expectations can be formulated. However, even when the allowable value is adjusted in this manner, it is impossible to allow adjustment of a level such as a failure that affects the human body of the user.

風險值係除了保養服務公司在作成保養計劃時被活用外,還會被管理者實時(realtime)地揭示,故而被有效地活用。 The risk value is used in addition to the maintenance service company in making a maintenance plan, and it is also revealed in real time by the manager, so it is effectively used.

保養計劃系統100係包括管理終端300。管理終端300係可設於運用著保養計劃系統100的中心設備設施,亦可設置於 藉由網路101所連接的遠端地。 The maintenance planning system 100 includes a management terminal 300. The management terminal 300 may be installed at a central facility using the maintenance planning system 100, or may be installed at The remote ground connected through the network 101.

管理者係可使用管理終端300而確認保養服務公司一面管理機體的風險一面適當地實施保養作業一事。再者,管理者係可根據關於適當之容許值的檢討結果,而立即地變更容許值。 The manager can use the management terminal 300 to confirm that the maintenance service company appropriately performs maintenance work while managing the risk of the body. Furthermore, the manager can change the allowable value immediately based on the result of the review of the appropriate allowable value.

當管理者變更了容許值時,使用現狀之風險值的預測,而再度計算保養計劃。當風險值已超過了新的容許值時,或者,當預測到至下一次定期造訪為止前風險值將會超過新的容許值時,保養計劃系統100即計劃非定期的保養。藉此,即可迅速地對應管理者的期望。 When the manager changes the allowable value, the current risk value forecast is used to calculate the maintenance plan again. When the risk value has exceeded the new allowable value, or when it is predicted that the risk value will exceed the new allowable value until the next regular visit, the maintenance planning system 100 plans non-scheduled maintenance. With this, you can quickly respond to the expectations of managers.

***實施形態1的效果*** ** Effect of Embodiment 1 **

為了使保養計劃系統100提供調整畫面130給管理者,管理者可適當調整容許值。結果,將可提供管理者所期望的保養服務。因此,可提升顧客滿足度。 In order for the maintenance planning system 100 to provide an adjustment screen 130 to the manager, the manager may appropriately adjust the allowable value. As a result, maintenance services expected by managers will be provided. Therefore, customer satisfaction can be improved.

***其他構成*** *** Other constructions **

保養計劃系統100(例如保養計劃裝置200)亦可包括產生初始之保養計劃資料120的產生部。此產生部係根據過去的風險值時間序列而預測未來的風險值時間序列,且根據未來的風險值時間序列而產生保養計劃資料120。風險值的預測及保養計劃資料120的產生,係可利用習知之基於風險的維修中的方法。 The maintenance planning system 100 (for example, the maintenance planning device 200) may further include a generating unit that generates initial maintenance planning data 120. This generating unit predicts future risk value time series based on past risk value time series, and generates maintenance plan data 120 based on future risk value time series. The prediction of the risk value and the generation of the maintenance plan data 120 are based on the conventional method in risk-based maintenance.

實施形態2 Embodiment 2

針對當下一次的造訪日為較新期限日更之後之日時限制監視對象110的動作以取代追加造訪日的形態,根據第11圖至第16圖來說明主要與實施形態1不同之點。 Regarding the configuration in which the operation of the monitoring target 110 is restricted to replace the additional visit day when the next visit date is later than the new deadline date, the differences from Embodiment 1 will be described with reference to FIGS.

***構成的說明*** *** Explanation of composition ***

保養計劃系統100的構成係與實施形態1的構成(參照第1圖)相同。 The configuration of the maintenance planning system 100 is the same as that of the first embodiment (see FIG. 1).

茲根據第11圖來說明保養計劃裝置200的構成。 The configuration of the maintenance planning device 200 will be described with reference to FIG. 11.

保養計劃裝置200係進一步包括限制部214與預測部215。 The maintenance planning device 200 further includes a restriction unit 214 and a prediction unit 215.

保養計劃程式係進一步使電腦發揮作為限制部214與預測部215之功能。 The maintenance planning program further causes the computer to function as the restriction section 214 and the prediction section 215.

***動作的說明*** *** Explanation of operation ***

茲根據第12圖及第13圖來說明保養計劃方法。 The maintenance planning method will be described with reference to FIGS. 12 and 13.

在步驟S201(參照第12圖)中,顯示部393係將限制畫面140顯示於顯示器。 In step S201 (see FIG. 12), the display unit 393 displays the restriction screen 140 on the display.

茲根據第14圖來說明限制畫面140。 The restriction screen 140 will be described with reference to FIG. 14.

限制畫面140係具有限制介面141。 The restriction screen 140 includes a restriction interface 141.

限制介面141係用以指定對於監視對象110之動作限制的介面。在限制介面141中,係包含用以指定推薦之動作限制的介面。 The restriction interface 141 is an interface for specifying a restriction on the movement of the monitored object 110. The restriction interface 141 includes an interface for specifying a recommended action restriction.

具體而言,限制介面141係依動作限制的每一種類而具有核取方塊(checkbox)。 Specifically, the restriction interface 141 has a checkbox for each type of operation restriction.

返回第12圖來說明步驟S201的程序。 Returning to Fig. 12, the procedure of step S201 will be described.

首先,畫面部211係產生限制畫面140的資料。 First, the screen section 211 generates data for limiting the screen 140.

接著,通訊部292係將限制畫面140的資料傳送至管理終端300。 Next, the communication unit 292 transmits the data of the restricted screen 140 to the management terminal 300.

接著,通訊部392係從保養計劃裝置200接收限制畫面140的資料。 Next, the communication unit 392 receives the data of the restriction screen 140 from the maintenance planning device 200.

再者,顯示部393係使用限制畫面140的資料而將限制畫面140顯示於顯示器。 The display unit 393 displays the restriction screen 140 on the display using the data of the restriction screen 140.

在步驟S202中,接受部394係接受指定動作限制。 In step S202, the acceptance unit 394 accepts the designated operation restriction.

指定動作限制係被限制畫面140之限制介面141所指定的動作限制。 The designated motion restriction is a motion restriction designated by the restriction interface 141 of the restriction screen 140.

茲說明步驟S202的程序。 The procedure of step S202 will be described.

首先,管理者係藉由管理終端300的輸入裝置,利用限制介面141而指定動作限制。具體而言,管理者係藉由操作滑鼠,而將核取輸入於任一個動作限制的核取方塊。 First, the manager specifies an operation restriction using the input interface of the management terminal 300 using the restriction interface 141. Specifically, the manager inputs the check into any check box of the operation restriction by operating the mouse.

再者,接受部394係接受指定動作限制。 In addition, the acceptance unit 394 accepts a specified operation restriction.

再者,通訊部392係將指定動作限制的通知傳送至保養計劃裝置200。 In addition, the communication unit 392 transmits a notification to specify the operation restriction to the maintenance planning device 200.

接著,通訊部292係從管理終端300接收指定動作限制的通知。 Next, the communication unit 292 receives a notification specifying the operation restriction from the management terminal 300.

然後,記憶部291係記憶指定動作限制。 Then, the memory unit 291 memorizes the designated operation restriction.

在步驟S211中,顯示部393係將調整畫面130顯示於顯示器。 In step S211, the display unit 393 displays the adjustment screen 130 on the display.

步驟S211係與實施形態1中的步驟S110(參照第5圖)相同。 Step S211 is the same as step S110 (refer to FIG. 5) in the first embodiment.

在步驟S212中,接受部394係接受指定容許值。 In step S212, the acceptance unit 394 accepts the specified allowable value.

步驟S212係與實施形態1中的步驟S120(參照第5圖)相同。 Step S212 is the same as step S120 (see FIG. 5) in the first embodiment.

在步驟S213中,調整部212係算出新期限日。 In step S213, the adjustment unit 212 calculates a new deadline date.

步驟S213係與實施形態1中的步驟S130(參照第5圖) 相同。 Step S213 is the same as step S130 in the first embodiment (see FIG. 5). the same.

在步驟S220中,限制部214係從保養計劃資料120選擇下一次的造訪日。 In step S220, the restriction unit 214 selects the next visit day from the maintenance plan data 120.

再者,限制部214係將下一次的造訪日與新期限日進行比較。 The restriction unit 214 compares the next visit date with the new deadline date.

當下一次的造訪日為較新期限日更之前之日時,處理前進至步驟S221及步驟S222。 When the next visit date is a day before the new deadline date, the process proceeds to steps S221 and S222.

當下一次的造訪日為新期限日之後之日時,處理前進至步驟S231(參照第13圖)。 When the next visit date is a day after the new deadline date, the process proceeds to step S231 (see FIG. 13).

在步驟S221中,畫面部211係更新調整畫面130。 In step S221, the screen section 211 updates the adjustment screen 130.

更新方法係與實施形態1中的步驟S140(參照第5圖)相同。 The update method is the same as step S140 (see FIG. 5) in the first embodiment.

在步驟S222中,計劃部213係將新期限日之前的造訪日決定為保養作業日。具體而言,計劃部213係從保養計劃資料120選擇緊接著新期限日之前的造訪日。所選擇的造訪日即成為保養作業日。 In step S222, the planning unit 213 determines the visit day before the new deadline as the maintenance work day. Specifically, the planning department 213 selects a visit date immediately before the new deadline from the maintenance plan data 120. The selected visit day becomes the maintenance work day.

再者,計劃部213係將保養作業日登錄於保養計劃資料120。 In addition, the planning section 213 registers the maintenance work day in the maintenance plan data 120.

在步驟S231(參照第13圖)中,限制部214係限制監視對象110的動作。 In step S231 (see FIG. 13), the restriction unit 214 restricts the operation of the monitoring target 110.

具體而言,限制部214係產生對應指定動作限制的動作命令。 Specifically, the restriction unit 214 generates an operation command corresponding to a specified operation restriction.

再者,通訊部292係將所產生的動作命令傳送至監視對象110。 The communication unit 292 transmits the generated operation command to the monitoring target 110.

監視對象110係接收動作命令,且依照所接收的動作命令而動作。 The monitoring target 110 receives an operation command and operates in accordance with the received operation command.

藉此,限制監視對象110的動作。 Thereby, the operation of the monitoring target 110 is restricted.

在步驟S232中,預測部215係算出限制後的風險值時間序列。 In step S232, the prediction unit 215 calculates the time series of the risk value after the limitation.

限制後的風險值時間序列係監視對象110之動作被限制之後的風險值時間序列。 The restricted risk value time series is a risk value time series after the operation of the monitoring object 110 is restricted.

具體而言,預測部215係根據監視對象110之限制後的動作與監視對象110之過去的風險值時間序列,而算出監視對象110之未來的風險值時間序列。 Specifically, the prediction unit 215 calculates the future risk value time series of the monitoring target 110 based on the restricted operation of the monitoring target 110 and the past risk value time series of the monitoring target 110.

風險值時間序列的算出,係可利用習知之基於風險的維修中的算出方法。 The calculation of the time series of the risk value can be performed by a conventional calculation method based on risk.

在步驟S233中,調整部212係算出限制後的期限日。 In step S233, the adjustment unit 212 calculates a deadline date after the restriction.

期限後的期限日,係在監視對象110的動作被限制之後對應指定容許值的期限日。 The deadline date after the deadline is a deadline date corresponding to the specified allowable value after the operation of the monitoring target 110 is restricted.

具體而言,調整部212係根據指定容許值與限制後的風險值時間序列而算出限制後的期限日。限制後的期限日係風險值達到指定容許值之日。換言之,限制後的期限日,係對應與指定容許值相同值的風險值之日。此外,記憶部291係將所記憶的期限日更新為限制後的期限日。 Specifically, the adjustment unit 212 calculates the limit date after the restriction based on the time series of the specified allowable value and the restricted risk value. The limit date is the day when the risk value reaches the specified allowable value. In other words, the limit date is the date corresponding to the risk value equal to the specified allowable value. The memory unit 291 updates the memorized deadline date to the restricted deadline date.

在步驟S234中,畫面部211係更新調整畫面130。 In step S234, the screen section 211 updates the adjustment screen 130.

具體而言,畫面部211係根據指定容許值而移動調整畫面130的容許標記132,且根據限制後的期限日而移動調整畫面 130的期限標記133。 Specifically, the screen section 211 moves the adjustment mark 132 of the adjustment screen 130 according to the specified allowable value, and moves the adjustment screen according to the limit date and time. Term mark 130 and 133.

步驟S234的程序係與實施形態1中的步驟S140(參照第5圖)的程序相同。 The procedure of step S234 is the same as that of step S140 (see FIG. 5) in the first embodiment.

在步驟S235中,計劃部213係根據限制後的期限日而決定保養作業日。 In step S235, the planning unit 213 determines a maintenance work day based on the restricted deadline.

再者,計劃部213係將保養作業日登錄於保養計劃資料120。 In addition, the planning section 213 registers the maintenance work day in the maintenance plan data 120.

步驟S235的程序係與實施形態1中的步驟S150(參照第5圖)的程序相同。 The procedure of step S235 is the same as that of step S150 (see FIG. 5) in the first embodiment.

茲根據第15圖及第16圖來說明保養作業日的決定。 The determination of the maintenance work day will be described with reference to FIGS. 15 and 16.

目前係較第2造訪日更之後之日,且為較第3造訪日更之前之日。換言之,下一次的造訪日係第3造訪日。 Currently, it is a date later than the second visit day, and it is a date before the third visit day. In other words, the next visit is the third visit.

在第15圖中,風險曲線圖係表示監視對象110之動作被限制之前的風險值時間序列。 In FIG. 15, the risk curve diagram shows a time series of risk values before the operation of the monitoring target 110 is restricted.

下一次的造訪日(第3造訪日)係較期限日更之後之日。因此,監視對象110的動作被限制。 The next visit day (third visit day) is a day after the deadline date. Therefore, the operation of the monitoring target 110 is restricted.

在第16圖中,風險曲線圖係表示監視對象110之動作被限制之後的風險值時間序列。由於監視對象110的動作被限制,因此風險值的上升被抑制。 In FIG. 16, the risk graph is a time series of risk values after the operation of the monitoring target 110 is restricted. Since the operation of the monitoring target 110 is restricted, an increase in the risk value is suppressed.

下一次的造訪日(第3造訪日)係較期限日更之前之日,緊接著期限日之前的造訪日係第3造訪日。因此,計劃部213係將第3造訪日決定為保養作業日。 The next visit day (third visit day) is a day before the deadline date, and the visit date immediately before the deadline date is the third visit day. Therefore, the planning department 213 decides the third visit day as the maintenance work day.

***實施形態2的補充*** ** Supplement of Embodiment 2 ***

當僅以所計劃之造訪時之作業內容的修正而難以將風險值的上升控制於容許值以下時,限制監視對象110之動作的一部分,以取代實施非定期保養。大部分的構件都會隨著使用次數而逐漸劣化。因此,可藉由限制使用次數來抑制劣化的進行。限制部214係以下一次造訪日之風險值未達容許值之方式決定動作限制的位準。當僅以動作限制而無法抑制風險值時,計劃部213係將追加的造訪日決定為保養作業日。 When it is difficult to control the increase of the risk value below the allowable value only by the modification of the operation content at the time of the planned visit, a part of the operation of the monitoring target 110 is restricted to replace the non-scheduled maintenance. Most components will gradually deteriorate with the number of uses. Therefore, the progress of deterioration can be suppressed by limiting the number of uses. The restriction unit 214 determines the level of the operation restriction in such a manner that the risk value on the next visit date does not reach the allowable value. When the risk value cannot be suppressed only by the operation limitation, the planning department 213 determines the additional visit day as the maintenance work day.

指定動作限制的內容係預先決定而登錄於記憶部291。動作限制的內容係可顯示於管理終端300的顯示器。再者,動作限制的實施狀況係可顯示於管理終端300的顯示器。再者,管理者係可在限制畫面140變更動作限制的內容。 The contents of the designated operation restriction are determined in advance and registered in the storage unit 291. The content of the motion restriction can be displayed on the display of the management terminal 300. It should be noted that the implementation status of the motion restriction can be displayed on the display of the management terminal 300. In addition, the manager can change the content of the operation restriction on the restriction screen 140.

當動作限制的內容被變更時,預測部215係重新算出風險值時間序列。當推算出風險值會超過容許值時,與未實施動作限制的情形同樣地,計劃部213係以實施非定期保養之方式訂定保養計劃。 When the content of the operation restriction is changed, the prediction unit 215 recalculates the time series of the risk value. When the risk value is estimated to exceed the allowable value, the planning section 213 establishes a maintenance plan by performing non-scheduled maintenance in the same manner as when the operation limit is not implemented.

動作限制係可以裝置整體為對象,亦可限定於與劣化進行中的構件直接相關的範圍。 The motion limitation system may be applied to the entire device, or may be limited to a range directly related to a component undergoing degradation.

例如,亦可當電梯的特定搭乘樓門發生了劣化時,限制在該樓層之電梯的利用次數。 For example, when the specific boarding door of the elevator is degraded, the number of times the elevator is used on that floor may be limited.

此外,亦可當發生了電梯之驅動機構相關的劣化時,使電梯廂的動作速度降低,或亦可藉由使規定人數偵測部的設定變化,而使電梯廂動作以限制乘客數。 In addition, when the deterioration of the driving mechanism of the elevator occurs, the operating speed of the elevator car can be reduced, or the elevator car can be operated to limit the number of passengers by changing the setting of the predetermined number of people detection unit.

此外,亦可當發生了搭乘樓門的劣化時,在開門時及關門時降低門的動作速度或啟動加速度。 In addition, when the deterioration of the boarding door occurs, the operating speed or starting acceleration of the door can be reduced when the door is opened and closed.

此外,亦可當升降路徑的一部分發生了劣化時,限定於電梯廂通過劣化部分時而降低電梯廂的速度。 In addition, when a part of the lift path is deteriorated, the speed of the elevator car may be reduced when the elevator car passes the deteriorated part.

管理者係可選擇推薦項目(推薦的動作限制)。推薦項目係影響較小的項目,且以通常的使用模式作為參考來選定。 The manager can select recommended items (recommended action restrictions). The recommended items are those with less influence, and are selected based on the usual usage patterns.

亦可在應用所選擇的動作限制之前設置確認步驟。在確認步驟中,顯示部393係將從保養計劃裝置200所通知之限制後的風險值時間序列及下一次的保養作業日結果顯示於顯示器。管理者係在確認該顯示之後,決定要應用的動作限制。再者,在決定了要應用的動作限制之後,限制部214係限制監視對象110的動作。 It is also possible to set a confirmation step before applying the selected motion limitation. In the confirmation step, the display unit 393 displays the risk value time series after the limit notified from the maintenance planning device 200 and the result of the next maintenance work day on the display. After confirming the display, the manager decides the motion restriction to be applied. After determining the operation restriction to be applied, the restriction unit 214 restricts the operation of the monitoring target 110.

在應用了動作限制時,限制部214亦可將所應用之動作限制的內容通知監視對象110的利用者。 When the operation restriction is applied, the restriction unit 214 may notify the user of the monitoring target 110 of the content of the applied operation restriction.

當監視對象110為電梯時,訊息可顯示於電梯廂內的顯示器,郵件(mail)可傳送給預先登錄的郵件收件人(mail address),訊息可顯示於設置於搭乘樓門周邊的廣告用顯示器。 When the monitored object 110 is an elevator, the message can be displayed on the display in the elevator car, and the mail can be transmitted to the pre-registered mail address, and the message can be displayed on the advertisement set around the door of the boarding. monitor.

***實施形態2的效果*** ** Effect of Embodiment 2 **

即使下一次的造訪日為較新期限日更之後之日時,亦可不追加造訪日而將任一天的造訪日設為保養作業日。 Even if the next visit date is later than the new deadline date, the visit day of any day can be set as the maintenance work day without adding the visit date.

(實施形態3) (Embodiment 3)

茲針對所提議之推薦之動作限制的形態,根據第17圖來說明主要與實施形態1及實施形態2不同之點。 Regarding the form of the proposed recommended operation restriction, the points that are mainly different from Embodiment 1 and Embodiment 2 will be described with reference to FIG. 17.

***構成的說明*** *** Explanation of composition ***

保養計劃系統100的構成係與實施形態1中的構成(參照 第1圖)相同。 The configuration of the maintenance planning system 100 is the same as that in Embodiment 1 (see (Figure 1) Same.

茲根據第17圖來說明保養計劃裝置200的構成。 The configuration of the maintenance planning device 200 will be described with reference to FIG. 17.

保養計劃裝置200係進一步包括推薦部216。 The maintenance planning device 200 further includes a recommendation unit 216.

保養計劃程式係進一步使電腦發揮作為推薦部216的功能。 The maintenance plan program further causes the computer to function as the recommendation unit 216.

***動作的說明*** *** Explanation of operation ***

推薦部216係預先決定推薦的動作限制。 The recommendation unit 216 determines a recommended operation limit in advance.

具體而言,推薦部216係根據監視對象110的動作歷程而決定推薦的動作限制。 Specifically, the recommendation unit 216 determines a recommended operation limit based on the operation history of the monitoring target 110.

監視對象110的動作歷程係顯示監視對象110之過去之動作狀況的資料,被預先記憶於記憶部291。 The operation history of the monitoring target 110 is data that shows the past operation status of the monitoring target 110 and is stored in the storage unit 291 in advance.

當管理者設定動作限制的容許範圍時,難以明確地指定容許範圍。 When the manager sets the allowable range of the operation limit, it is difficult to specify the allowable range explicitly.

因此,推薦部216即根據監視對象110的動作歷程而決定推薦的動作限制。 Therefore, the recommendation unit 216 determines a recommended operation limit based on the operation history of the monitoring target 110.

例如,當監視對象110為電梯時,推薦部216係求出每一時段或每一樓層的利用頻率。再者,推薦部216係選擇影響較少的時段或樓層作為限制對象,且將限制對象中的利用限制或速度限制決定為推薦的動作限制。推薦部216係可根據顯示各大樓之資訊的大樓資料而選擇用途或階層數等與具有監視對象110之電梯的大樓相似的大樓,且根據評估所選擇之大樓中之電梯之動作限制之效果而得的資料而決定推薦的動作限制。換言之,推薦部216係可依據以前在相似的大樓實施動作限制時的影響而決定推薦的動作限制。 For example, when the monitoring target 110 is an elevator, the recommendation unit 216 obtains the use frequency of each time period or each floor. Further, the recommendation unit 216 selects a time period or a floor with less influence as the restriction target, and determines the use restriction or speed restriction among the restriction targets as the recommended motion restriction. The recommendation unit 216 can select a building similar to the building having the elevator with the monitoring target 110 based on the building data displaying the information of each building, and evaluates the effect of the elevator movement restriction on the selected building. The information obtained determines the recommended action limits. In other words, the recommendation unit 216 can determine the recommended operation restriction based on the influence of the previous operation restriction in a similar building.

***實施形態3的效果*** **** Effect of Embodiment 3 **

由於在保養計劃系統100中決定推薦的動作限制,因此管理者可在限制畫面140選擇推薦的動作限制,藉此而適當地限制監視對象110的動作。 Since the recommended action restriction is determined in the maintenance planning system 100, the manager can select the recommended action restriction on the restriction screen 140, thereby appropriately restricting the action of the monitoring target 110.

(實施形態4) (Embodiment 4)

茲針對當發生了如大規模災害的事件時適當變更保養計劃的形態,根據第18圖至第20圖來說明主要與實施形態1不同之點。 Regarding the form of appropriately changing the maintenance plan when an event such as a large-scale disaster occurs, the main differences from Embodiment 1 will be described with reference to FIGS. 18 to 20.

***構成的說明*** *** Explanation of composition ***

保養計劃系統100的構成係與實施形態1中的構成(參照第1圖)相同。 The configuration of the maintenance planning system 100 is the same as that in the first embodiment (see FIG. 1).

茲根據第18圖來說明保養計劃裝置200的構成。 The configuration of the maintenance planning device 200 will be described with reference to FIG. 18.

保養計劃裝置200係進一步包括事件部217。 The maintenance planning device 200 further includes an event unit 217.

保養計劃程式係進一步使電腦發揮作為事件部217的功能。 The maintenance plan program further causes the computer to function as the event unit 217.

***動作的說明*** *** Explanation of operation ***

茲根據第19圖來說明事件對應方法。 An event correspondence method will be described with reference to FIG. 19.

事件對應方法係保養計劃方法的一部分。 The incident response method is part of the maintenance planning method.

在步驟S410中,事件部217係判定是否發生了特定事件。 In step S410, the event unit 217 determines whether a specific event has occurred.

特定事件係需要變更容許值的事件,換言之,係需要變更保養計劃的事件。具體的特定事件係大規模災害。 The specific event is an event in which an allowable value needs to be changed, in other words, an event in which a maintenance plan needs to be changed. Specific specific events are large-scale disasters.

特定事件的發生,係藉由人或感測器而檢測出。 The occurrence of a specific event is detected by a person or a sensor.

當檢測出特定事件的發生時,發生通知即被輸入於保養計 劃裝置200。 When a specific event is detected, a notification of the occurrence is entered in the maintenance plan Planning device 200.

再者,當發生通知被輸入於保養計劃裝置200時,事件部217係判定為已發生了特定事件。 When an occurrence notification is input to the maintenance planning device 200, the event unit 217 determines that a specific event has occurred.

當發生了特定事件時,處理前進至步驟S420。 When a specific event has occurred, the process proceeds to step S420.

當未發生特定事件時,處理結束。 When no specific event occurs, the process ends.

在步驟S420中,調整部212係算出事件期限日。 In step S420, the adjustment unit 212 calculates the event deadline date.

事件期限日係對應事件容許值的期限日。 The event deadline date is the deadline date corresponding to the event allowable value.

事件容許值係發生了特定事件時所使用的容許值。 Event tolerance is the tolerance used when a specific event occurs.

具體而言,係容許值的設定範圍預先記憶於記憶部291。 Specifically, the setting range of the allowable value is stored in the storage unit 291 in advance.

再者,調整部212係從設定範圍選擇上限容許值,且根據上限容許值與風險值時間序列而算出事件期限日。事件期限日係風險值達到上限容許值之日。換言之,事件期限日係對應與上限容許值相同之值的風險值之日。此外,記憶部291係將所記憶的容許值更新為上限容許值,且將所記憶的期限日更新為事件期限日。 In addition, the adjustment unit 212 selects an upper limit allowable value from the setting range, and calculates an event deadline date based on the upper limit allowable value and the risk value time series. The event deadline date is the day when the risk value reaches the upper allowable value. In other words, the event deadline date is the date corresponding to the risk value of the same value as the upper limit allowable value. In addition, the storage unit 291 updates the stored allowable value to the upper limit allowable value, and updates the stored deadline date to the event deadline date.

在步驟S430中,計劃部213係根據事件期限日而決定新保養作業日。 In step S430, the planning unit 213 determines a new maintenance work day based on the event deadline.

再者,計劃部213係將登錄於保養計劃資料120的保養作業日變更為新保養作業日。 The planning unit 213 changes the maintenance work day registered in the maintenance plan data 120 to a new maintenance work day.

決定新保養作業日的程序,係與在實施形態1的步驟S150(參照第5圖)中決定保養作業日的程序相同。 The procedure for determining a new maintenance work day is the same as the procedure for determining a maintenance work day in step S150 (see FIG. 5) of the first embodiment.

***實施形態4的補充*** *** Supplement to Embodiment 4 ***

當發生了大規模災害時,由於會發生大量例如復原作業的 緊急作業,因此預期人員資源將會不足。 When a large-scale disaster occurs, due to Urgent operations, so human resources are expected to be insufficient.

另一方面,管理者係抱持著即使發生了大規模災害時也盡可能地想要使用設備的期望。 On the other hand, managers have an expectation that they want to use the equipment as much as possible even in the event of a large-scale disaster.

因此,當發生了大規模災害時,調整部212係自動地提高容許值。惟,調整部212係使提高後的容許值與通常時所可設定之容許值的上限一致。換言之,僅在容許值被設定為較低時才提高容許值。 Therefore, when a large-scale disaster occurs, the adjustment unit 212 automatically increases the allowable value. However, the adjustment unit 212 matches the allowable value after the increase with the upper limit of the allowable value that can be set normally. In other words, the allowable value is increased only when the allowable value is set to be low.

藉此,既可優先進行緊急對應,又可抑制保養作業的增加。 Thereby, emergency response can be performed in priority, and an increase in maintenance work can be suppressed.

緊急時要提高容許值乙事,係預先向管理者提示。例如,顯示部393係將顯示適用條件及變動範圍的通知畫面顯示於顯示器。 In case of emergency, it is necessary to increase the allowable value, which is to be notified to the manager in advance. For example, the display unit 393 displays a notification screen displaying the applicable conditions and the range of variation on a display.

視監視對象110的用途而定,即使緊急時亦會被要求優先性的保養作業。例如,關於醫療機構的裝置,即使緊急時亦會被要求優先性的保養作業。 Depending on the purpose of the monitoring target 110, priority maintenance work may be required even in an emergency. For example, regarding a medical facility's equipment, priority maintenance work is required even in an emergency.

針對此種監視對象110,亦可設定為不要進行容許值的提高。 The monitoring target 110 may be set such that the allowable value is not increased.

此外,亦可設定為依照災害的規模而變化容許值的上升幅度。例如,從災害規模與容許值彼此建立對應關係的表單(table)選擇對應災害規模的容許值。 It is also possible to set a rise in the allowable value that varies according to the scale of the disaster. For example, the tolerance value corresponding to the disaster scale is selected from a table in which the disaster scale and the tolerance value correspond to each other.

如此,即使是緊急時的服務,亦可藉由根據風險值及容許值的管理,以沿著管理者之意向的形態而提供適當的服務。 In this way, even in the case of emergency services, it is possible to provide appropriate services in a form that conforms to the manager's intentions through management based on risk value and allowable value.

再者,當發生了大規模災害時,依照災害發生時用的動作限制(事件動作限制)而限制監視對象110的動作,藉此即可執行更適當的服務。 Furthermore, when a large-scale disaster occurs, the operation of the monitoring target 110 is restricted in accordance with the operation limitation (event operation limitation) used at the time of the disaster, whereby a more appropriate service can be performed.

此外,顯示部393係可將用以指定緊急時所適用的容許值及動作限制的設定畫面顯示於顯示器。再者,與通常時指定容許值及動作限制的情形相同,在設定畫面中,管理者可指定緊急時所適用的容許值及動作限制。 In addition, the display unit 393 can display a setting screen for designating an allowable value and an operation limit applied in an emergency on a display. In addition, as in the case where the allowable value and the operation limit are designated in the normal time, the manager can specify the allowable value and the operation limit applied in the emergency on the setting screen.

***其他構成*** *** Other constructions **

實施形態4係可與實施形態2或實施形態3組合而實施。換言之,保養計劃裝置200係可包括限制部214、預測部215及推薦部216。 The fourth embodiment can be implemented in combination with the second embodiment or the third embodiment. In other words, the maintenance planning device 200 may include a restriction unit 214, a prediction unit 215, and a recommendation unit 216.

***實施形態的補充*** ** Addition of implementation form ***

保養計劃裝置200係使用構成經由遠端監視所掌握之裝置的複數個零件之劣化狀態的資訊,而求出各故障模式的發生頻率。保養計劃系統100係藉由將從各故障模式之發生時的影響所求出的影響度與各故障模式的發生頻率相乘而算出每一故障模式的風險值,取得該等風險值的合計。 The maintenance planning device 200 obtains the frequency of occurrence of each failure mode by using the information of the deterioration status of a plurality of parts constituting the device grasped through remote monitoring. The maintenance planning system 100 calculates the risk value of each failure mode by multiplying the degree of influence obtained from the influence of each failure mode by the occurrence frequency of each failure mode, and obtains the total of these risk values.

保養計劃裝置200係比較預先設定的容許風險值與現狀之設備的風險合計值。再者,保養計劃裝置200係在預測出會超過容許風險值的階段,修正對於該設備的保養作業的計劃。 The maintenance planning device 200 compares a preset allowable risk value with the total risk value of the current equipment. In addition, the maintenance planning device 200 corrects a plan for maintenance operations of the equipment at a stage where it is predicted that the allowable risk value will be exceeded.

管理終端300係對於管理者(包含設備的所有者)顯示風險合計值的實績值及所預測的時間序列變化。在管理終端300中,管理者可依據所顯示的風險合計值而進行使容許風險值變動的操作。 The management terminal 300 displays the performance value of the total risk value and the predicted time series change to the manager (including the owner of the equipment). In the management terminal 300, the manager may perform an operation of changing the allowable risk value according to the displayed total risk value.

保養計劃裝置200係偵測出已實施了操作,且修正保養作業的計劃。 The maintenance planning device 200 detects that an operation has been performed and corrects the maintenance operation plan.

基本上,保養作業係根據預先設定的容許值而計劃及實 施。然而,亦可由管理者依據狀況而變動容許值,管理者以所需要的水準來提供保養服務。 Basically, maintenance work is planned and implemented according to preset allowable values Shi. However, the allowable value can also be changed by the manager according to the situation, and the manager can provide maintenance services at the required level.

保養計劃裝置200係具有劣化伴隨著經由加速實驗所取得之要素的時間經過或使用次數而進行的模型。 The maintenance planning device 200 has a model in which deterioration is accompanied by the passage of time or the number of uses of the elements obtained through the acceleration experiment.

保養計劃裝置200係活用劣化之進行模型的輸出、及遠端監視之結果之資訊二者而利用推算零件之劣化狀態後的結果。 The maintenance planning device 200 utilizes both the output of the model for deterioration and the information of the results of remote monitoring, and uses the result of estimating the deterioration state of the part.

在零件劣化的狀態推算中,係藉由將預先經由加速實驗所推算之在時間序列模型中的計算結果,與遠端監視及造訪時檢查資料統合,可實現精確度更高的狀態推算。 In the estimation of the condition of the deteriorated part, the calculation result in the time series model, which is calculated in advance through the acceleration experiment, is integrated with the remote monitoring and inspection data during the visit to achieve a more accurate state estimation.

保養計劃裝置200係當推算出合計風險在下一次預定之造訪之前會超過容許值時,以限制(或抑制)裝置(整體或一部分)的動作(次數或速度)之方式從遠端設定機體。此外,保養計劃裝置200係管理動作限制的內容。 When the maintenance planning device 200 is calculated that the total risk will exceed the allowable value before the next scheduled visit, the machine is set remotely by limiting (or inhibiting) the movement (number or speed) of the device (whole or part). In addition, the maintenance planning device 200 manages the content of operation restrictions.

管理終端300係對於管理者顯示動作限制的容許內容及實際適用之動作限制的內容。在管理終端300中,係執行改寫所要容許之動作限制之內容的操作。 The management terminal 300 displays the allowable content of the operation restriction and the content of the actually applicable operation restriction to the manager. The management terminal 300 executes an operation of rewriting the content of the operation restriction to be permitted.

保養計劃裝置200係偵測出已實施了操作而修正保養作業的計劃。 The maintenance planning device 200 detects that an operation has been performed to correct the maintenance operation plan.

當因為零件急遽的劣化等,零件無法支撐到所預定的下一次定期保養時,藉由實施動作限制而抑制零件的劣化,可避免追加的保養實施。要容許如何的動作限制,要預先於契約時設定。動作限制的範圍亦包含完全停止。然而,當實際應用動作限制時,由於影響較大,因此有可能會產生欲盡快解除動作限制的期望。因此,設定為管理者可易於變更或解除動作限制的 內容。 When the parts cannot be supported for the next scheduled maintenance due to rapid deterioration of the parts, etc., the deterioration of the parts can be suppressed by restricting the operation, and additional maintenance can be avoided. How to restrict the movements is set in advance at the time of contract. The range of motion limitation also includes complete stop. However, when the motion restriction is actually applied, since the influence is great, there may be a desire to release the motion restriction as soon as possible. Therefore, it is set as a manager who can easily change or remove the operation restriction. content.

保養計劃裝置200係根據成為對象之裝置之通常時的每一時段或每一動作對象的運行歷程資料,抽出服務之實施次數較少的條件。再者,保養計劃裝置200係選定動作限制的對象及內容,且將所選定的資訊作為推薦內容而顯示於管理終端300。 The maintenance planning device 200 extracts a condition that the number of times of service implementation is small based on the operation history data of each time period or each action object of the target device. Furthermore, the maintenance planning device 200 selects the object and content of the operation restriction, and displays the selected information as recommended content on the management terminal 300.

保養計劃裝置200係當發生了大規模災害時等之預先決定的重大事件時,將依每一設備設定之風險的容許值,暫時變更為較通常更高的值。 The maintenance planning device 200 temporarily changes the allowable value of the risk set for each device to a higher value than usual when a major event such as a large-scale disaster occurs in advance.

當大規模災害時等,保養資源不足的可能性較高時,係可藉由變動各機體的容許風險值,而抑制保養作業量的增加。惟可變動的最大容許風險(可避免對於利用者之身體所造成之影響的最低限度)不使之變化,而將通常時容許值設定為較低之機體的容許值,在至最大值為止的範圍內提高。 When the possibility of insufficient maintenance resources is high during large-scale disasters, etc., the increase in the amount of maintenance work can be suppressed by changing the allowable risk value of each body. However, the maximum allowable risk that can be changed (the minimum that can avoid the impact on the user's body) is not changed, and the allowable value of the normal time is set to a lower allowable value of the body, up to the maximum value. Within range.

保養計劃裝置200係當大規模災害時等之預先決定的重大事件發生時,將依每一設備設定之動作限制的容許內容,暫時變更為較通常更廣的範圍。 The maintenance planning device 200 temporarily changes the allowable content of the operation limit set for each device to a wider range than usual when a major event such as a large-scale disaster occurs.

電梯或扶手梯成為對象。 Elevators or escalators are targeted.

保養計劃裝置200係將一定時間內之特定的樓層之門的開閉次數限制為一定次數以下,對於超過該以上之次數的呼叫則不實施服務。或者,保養計劃裝置200係僅分配同一組合(bank)內的其他機體。 The maintenance planning device 200 restricts the number of times of opening and closing the door of a specific floor within a certain period of time to a certain number of times, and does not perform service for calls exceeding this number of times. Alternatively, the maintenance planning device 200 is only allocated to other bodies in the same bank.

保養計劃裝置200係在特定的樓層或所有的樓層中,抑制開門時或關門時的啟動加速度或動作速度。 The maintenance planning device 200 suppresses the start acceleration or operation speed at the time of opening or closing the door on a specific floor or all floors.

保養計劃裝置200係在所有行進、朝特定方向的行進或來自特定樓層的服務中,根據偵測廂內規定人數之感測器的測量設定值或該感測器的輸出,而變更判定是否可行進之裝置中之判定的基準值。 The maintenance planning device 200 changes the determination of whether it is possible in all travels, travels in a specific direction, or services from a specific floor according to the measurement setting value of a sensor of a predetermined number of persons in the detection compartment or the output of the sensor. The reference value of the judgment in the traveling device.

茲根據第20圖來說明保養計劃裝置200的硬體構成。 The hardware configuration of the maintenance planning device 200 will be described with reference to FIG. 20.

保養計劃裝置200係包括處理電路209。 The maintenance planning device 200 includes a processing circuit 209.

處理電路209係實現畫面部211、調整部212、計劃部213、限制部214、預測部215、推薦部216、事件部217、及記憶部291的硬體。 The processing circuit 209 is hardware that implements the screen unit 211, the adjustment unit 212, the planning unit 213, the restriction unit 214, the prediction unit 215, the recommendation unit 216, the event unit 217, and the memory unit 291.

處理電路209係可為專用的硬體,亦可為執行儲存於記憶體202之程式的處理器201。 The processing circuit 209 may be dedicated hardware or a processor 201 that executes a program stored in the memory 202.

當處理電路209為專用的硬體時,處理電路209係例如為單一電路、複合電路、經程式化的處理器、經並聯程式化的處理器、ASIC、FPGA或此等組合。 When the processing circuit 209 is dedicated hardware, the processing circuit 209 is, for example, a single circuit, a composite circuit, a programmed processor, a parallel-programmed processor, ASIC, FPGA, or a combination thereof.

ASIC係Application Specific Integrated Circuits(特殊應用積體電路)的簡稱,FPGA係Field-Programmable Gate Array(現場可程式閘陣列)的簡稱。 ASIC is an abbreviation for Application Specific Integrated Circuits, and FPGA is an abbreviation for Field-Programmable Gate Array.

保養計劃裝置200係可包括替代處理電路209的複數個處理電路。複數個處理電路係分擔處理電路209的作用。 The maintenance planning device 200 may include a plurality of processing circuits instead of the processing circuit 209. The plurality of processing circuits share the role of the processing circuit 209.

在保養計劃裝置200中,係可由專用的硬體來實現一部分的功能,且由軟體或韌體(firmware)來實現其餘功能。 In the maintenance planning device 200, a part of the functions may be implemented by dedicated hardware, and the remaining functions may be implemented by software or firmware.

如此,處理電路209係可藉由硬體、軟體、韌體 或此等組合來實現。 In this way, the processing circuit 209 can be implemented by hardware, software, and firmware. Or a combination of these.

茲根據第21圖來說明管理終端300的硬體構成。 The hardware configuration of the management terminal 300 will be described with reference to FIG. 21.

管理終端300係包括處理電路309。 The management terminal 300 includes a processing circuit 309.

處理電路309係實現控制部311與記憶部391的硬體。 The processing circuit 309 is hardware that implements the control unit 311 and the memory unit 391.

處理電路309係可為專用的硬體,亦可為執行儲存於記憶體302之程式的處理器301。 The processing circuit 309 may be dedicated hardware or a processor 301 that executes a program stored in the memory 302.

當處理電路309為專用的硬體時,處理電路309係例如為單一電路、複合電路、經程式化的處理器、經並聯程式化的處理器、ASIC、FPGA或此等組合。 When the processing circuit 309 is dedicated hardware, the processing circuit 309 is, for example, a single circuit, a composite circuit, a programmed processor, a parallel-programmed processor, an ASIC, an FPGA, or a combination thereof.

管理終端300係可包括替代處理電路309的複數個處理電路。複數個處理電路係分擔處理電路309的作用。 The management terminal 300 may include a plurality of processing circuits instead of the processing circuit 309. The plurality of processing circuits share the role of the processing circuit 309.

在管理終端300中,係可由專用的硬體來實現一部分的功能,且由軟體或韌體來實現其餘功能。 In the management terminal 300, some functions can be implemented by dedicated hardware, and the remaining functions can be implemented by software or firmware.

如此,處理電路309係可藉由硬體、軟體、韌體或此等組合來實現。 As such, the processing circuit 309 may be implemented by hardware, software, firmware, or a combination thereof.

實施形態係為較佳形態之例示,並非意圖限制本發明的技術範圍。實施形態係可局部實施,亦可與其他形態組合來實施。使用流程圖等所說明的程序,係可適當變更。 The embodiment is an example of a preferred embodiment, and is not intended to limit the technical scope of the present invention. The implementation form may be implemented locally or in combination with other forms. The procedures described using flowcharts and the like can be changed as appropriate.

電腦程式產品(computer program product)(亦簡稱為程式產品)不限定於外觀形式之物,可為載入有可由電腦讀取的程式者。 A computer program product (also referred to simply as a program product) is not limited to appearances, and may be a person loaded with a program that can be read by a computer.

Claims (12)

一種保養計劃系統,係包括:顯示部,係顯示調整畫面,該調整畫面包含:表示風險值時間序列的風險曲線圖;表示容許值的容許標記;表示風險值到達前述容許值之期限日的期限標記;及用以變更前述容許值的變更介面;接受部,係接受經由前述變更介面所指定的指定容許值;調整部,係根據前述指定容許值與前述風險值時間序列而算出新期限日;及計劃部,係根據前述新期限日而決定保養作業日。 A maintenance planning system includes: a display unit that displays an adjustment screen including: a risk curve diagram showing a time series of risk values; an allowable mark indicating an allowable value; and a time limit indicating a date when the risk value reaches the aforementioned allowable value Mark; and a change interface for changing the aforementioned allowable value; an accepting unit that accepts the specified allowable value designated through the aforementioned change interface; an adjusting unit that calculates a new deadline date based on the aforementioned allowable value and the aforementioned risk value time series; And the planning department determines the maintenance work day based on the new deadline. 根據申請專利範圍第1項之保養計劃系統,係包括畫面部,該畫面部係根據前述指定容許值而移動前述調整畫面的前述容許標記,且根據前述新期限日而移動前述調整畫面的前述期限標記。 The maintenance planning system according to item 1 of the scope of patent application includes a screen section that moves the allowable mark of the adjustment screen according to the specified allowable value, and moves the deadline of the adjustment screen according to the new deadline date. mark. 根據申請專利範圍第1或2項之保養計劃系統,其中前述風險曲線圖係線曲線圖;前述容許標記係直線;前述變更介面係用以升高前述容許標記的上升按鍵與用以降低前述容許標記的下降按鍵。 The maintenance planning system according to item 1 or 2 of the scope of patent application, wherein the aforementioned risk curve is a line graph; the aforementioned allowable mark is a straight line; the aforementioned change interface is used to raise the aforementioned allowable mark by a rising button and to reduce the aforementioned permit Marked down button. 根據申請專利範圍第1或2項之保養計劃系統,其中前述計劃部係從表示造訪日程的保養計劃資料選擇下一次的造訪日,且於前述下一次的造訪日為較前述新期限日更之前之日時將前述新期限日之前的造訪日決定為前述保養作業日。 According to the maintenance plan system of the scope of application for patents 1 or 2, the aforementioned planning department selects the next visit date from the maintenance plan information indicating the visit schedule, and the previous visit date is before the new deadline date The date of the visit before the new deadline is determined as the maintenance work day. 根據申請專利範圍第4項之保養計劃系統,其中前述計劃部係於前述下一次的造訪日為較前述新期限日更之後之日時,將較前述新期限日更之前之追加的造訪日決定為前述保養作業日。 According to the maintenance plan system of the scope of application for patent No. 4, wherein the aforementioned planning department decides the additional visit date which is earlier than the new deadline date when the previous visit date is later than the new deadline date, The aforementioned maintenance work day. 根據申請專利範圍第4項之保養計劃系統,其中前述保養計劃系統係包括:限制部,係於前述下一次的造訪日為較前述新期限日更之後之日時限制監視對象的動作;及預測部,係於前述下一次的造訪日為較前述新期限日更之後之日時算出限制後的風險值時間序列;前述調整部係根據前述指定容許值與前述限制後的風險值時間序列而算出限制後的期限日;前述計劃部係於前述下一次的造訪日為較前述新期限日更之後之日時根據前述限制後的期限日而決定前述保養作業日。 The maintenance planning system according to item 4 of the scope of patent application, wherein the aforementioned maintenance planning system includes: a restriction section that restricts the actions of the monitoring target when the next visit date is later than the new deadline date; and the forecast section , Is calculated when the limit of the risk value time series is calculated when the next visit date is later than the new deadline; the adjustment unit calculates the limit based on the specified allowable value and the time limit of the risk value after the limit. The aforementioned planning department decides the aforementioned maintenance work day based on the aforementioned restricted deadline when the next visit date is later than the new deadline. 根據申請專利範圍第6項之保養計劃系統,其中前述顯示部係顯示限制畫面,該限制畫面係包含用以指定對於前述監視對象之動作限制的限制介面;前述接受部係接受經由前述限制介面所指定的指定動作限制;前述限制部係於前述下一次的造訪日為較前述新期限日更之後之日時依據前述指定動作限制而限制前述監視對象的動作;前述預測部係於前述下一次的造訪日為較前述新期限日更 之後之日時依據前述指定動作限制而算出前述限制後的風險值時間序列。 The maintenance planning system according to item 6 of the scope of patent application, wherein the aforementioned display unit displays a restriction screen, and the restriction screen includes a restriction interface for designating a restriction on the operation of the monitoring object; the aforementioned acceptance unit accepts the restriction via the aforementioned restriction interface. Designated designated action restrictions; the aforementioned restriction unit restricts the actions of the monitored object based on the aforementioned designated action restrictions when the next visit date is later than the new deadline date; the forecast unit is based on the next visit Day is more than the new deadline At the following day, the time series of the risk value after the limitation is calculated according to the specified operation limitation. 根據申請專利範圍第7項之保養計劃系統,其中前述限制介面係包含用以指定推薦之動作限制的介面。 The maintenance planning system according to item 7 of the scope of patent application, wherein the aforementioned limitation interface includes an interface for specifying recommended operation limitation. 根據申請專利範圍第8項之保養計劃系統,係包括推薦部,該推薦部係根據表示前述監視對象之過去之動作狀況的動作歷程而決定前述推薦的動作限制。 The maintenance planning system according to item 8 of the scope of patent application includes a recommendation unit that determines the recommended operation limitation based on the operation history indicating the past operation status of the monitoring object. 根據申請專利範圍第6項之保養計劃系統,其中前述監視對象係電梯或扶手梯。 The maintenance planning system according to item 6 of the patent application scope, wherein the aforementioned monitoring object is an elevator or an escalator. 根據申請專利範圍第1項之保養計劃系統,其中前述保養計劃系統係包括判定是否發生了特定事件的事件部;前述調整部係於前述特定事件發生時根據事件容許值與前述風險值時間序列而算出事件期限日;前述計劃部係於特定事件發生時根據前述事件期限日而變更前述保養作業日。 The maintenance planning system according to item 1 of the scope of patent application, wherein the aforementioned maintenance planning system includes an event section that determines whether a specific event has occurred; the aforementioned adjustment section is based on the event allowable value and the aforementioned risk value time series when the specific event occurs Calculate the event deadline; the aforementioned planning department changes the aforementioned maintenance work day based on the aforementioned event deadline when a specific event occurs. 一種保養計劃方法,係包括下列步驟:顯示部顯示調整畫面,該調整畫面包含:表示風險值時間序列的風險曲線圖;表示容許值的容許標記;表示風險值到達前述容許值之期限日的期限標記;及用以變更前述容許值的變更介面;接受部接受經由前述變更介面所指定的指定容許值;調整部根據前述指定容許值與前述風險值時間序列而算出新期限日;及計劃部根據前述新期限日而決定保養作業日。 A maintenance planning method includes the following steps: a display unit displays an adjustment screen including: a risk curve diagram showing a time series of risk values; an allowable mark indicating an allowable value; and a time limit indicating a date when the risk value reaches the aforementioned allowable value Mark; and a change interface for changing the aforementioned allowable value; the accepting unit accepts the specified allowable value designated via the aforementioned change interface; the adjustment unit calculates a new deadline date based on the aforementioned allowable value and the aforementioned risk value time series; and the planning department according to The maintenance deadline will be determined based on the new deadline.
TW107110694A 2017-11-29 2018-03-28 Maintenance planning system and maintenance planning method TW201926091A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PCT/JP2017/042798 WO2019106753A1 (en) 2017-11-29 2017-11-29 Maintenance planning system and maintenance planning method
??PCT/JP2017/042798 2017-11-29

Publications (1)

Publication Number Publication Date
TW201926091A true TW201926091A (en) 2019-07-01

Family

ID=65228966

Family Applications (1)

Application Number Title Priority Date Filing Date
TW107110694A TW201926091A (en) 2017-11-29 2018-03-28 Maintenance planning system and maintenance planning method

Country Status (5)

Country Link
JP (1) JP6462954B1 (en)
KR (1) KR102242630B1 (en)
CN (1) CN111386540B (en)
TW (1) TW201926091A (en)
WO (1) WO2019106753A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6917288B2 (en) * 2017-12-12 2021-08-11 株式会社日立製作所 Maintenance plan generation system
JP7317763B2 (en) * 2020-05-29 2023-07-31 株式会社日立ビルシステム Elevator monitoring system
CN115239044A (en) * 2021-04-23 2022-10-25 中国石油化工股份有限公司 Key safety facility management method and system
CN113361729B (en) * 2021-06-24 2022-09-02 广东电网有限责任公司 Risk assessment method, device, terminal and storage medium based on maintenance plan

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5216612A (en) * 1990-07-16 1993-06-01 R. J. Reynolds Tobacco Company Intelligent computer integrated maintenance system and method
JP3133553B2 (en) * 1993-05-24 2001-02-13 株式会社日立ビルシステム Elevator maintenance work management system
JPH08129413A (en) * 1994-10-31 1996-05-21 Hitachi Ltd Process monitoring device
KR100342168B1 (en) * 1998-12-01 2003-04-23 박경희 How to set operating pattern of elevator door automatically
JP4700188B2 (en) * 2000-12-22 2011-06-15 ホーチキ株式会社 Maintenance inspection schedule determination notification system, maintenance inspection schedule information processing device, maintenance inspection schedule information terminal device, maintenance inspection schedule determination notification method, and recording medium
JP4058289B2 (en) 2002-04-09 2008-03-05 株式会社東芝 Plant equipment life diagnosis / maintenance management method and apparatus
JP5030528B2 (en) * 2006-10-25 2012-09-19 中国電力株式会社 Operation and maintenance management device
JP2008292189A (en) * 2007-05-22 2008-12-04 Omron Corp Knowledge preparation support system
JP4977064B2 (en) * 2008-03-12 2012-07-18 株式会社東芝 Maintenance plan support system
DE102008002738B4 (en) * 2008-06-27 2010-03-11 Airbus Deutschland Gmbh Method for detecting a faulty node
DE102008051017A1 (en) * 2008-10-13 2010-04-15 Rheinmetall Landsysteme Gmbh Method for increasing the efficiency of vehicles or vehicle systems with and without weapon systems
JP5208812B2 (en) * 2009-02-27 2013-06-12 株式会社東芝 Apparatus and method for creating a maintenance plan
JP5541451B2 (en) * 2010-03-18 2014-07-09 株式会社日立製作所 Server apparatus and maintenance method
JP5437989B2 (en) * 2010-12-22 2014-03-12 株式会社日立製作所 Elevator control system
JP5832258B2 (en) 2011-11-30 2015-12-16 三菱電機株式会社 Elevator abnormality diagnosis device
FI128899B (en) * 2012-09-19 2021-02-26 Konecranes Oyj Predictive maintenance method and system
US9058568B2 (en) * 2012-12-11 2015-06-16 International Business Machines Corporation System and method for maintenance planning and failure prediction for equipment subject to periodic failure risk
JP6263552B2 (en) * 2013-11-28 2018-01-17 株式会社日立製作所 Elevator safety system
WO2016185596A1 (en) * 2015-05-21 2016-11-24 三菱電機株式会社 Remote monitoring device, remote monitoring and maintenance system, remote monitoring method, and remote monitoring program
JP6367757B2 (en) * 2015-05-27 2018-08-01 日本電信電話株式会社 Management method and management apparatus
US10642258B2 (en) * 2015-07-01 2020-05-05 Panasonic Intellectual Property Management Co., Ltd. Maintenance work support system
CN105184490B (en) * 2015-09-09 2019-02-26 贵州电网公司电力调度控制中心 Forming Electrical Dispatching Command Tickets process risk assists Pre-control System
JP6447534B2 (en) * 2016-02-19 2019-01-09 三菱電機ビルテクノサービス株式会社 Maintenance work management system

Also Published As

Publication number Publication date
CN111386540A (en) 2020-07-07
JPWO2019106753A1 (en) 2019-12-12
WO2019106753A1 (en) 2019-06-06
CN111386540B (en) 2023-07-21
KR102242630B1 (en) 2021-04-20
JP6462954B1 (en) 2019-01-30
KR20200061413A (en) 2020-06-02

Similar Documents

Publication Publication Date Title
TW201926091A (en) Maintenance planning system and maintenance planning method
Sánchez-Martínez et al. Real-time holding control for high-frequency transit with dynamics
US20200272889A1 (en) Optimizing data center controls using neural networks
TWI245018B (en) Condition-based, auto-thresholded elevator maintenance
US8433596B2 (en) System and method for service parts planning
US9081656B2 (en) Methods and systems for predicting a fault
CN106503813A (en) Prospective maintenance decision-making technique and system based on hoisting equipment working condition
US7558638B2 (en) Applying real-time control to a production system
US10520937B2 (en) Sensing and computing control system for shaping precise temporal physical states
US9904540B2 (en) Method and system to automate the maintenance of data-driven analytic models
JPH0220557B2 (en)
WO2020223249A1 (en) Vehicle service center dispatch system
US20130155834A1 (en) Methods and systems for scheduling a predicted fault service call
EP3617117B1 (en) Model development framework for remote monitoring condition-based maintenance
US20240217772A1 (en) Collaborative scheduling method for high-rise elevators based on internet of things
JP2022527961A (en) Workflow allocation method and system
CN110992515A (en) Method and system for predicting remaining useful life of a component using an accelerated time to failure model
JP7280811B2 (en) Congestion predictive display system, congestion predictive display method and program
EP3871053A2 (en) A building management system and method
CN116384876A (en) Spare part dynamic inventory-production control method, system and medium based on wiener process
KR20210022529A (en) Method for detecting malfunction in elevator and elevator controller
Pipe Practical prognostics for condition based maintenance
JP6848984B2 (en) Elevator renewal planning device
KR102606669B1 (en) Method and system for fire-extinguishing-performance improvement and maintenance of fire-engine by using IoT
JP7498874B1 (en) Abnormality determination system, abnormality determination method, and program