SU821671A1 - Method of erecting buildings by lifting floors and ceilings - Google Patents

Method of erecting buildings by lifting floors and ceilings Download PDF

Info

Publication number
SU821671A1
SU821671A1 SU792830454A SU2830454A SU821671A1 SU 821671 A1 SU821671 A1 SU 821671A1 SU 792830454 A SU792830454 A SU 792830454A SU 2830454 A SU2830454 A SU 2830454A SU 821671 A1 SU821671 A1 SU 821671A1
Authority
SU
USSR - Soviet Union
Prior art keywords
core
floor
walls
slabs
rigidity
Prior art date
Application number
SU792830454A
Other languages
Russian (ru)
Inventor
Александр Оганесович Саакян
Рубен Оганесович Саакян
Сергей Христофорович Шахназарян
Original Assignee
Проектно-Экспериментальный Конструкторскийи Технологический Институт Министерствапромышленного Строительства Армянской Ccp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Проектно-Экспериментальный Конструкторскийи Технологический Институт Министерствапромышленного Строительства Армянской Ccp filed Critical Проектно-Экспериментальный Конструкторскийи Технологический Институт Министерствапромышленного Строительства Армянской Ccp
Priority to SU792830454A priority Critical patent/SU821671A1/en
Application granted granted Critical
Publication of SU821671A1 publication Critical patent/SU821671A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

(54) СПОСОБ ВОЗВЕДЕНИЯ ЗДАНИЯ МЕТОДОМ ПОДЪЕМА ЭТАЖЕЙ И ПЕРЕКРЫТИЙ(54) METHOD FOR CONSTRUCTING A BUILDING BY THE METHOD OF RISING FLOORS AND COVERS

1one

Изобретение относитс  к строительству и может быть использовано в многоэтажных здани х с железобетонным  дром жесткости , возводимых методом подъема, этажей и перекрытий.The invention relates to the construction and can be used in multi-storey buildings with reinforced concrete stiffening core, constructed by the method of lifting, floors and ceilings.

Известен способ .возведени  здани  методом подъема этажей и перекрытий, включающий изготовление  дра жесткости на всю высоту здани , установку колонн, бетонирование пакета плит перекрытий с последующим подъемом на проектные отметки 1.There is a known method of building a building using the method of lifting floors and ceilings, which includes making a core of rigidity to the entire height of the building, installing columns, concreting a package of floor slabs with a subsequent rise to design marks 1.

Известен также способ возведени  здани  методом, подъема этажей и перекрытий , включаю1ций установку колонн, изготовление пакета плит перекрытий с последующим их подъемом на проектные отметки подъемниками с грузовыми т гами, бетонирование  дра жесткости 2.There is also known a method of erecting a building by the method of raising floors and floors, including installation of columns, making a package of floor slabs with their subsequent lifting to design marks with hoists with cargo bars, concreting the stiffening core 2.

Недостатком-известных рещений  вл етс  то, что работы по возведению здани  при такой последовательности трудоемки. Кроме того, недостаточно обеспечиваетс  сейсмостойкость здани  при действии горизонтальных сил.The disadvantage of known solutions is that the construction of the building with such a sequence is laborious. In addition, the seismic resistance of a building under the action of horizontal forces is not sufficiently ensured.

Цель изобретени  - уменьщение трудоемкости работ при повыщении устойчивости возводимого здани  на горизонтальные нагрузки.The purpose of the invention is to reduce the labor-intensive work while increasing the stability of the erected building by horizontal loads.

Claims (2)

Достигаетс  это тем, что в способе возведени  здани  методом подъема этажей и перекрытий, включающем установку колонн, изготовление плит перекрытий с последующим их подъемом на проектные отметки подъемниками с грузовыми т гами, бетонирование  дра жесткости одновременно с установкой колонн здани  относительно мест пересечени  осей стен  дра жесткости внутри и вне его устанавливают парные инвентарные стойки, соедин ют их между собой распорками , на которых монтируют подъемники с грузовыми т гами, а при изготовлении пакета плит перекрытий в местах образовани  стен  дра жесткости в них выполн ют сквозные замкнутые в плане прорези с конфигурацией , соответствующей конфигурации  дра жесткости, причем рабочую арматуру плит пропускают через прорези, а в местах пересечени  осей стен  дра жесткости в плитах перекрытий устанавливают воротники , охватывающие парные стойки, затем осуществл ют поэтажно подъем плит перекрытий , после установки в проектное положение которых бетонируют поэтажно стены ствола  дра жесткости, а по возведении последнего на всю высоту здани  инвентарные стойки с распорками демонтируют. На фиг. 1 показаны парные инвентарные колонны с распорками и воротниками, в процессе установки; на фиг. 2 - арматура  дра жесткости в процессе установки; на фиг. 3 -  дро жесткости в процессе бетонировани  снизу вверх. Способ возведени  здани  методом подъема этажей и перекрытий с железобетонным  дром жесткости осуществл ют следующим образом. Одновременно с установкой колонн здани  1 в местах пересечени  осей стен  дра жесткости внутри и вне щахты устанавливают парные инвентарные стойки 2. Далее стойки соедин ют между собой распорками 3, на которых монтируют подъемники 4 с грузовыми т гами 5, после чего приступают к бетонированию пакета плит перекрытий 6, причем в местах образовани  стен  дра жесткости плиты выполн ют сквозные замкнутые прорези 7 с конфигурацией, соответствующей конфигурации  дра жесткости , причем рабочую арматуру 8 плиты пропускают через прорези. Далее в местах пересечени  осей  дра жесткости в плитах перекрытий устанавливают воротники 9, охватывающие парные стойки 2. Затем осуществл ют поэтажный подъем плит перекрытий, а после их установки в проектное положение бетонируют поэтажно стены ствола  дра жесткости 10. После возведени  здани  на всю высоту инвентарные стойки 2 с распорками 3 демонтируют. Способ описываемому изобретению позвол ет получить цельную монолитную конструкцию  дра как по всему сечению, так и но высоте, благодар  чему увеличиваетс  прочность и жесткость  дра при действии горизонтальных нагрузок. Кроме того , по вл етс  возможность объединить в единую систему плиты перекрыти  этажей и внутренние плиты перекрыти   дра жесткости , что сундественно уменьшает трудоемкость работ как при изготовлении пакета плит перекрытий, так и во врем  подъемномонтажных работ. И наконец, такое рещение  дра в системе каркаса позвол ет наружные и внутришахтные плиты перекрытий использовать в роли ребер жесткости дл  стен ствола  дра, что значительно увеличивает Несущую устойчивость  дра жесткости. Формула изобретени  Способ возведени  здани  методом подъема этажей и перекрытий, включающий установку колонн, изготовление пакета плит перекрытий с последующим их подъемом на проектные отметки подъемниками с грузовыми т гами, бетонирование  дра жесткости , отличающийс  тем, что, с целью уменьщени  трудоемкости работ и повыщени  устойчивости возводимого здани  на горизонтальные нагрузки, одновременно с установкой колонн здани  относительно мест пересечени  осей стен  дра жесткости внутри и вне его устанавливают парные инвентарные стойки, соедин ют их между собой распорками, на которых монтируют подъемники с грузовыми т гами, а при изготовлении пакета плит перекрытий в местах образовани  стен  дра жесткости в них выполн ют сквозные замкнутые в плане прорези с конфигурацией, соответствующей конфигурации  дра жесткости, причем рабочую арматуру плит пропускают через прорези , а в местах пересечени  осей стен  дра жесткости в плитах перекрытий устанавливают воротники, охватывающие парные стойки, затем осуществл ют поэтажно подъем плит перекрытий, после установки в проектное положение которых бетонируют поэтажно стены ствола  дра жесткости, а по возведении последнего на всю высоту здани  инвентарные стойки с распорками демонтируют . Источники информации, прин тые во внимание при экспертизе 1. Шахназар н С. X и др. Возведение зданий методом подъема этажей и перекрытий . М., Стройиздат, 1974, с. 98-102. This is achieved by the fact that in the method of erecting a building by raising floors and floors, including installing columns, making floor slabs and then raising them to design marks with elevators with cargo drafts, concreting the core stiffness simultaneously with installing columns of rigidity walls inside and outside of it, pair inventory counters are installed, they are interconnected by spacers on which they mount lifts with cargo rods, and in the manufacture of a pack of plates In the places where the stiffener walls are formed, they are made through closed slots in the plan with a configuration corresponding to the stiffener configuration, and the working reinforcement of the plates is passed through the slots, and at the intersection of the axes of the stiffener walls in the floor slabs the collars are installed, covering paired racks, Then, floor slabs are lifted on a floor-by-floor basis, after installation of which the walls of the core of the stiffening shaft are concrete-cast on a floor-by-floor basis, and after the latter is erected over the entire height of the building, tare racks with spacers dismantle. FIG. 1 shows paired inventory columns with struts and collars, during installation; in fig. 2 - stiffening reinforcement armature during installation; in fig. 3 - draw rigidity in the process of concreting from the bottom up. The method of erection of a building by the method of lifting floors and floors with reinforced concrete core of rigidity is carried out as follows. Simultaneously with the installation of the columns of the building 1, pair inventory racks 2 are installed at the intersections of the axes of the wall of the core of the rigidity core inside and outside the platform. Next, the racks are interconnected by spacers 3, on which the lifts 4 are mounted with the cargo bars 5, and then proceed to concreting the slab package overlaps 6, in the places where the walls of the core of formation of the rigidity of the slab are formed, through through closed slots 7 are configured with the configuration of the rigidity core, and the working reinforcement 8 of the plate is passed through the slots. Then, at the intersection of the axes of the core of rigidity in the slabs, collars 9 are installed, covering paired racks 2. Then, floor-by-floor lifting of the slabs is performed, and after they are installed, the walls of the core of the stiffener core 10 are concrete-cast 2 with spacers 3 dismantle. The method according to the invention makes it possible to obtain a solid monolithic structure of the core both over the whole section and at the height, thereby increasing the strength and rigidity of the core under the action of horizontal loads. In addition, it becomes possible to combine floor slabs and internal hardness floor slabs into a single system, which naturally reduces the laboriousness of work both in the manufacture of a package of floor slabs and during lifting installation work. Finally, such a design of the core in the framework system allows external and internal floor slabs to be used as stiffeners for the walls of the core of the core, which significantly increases the load-bearing stability of the stiffener core. The invention The method of building a method of raising floors and floors, including the installation of columns, the manufacture of a package of floor slabs and their subsequent rise to design marks with hoists with loading rods, concreting the core, characterized in that, in order to reduce the complexity of work and increase the stability of the erected building on horizontal loads, simultaneously with the installation of columns of the building relative to the intersection of the axes of the walls of the core of stiffness inside and outside it set the pair inventory The racks are interconnected by struts on which they install hoists with cargo drafts, and in the manufacture of a package of floor slabs in places where the stiffener walls are formed, they are made through closed in plan slots with a configuration corresponding to the stiffener core configuration the plates are passed through the slots, and at the intersections of the axes of the walls of the core of rigidity in the slabs, collars are installed, covering the paired racks, then floor-by-floor lifting of the slabs, after Application to the design position where each floor concreted walls of the core hardness of the barrel, and in the construction of the latter on the entire height of the building inventory racks with spacers dismantle. Sources of information taken into account in the examination 1. Shahnazar and S. X and others. Construction of buildings by the method of lifting floors and ceilings. M., stroiizdat, 1974, p. 98-102. 2. Шахназар н С. X. и др. Возведение зданий методом подъема этажей и перекрытий . М., Стройиздат, 1974, с. 105-110 (прототип ).2. Shakhnazar and S. X. and others. The construction of buildings by lifting floors and ceilings. M., stroiizdat, 1974, p. 105-110 (prototype). фиг-5fig-5
SU792830454A 1979-11-05 1979-11-05 Method of erecting buildings by lifting floors and ceilings SU821671A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792830454A SU821671A1 (en) 1979-11-05 1979-11-05 Method of erecting buildings by lifting floors and ceilings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792830454A SU821671A1 (en) 1979-11-05 1979-11-05 Method of erecting buildings by lifting floors and ceilings

Publications (1)

Publication Number Publication Date
SU821671A1 true SU821671A1 (en) 1981-04-15

Family

ID=20855270

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792830454A SU821671A1 (en) 1979-11-05 1979-11-05 Method of erecting buildings by lifting floors and ceilings

Country Status (1)

Country Link
SU (1) SU821671A1 (en)

Similar Documents

Publication Publication Date Title
US3239990A (en) Multi-storey buildings
CN106869328A (en) A kind of suspension type modular architectural structural and its construction method
JP2002089043A (en) Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
US4137679A (en) Inverted, doubly-curved umbrella, hyperbolic paraboloid shells with structurally integrated upper diaphragm
US3524293A (en) Apparatus and method for construction of multistoried buildings
SU821671A1 (en) Method of erecting buildings by lifting floors and ceilings
CN111058476A (en) Beam lowering construction method of underground structure in reverse construction method
SU1682472A1 (en) Strip foundation
SU723082A1 (en) Multistorey building of prefabricated-monolythic type
JP3779797B2 (en) Seismic isolation system for steel frame ramen construction
SU857405A1 (en) Method of erecting rigidity core of multistorey building erected by method of lifting storeys and ceilings
SU1408034A1 (en) Multistorey building
JPH07268813A (en) Construction method of concrete structure
RU2116414C1 (en) Method for erection of sectional-and-monolithic buildings
SU831942A1 (en) Method of lifting the floors and ceilings of multistorey building
SU1263793A1 (en) Method of erecting buildings with prefabricated solid skeleton
US1906117A (en) Building and method of constructing the same
SE453411B (en) Prefab. concrete wall component
SU933901A1 (en) Prefabricated ferroconcrete framework of building or structure
JPH0791876B2 (en) Radiation shielding slab and its construction method
JPH04247127A (en) Outer wall construction works for underground floor
SU636355A1 (en) Multistoried building
SU1024575A1 (en) Method of erecting a building
SU853031A1 (en) High-building construction method
SU1760052A2 (en) Method of erecting building