SU516820A1 - The way the open development of mineral deposits - Google Patents

The way the open development of mineral deposits

Info

Publication number
SU516820A1
SU516820A1 SU2052388A SU2052388A SU516820A1 SU 516820 A1 SU516820 A1 SU 516820A1 SU 2052388 A SU2052388 A SU 2052388A SU 2052388 A SU2052388 A SU 2052388A SU 516820 A1 SU516820 A1 SU 516820A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mineral deposits
way
ore passes
open development
underground workings
Prior art date
Application number
SU2052388A
Other languages
Russian (ru)
Inventor
Федор Климентьевич Алексеев
Владимир Григорьевич Храпач
Николай Иосифович Павликов
Борис Емельянович Ященко
Вадим Николаевич Китач
Борис Дмитриевич Иванов
Original Assignee
Научно-Исследовательский Горнорудный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Горнорудный Институт filed Critical Научно-Исследовательский Горнорудный Институт
Priority to SU2052388A priority Critical patent/SU516820A1/en
Application granted granted Critical
Publication of SU516820A1 publication Critical patent/SU516820A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

ционным способом доставл ют по рудоспугкам в подземные бункера 6. Из бунк-;ооБ 6 горную массу загружают в транспортные средства, например железнодорожные составы , и по подземным вскрывающим выработкам вывоз т к местам назначени  на поверхность.by means of the method, they are delivered to the underground bunkers through ore sparks 6. From the bunker; sg 6, the mountain mass is loaded into vehicles, such as trains, and transported to the surface sites along the underground opening workings.

Преимуществом предложенного способа  вл етс  сокращение числа и объема подземных выработок на погрузочно транспортном горизонте при одновременном увеличении количества приемных пунктов горной массы Б карьере, что, в свою очередь, снижает рассто ние дорогосто щих внутрикарьерных перевозок горной массы. В результате достигаетс  значительное сокращение объема капиталовложений и экономи  по экс плуатационным расходам на перевозку горной массы. При этом с углубкой горных работ эффективность способа не снижаетс , так как усть  рудоспусков перемещаютс The advantage of the proposed method is the reduction in the number and volume of underground workings on the loading transport horizon while simultaneously increasing the number of receiving points of the rock mass of the open pit, which, in turn, reduces the distance of expensive intra-mine transportation of the rock mass. The result is a significant reduction in investment and savings in operating costs for transportation of the rock mass. At the same time, with the deepening of the mining operations, the efficiency of the method is not reduced, since the mouths of the ore passes move

вслед за подвиганивм горных работ на глубину .following the plowing of mining work to depth.

Claims (2)

1.Способ открытой разработки месторождений полезных ископаемых, включающий вскрытие подземными выработками, проведение рудоспусков дл  гравитационной доставки горной массы из карьера к подземны выработкам и отработку уступами, о т л ич а ю щ и и .с   тем, что, с целью сокращени  числа и объема подземных выработок на погрузочно-транспортном горизонте, провод т дополнительные наклонные рудоспуски, соедин ющие уступы рабочей зоны карьера с рудоспусками дл  гравитационной доставки горной массы.1. The method of opencast mining of mineral deposits, including the opening of underground workings, conducting ore passes for gravitational delivery of rock from the quarry to underground workings and mining with ledges, so that, in order to reduce the number and the volume of underground workings on the loading and transport horizon, additional inclined ore passes are carried out, connecting the ledges of the working area of the quarry with the ore passes for gravitational delivery of the rock mass. 2.Способ по п. 1, отлича ющийс   тем, что дополнительным рудоспуском придают наклон навстречу продвиганию рабочих уступов.2. The method according to claim 1, characterized in that the additional ore passes are inclined towards the advancement of working benches. .1.one
SU2052388A 1974-08-09 1974-08-09 The way the open development of mineral deposits SU516820A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU2052388A SU516820A1 (en) 1974-08-09 1974-08-09 The way the open development of mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU2052388A SU516820A1 (en) 1974-08-09 1974-08-09 The way the open development of mineral deposits

Publications (1)

Publication Number Publication Date
SU516820A1 true SU516820A1 (en) 1976-06-05

Family

ID=20593703

Family Applications (1)

Application Number Title Priority Date Filing Date
SU2052388A SU516820A1 (en) 1974-08-09 1974-08-09 The way the open development of mineral deposits

Country Status (1)

Country Link
SU (1) SU516820A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4938536A (en) * 1989-11-22 1990-07-03 Lee Raymond C Conic mass caving structure and method
CN102486090A (en) * 2010-12-01 2012-06-06 中国华冶科工集团有限公司 Method for recovering upper boundary residual mine and forming lower mining cover layer of stope
CN108397196A (en) * 2018-01-16 2018-08-14 中蓝长化工程科技有限公司 A kind of gently inclined orebody open air trestle mining methods based on lattice guest's artificial ore pillar

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4938536A (en) * 1989-11-22 1990-07-03 Lee Raymond C Conic mass caving structure and method
CN102486090A (en) * 2010-12-01 2012-06-06 中国华冶科工集团有限公司 Method for recovering upper boundary residual mine and forming lower mining cover layer of stope
CN108397196A (en) * 2018-01-16 2018-08-14 中蓝长化工程科技有限公司 A kind of gently inclined orebody open air trestle mining methods based on lattice guest's artificial ore pillar
CN108397196B (en) * 2018-01-16 2019-10-18 中蓝长化工程科技有限公司 A kind of gently inclined orebody open air trestle mining methods based on lattice guest's artificial ore pillar

Similar Documents

Publication Publication Date Title
US4103972A (en) Open pit mine
SU516820A1 (en) The way the open development of mineral deposits
SU1564347A1 (en) Method of layer-wise working of thick steep coal strata by poles on slope
SU1353889A1 (en) Mine pit-bottom
SU659747A1 (en) Method of mineral deposit opening
SU877009A1 (en) Method of strip mining of mineral deposits
RU2039267C1 (en) Method for formation of open pit transfer point
SU605000A1 (en) Method of bypassing rock from quarry steps
SU502116A1 (en) The executive body of the tunnel miner
SU699181A1 (en) Method of internal dump formation
SU691578A1 (en) Method of filling a space after mining
SU1756567A1 (en) Method for mineral opencast mining
SU1004637A1 (en) Method of opening-up mine working levels
SU899949A1 (en) Method of stripping mining of mountainous mineral deposits
SU1700248A1 (en) Method of mineral opencast mining
ES8703572A1 (en) Method and equipment for mining steep mineral seams, particularly coal seams
SU395580A1 (en) PAT [NUHSH-T1AK; G; E: KAYA
SU1479645A1 (en) Method of strip mining of mineral depostits
SU1677314A1 (en) Method for working gently sloping coal seams
SU773268A1 (en) Method of open-cast mining of mineral deposits
SU1686171A1 (en) Method for opencast mining of minerals
SU1267487A1 (en) Discharging-crushing unit of underground hopper complex
SU819311A1 (en) Method of underground leaching of minerals
RU2070292C1 (en) Method for stripping and development of inclined and steeply dipping deposits
SU956792A1 (en) Method of excavation of deposits