SU657150A1 - Form for concreting reinforced concrete structures - Google Patents
Form for concreting reinforced concrete structuresInfo
- Publication number
- SU657150A1 SU657150A1 SU772535785A SU2535785A SU657150A1 SU 657150 A1 SU657150 A1 SU 657150A1 SU 772535785 A SU772535785 A SU 772535785A SU 2535785 A SU2535785 A SU 2535785A SU 657150 A1 SU657150 A1 SU 657150A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formwork
- reinforced concrete
- concrete structures
- concreting
- clamps
- Prior art date
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
(54) ОПАЛУБКА ДЛЯ БЕТОНИРОВАНИЯ ЖЕЛЕЗОБЕТОННЫХ(54) FORMWORK FOR CONCRETING CONCRETE
КОНСТРУКЦИЙCONSTRUCTIONS
Изобретение относитс к строительству и может быть применено при возведении вертикальных конструкций КЗ монолитного железобетона , преимущественно стен.The invention relates to the construction and can be applied in the construction of vertical structures of monolithic reinforced concrete, mainly walls.
Известна опалубка дл бетонировани железобетонных конструкций, состо ща из щитов и опорной части в виде обоймы, опираемой посредством стоек на фундамент или опо сывающей возводимую конструкцию 1 .A known formwork for concreting reinforced concrete structures, consisting of shields and a supporting part in the form of a cage, supported by means of racks on the foundation or surrounding the erected structure 1.
Недостатками известной опалубки вл ютс ее высока металлоемкость и значительные трудозатраты при монтаже и демонтаже .The disadvantages of the known formwork are its high metal consumption and considerable labor costs during installation and dismantling.
Цель изобретени - сокращение металлоемкости и трудозатрат на работах по монтажу и демонтажу.The purpose of the invention is to reduce metal consumption and labor costs for installation and dismantling works.
Цель достигаетс тем, что в опалубке дл бетонировани железобетонных конструкций , включающей опалубочные щиты и опору, последн выполнена в виде горизонтальных ст жек, на которых установлены опалубочные щиты, причем каждый из щитов имеет в нижней части зажимы и консоль с винтовым захватом.The goal is achieved by the fact that in the formwork for concrete casting of reinforced concrete structures, including formwork boards and a support, the latter is made in the form of horizontal bars, on which formwork boards are installed, each of the boards having clamps in the lower part and a console with screw grab.
На чертеже изображена опалубка в положении бетонировани ущиренной части стены, поперечный разрез.The drawing shows the formwork in the position of concreting the enlarged part of the wall, a transverse section.
Опалубка состоит из щитов, выполненных КЗ палубы 1 и каркаса 2 и имеющих в нижней части зажимы 3, взаимодействующие со ст жками 4, и консоль 5 с винтовыми захватами 6. Опалубка крепитс к стене 7.The formwork consists of shields made of a short-circuit deck 1 and a frame 2 and having clamps 3 at the bottom, which cooperate with straps 4, and a cantilever 5 with screw clamps 6. The formwork is attached to the wall 7.
Опалубка работает следующим образом.The formwork works as follows.
На отформованную часть стены укладывают ст жки 4, на которых с помощью зажимов 3 закрепл ют каркас 2. Вертикальную установку щитов опалубки, а также фиксацию ее в проектном положении 5 осуществл ют с помощью винтовых захватов 6, упирающихс в готовую часть стены 7 или в опалубку предыдущего руса. После монтажа опалубки в нее укладывают бетонную смесь и уплотн ют ее с помощью глубинных вибраторов. При наборе бетоном распалубочной прочности отпускают захваты 6, удал ют зажимы Z и переставл ют опалубочные щиты на очередную захватку дл бетонировани .Straps 4 are placed on the molded part of the wall, on which frame 3 is fastened with the help of clamps 3. Vertical installation of the formwork panels and its fixation in design position 5 are carried out using screw clamps 6 resting against the finished part of the wall 7 or into the formwork previous rusa. After installation of the formwork, the concrete mix is placed into it and compacted with deep vibrators. When the concrete has set up the stripping strength, the grippers 6 are released, the clamps Z are removed and the shuttering boards are moved to the next concrete grapple.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772535785A SU657150A1 (en) | 1977-11-19 | 1977-11-19 | Form for concreting reinforced concrete structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772535785A SU657150A1 (en) | 1977-11-19 | 1977-11-19 | Form for concreting reinforced concrete structures |
Publications (1)
Publication Number | Publication Date |
---|---|
SU657150A1 true SU657150A1 (en) | 1979-04-15 |
Family
ID=20729721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772535785A SU657150A1 (en) | 1977-11-19 | 1977-11-19 | Form for concreting reinforced concrete structures |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU657150A1 (en) |
-
1977
- 1977-11-19 SU SU772535785A patent/SU657150A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU657150A1 (en) | Form for concreting reinforced concrete structures | |
JPS5953981B2 (en) | Formwork method and its equipment | |
SU585984A1 (en) | Falsework for making building structures | |
SU977650A1 (en) | Method and device for forming opening in cast-in-place concrete wall erected in slipform | |
SU737600A1 (en) | Method of making a floor in sliding form | |
SU938750A3 (en) | Form for making ribbed cast-in-place reinforced concrete floor | |
SU724667A1 (en) | Form for concrete-coating of walls | |
JPS6347244Y2 (en) | ||
SU1099033A1 (en) | Forms for concreting monolithic floor | |
SU998693A1 (en) | Form for erecting monolithic ferroconcrete structure | |
JP2000160834A (en) | Step-up construction of concrete caisson | |
SU977644A1 (en) | Method for erecting cast-in-place buildings | |
SU755968A1 (en) | Method of erecting multistorey building with suspended storeys | |
SU1726699A1 (en) | Movable formwork | |
RU176337U1 (en) | FORMWORK CONCRETE FOR BRACKET OF INTERMEDIATE BRIDGE SUPPORT | |
SU842175A1 (en) | Form shield | |
RU55399U1 (en) | FORMWORK SYSTEM | |
SU1411414A1 (en) | Forms for concreting a solid ceiling | |
SU1366617A1 (en) | Hoistable and shiftable forms | |
SU691545A1 (en) | Shield form for the erection of cast-in-place reinforced concrete walls lined with a tile material | |
SU1606637A2 (en) | Solid wall formwork | |
SU863811A1 (en) | Slide for for erecting columns | |
SU659709A1 (en) | Device for erecting tall structures from monolithic reinforced concrete | |
RU2040659C1 (en) | Concrete form for forming projections along length or height of a structure to be erected | |
SU737595A1 (en) | Form for hollow concrete articles |