SU412099A1 - - Google Patents

Info

Publication number
SU412099A1
SU412099A1 SU1610104A SU1610104A SU412099A1 SU 412099 A1 SU412099 A1 SU 412099A1 SU 1610104 A SU1610104 A SU 1610104A SU 1610104 A SU1610104 A SU 1610104A SU 412099 A1 SU412099 A1 SU 412099A1
Authority
SU
USSR - Soviet Union
Prior art keywords
car
loading
conveyor
weight
continuously
Prior art date
Application number
SU1610104A
Other languages
Russian (ru)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1610104A priority Critical patent/SU412099A1/ru
Application granted granted Critical
Publication of SU412099A1 publication Critical patent/SU412099A1/ru

Links

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)
  • Intermediate Stations On Conveyors (AREA)

Description

Известе  опособ пог.рузии сыпучих и кусковых материалов в вагоны с открытыми кузовами , по которому вагоны лоследо вательно устанавливают на платформениые весы, а 1материал подают в вагон с 1помощью зацрузочного конвейера, чел.ноч1но |пере1мещаемого вдоль. Од1нако по окоН1ча.н.и« заполиени  вагона прек,ращают постуиление мате1риала на транапортиру1Ю1Щий орган, при этом в лроцессе запоЛНеии  вагонов создаютс  паузы - основна , вызываема  возвратам конвейера в исход1ное положеиие, и допол ительна , св занна  с необходимостью прохожден-и  вновь поданного 1на траиопюртирующий орган материала 1ПО загрузоч1НОму коивейеру, что снижает (Производительность по грузки. Кроше того, распределение материала вдоль кузова вагона осуществл ют лнбо при посто нной акоросши, либо в повторных 1К ратковрвмбН1Ных л(уанов загрузочного конвейера. При эг01М не достигаетс  соответствие .между 1интенс,ивностью inoTOiKa (материала паст упающег10 в агон, a-t .окорость ра-апределени  этого материала в вагоне, особенно в -случ-ае лог,р1уз1ки лвгковеоньж матернашов. Целью изобретени  Я1вл вто  завышение П ро;иэводи,тельности погру13,ки и уееличение точности дозировани . Это достигаетс  тем, что материал подают на загрузочный конвейер непрерывно, а скорость леремещениЯ iKOHiBefiiepa «замен ют пролорцианальво скорости иарастанн  веса материала и непрерывно измер ют нарастающий вес. По предложенному опосо.бу вагоны по следователыно устанавливают на платформенные весы. Материал 1подаю т ъ вагоны загрузочным конвейером, челночно лерамещающвмс  над вагоном вцоль него. Заиолнение вагона начинают с orcbiHiKH объема первичного -конуса при н0под1ви1Ж1но)М лоложении загрузочного конвейера , после чего конвейер перемещают вдоль вагона со скоростью, пропорциональной скорости нарастани  веса вагона. Нарастающий вес измер ют непрерывно. По окончании заполнени  вагона загрузочный конвейер перемещают в исходное положение дл  занолнени  очере1дного вагона, не лрек1р.аща1Я шодачу .материала на транспортирующ;ий ор.ган 1КОнвейера, который в это врем  не работает. Материал накапливают на неработающем транопортирующе(м органе и С1б1ра1сы1вают его в вагон при заполнени и объема начального конуса. 34It is known a method of running loose and lumpy materials into cars with open bodies, through which cars are subsequently installed on platform scales, and 1 material is fed into the car with 1 help of a conveyor belt, man-traveled along | However, about a quarter of the carriage of the wagon, the material was displaced by the transport agency, while pauses are created in the process of filling the wagons - the main cause of the return of the conveyor to the original position is added by the suspension. 1 on the traiopurtier body of the 1PO material to the loading co-fayer, which reduces (load capacity. In addition, the distribution of the material along the car body is performed at a constant acoroschi, or in repetitive 1К It is not possible to meet the conformity between the injetoi and the inoTOiKa (the material of the paste falling into the agon, at. The rate of distribution of this material in the car, especially in the case of the log, the logging of the matrices). This is due to the fact that the material is fed to the loading conveyor continuously, and the iKOHiBefiiepa depletion speed is replaced by the prolactan speed and the weight of the material and is continuously measured by increasing weight. According to the proposed package, the cars are subsequently installed on the platform scales. Material 1 is delivered to the wagons by the loading conveyor, which is shuttled over the wagon over the wagon. The charging of the car starts with orcbiHiKH of the primary volume of the cone at the bottom of the loading conveyor, after which the conveyor is moved along the car at a speed proportional to the rate of increase of the car weight. The increasing weight is measured continuously. At the end of the filling of the car, the loading conveyor is moved to its original position to fill a single car without losing any shodach of the material on the transport, or the iron, which doesn’t work at that time. The material is accumulated on the inoperative transshipment body (C organ and S1b1ra1s1vayut it in the car when filling and volume of the initial cone. 34

Предмет и з о б р- е т е н д  с  тем, что, с целью повышени  про-изводиСпособ иогрузки сыпучих и кусковых мате-знр01ва;нн1Я, материал подают на загрузочный риалов в вагоны путем последовательной уста-«OHiBefleip непрерывно, а скорость перемещени  Н01ВКИ вагонов на платформенные весы и за-5 конвейера измел ют пропорционально скополиени  их с помощью загрузочного конвейе-рости нарастани  веса .материала и непрерывра , неремещае-мого вдоль вагона, отличающий-но из мер ют нарастающий вес.The subject and concern is that, in order to increase the production of bulk and lumps of materials and materials, the material is fed to the loading rials in the wagons by sequentially setting the OHiBefleip continuously, and the speed Moving the truck's N01VKIs onto platform scales and behind-5 conveyors is crushed proportionally to their replenishment with the help of a loading conveyor to increase the weight of the material and uninterruptedly along the car, but the measured weight is different.

412099 412099

телыносги погрузки и у1вел1ичени  точности доbody loading and accuracy

SU1610104A 1971-01-06 1971-01-06 SU412099A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1610104A SU412099A1 (en) 1971-01-06 1971-01-06

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1610104A SU412099A1 (en) 1971-01-06 1971-01-06

Publications (1)

Publication Number Publication Date
SU412099A1 true SU412099A1 (en) 1974-01-25

Family

ID=20463391

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1610104A SU412099A1 (en) 1971-01-06 1971-01-06

Country Status (1)

Country Link
SU (1) SU412099A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2674898C2 (en) * 2014-01-30 2018-12-13 Плассер Энд Тойрер Экспорт Фон Банбаумашинен Гезельшафт М.Б.Х. Method of loading railway vehicle and railway vehicle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2674898C2 (en) * 2014-01-30 2018-12-13 Плассер Энд Тойрер Экспорт Фон Банбаумашинен Гезельшафт М.Б.Х. Method of loading railway vehicle and railway vehicle

Similar Documents

Publication Publication Date Title
ZA75288B (en) Gear mounted on a lorry, for tipping a container, and loading and unloading a container over rolling means
GB1328729A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle
SU412099A1 (en)
GB1338183A (en) Apparatus for loading particulate material onto open railway trucks
SU709487A1 (en) Method of loading loose and bulk loads into railway cars
GB679981A (en) Container for the transport in bulk of powdery or granular materials
GB1129836A (en) A device for loading trucks by gravity
ES455010A1 (en) Wagon loading equipment with adjustable chutes - has two offset chutes joined together and each rotating about vertical axis
SU627038A1 (en) Method of bringing open-box car weight to required value
GB253021A (en) Improvements relating to trucks or wagons for transporting materials
FR2310293A1 (en) Horizontal conveyor system for truck loading - has discharge end of final conveyor movable to remain over empty trucks
SU979867A1 (en) Method of batch-loading loose materials to freight cars
SU611813A1 (en) Method of averaging ore composition
SU132598A1 (en) Self-propelled machine for loading and transporting bulk material in mine conditions
RU93004483A (en) WAGON LOADER
SU601206A1 (en) Loose material loading/unloading unit
SU701907A1 (en) Method of loading a predetermined weight batch of granular and lump materials in gondola cars
SU78589A1 (en) Device for mechanizing the supply of bulk and lump materials from the central factory warehouse to the consumer shops
GB894540A (en) Improvements in or relating to vehicles for carrying bulk loads of powdered granularand like substances
SU441415A1 (en) Conveyor belt for transporting rock mass
US1422493A (en) System of conveying and delivering material to carriers
SU709469A1 (en) Arrangement for unloading loose loads from hoppers onto belt conveyer
SU99436A1 (en) Mobile unloading vehicle platform
SU397390A1 (en) DEVICE FOR DOSED UNLOADING OF BAD BULK MATERIALS FROM THE VEHICLE
SU1204530A2 (en) Device for metered loading of loose materials to railway open wagons